    4.1.025Arrange the cables in an orderly and good-looking way, the cables must be bundled with

    evenly distributed space and proper tightness.MIN 0.2 000000L

    5.1.003

    Distribution of tail fibers:

    1. When tail fibers are distributed at bending positions, they must not be too tight and cross

    there. A pair of tail fibers must be tied neatly with moderate tightness.

    2. Tail fibers can be drawn freely from the ring of cable

    MAJ 2 000000G

    5.1.004The protection tube must enter into the cabinet with a length of less than 10 cm, and be tied

    firmly.MED 0.5 000000J

    5.1.005The cut of protection tube for tail fiber must be smooth. Otherwise, the insulating tape must be

    used to avoid hurting anyone.MED 0.5 000000J

    5.1.006The flange of tail fiber must be fixed. If a fixing bracket exists, it must be installed on the fixing

    bracket. MED 0.5 000000J

    5.1.008The over long tail fiber inside a cabinet must be coiled in the box or coiled into a circle with

    dia. more than 8 cm before it is fixed.MIN 0.2 000000L

    7.1.005

    The labels of cable are filled in and stuck correctly and reliably. They must be tidy position and

    same direction. They must be stuck on a position 2 cm away from their connectors. They can

    be made in a uniform way according to customer requirement.

    MED 0.5 000000J

    7.1.006

    The labels of power cable and ground cable are filled in and stuck correctly and reliably. They

    must be in a tidy position and the same direction. They must be stuck on a position about 2cm

    away from their connectors. They can be made in a uniform way acc

    MED 0.3 000000K

    7.1.007 Labels must be stuck on the alarm box according to specifications, easy to maintenance. MED 0.3 000000K

    7.1.008 On the DDF, trunk cable labels must be easily viewed for going to problem location. MED 0.3 000000K

    7.1.009 Network cables, power cables, and SCSI cables must be properly labeled. MED 0.3 000000K

    7.1.010 Labels of WS and network management system and so on must be placed neatly and firmly. MED 0.2 000000L

    7.1.011 The labels of rack shall be placed neat and clean. MIN 0.2 000000L

    7.1.012

    The row and column labels of the cabinet must be stuck in a clear and tidy way. If there has a

    dashed box on the cabinet,

    labels must be stuck within it.

    MIN 0.2 000000L

    14.1.001 Check Antenna(s) Polarization according to the Plant documentation MAJ 2 000000G14.1.002 Check ODU(s) and pole mounting position according to the plant documentation MAJ 2 000000G

    Microwave Installation

    Fibers: Common

    Labels

  • 8/3/2019 SQMT Microwave

    5/8

  • 8/3/2019 SQMT Microwave

    6/8

    20.1.004The engineering supervisor must upload the completion photographs for the BTS along with

    Hardware Self-Check Report to the EPMS system.MAJ 2 000000G

    20.1.005 Lock rack door MED 1 000000I20.1.006 Lock site door MED 1 000000I

    20.1.007 Equipment missing MED 1 000000I20.1.008 Equipment damaged MED 1 000000I

    20.1.009

    The items to be evaluated but not to be mentioned in this table:

    1. According to the engineering design document

    2. Referring to the installation manual

    3. The re uirements to be ne otiated with customers before installation.

    MED 0.5 000000J

    20.1.010The alarm monitoring system is normal in test. It should not has any alarm when it runs

    normally.MED 0.5 000000J

    20.1.011 The power-on hardware test of equipment is normal. MED 0.5 000000J

    20.1.012Fire safety system installation: Fire safety signs are clear, and hand extinguishers are firmly

    fixed.MED 0.5 000000J

    21.1.001Parameter of power in the equipment room can assure equipments running safety for long

    time.MIN 0.2 000000L

    21.1.002The cable distribution frame must be grounded firmly. The shielding layer of subscriber

    external cable must be grounded.MIN 0.2 000000L

    21.1.003Protection grounding cable must be connected firmly, grounding mode for equipment room

    must be selected jointed gronding.

    MIN 0.2 000000L

    21.1.004The joint grounding resistance value must be satisfied the design requirements. Generally, it

    must be less than 10 ohm,MIN 0.2 000000L

    21.1.005

    The radius and power supply mode of PGND cable, GND cable of primary power and -48V

    power cable that connected to PDF or distribution power box are according to engineering

    design document. They can assure equipment running safely and expansion request.

    MIN 0.2 000000L

    21.1.006 PDF and primary power output current-limiting fuse must be as specif ied. MIN 0.2 000000L

    21.1.007Power cable arrangement outside must avoid impracticable into equipment room and must be

    protected lightning.MIN 0.2 000000L

    21.1.008 Condition of equipment room can assure equipments running safety for long time. MIN 0.2 000000L

    21.1.009The ODF must be connected to the protection ground. The wire used to increase the strength

    of an optical cable must also be connected to the protection ground.MIN 0.2 000000L

    21.1.010 Fireproof measures must be adopted in the equipment room. MIN 0.2 000000L21.1.011 Corresponding antistatic measures must be adopted in the equipment room. MIN 0.2 000000L

    21.1.012The earthquake-proof, lightning-proof protection and bearing measures of equipment room

    must meet the requirements of construction and long-term safe operation.MIN 0.2 000000L

    Equipment Working Enviorment

  • 8/3/2019 SQMT Microwave

    7/8

  • 8/3/2019 SQMT Microwave

    8/8

    23.1.003QC of the partner must perform quality management regulation of partner ,and must inspect

    sites quality;MAJ 2 000000G

    23.1.004 The sites quality defects must be modified ,and quality report (after modified) must besubmitted. MAJ 2 000000G

    23.1.005 The Engineer of partner must install Equipments by installation manual. MAJ 2 000000G

    23.1.006Issue quality defects regular and implement correlative action according to award and

    punishment rules.MAJ 1 000000I

    23.1.007The supervisor of huawei must audit site quality,and must supervise defects to be modified by

    the partner.MED 0.5 000000J

    23.1.008 The QA of representative must audit site quality. MED 0.5 000000J