Upload
dangnga
View
212
Download
0
Embed Size (px)
Citation preview
STATE BANK OF INDIA
PREMISES & ESTATE DEPARTMENT, LOCAL HEAD
OFFICE, THIRUVANANTHAPURAM
TENDER FOR
SUPPLY, INSTALLATION, TESTING, COMMISSIONING &
MAINTENANCE OF 1No of (RTU) 320 kVA DG SET WITH
ACCOUSTIC ENCLOSURE AT CALICUT NEW BUILDING
AT MANANCHIRA
[NIT No: 06/2018-19 DATED 29/06/2018]
TENDER SUBMITTED BY
Name of the bidder: - …………………………………………………………………..
Address: - …………………………………………………………………...
……………………………………………………………………
Tel/Mob. No: - …………………………………………………………………...
Submitted to: Asst. General Manager
Premises & Estate Department, 4th
Floor,
Local Head Office, State Bank of India.
Poojappura,
Thiruvananthapuram-695012
Office Tel. No.: 0471- 2192402, 2192407
Fax: 0471-2353470
Email: [email protected]
For clarifications contact
1. Chief Manager (Elect: ), ph: 9847170391
2. Deputy Manger (Elect:), ph: 9497714782
Supply of 1No of 320KVA DG set” Page 2
Signature of the Supplier with Seal
STATE BANK OF INDIA
LOCAL HEAD OFFICE, POOJAPPURA
THIRUVANANTHAPURAM
COVER- 1 TECHNICAL BID
Each page to be signed including blank format of the Price bid and
submit in sealed cover marked “Cover 1 Technical Bid – Supply,
commissioning and maintenance of 1 No of 320KVA DG set with
acoustic enclosure”
Supply of 1No of 320KVA DG set” Page 3
Signature of the Supplier with Seal
TECHNICAL BID- (ENVELOPE-I)
TABLE OF CONTENTS
SECTION
NO. PARTICULARS
PAGE
FROM TO
A TENDER DOCUMENT 1 44
1.
NOTICE
4 5
2. DETAILED NOTICE INVITING TENDER 6 15
3. FORM OF SUBMISSION OF TENDER 16 17
4. GENERAL NOTES 18 18
5. GENERAL CONDITIONS OF CONTRACT 19 28
6. SPECIAL CONDITIONS 28 29
7. FORM OF AGREEMENT 29 32
8. TECHNICAL SPECIFICATIONS ( GENERATOR ) 33 33
9. APPROVED MAKE OF MATERIALS 33 33
10. ANNEXURE A 320 KVA DIESEL GENERATOR 34 36
11. LIST OF DOCUMENTS TO BE FURNISHED IN
COVER 1 37 37
ANNEXURE I PRICE BREAKUP FORM 38 39
ANNEXURE II PROCESS COMPLIANCE FORM 40 41
ANNEXURE I PRICE CONFIRMATION FORM 42 42
Supply of 1No of 320KVA DG set” Page 4
Signature of the Supplier with Seal
INDICATIVE PRICE BID –(ENVELOPE –II)
1
SCHEDULE OF QUANTITIES (SUPPLY OF 1 No 320
KVA 415V DG SETS WIH ACCOUSTIC
ENCLOSURE AS PER ANNEXURE A ) INCLUDING
COST OF NON COMPREHENSIVE AMC
43 44
Supply of 1No of 320KVA DG set” Page 5
Signature of the Supplier with Seal
SECTION 1.0 NOTICE INVITING TENDER ( NIT ) - 06/2018-19
1 NAME OF WORK
SUPPLY, DELIVERY AT SITE,
INSTALLATION,TESTING,COMMISSIONING
AND MAINTENANCE OF ONE NO OF READY
TO USE DIESEL GENERATOR SET WITH ALL
ACCESSORIES AT NEWLY CONSTRUCTED
BUILDING OF SBI AT MANANCHIRA
2. LOCATION OF SITE
NEWLY CONSTRUCTED BUILDING
BESIDE SBI CALICUT MAIN
BRANCH,MANACHIRA
3. TIME OF COMPLETION OF
WORK Within 30 days from the date of work order
4. TOTAL ESTIMATED VALUE OF
WORK Rs.32 LACS (Approx.)
5. EARNEST MONEY
DEPOSIT(EMD)
Rs 32,000 /- in the form of Demand Draft favoring
Assistant General Manager (Premises & Estate), State
Bank of India, Payable at Thiruvananthapuram drawn
in any scheduled/ commercial bank.
6. SECURITY DEPOSIT ( 5% )
A. INITIAL SECURITY
DEPOSIT
B. RETENTION MONEY
2% of the Contract Value (including EMD)
3% of the Contract Value
7. PERFORMANCE GUARANTEE Nil
10. TENDER RECEIVING
AUTHORITY
Asst. General Manager, Premises & Estate Dept.,
State Bank of India, Local Head Office, Poojappura,
Thiruvananthapuram – 695 012
11. LAST DATE FOR SUBMISSION Upto 03.00 P.M on 29-06-2018
12. DATE OF OPENING OF TENDERS 03.30 P.M on 29-06-2018
13. PLACE OF OPENING TECHNICAL
TENDERS
Premises & Estate Dept., State Bank of India, Local
Head Office, Poojappura, Thiruvananthapuram.
Subsequent Price bidding through online reverse
auction conducted by M/s.E-procurement
technologies, India AFTER OPENING OF
INDICATIVE PRICE BIDS
14. DEFECT LIABILITY PERIOD 1 Year
15. VALIDITY OF OFFER 90 Days.
16. LIQUIDATED DAMAGES 0.50% per week subject to a maximum of 5% of the
contract value for delay after 30 days
Supply of 1No of 320KVA DG set” Page 6
Signature of the Supplier with Seal
* - In case the date of opening of tenders is declared as a holiday, the tenders will be opened
on the next working day at the same time.
Complete set of tender documents can be obtained by down loading from Bank’s web-
site under procurement news, www.sbi.co.in
Please read the ‘INSTRUCTIONS TO TENDERERS’ thoroughly before submitting the
Tenders. Also note to verify the Bank web-site under ‘Tender Notices’ before the last date and
confirm that ‘CORRIGENDA’ to the Tender Notices issued (if any) has been read and / or
complied with. .
SBI (State Bank of India) has the right to accept / reject any / all tenders without
assigning any reasons thereof.
SBI has engaged the service provider (E procurement Pvt Ltd) for sealed bid & Reverse
Auction. Only technically and commercially acceptable bidders from SBI shall be eligible to
participate in the auction.
Further details can be obtained from the office of the under signed.
Asst. General Manager (Premises & Estate)
For and on behalf of State Bank of India.
Supply of one No of 320KVA DG set Page 7
Signature of the Supplier with Seal
SECTION 2.0 NOTICE INVITING TENDER -
Sealed tenders under two bid system in prescribed form, for the work as stated in the NIT, are
invited from OEMs/Dealers having service centre within a distance of 300km from Calicut
for “Supply of one No of 320 KVA, 415V, 3-Phase,50Hz, 1500 RPM (RTU) DG Sets”. “Price
bid of only those tenderers who are prequalified will be considered for e-tendering (reverse
auction)”. Eligibility criteria for prequalification are as follows.
i) Authorized dealer or original equipment manufacturer who has got authorized
service centre within three hundred kilometers of radial distance from
Calicut,Mananchira.
ii) Should have supplied at least one similar Diesel generator of capacity equal to
320KVA or more in Kerala during the last 3 years to Govt Departments/ PSUs /
Banks / Reputed Corporate Offices, private institutions/ IT, Pharma & Chemical
Industries.
iii) Average annual financial turnover of the bidder during the period of 2015 -’16,
2016-’17, 2017-18 should not be less than 7.5 lakhs.
iv) Two year warranty for the engine and alternator
v) Submission of all the documents mentioned in section 11.(Page 39)
vi) They should have a branch office in Kerala. (Documentary proof with telephone
bills / rental agreement etc shall be submitted for verification).
TECHNICAL BID (Envelope-I) should contain all following documents
A. Tender documents (1-46 pages) duly signed and sealed
B. Demand Draft for Rs 32,000/- (EMD).
C. Copy of certificate from Manufacturer/OEM declaring that the Tenderer is
authorized OEM/dealer for Kerala operations
D. Undertaking of the tenderer acknowledged by the OEM/authorized service
dealer mentioning willingness to carry out AMC at quoted rates (The actual
rates not to be shown).
E. Proof for supply of DG of capacity 320KVA or more in Kerala during the last
3 years.
F. Satisfactory Performance report/ work certificate issued by clients with
addresses, telephone number.
G. Audited Balance Sheet with P&L statement for 2015-’16, 2016-’17, 2017-18.
H. Original Catalogue of the DG set.
I. Full address of service centre within 300km with land phone no.
J. Copy of latest CPCB II norms compliance certificate from ARAI or NAL or
FCRI or any other authorized government agency.
Supply of one No of 320KVA DG set Page 8
Signature of the Supplier with Seal
PRICE BID (Envelope-II) shall contain Indicative Price Schedule of quantities ONLY.
1. Tenders placed in sealed covers in two separate envelopes duly marked as
TECHINICAL BID (Envelope-I), INDICATIVE PRICE BID (Envelope 2) with the
name of the work ('Supply of 1 No of 320KVA DG set') written on the envelopes shall
be enclosed in a single envelope addressed to Asst. General Manager (Premises &
estate), State Bank of India, Poojappura, Thiruvananthapuran will be received till the
last date and time for submission of tender as specified in NIT, in the office of the
undersigned.
Interested parties who fulfill the above eligibility conditions can download the tender
form from the Bank's website “https:// www.sbi.co.in” under the link procurement
news or contact the undersigned.
Date of availability of tender : 08.06.18 to 28.06.18
Date of pre-bid meeting : 19.06.2018
Date of submission of tender : 29.06.2018 at 15.00 hrs
Date of Technical Bid opening : 29.06.2018 at 15.30 hrs
2. No order will be placed against the indicative price bids. However the starting
price for reverse auction will be decided based on the indicative price.
The supplier should retain with him duplicate set of tender documents.
3. The supply has to be carried out within the time schedule. The tender documents shall
be taken as complementary and mutually explanatory of one another but in case of
ambiguities or discrepancies, shall take precedence in the order given below;
a) Bill of quantities
b) Technical specifications
c) Special conditions of contract
d) General conditions of contract
e) Instructions to tenderers, NIT, NIT and General notes.
The technical bid shall be opened as specified in NIT by a committee constituted for this
purpose, in the presence of the tenderers or their authorized representatives who wish to be
present. The technical bids shall be scrutinized and the Indicative Price bids of those
Suppliers whose technical bids are acceptable to the Bank shall alone be considered for e
tendering and the decision of the Bank in this regard is final and binding. The reverse
auction bidding shall be done later after intimation through authorized agency E-
Procurement Technologies Ltd. (abcprocure,B-705, Wall Street - II, Opp. Orient Club,
Nr. Gujarat College, Ahmedabad - 380 006,Gujarat State, India
Supply of one No of 320KVA DG set Page 9
Signature of the Supplier with Seal
Procedure of Reverse Auctioning:-
a. Reverse Auction shall be through English Reverse Auction (no ties).
b. For the proposed reverse auction, technically and commercially short-listed bidders
from the Technical bids submitted shall only be eligible to participate in the
auction.
SBI will engage the services to our service provider (E-Procurement Technologies Ltd.
(abcprocure)
a. Who will provide all necessary training and assistance before commencement of on
line bidding through Internet
b. SBI will inform the vendor in writing in case of reverse auction, the details of service
provider to enable them to contact and get trained.
c. Business rules like event date, time, start price, bid decrement, extensions, etc. also
will be communicated through service provider for compliance.
d. Vendors have to email the compliance form in the prescribed format (provided by
service provider) before start of Reverse auction. Without this the vendor will not be
eligible to participate in the event.
e. Reverse auction will be conducted on schedule date & time.
f. At the end of reverse auction event, the lowest bidder value will be known on the
network.
g. The lowest bidder has to email the duly signed filled-in prescribed format as provided
by SBI through service provider within 1 hour of auction without fail which is
Annexure III (Price Confirmation Letter) and Annexure I (Price break up ) within 24
hours after completion of reverse Auction.
h. At the end of reverse auction process, the lowest Bidder (L1) will be selected on the
basis of Total Price, including taxes, as mentioned in the Price breakup format in
Annexure –I
- Bidding Example:
i. The final rates of the items will have to be calculated in ratio of total amount quoted
by the lowest bidder through reverse auction process and the amount quoted in
indicative price bid.
j. Example:
Indicative Price Bid submitted by vendor:
Supply of one No of 320KVA DG set Page 10
Signature of the Supplier with Seal
Item Rate (R) Qty. Amount
A 100 2 200/-
B 200 3 600/-
C 300 4 1200/-
Total amount in Indicative Price bid 2000/-
The total amount mentioned in indicative price bid is Rs.2, 000/- but the final L-1 amount
quoted by the vendor through E-reverse auction is Rs.1, 600/- then the K factor for L-1 vendor
will be calculated as under:
Ratio K = (Total amount quoted by the lowest bidder through reverse auction process) / (The
amount quoted in indicative price bid).
K = 1600 /2000 = 0.8
k. The item wise final price to be confirmed by the vendor shall be as under:
l. The L1 tenderer should submit the detailed break up as per the Price break up format
provided as per Annexure-I format within 24 hours of the reverse auction. The price
breakup should contain not only the rates but also the value of each item of work
entered in a separate column and all the items as per the Banks BOQ format totaled
up in order to show the L1 aggregate value of the amount.
m. In case SBI decides not to go for Reverse auction procedure for this tender enquiry,
the price bids and price impacts, if any already submitted and available with SBI shall
be opened as per SBI standard practice.
n. The reverse auction will be treated as closed only when the bidding process gets
closed in all respects for the item listed in the tender.
Item Final Rate= K*(R) Qty. Amount
A 100X0.8 2 160/-
B 200X0.8 3 480/-
C 300X0.8 4 960/-
Total amount worked out after e-reverse Auction 1600/-
Supply of one No of 320KVA DG set Page 11
Signature of the Supplier with Seal
CONTACT INFORMATION
E-Procurement Technologies Ltd STATE BANK OF INDIA
E-Procurement Technologies Ltd.,
Contact person :- Sujith Nair
Address: B- 704/705, Wall Street – II, Opp. Orient
Club, Ellisbridge, Ahmedabad – 380006, India
Contact: [email protected] |
Phone: +91-79-40270 579 | 580 | 590
Email:
Asst. General Manager ,
Premises & estate Department,4th Floor,
Local Head Office, State Bank of India.
Poojappura,
Thiruvananthapuram-695012
Office Tel. No.: 0471-2192410; 2192406
Fax: 0471-2352087
Email: [email protected]
Finalization for Procurement, Installation, Commissioning and Maintenance of 320KVA
DG sets with acoustic enclosure
a. SBI shall finalize the procurement of the item against this Tender through reverse
auction mode. SBI has made arrangement with M/s. E-Procurement Technologies Ltd.
(abcprocure) who shall be SBI’s authorized service provider for the same. Please go
through the guidelines given below and give your acceptance to the same.
b. Computerized Reverse auction shall be conducted by SBI, on pre-specified date,
while the vendors shall be quoting from their own offices/ place of their choice.
Internet connectivity and other paraphernalia requirements shall have to be ensured by
vendors themselves. In the event of failure of their Internet connectivity, (due to any
reason whatsoever it may be) it is the bidder’s responsibility / decision to send email
communication, immediately to M/s. E-PROCUREMENT TECHNOLOGIES LTD.
(ABCPROCURE) furnishing the price, the bidder wants to bid online, with a request
to M/S. E-PROCUREMENT TECHNOLOGIES LTD. (ABCPROCURE). to upload
Supply of one No of 320KVA DG set Page 12
Signature of the Supplier with Seal
the emailed price on line so that the service provider will up load that price on line on
behalf of the Bidder. It shall be noted clearly that the concerned bidder
communicating this price to service provider has to solely ensure that the email
message is received by M/S. E-PROCUREMENT TECHNOLOGIES LTD
(ABCPROCURE) in a readable / legible form and also the Bidder should
simultaneously check up with M/S. E-PROCUREMENT TECHNOLOGIES LTD
(ABCPROCURE) over phone about the clear receipt of the price emailed. It shall also
be clearly understood that the bidder shall be at liberty to send such email
communications of prices to be up loaded by M/S. E-PROCUREMENT
TECHNOLOGIES LTD (ABCPROCURE) only before the closure of Bid time and
under no circumstances it shall be allowed beyond the closure of bid time. Such
bidders have to ensure that the service provider is given a reasonable required time by
the bidders, to upload such emailed prices online and if such required time is not
available at the disposal of M/S. E-PROCUREMENT TECHNOLOGIES LTD
(ABCPROCURE) at the time of receipt of the email message from the bidders, M/S.
E-PROCUREMENT TECHNOLOGIES LTD. (ABCPROCURE) will not be
uploading the prices. It is to be noted that SBI or M/S. E-PROCUREMENT
TECHNOLOGIES LTD. (ABCPROCURE) are not responsible for these unforeseen
circumstances. In order to ward-off such contingent situation, bidders are requested to
make all the necessary arrangements / alternatives whatever required so that they are
able to circumvent such situation and still be able to participate in the reverse auction
successfully. However, the vendors are requested to not to wait till the last moment to
quote their bids to avoid any such complex situations.
c. Please note that the start price of an item in online reverse auction is open to all the
participating technically short-listed bidders. Any bidder can start bidding, in the online
reverse auction, from the start price itself or lower. Please note that the first online bid
that comes in the system during the online reverse auction can be equal to the auction's
start Price, or lesser than the auction's start price by one decrement, or lesser than the
auction's start price by multiples of decrement. The subsequent bid that comes in to
outbid the L1 rate will have to be lesser than the L1 rate by one decrement value or in
multiples of the decrement value.
d.M/S. E-PROCUREMENT TECHNOLOGIES LTD (ABCPROCURE) shall arrange to
train your nominated person(s), without any cost to you. They shall also explain you, all
the Rules related to the Reverse Auction/ Business Rules Document to be adopted along
with bid manual. You are required to give your compliance on it before start of bid
process.
e. BIDDING CURRENCY AND UNIT OF MEASUREMENT: Bidding will be
conducted in Indian Rupees (INR). Bidder has to quote Price for the given item as
mention in the tender document on Lumpsum basis (Note:-Prices quoted should be
inclusive of all Central / State Government levies, taxes, cost of incidental services such
as transportation, insurance etc. )
Supply of one No of 320KVA DG set Page 13
Signature of the Supplier with Seal
f. Starting Bid/Bid Decrement: The opening price of the RA and the bid decrement value
shall be available to the bidders on their bidding screen.
g.BID PRICE: Bidder has to quote Price for the given item on Lumpsum (“ Prices quoted
should be inclusive of all Central / State Government taxes(GST) etc.as also cost of
incidental services such as transportation, insurance along with supply, installation, testing,
commissioning charges etc.
The technical & commercial terms are as per SBI Tender for the Reverse Auction for
Procurement, Commissioning and Maintenance of one number 320KVA DG set
1. VALIDITY OF BIDS: The Bid price shall be firm for a period specified in the tender
document and shall not be subjected to any change whatsoever.
2. At the end of the reverse auction, bidder has to provide a detail break up for his lowest
offer within 24 hour of closing of auction (Annexure I) and Price confirmation letter within 1
hour of closing of auction (Annexure III)
Terms & Conditions of Reverse Auction for Procurement, Commissioning and
Maintenance of one number 320KVA DG set
� LOG IN NAME & PASSWORD: Each Bidder is assigned a Unique User Name &
Password by M/S. E-PROCUREMENT TECHNOLOGIES LTD. (ABCPROCURE).
The Bidders are requested to change the Password after the receipt of initial Password
from M/S. E-PROCUREMENT TECHNOLOGIES LTD. (ABCPROCURE). All bids
made from the Login ID given to the bidder will be deemed to have been made by the
bidder.
� BIDS PLACED BY BIDDER: The bid of the bidder will be taken to be an offer to
execute the work. Bids once made by the bidder cannot be cancelled. The bidder is
bound to execute the work the as mentioned above at the price that they bid. Should
any bidder back out and not make the supplies at per the rates quoted, SBI and / or
M/S. E-PROCUREMENT TECHNOLOGIES LTD. (ABCPROCURE) shall take
action as appropriate.
� LOWEST BID OF A BIDDER: In case the bidder submits more than one bid, the
lowest bid will be considered as the bidder’s final offer to execute the work.
� AUCTION TYPE: English Reverse Auction. ( No Ties )
� DURATION OF AUCTION: The auction will be of 1 hour duration. In case there is
any acceptable bid quoted by any bidder within 5 minutes of closing of the auction,
the auction will be extended for another 5 minutes from the time that Bid comes in.
However, vendors are advised not to wait till the last minute or last few seconds to
enter their bid during the auto-extension period to avoid complications related with
internet connectivity, network problems, system crash down, power failure, etc.
(THIS SCHEDULE IS TENTATIVE. IF ANY CHANGE IN SCHEDULE, THE
SAME SHALL BE COMMUNICATED TO YOU).
Supply of one No of 320KVA DG set Page 14
Signature of the Supplier with Seal
� BID DECREMENT: The minimum Bid decrement shall be available to the Bidders
at the start of the auction. The bidder can view the same by clicking on the Item
details at the start of the auction. The bidder can bid lower than the Lowest Bid in the
auction by a decrement, multiple of the minimum Bid decrement or at least of
minimum bid decrement plus multiples of Bid Decrement. Also, please note that the
start price of an item in online reverse auction is open to all the participating bidders.
Any bidder can start bidding, in the online reverse auction, from the start price itself.
Also, please note that the first online bid that comes in the system during the online
reverse auction can be equal to the auction's start price, or lesser than the auction's
start price by one decrement, or lesser than the auction's start price by multiples of
decrement. The second online bid and onwards will have to be lesser than the L1 rate
by one decrement value, or lesser than the L1 rate by multiples of the decrement
value.
� VISIBLITY TO BIDDER: The Bidder shall be able to view the following on his
screen along with the necessary fields during English Reverse – No ties Auction:
1. Leading Bid in the Auction
2. Bid Placed by him
3. Rank of the respective bidder
4. Start Price & Bid Decrement Value
� AUCTION WINNER: At the end of the Reverse Auction, SBI will evaluate all the
bids submitted and will decide upon the winner.
� OTHER TERMS & CONDITIONS:
� The Bidder shall not involve himself or any of his representatives in Price
manipulation of any kind directly or indirectly by communicating with other
suppliers / bidders.
� The Bidder shall not divulge either his Bids or any other exclusive details of SBI to
any other party.
� SBI’s decision on award of Contract shall be final and binding on all the Bidders.
� SBI along with M/S. E-PROCUREMENT TECHNOLOGIES LTD (ABCPROCURE
can decide to extend, reschedule or cancel any Auction. Any changes made by SBI
and / or M/S. E-PROCUREMENT TECHNOLOGIES LTD. (ABCPROCURE), after
the first posting will have to be accepted if the Bidder continues to access the site
after that time.
� M/S. E-PROCUREMENT TECHNOLOGIES LTD. (ABCPROCURE) shall not have
any liability to Bidders for any interruption or delay in access to the site irrespective
of the cause.
Supply of one No of 320KVA DG set Page 15
Signature of the Supplier with Seal
� M/S. E-PROCUREMENT TECHNOLOGIES LTD (ABCPROCURE) is not
responsible for any damages, including damages that result from, but are not limited
to negligence. M/S. E-PROCUREMENT TECHNOLOGIES LTD. (ABCPROCURE)
will not be held responsible for consequential damages, including but not limited to
systems problems, inability to use the system, loss of electronic information etc.
Important Note:-
All the Bidders are required to submit the scan copy of Process Compliance Statement
(Annexure- II) duly signed to M/s E-Procurement technologies pvt ltd on their letter
head.
All the bidders are requested to ensure that they have a valid Digital certificate well
in advance to participate in the online event. Under no circumstances will the
bidders be allowed to participate in the online event without Digital Certificate.
After the completion of the Auction event, L-1 Bidders have to submit the Price
Confirmation Letter (Annexure III) within 1 Hour immediately to M/s E-Procurement
technologies pvt ltd /SBI for further proceedings on their letter head.
The tenders received shall be numbered in the order of receipt. The covers containing the
tenders shall be verified whether they are in sealed condition by the members of the
Committee and shall be shown to the tenderers present. On opening of the Tender, only
the total tendered amount of each tender shall be read out. The actual / final quoted
amount and the lowest tender (L-1) shall be announced only after completion of physical
arithmetic checking of the amounts of individual items. This L1 amount shall be probably
the starting price for reverse auction.
4. When a supplier signs a tender in an Indian language, the RATES and tendered
amount and / or the total amount tendered should also be written in the same
language. In the case of illiterate suppliers the rates or the amount tendered should be
attested by a witness.
Earnest Money Deposit (EMD) for an amount as specified in NIT, is to be deposited
with the tender in the form of Demand Draft (favoring ASST. GENERAL
MANAGER (PREMISES & ESTATE), STATE BANK OF INDIA, payable at
Thiruvananthapuram drawn on any Scheduled/ Commercial Bank ) and
otherwise the tender is liable for rejection. E.M.D in the form of Bank Guarantee
or any other form is not acceptable.
No Interest will be paid on the EMD. EMD of unsuccessful tenderers will be refunded
within 30 days of award of Contract. EMD of successful tenderer will be retained as a
part of Initial Security Deposit.
5. Initial Security Deposit shall be 2% of the contract value. The successful tenderer has
to deposit a sum equivalent to 2% of contract value less EMD, by means of Demand
Draft (favoring Asst. General Manager (Premises & Estate), State Bank of India,
Supply of one No of 320KVA DG set Page 16
Signature of the Supplier with Seal
payable at Thiruvananthapuram drawn on any Scheduled/ Commercial Bank),
with in a period of 15 days of acceptance of tender.
6. Total security deposit shall be 5% of contract value. Out of this 2% of contract value
is in the form of initial security deposit, which includes the EMD. Balance 3% shall
be deducted from the running account bills of the work at the rate of 10% of the
respective running account bill i.e., deduction from each running bill account will be
10% till total 3% of contract value is reached. Initial security deposit shall be released
to the supplier on virtual completion of the work. The Retention money would be
released to the supplier after the defects liability period as specified in the contract,
subject to satisfactory rectification of defects during the defect liability period. No
interest shall be paid to the amount retained by the Bank as Security Deposit.
7. The liquidated damages shall be 0.5% per week, subject to a maximum of 5% of
contract value for delay after 30 days.
8. There is no provision for any advance payment including for mobilization purpose
for this work.
9. The acceptance of a tender will rest with the Competent Authority, who does not bind
himself to accept the lowest tender and reserves to himself the authority to reject any
or all of the tenders received, without assigning any reasons whatsoever. The
tenderers shall have no right to question the acts of the Bank. However, adequate
transparency shall be maintained by the Bank. All tenders in which any of the
prescribed conditions are not fulfilled, or are incomplete in any respect are liable to be
rejected.
10. The Bank will accept no condition on the tender from the tenderers. Tender
containing any condition leading to unknown/ indefinite liability, are liable to be summarily rejected. Any clarification on the tender may be obtained from the Bank
before submission.
11. Canvassing in connection with tenders is strictly prohibited and the tenders submitted
by the supplier who resort to canvassing will be liable for rejection.
12. The estimated value of work stated in the NIT is approximate and prepared for
internal use of the Bank. The tenderer must obtain himself on his own responsibility
and his own expenses all information and data which may be required for the purpose
of filling this tender document and enter into a contract for the satisfactory
performance of the work. The tenderer is requested to satisfy himself regarding the
availability of transport and communication facilities, the character, quality and
quantity of the materials, labour, the law and order situation, climatic conditions, local
authorities requirement, traffic regulations etc. The tenderer should quote their own
rates for completing the work, complete in all respects from functional point of
view to the entire satisfaction of the Bank.
13. The supplier should quote his rates including all taxes The Supplier shall be responsible to pay all statutory levies imposed by the State and
Central Government such as Income Tax, GST etc. and the rates quoted in the tender
shall allow for the same.
Deduction at source of Income Tax on works contract etc. shall be made by the Bank
as per the provisions prevailing from time to time from the Running Account or Final
Supply of one No of 320KVA DG set Page 17
Signature of the Supplier with Seal
Bills and remitted to the concerned Taxation Authorities / State Government on behalf
of the Supplier. The rates quoted shall be firm till completion of work and no
escalation shall be considered.
14. Time is the essence of the contract. The work should be completed in all respects in
accordance with the terms of contract within the period as stated in NIT.
15. Tenders shall remain open for acceptance for a period of 90 days from the date of opening of Technical Bid. If the tenderer withdraws his tender before the expiry of
the said period or makes any modifications in terms and condition of the tender which
are not acceptable to the Bank or the contract agreement is not executed within fifteen
(15) days from the date of letter of acceptance after execution of contract agreement
then the Bank without prejudice to any other right or remedy be at liberty to forfeit the
earnest money.
16. It will be obligatory on the part of the tenderer to tender and sign the tender
documents for all the component parts and after the work is awarded, the successful
tenderer shall be bound to implement the contract by signing an agreement and
conditions of contract attached herewith within 15 days from the receipt of intimation
of acceptance of his tender by the Bank. However, the written acceptance of the
tender by the Bank will constitute a binding agreement between the Bank and
successful tenderer whether such formal agreement is subsequently entered into or
not.
17. The quantities of various items of work given in the schedule of quantities are
approximate. The quantities of work may vary at time of allotment/ execution of
work. Bank reserves the right to omit/delete any item(s) of work from the schedule at
the time of allotment/ before the commencement of work without assigning any
reason whatsoever. Supplier will be paid for the authorized actual supply of material
at the site duly verified by the concerned officials of the Bank.
18. Clarifications if any, regarding this tender may be obtained during “PRE-BID
MEETING” scheduled for – 15.00 PM on date 19/06/2018 at the office of
undersigned.
Yours faithfully,
Asst. General Manager (Premises & estate)
Supply of one No of 320KVA DG set Page 18
Signature of the Supplier with Seal
SECTION 3.0 FORM OF SUBMISSION OF TENDER
To
Asst. General Manager (Premises & Estate)
State Bank of India,
Local Head Office, Poojappura,
Thiruvananthapuram-12.
Dear Sir(s),
Tender for supply of 1 No of 320 KVA, 415V, 3-phase, 50Hz, 1500 rpm DG Sets at SBI,
newly constructed building at Calicut
1. We refer to the NIT for the aforesaid supply contract, I/We hereby offer to perform,
execute, complete and maintain the works in conformity with the conditions of
contract, schedule of quantities and specifications at the respective rates quoted in the
Schedule of Quantities.
2. I/ We have satisfied myself/ ourselves as to the site conditions, examined all aspects of
the tender conditions, subject to above, I/We do hereby agree, should this tender be
accepted in whole or in part, to :-
i. Abide by and fulfill all the terms and provisions of the said conditions annexed
hereto,
3. I/We have deposited the required earnest money as specified in the NIT which, I/We
note, will not bear any interest and is liable for forfeiture;
i. If our offer is withdrawn within the validity period of acceptance.
Or
ii. If we makes any modifications in terms and condition of the tender which are
not acceptable to the Bank.
Or
iii. If the contract is not executed within fifteen (15) days from the date of letter of
acceptance.
Or
iv. If the work is not commenced within fifteen (15) days after execution of
contract.
4. I/We understand that the Bank reserves the right to reject any/ all tenders without
Supply of one No of 320KVA DG set Page 19
Signature of the Supplier with Seal
assigning any reason what so ever. Further, we understand that the Bank is not bound
to accept the lowest or any tender you receive.
Yours Faithfully,
Signature _______________
Designation_______________
Address _______________
Supply of one No of 320KVA DG set Page 20
Signature of the Supplier with Seal
SECTION 4.0 GENERAL NOTES
1. PROCEDURE OF FILLING AND SUBMISSION OF TENDER
i) The tenderers should quote their rates in figures and words where the quantities have
been indicated in the relevant items of the schedule of quantities. Failure to do so may
invalidate the tender. Erasing or over writing shall not be allowed. Corrections in the
tender should be avoided. If this becomes unavoidable, the entire rate (and not a
portion only) shall be scored out and signed (not simply initialed) by the tenderer as
token of such cancellation. A fresh rate in specified manner shall then be correctly
written.
The rates quoted shall be firm. The rates quoted shall not be subject to any variations
due to labour conditions, fluctuations in railway freight and any other conditions
whatsoever. Under this clause any increase or decrease in prices of materials and
labour rates shall be fully borne by the Supplier.
ii) In the event of the tender being submitted by a firm, it must be signed by a member or
members of the firm having legal authority to do so, and if called for, the legal
documents in support thereof must be produced for inspection and the same in the
case of the firm carried out by one member of a joint family. It must disclose that the
firm is duly registered under the INDIA Partnership Act. Any tender signed by a
member not holding a power of attorney shall be treated as informal.
iii) Each page of (BOQ) shall be signed by the authorized person and cutting or
corrections shall be duly attested/ signed by him.
iv) The tenderer is to quote his rate in ink pen/ ball pen both in words and figures in
English. In case of any variation, the rates quoted in the words in the “Original” copy
of the tender shall only be valid. The tender shall be clearly and legibly written and
whole writing must be by the hand of the person signing the tender and with the same
pen and ink. Failure to do so may invalidate the tender.
v) Tenderer shall note that their tenders shall remain open for acceptance for a minimum
period of 90days from the date of finalizing the tenders (Price Bid). The tender must
be unconditional. Conditional tenders may be summarily rejected.
Submission of tenders:
The tenders are to be duly signed by the tenderer and submitted in a sealed covers at
the office as mentioned in the tender notice. An authorized representative of the
tenderer can be present during opening of the tender.
Supply of one No of 320KVA DG set Page 21
Signature of the Supplier with Seal
SECTION 5.0 GENERAL CONDITIONS OF CONTRACT
Except where provided for in the description of the individual items in the schedule of
quantities and in the specifications and conditions laid down hereinafter and in the drawings,
the work shall be carried out as per standard specifications (relevant IS) and under the
direction of Employer .
1.0) INTERPRETATIONS/ DEFINITIONS
In construing these conditions, the specifications, the schedule of quantities, tender and
agreement, the following words shall have the meaning herein assigned to them except where
the subject or context otherwise requires:
1.1) Employer: The term employer shall denote State Bank of India with their Local Head
office at Poojappura, Thiruvananthapuram and any of its employees representative
authorized on their behalf.
1.2) Supplier: The term supplier shall mean the individual or firm or company whether
incorporated or not, undertaking the works and shall include legal personal
representative of such individual or the composing the firm or company and the
permitted assignees of such individual or firms of company.
1.3) ‘Contract Agreement’ shall mean the documents forming the tender and the
acceptance thereof and the formal agreement executed between State Bank of India
(client) and the Supplier, together with the documents referred therein including these
conditions, the specifications, designs, drawings and instructions issued from time to
time by the Bank and all these documents taken together shall be deemed to form one
contract and shall be complementary to one another.
1.4) ‘Contract value’ shall mean the value of the entire work as stipulated in the letter of
acceptance of tender subject to such additions there to or deductions there from as
may be made under the provision herein after contained.
1.5) 'Specifications’ shall mean the specifications referred to in the tender and any
modifications thereof as may be furnished or approved by the Bank time to time.
1.6) Site: The site shall mean the site where the works are to be executed as shown within
boundary on the site plan including any building and erections thereon allotted by the
Employer for the Supplier’s use.
1.7) ‘The Bank’ shall mean State Bank of India having its L.H.O. at Poojappura,
Thiruvananthapuram and includes its representatives, successors and assigns.
1.8) Bank's Engineer: Bank's Engineer shall mean the Engineer appointed by Bank/
Employer as their representative for the work.
1.9) Engineer: Engineer shall mean the representative of the Bank.
1.10) Drawings: Drawings shall mean the drawings prepared by the Bank and issued to the
Supply of one No of 320KVA DG set Page 22
Signature of the Supplier with Seal
Supplier and referred to in the specifications including any modifications of such
drawings as may be issued by him from time to time. The work is to be carried out in
accordance with drawings, specifications, the schedule of quantities and any further
drawings which may be supplied or any other instruction, which may be given by the
Employer during the execution of the work.
All drawings relating to work given to the Supplier together with a copy of schedule
of quantities are to be kept at site and the Employer/ PMC shall be given access to
such drawings or schedule of quantities wherever necessary.
In case any detailed Drawings are necessary Supplier shall prepare such detailed
drawings and/or dimensional sketches and have it confirmed by the Employer/ PMC
as case may be prior to taking up such work.
The Supplier shall ask in writing for all clarifications on matters occurring anywhere
in drawings, specifications and schedule of quantities or to additional instructions at
least 10 days ahead from the time when it is required for implementation so that the
Employer may be able to give decision thereon.
1.11)“The Schedule of Quantities” shall mean the schedule of quantities as specified and
forming part of this contract.
1.12) “Priced Schedule of Quantities” shall mean the schedule of quantities duly priced with
the accepted rates of the Supplier after reverse auction.
1.13) ‘Month’ means calendar month.
1.14) ‘Week’ means seven consecutive days of 24 Hrs.
1.15) AMC period: Maintenance period of 60 months (5 years) from the date of actual
completion of work at its own cost and to the satisfaction of State Bank of India.
2.0. Language
The language in which the contract documents shall be drawn shall be in English.
3.0. Errors, Omissions & Discrepancies
In case of errors, omissions or disagreement
i) Between written description of the item in the specifications and descriptions in
bills of quantities of the same item, the former shall be adopted.
ii) In case of difference between rates percentage written in figures and words the
rate in words shall prevail.
iii) Between the duplicate/subsequent copies of the tender, the original tender shall
be taken as correct.
4.0. Ownership of drawings
Supply of one No of 320KVA DG set Page 23
Signature of the Supplier with Seal
All drawings, specifications and copies thereof furnished by the Bank are the properties
of the Bank. They are not to be used on other work.
5.0. Detailed drawings and instructions
The work shall be executed in conformity therewith and the Supplier shall prepare a
detailed program schedule indicating therein the date of start and completion of various
activities on receipt of the work order and submit the same to the Bank.
6.0. Letter of Acceptance
Within the validity period of the tender the Bank shall issue a letter of acceptance to
enter into a Contract for the execution of the work as per the terms of the tender. The
letter of acceptance shall constitute a binding contract between the Bank and the
Supplier.
7.0. Contract Agreement
On receipt of intimation of the acceptance of tender from the Bank the successful
tenderer shall be bound to implement the contract and within fifteen days thereof he
shall sign an agreement in a non judicial stamp paper of appropriate value.
8.0 Copies of Agreement
Two copies of agreement duly signed by both the parties with the drawings shall be
handed over to the Suppliers.
9.0. Obtaining information related to Execution of Work
No claim by the Supplier for additional payment shall be entertained which is
consequent upon failure on his part to obtain correct information as to any matter
affecting the execution of the work nor any misunderstanding or the obtaining incorrect
information or the failure to obtain correct information relieve him from any risks or
from the entire responsibility for the fulfillment of contract.
10.0. Commencement of Work
The date of commencement of the work will be reckoned from the date of issue of letter
of acceptance of the tender by the Bank.
11.0. Time for Completion
Time is essence of the supply and shall be strictly observed by the Supplier. The entire
work shall be completed within a period of 30 days from the date of work order.
12.0 Payment terms are as follows,
No advance payment
i. 70% of quoted rate – against item wise supply of material at site.
Supply of one No of 320KVA DG set Page 24
Signature of the Supplier with Seal
ii. 30% of quoted rate - against commissioning and handing over.
13.0 Deduction from the bill
iii. 3% of quoted rate – towards retention amount for defects liability period of one year.
14.0. Release of Security Deposit and Bank Guarantee:
14.1. Initial Security Deposit [SD] mentioned in 32.2.1 above shall be refunded to the
Supplier without any interest on satisfactory completion of the work.
14.2. The Retention Money deducted from the bills as per Clause 32.3 above shall be
refunded to the Supplier without interest within fifteen days after the end of Defects
Liability Period [DLP] provided the Supplier has satisfactorily attended to all defects
in accordance with the conditions of contract including site clearance and after
deduction of any appropriations thereof. However, this amount shall be released
earlier but after issue of VCC, on producing a Bank Guarantee (from any scheduled
Bank other than State Bank of India) for the equivalent amount and validity as
specified by the Bank (Minimum validity period shall not be less than the defect
liability period).
15.0. Taxes and Deduction at Source.
15.1. The Supplier shall be responsible to pay all statutory levies imposed by the State and
Central Government such as Income Tax/ GST etc. and the rates quoted in the tender
shall allow for the same.
The rates quoted shall be firm till completion of work and no escalation shall be
considered.
15.2. The Supplier shall also fully indemnify the Bank in respect of any costs, charges or
expenses arising out of any claim or proceedings at law and also in respect of any
award of compensation of damages arising there from.
15.3. The Bank shall be at liberty and is hereby empowered to deduct fully the amount of
any damages, compensation costs, charges and expenses arising or accruing any such
claim of damage from any sum or sums due or to become due to the Supplier.
16.0. Liquidated Damages
If the Supplier fails to maintain the required progress in completing the work and clear
the site including vacating their office on or before the contracted or extended date of
completion without justification in support of the cause of delay, he may be called upon
without prejudice to any other right of remedy available under the law to the Bank on
account of such breach to pay a liquidated damages at the rate of 0.5% of the contract
value shown in tender per week, subject to a maximum of 5% of the contract value.
17.0. Action when the whole Security Deposit is forfeited
Supply of one No of 320KVA DG set Page 25
Signature of the Supplier with Seal
In any case in which under any clause or clauses of this contract, the Supplier shall have
rendered himself liable to pay compensation amounting to the whole of his security
deposit, the Bank shall have the power to adopt any of the following course as they may
deem best suited to the interest of the Bank.
a) To rescind the contract of which rescission notice in writing issued to the Supplier by
the Bank shall be conclusive evidence and in which case the security deposit of the
Supplier shall be forfeited and be absolutely at the disposal of the Bank.
b) In the event of any of above courses being adopted by the Bank the Supplier shall
have no claim to compensation for any loss sustained by him by reasons of his having
purchased or procured any material or entered into any engagements or make any
advances on account of, or with a view to the execution of the work or the
performance of the contract and in case the contract shall be rescind under the
provision aforesaid, the Supplier shall not be entitled to recover or to be paid any sum
or any work there to for actually performed under this contract, unless, and until the
Bank will have certified in writing the performance of such work and the value
payable in respect thereof, and he shall only be entitled to be paid the value so
certified.
18.0. Owner’s Right to Terminate the Contract
If the Supplier being an individual or a firm commit any ‘Act of insolvency’ or shall
be adjudged an insolvent or being an incorporated company shall have an order for
compulsory winding up voluntarily or subject to the supervision of Govt. and of the
Official Assignee of the liquidator in such acts of insolvency or winding up shall be
unable within seven days after notice to him to do so, to show to the reasonable
satisfaction of the Bank that he is able to carry out and fulfil the contract, and to give
security therefore if so required by the Bank.
Or
If the Supplier (whether an individual firm or incorporated Company) shall suffer
execution to be issued or shall suffer any payment under this contract to be attached
by or on behalf of any of the creditors of the Supplier.
Or
Shall assign or sublet this contract without the consent in writing of the Bank or shall
charge or encumber this contract or any payment due to which may become due to the
Supplier there under:
a) Has abandoned the contract; or
b) Has failed to commence the work, or has without any lawful excuse under these
conditions suspended the progress of the work for 14 days after receiving from the
Bank written notice to commence/proceed, or
Supply of one No of 320KVA DG set Page 26
Signature of the Supplier with Seal
c) Has failed to proceed with the works with such diligence and failed to make such due
progress as would enable the works to be completed within the time agreed upon, or has
failed to remove the materials from the site or to pull down and replace work within
seven days after written notice from the Bank that the said materials were condemned
and rejected by the Bank under these conditions ;or has neglected or failed persistently
to observe and perform all or any of the acts, matters or things under this contract to be
observed and performed by the Supplier for seven days after written notice shall have
been given to the Supplier to observe or perform the same or has to the detriment of
good workmanship or in defiance of the Bank’s instructions to the contrary subject to
any part of the contract. Then and in any of the said cases the Bank may not
withstanding any previous waiver, after giving seven days notice in writing to the
Supplier, determine the contract, but without thereby affecting the powers of the Bank
or the obligation and liabilities of the Supplier the whole of which shall continue in
force as fully as if the contract had not been so determined and as if the works
subsequently had been executed by or on behalf of the Supplier. And, further the bank
through the employees may enter upon and take possession of the work and all plants,
tools, scaffoldings, materials, sheds, machineries lying upon the premises & estate or on
the adjoining lands or roads use the same by means of their own employees or
workmen in carrying on and completing the work or by engaging any other Suppliers or
persons to complete the work and the Supplier shall not in any way interrupt or do any
act, matter or thing to prevent or hinder such other Supplier or other persons employed
for completing and finishing or using the materials and plant for the works.
When the works shall be completed or as soon thereafter as convenient the bank shall
give a notice in writing to the Supplier to remove his surplus materials and plants and
should the Supplier fail to do so within 14 days after receipt thereof by him the Bank
sell the same by public auction after due publication, and shall adjust the amount
realized by such auction. The Supplier shall have no right to question any of the act of
the Bank incidental to the sale of the materials etc.
19.0. Settlement of Disputes and Arbitration
Except where otherwise provided in the contract all questions and disputes relating to
the meaning of the specifications, design, drawings and instructions herein before
mentioned and as to the quality of workmanship or materials used on the work or as to
any other question, claim, right, matter or thing whatsoever in any way arising out of or
relating to the contract, designs, drawings, specifications, estimates, instructions orders
or these conditions or otherwise concerning the work or the execution or failure to
execute the same whether arising during the progress of the work or after the
cancellation, termination, completion or abandonment thereof shall be dealt with as
mentioned hereinafter.
1) If the Supplier considers that he is entitled to any extra payment or compensation in
respect of the works over and above the amounts admitted as payable by the Bank
or in case the Supplier wants to dispute the validity of any deductions or recoveries
made or proposed to be made from the contract or raise any dispute, the Supplier
Supply of one No of 320KVA DG set Page 27
Signature of the Supplier with Seal
shall forthwith give notice in writing of his claim, or dispute to the Assistant
General Manager, Premises & estate Dept., SBI, Local Head Office,
Thiruvananthapuram, and endorse a copy of the same to the Bank within 30 days
from the date of disallowance thereof or the date of deduction or recovery. The said
notice shall give full particulars of the claim, grounds on which it is based and
detailed calculations of the amount claimed and the Supplier shall not be entitled to
raise any claim nor shall the Bank be in any way liable in respect of any claim by
the Supplier unless notice of such claim shall have been given by the Supplier to the
Assistant General Manager, Premises & estate Dept., in the manner and within the
time as aforesaid. The Supplier shall be deemed to have waived and extinguished all
his rights in respect of any claim not notified to the Assistant General Manager,
Premises & estate Dept., in writing in the manner and within the time aforesaid.
2) The Assistant General Manager, Premises & estate Dept., shall give his decision in
writing on the claims notified by the Supplier. The Supplier may within 30 days of
the receipt of the decision of the Assistant General Manager, Premises & estate
Dept., submit his claims to the conciliating authority namely General Manager, SBI,
Local Head Office, Thiruvananthapuram for conciliation along with all details and
copies of correspondence exchanged between him and the Head of Premises &
estate Dept.
3) If the conciliation proceedings are terminated without settlement of the disputes, the
Supplier shall, within a period of 30 days of termination thereof shall give a notice
to the Chief General Manager of the Bank for appointment of an arbitrator to
adjudicate the notified claims failing which the claims of the Supplier shall be
deemed to have been considered absolutely barred and waived.
4) Except where the decision has become final, binding and conclusive in terms of the
contract, all disputes or differences arising out of the notified claims of the Supplier
as aforesaid and all claims of the Bank shall be referred for adjudication through
arbitration by the Sole Arbitrator appointed by the Chief General Manager. It will
also be no objection to any such appointment that the Arbitrator so appointed is a
Bank Officer and that he had to deal with the matters to which the Contract relates
to in the course of his duties as Bank Officer. If the arbitrator so appointed is unable
or unwilling to act or resigns his appointment or vacates his office due to any reason
whatsoever another sole arbitrator shall be appointed in the manner aforesaid by the
Chief General Manager. Such person shall be entitled to proceed with the reference
from the stage at which it was left by his predecessor.
It is a term of this contract that the party invoking arbitration shall give a list of
matters of amounts claimed in respect of each disputed matter along with the notice
for appointment of arbitrator.
It is also a term of this contract that no person other than a person appointed by
Chief General Manager as aforesaid should act as arbitrator.
The conciliation and arbitration shall be conducted in accordance with the
provisions of the Arbitration & Conciliation Act 1996 or any statutory modification
or re-enactment thereof and the rules made there under.
Supply of one No of 320KVA DG set Page 28
Signature of the Supplier with Seal
It is also a term of the contract that if any fees are payable to the arbitrator the same
shall be paid equally by both the parties. However no fee will be payable to the
arbitrator if he is a bank officer. It is also a term of the contract that the arbitrator
shall be deemed to have entered on the reference on the date he issues notice to both
the parties calling them to submit their statement of claims and counter statement of
claims. The venue of the arbitration shall be such place as may be fixed by the
arbitrator in his sole discretion. The fees, if any, of the arbitrator shall, if required to
be paid before the award is made and published, be paid half and half by each of the
parties. The cost of the reference and of the award (including the fees, if any of the
arbitrator) shall be in the discretion of the arbitrator who may direct to any by whom
and in what manner, such costs or any part thereof, shall be paid and fix or settle the
amount of cost to be so paid.
5) The work under the contract shall however continue during the arbitration
proceedings and no payment due to payable to the Supplier relating to the disputed
items shall be with held on account of such proceedings.
6) The arbitrator shall be deemed to have entered on the reference on the date he issues
notice to both parties fixing the date of first hearing.
7) The arbitrator from time to time with the consent of the parties may enlarge the time
for making and publishing the award.
8) The arbitrator shall give a separate award in respect of each dispute or difference
referred to him. The arbitrator shall decide each dispute in accordance with terms of
the contract and give a reasoned award.
9) The fees, if any, of the arbitrators shall if required to be paid before the award is
made and published, be shared equally by both parties.
10) The award of the arbitrator shall be final and binding on both parties.
11) Subject to aforesaid the provisions of the Arbitration Act 1940 or any statutory
modifications or re-enactment thereof and the rules made there under, and the time
in force shall apply to the arbitration proceeding under this clause.
12) In all cases where the amount of the claim is in dispute is Rs. 50,000/- and above the
arbitrator shall give reasons for the award.
13) It is also a term of contract that if the Supplier does not make any demand for
arbitration in respect of any claim (s) within 90 days of receiving intimation from
the Bank that the bill after verification is passed for payment of a lesser amount or
otherwise the Supplier’s right under this agreement to refer to arbitration shall be
deemed to have been forfeited and the Bank shall be relieved and discharged of
their liability under this agreement in respect of this claim(s). Further it is agreed
that for the purpose of this clause such notice will be deemed to have been received
by the Supplier with in two days of posting of the letter by the Bank or delivered by
hand and immediately after receipt thereof by the Supplier whichever is earlier.
Further a letter signed by the officials of the Bank the letter was posted to the
Supplier shall be conclusive.
Supply of one No of 320KVA DG set Page 29
Signature of the Supplier with Seal
20.0. Assignment and Subletting
The whole of work included in the contract shall be executed by the Supplier and he
shall not directly entrust and engage or indirectly transfer, assign or underlet the
contract or any part or share thereof or interest therein without the written consent of
the Bank and no undertaking shall relieve the Supplier from the responsibility of the
Supplier from active superintendence of the work during its progress.
21.0. Work by other Agencies
The Bank reserves the rights to use premises & estate and any portion of the site for
execution of any work not included in the scope of this contract which it may desire to
have carried out by other persons simultaneously and the Supplier shall not only allow
but also extend reasonable facilities for the execution of such work. The contract
however shall not be required to provide any plant or material for the execution of such
work except by special arrangement with the Bank. Such work shall be carried out in
such manner as not to impede the progress of the works includes in the contract.
22.0. Force Majeure:
22.1. Neither Supplier nor the Bank shall be considered in default in performance of their
obligations if such performance is prevented or delayed by events such as war,
hostilities, revolution, riots, civil commotion, strikes, lockout, conflagrations,
epidemics, accidents, fire, storms, floods, droughts, earthquakes or ordinances or any
act of god or for any other cause beyond the reasonable control of the party affected
or prevented or delayed. However a notice is required to be given within 30 days
from the happening of the event with complete details, to the other party to the
contract, if it is not possible to serve a notice, within the shortest possible period
without delay.
22.2. As soon as the cause of force majeure has been removed the party whose ability to
perform its obligations has been affected, shall notify the other of such cessation and
the actual delay incurred in such affected activity adducing necessary evidence in
support thereof.
22.3. From the date of occurrence of a case of force majeure obligations of the party
affected shall be suspended during the continuance of any inability so caused. With
the cause itself and inability resulting there from having been removed, the agreed
time of completion of the respective obligations under this agreement shall stand
extended by a period equal to the period of delay occasioned by such events.
22.4. Should one or both parties be prevented from fulfilling the contractual obligations by
a state of force majeure lasting to a period of 6 months or more the two parties shall
decide on the future execution of this agreement, on mutual consultation.
Supply of one No of 320KVA DG set Page 30
Signature of the Supplier with Seal
23.0. Accidents:
The Supplier shall immediately on occurrence of any accident at or about the site or in
connection with the execution of the work report such accident to the Bank. The
Supplier shall also submit such report immediately to the competent authority
whenever such report is required to be lodged by the law and take appropriate actions
thereof.
SECTION 6.0 SPECIAL CONDITIONS
1.0. Scope of work
Supply and commissioning of 1 No of 320 KVA ,415 V,3-phase,50 Hz,1500 rpm ready
to use DG Sets with acoustic enclosure at State Bank of India, Newly constructed
building at Calicut
2.0. Address of site
State Bank of India, Newly constructed building at Calicut behind SBI main branch,
3.0 Approved make
The Supplier shall provide all materials from the list of approved makes at his own cost.
4.0 Taxes, levies loading, unloading, transportation, installation charges etc;
The Supplier shall pay and be responsible for payment of all taxes, charges in respect of
the works required for supply, installation and commissioning at site, charges payable in
respect of materials, equipment plant and other things required for the contract. All of
the aforesaid taxes and charges shall be to the Supplier’s account and the Bank shall not
be required to pay any additional or extra amount on this account. Variation of taxes,
duties, fees, levies etc if any till completion of work shall be deemed to be included in
the quoted rates and no extra claim on this account will in any case be entertained. If a
new tax is imposed under a statute or law during the currency of contract the same shall
be borne by the Supplier. All loading /unloading expenses for equipments supplied shall
be borne by Supplier, any payment to local unions etc shall be borne by Supplier.
5.0 Non-Comprehensive Annual maintenance Contract (AMC)
The supplier will have to quote for the AMC of the DG set supplied for 5 years from
the date of commissioning. 10 visits/year is to be given under the AMC. Necessary
spares and consumables will be supplied at the cost of the Bank. Payment will be
released on half yearly basis against submission of satisfactory service reports.
6.0 Acceptance of tender
The Bank shall have the right to accept or reject any or all tenders without assigning
any reason. They are not found to accept the lowest or any tender and the tenderers shall
Supply of one No of 320KVA DG set Page 31
Signature of the Supplier with Seal
have no right to question the acts of the Bank. However adequate transparency would
be maintained by the Bank.
SECTION 7.0
FORMAT FOR AGREEMENT
ARTICLES OF AGREEMENT made at this day of----/ ----- /------ (-------) between
The Assistant General Manager, Premises & estate Department, State Bank of
India, Local Head Office, P.B No.2704, Poojappura, Thiruvananthapuram (hereinafter
referred to as the EMPLOYER which expression shall include his heirs, executors,
administrators and assigns) of the one part and in the name and style as mentioned
above at (hereinafter referred as the SUPPLIER which expression shall include
heirs, executors, administrators and assigns) of the other part.
AND WHEREAS the said drawings and specifications and priced schedule of
quantities have been signed by or on behalf of the parties hereto.
AND WHEREAS the Supplier has agreed to execute upon and subject to the
conditions set for the herein (hereinafter referred to as the said conditions) the
work shown upon the said drawings and described in the said specifications and the
priced schedule of quantities at the respective rates mentioned in the priced
schedule of quantities attached herewith.
NOW IT IS HEREBY AGREED AS FOLLOWS:
1. In consideration of the payments to be made to the Supplier as
hereinafter provide, he shall upon and subject to the said conditions
execute and complete the works shown upon the said drawings and such
further details drawings, as may be furnished to him, by the said Bank
and described in the said specifications and the said priced schedule of
quantities.
2. The Employer shall pay the Supplier such sums as shall become payable
hereunder at the times and in the manner specified in the said conditions.
3. The Suppliers agree and undertake to duly perform and execute and
complete the said work set forth in the Work Order No. issued by the
Bank and the subsequent amendments, if any, issued from time to time
thereto in the manner authorized by and under the General Conditions of
Contract. The said work shall throughout the stipulated period of the
contract be proceed with all due diligence, promptness, care and
accuracy and in a workman like manner to the satisfaction of the Bank
and would be completed in accordance with the said specifications,
designs, drawings bill of quantities and instructions on or before due date
mentioned in the said work order, time being the essence of the contract
on part of the Suppliers. Acquiescence of NO OBJECTION of the
Supply of one No of 320KVA DG set Page 32
Signature of the Supplier with Seal
STATE BANK OF INDIA, to the completion of any portion of the work
beyond the stipulated due time shall be without prejudice to the rights of
the STATE BANK OF INDIA, to enforce its rights and remedies
available under this Agreement and the Conditions of Contract regarding
forfeiture, damages, penalty or otherwise and shall not constitute a
waiver of the Corporation's rights in that behalf.
4. Without prejudice to the rights and remedies of the STATE BANK OF
INDIA, against the Suppliers under any of the provision of this
agreement and General Conditions of Contract of the said work order or
otherwise in law, if the Suppliers commit any default or breach of terms
and conditions of this Agreement and/or the General Conditions of the
contract and/or the work order or foil in the due performance thereof
within the time fixed by the contract (which is the essence of the
Contract) and do not complete the entire work on the stipulated due date,
the STATE BANK OF INDIA, shall be entitled to recover from the
Suppliers and the Suppliers hereby agree to be bound to pay the STATE
BANK OF INDIA, as by way of compensation or liquidated damages an
amount calculated at the rate of 0.5% contract amount whichever is higher
per week subject to a maximum of 5% of the contract amount. The delay
beyond the stipulated date in respect of the item which is not completed
or finished and delivered completely to the STATE BANK OF INDIA on
the stipulated date as mentioned in the Contract work order and declare
that the amount of compensation or liquidated damages fixed as above
represent the genuine, fair and reasonable pre-estimate thereof
considering all the facts and circumstances as the loss and damages that
would be likely suffered by the STATE BANK OF INDIA on account
thereof. It is further hereby agreed and confirmed that the sum payable
by the Supplier under this provision shall be considered as reasonable
compensation irrespective of whether actual loss or damage has or has
not been sustained and the STATE BANK OF INDIA, would not be
required to render any proof in support thereof. It is specifically agreed
and declared that in the event of the Suppliers not completing the work
after the stipulated date, the aforesaid provisions shall not be deemed to
prevent or stop the STATE BANK OF INDIA, from exercising any other
rights or remedies available to the STATE BANK OF INDIA, against the
Suppliers including the completion of the work departmentally or
through any other Supplier or agency or otherwise whomsoever at the
risk and account of Suppliers and the STATE BANK OF INDIA, shall be
entitled to recover and the Suppliers shall be bound to pay all such losses
and damages which the STATE BANK OF INDIA, may suffer on account
thereof. This is also without prejudice to all the rights and remedies
available to the STATE BANK OF INDIA, under the General Conditions
of Contract.
Supply of one No of 320KVA DG set Page 33
Signature of the Supplier with Seal
5. The Suppliers shall keep constantly at the work site a competent
supervisor or such other competent technical person as may be required
to set the work and any direction or explanation given by the STATE
BANK OF INDIA/ authorized representative to such person in writing
shall be held to have been given to the Suppliers.
6. The Plans, Agreements and Documents above mentioned shall form the
basis of this contract and the decision of the said Bank’s Engineer for the
time being, as mentioned in the conditions of contract, taken with the
approval of the Employer, in reference to all the matters of dispute as to
the material, workmanship or account and as to the intended
interpretation of the Clauses of this agreement or any other document
attached shall be final and binding on both the parties and may be Rule
of Court.
7. The said contract comprises the buildings above mentioned and all
subsidiary works connected therewith the same site as may be ordered to
be done from time to time by the said Bank’s Engineer for the time being
with the approved of the Employer even though such works may not be
shown in the drawings of described in the said specifications or the
priced schedule of quantities.
8. The Bank reserve the rights of altering, the drawings and nature of work
and of adding to or omitting any item of work or of having portions of
the same carried out departmentally or otherwise and such alterations or
variations shall be carried out without prejudice to this contract.
Provided that the Supplier shall not be entitled to claim any
compensation other than the admissible rates provided for in the contract
or otherwise mutually agreed upon for such additions, alterations,
notification, variations, omissions etc.
9. The said conditions shall be read and construed as forming part of this
agreement and the parties will respectively abide by and submit
themselves to the conditions and stipulations and perform the agreements
on their parts respectively in such conditions contained.
10. All disputes arising out or in any way connected with this agreement
shall be deemed to have arisen in LOCAL HEAD OFFICE
THIRUVANANTHAPURAM and only the Courts in
THIRUVANANTHAPURAM shall have jurisdiction to determine the
same.
11. The several parts of this contract have been read to us and fully
understood by us.
Supply of one No of 320KVA DG set Page 34
Signature of the Supplier with Seal
IN WITNESS, WE SET OUR HAND THIS DAY OF 20---- (TWO
THOUSAND AND -------------- )
WITNESS: EMPLOYER
1.
2.
WITNESS: SUPPLIER
1.
2
Supply of one No of 320KVA DG set Page 35
Signature of the Supplier with Seal
SECTION 8.0
TECHNICAL SPECIFICATIONS FOR 320 KVA DG SET
a)
Requirements of AC Circuit breaker
IS 2516 (Part I)
Sec 1,2 & 3 Part III)
b)
Code of practice for selection, installation and
maintenance of switchgear. Part 1-4, General,
selection, installation, maintenance.
IS 10118- (Part 1-4)
C)
Specification for ac generators driven by
reciprocating internal combustion engine Part 1
Rated up to 20 kVA /Part 2 Rated above 20kVA and
up to 1250kVA
IS 13364- (Part 1-2)
SECTION 9.0
APPROVED MAKE OF MATERIALS
Engine
CUMMINS/Caterpillar/Perkins/Volvo/Greaves/
Mahindra powerol/ Kirloskar Oil Engine
(KOEL)
Alternator
Leroy Somer/ Stamford/ Kerala Electrical &
Allied Engg. co. ltd.(KEL)/ KOEL GREEN/
Greaves Cotton
Supply of one No of 320KVA DG set Page 36
Signature of the Supplier with Seal
SECTION-10 Annexure- A
SUPPLY OF 1 no OF 320KVA DIESEL GENERATOR AT THE PREMISES & ESTATE OF
SBI NEW BUILDING AT CALICUT
320KVA DIESEL GENERATOR
Supply of each 320 KVA DG Set comprising of Diesel Engine, Alternator, standard control panel as
per Inspectorate standards, integrated fuel tank and battery with leads and digital battery charger,
lights etc housed inside acoustic insulation chamber with 8 nos anti-vibration pads, residential type
silencer. The DG set shall conform to detailed specifications.
Engine: - CUMMINS/Caterpillar/Perkins/Volvo/Kirloskar Oil Engine (KOEL)/ Greaves/Mahindra
powerol make, WATER cooled, Four Stroke, in line type arrangement developing adequate BHP for
delivering 320KVA @ 1500 RPM Diesel Engine developing minimum 256 kW rated output with 24 V
Electric start arrangement. Fuel system should be mechanically actuated electronically controlled
(MEUI) or similar fuel system.
� Radiator � Fuel pump, electronic fuel Injector, electronic governor. � Turbocharger � Stainless steel exhaust flexible connection � Residential type silencer. � Lube oil cooler, � Flywheel with housing � Starting motor – with battery and charger
Alternator:- Leroy Somer/ Stamford/ Kerala Electrical & Allied Engineering Co.Ltd.(KEL)/ KOEL
GREEN/ Greaves Cotton make alternator with electronic governor rated at 320 KVA, 3 phase, 415 V,
50 cycles per second 1500rpm. The alternator should be AREP excitation or self excitation, self
regulated. Under normal conditions the voltage regulation will be +/- 1%, voltage adjustment +/-5%,
Total Harmonic Distortion less than 3% (under balanced load). Frequency 50Hz +/- 1%. The
alternator shall be of class “H” insulation and designed and built to withstand tropical conditions. IP
rating should be under Drip proof IP23. Single phase sensing voltage regulator with Load
Acceptance Module (LAM). Should be random wound.
Base frame: - Sturdy channel iron base frame welded construction for mounting engine and
alternator.
Acoustic Enclosure: -
The DG set shall be provided with acoustic enclosure as per provisions covered in the notification
GSR-445/8 dated 12/7/04 issued by the ministry of environment and forest (CPCB norms).
The acoustic enclosure should have sufficient approach, operation and service space, air inlet
louvers are to be provided for sufficient fresh air availability. The enclosure shall be powder coated
for long lasting and superior finish and be capable of withstanding tropical weather conditions. It
shall have suitable provision for fluid drain. The enclosure should have light fitting inside for
illumination during maintenance.
The dimension of the acoustic enclosure to be specified so that generators can be installed without
constrain in the available space (to be specified L X B X H).
Supply of one No of 320KVA DG set Page 37
Signature of the Supplier with Seal
Control panel: - Stand alone manually operated, mounted outside near the acoustic enclosure or
inbuilt panel with all features and meters as specified below. Provision of connecting 2 Runs of 320
Sq.mm AYFY cables with the control panel. The Floor mounted totally enclosed sheet metal control
panel, comprising Microprocessor based Digital engine control unit with protection signal actuation
and display in LED panel.AMF panel with KSEB supply bypass facility.
a. 1 No MCCB +stand by low set earth fault relay with CT in neutral earthing conductor b. Combined Voltmeter, Ammeter & Frequency meter c. Combined kW, kVA and PF meter d. Indicating lamps for “Load On” and “DG On” e. Current Transformers f. Instrument fuses / MCBs duly wired. g. Al bus bar of rated capacity h. Cubicle (IP65) with louvers, hinged doors. i. Emergency stop push button j. 1 No: Earth fault Relay (CDG11 or equivalent) k. 1 No: Reverse Current relay l. Battery charger with adequate capacity and located inside acoustic enclosure for continuous
charging of batteries The control panel shall be complete with necessary internal cables/bus bar, fuses and accessories
as per Electrical Inspectorate standards. Droop CT should be provided for DG set as parallel
operation is envisaged. Energy meter shall be CT operated; three phase digital type (Preferably L&
T) acceptable to Kerala Electrical Inspectorate.
The control panel shall have suitable means for control and monitoring of the following
� Electronic governor � Digital Voltage regulation – suitable for parallel operation � Alternator over current protection � Battery monitoring system with alarm � Alarm with status message display � Display for all generator and engine functions � Network capability
Cooling: - The coolant based radiator system must have guard for fan and belt, and should be low
profile. There should be provision for draining the coolant. There shall be provision for alarm when
the coolant level is low. The hot air must be let out through the top of the enclosure.
Fuel Tank: - The integrated fuel tank shall be of minimum 600 litres capacity, complete with level
indicator, fuel inlet and outlet, air vent, drain plug, inlet arrangement for direct filling. Emergency fuel
shut off facility shall be provided.
Fuel Consumption:-Fuel consumption at various loads shall be furnished.
Battery: - 24V batteries, with leads and terminals, with suitable battery charger.
Mounting: - The engine and alternator are mounted on a common MS fabricated base frame with
Anti Vibration Pads.
Supply and providing fuel pipe line to connect the external fuel tank.
Supply and Providing additional equipments if any, required along with the DG set for completion of
the installation along with foundation.The control panels
Supply of one No of 320KVA DG set Page 38
Signature of the Supplier with Seal
CONDITIONS
� DG set is to be delivered at site of State Bank of India, new building Calicut behind SBI main branch, Calicut and prices quoted accordingly. THE SET HAS TO BE COMMISSIONED AFTER INSTALLATION BY SUPPLIER. The supplier should provide the first fill of lube oil, coolant, 600 litres of diesel for operating the DG set at site.
� � A 5 hour continuous run on full rated load followed by one hour at 10% over load at
rated speed. � � Tests to determine frequency and voltage regulation under the following conditions. � i) No load to full load instantaneously. � ii) Full load to no load instantaneously. � iii) Load variation up and down in steps of approximately 20% of rated load. � � Alternator short circuit characteristics, reading of output current and excitation
current at values up to 10% over load should be close to obtain a satisfactory curve. � Alternator and exciter heat run at full load.0.8Pf for not less than four hours.
Temperature and electrical reading shall be recorded at intervals of approximately half an hour, together with maximum temperature and hot winding resistance after shut down.
� Measurement of cold resistance of electrical windings. � Insulation resistance test. � Bank’s Engineer/representative may attend performance test at the factory and the
test should be satisfactory. Facility should be provided for witnessing the above testing.
� Following should be supplied in triplicate by the successful tenderer. a. Maintenance manual and catalogue for installation, operation and
Maintenance of engine and alternator. b. Catalogue for spare parts. c. Foundation details. d. Connection diagram for Engine Control Panel.
� Supplier has to carry out all erection including fuel tank connection, and radiator
connection, anti vibration pad mounting.
� Supplier has to carry out the installation of control panel, control panel wiring, control
wiring, and render necessary assistance to the electrical contractor for testing and
commissioning of the DG set and control panel to the satisfaction of the Bank at site.
� Warranty:- Minimum 2 Years for Engine and Alternator. Certificate of the
Manufacturer to be produced before payment.
Supply of one No of 320KVA DG set Page 39
Signature of the Supplier with Seal
SECTION-11
LIST OF DOCUMENTS TO BE FURNISHED IN COVER 1 FOR TECHNICALLY
QUALIFYING.
(Please arrange & flag the documents in the given order for quick verification)
SL
NO:
DESCRIPTION OF DOCUMENT WHETHER SUBMITTED
YES NO
A TECHNICAL BID [PAGES 1-44] DULY SIGNED AND SEALED
(PAGES OF INDICATIVE PRICEBID IN COVER-1 SHALL BE UN
FILLED, SIGNED AND SEALED )
B EARNEST MONEY DEPOSIT IN THE FORM OF DEMAND DRAFT
FOR RS. 32,000.00
C CERTIFICATE OF BEING AUTHORISED DEALER/OEM
D UNDERTAKING FROM OEM/AUTHORISED SERVICE DEALER
TO CARRY OUT MAINTENANCE FOR NEXT FIVE YEARS AT
RATES QUOTED BY TENDERER
E PROOF OF SUPPLY OF DG SETS OF CAPACITY 320KVA OR
MORE IN KERALA DURING LAST 3 YEARS
F SATISFACTORY PERFORMANCE CERTIFICATE FROM REPUTED
CLIENTS WITH ADRESSES AND CONTACT NUMBERS
G AUDITED P&L ACCOUNT AND BALANCE SHEET FOR THE
YEARS 2015-16,2016-2017,2017-2018 AVERAGE TURN OVER OF
THE FIRM FOR THREE YEARS SHOULD NOT BE LESS THAN 24
LACS
H TWO YEAR WARRANTY CONFIRMATION LETTER
I ORIGINAL CATALOGUE OF DG SET
J FULL ADDRESS OF SERVICE CENTRE WITHIN 300KM WITH
LAND PHONE NO.
K COPY OF LATEST CPCB II NORMS COMPLIANCE
CERTIFICATE FROM ARAI OR NAL OR FCRI OR ANY OTHER
AUTHORIZED GOVERNMENT AGENCY.
Supply of one No of 320KVA DG set Page 40
Signature of the Supplier with Seal
ANNEXURE- I
Price break up
The List of Items to be procured along with the Supply, Commissioning and Maintenance of
1 No of 320KVA DG Sets with acoustic enclosure as per Tender No:--
Price Break up after Reverse Auction:-
1 SUPPLY OF DG SET
320 KVA & AMF Panel
(Including charges for transport, loading,
unloading, transit insurance, all applicable
taxes etc )
2. INSTALLATION, TESTING AND
COMMISSIONING OF THE FOLLOWING
i)DGSET 320 KVA
ii) AMF Control Panel
iii) Control cabling between control panel and
alternator (15 mtr) and its termination.
iv)2 runs of 3.5 x 300 Sqmm AYFY cable-
25mtr with termination
(including cost of testing charges including all
applicable taxes etc)
3 Exhaust pipe extension with suitable frame
work – Charges for extending the exhaust pipe
to adequate height with coating of Heat
resistant paint with suitable grading as per
Inspectorate norms with suitable frame work
for support. Rate for 20 meter in Rs
4 Charges for Thermal Insulation. Rate per for 20
meter in Rs
5 Foundation cost for the DG set & control panel
Supply of one No of 320KVA DG set Page 41
Signature of the Supplier with Seal
6 Part – A (1+2+3+4+5)
All the rates quoted must be inclusive of taxes
7 Non comprehensive AMC for 5 years after
warranty period of Two years including all
charges for periodical inspection, preventive
maintenance and unlimited breakdown calls
etc. The charges for Non comprehensive AMC
with 10 visits/year is exclusive of GST
320 KVA
Ist
year
II nd
year
III rd
year
IVth
year
Vth
year
Part-B in Rs.
8
Total – Part –A+ Part-B
Note: Depending on the site condition the exhaust pipe be executed to satisfy the norms of Kerala
State Electrical Inspectorate
Supply of one No of 320KVA DG set Page 42
Signature of the Supplier with Seal
ANNEXURE- II
Process Compliance Form
(The bidders are required to print this on their company’s letter head and sign, stamp before
sending)
To,
E-Procurement Technologies Ltd. (abcprocure)
B-705, Wall Street - II,
Opp. Orient Club,
Nr. Gujarat College,
Ahmedabad - 380 006.
Gujarat State, India
Sub: Agreement to Process related Terms and Conditions for the Reverse Auction
Dear Sir,
This has reference to the Terms & Conditions for the Reverse Auction mentioned in the
Tender document Reverse Auction for Supply, Commissioning and Maintenance of 1 No of
320KVA DG Sets with acoustic enclosure and Non comprehensive AMC for 5 years.
This letter is to confirm that:
a) The undersigned is authorized representative of the company.
b) We have studied the Commercial Terms and the Business rules governing the Reverse
Auction as mentioned in Tender of SBI as well as this document and confirm our
agreement to them.
c) We also confirm that we have taken the training on the auction tool and have
understood the functionality of the same thoroughly.
d) We confirm that SBI and M/S. E-Procurement Technologies Ltd. shall not be liable &
responsible in any manner whatsoever for my/our failure to access & bid on the e-
auction platform due to loss of internet connectivity, electricity failure, virus attack,
problems with the PC, any other unforeseen circumstances etc. before or during the
auction event.
e) We understand that in the event we are not able to access the auction site, we may
authorize M/S. E-Procurement Technologies Ltd. to bid on our behalf by sending a email
containing our offer price before the auction close time and no claim can be made by
us on either State Bank Group or M/S. E-Procurement Technologies Ltd. regarding any
loss etc. suffered by us due to acting upon our authenticated email instructions.
Supply of one No of 320KVA DG set Page 43
Signature of the Supplier with Seal
f) I/we do understand that M/s. E-Procurement Technologies Ltd. may bid on behalf of
other bidders as well in case of above mentioned exigencies.
g) We also confirm that we have a valid digital certificate issued by a valid Certifying
Authority.
h) We also confirm that we will email the price confirmation as per Annexure III will be
submitted within 1 hour of the completion of the reverse auction and similarly the
break up as per Annexure I within 24 hour of the completion of the reverse auction as
format requested by SBI/ M/S. E-Procurement Technologies Ltd.
i) We, hereby confirm that we will honour the Bids placed by us during the auction
process.
With regards
Signature with company seal
Name –
Company / Organization –
Designation within Company / Organization –
Address of Company / Organization –
Duly Sign and Stamp this document and send to: -
Supply of one No of 320KVA DG set Page 44
Signature of the Supplier with Seal
ANNEXURE III
Price Confirmation
To,
E-Procurement Technologies Ltd. (abcprocure)
B-705, Wall Street - II,
Opp. Orient Club,
Nr. Gujarat College,
Ahmedabad - 380 006.
Gujarat State, India
Sub: Final price quoted during reverse auction and price break Reverse Auction
Ref: 1. Reverse Auction dt. _________________
Dear Sir,
We confirm that we have quoted -------------------------------------------(Price quoted on Total
cost to SBI) for Supply, Commissioning and Maintenance of 1 No of 320KVA DG Sets with
acoustic enclosure and Non comprehensive AMC for 5 years as our Final lump sum prices
during the Reverse Auction conducted today.
Thanking you and looking forward to the valuable order from SBI.
Yours,
For _________________
Name:
Company:
Date:
Seal:
Supply of one No of 320KVA DG set Page 45
Signature of the Supplier with Seal
STATE BANK OF INDIA
LOCAL HEAD OFFICE, POOJAPPURA
THIRUVANANTHAPURAM
COVER- 2 INDICATIVE
PRICE BID
Supply of one No of 320KVA DG set Page 46
Signature of the Supplier with Seal
SCHEDULE FOR SUPPLY, COMMISSIONING AND MAINTENANCE OF
320 KVA DG SET
SL.NO DESCRIPTION AMOUNT (Rs.)
1 SUPPLY OF DG SET 320 KVA
(Including charges for transport, loading, unloading,
transit insurance, all applicable taxes etc )
2. INSTALLATION, TESTING AND COMMISSIONING OF
THE FOLLOWING
i)DGSET 320 KVA
ii) AMF Control Panel
iii) Control cabling between control panel and
alternator (15 mtr) and its termination.
iv)2 runs of 3.5 Core 300 Sqmm AYFY cable- 25mtr
with termination
(including cost of testing charges including all
applicable taxes etc
3 Exhaust pipe extension with suitable frame work –
Charges for extending the exhaust pipe to adequate
height with coating of Heat resistant paint with
suitable grading as per Inspectorate norms with
suitable frame work for support. Rate for 20 meter in
Rs
4 Charges for Thermal Insulation. Rate for 20 meter in
Rs
5 Foundation cost for the DG set & Control panel
6 Total –Part-A (1+2+3+4+5)
Supply of one No of 320KVA DG set Page 47
Signature of the Supplier with Seal
7 Non comprehensive AMC for 5 years after post
warranty period of Two years including all charges for
periodical inspection, overhauling, preventive
maintenance and unlimited breakdown calls etc. The
charges for Non comprehensive AMC with 10
visits/year is exclusive of GST The taxes for Non
comprehensive AMC is exclusive of taxes
Ist
year
II nd
year
III rd
year
IVth
year
Vth
year
Total – Part-B
8 GRAND TOTAL (6+7)
Grand Total in words: