Signalling Programme en Fjernbane East in Denemarken Schaal, standaardisatie en ‘collaboratie’
IRSE bijeenkomst , 28 augustus 2013
Ello Weits
Even voorstellen: Ello Weits
• Sinds 1998 in dienst van Movares
• Diverse projecten op het gebied van spoorwegveiligheid en spoorwegcapaciteit
• In 2011 en 2012 Safety assurance manager, Signalling System Hanzelijn van Alstom
• Sinds 2012 Safety manager, TMS Subsysteem van Fjernbane East Signalling System van Alstom
Signalling Programme en Fjernbane East
Inhoud
• A. Achtergrond Signalling Programme
− Investeringen in spoor − (Investeringen in openbaar vervoer en infrastructuur) − Belangrijkste speler: Banedanmark
• B. Signalling Programme
• C. Fjernbane East (met een accent op Traffic Management System)
• Enkele conclusies
Signalling Programme en Fjernbane East
‘Acknowledgements’
• Deel A: presentatie Jesper Hansen, CEO Banedanmark
• Deel B:
− presentatie Morten Søndergaard, Programme Director Signalling Programme
− Signal& Draht artikel (6/2013) van Georg Köpfler, Gunnar Lohmann, Baghar Ghias Haddadan, Christina Stenderup Jensen, Erik Damgaard, Paul Visser en Maurice Ezratty
• Deel C: Paul Visser, Alstom project manager van Fjernbane East project
Signalling Programme en Fjernbane East
A. Achtergrond Signalling Programme
• Grote investeringen in transport, openbaar vervoer, rail
• Voor rail 3 jaartallen: 2007, 2009 en 2013
Signalling Programme en Fjernbane East
Agreement on Traffic for 2007 (Aftale om trafik for 2007)
• Poor performance in 2005-2006
• Political agreement (concerning rail):
− Full catch up with multi-annual agreement for the years 2007 -2014 − Yearly investments in renewal: Ca. DKK 1,5 billion (€ 201 million) − Yearly investments in maintenance: Ca. DKK 1 billion (€ 134 million) − Focus on track renewal & maintenance − Decision in principle to replace existing signalling systems in 2018 – 2020
using ERTMS Level 2
Signalling Programme en Fjernbane East
2009
• ‘Signalling Programme’ goedgekeurd in parlement
• ‘Green transport policy’: massive investments in the Danish railway network
− Shorter travel times − Development of coverage in metropolitan areas − Better and new stations − Fixed connection to Germany: Femern Belt (of: Fehmarn Belt) − New line Copenhagen - Ringsted
Signalling Programme en Fjernbane East
Signalling Programme en Fjernbane East
Spoorkaart
• Femern Belt
• Copenhagen - Ringsted
2013: Togfunden.dk
• March 2013:
− Reducing travel time to one hour between the major cities in Denmark (Copenhagen → Odense → Aarhus → Aalborg)
Signalling Programme en Fjernbane East
Projecten (2009, 2013)
Signalling Programme en Fjernbane East
Investeringen
2007
2009, 2013
2007, 2009
2009, 2013
Signalling Programme en Fjernbane East
Other/related infrastructure investments
• Storebælt (Great Belt): from Fyn to Sjælland)
• Øresund Belt (from Copenhagen to Malmö)
• Metro in Copenhagen
• Metro city ring in Copenhagen.
• Road investments (e.g. Femern connection for road)
Signalling Programme en Fjernbane East
Banedanmark
• Banedanmark is the state owned infrastructure owner controlling traffic, maintaining infrastructure assets
• DSB → Banestyrelsen (1997) → Banedanmark (2004)
• Key figures
− 2,200 employees − 170+ mill. passengers yearly − 15 mill. ton freight − Track: 3240 km − Bridges: 2342 − Remote control: 16 − Stations: 307 − Level Crossings: 750
Signalling Programme en Fjernbane East
Tussentijdse conclusie
• Politiek klimaat gunstig voor investeringen in OV en rail
− Financiering − Lange termijn afspraken − Durf om over te gaan tot een ‘total renewal’
Signalling Programme en Fjernbane East
Signalling Programme
• Aanleiding
− Einde levensduur van circa 60% van de beveiliging vóór 2024
− 50% of today's train delays are due to signalling failures
• Optie: total renewal (p.8)
− Van treindetectie en wisselsteller tot aan verkeersleiding (TMS)
− Kostenvoordelen (schaalvoordelen, standaardisatie, competitie, minder interfaces, minder safety approvals, goedkoper onderhoud & operatie)
− Meer veiligheid − Key benefits geven de doorslag
Signalling Programme en Fjernbane East
Key benefits
• 80% reduction in signalling related train delays → punctuality to be increased by 2.8 % via the Signalling Programme
• Reductie rijtijden
• Verhoging capaciteit:
− Signalling system shall, in combination with other types of infrastructure investments and process improvements, enable a doubling of the railway transport capacity in 2020, compared to the traffic level of 2008
• Modern Traffic management (m.b.v. Decision Support System, DSS, for rescheduling) and ATO (Automatic Train Operation )
• Better data for Traffic information (real time service information for passengers)
• Energiezuining rijden (m.b.v. ‘Driver Guidance Tool’) Signalling Programme en Fjernbane East
Scope
• Fjernbanen en S-banen: 4 grote contracten
− S-banen: Siemens − Fjernbane East: Alstom − Fjernbane West: Thales-BBR − On-board: Alstom (789 trains / 41 operators)
• Overige projecten
− ‘Operational Rules’ − Fixed Transmission network − GSM-R − STM − Training − 2 new Control Centres
• Investeringskosten: circa 2 miljard euro
Signalling Programme en Fjernbane East
Strategie
• New operational rules: remove national monopoly barriers
• Breng consequenties in beeld van nieuwe ‘operational rules’
• Early dialog with suppliers & Functional requirements
− Let the Supplier supply existing systems, proven technology
• Dedicated organisation and international team
− Nauw contact met Deense belanghebbenden (m.n. Banedanmark, NSA) − Direct contact met leveranciers, ‘Collaboration approach’
• Migratiestrategie
Signalling Programme en Fjernbane East
Migratie
• Early deployment is separate fase in project
− Pilots − Testen tijdens niet-
operationele uren − Switch-over system
• Vervolgens seriematige uitrol
Signalling Programme en Fjernbane East
Globale planning
Signalling Programme en Fjernbane East
Risico’s
• Ondanks standaardisatie en ‘proven technology’: complexiteit
− Technisch
• bestaande en nieuwe interfaces, o.a. Oost-West, Zweden, Duitsland
• nieuwe (deel)systemen, m.n. DSS − Migratie (Total renewal is geen ‘greenfield’!) − Planning − Veel belanghebbenden − Safety approvals
• Spanning tussen risicoreductie en ambitie (kansen grijpen)
Signalling Programme en Fjernbane East
Belangrijkste extra mitigaties
• Collaboration (on the basis of Collaboration agreement)
− Joint design − Co-location − Collaboration agreement >> 10
commandments − Shared risk assessments
• ‘Collaboration betreft expiciet
− Samenwerking Banedanmark en leveranciers − Samenwerking leveranciers onderling
• JTL – Joint Test Lab
− In Kopenhagen − Systeemintegratie (externe interfaces)
Signalling Programme en Fjernbane East
Collaboration
Signalling Programme en Fjernbane East
Tussentijdse conclusies
• Voordelen ‘total renewal‘
− Kostenvoordelen door onder meer grote contracten
− ‘Key benefits’ door aangrijpen van kansen/innovaties
• Nadelen ‘total renewal‘
− Risico’s vanwege complexiteit
Signalling Programme en Fjernbane East
C. Fjernbane East
• Scope: 12 lines, 87 stations, 650 km
• Systeembeschrijving
• Systeemontwikkeling
Signalling Programme en Fjernbane East
Telecom & Network
ETCS
ETCS level 2
ICONIS
Traffic Management System through the ICONIS Operation
Control Center
SMARTWAY
SMARTWAY range of trackside products
FTN & GSM-R Network
ATLAS 200 is the technical solution for F-Bane East line
Signalling Programme en Fjernbane East
SMARTLOCK
Interlocking control through SMARTLOCK
SMARTLOCK – The Interlocking Solution
Signalling Programme en Fjernbane East
• SMARTLOCK 400 GP (2oo3) + Smart IO
• Per line a Main Technical object building
• Per station and along the line Satellite Technical Object Buildings
• Fiber optic network
• Point machine: P80 and MET
• Train detection: axle counters
• Level crossings (cabinet or shelter depending on the local implementation)
• RBC (2oo3) same hardware as for the interlocking
• ETCS level 2 on conventional and new lines (max speed 200 kph)
• Compliancy to UNISIG Baseline 3.0
• Trackside-Train communication based on GPRS technology
• Online Key Management System for secure on-line access control
ETCS – The Automatic Train Control Solution
Signalling Programme en Fjernbane East
• Integrated TMS Solution (modular approach for scalable performances)
• Centralisation of traffic management in Denmark will be based on two Traffic Control Centers, one in Copenhagen (East lot) and one in Fredericia (West lot).
• Alstom will deliver the advanced functions (in Decision Support System, DSS) for rescheduling
− Late booking or changes to booking − Conflict detection and resolution
• Alstom will deliver offline scheduler
• BDK owned interfaces
• Human factor studies to be performed by the supplier
• Hand held terminal to support maintenance operation
ICONIS – The Traffic Management Solution
Signalling Programme en Fjernbane East
F-Bane East: Overall System Architecture
Traffic Control Centre (TCC)
TMS
Level Crossing
LX Controller
Satellite TOB
Object Controller Axle Counter CIXL RBC
Main TOB
Fixed Transmission Network (FTN)
Disaster Recovery
TMS
CIXL RBC
Backup TCC Maxi Main TOB
Satellite TOB
Axle Counter
F-Bane East: Integration with External Systems
Fjernbane Infrastructure System
(FbIS)
Catenary
Management
System
TMS Existing
fjernbane
Offline
Production Plan
Point Heating
Control System
Possession
Planning System
Punctuality/Delay
Reporting
System
Telephone
Exchange/
Switchboard
Neighbouring
Key Management
Centre
UT circular
System
Road Signalling
System
Interlocking
Private lines
Interlocking
Existing
Fjernbane
TMS private lines
Time Reference
RBC Foreign
Railway
TMS
Neighbouring
Fjernbane
Infrastructure
Interlocking
Neighbouring
Fjernbane
Infrastructure
Interlocking
S-bane
(existing and
new)
Interlocking
Foreign Railway
Identity
Management
System
Passenger
Information
System
Po
int h
ea
tin
g
mo
nito
rin
g (
44
2)
Pla
nn
ed
po
sse
ssio
ns (
99
)
Pla
nn
ed
Ca
t. S
hu
toff (
17
3)
Handover train (276,279)
Handover train (276,279)
Handover train (276,279)
ERTMS Fitted
Train
(Level 0, 2-DK, 2,
STM)
RBC
Neighbouring
Fjernbane
Infrastructure
TMS Foreign
Railway
Handover train (476)
Receive train (475)
Foreign Key
Management
Centre
Tra
in T
raffic
on
Mig
rate
d tra
cks (
44
5)
Tra
in T
raffic
on
No
n
mig
rate
d tra
cks (
44
4)
Bridge position (606)
Bridge release (241)
Point positions (351)
SCADA(SRO)
Systems
Sund & Bælt
Hot Axel Box and
Derailment
Detector
Time synchronisation (264)
Sto
p/r
esu
me
tra
ins (
23
0)
SC
AD
A A
larm
s (
62
9)
Receive train (278,429)
File SystemGSM-R
CCTV
Emergency
Services
(Alarmcentralen
112)
Tra
in p
ositio
ns (
58
9)
Ch
an
ge
s to
On
line
Pro
du
ctio
n P
lan
(6
30)
Handover train (276,279)
Bascule Bridge
Receive train (278,429)
Receive train (278,429)
Receive train (278,429)
Handover train (276,279)
Receive train (278,429)
Handover train (476)
Receive train (475)
Enterprise Service Bus (ESB)
Enterprise Service Bus (ESB)
Train Status
Train data from TOC (192)
Change Online Production Plan (492)
Reject/Accept offered changes (624)
Driver (499)
Driver Feedback (611)
Guard Feedback (640)
Vehicle and staff roster (646)
Online Production Plan (45) *
Offer Changes to Online Production
Plan or Service Intention (623)
Confirm Changes (625)
Impose Changes (626)
Predicted Delays (46) *
Train positions (80) *
Infrastructure status (87)
Report booking status (405)
Planned Temp. Speed Restriction (482)
Temp & Emerg. Speed (483) *
Planned Temp. Possess. (484)
Possessions (485) *
Low adhesion (486) *
Catenaries (487) *
Cancel Online Production Plan (493) *
New trains (494) *
Changing stopping patterns (495) *
Production Plan information (497)
Arrivals/departures (503) *
Train route (504) *
Use
r A
uth
en
tica
tio
n (
51
7)
Up
da
te tra
in p
ath
(5
77
)
De
lete
tra
in p
ath
(5
78
)
Arr
iva
l (5
79
)
De
pa
rtu
re (
58
0)
De
lay (
58
1)
Pla
tfo
rm c
ha
ng
es (
63
1)
Ne
w c
om
mitte
d c
on
n. (6
32
)
Cu
rre
nt T
rain
Po
sitio
n (
63
3)
On
line
Pro
du
ctio
n P
lan
(6
34
)
Tele
gra
mjo
urn
ale
n O
utp
ut (2
54)
Log O
utp
ut (2
7)
Pro
duct
ion P
lan e
xport (38)
Exp
ort o
f P
layb
ack
Sess
ion (627)
Ha
nd
ove
r tr
ain
to
Sw
ed
en
(4
64
)
Ha
nd
ove
r tr
ain
to
Ge
rma
ny (
46
6)
Re
ce
ive
tra
in fro
m S
we
de
n (
46
5)
Re
ce
ive
tra
in fro
m G
erm
an
y (
46
7)
Priva
te L
ine
Sta
tus (
15
7)
Re
ce
ive
tra
in (
59
9)
Ra
ilwa
y s
tatu
s (
15
8)
Ha
nd
ove
r tr
ain
(5
98)
Se
nd
On
line
Pro
du
ctio
n P
lan
(6
8)
Se
nd
Ra
ilwa
y s
tatu
s (
20
2)
Se
nd
Tra
in p
ositio
ns a
nd
de
lay (
50
9)
Re
ce
ive
d O
nlin
e P
rod
uctio
n P
lan
(3
83
)
Re
ce
ive
d R
ailw
ay s
tatu
s (
20
1)
Re
ce
ive
d T
rain
po
sitio
n a
nd
de
lay (
50
8)
Sto
p tra
ins (
590)
Cate
nary
Sta
tus (
176)
Revoke c
ate
nary
shut off (
237)
Ma
pp
ing
of sig
na
lma
n
to
are
a (
43
)
Coordinate railway and road signalling (456)
Accident Information (614)
Keys for danish trains abroad (477)
Keys of foreign trains in DK (478)
Ro
utin
g o
f vo
ice
ca
lls to
Co
ntr
ol R
oo
m u
se
rs (
43
6)
Ro
utin
g o
f vo
ice
ca
lls to
tra
in (
43
7)
Are
a g
rou
p c
alls
(4
38
)
ER
TM
S b
alis
e m
essa
ge
(26
1)
ER
TM
S ra
dio
me
ssa
ge
(32
)
KM
AC
Ke
y (5
82)
TCC Building
control system
Punctuality data (20)
Online production plan updates (446)
Surv
eill
ance v
ideo (
622)
TCC Building room diagnostics (430)
Figure 4. The System’s Interface Overview Diagram
SM
S in
(4
40
)
Customer Back-
office Systems
KM
C d
ata
for c
ou
ntry
wid
e s
yn
ch
ron
iza
tion
(62
0)
KM
C d
ata
for c
ou
ntry
wid
e s
yn
ch
ron
iza
tion
(61
9)
TOC Systems
TOC Systems
Planning
systems
Online
timetable
Dispatching
System
Rolling Stock
Dispatching
System
Staff
Traffic
Information
System
Driver
Guidance
Tool
Operations
Monitoring
Systems
Guard
Device
Failure
Management
Tool
UT circu
lar (2
27)
Failure Management Plan (636)
Milestone Confirmation (637)
Request Failure Management Plan (638)
Request update on milestone (639)
Sto
p d
ue to h
ot axle
(469)
Sto
p d
ue to d
era
ilment (4
70)
SAP PM
Infra
stru
ctur
e us
age
(644
)
Infra
stru
ctur
e fa
ilure
(645
)
SM
S o
ut (4
39)
ER
TM
S ra
dio
me
ssa
ge
(15
9)
Offic
e a
pp
lica
tio
n H
MI
info
rma
tio
n (
61
7)
Offic
e a
pp
lica
tio
n u
se
r in
pu
t (6
16)
*
Tra
in P
ositio
ns (
174)
Pro
duction P
lan im
port
(37)
Fiernbane East Signaling System
ETCS
IXL
TMS
Systeemontwikkeling
• In IXL en RBC beperkt aantal aanpassingen; voorbeelden
− Level crossing − Route for Shunting (rangeren buiten een rangeergebied)
• Merendeel van aanpassingen in TMS
− Veel externe interfaces − Operational rules − Look and feel − DSS (rescheduling)
Signalling Programme en Fjernbane East
IXL: Level crossing
• Level crossing
− RBC zendt MA met ‘level crossing restriction’
− TMS zendt JIT opdracht naar LX − LX sluit en meldt dat aan IXL − RBC verwijdert ‘level crossing restriction’ − Trein kan op snelheid doorijden
• Consequentie:
− relatief lange dichtligtijden (vergeleken met NL)
− maar wel zo kort mogelijk
Signalling Programme en Fjernbane East
TMS: operationele processen
• Kader: Operational Rules → Requirements en Use cases
• Kern/principe
− OnPP (‘Procesplan’), Service Intentions (‘Orderaanvragen’) en DSS (bij nieuwe ‘Service Intentions’ en bij verstoringen)
− Niets gebeurt ongepland
• Onderwerpen voor veiligheidsanalyse
− Werkzones en tijdelijke rangeergebieden (TSA) − Routering en snelheden Buitengewoon Vervoer = Buiten Profiel (BP) en
Bijzonder Vervoer (BV: zware treinen, gevaarlijke stoffen); m.n. in tunnels − TSR en verhinderingen − Catenary Management System − Emergency commands
Signalling Programme en Fjernbane East
Activering werkzone
Signalling Programme en Fjernbane East
PICOP vraagt werkzone aan, m.b.v. HHT,
gekoppeld aan TMS
Signal operator activeert werkzone m.b.v. Double
Command Entry
PICOP wordt op een veilige wijze op de
hoogte gesteld
TMS: SIL allocatie
• TMS is SIL0 systeem
• Hoe kan een Signal operator een werkzone activeren op veilige wijze, vanaf een SIL0 systeem?
− M.b.v. Double Command Entry − Signal operator geeft 1e opdracht in. − IXL vraagt om bevestiging − Signal operator geeft 2e opdracht in (qua inhoud identiek aan 1e opdracht). − IXL controleert op inhoud en timing.
• ‘Functional independence’ van 1e opdracht en 2e opdracht vormt basis van bewijsvoering dat een SIL0 systeem (dat aan bepaalde veiligheidseisen voldoet) volstaat.
• Principe is toegepast op BetuweRoute en Hanzelijn
Signalling Programme en Fjernbane East
Tussentijdse conclusies
• Context (‘operational rules’) gaat op de schop
− Kansen op vernieuwing qua processen. − Context bestaat alleen op papier en is deels nog in ontwikkeling − Eisen nog in ontwikkeling (i.v.m. operationale processen), terwijl
systeemontwikkeling al in volle gang is
• Systeemontwikkeling door ambitie (DSS, HHT, veel nieuwe interfaces)
− Systeemontwikkeling doet keuze voor standaardisatie en keuze voor proven technology deels teniet,
− maar levert veel meerwaarde op
Signalling Programme en Fjernbane East
Enkele conclusies
• Politiek klimaat gunstig voor investeringen in OV en rail
− Financiering − Lange termijn afspraken − Durf om over te gaan tot een ‘total renewal’
• Total renewal heeft voordelen en risico’s voor Banedanmark
− Kostenvoordelen en ‘key benefits’ − Zeer complex project
• Total renewal bevat voor Alstom grote uitdagingen
− Alstom werkt in context (‘operational rules’) die in ontwikkeling is; Europese harmonisering t.a.v. operationele processen node gemist
− Realiseren van ‘key benefits’, m.n. het ontwikkelen van het Decision Support System wordt een grote stap vooruit
Signalling Programme en Fjernbane East