s u r r y h i l l s f e s t i v a l / / s u s p e n d e d l i g h t i n g e x h i b i t i o n

u n e s c o d e s i g n c o m p e t i t i o n / / b a m i y a n c u l t u r a l c e n t r e

r a n d w i c k 1 b e d u n i t / / r e n o v a t i o n p r o j e c t

Page 3: SeanVirili summary

Tonic water, bottles + elbow grease are the key ingredients to a successful lighting installation. Suspended from 6 metres above the ground, over 400 carbon neutral bottles were filled with tonic water and lit up at nightfall with UV lights. The only brief requirement was to successfully install a suspended lighting. Working with extant structure and obstacles, we decided to introduce an interven-tion which would change the skyline for one day. Taking over the local neighbourhood, Surry Hills Festival uses parks, laneways and other spaces in the suburb for an annual 1 day festiv event. Gin&-Juice was selected for use in the Velvet Cave area housing over 2000 guests over the course of the event.

G I N &J U I C E

S U R R Y H I L L SF E S T I V A L

Page 4: SeanVirili summary
Page 5: SeanVirili summary
Page 6: SeanVirili summary

After a long period of turmoil, Afghanistan is

beginning its second decade of democratic gover-

nance. The emerging government has had to

manage ongoing instability while taking steps to

rebuild the nation’s infrastructure, which has been

devastated by over 30 years of conflict and neglect.

Further exacerbating these rebuilding challenges is

the geographic isolation and limited access to

resources of some parts of the country. Practicality

in construction meathods is crutial under such

conditions and a design based on prefabrication is

being proposed. The centre aims at promoting

heritage safe-guarding and cross-cultural awareness.

B A M I Y A NCULTURAL CENTRE

U N E S C OCOMP E T I T I O N

Page 7: SeanVirili summary
Page 8: SeanVirili summary
Page 9: SeanVirili summary

Bligh Apartment is an ongoing private project

involving the complete renovations of a one

bedroom flat in the Sydney area. Being an invest-

ment property, a specific brief was tailored to

maximise the targeted buyer demography.

The flat will see the removal of a partition wall in

order to promote open plan living and increased

natural light for the otherwise dark space. All

joinery is bespoke, ensuite is expanded by moving

the laundry and all kitchen appliances are

concealed.

B L I G H

APAR TMENT

R A N D W I C KR E N O VAT I O N

Page 10: SeanVirili summary

ELEVATION KITCHEN/LOUNGE JOINERY 1

A101 1:20

AMENDMENT

ISSUE DESCRIPTION BY DATE

DRAWING TITLE

DRAWING STATUS

SCALE

DRAWING NO. ISSUE NO.

BLIGH UNIT4/4C BLIGH PLACE RANDWICK EL DORADO NSW 2032

PROJECT NAME & ADDRESS

DATE NORTH

A NB

16-11-14

1:20

KITCHEN JOINERY ELEVATION

DR

OP

OP

OP

DR

DR

DR

DR

DR

DR

GENERALLY, THE BUILDER SHOULD COMPLY WITH LOCAL AUTHORITYREQUIREMENTS AND ADHERE TO THE PROVISION OF THE BUILDING CODEAUSTRALIA, BUILDING SERVICE (N.S.W.) AND OTHER RELEVANT AUSTRALIANSTANDARDS. ALL DIMENSIONS SHOWN ON THE DRAWING ARE TO BE CHECKEDON SITE BEFORE COMMENCING WORK AND QUERIES ARE TO BE DIRECTED TOTHE DESIGN AUTHORITY. FIGURE DIMENSIONS ONLY ARE TO BE USED, WITH NODIRECT SCALING FROM THE DRAWINGS ALLOWED. ALL LEVELS ARE TO BECHECKED AND VERIFIED ON SITE BEFORE COMMENCING WORK. THIS DRAWINGIS COPYRIGHT AND IS THE PROPERTY OF CUBIT DESIGN AND MUST NOT BE

LEGENDOP - OPEN SHELFDR - DRAWERSL - SLIDER PANELDW - DISH WASHEROV - OVENFB- FUSE BOXRH - RANGEHOODFR - FRIDGE FREEZER

SL SL

FB

A-002A200

JF

JF

JF

PT1

PT1

PT1

PT1

PT1

PT1

PT1

EQ8

TL1TL1

PT1PT1PT1PT1 PT1

PT1

EQ9

EQ5

EQ10

PT1PT1

EQ6

PT1PT1

EQ11

PT1

REVIEW DRAWING: ENGINEERED TIMBER

FLOOR ING THICKNESS

Page 11: SeanVirili summary

AMENDMENT

ISSUE DESCRIPTION BY DATE

DRAWING TITLE

DRAWING STATUS

SCALE

DRAWING NO.

GENERALLY, THE BUILDER SHOULD COMPLY WITH LOCAL AUTHORITYREQUIREMENTS AND ADHERE TO THE PROVISION OF THE BUILDING CODEAUSTRALIA, BUILDING SERVICE (N.S.W.) AND OTHER RELEVANT AUSTRALIANSTANDARDS. ALL DIMENSIONS SHOWN ON THE DRAWING ARE TO BE CHECKEDON SITE BEFORE COMMENCING WORK AND QUERIES ARE TO BE DIRECTED TOTHE DESIGN AUTHORITY. FIGURE DIMENSIONS ONLY ARE TO BE USED, WITH NODIRECT SCALING FROM THE DRAWINGS ALLOWED. ALL LEVELS ARE TO BECHECKED AND VERIFIED ON SITE BEFORE COMMENCING WORK. THIS DRAWINGIS COPYRIGHT AND IS THE PROPERTY OF CUBIT DESIGN AND MUST NOT BEUSED WITHOUT IVDL'S DIRECT PERMISSION.

ISSUE NO.

BLIGH UNIT4/4C BLIGH PLACE RANDWICK EL DORADO NSW 2032

PROJECT NAME & ADDRESS

DATE NORTH

A NB

ENSUITE ELEVATION 2

TOILET CABINET ELEVATION6

1:20

VANITY ELEVATION7

1:20

REVISION-DRAFT-1

16-11-14

1:20

DR

OP

OP

OP

DR

LEGENDOP - OPEN SHELFDR - DRAWERMI - MIRRORSH - SHOWER

SH

A-002A400

STTMI

JF

PT1

EQ4

STT

EQ1

EQ12

STT

STT

EQ12

EQ1

EQ2

MI

STT

JF

JF

PT1

A101 A101

Page 12: SeanVirili summary

w w w . i n t r a v e n o u s - d l . c o m

s e a n@ i n t r a v e n o u s-dl . c o m

+ 6 1 . 4 0 2 . 6 9 4 . 3 3 7