SOLID WASTE MANAGEMENT SOLID WASTE MANAGEMENT IN DKI JAKARTAIN DKI JAKARTA
March, 2013
PT. PEMBANGUNAN JAYAPT. PEMBANGUNAN JAYA
1
Contents
Service Area
Generation & Composition of Solid Waste
Solid Waste Management System
Master Plan Solid Waste Management
2
1. Service Area
DKI Jakartao Population in 2010 :
9.588.198 . o Width area: 662,33 km2
3
No.
Administration Area
Sub-Department of Solid Waste
Generation (m3/day)
Served (m3/day)
Not Served (m3/day)
Served Percentage
Not Served Percentage
1 Center Jakarta 5.479 5.479 0 19,21% 0,00%
2 North Jakarta 4.519 4.517 2 15,84% 0,01%
3 West Jakarta 6.490 5.526 964 19,38% 3,38%
4 South Jakarta 5.696 5.642 54 19,79% 0,19%
5 East Jakarta 6.331 3.901 2.430 13,68% 8,52%
Total 28.515 25.065 3.450 87,90% 12,10%
Sources: Dinas Kebersihan Pemerintah Provinsi DKI Jakarta, Informasi Data Pengelolaan Kebersihan Triwulan I 2011
2. Generation of Solid Waste 2011
4
No. Waste CompositionPercentag
e(%)
I Organics 55,37II Anorganics 44,631. Paper 20,572. Plastics 13,253. Wood 0,074. Fabric & Textiles 0,615. Rubber / Imitation
Leather0,19
6. Metal 1,067. Glass 1,918. Chunk of material 0,819. Hazardous Waste 1,52
10. Other (Stone, sand, etc) 4,65Total 100Sources: Dinas Kebersihan Pemerintah Provinsi DKI Jakarta, Informasi Data Pengelolaan Kebersihan
Triwulan I 2011, Januari-Maret Tahun 2011
3. Composition of Solid Waste 2011
5
4. Solid Waste Management System (Existing) (1/2)
6
4. Solid Waste Management System(Existing) (2/2)
7
MASTER PLANMASTER PLANSOLID WASTE MANAGEMENT SOLID WASTE MANAGEMENT
DKI JAKARTADKI JAKARTA2012-2032
8
Estimation of Waste Reduction
Note :ITF Cacing capacity : 1300 ton/day, reduction : 90 %ITF Sunter capacity : 1000 ton/day, reduction : 90 %ITF Marunda capacity : 2000 ton/day, reduction : 90 %ITF Duri Kosambi capacity : 2000 ton/day, reduction : 90 %
No YearWaste
Generation (Ton/day)
% Reduction
Reduction (Ton/day)
ITFReduction Total
(Ton/day)
TPST Bantar Gebang (Ton/day
)CacingSunterMarunda
Duri Kosam
bi
1 2012 6716 7% 470 1300 0 0 0 1640 5076
2 2017 7270 10% 727 1300 1000 0 0 2797 4473
3 2022 7871 20% 1574 1300 1000 2000 0 5444 2427
4 2027 8521 25% 2130 1300 1000 2000 2000 7800 721
5 2032 9225 30% 2768 1300 1000 2000 2000 8438 787
1. Concept & Strategy of Solid Waste Management (DKI JAKARTA 2012 - 2032) (1/12)
9
General Concept of Waste Management
10
1. Concept & Strategy of Solid Waste Management (DKI JAKARTA 2012 - 2032) (2/12)
Transfer Station
Garden
Staging period during 20 years (2012-2032) is divided
into 4 phase:
v 1st Phase : 2012 – 2017
v 2nd Phase : 2017 – 2022
v 3th Phase : 2022 – 2027
v 4th Phase : 2027 – 2032
Staging Period
1. Concept & Strategy of Solid Waste Management (DKI JAKARTA 2012 - 2032) (3/12)
11
Sorting Collection Transport Intermediate treatment
Final processing
a. Manual cartb. Separate
motor cycle cart
c. Pick up car
a. Small Arm Roll
b. Big Arm Roll c. Small
Compactord. Big
Compactor e. Small Typer f. Big Typer
a. ITF Cakung Cilincing , capacity 1300 ton/day.
b. ITF Sunter, capacity 1200 ton/day.
TPST Bantar Gebang
The 1th Phase : 2012 – 2017
Waste reduction•Built Sentra 3R in Pesanggrahan and “Indah Kapuk” Coast•Waste management development base on community in a stage•Waste management increase according to region scale (stores, mall, etc)•Schedule for waste transfer because waste transportation was not separate
1. Concept & Strategy of Solid Waste Management (DKI JAKARTA 2012 - 2032) (4/12)
12
The 1th Phase in2012-2017
ITF SUNTER
PERMUKIMAN
PASAR
SEKOLAH/PERGURUAN TINGGI
KOMERSIAL
RUMAH SAKIT
INDUSTRI
FASILITAS UMUM
TPS- Dipo- Pool Gerobak- Transito- Pool Container- Bak Beton- TPS Indoor
1
2
3
4.1
4.2
4.3
4.4
4.5
5
6
7
8
9T
PS
TBA
NT
AR
GE
BA
NG
PENGELOLA LIMBAH B3
4
Sumber sampah Pengumpulan Pengangkutan Pengolahan AkhirPengolahan Antara
LIMBAH B3
Rumah Tangga
Apartemen
Pasar Modern
Pasar Tradisional
Pertokoan (Mall, Ruko)
Hotel
Rumah Makan
Perkantoran
Tempat Rekreasi
Puskesmas
Kawasan Industri
Industri Rumah Tangga
Jalan (Penyapuan)
Taman
ITF CAKUNG CILINCING
Pemilahan danpengelolaan sampah darisumber
Pemilahan danpengelolaan sampah darisumber
TPS- Dipo- Container- Bak Beton- TPS Indoor
SPA SUNTER
Stasiun, Terminal
Sungai
Sentra 3R/Lembaga
Pengolahan Sampah Berbasis Masyarakat
Sentra 3R/Skala Kawasan
Pengolahan sampah berbasis
Pemilahan dan
pengelolaansampah darisumber
Pemilahan dan pengelolaansampah darisumber
Waste transportation with not separate container
Waste Management Flow
1. Concept & Strategy of Solid Waste Management (DKI JAKARTA 2012 - 2032) (5/12)
13
Sorting Collection Transport Intermediate treatment
Final processing
a. Manual cartb. Separate
motor cycle cart
c. Pick up car
a. Separate Small Arm Roll
b. Separate Big Arm Roll
c. Separate Small Compactor
d. Separate Big Compactor
e. Separate Small Typer
f. Separate Big Typer
a. ITF Cakung Cilincing , capacity 1300 ton/day.
b. ITF Sunter, capacity 1000 ton/day.
c.c. ITF ITF Marunda, Marunda, capacity capacity 2000 2000 ton/dayton/day
TPST Bantar Gebang
The 2nd Phase : 2017 – 2022
Waste reduction•Waste management development base on community in a stage •Waste management increase according to region scale (stores, mall, etc)•Waste transportation was separated
1. Concept & Strategy of Solid Waste Management (DKI JAKARTA 2012 - 2032) (6/12)
14
The 2nd Phase in 2017-2022
ITF SUNTER
PERMUKIMAN
PASAR
SEKOLAH/PERGURUAN TINGGI
KOMERSIAL
RUMAH SAKIT
INDUSTRI
FASILITAS UMUM
TPS- Dipo- Pool Gerobak- Transito- Pool Container- Bak Beton- TPS Indoor
1
2
3
4.1
4.2
4.3
4.4
4.5
5
6
7
8
9
TP
STB
AN
TA
RGE
BA
NG
PENGELOLA LIMBAH B3
4
LIMBAH B3
Rumah Tangga
Apartemen
Pasar Modern
Pasar Tradisional
Pertokoan (Mall, Ruko)
Hotel
Rumah Makan
Perkantoran
Tempat Rekreasi
Puskesmas
Kawasan Industri
Industri Rumah Tangga
Jalan (Penyapuan)
Taman
ITF CAKUNG CILINCING
Pemilahan danpengelolaansampah darisumber
Pemilahan danpengelolaan sampah darisumber
TPS- Dipo- Container- Bak Beton- TPS Indoor
Stasiun, Terminal
Sungai
Sentra 3R/Lembaga
Pengolahan Sampah Berbasis Masyarakat
Sentra 3R/Skala Kawasan
Pengolahan sampah berbasis
Pemilahan danpengelolaan sampah darisumber
Pemilahan dan pengelolaan sampah darisumber
ITF MARUNDA
Waste transportation with separate container
Waste Management Flow
1. Concept & Strategy of Solid Waste Management (DKI JAKARTA 2012 - 2032) (7/12)
15
Sorting Collection Transport Intermediate treatment
Final processing
a. Manual cart
b. Separate motor cycle cart
c. Pick up car
a. Separate Small Arm Roll
b. Separate Big Arm Roll
c. Separate Small Compactor
d. Separate Big Compactor
e. Separate Small Typer
f. Separate Big Typer
a. ITF Cakung Cilincing , capacity 1300 ton/day.
b. ITF Sunter, capacity 1000 ton/day.
c.c. ITF ITF Marunda, Marunda, capacity capacity 2000 2000 ton/dayton/day
d.d. ITF Duri ITF Duri Kosambi, Kosambi, capacity capacity 2000 2000 ton/dayton/day
TPST Bantar Gebang
The 3th Phase : 2022 – 2027
Waste reduction•Waste management development base on community in a stage •Waste management increase according to region scale (stores, mall, etc)•Waste transportation was separated
1. Concept & Strategy of Solid Waste Management (DKI JAKARTA 2012 - 2032) (8/12)
16
The 3th Phase in 2022-2027
ITF SUNTER
PERMUKIMAN
PASAR
SEKOLAH/PERGURUAN TINGGI
KOMERSIAL
RUMAH SAKIT
INDUSTRI
FASILITAS UMUM
TPS- Dipo- Pool Gerobak- Transito- Pool Container- Bak Beton- TPS Indoor
1
2
3
4.1
4.2
4.3
4.4
4.5
5
6
7
8
9
TP
STB
AN
TA
RG
EB
AN
G
PENGELOLA LIMBAH B3
4
Sumber sampah Pengumpulan Pengangkutan Pengolahan AkhirPengolahan Antara
LIMBAH B3
Rumah Tangga
Apartemen
Pasar Modern
Pasar Tradisional
Pertokoan (Mall, Ruko)
Hotel
Rumah Makan
Perkantoran
Tempat Rekreasi
Puskesmas
Kawasan Industri
Industri Rumah Tangga
Jalan (Penyapuan)
Taman
ITF CAKUNG CILINCING
Pemilahan dan
pengelolaansampah darisumber
Pemilahan danpengelolaan sampah darisumber
TPS- Dipo- Container- Bak Beton- TPS Indoor
Stasiun, Terminal
Sungai
Sentra 3R/Lembaga
Pengolahan Sampah Berbasis Masyarakat
Sentra 3R/Skala Kawasan
Pengolahan sampah berbasis
Pemilahan dan
pengelolaansampah darisumber
Pemilahan danpengelolaan sampah darisumber
ITF MARUNDA
ITF DURI KOSAMBI
Waste Management Flow Waste transportation with separate container
1. Concept & Strategy of Solid Waste Management (DKI JAKARTA 2012 - 2032) (9/12)
17
The 4th Phase : 2027 – 2032
Waste reduction•Waste management development base on community in a stage •Waste management increase according to region scale (stores, mall, etc)
Sorting Collection Transport Intermediate treatment
Final processing
a. Manual cartb. Separate
motor cycle cart
c. Pick up car
a. Separate Small Arm Roll
b. Separate Big Arm Roll
c. Separate Small Compactor
d. Separate Big Compactor
e. Separate Small Typer
f. Separate Big Typer
a. ITF Cakung Cilincing , capacity 1300 ton/day.
b. ITF Sunter, capacity 1000 ton/day.
c.c. ITF ITF Marunda, Marunda, capacity capacity 2000 2000 ton/dayton/day
d.d. ITF Duri ITF Duri Kosambi, Kosambi, capacity capacity 2000 2000 ton/dayton/day
TPST Bantar Gebang
1. Concept & Strategy of Solid Waste Management (DKI JAKARTA 2012 - 2032) (10/12)
18
The 4th Phase in
2027-2032
Waste Management Flow
ITF SUNTER
PERMUKIMAN
PASAR
SEKOLAH/PERGURUAN TINGGI
KOMERSIAL
RUMAH SAKIT
INDUSTRI
FASILITAS UMUM
TPS- Dipo- Pool Gerobak- Transito- Pool Container- Bak Beton- TPS Indoor
1
2
3
4.1
4.2
4.3
4.4
4.5
5
6
7
8
9
TP
STB
AN
TA
RG
EB
AN
G
PENGELOLA LIMBAH B3
4
Sumber sampah PengumpulanPemindahan/Pengangkutan Pengolahan AkhirPengolahan Antara
LIMBAH B3
Rumah Tangga
Apartemen
Pasar Modern
Pasar Tradisional
Pertokoan (Mall, Ruko)
Hotel
Rumah Makan
Perkantoran
Tempat Rekreasi
Puskesmas
Kawasan Industri
Industri Rumah Tangga
Jalan (Penyapuan)
Taman
ITF CAKUNG CILINCING
Pemilahan dan
pengelolaansampah darisumber
Pemilahan danpengelolaan sampah darisumber
TPS- Dipo- Container- Bak Beton- TPS Indoor
Stasiun, Terminal
Sungai
Sentra 3R/Lembaga
Pengolahan Sampah Berbasis Masyarakat
Sentra 3R/Skala Kawasan
Pengolahan sampah berbasis
Pemilahan dan
pengelolaansampah darisumber
Pemilahan danpengelolaansampah darisumber
ITF MARUNDA
ITF DURI KOSAMBI
Waste transportation with separate container
1. Concept & Strategy of Solid Waste Management (DKI JAKARTA 2012 - 2032) (11/12)
19
Service area on 4th phase (2027 – 2032)
1. Concept & Strategy of Solid Waste Management (DKI JAKARTA 2012 - 2032) (12/12)
20
21