Scheduling: Minimizing the input while maximizing the output
Chris Ackerman, PMI-SP Rick Fox, PMPSSOE Group SSOE Group
4/16/2012
3
Did you miss the mark?• Is your schedule more than
just wallpaper?• Is your schedule usable at all
stakeholder levels?• Is your schedule easy to
maintain?• Are your schedule reports
meaningful?
4/16/2012
4
• Utilization of Multiple Projects
• Benefits of Activity Steps
• High Level Resource Planning
• Primavera Reporting
Presentation Topics / Takeaways
4/16/2012
5
• Allows for simultaneous updating by multiple users
• Allows project stakeholders (Responsible Resources) the ability to focus on relevant information
• Ease of baseline maintenance
Utilization of Multiple Projects
4/16/2012
7
• Allows for simultaneous updates by multiple users
• Each project can be updated independently
• Each project can be baselined independently
4/16/2012
8
• Allows for efficiency in re-baselining• Keeps detailed history of project baselines• Projects tracked against current approved scope
Maintain Baseline Assign Baseline
4/16/2012
9
• Keeping the detail while minimizing activities• Less logic to manage• Allows greater flexibility in activity sequencing• Streamline schedule creation through the use
of templates• Use steps to create checklist reports
Benefits of Activity Steps
4/16/2012
11
Creation and storage of step templates for future use allows schedules to be created in minutes / hours rather than days.
4/16/2012
12
Allows end users the ability to view and update project status without having access to the software
4/16/2012
13
High Level Resource Planning• Use discipline level resources with average
billing rates• Resource assignment on WBS
Summary/LOE activity types• Resource leveling through the use of curves
4/16/2012
14
High Level Resource (i.e. Job Classification or Department)• Assigning and updating is more user friendly
• Less time consuming• Easier to manage
4/16/2012
19
• Use of layouts to create reports• Custom filters on activity codes, user defined
fields, existing fields• Custom formatting for enhanced output
Primavera Reporting Output Solutions
4/16/2012
21
• Filter activity table to show required information (WBS Summary activities with Est. Weight = 2).
• Select Tools > Report Wizard from the menu bar.
• Select Use Current Screen in the Report Wizard.
4/16/2012
22
Report created from layout with incorporation of UDF’s for spreadsheet appearance, filtered to extract requested information, and custom formatting to enhance presentation.
4/16/2012
23
Another example of custom filtering and formatting to enhance report output and appearance.
4/16/2012
24
• Gained efficiency by minimizing schedule input• Gained knowledge and visibility by maximizing
schedule output• Enhanced communication by bridging the gap
between production and management
ConclusionThe methods mentioned above help to achieve the following:
4/16/2012
25
Scheduling: Minimizing the input while maximizing the output