HALLIBURTON SPERRY DRILLINGDIRECTIONAL DRILLING & M/LWD PERFORMANCE REVIEWMAY 1 – SEP 30 2013
Halliburton Life Rulesالحياة - قواعد هاليبرتون
الوقاية مهماتالعمل تصريحاآلمنة القيادةالشخصية
الطاقة نظام عزلوالتسجيل
المرتفعة المغلقة األماكن دخول األماكن في العملالي ١٠ للوصول صفر قواعد
حوادث
الكيميائية المواد تـداولالمتساقطة األشياءاليدوية العِددالرفع عمليات
LOTO PPE Work Permit Driving Safety
Working at Height Confined Space
10 to ZERO
Chemical Handling Dropped Objects Hand Tools Lifting and Hoisting
Safety is part of our culture at Halliburton.It is not only a priority, but also a core value.
Dave LesarChairman of the Board,
President and Chief Executive Officer
Zero Fatalities
Zero LTI
Zero Recordable Injuries
Zero Recordable MVAs
Zero Env. Incidents
LTI: Lost Time Injury
MVA: Motor Vehicle Accident
Halliburton HSE Performance at Khalda Operation Area (Incidents Stats.)
Khalda / Halliburton Operation (Q2&3 2013)
6
Zero LTI, Zero damage to equipment and Zero environmental incidents with Khalda
Sperry drilled successfully 29 wells with 13,697 operating hrs with a run success rate of 93%
Successful record breaking run of Meghar-3 with a complete footage of 6543 ft in 44.2ft/hr
Another successful record breaking run of Pepi-12 with a complete footage of 2862 ft in 18.3ft/hr
Thorough investigation of all failures and rapid action taken to correct and prevent future failures
HIGHLIGHTS
7
7” GeoForce Motor back-off on W. Kanayes-I2 EDC-54 after 17 circulation hrs
7” Geoforce motor in well SIWA R-1X rig EDC-48 was exposed to high downhole vibration which exceeded the tool limits due to the damage/loss of the PDC bit blades in hole
LOWLIGHTS
New PDC bit vs the Damage PDC bit
8
LWD failure occurred in well Tayim-W2 due to lack of process adherence
Several MWD service interrupts occurred due to downhole vibration
LOWLIGHTS
9
BUCHIS-W2X
JADE-N2X KHALDA SW-5 NARMER-1X NEILOS-5 RAMOSE-1X SHROUK-E31 SHROUK-E32 SIWA R-1X SYRAH-N1X TAYIM W-2 UMB-221 AMOUN NE-2 FAGHUR-S5 SHAMS-15X
WELLS COMPLETED DURING MAY 1 – SEP 30 ‘03
SIWA E-1X TUT-105 UMBARKA-225 AG-117 PEPI-12 W.KALABSHA A-8 HYDRA 7 KHEPRI-48 ST1 Meghar-3 NRQ-255-4 A PEPI S-1X TAYIM W-4 ST UMB-224 W. KAL N-4 W.KANAYES I-2
10
May June July Aug Sep
# Wells 8 6 4 3 8
# Runs 29 25 18 22 32
Total Operating Hours 3186 2758 2166 2543 3044
Total Footage (m) 49,354 43,946 28,441 33,957 46,548
Total NPT (Hrs) 24 18 15 37.5 75
Total # Service Interrupts 2 1 1 2 1
Total # Trips For Failures 1 1 0 2 5
Operating Efficiency (%) 99.2 99.3 99.3 98.5 97.5
Bit Run Success Rate (%) 97 96 100 91 85
MTBTFF (Hrs) 3186 2758 1618 1271.5 608.8
MTBTFF 3 Mo Rolling Avg 2620.7 2987.3 2520.7 1882.5 1166.1
Total NPT Rig Cost ($) 35,016 26,262 21,885 54,713 109,425
SPERRY PERFORMANCE SUMMARY DD/MWDMAY-SEPT 2013
11
OPERATING HOURS VS. NPT HOURS
May-13 Jun-13 Jul-13 Aug-13 Sep-13 Oct0.0
500.0
1000.0
1500.0
2000.0
2500.0
3000.0
3500.0
50.0%
55.0%
60.0%
65.0%
70.0%
75.0%
80.0%
85.0%
90.0%
95.0%
100.0%
Operating hrs. NPT Operating Efficiency %
Ope
ratin
g E
ffic
ienc
y
%%
Ope
ratin
g H
ours
12
RUN EFFICIENCY
May-13 Jun-13 Jul-13 Aug-13 Sep-130
5
10
15
20
25
30
35
50.00
55.00
60.00
65.00
70.00
75.00
80.00
85.00
90.00
95.00
100.00
29
25
18
22
32
2 1 1 2 11 1 02
5
Number of runs Runs with SI TFF Run efficiency %
Num
ber
of r
uns
Run
Effi
cien
cy %
13
Well Name Run #
NPT Hrs
Preliminary Findings & Probable Cause
Corrective Action / Action Plan
1) W. Kanayes I-2 600 20 Motor backed off at adjustable ring connection.
1. Torq Lok will be mandatory for all motor connections.
2. Rotor Catcher will be installed in all Sperry motors.
3. Utilization of whirl analysis for all drilling runs.
2) PEPI-S1X 500 19Power section elastomer failure & mud invasion of the bearing assembly due to seal failure.
1. Change bearing system from oil-packed lubricant to mud-lubricant system.
3) PEPI-12-ST 400 24Power section elastomer failure & mud invasion of the bearing assembly due to seal failure.Additional to physical damage to the rotor’s thread box connection.
1. Change bearing system from oil-packed lubricant to mud-lubricant system. 2. Replaced damaged parts.
4) Tayim W-2 600 18 Human procedural error in using the proper adapter tips compression.
1. Memo was circulated to all M/LWD field engineers.
2. Re-assess LWD crew.3. Check sheets re-submitted to the field
engineers.
5) PEPI-12-ST 500 18 Many clutch slips occurred as the piston was totally compressed (mud invaded), when moving the oil plug the mud came out from it instead of oil.GeoPilot TL 381 failed L1 test, tool sent “No Response” Tool-face error and clutch slip error.
1. Problematic GeoPilot sent to higher level of repair and maintenance for full tear down to component level for further investigation. Still in Progress.
TOP 5 NPT EVENTS MAY 1 - SEPT 30 2013
14
WHAT WENT WRONG ACTION TAKEN 7” GeoForce motor back off
EDC-54 W. Kanayes-I2 after 17 circulation hrs
The rotor was in a bad condition, & the connection of the adjust ring was destroyed (Swell).
Torq Lok will be mandatory for all motor connections
Rotor Catcher will be installed in all Sperry motors
Utilization of whirl analysis for all drilling runs
1) W. KANAYES-I2 EDC-54
Adjust ring connection
The departed motor
15
WHAT WENT WRONG ACTION TAKEN Mud conditions (high mud
solids, invasive muds) Running the motor in excess
of recommended parameters
Changed bearing system from oil-packed lubricant to mud lubricant system
2) PEPI-S1X EDC-16
Corrosion impact on the HCP (hard chrome plated) rotors
16
WHAT WENT WRONG ACTION TAKEN
Failure of rotor adopter seal boot
Changed bearing system from oil-packed lubricant to mud lubricant system
Replaced damaged parts
3) PEPI-12-ST EDC ST-5
Damaged motor catch stem’s pin thread
Damaged rotor’s thread box connection
Wear on stabilizer blades and the body has crack shown on its surface
17
WHAT WENT WRONG ACTION TAKEN Human procedural error
in using the proper adapter tips compression range between 0.25" and 0.75”.
Failure of LWD lead engineers to follow the check off system in place to prevent the incident
Check sheets re-submitted to the field engineers & Spot audit will be conducted on two rigs to ensure compliance
Disciplinary action was applied to the LWD lead engineer and re-assessment of LWD crew
4) TAYIM W-2 EDC-19
Memo was circulated to all M/LWD field engineers
18
WHAT WENT WRONG ACTION TAKEN Many clutch slips
occurred as the piston was totally compressed (mud invaded), when moving the oil plug the mud came out from it instead of oil
GeoPilot TL 381 failed L1 test, tool sent “No Response” Tool-face error and clutch slip error
Problematic GeoPilot sent to higher level of repair and maintenance for full tear down to component level for further investigation. Still in Progress
5) PEPI-12-ST EDC ST-5
19 © 2011 HALLIBURTON. ALL RIGHTS RESERVED.
Builds on successful GeoTap pressure sampling technology
Fluid sampling and identification while drilling
Reduce risk with Real-time decisions
Positioning the well correctly in the reservoir…
FUTURE TECHNOLOGY TO ENHANCE OPERATION:GeoTap IDS Tool
• The GeoTap IDS sensor is a fluid identification and reservoir sampling tool
20 © 2013 HALLIBURTON. ALL RIGHTS RESERVED.
Thank you Q&A