Sme Mantra

Embed Size (px)

Citation preview

  • 8/3/2019 Sme Mantra

    1/9

    Sme business mantra has been categorized into following modules.

    Core Moduleso Accountingo Ordero Catalogo Facilityo Manufacturing

    Additional Moduleso Project Managemento Issue Trackingo SFAo Asset Maintenanceo eGovernance

    MANUFACTURING MODULE:

    In Manufacturing some important concepts are Finished goods , Raw materials,

    reorder, ware house, bom(bill of materials), routing task, routing, mrp(material

    requirement plannning), jobshop, facilities, locations, make to stock, make to

    order,ATP(Available to promise),QOH(Quantity on Hand).

    ReOrder:

    The importance of Reorder Level arises from the need to have sufficient stocks to

    service customer orders and, at the same time, not to unnecessarily accumulate

    stock.

    So before only in this module we allocate some number to reorder.

    Finished Good:

    When the good is completed as to manufacturing but not yet sold or distributed to

    the end-user, it is called a "finished good". Ex. Table,computer,etc

    In this there will be no concept of reorder.

    Raw material:

    A good purchased as a "raw material" goes into the manufacture of a product

    In this the concept suppliers comes and also reorder.

    Bill of Materials:

    A bill of materials (sometimes bill of material or BOM) is a list of the raw materials,

    sub-assemblies, intermediate assemblies, sub-components, components, parts and

    the quantities of each needed to manufacture an end product.

    A BOM can define products as they are designed (engineering bill of materials), as

    they are ordered (sales bill of materials), as they are built (manufacturing bill of

    materials), or as they are maintained (service bill of materials)

  • 8/3/2019 Sme Mantra

    2/9

    Routing tasks:

    The routing is the task list used for production planning applications. It describes

    the work steps that are necessary to produce a material or provide a service in a

    production or manufacturing environment.

    .product configuration done by catalog manager

    Routing :

    Routing is an ordered list of tasks required for a manufacturing process that is used

    for making a product. The same Routing can be assigned to more than one product

    if the same process is used to make each of them. I,e they specify the steps or

    sequences that are used to manufacture a product

    Material Requirement Planning :

    MRP is a time phased priority planning technique that calculates material

    requirements and schedules supply to meet changing demand across all products

    and parts in one or more plants.

    MRP is used to derive the master schedule from the forecast, the sales order or

    both. The master schedule is the foundation of all the operations, with MRP handling

    all the ordering and scheduling of the inventory (raw materials, components, etc).

    One big advantage of MRP is that it analyses and plans your future needs for all

    dependant demand items. If an item is not needed, you don't plan for it any more.

    The basic function of MRP system includes inventory control, bill of material

    processing and elementary scheduling. MRP helps organizations to maintain low

    inventory levels. It is used to plan manufacturing, purchasing and deliveringactivities.

    The module provides the capability to do MRP in both the scenarios.

    1.Make to Stock

    2.Make to Order.

    In MTS (Make to Stock), products are manufactured based on demand forecasts.

    Since accuracy of the forecasts will prevent excess inventory and opportunity loss

    due to stockout, the issue here is how to forecast demands accurately.

    MTO (Make to Order) is a manufacturing process in which manufacturing starts only

    after a customer's order is received.

    Available-to-promise (ATP):

    ATP is an important concept in supply chain management, meaning to quote an

    available quantity and a delivery date for an order from a customer.

  • 8/3/2019 Sme Mantra

    3/9

    Available-to-promise (ATP) is a business function that provides a response to

    customer order enquiries, based on resource availability.[1] It generates available

    quantities of the requested product, and delivery due dates. Therefore, ATP

    supports order promising and fulfillment, aiming to manage demand and match it to

    production plans.

    Quantity on hand:

    Quantity on hand describes the actual physical inventory in the possession of the

    business. When inventory is received or produced, it is added to quantity on hand,

    when inventory is sold or consumed, it is removed from quantity on hand.

    Work Flow of Manufacturing Module:

    Login into sme business mantra as admin and password as smemantra, presently

    no tenant id is required.

    The steps included in manufacturing process are

    setup the products(Raw Materials and Finished Goods) through catalog mgr.

    Bill of Material

    o Find

    o Bom Simulation

    o Edit Bom

    Routing Tasks

    o Edit Routing Task

    Routing

    o Edit Routing

    o Edit Routing Task Assoco Edit Routing Product Link

    Calendar

    o Calenders

    o Weeks

    MRP

    o Run Mrp

    o Mrp Log

    o Inventory Event Planned

    Order mgr

    Facility mgr Manufac mgr

    setup the products(Raw Materials and Finished Goods) through

    catalog

    setting up of new products are done through catalog manager.

  • 8/3/2019 Sme Mantra

    4/9

    In this module we have taken example of manufacturing a finished product

    TABLE, for which raw materials required are 1.wood 2.Nails 3.varnish

    (paint).

    For Finished product Table. We need to navigate

    Creating a product

    Facilities

    Locations

    suppliers are not required since it is a finished good and we need to

    supply that finished good to customers.

    For Raw Materials wood. We need to navigate

    Creating a product

    FacilitiesLocations

    Suppliers (suppliers concept is involved, since we need suppliers of raw

    materials for manufacturing finished good of Table)

    Navigation : Goto Appln -> catalog

    For Table :

    Creating a product

    In this page, give the internal name : TableeProduct type : Finished good

    Id : Tablee - 111

    Click on create product, then product with intername and id (Tablee-111)is

    generated.

    Facilities:

    Give Facility Id : Webstore ware house

    Minimum stock : 5

    No Reorder quantity.

    Click Add.

    Locations :

    Give Facility Id : Webstore ware house

    Location seq id : TL.. (as shown in screen shot)

    Click Add.

    For wood :

  • 8/3/2019 Sme Mantra

    5/9

    Creating a product

    In this page, give the internal name : Woodd

    Product type : Raw Material.

    Id : Woodd-111

    Click on create product, then product with intername and id(Woodd-111) is

    generated.

    Facilities:

    Give Facility Id : Webstore ware house

    Minimum stock : 5

    Reorder quantity : 50

    Click Add.

    Locations :

    Give Facility Id : Webstore ware house

    Location seq id : TL.. (as shown in screen shot)

    Click Add.

    Suppliers :

    Give Supplier : Demo Supplier

    Last Price : 5000

    Supplier Product Id : Woodd_S

    Then click create button.

    Then similarly do for raw materials of nails and varnish.

    For Nail :Creating a product

    In this page, give the internal name : Nailsss

    Product type : Raw Material.

    Id : Nailsss-111

    Click on create product, then product with intername and id(Nailsss-111) is

    generated.

    Facilities:

    Give Facility Id : Webstore ware house

    Minimum stock : 20Reorder quantity : 100

    Click Add.

    Locations :

    Give Facility Id : Webstore ware house

    Location seq id : TL.. (as shown in screen shot)

    Click Add.

  • 8/3/2019 Sme Mantra

    6/9

    Suppliers :

    Give Supplier : Demo Supplier

    Last Price : 3000

    Supplier Product Id : Nailsss_S

    Then click create button.

    For Varnish :

    Creating a product

    In this page, give the internal name : varnisss

    Product type : Raw Material.

    Id : varnisss-111

    Click on create product, then product with intername and id(varnisss-111) is

    generated.

    Facilities:

    Give Facility Id : Webstore ware house

    Minimum stock : 5

    Reorder quantity : 5

    Click Add.

    Locations :

    Give Facility Id : Webstore ware house

    Location seq id : TL.. (as shown in screen shot)

    Click Add.

    Suppliers :Give Supplier : Demo Supplier

    Last Price : 2000

    Supplier Product Id : varnisss_S

    Then click create button.

    Navigation : Applns -> Manufacturing -> Manufac Mgr -> Bill of Materials

    In Bill of Materials:

    Click create Bom

    Product id : main finished product like Table-111

    Bom Type : Bill of Materials

    (As shown in screen shot)

    Then click submit.

    Then in Edit Bom Tab:

    Product Id would be same like : Tablee-111 but

  • 8/3/2019 Sme Mantra

    7/9

    To Product id : Wood-111

    Quantity : 5

    (As shown in screen shot)

    Similarly, we have to give raw materials like nails-111 ,varnish-111 as

    Product Id would be same like : Tablee-111 but

    To Product id : Nailsss-111

    Quantity : 4

    Product Id would be same like : Tablee-111 but

    To Product id : varnisss-111

    Quantity : 2

    Imp Note : So we are using these raw materials of mentioned quantities to make

    table of 5 quantities because we have mentioned in Table min. stock as 5.

    Routing Task:In Routing Task Name : Cutting of wood.

    Task Type : ManufacturingThen click on submit.

    Similarly give as Nailing of wood and Varnishing of table.(As shown in screen shot we can see in the list of Routing task name as cutting ofwood, Nailing of wood and varnishing of table)

    Routing:

    Give Routing Name : Table RoutingThen click submit.

    Then in Edit Routing Task Assoc tab, give the routing task id (which must be pickedup by routing task list )and sequence no. as 1,2,3 etc for each routing task.

    Then in Edit Routing Product link, give : product id : Tablee-111Click update.(As shown in screen shot)

    Calender :

    In which starting time of work and week days and capacitys can be set.

    MRP :In Run Mrp tab

    Give Mrp name : mrp_tableeFacility : web store warehouse

    In mrplog first status id of job will be in running stage , afte few seconds or refresh, it will change to finished

  • 8/3/2019 Sme Mantra

    8/9

    In Inventory Event Planned:In Inventory Event Planned , we can see Proposed order receipts which are of

    Manufacturing and Purchasing, quantity, mrp requirement(As shown in screen shot)

    Navigation : Applns -> order -> order Manager -> Requirements

    In Requirements , we can see proposed type of Product requirement of rawmaterials and internal requirement of Finished good.

    In Approve Requirements :Select our raw materials which are of product requirement and submit.(As

    shown in Screen shot).

    In Find Approved Requirements by supplier:Select Bill to customer Party id as Your company name here(company) and

    facility id as web store ware house, then click prepare order.

    Select the raw materials which are required and click purchase order quick entry.

    Then Purchase order (temporary) is generated which contains shipping information,supplier, quantity, item list with sales tax, then click create order in the rightcorner to create the purchase order.

    Then Purchase order with number is generated and current status will be created.

    Then click Approve order , now the current status will be Approved.

    Here pdfs can also be generated.

    Then click quick Receive Purchase order.

    Then select the shipment to Receive and click Receive selected shipment.

    Then click receive selected products which we have been ordered.

    In Receive inventory , we can see the materials received with quantity in therespective inventories.

    In Inventory , we can see ATP(Available to Promise) as 0 and QOH(Quantity onHand) as 0 for tablee. Since the good has to be manufactured.

    And woodd-111 as 50 and Nailsss as 100 and Varnisss as 15. Since we have takenfrom the supplier.

    Go Back to order Mgr and in Requirements, we can search with Product id : Tablee-111, then we can see the internal requirement for Table , quantity as 5, select andsubmit.(As shown in screen shot)

  • 8/3/2019 Sme Mantra

    9/9

    Go to Manufac Mgr -> Job shop

    Click on the related id of production Run name (here, it is 10108),

    Here we can see product name : Tablee(Tablee-111) and current status as createdand list of Routting Task names, product names and quantity.

    Then click confirm to confirm the production run and status of routing task nameswill come as confirmed, quantiy to produce as 5 and produced as 0.

    Then click quick complete and now status of routing task names will come ascompleted.

    Then click Add under production run produce tab to update the producedfinished good and now it shows produced as 5.

    Hence, The produced quantity is updated as ATP and QOH for the finished goodsand ATP, QOH for the raw materials are reduced.

    Then click quick close to close the production run.

    Then check the inventory from facility to see the status of finished good and rawmaterials.

    Go to applns -> facility -> facility id : webstore and submit then go to inventory

    Check for Tablee, give product id : Tablee, product type as finished goodwe can see ATP as 5 and QOH as 5.(as shown in screen shot)

    Now check for raw materials, give product id : Woodd-111,Nailsss-111,Varnisss-111product type as Raw Material.we can see ATP as 25 and QOH as 25. For woodd-111we can see ATP as 80 and QOH as 80. For Nailsss-111we can see ATP as 5 and QOH as 5. For Varnisss-111which are reduced to manufacture 5 Tables.

    (as shown in screen shot)