 MECHANICAL TECHNICAL SPECIFICATIONS TENDER DESIGN TIÊU CHUN KTHUT PHN HTHNG ĐIU HÒA KHÔNG KHÍ  THIT KĐẤU THU  THI CÔNG   DEUTSCHES HAUS Le Van Huu Street, District 1, Ho Chi Minh, Vietnam Đường Lê Văn Hưu , Qu ân 1, Tp.HChí Minh , Vit Nam WSP-TN-ME- SPC- 50001 DATE OF ISSUE: 17 Aug 2015 PHÁT HÀNH: 17 tháng 08 năm 2015 WSP Vietnam Ltd. Unit 5, 16 th Floor Green Power Building 35 Ton Duc Thang Street Ben Nghe Ward, District 1 Ho Chi Minh City, Vietnam Tel: +84.8.2220.5345 Fax: +84.8.2220.5348 Email: [email protected] http://www.wspgroup.com

SPEC HVAC.pdf

Embed Size (px)

Citation preview

  • MECHANICAL TECHNICAL SPECIFICATIONS TENDER DESIGN

    TIU CHUN K THUT PHN H THNG IU HA KHNG KH THIT K U THU THI CNG

    DEUTSCHES HAUS

    Le Van Huu Street, District 1, Ho Chi Minh, Vietnam

    ng L Vn Hu, Qun 1, Tp.H Ch Minh , Vit Nam

    WSP-TN-ME- SPC- 50001

    DATE OF ISSUE: 17 Aug 2015

    PHT HNH: 17 thng 08 nm 2015

    WSP Vietnam Ltd.

    Unit 5, 16th

    Floor Green Power Building

    35 Ton Duc Thang Street Ben Nghe Ward, District 1 Ho Chi Minh City, Vietnam

    Tel: +84.8.2220.5345 Fax: +84.8.2220.5348

    Email: [email protected] http://www.wspgroup.com

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 2 AC R04

    TABLE OF CONTENT MC LC

    SECTION 1 GENERAL SPECIFICATION ................................................................................................ 8

    PHN 1 THUYT MINH K THUT CHUNG .......................................................................................... 8

    1.1 Scope, Definition and Interpretatios of Specification ....................................................................... 8

    Phm Vi, nh Ngha V Din Gii Cho Thuyt Minh K Thut...................................................... 8

    1.2 Statutory Requirements, Standards and Other Regulations ........................................................... 8

    Cc yu cu php qui, tiu chn v cc quy nh khc .................................................................. 8

    1.3 General Requirements ................................................................................................................... 11

    Cc Yu Cu Chung ...................................................................................................................... 11

    1.4 Equipment and Materials ............................................................................................................... 30

    Vt T V Thit B.......................................................................................................................... 30

    1.5 Contractor's Drawings, Coordination, Work Sequencing and Design Responsibilities ................ 39

    Bn V Ca Nh Thu, S Phi Hp, Trnh T Cng Vic V Trch Nhim Thit K ................ 39

    SECTION 2 WATER-COOLED CHILLERS ........................................................................................... 44

    PHN 2 MY LNH GII NHIT NC .............................................................................................. 44

    2.1 General .......................................................................................................................................... 44

    Tng qut ....................................................................................................................................... 44

    2.2 Equipment ...................................................................................................................................... 48

    Thit b ........................................................................................................................................... 48

    2.3 Installation ...................................................................................................................................... 65

    Lp t ........................................................................................................................................... 65

    SECTION 3 COOLING TOWERS........................................................................................................... 68

    PHN 3 THP GII NHIT .................................................................................................................... 68

    3.1 General .......................................................................................................................................... 68

    Yu Cu Chung ............................................................................................................................. 68

    3.2 Equipment ...................................................................................................................................... 71

    Thit B ........................................................................................................................................... 71

    3.3 Installation ...................................................................................................................................... 76

    Lp t ........................................................................................................................................... 76

    SECTION 4 AIR HANDLING UNITS ...................................................................................................... 80

    PHN 4 THIT B X L KHNG KH ................................................................................................. 80

    4.1 General .......................................................................................................................................... 80

    Tng quan ...................................................................................................................................... 80

    4.2 Equipment ...................................................................................................................................... 83

    Thit B ........................................................................................................................................... 83

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 3 AC R04

    4.3 Installation ...................................................................................................................................... 93

    Lp rp ........................................................................................................................................... 93

    SECTION 5 PLATE HEAT EXCHANGER AND EXPANSION TANK ................................................... 95

    PHN 5 THIT B TRAO I NHIT DNG TM V BNH GIN N. .............................................. 95

    5.1 Plate heat exchanger ..................................................................................................................... 95

    Thit b trao i nhit dng tm ..................................................................................................... 95

    5.2 Expansion tank, water make up, air degassing ............................................................................. 97

    Bnh gin n, h thng cp b nc, h thng kh kh ................................................................ 97

    SECTION 6 V.A.V/C.A.V. TERMINALS (V.A.V/C.A.V. BOXES)........................................................... 99

    PHN 6 THIT B U CUI PHN PHI KH KIU LU LNG THAY I / KIU LU LNG KHNG I. (HP V.A.V/C.A.V.) ............................................................................................................ 99

    6.1 General .......................................................................................................................................... 99

    Tng quan ...................................................................................................................................... 99

    6.2 Equipment .................................................................................................................................... 101

    Thit b ......................................................................................................................................... 101

    6.3 Installation .................................................................................................................................... 106

    Lp rp ......................................................................................................................................... 106

    SECTION 7 SPLIT TYPE AIR-CONDITIONING UNITS ...................................................................... 109

    PHN 7 - CC KIU IU HA NHIT LOI 2 MNH .................................................................. 109

    7.1 General ........................................................................................................................................ 109

    Tng quan .................................................................................................................................... 109

    7.2 Casing .......................................................................................................................................... 109

    V bc .......................................................................................................................................... 109

    7.3 Compressor.................................................................................................................................. 110

    My nn ....................................................................................................................................... 110

    7.4 Evaporation Coils ......................................................................................................................... 111

    Dn lnh ....................................................................................................................................... 111

    7.5 Air Cooled Condensers ................................................................................................................ 111

    Dn ngng t gii nhit gi .......................................................................................................... 111

    SECTION 8 PUMPS .............................................................................................................................. 112

    PHN 8 BM ........................................................................................................................................ 112

    8.1 General ........................................................................................................................................ 112

    Yu cu chung ............................................................................................................................. 112

    8.2 Equipment .................................................................................................................................... 116

    Thit b ......................................................................................................................................... 116

    8.3 Installation .................................................................................................................................... 121

    Lp t ......................................................................................................................................... 121

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 4 AC R04

    SECTION 9 FAN COIL UNITS ............................................................................................................. 124

    PHN 9 FCU (FAN COIL UNITS) ........................................................................................................ 124

    9.1 General ........................................................................................................................................ 124

    Tng quan .................................................................................................................................... 124

    9.2 Equipment .................................................................................................................................... 126

    Thit b ......................................................................................................................................... 126

    9.3 Installation .................................................................................................................................... 130

    Lp t ......................................................................................................................................... 130

    SECTION 10 VENTILATION FANS ..................................................................................................... 132

    PHN 10 QUT THNG GI .............................................................................................................. 132

    10.1 General ........................................................................................................................................ 132

    Tng qut ..................................................................................................................................... 132

    10.2 Equipment .................................................................................................................................... 136

    Thit b ......................................................................................................................................... 136

    10.3 Installation .................................................................................................................................... 145

    S lp t ..................................................................................................................................... 145

    SECTION 11 PIPEWORK AND FITTING ............................................................................................. 148

    PHN 11 NG V PH KIN .............................................................................................................. 148

    11.1 Description ................................................................................................................................... 148

    M t ............................................................................................................................................ 148

    11.2 Manufacture ................................................................................................................................. 148

    Ch to ......................................................................................................................................... 148

    11.3 Submissions ................................................................................................................................. 148

    H s trnh np ............................................................................................................................ 148

    11.4 Selection ...................................................................................................................................... 149

    La chn ...................................................................................................................................... 149

    11.5 Standards ..................................................................................................................................... 150

    Tiu chun p dng ..................................................................................................................... 150

    SECTION 12 DUCTWORK AND FITTINGS ........................................................................................ 188

    PHN12 NG GI V PH KIN ....................................................................................................... 188

    12.1 General ........................................................................................................................................ 188

    Tng qut ..................................................................................................................................... 188

    12.2 Equipment .................................................................................................................................... 192

    Thit b ......................................................................................................................................... 192

    12.3 Ductwork and Fittings .................................................................................................................. 196

    ng gi v cc ph kin .............................................................................................................. 196

    12.4 Installation .................................................................................................................................... 203

    S lp t ..................................................................................................................................... 203

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 5 AC R04

    SECTION 13 AIR FILTERS .................................................................................................................. 209

    PHN 13 PHIN LC KHNG KH ....................................................................................................... 209

    13.1 General ........................................................................................................................................ 209

    Khi qut ...................................................................................................................................... 209

    13.2 Equipment .................................................................................................................................... 210

    Thit b ......................................................................................................................................... 210

    13.3 Installation .................................................................................................................................... 211

    Lp t ......................................................................................................................................... 211

    SECTION 14 INSULATION AND PAINTINGS..................................................................................... 213

    PHN 14 CCH NHIT V SN ......................................................................................................... 213

    14.1 General ........................................................................................................................................ 213

    Khi qut ...................................................................................................................................... 213

    14.2 Equipment .................................................................................................................................... 215

    Thit b ......................................................................................................................................... 215

    14.3 Installation .................................................................................................................................... 228

    Lp t ......................................................................................................................................... 228

    SECTION 15 ACOUSTIC INSULATION .............................................................................................. 232

    PHN 15 B CCH M ....................................................................................................................... 232

    15.1 General ........................................................................................................................................ 232

    Tng quan .................................................................................................................................... 232

    15.2 Equipment .................................................................................................................................... 235

    Thit b ......................................................................................................................................... 235

    15.3 Installation .................................................................................................................................... 237

    Lp t ......................................................................................................................................... 237

    SECTION 16 SOUND AND VIBRATION ISOLATORS ....................................................................... 240

    PHN 16 TIU M V CHNG RUNG ............................................................................................... 240

    16.1 General ........................................................................................................................................ 240

    Tng quan .................................................................................................................................... 240

    16.2 Equipment .................................................................................................................................... 242

    Thit b ......................................................................................................................................... 242

    SECTION 17 ELECTRICAL INSTALLATION FOR AIR CONDITIONING .......................................... 249

    PHN 17 LP IN CHO MY IU HO KHNG KH .................................................................. 249

    17.1 General ........................................................................................................................................ 249

    Tng quan .................................................................................................................................... 249

    17.2 Equipment .................................................................................................................................... 251

    Thit b ......................................................................................................................................... 251

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 6 AC R04

    17.3 Installation .................................................................................................................................... 312

    Lp t ......................................................................................................................................... 312

    SECTION 18 AUTOMATIC CONTROL AND BUILDING MANAGEMENT SYSTEM......................... 320

    PHN 18 H THNG QUN L TA NH V IU KHIN T NG .......................................... 320

    18.1 Introduction ..................................................................................................................................... 320

    Gii thiu ...................................................................................................................................... 320

    18.2 Scope of Works ............................................................................................................................ 320

    Phm vi cng vic ........................................................................................................................ 320

    18.3 General System Description ........................................................................................................ 323

    M t chung h thng .................................................................................................................. 323

    18.4 Operator Workstation ................................................................................................................... 325

    Trm cng tc Ngi thao tc ..................................................................................................... 325

    18.5 Printers ......................................................................................................................................... 334

    My in ........................................................................................................................................... 334

    18.6 Power Supply to BMS (UPS) ....................................................................................................... 335

    Cp in cho h thng BMS (UPS) ............................................................................................. 335

    18.7 DDC Outstations .......................................................................................................................... 335

    Trm u cui DDC ..................................................................................................................... 335

    18.8 DDC Controllers ........................................................................................................................... 338

    B iu khin DDC ...................................................................................................................... 338

    18.9 System Integration ....................................................................................................................... 339

    Tch hp h thng ........................................................................................................................ 339

    18.10 Instrumentation/Control Device ................................................................................................... 340

    Trang thit b o/Dng c iu khin .......................................................................................... 340

    18.11 Communication Network .............................................................................................................. 350

    Mng lin lc ................................................................................................................................ 350

    18.12 HVAC Control System Software .................................................................................................. 351

    Phn mm h thng iu khin HKK ....................................................................................... 351

    18.13 BMS System Support Software ................................................................................................... 351

    Phn mm h tr h thng BMS ................................................................................................. 351

    18.14 BMS Applications Software ......................................................................................................... 358

    Phn mm ng dng BMS .......................................................................................................... 358

    18.15 Installation .................................................................................................................................... 373

    Lp t ......................................................................................................................................... 373

    SECTION 19 MISCELLANEOUS PROVISIONS ................................................................................. 374

    PHN 19 CC CNG VIC PH KHC ............................................................................................. 374

    19.1 General ........................................................................................................................................ 374

    Tng qut ..................................................................................................................................... 374

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 7 AC R04

    19.2 Equipment .................................................................................................................................... 375

    Thit b ......................................................................................................................................... 375

    SECTION 20 COMMISSIONING AND TESTING AND MAINTENANCE............................................ 379

    PHN 20 VN HNH TH, TH NGHIM V BO TR ................................................................... 379

    20.1 General ........................................................................................................................................ 379

    Yu cu chung ............................................................................................................................. 379

    20.2 Equipment .................................................................................................................................... 382

    Thit b ......................................................................................................................................... 382

    20.3 Calibration .................................................................................................................................... 383

    Hiu chun ................................................................................................................................... 383

    20.4 Installation .................................................................................................................................... 386

    Lp t ......................................................................................................................................... 386

    20.5 Particular Requirements on Testing and Commissioning ........................................................... 397

    Cc yu cu c th v th nghim v vn hnh th ................................................................... 397

    20.6 Particular Requirements on Operations and Maintenance ......................................................... 401

    Cc yu cu c th v vn hnh v bo dng .......................................................................... 401

    20.7 Training for Operation and Maintenance Personnel.................................................................... 404

    Hng dn cho Nhn vin vn hnh v bo dng ................................................................... 404

    20.8 Maintenance................................................................................................................................. 409

    Bo tr ........................................................................................................................................... 409

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 8 AC R04

    SECTION 1 GENERAL SPECIFICATION

    PHN 1 THUYT MINH K THUT CHUNG

    1.1 Scope, Definition and Interpretatios of Specification

    Phm Vi, nh Ngha V Din Gii Cho Thuyt Minh K Thut

    1.1.1 General

    Tng Qut This Specification covers the standards, performance, materials, engineering, fabrication, factory

    testing, delivery, erection, site testing and commissioning, handover and inspection for the HVAC installations. HVAC installations shall be carried out to conform to this Specification.

    Thuyt minh k thut ny bao gm cc tiu chun, cch thc hin, chng loi vt t, hng dn k thut, ngun gc sn phm, th nghim nh my, phn phi, lp t, kim tra v vn hnh th bn ngoi cng trnh, bn giao v thm nh cho cng vic lp t h thng iu ha khng kh v thng gi ( HVAC ) cho Vn phng lm vic, gii thiu sn phm, dch v thng mi v nh ti Vit Nam. Tt c cc vic lp t cho h thng HVAC s c thc hin tun theo thuyt minh k thut ny.

    1.1.2 Definition and Interpretations nh Ngha V Din Gii Definition of the particular terms in this specification shall be referred to the preliminaries of the

    tender document.

    nh ngha ca cc iu khon c bit trong thuyt minh ny s c tham kho n phn m u ca ti liu mi thu.

    1.1.3 Tender Submissions Trnh Thu

    The tenderer shall provide the following information for tender:

    Nh thu s cung cp cc thng tin theo h s thu

    Provide the relevant office job reference.

    Cung cp y n cc c quan thm nh c lin quan

    Provide the organization chart and relevant persons Curriculum Vitae of the proposed project team members.

    Cung cp s t chc v s yu l lch ca cc c nhn c lin quan l thnh vin i d n c xut

    1.2 Statutory Requirements, Standards and Other Regulations

    Cc yu cu php qui, tiu chn v cc quy nh khc

    1.2.1 International System of Units

    H Thng n V Quc T

    The Contractor shall provide all information, drawings, manufacturers' data and materials in metric (S.I.) units.

    Nh Thu s cung cp tt c cc thng tin, bn v, thng s sn xut v vt liu trong h n v mt (SI)

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 9 AC R04

    1.2.2 Standards and Regulations Cc Tiu Chun V Lut

    The whole of the Contract Works shall be consistent with good practice in Vietnam to the satisfaction of the Project manager.

    Ton b cng vic ca thu phi ph hp vi thc tin Vit Nam v tha mn qun l d n.

    The Contract Works shall comply with the latest edition of the 'Ashrae Standard ', where applicable to the particular work, or alternatively other internationally recognized standards issued by such bodies as:

    Cc cng vic ca thu s phi hon tt y theo Tiu chun Ashrae phin bn mi nht, ni ng dng cc cng vic ring bit, hoc la chn cc tiu chun quc t c chp nhn khc nh sau :

    a. NFPA - For the using of Fire and Smoke Dampers

    NFPA - Lp t van chng chy

    b. HVCA TR19 - Internal Cleanliness of Ventilation Systems

    Hip hi nh thu nhit lnh TR19 sch bn trong h thng thng gi

    c. HVCA - Ductwork Leakage Testing DW143

    Hip hi nh thu nhit lnh Th nghim x ng gi DW143

    d. HVCA TR19 - Cleanliness of Ducts

    Hip hi nh thu nhit lnh TR19 sch ng gi

    e. HVCA DW 141 - Ductwork

    Hip hi nh thu nhit lnh ng gi DW141

    f. HVCA DW 144 - Sheet Metal Ductwork

    Hip hi nh thu nhit lnh ng gi tn DW144

    g. HVCA DW 146 - Ductwork Testing

    Hip hi nh thu nhit lnh Th nghim ng gi DW146 Where materials or equipment offered comply with other standards or specifications, the

    Contractor shall demonstrate they meet the requirements of the relevant Standards in full.

    Khi vt t v thit b tun theo cc tiu chun v thuyt minh k thut khc, Nh Thu s m t cc c tnh y ca chng ph hp vi nhng yu cu ca tiu chun lien quan.

    1.2.3 Statutory Requirements Cc Yu Cu V Php L

    The Contract Works shall fully comply with all statutory obligations and regulations together with any amendments made thereto as required by the following bodies:

    Cng vic ca nh thu l phi lm y tt c cc th tc lin quan n php lut v cc lut l cng vi nhng sa i b sung c yu cu bi cc c quan sau :

    a. Buildings Department

    S xy dng

    b. Natural resources and Environment Department

    S ti nguyn mi trng

    c. Fire Services Department

    S cnh st PCCC

    d. Labour Invalids and social affairs Department

    S lao ng thng binh x hi

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 10 AC R04

    e. Local Authority

    Ban ngnh s ti The Contract Works shall comply with the following statutory obligations and regulations.

    Cng vic ca nh thu l phi lm y tt c cc th tc lin quan n php lut

    a. The Building Ordinance and Regulations

    Cc sc lnh v qui nh xy dng

    b. Fire Services Ordinance and Regulations

    Cc sc lnh v qui nh cho cng tc phng chng chy

    c. The current requirements of Fire Services Department as defined in the latest edition of the Code of Practice for Minimum Fire Services Installation and Equipment and all Fire Services Department Circular Letters.

    Cc yu cu hin hnh thuc s cu ha c ban b trong cc thng bo sau cng ca tiu chun thc hnh lp t ti thiu cho cng tc cu ha v thit b v tt c cc thng t do c quan PCCC ban hnh.

    d. Fire Services (Installation and Equipment) Regulation, Fire Services Ordinance.

    Cc qui nh cho cng tc cu ha (Lp t v thit b), sc lnh cho cng tc cu ha.

    e. Other relevant regulation.

    Cc quy nh lin quan khc.

    1.2.4 Installation to Comply with other Rules and Requirements Lp t Theo Cc Yu Cu V Qui nh Khc

    The foregoing alternatives and others not indicated shall whenever offered by demonstration to be equivalent in overall technical substance. Furthermore the onus is on the Contractor to provide, at the time of tender, detailed evidence of the equivalence of any alternative standard for each and every item offered by him forming part of his tender.

    Nhng qui nh c ni trn v nhng qui nh khc khng c nhc n s c chng minh c gi tr tng ng v mt k thut tng qut. Hn na nh thu c trch nhim cung cp nhng bng chng chi tit ca tiu chun tng ng c chn la i vi mi hng mc m nh thu a ra khi np h s thu.

    The Project managers determination on whether or not equivalence has been proved shall be final.

    Qun l d n s xc nhn chng thc sau cng tnh tng ng

    In the event of conflict between any or all of the above requirements the order of precedence shall be as follows:

    Trong trng hp xy ra xung t mt phn hoc tt c cc yu cu trn th th t u tin xem xt s nh sau :

    1. Statutory requirements

    Cc yu cu v mt php l

    2. This Specification

    Thuyt minh k thut ny

    a) Notwithstanding the order of precedence of the standards and regulations as stated, the most stringent requirements of the standards and regulations shall also apply subject to jurisdiction of the Project manager.

    Tuy nhin th t u tin ca tiu chun v qui chun vn ty thuc vo tng hon cnh, nhng yu cu nghim nght nht ca tiu chun v qui chun vn do qun l d n quyt nh.

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 11 AC R04

    b) No substitutions to these shall be permitted without the endorsement of the Project manager.

    Khng c bt k s thay th no vi nhng iu ny m khng c s xc nhn ca qun l d n.

    1.2.5 Wherever there are conflicts between different codes of the above and provision of this technical

    specification, the more stringent code shall apply. The Contractor shall comply without additional cost to the Contract.

    Bt k ni no c s xung t gia cc tiu chun trn v ca thuyt minh k thut ny, tiu chun no nghim ngt hn s c p dng. Nh Thu phi tun theo v khng c tnh pht sinh n gi thu.

    1.2.6 The Contractor shall arrange for all submissions, liaisons and pay the cost of all statutory

    inspections and certificates. The Contractor shall be responsible for all submissions including any fee, if necessary, to obtain all permits and approval from various authorities. The payment to the authorities shall be paid well in advance so as to meet with the construction programme.

    Nh Thu phi sp xp tt c cc h s trnh, lin h v tr ph cho tt c cc giy chng nhn v cc cuc kim tra. Nh Thu phi chu trch nhim cho tt c cc h s trnh v tt c cc chi ph, nu cn thit c c tt c cc h s xin php chp thun t cc c quan chnh quyn khc nhau. Chi ph cho a phng s c tr sng phng nhm thun tin cho lch trnh thi cng.

    1.2.7 Products and materials manufactured from, or containing, asbestos shall not be used in the

    Contract Works.

    Cc sn phm v vt liu c sn xut t, hoc cha aming s khng c s dng trong cng vic thu.

    1.2.8 The Contractor shall fulfill the requirements for environmental performance during construction.

    Nh thu phi m bo tun theo cc yu cu v mi trng khi thi cng. 1.3 General Requirements

    Cc Yu Cu Chung

    1.3.1 Notations Ch thch

    Notations and symbols used throughout the tender documents are as listed on the abbreviations and symbols sheet of the Drawings.

    Cc ch thch v k hiu c dng trong h s thu c lp thnh danh sch tm tt v trang k hiu ca bn v.

    All other notations used shall have their normally accepted meaning and where any doubt or ambiguity is found, then the Contractor must seek clarification in writing from the Project manager at the time of tender.

    Tt c cc ch thch c s dng phi mang ngha thng thng c cng nhn v ch no nghi ng hoc ti ngha th Nh Thu phi lm sng t ra v ghi bo co n qun l d n khi np h s thu.

    1.3.2 Programme of Works Chng Trnh Lm Vic

    The Contractor shall submit to the Project manager for approval within two weeks after awarding of this Contract, a detailed preliminary works programme showing his intended method, stages and any other aspects of proceeding with the work, together with the period of time he has

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 12 AC R04

    estimated for each and every stage.

    Nh Thu phi trnh n qun l d n cho chp thun trong vng 2 tun sau khi nhn c gi thu ny, mt bn chi tit v chng trnh lm vic s khi trnh by phng php tham gia, cc giai on v cc vn khc trong tin trnh cng vic ca h, kt hp vi thi gian h tnh ton cho mt phn hoc c giai on.

    The Contractor shall submit manufacture/delivery programme and preliminary installation programme after awarding of this Contract. The actual installation programme shall be prepared in coordination with other specialist Contractors to ensure inter services coordination and appropriate phasing to suit the progress of other trades' work and to ensure completion within the overall programme for the project. The programme shall be itemised in detail to show the intended progress of different activities. The following activities shall be indicated in this Contractors programme.

    Nh Thu phi trnh ngun gc sn phm, tin trnh phn phi v tin trnh lp t s b sau khi nhn c gi thu ny.Tin trnh lp t tht s s c chun b kt hp vi cc Nh Thu khc m bo cng tc phi hp tng ng vi tng giai on thch hp nhm kt hp vi tin trnh ca cng tc thng mi v nhm m bo tin tng th ca d n. Tin s c ghi chi tit thnh tng phn nh trnh by tin d nh ca nhng hot ng khc. Cc hot ng tip theo s c m t trong chng trnh ca Nh Thu.

    a. Submission dates;

    Ngy trnh

    b. Submission for approval of all shop drawings, designs, samples and equipment;

    trnh cho ph duyt ca tt c bn v thi cng, thit k, vt t mu v cc trang thit b

    c. Manufacture of equipment;

    Ni sn xut ca thit b.

    d. Origin of equipment;

    Ngun gc ca thit b.

    e. Dates of ordering of equipment and materials;

    Cc ngy t hng ca thit b v vt t.

    f. Dates of delivery of equipment and materials to site;

    Ngy phn phi thit b v vt t n cng trnh.

    g. Installation of equipment indicating methods, sequencing, and duration of each activity;

    Phng php m t cch lp t thit b, chui v thi gian cho mi hnh ng.

    h. Dates of requirement of temporary and permanent electricity;

    Cc ngy yu cu cho cng vic in tm thi v c nh.

    i. Dates of commencement and completion of every stage of work in line with the building construction programme;

    Cc ngy khi u v hon tt cng vic dng ng thng vi tin trnh thi cng xy dng.

    j. Dates of expected completion of builder's work requirements;

    Cc ngy hon tt cng vic mong mun theo cc yu cu cng vic ca th xy dng.

    k. Submission of equipment, material and drawing schedules;

    trnh cc thit b, vt t v danh mc ca bn v.

    l. Submission to Government and relevant authorities.

    trnh n chnh quyn v cc ban nghnh lin quan.

    m. Inspection dates by Government authorities;

    Cc ngy kim tra bi chnh quyn a phng.

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 13 AC R04

    n. Testing and commissioning carried out in full load condition; and

    Kim tra v vn hnh th vi iu kin y ti

    o. Handover.

    Bn giao. 1.3.3 Submissions Trnh

    The Contractor shall submit for Project managers approval all design data necessary to develop the installation drawings to the extent required for the satisfactory execution of the Works.

    Nh Thu phi trnh cho qun l d n ph duyt tt c cc d kin thit k cn thit trin khai cc bn v lp t theo cc phm vi yu cu thc hin tha ng cng vic.

    All submissions must be made early enough in the Contract to enable the Project manager to fully check each item prior to giving approval. The Contractor shall ensure that submissions are made at least one month before any equipment is required to be ordered to meet the overall construction programme.

    Tt c cc h s trnh cn ng hn trong gi thu qun l d n c th kim tra y cc hng mc trong tng thi k ph duyt. Nh Thu phi m bo rng cc h s trnh phi lm trc t nht mt thng cho bt k thit b no c t hng nhm ph hp vi tin thi cng xy dng.

    A schedule of submissions for individual, working drawings and equipment shall be submitted for checking within two weeks after award of Contract.

    Danh sch trnh cho cc phn ring bit, bn v lp t v thit b phi c trnh kim tra trong vng hai tun sau khi nhn thu.

    The Contractor shall ensure that all design work undertaken and equipment selected shall enable the system performance requirements to be achieved. Prior to the commencement of any detailed design work or selection of equipment the Contractor shall review the Specification and the Drawings and shall satisfy himself that the related system performance requirements can be achieved. This notification shall not relieve the Contractor of his liability in respect of design or selection of equipment.

    Nh Thu phi m bo rng tt c cc cng vic thit k m nhn v thit b c la chn phi ph hp vi cc yu cu thc hin ca h thng. Trc khi bt u tin hnh cng vic thit k chi tit hoc chn la thit b, nh thu s xem li thuyt minh k thut v bn v v s m bo t c cc c tnh k thut ca h thng.Thng bo ny nhm rng buc Nh Thu v mt php l trong vic tn trng thit k hoc la chn thit b.

    Unless otherwise specified, the Contractor shall submit full drawings of all equipment to a scale suitable for the fullest understanding by the Project manager of the design details but in any event not less than a scale of 1:50, within the time required by the Project manager that they may be incorporated into other elements of works and as instructed by the Project manager, together with the fullest particulars and details of positions where power for any elements is required.

    Tr khi c cc yu cu khc, Nh Thu phi xut trnh y cc bn v ca tt c cc thit b vi t l thch hp qun l d n hiu r nht v thit k chi tit nhng khng c biu din vi t l nh hn 1:50, trong thi hn c yu cu bi qun l d n v chng s c kt hp vo phn khc ca cng vic v c ch th bi qun l d n, cng vi cc phn ring bit y nht v chi tit v tr ni cc b phn cn cung cp in.

    The Contractor shall be responsible for ensuring that the Works are carried out in strict accordance with the working drawings.

    Nh Thu phi chu trch nhim v m bo cng vic thi cng c thc hin mt cch nghim ngt theo bn v thi cng

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 14 AC R04

    The Contractor shall submit for Project managers approval his designs and proposals for plant and equipment progressively throughout various stages of the contract Works and shall ensure that all his designs and drawings including all calculations, proposals, documentation and information necessary are submitted in a timely and logical manner to ensure that he is able to obtain the Project managers approval to proceed. Due allowance shall be made for the drawings, calculations, proposals, documentation and information to be checked, and the time taken by this Contractor to correct mistakes and errors for resubmission.

    Nh Thu phi trnh tt c bn v thit k v cc my mc thit b xut s dng theo tng giai on ca cng vic thu cho qun l d n ph duyt v phi bo m rng tt c thit k v bn v bao gm tt c bng tnh, xut, h s v thng tin cn trnh ng thi gian v hp l nhm m bo nh thu c kh nng nhn c s ph duyt t qun l d n cho qu trnh tin hnh cng vic. Do cc bn v, tnh ton, xut, ti liu v thng tin s c kim tra cho php thc hin nn Nh Thu s cn thi gian sa cha cc lI sai trnh li.

    The submission of design data shall constitute an acknowledgement that all materials, site measurements and installation criteria have been determined and verified as appropriate and that the information contained requirements of the Contract Works.

    Tt c cc d liu thit k phi c chp nhn l tt c vt t, o lng bn ngoi cng trng v cc ni lp t c bit c xc nh v thm tra l ph hp vi cc yu cu ca cng vic thu.

    The Contractor shall be fully responsible to check the setting out, size and quantity of openings required.

    Nh Thu phi chu hon ton trch nhim kim tra s lp t, c v s lng cc l m yu cu.

    No claims for extensions of time or additional costs shall be entertained as a result of the Contractor's failure to make submissions in adequate time.

    Khng tnh thm gi hay chi ph pht sinh nu li do Nh Thu khng lm bn trnh thi im thch hp.

    If, in the opinion of the Project manager, the Contractor's failure to make his submissions in adequate time may result in a delay in the completion of the project as a whole, then the Project manager shall have the authority to instruct the Contractor to order materials and/or equipment from a source approved and nominated by the Project manager at no variation to the contract sum.

    Nu theo quan im ca qun l d n, li ca Nh Thu lm trnh sa i thi gian lm tr tin ton b d n, th qun l d n c quyn ch th Nh Thu t mua vt t v/hoc thit b t cc ngun c chp thun v ch nh bi qun l d n v gi thu tng s khng thay i.

    The Contractor shall on request, or where specified elsewhere, submit to the Project manager samples of materials and/or workmanship. Such samples shall be approved in writing before the appropriate equipment or installation work is carried out.

    Nh thu phi trnh mu vt t n qun l d n v/hoc chuyn vin. Cc mu vt t phi c chp thun bng vn bn trc khi thc hin cng vic lp t hoc ci t thit b thch hp.

    Such samples shall be retained by the Project manager as the criteria of the workmanship or material to be supplied and any items not so complying may forthwith be rejected by the Project manager and shall be replaced by the Contractor at no extra cost to the Contract.

    Cc mu vt t c qun l d n gi li nh l vt t chun cho cng vic hoc vt t s c cung cp v bt k hng mc no khng cung cp y s b loi bi qun l d n v s c thay th bi Nh Thu v khng tnh thm ph cho thu.

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 15 AC R04

    1.3.4 Submissions Schedule Trnh Lch Lm Vic Schedule of documents/working drawings to be provided

    Lch pht hnh ti liu/bn v thi cng c cung cp

    Quantity/ Distribution S lng/Pht hnh

    A B C D E F G H 1. Working/Shop Drawings

    Bn v thi cng

    No. of prints for submission/resubmission S bn v trnh/ trnh li

    7 1 1 1 1 1 - 1 1

    No. of prints for distribution after approval 8 1 1 1 1 1 1 1 1 S bn v pht hnh sau khi c ph duyt

    2. Technical Catalogue, Calculation and Specification

    Ca ta l k thut, Tnh ton v thuyt minh k thut

    No. of prints for submission/resubmission 6 1 1 1 1 1 - - 1 S bn in trnh/ trnh li

    3. Samples of Material and Workmanship Mu vt t v cng c thi cng

    No. of sets for submission/resubmission 6 1 1 1 1 1 - - 1 S b cho trnh/ trnh li

    4. Testing & Commission Procedures and Testing Report Format Th tc th nghim & vn hnh v nh dng h s th nghim

    No. of prints for approval 6 1 1 1 1 1 - - 1 S bn in cho ph duyt

    5. As Built Drawings Bn v hon cng

    No. of prints for approval S bn in cho ph duyt

    6 1 1 1 1 1 - - 1

    No. of prints for distribution after approval S bn in pht hnh sau thm nh

    10 1 1 3 1 1 1 1 1

    No. of soft copies for distribution after approval 6 1 1 3 1 - - - - S bn sao mm phn phi sau thm nh

    6. Operating and Maintenance Manuals S tay vn hnh v bo tr

    No. of copies for approval S bn sao cho thm nh

    5 1 1 1 1 1 - - -

    No. of copies for distribution after approval S bn sao phn phi sau thm nh

    7 1 1 3 1 1 - - -

    No. of soft copies for distribution after approval S bn sao mm phn phi sau thm nh

    6 1 1 3 1 - -

    Extra sets of working/shop drawings/documents necessary to expedite co-ordination shall be additional to the numbers required above, and shall be at no extra cost to the Contract. All the submission/approval document and drawing shall be submitted by hardcopy for submission and distribution.

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 16 AC R04

    S b thm ca thi cng/bn v thi cng/cc ti liu cn thit tin hnh phi hp phi c tnh vo s liu yu cu trn v khng c tnh thm ph cho Nh Thu. Tt c cc ti liu v bn v trnh v thm duyt s dng bn giy cho trnh v phn phi

    1.3.5 Distribution code M Phn Phi

    A = E/M Consultant T vn c in

    B = Project manager Qun l d n

    C = Project Manager/Employer Qun l d n/Ch u t

    D = Site/Resident engineer Cng trng/K s d n

    E = Main Contractor Thu chnh

    F = This Contractor Nh Thu ny

    G = Structural Engineer K s kt cu

    H = Acoustic Consultant T vn m

    1.3.6 Submissions Approval Process Qui Trnh Ph Duyt H S Trnh

    All submissions and any changes or modification required by the Contractor or proposed by the Contractor during the course of the Contract shall be made in accordance with the approval process and at the expense of the Contractor.

    Tt c cc trnh v bt k s thay i hoc yu cu sa cha ca Nh Thu hoc c ngh bi Nh Thu trong qu trnh din tin thu phi c thc hin theo qui trnh thm duyt v Nh Thu phi tr ph.

    The Contractor shall allow a minimum of fourteen (14) days in his programmes from the date of issue of submissions to the date of receipt of a response from the Project manager. This duration covers the Contractor's normal processing procedure and makes no allowance for resubmissions. The Project manager will inform the Contractor after receiving such submissions either.

    Nh Thu s ch t nht 14 ngy trong tin ca thu t ngy pht hnh h s trnh n ngy tip nhn phn hi t qun l d n. Khong thi gian ny bao gm qu trnh tin hnh bnh thng ca Nh Thu v khng cho php trnh li. Qun l d n s xc nhn vi Nh Thu sau khi nhn c nhng trnh trn.

    p. That his submission is "Approved" Cung cp y n cc c quan thm nh c lin quan

    which means that the Contractor's proposals have the Approval of the Project manager and that any associated placing of orders, manufacture or installation may proceed. Such Approval may be conditional on the correction, alteration or clarification of some minor aspects of the Contractor's submission or

    iu ny c ngha rng cc ngh ca Nh Thu c chp thun bi qun l d n v bt k ni t hng no c lin quan, sn phm hoc vic lp t s c tin hnh. Vic chp thun c th to iu kin cho php sa cha, thay i hoc chnh nh li mt vi sai st nh t trnh ca thu, hoc

    q. That his submission is "Approved with comment" trnh t thu c Chp thun vi ch gii

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 17 AC R04

    which means that the Contractor's proposals are generally satisfactory but that some aspects require correction, alteration or clarification. Such unsatisfactory aspects will be identified by the Project manager and those areas where the placing of orders, manufacture or installation may or may not proceed will be listed, or

    iu ny c ngha rng xut ca thu hu nh c chp nhn nhng mt vi kha cnh cn sa cha, thay i hoc lm r ra. Nh vy mt vi kha cnh thay i c nhn nh bi qun l d n v cc khu vc ni m v tr lin quan, sn phm v s lp t c th hoc khng th tin hnh thc hin s c lp thnh danh sch, hoc

    r. That his submission is "Reject" trnh t thu l khng chp thun

    which means that in the opinion of the Project manager, the Contractor's proposals fail to meet the requirements of the Contract Specification or would be detrimental to the operation of the equipment and that the placing of orders, manufacture or installation should not proceed. The unacceptable aspects will be listed by the Project manager.

    iu ny c ngha rng theo kin ca qun l d n l xut ca nh thu khng ph hp vi yu cu t thuyt minh k thut thu hoc s gy bt li cho vic vn hnh thit b v rng v tr c cp, ngun gc sn phm hoc s lp t s khng c thc hin. Danh sch khng chp nhn s c lp bi qun l d n.

    All design data which is not approved by the Project manager shall be revised and resubmitted by the Contractor without delay in accordance with the Conditions of Contract and the instructions of the Project manager.

    Tt c cc d liu khng c chp thun bi qun l d n s c sa v trnh li bi Nh Thu khng c chm tr theo tha thun thu v hng dn ca qun l d n.

    Obtain all necessary approvals and the like by others as may be required for the equipment supplied under this Contract. The costs of any tests associated with obtaining such approvals shall be deemed to be included in the tender price. No claim for extension of time or additional costs will be entertained in respect of this Contractor not having obtained the necessary approvals.

    Tt c cc trnh c chp thun v nhng ci khc tng t c th c yu cu cho vic cung cp thit b theo h s thu ny. Tt c cc ph cho cc th nghim lin quan n cc xut c chp thun s c tnh bao gm trong gi thu. Ph thm gi v pht sinh khng c tnh v c a vo trong gi thu, i vi trng hp khng c c nhng thm nh cn thit.

    1.3.7 Supervision Vic Gim St

    The Contractor shall employ one or more qualified and competent supervising engineers for control and supervision of the Works.

    Nh Thu phi thu mt hoc nhiu k s gim st gii v cht lng iu khin v gim st cng vic.

    The Contractor shall also employ a full time competent foreman on site.

    Nh Thu cng phi thu mt qun l cng trng gii lm vic ton thi gian bn ngoi cng trng.

    The Contractor shall immediately replace any supervising engineer or trade foreman whose experience, skill or competency is, in the opinion of the Project manager found to be inadequate for the works.

    Nh Thu phi ngay lp tc thay th bt k k s gim st hay qun l cng trng nhng ngi m kinh nghim, k nng v kh nng nm bt cng vic theo qun l d n l khng tng ng vi cng vic

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 18 AC R04

    1.3.8 Co-ordination Kt Hp

    The Contractor shall be responsible for the co-ordination of all elements of the Contract Works. This general responsibility of co-ordination shall include but not be limited to:

    Nh Thu s phi chu trch nhim cho vic phi hp tt c cc phn ca cng vic thu. Trch nhim phi hp chung ny s bao gm nhng khng c gii hn n :

    a. Co-ordination of all elements of the Contract Works for their compatible integration into the Works;

    Phi hp cc phn trong cng tc thu cho tch hp tng thch vo cng vic

    b. Ensuring that the Contract Works is completed in accordance with the Specification and the details shown on the Drawings;

    m bo rng cng vic thu c hon tt theo ng thuyt minh k thut v cc chi tit c trnh by trn cc bn v.

    c. Establishment of detailed logical sequences of work or installation schedules;

    Thit lp cc chui lun l chi tit ca cng vic hoc lch trnh lp t

    d. Provision of suitable and sufficient staff to ensure that the co-ordination procedures are followed to enable the expeditious completion of the Contract Works in accordance with the Contractor's installation programme;

    Cung cp cc nhn vin thch hp v lm vic hiu qu m bo cc th tc phi hp ca cng tc thu hon tt y v nhanh chng theo tin trnh lp t ca Nh Thu

    e. Carrying out any alteration work resulting from his failure to co-ordinate his Works; and

    Thc hin cc cng vic sa cha ngay cc sai lm trong khi phi hp lm vic; v

    f. Co-ordination, liaising and attending the works carried out by the Main Contractor.

    Phi hp, gi lin lc v tham d cc cng vic c thc hin bi thu chnh

    1.3.9 Cooperation, Coordination and Work Sequencing with Other Trades Hp Tc, Phi Hp V Trnh T Lm Vic Vi Cc Ban Nghnh Khc

    The Contractor shall cooperate and where necessary coordinate his work and programme with all other trades, Contractors and whatever coordination arrangements have been contractually arranged for by the Employer to control all of the contracts.

    Nh Thu phi hp tc v phi hp cng vic v tin ca mnh nhng ni cn thit vi tt c cc ban nghnh khc, Nh Thu v phi hp sp xp tt c mi th c sp xp thu bi ch u t kim sot tt c nh thu.

    The responsibility for co-ordinating his work with others and for timely and satisfactory completion of the Contract is the Contractor's responsibility unless otherwise stated in the Contract documents.

    Trch nhim phi hp cng vic vi cc ban nghnh khc hon thnh ng tin v m mn ca nh thu l trch nhim ca Nh Thu ngoi tr c ghi ch khc trong ti liu thu.

    The Contractor shall provide assistance and attendance for preparation of co-ordination drawings by the Main Contractor as stipulated in the Preliminaries.

    Nh Thu phi cung cp tr l v ngi tham d chun b cc bn v phi hp vi thu chnh nh c qui nh phn dn nhp.

    During the preparation of shop drawings, the Contractor shall liaise closely with other specialist Contractors to ensure complete co-ordination of services installed by all parties.

    Trong khi chun b bn v thi cng Nh Thu phi gi lin lc thng xuyn vi cc nh thu chuyn bit khc m bo hon tt y cng tc lp t cho tt c cc hng mc.

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 19 AC R04

    Where headroom or space conditions appear inadequate, the Project manager shall be notified before proceeding with installation.

    Nhng khong khng gian c iu kin khng tng thch, qun l d n s phi lu trc khi tin hnh lp t.

    The Contractor shall make reasonable modifications in the layout as needed to prevent conflict with work of other trades for the proper execution of Works.

    Nh Thu phi c l do chnh ng khi thay i cch b tr iu ny l cn thit ngn nga xung t cng vic vi cc i tc khc nhm thc thi cng vic ng n.

    The Contractor shall be responsible before commencing work for checking all levels and gradients shown on Drawings and for relating them to site conditions to ascertain that condition on site permit execution of work.

    Nh Thu phi c trch nhim kim tra tt c cc mc v dc trnh by trn bn v khi cng vic bt u v lin h chng vi iu kin bn ngoi xc nh chc chn rng cc iu kin bn ngoi cho php thc hin cng vic.

    No extra claim for delay either financially or by extension of the contract period will be entertained if the Contractor fails to properly and adequately coordinate and programme his work at all times.

    Khng c khiu ni thm c v ti chnh hay vic ko di thi gian thu, nu Nh Thu phi hp khng tt hoc khng lm ng theo tin cng vic.

    Liaison with Utility and Government Authorities

    Gi lin h vi cc ban nghnh nh nc c lin quan

    It is the responsibility of the Contractor to liaise with all the utility companies and the Government Departments, and to make formal application on behalf of the Employer.

    Trch nhim ca Nh Thu l gi lin h vi cc cng ty lin quan v cc ban nghnh nh nc v to cc mu n vi t cch i din cho ch u t.

    Due to the time and the procedure involved, the Contractor shall ensure the all applications are made on good time in order that there will be no delay to the overall programme.

    Do thi gian v th tc rc ri phc tp nn Nh Thu phi m bo tt c cc n xin c lm ng thi im theo trnh t u tin sao cho khng lm tr tin chung ca d n.

    1.3.10 Painting

    Cng Tc Sn

    All exposed metal work furnished under this Contract, except as otherwise noted, shall be cleaned of oil, grease, scale and other foreign matter and painted 1 shop coat of rust-resistant primer. For prime finish, clean all surfaces receiving baked enamel finish of oil, grease, scale, etc. Apply 1 coat of rust-resistant mineral paint followed by a filler coat over uneven surfaces. Sand smooth and apply final coat of mineral paint.

    Tt c cc vt dng bng kim loi ph by ra trong gi thu ny, ngoi tr c ch thch khc s c lm sch du, m, co sch g v cc vt liu khc v c sn lt mt lp chng st. hon tt s b, lm sch tt c b mt trng men khi du m, cn, v.v... Sn mt lp chng st khong cht bao ph cc b mt gh gh. Lm sch ct v hon tt bng lp sn khong cht.

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 20 AC R04

    1.3.11 Inspection and Testing Kim Tra V Th Nghim

    a. General

    Tng Qut

    Inspection and testing shall be carried out as specified herein and relevant sections of the Specification.

    Kim tra v th nghim phi c thc hin theo m t tng ng trong thuyt minh k thut.

    The inspections and tests will be divided into four basic stages:

    Kim tra v th nghim s chia thnh bn phn c bn

    Type Tests

    Kim Tra Chng Loi

    Factory Acceptance Tests (FAT), carried out before delivery of plant and equipment;

    Th nghim xc nhn nh my (FAT), thc hin trc khi phn phi my mc v thit b.

    This Contractor's initial On-site testing and commissioning; and

    Th nghim v vn hnh th u tin ngoi cng trng ca Nh Thu ny, v

    Site Acceptance Tests (SAT) carried out after delivery, installation and initial commissioning of the plant, equipment and systems.

    Chp thun Th nghim ngoi cng trng (SAT) thc hin sau phn phi, lp t v vn hnh ln u ca my mc, thit b v h thng

    The full cost of providing all facilities, labour consumable stores and appliances required in connection with all inspection and testing shall be deemed to be included in the tender price.

    Gi thnh tt c cho cc tin nghi, kho cha d chy ca cng nhn v cc dng c c yu cu c lin quan vi cc kim tra v th nghim phi c tnh lun trong gi thu.

    The inspection and passing of work or equipment by the Project manager shall not relieve the Contractor from liability to complete the Works in accordance with the Contract nor relieve him of any of his obligations under the Contract.

    Vic Nghim thu v cho qua phn hng mc hoc thit b bi qun l d n khng c ngha l gii phng Nh Thu khi trch nhim php l hon tt cng vic theo hp ng khng gii phng Nh Thu khi bn phn thuc gi thu.

    b. Type Tests

    Th Nghim Chng Loi

    All plant and equipment shall be subjected to inspection and the witnessing of tests by the Project manager. This requirement will be waived provided that sufficient documentation can be furnished to the Project manager that the plant and equipment in question has been satisfactorily type tested.

    Tt c cc my mc v thit b s l i tng kim tra v th nghim di s gim st ca qun l d n. Yu cu ny s b khc t cung cp h s y cho qun l d n rng my mc v thit b ang cp tha mn vic th nghim v chng loi.

    The scope of type tests for each major item of equipment or sub-assembly shall be in accordance with the test procedures of relevant standards, the Specification or the test procedures submitted by this Contractor and approved by the Project manager.

    Phm vi th nghim chng loi cho mi hng mc ch yu hoc h tr lp t phi c tun theo cc th tc kim nghim hoc cc tiu chun lin quan, thuyt minh k thut th tc th nghim c xut bi Nh Thu ny v c chp thun bi qun l d n.

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 21 AC R04

    c. Factory Acceptance Tests (FAT) Cc Th Nghim C Xc Nhn Ca Nh My (FAT)

    Submit a detailed list of all tests and general descriptions of each of the tests indicating the way in which these will be conducted and the estimated testing time required for each of these tests. Such time estimates shall not limit in any way this Contractor's obligations to complete each and all tests as specified and necessary to demonstrate the satisfactory performance of the system. No deviations shall be allowed without the prior approval of the Project manager.

    trnh mt danh sch tt c cc th nghim v m t tng qut cho tng th nghim ch ra cch kim sot v c tnh thi gian yu th nghim cn cho cc th nghim ny. Vic c tnh thi gian s khng gii hn trong bt c ngha ca Nh Thu han tt tng th nghim mt v tt c cc th nghim c m t v cn thit chng thc c tnh tha ng trong h thng. Khng c php sai s khi cha c ph duyt ca qun l d n.

    Submit for the Project managers approval all detailed test procedures and final schedules for the tests at least eight weeks prior to the scheduled commencement of Factory Acceptance Tests.

    trnh cho qun l d n ph duyt tt c th tc th nghim chi tit v lch th nghim cuI cng t nht tm tun trc khi c lch th nghim xc nhn nh my.

    Factory Acceptance Tests shall be conducted under the direction of an approved engineer employed by this Contractor.

    Th nghim xc nhn nh my s c hng dn theo ch o ca mt k s thm nh c thu bi Nh Thu.

    This Contractor shall be responsible for undertaking and recording the tests.

    Nh Thu s chu trch nhim cho cng vic v ghi li qu trnh th nghim.

    Should a defect be found during one of the tests, the nature of the defect shall be explained in detail to the Project manager who shall decide what portion of the test or tests must be re-run after the fault has been rectified.

    Nu c nhc im trong khi th nghim, khuyt im t nhin s phi c gii thch mt cch c th r rng vi qun l d n, ngi s quyt nh mt phn no ca th nghim hoc ton b th nghim phi c lm li sau khi sa cha li.

    If the Project manager decides that the plant is not in accordance with this Contract, he may reject the plant, and he shall inform this Contractor of the reasons in writing within a reasonable time.

    Nu qun l d n quyt nh my mc khng tun theo gi thu ny, h c th khng chp nhn n v s thng bo n Nh Thu l do bng vn bn trong thi gian cho php.

    d. On-Site Testing and Commissioning

    Th Nghim V Vn Hnh Ln u Ngoi Cng Trng

    Testing of the complete equipment and all ancillaries properly installed and connected in final working arrangements shall be made at Site. These tests shall be arranged to prove that equipment has been properly installed and adjusted. Testing may be proceeded in stages as the work allows, but check testing of the full equipment in operational mode shall be made to show that work subsequent to stage testing has not affected the performance of previous work. In the event of any part of the equipment failing these tests, further tests shall be made after rectification of the fault, over at least two successive and separate periods with no further fault occurring. All expenses and costs incurred by the Project manager/Engineer and his representatives arising from such further tests shall be deducted from the tender price.

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 22 AC R04

    Vic th nghim hon tt thit b v lp t ng cc phn ph tr v kt ni cc hng mc sau cng s c thc hin ngoi cng trng. Nhng th nghim ny c sp t chng minh rng cc thit b c lp t v iu chnh ng. Vic th nghim cng c th tin hnh theo tng giai on khi cng vic cho php, nhng vic kim tra th nghim y thit b trong ch vn hnh s c thc hin cho thy cng vic tip theo trong giai on th nghim khng nh hng n vic thc hin ca cng vic trc. Trong trng hp c bt c phn no ca thit b b li trong nhng th nghim ny, th nghim tip sau s c thc hin sau khi sa cha li, trn t nht hai khong thi gian ring bit v ln lt m khng xy ra li na. Tt c cc chi ph pht sinh c tr bi qun l d n/k s v i din ca h v nhng pht sinh trong th nghim s c tnh t gi thu.

    Suitable test equipment, instruments and layout for the purpose of the tests or rectification of faults found during testing shall be provided by this Contractor and shall be deemed to be covered by the tender price. All instruments shall be to the approval of the Project manager/Engineer and, if required by the Project manager/Engineer, they shall be calibrated before and after tests. If required, their accuracy shall be tested and certified by an approved laboratory.

    Thit b th nghim thch hp, hng dn s dng v b tr sp t theo mc ch th nghim hoc sa cha cc li tm thy trong khi th nghim s c cung cp bi Nh Thu v s c xem nh bao gm trong gi thu. Tt c cc hng dn s dng phi c chp thun bi k s/qun l d n s v, nu n c yu cu bi k s/qun l d n s th n phi c iu chnh trc v sau khi th nghim. Nu cn tnh chnh xc ca chng phi c th nghim, xc nhn t phng th nghim.

    All consumable parts, replacements, etc., required during the tests shall be supplied and fitted by this Contractor.

    Tt c cc phn c th hao mn, thay th, c yu cu khi th nghim s c cung cp v sa cha bi Nh Thu.

    At least six weeks in advance of any particular Site testing, submit to the Project manager for his approval details of the test equipment he proposes to use for that testing. He shall at all times, during the execution of the Works on Site, provide for the exclusive use of the Project managers staff on Site and in sound working order, one of each type of suitable instruments for the checking of current, voltage, resistance and insulation within the ranges and impedance levels required for the safe testing of the equipment.

    Cn trnh cho qun l d n ph duyt cc chi tit thit b th nghim t nht 6 tun trc . Nh thu s cung cp cho qun l d n nhn vin ton thi gian v th t lm vic ng n ti bt c thi im no trong sut qu trnh thc hin cng vic ngoi cng, tng loi hng dn thch hp cho vic kim tra dng in, in th, in tr v cch in trong tm in tr cch in yu cu cho th nghim an ton ca thit b.

    All tests for statutory requirements and insurances including arrangements for such tests, inspections by authorized bodies, persons or insurers, as may be necessary and the provision of certificates in the prescribed and approved forms necessary to enable plant and equipment to be put into service, shall be made by this Contractor.

    Tt c cc th nghim tun theo cc yu cu php lut v bo him bao gm s chun b cho cc th nghim, c kim tra bi ngi,c nhn v nhn vin bo him, iu ny l cn thit v iu khon chng nhn trong cc mu n quy nh v ph duyt cn thit my mc v thit b c th a vo vn hnh, phi c lm bi Nh Thu.

    e. Site Acceptance Test (SAT)

    Th Nghim Chp Thun Ngoi Cng Trng (SAT)

    The Site Acceptance Tests shall be conducted under the direction of the Project manager/Engineer and shall begin after all on-site commissioning tests have been satisfactorily completed and all defects found during the tests have been rectified to the

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 23 AC R04

    satisfaction of the Project manager/Engineer. The purpose of the SAT is to demonstrate that the complete installation is fully compliant with the technical and operational requirements specified.

    Th nghim chp thun ngoi cng trng s c thc hin di s hng dn ca k s/qun l d n s v phi c bt u sau khi tt c cc th nghim chy th hon tt m mn v tt c cc sai st pht hin c phi c sa cha tha mn cc yu cu ca k s/qun l d n s. Mc ch ca SAT l lp t y tt c cc thit b ng theo yu cu m t v vn hnh v k thut.

    f. Period of Notice

    Thi Gian Thng Bo

    A minimum of seven days' notice shall be given to the Project manager before all testing and commissioning operations commence.

    Thng bo phi c gi trc t nht 7 ngy n qun l d n trc khi cc th nghim v vn hnh chy th bt u.

    A minimum of four weeks' notice shall be given in the case of factory tests on major plant.

    Phi thng bo trc t nht bn tun trong trng hp th nghim cc my mc chnh nh my.

    1.3.12 Maintenance and Operating Manual S Tay Hng Dn Vn Hnh V Bo Tr

    Two weeks before the programmed test/commission of the Works, the Maintenance and Operating Manual (in English-Vietnamese) are to be provided by the Contractor, bound in suitable hard covers, properly labelled and identified; they shall contain the following (properly ordered and indexed) in a form completed and agreed with the Project manager.

    Hai tun trc khi tin hnh chng trnh th nghim, chy th, s tay vn hnh v bo tr (Song ng Anh-Vit) phi c cung cp bi Nh Thu, c b trong ba cng, dn nhn nhn bit ng; chng phi bao hm y (Chng v ph lc) v c chp thun bi qun l d n.

    A cover giving:

    Ba cn c:

    a. The name of the development,

    Tn cng trnh

    b. The title of the document, and

    Tiu ca ti liu, v

    c. The name and address of the Contractor.

    Tn v a ch ca Nh Thu

    Inside page giving similar information to the cover but including contact person and telephone numbers for normal and emergency use.

    Trang bn trong cho thng tin tng t ba nhng bao gm cc thng tin lin h c nhn v cc s din thoi lin lc thng thng v dng khi khn cp.

    The contact person and telephone number shall be 24 hours, 7 days a weeks basis. He shall be able to respond and arrive on site for every emergency call within 1 hour after receipt of the call.

    S in thoi lin h c nhn phi c s dng 24 gi, 7 ngy mt tun c bn. Ngi dc gi phi tr li v n cng trng cho cc cuc gi khn cp trong vng 1 gi sau khi nhn c cuc gi.

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 24 AC R04

    Contents page.

    Trang mc lc

    Description of the installation.

    M t lp t

    Scheduled details of all equipment and plant.

    Danh mc chi tit ca tt c cc my mc thit b

    Operating instructions including details of any automatic control system.

    Hng dn vn hnh bao gm chi tit ca tt c cc h thng iu khin t ng.

    Maintenance and fault finding instructions including composite schedule of routine maintenance.

    Hng dn bo tr v pht hin li bao gm danh mc hn hp bo tr nh k.

    Test reports and commissioning records.

    Bo co th nghim v bo co chy th

    Recommended spare parts and lubricants.

    Cc phn d phng v du bi trn

    List of equipment and plant with manufacturer's name and address and local agent, if applicable.

    Danh sch thit b v my mc vi tn nh sn xut v a ch i l ti a phng nu c

    Manufacturer's literature suitably indexed to include shop drawings, wiring diagrams, performance curves, etc.

    S tay sn phm tng ng vi m thit b bao gm bn v thi cng, s ni in, ng c tnh,v.v.

    List of As-Built drawings.

    Danh sch bn v hon cng

    Equipment/Manufacturer guarantee copies

    Bn sao phiu bo hnh ca my mc thit b

    Test Certificates

    Cc chng nhn th nghim

    A separate binder shall be provided for the as-built drawings of the following:

    nh km bn v hon cng bao gm :

    a. Full size of as-built drawings;

    B bn v hon cng vi c ng

    b. A3 reduced size as-built drawings;

    B bn v hon cng vi kh A3

    c. In case the full size drawing is AO size, an additional of A2 reduced size drawings;

    Trong trng hp kh ng l A0 th thm vo b bn v c A2

    d. All electronic files for the as-built drawings shall be stored on a readable CD-ROM; and

    Tt c cc file mm cho bn v hon cng s c lu tr trn mt a CD-ROM, v

    e. One set of 35mm aperture card properly labelled for each drawing.

    Ba c l 35mm dn nhn ng cho mi bn v

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 25 AC R04

    All full size drawings and A2 reduced drawings shall be individually folded and placed in a plastic holder. The plastic holder shall also be labelled with the respective drawing number and drawing title.

    Tt c cc bn v vi kh gc v kh A2 s c lu vo cc th mc ring bit trong ba nha. Ba nha cng phi c dn nhn vi cc s bn v ring bit v tn bn v.

    1.3.13 Defect Liability Period Thi Gian Bo Hnh

    At the time of Completion, the Contractor shall prepare and issue an approved "Defects/Remedial Work Programme" giving details as to the manner and timing for clearly listed defects and remedial works.

    thi im hon tt, Nh Thu s chun b v pht hnh chng trnh cng vic hiu chnh/sa cha c ph duyt c cc chi tit nh l mt loi s tay v thi gian biu r rng cho cng vic hiu chnh, sa cha.

    The Contractor shall provide, without charge, labour and materials to rectify the defects aroused and found during the Defect Liability Period of 18 months after Substantial Completion of the whole Main Contract Works.

    Nh Thu phi cung cp, khng tnh ph, nhn cng v vt t sa cha cc sai st h hng trong thi gian bo hnh l 18 thng sau khi hon tt thc s ton b cng vic ca thu chnh.

    Upon the completion of the Defect Liability Period, the Contractor shall renew the Ventilating Certificate as required by Fire Service Department for the project. Cost shall be paid by this Contractor.

    Da trn qu trnh hon tt ca thi gian bo hnh, Nh Thu phi lm mi cc chng ch v thng gi theo yu cu ca s cnh st PCCC cho d n. Ph s c tr bi cc Nh Thu ny.

    1.3.14 Free Maintenance and Service Cng Tc Sa Cha V Bo Tr Min Ph

    Apart from his contractual responsibilities for making good inherent defects, the Contractor shall furnish full comprehensive maintenance service free of charge on the entire equipment supplied and installed under this Contract during the 18-month Defect Liability Period. Maintenance shall include systematic and periodical examination, adjustment and lubrication of all equipment, details of which shall be submitted to the Project manager for approval.

    Mt phn trch nhim trong hp ng thu l sa sai cc h hng, Nh Thu phi trang b y bao hm c cng tc bo tr min ph cho ton b cc thit b cung cp v lp t trong gi thu ny trong thi hn 18 thng ca thi gian bo hnh. Vic bo tr bao gm c h thng, kim tra nh k, iu chnh v bi trn cho tt c cc thit b, chi tit ca cc cng vic ny phi c trnh cho qun l d n ph duyt.

    During the Defect Liability Period the Contractor shall provide the facility of 24-hour "call-out whereby at any time of the day or night, to despatch skilled men to repair any equipment that has broken down. The skilled men must reach the site within 24 hours after received the report of breakdown. Maintenance report shall be submitted for every breakdown in which cause of breakdown and remedial proposal shall be included.

    Trong thi gian bo hnh Nh Thu phi cung cp cc phng tin lin lc thun tin 24 gi cho bt k thi im no ca ngy hay m gi chuyn gia n sa cha tt c cc thit b h hng. Cc chuyn gia phi n hin trng trong vng 24 gi sau khi nhn c bo co h hng. Bo co bo tr phi trnh cc h hng v nguyn nhn gy ra hng hc cng nh km theo xut sa cha.

    The Contractor shall carry out regular inspections at periods not exceeding one calendar month, and shall fully service all plant installed under this Specification within the Defects Liability Period, and shall maintain all such plant in perfect operation during that period.

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 26 AC R04

    Nh Thu phi lm cng tc kim tra nh k khng qu mt thng mt ln v phi kim tra y tt c cc my mc thit b c lp t theo thuyt minh k thut ny trong thi gian bo hnh v phi duy tr cc my mc hot ng hon ho trong thi gian bo hnh.

    At each maintenance visit, the Contractor shall:

    Mi ln gh qua bo tr Nh Thu phi :

    a. Clean all main equipment monthly;

    Lau chi cc my mc thit b chnh hng thng

    b. Clean all filters monthly;

    Lau chi tt c cc b lc gi hng thng

    c. Carry out all lubrication as necessary monthly;

    Thc hin bi trn cn thit hng thng

    d. Clean all strainers monthly;

    Lm sch tt c cc thit b lc ng nc hng thng

    e. Check and adjust as necessary all drives monthly;

    Kim tra v iu chnh tt c b truyn ng thit yu hng thng

    Check all bearings for correct operation monthly;

    Kim tra cc bc lt vn hnh chnh xc hng thng

    f. Check all connections for tightness monthly;

    Kim tra kht cht cc mi ni hng thng

    Prove correct operation of all safety controls monthly;

    Th vn hnh ng ca cc thit b kim sot an ton hng thng

    g. Prove operation of all automatic controls monthly; and

    Th vn hnh ng ca cc thit b iu khin t ng hng thng

    h. Check all glands, packings, etc. and adjust or replace as necessary.

    Kim tra tt c cc ming m, vt liu m,v.v.. v iu chnh hoc thay th khi cn thit

    In addition to the monthly maintenance schedule, the Contractor shall at interval not exceeding six months:

    Thm vo lch bo tr hng thng, khng qu 6 thng gia hai ln bo tr Nh Thu phi :

    a. Clean and re-grease all bearings as necessary;

    Lau chi v bi m tt c cc bc lt khi cn thit

    b. Inspect and clean as necessary all items of plant and equipment;

    Kim tra v lau chi khi cn thit tt c cc phn ca my mc v thit b

    c. Clean and adjust all switchgear, contactors and starters; and

    Lau chi v iu chnh tt c cc bnh rng, cng tc v b khi ng; v

    d. Prove operation of all thermal overloads.

    Vn hnh th tt c cc b bo v qu ti nhit

    At each visit the Contractor shall fill out a maintenance schedule and get it counter-signed by the Building Owner's representative. All signed schedules will be required to be submitted to the Project manager/Building Owners representative.

    Mi ln Nh Thu gh qua phi in vo mu bo tr nh k v phi c k xc nhn bi i din ch ta nh. Cc ch k xc nhn cng vic nh k s c yu cu trnh cho qun l d n/i din ch ta nh.

  • Technical Specification DEUTSCHES HAUS WSP Vietnam Ltd

    J0068 17 Aug 2015 27 AC R04

    Contractor is required to clean all filters for air conditioners installed in the contract prior hand over to residents.

    Nh Thu c yu cu lm sch cc li lc trong h thng iu ha khng kh c lp t trong gi thu trong thi k bn giao cho ch nh

    1.3.15 Spares and Tools Dng C V D Phng

    For plant and/or equipment included in this Contract, the Contractor shall provide, where requested in the Specification, the types of spare parts indicated. In addition, one set of special tools for the operation and general maintenance shall also be provided.

    i vi my mc v/hoc thit b bao gm trong gi thu ny, Nh Thu phi cung cp, theo yu cu trong thuyt minh k thut, m vt t chng loi ca cc phn d phng. Thm vo , mt b dng c c bit cho vn hnh v bo tr tng qut cng s c cung cp.

    Unless otherwise specified, at the time of equipment submission, or in such period of time as has been agreed by the Project manager in writing, the Contractor shall submit, through the Main Contractor, in respect of his proposed plant and/or equipment three copies of a list of the manufacturer's recommended spare parts that are likely to prove necessary to service the plant and/or equipment during the first year's operation.

    Tr khi c ch thch khc, thi im trnh thit b hoc trong khong thi gian c chp thun ca qun l d n bng vn bn, Nh Thu phi trnh thng qua thu chnh, chi tit c th cc my mc v/hoc thit b ba bn sao danh sch ngun gc sn phm ca cc phn d phng c khuyn dng, iu ging nh cn thit chng thc cho my mc v