1 CARE SB 5.9.05 Status of HIPPI Status of HIPPI M. Vretenar, 5.9.2005 - Changes in the HIPPI Management - HIPPI 05 Preparation - Highlights from the 4 WP’s - Status of milestones and deliverables

Status of HIPPI

  • Upload
    licia

  • View
    22

  • Download
    0

Embed Size (px)

DESCRIPTION

Status of HIPPI. M. Vretenar, 5.9.2005. Changes in the HIPPI Management HIPPI 05 Preparation Highlights from the 4 WP’s Status of milestones and deliverables. New HIPPI Management - 1. In 2006 the CERN AB Department needs to replace 6 Group Leaders out of 9. - PowerPoint PPT Presentation

Citation preview

Page 1: Status of HIPPI

1 CARE SB 5.9.05

Status of HIPPIStatus of HIPPI

M. Vretenar, 5.9.2005

- Changes in the HIPPI Management- HIPPI 05 Preparation- Highlights from the 4 WP’s- Status of milestones and

deliverables

Page 2: Status of HIPPI

2 CARE SB 5.9.05

New HIPPI Management - 1New HIPPI Management - 1

In 2006 the CERN AB Department needs to replace 6 Group Leaders out of 9.

Roland Garoby has been convinced to accept the responsibility of the BDI (=Beam Diagnostics and Instrumentation) Group (~85 people, LHC on sight…), effective September 1st.

To reduce his workload, from July 1st RG passed to MV the role of HIPPI coordinator and the responsibility for the CERN contribution to HIPPI-related work (R&D for Linac4).

However, RG remains involved in CERN studies for future accelerators (PAF Working Group) and keeps control of the SPL work.

Page 3: Status of HIPPI

3 CARE SB 5.9.05

New HIPPI Management - 2New HIPPI Management - 2

From July 1st:

HIPPI Coordinator: Maurizio VretenarHIPPI Deputy Coordinator: Alessandra

Lombardi

HIPPI WP Coordinators:WP2: J.M. De Conto (was IN2P3, will be soon

University of Grenoble).WP3: S. Chel (CEA)WP4: A. Lombardi (CERN, confirmed)WP5: I. Hofmann (GSI)

Page 4: Status of HIPPI

4 CARE SB 5.9.05

HIPPI ProgressHIPPI Progress

- 2nd 2005 Quarterly Report finished on Aug. 30th (46 pages)

- Work Package meetings going on as foreseen.

- 10 HIPPI papers (Conf and Doc categories) published so far in 2005 (less than last year because only PAC Conference). – Many reminders needed to keep the discipline…

- 3 positions opened in 2005 (GSI, started – CEA, candidate selected, waiting for paperwork – IAP, published).

- The Annual HIPPI Meeting will take place in Abingdon (near Oxford, UK), organised by RAL, on Sept. 28-29-30.

Page 5: Status of HIPPI

5 CARE SB 5.9.05

2005 Meetings2005 Meetings

Jan. Feb. March April May June July Aug. Sept. Oct. Nov. Dec. CARE & HIPPI

CSC meetings

5 CERN

5 & 6 Paris

Workshop WP2

2 &3 CERN

Workshop WP3

13 & 14 INFN-Mi

Workshop WP4

13 &14 RAL

Workshop WP5

14 & 15 RAL

HIPPI yearly meeting 28 - 30

RAL

CARE yearly meeting

23 - 25 CERN

Other workshops

High Power SC Linac

23 - 25 FNAL

Other collaborations

IPHI-SPL 27 & 28 CERN

???

IPNO

Russia (ISTC)

18 - 22 Russia

17 – 19 CERN (DTL)

10 – 14 CERN

(CCDTL)

5 – 11 CERN (DTL)

Miscellaneous

INTC 10 - 14 CERN

PAC05 16 - 20 Knoxville

ICIS05 12 -16 Caen

Page 6: Status of HIPPI

6 CARE SB 5.9.05

2005 Annual Meeting2005 Annual Meeting

Wednesday 28, September, morning

9h00 10h00 12h30

Welcoming address and Introduction WORK PACKAGE 4 (Chopper)

A. Lombardi (convener)

Wednesday 28, September, afternoon

14h00 18h00

WORK PACKAGE 2 (Normal Conducting RF struct.) J.M. De Conto (convener)

Thursday 29, September, morning

8h30 12h30

WORK PACKAGE 3 (Superconducting RF structures) S. Chel (convener)

Thursday 29, September, afternoon

14h00 18h00

WORK PACKAGE 5 (Beam Dynamics)

I. Hofmann (convener)

Friday 30, September, morning

9h00 11h00 12h30

HIPPI planning and deliverables meeting ESAC preliminary assessment Concluding talk

Friday 30, September, afternoon: Visit to Rutherford Lab.

The Cosener's HouseAbbey CloseAbingdon, UK

- 37 registered participants as of Sep. 2nd (total of 38 in 2004)- All 3 members of the ESAC will attend (J. Stovall, J. Yamazaki, A.

Pisent)- At Care Meeting: summary of HIPPI05, report of the ESAC, meeting of

HIPPI SB

Page 7: Status of HIPPI

7 CARE SB 5.9.05

WP2 Normal Conducting- WP2 Normal Conducting- HighlightsHighlights

CH model cavity under construction at IAP-Frankfurt

Thermal calculations of Side Coupled Linac cavity at LPSC

Cell Coupled Drift Tube Linac (CCDTL) Prototype (finally) ready at CERN

Bead pull measerement

0.0000

0.1000

0.2000

0.3000

0.4000

0.5000

0.6000

0.7000

0.8000

0.9000

1.0000

0 400 800 1200 1600

Step (#)

Ez (a

.u.)

Page 8: Status of HIPPI

8 CARE SB 5.9.05

WP2 – Highlights 2WP2 – Highlights 2

RF Coupler for Drift Tube Linac prototype:-Basic concept from CERN-RF design from CEA-Thermal calculations from LPSC Grenoble-Mechanical design LPSC Grenoble-Starting construction at LPSC-Power tests foreseen at CERN (2007)

Page 9: Status of HIPPI

9 CARE SB 5.9.05

WP2 – MembersWP2 – Members

Few staff problems:- At RAL, F. Gerigk left (to join CERN…), replaced in WP2 by G.

Bellodi, who will leave end of September (for CERN…). New CARE Recruitment (C. Plostinar) will take over.

- At LPSC-Grenoble, no way to find a PhD student for the SCL studies. J.M. De Conto (WP Coordinator) leaves the lab for the University (will continue work, but Univ. Grenoble is not a partner of HIPPI). His group at LPSC now with M. Baylac (will be Scientific Coordinator for CNRS-HIPPI ?).

An important opportunity:• INFN-Naples has a long experience in Side Coupled Linac Structures

(for medical applications – TERA).• They were present to the WP2 meeting in June and are willing to

participate to the HIPPI work. They would be welcome, because in particular the SCL work is late and understaffed (see above).

• Some funding has been already asked by Naples to INFN for 2006.• Is it possible for them to join officially HIPPI as a full partner (of

course, without receiving contributions from the EU ?)

Page 10: Status of HIPPI

10 CARE SB 5.9.05

WP2 – Workplan and WP2 – Workplan and MilestonesMilestones

WBS #

Title Original begin date

(Annex 3) Original end date

(Annex 3) Estimated

Status Revised end date

2.1 Drift Tube linac 2.1.1 DTL Design July 2004 June 2007 On time 2.1.2 Decision on prototyping April 26, 2004 April 26, 2004 100% September 2004 2.1.3 DTL coupler prototype design May 2004 June 2005 100% 2.1.5 DTL coupler prot. constr., testing July 2005 June 2006 10% 2.1.4 DTL beam dynamics design January 2004 June 2008 On time 2.2 H mode DTL 2.2.1 RF model CH tank 1, RF design January 2004 August 2004 see note see note 2.2.2 RF cold model design & construction January 2004 January 2005 85 % October 2005 2.2.3 RF model construction December 2004 June 2005 40% June 2006 2.2.4 Beam dynamics design CH tank 1 January 2004 June 2004 100 % June 2005 2.2.5 CH model cavity tests January 2005 December 2005 65% 2.2.6 CH prototype design January 2005 October 2005 75% 2.2.8 CH DTL beam, dynamics study January 2005 June 2005 100 % 2.3 Side Coupled Linac 2.3.1 RF model, RF design January 2004 July 2004 40 % Mid 2005 2.3.2 RF model mechanical design July 2004 December 2004 30 % End 2005 2.4 Cell Coupled DTL 2.4.1 Pre-prototype construction January 2004 June 2004 100% 2.4.2 Pre-prototype high power RF tests July 2004 March 2005 Delayed October 2005 2.4.3 Prototype mechanical design January 2005 June 2005 90 % On time

WBS #

Title Due date in

Annex 1 Status Revised delivery date

2.2.5 Test of CH model cavity: intermediate report

December 2005

On time

2.2.8 Design report on beam dynamics in the CH-DTL

June 2005 Delayed September 2005

2.4.1 Construction of CCDTL pre-prototype: intermediate report

June 2005 Delayed December 2005

Page 11: Status of HIPPI

11 CARE SB 5.9.05

WP3 Superconducting - WP3 Superconducting - HighlightsHighlights

Common work INFN-Mi / CEA to understand the large values of Lorenz Force Detuning coefficients measured on test cavity A (needed to dimension tuner) extensive modeling of supporting systems allowed to trace it back to the reduced constraint from the support LFD as in the “free” case.

Design of test cavity B terminated.Tendering for cavity construction in preparation, order expected for November 05.

Construction of klystron for high power test stand should start in September.

Modulator being prepared.

Page 12: Status of HIPPI

12 CARE SB 5.9.05

WP3 – Highlights 2WP3 – Highlights 2

First cold tests of 2-gap spoke cavity at Orsay.Wide spread of LFD coefficient measurements,analysis done at FZ Jülich explains it with inhomogeneous thickness of the Nb.

Page 13: Status of HIPPI

13 CARE SB 5.9.05

WP3 – Highlights 3WP3 – Highlights 3

Analysis of mechanical modes of CH prototype cavity at IAP – Frankfurt.

The TTF tuner finally adopted for the CH prototype.

Assembled CH test cavity in the new cryogenic lab at Frankfurt.

Page 14: Status of HIPPI

14 CARE SB 5.9.05

WP3 – Workplan and WP3 – Workplan and milestonesmilestones

WBS #

Title Participants Original begin

date Original end

date Estimated

Status Revised end

date 3.1 Elliptical cavities 3.1.1 Cavity A vertical tests INFN, CEA 01 / 2004 12 / 2004 Done 3.1.2 Tuner design INFN 07 / 2004 12 / 2005 40% 3.1.3 Integration of piezo design INFN 07 / 2004 12 / 2005 40% 3.1.4 Tuner construction and testing INFN 01 / 2006 06/2006 3.1.5 Design cavity B CEA 07 / 2004 10 / 2005 90% 3.1.6 Construction cavity B CEA 11 / 2005 06/2006 3.1.7 Power coupler design & engineering CEA-LPSC 01 / 2005 04/2006 25% 3.1.9 RF coupler construction CEA-LPSC 01 / 2006 10/2006 3.1.8 RF source order and preparation CEA 07 / 2004 09/2006 40% 3.1.10 Modulator preparation for test stand CEA 01 / 2005 05/2006 30% 3.2 Spoke cavities 3.2.1 Test stand preparation at FZJ FZJ 04 / 2004 08 / 2004 Done 3.2.2 Evaluation of 700 MHz prototype FZJ 09 / 2004 09 / 2005 90 % 3.2.3 Evaluation of 352 MHz 2 gaps-proto IPNO 06 / 2004 06 / 2005 Done 3.2.4 Design of coupler prototype IPNO 01 / 2004 12 / 2005 60 % 06 / 2006 3.2.5 Realization and test of coupler proto. IPNO 01 / 2006 12 / 2006 3.2.6 RF design of 352 MHz multigaps-res. FZJ-IPNO 01 / 2004 04 / 2005 Done 3.2.7 Final mechanical design of resonator FZJ-IPNO 05 / 2005 06 / 2005 Done 3.2.8 Integration of coupler. Tuning options FZJ-IPNO 07 / 2005 06 / 2006 30 % 3.2.9 Preparations for electron beam welding FZJ-IPNO 07 / 2005 03 / 2006 5 % 3.3 CH resonators 3.3.1 Design of tuning system IAP-FU 01 / 2004 06 / 2006 65 %

WBS #

Title Due date in

Annex 1 Status Revised delivery date

3.1.4 Cavity A tuner: intermediate report December

2005 On time

3.2.2 Report on evaluation of 760 MHz prototype

March 2005 Delivered

3.2.3 Report on evaluation of 352 MHz 2gaps-proto

October 2005 On time

3.2.6 Design report on 352 MHz n-gaps resonator

May 2005 Results available August 2005

3.3.1 Report on CH tuners June 2005 Delayed September 2005

Page 15: Status of HIPPI

15 CARE SB 5.9.05

WP4 – Chopping WP4 – Chopping

Chopper structure components at CERN finally delivered from workshop (~1 year late!), now being cleaned and assembled.

To save time, decided to pass over the pre-testing phase and go directly to the final layout.

New driver design based on MOSFET’s gives promising results.

At RAL, complete redesign of the chopper lineArchitecture of the “slow pulse” driver has been redefined, and tests are in preparation

Page 16: Status of HIPPI

16 CARE SB 5.9.05

WP4 – Workplan and WP4 – Workplan and milestonesmilestones

WBS # Title Original begin date (Annex 1)

Original end date (annex1)

Estimated Status Revised end date

4.1 Chopper structure A (CERN) 4.1.1 Pre-prototype construction January 2004 June 2004 Finished June2005

4.1.2 Pre-prototype testing July 2004 November 2004 Combined with task 4.1.5

December 2005

4.1.3 Driver construction & testing January 2004 December 2005 80 % 4.1.4 Full scale prototype design January 2005 June 2005 Finished 4.1.5 Full scale prototype construction January 2005 December 2005 90% 4.2 Chopper line (CERN) 4.2.1 Dump design January 2004 June 2004 Finished 4.2.2 Dump construction January 2005 June 2005 20% December 2005 4.3 Chopper structure B (RAL) 4.3.1 Pre-prototype design and test January 2004 June 2005 Finished 4.3.2 Prototype design January 2005 December 2005 40 %

WBS # Title Due date in Annex 1 Status Revised delivery date 4.1.1 Chopper A design report June 2005 delayed December 2005

4.1.2 Intermediate test report March 2005 Waiting for task 4.1.5

March 2006

4.2.2 Dump design report June 2005 pending October 2005 4.3.1 Chopper B intermediate report June 2005 Delivered July2005

Page 17: Status of HIPPI

17 CARE SB 5.9.05

WP5 – Beam dynamics - WP5 – Beam dynamics - HighlightsHighlights

Beam dynamics simulations and code comparison in progress in all participating labs.

Progress in the field of diagnostics and beam detectors:

- Beam Shape and Halo Monitor at CERN assembled and ready for testing.

- At GSI, prototype of non destructive fluorescence detector ready for testing.

Page 18: Status of HIPPI

18 CARE SB 5.9.05

WP5 – Progress and MilestonesWP5 – Progress and Milestones

WBS #

Title Original begin date

(Annex 3) Original end date

(Annex 3) Estimated

Status Revised end

date 5.1 Code development

5.1.1 Preparation, Dev. of 3D space charge routines, Testing

January 2004 June 2006 60 %

5.1.2 LORASR development January 2004 December 2005 80 % 5.1.3 Transport in 3D map implementation January 2004 December 2005 80 % 5.1.4 Improvement, modeling high current January 2004 June 2006 60 % 5.1.5 Codes preparation for 3 MeV test stand January 2004 December 2006 50 % 5.1.6 Codes preparation for SC linacs January 2004 December 2006 50 % 5.1.7 Code comparison and benchmarking January 2005 On time

5.2 Experiment at UNILAC: preparation & simulations

January 2004 June 2006 50 % December 2006

5.3 Diagnostics and collimation

5.3.1 Profile measurement prototype design and construction (GSI)

July 2004 February 2005 Done

5.3.2 Profile measurement testing (GSI) March 2005 June 2006 20 %

5.3.3 Non-interceptive bunch measurement design (GSI)

October 2004 June 2005 100%

5.3.4 Non-interceptive b. meas. construction January 2005 June 2006 80% October 2005

5.3.5 Halo measurement device design & construction (CERN)

January 2004 June 2005 100 %

5.3.6 On-line transmission control (GSI) October 2005 Not yet started 5.3.7 Beam profile monitor design (FZJ) January 2005 June 07 20 %

5.3.8 Collimators design (CERN) January 2005 December 2006 Replaced by dump

WBS # Title Due date in Annex 1 Status Revised delivery date 5.1.2 LORASR development: intermediate report December 2005 On time

5.3.1 Profile measurement by fluorescence prototype

March 2005 Ready

5.3.3 Non-interceptive meas. preparation June 2005 80% Ready October 2005 5.3.5 Halo measurement device prototype ready June 2005 Ready

5.3.5 Final report on Halo measurement device June 2005 Done (CARE/HIPPI Document-05-005)

Page 19: Status of HIPPI

19 CARE SB 5.9.05

Detailed planning and progressDetailed planning and progress

ID Task Name Milestones Deliverables

1 WP2: NORMAL CONDUCTING STRUCTURES

2 2.1 Drift Tube Linac

3 2.1.1 DTL design

4 2.1.2 Decision on prototyping

5 2.1.3 DTL coupler prototype design

6 2.1.5 DTL coupler prototype construction and testing

7 2.1.4 DTL beam dynamics design

8 2.2 H-mode Drift Tube Linac

9 2.2.1 RF model CH tank1 RF design

10 2.2.2 RF cold model design & construction

11 2.2.3 RF model construction

12 2.2.4 Beam dynamics design CH tank1

13 2.2.5 CH model cavity tests Dec-05 Intermediate report

14 2.2.6 CH-prototype design

15 2.2.7 CH-prototype construction Dec-06: Prototype ready

16 2.2.8 CH-DTL beam dynamics study Jun-05 Design report

17 2.3 Side Coupled Linac

18 2.3.1 RF model RF design

19 2.3.2 RF model mechanical design

20 2.3.3 RF model construction and testing

21 2.4 Cell Coupled Drift Tube Linac

22 2.4.1 Pre-prototype construction Jun-05 Intermediate report

23 2.4.2 Pre-prototype high-power RF tests

24 2.4.3 Contribution to ISTC prototype construction Jun-06 Prototype ready

25 2.4.4 Revision of design after prototype testing Dec-06: Design report

26 WP3: SUPERCONDUCTING STRUCTURES

27 3.1 ELLIPTICAL CAVITIES

28 3.1.1 Cavity A vertical tests

29 3.1.2 Tuner design

30 3.1.3 Integration of piezo design

31 3.1.4 Tuner construction and testing Dec-05 Intermediate report

32 3.1.5 Design cavity B

33 3.1.6 Construction cavity B Jun-06: cavity B ready

34 3.1.7 Power coupler design & engineering

35 3.1.9 RF coupler construction

36 3.1.8 RF source order & preparation

37 3.1.10 Modulator preparation for 700 MHz test stand

38 3.2 SPOKE CAVITIES

39 3.2.1 Test stand preparation at FZJ

40 3.2.2 Evaluation of 760 MHz resonator in vertical cryostatMar-05 Intermediate report

41 3.2.3 Evaluation of 352 MHz 2-gap res. in vertical cryostatOct-05 Intermediate report

42 3.2.4 Design of coupler prototype

43 3.2.5 Test of coupler prototype

CEA,CERN,LPSC

26/04

CEA,LPSC

CEA,LPSC

RAL

IAP-FU

IAP-FU

IAP-FU

IAP-FU

IAP-FU

IAP-FU

IAP-FU

LPSC,CERN

LPSC

LPSC,CERN

CERN

CERN,LPSC,CEA

CERN

CERN

INFN-MI,CEA

INFN-MI

INFN-MI

INFN-MI

CEA

CEA

CEA

CEA,LPSC

CEA

CEA

FZJ

IN2P3-Orsay

IN2P3-Orsay

IN2P3-Orsay

12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 122003 2004 2005

Page 20: Status of HIPPI

20 CARE SB 5.9.05

Detailed planning and progressDetailed planning and progress

ID Task Name Milestones Deliverables

44 3.2.6 RF design of 352 MHz multi-gap resonator May-05 Design report

45 3.2.7 Engineering of resonator, coupler and tuner

46 3.2.8 Final design of 352 MHz multi-gap prototype

47 3.3 CH RESONATOR

48 3.3.1 Design of tuning system Jun-05 Intermediate report

49 3.3.2 Construction of CH tuning system

50 WP4: CHOPPING

51 4.1 CHOPPER STRUCTURE A

52 4.1.1 Pre-prototype construction Jun-05 Design report

53 4.1.2 Pre-Prototype testing Mar-05 Intermediate report

54 4.1.3 Driver construction, testing

55 4.1.4 Full scale prototype design

56 4.1.5 Full scale prototype construction Aug-06: Prototype ready

57 4.1.6 Pre-prototype testing w/o beam

58 4.2 CHOPPER LINE

59 4.2.1 Dump design

60 4.2.2 Dump construction Jun-05 Intermediate report

61 4.2.3 Beam line assembling

62 4.3 CHOPPER STRUCTURE B

63 4.3.1 Pre-prototype design and test Jun-05 Intermediate report

64 4.3.2 Prototype design Jun-06 Design report

65 4.3.3 Prototype construction

66 WP5: BEAM DYNAMICS

67 5.1 Code development

68 5.1.1 3D space charge routines dev., testing

69 5.1.2 LORASR development Dec-05 Intermediate report

70 5.1.3 Neutralization and ECR source modelization study

71 5.1.4 Improvement, modell ing high current

72 5.1.5 Code preparation for 3 MeV test stand Jun-06 Intermediate report

73 5.1.6 Codes preparation for SC linacs

74 5.1.7 Code comparison and benchmarking

75 5.2 Experiment at UNILAC

76 5.2.1 Preparation, simulations

77 5.2.2 First experiment campaign

78 5.3 Diagnostics and collimation

79 5.3.1 Profi le measurement prototype design, constructionMar-05 Prototype ready

80 5.3.2 Profi le measurement testing

81 5.3.3 Non-interceptive bunch measurement design

82 5.3.4 Non-interceptive bunch measurement const. and testingJun-05 Components ready

83 5.3.5 Halo meas. device design, construction Jun-05 Prototype ready Jun-05 Final report

84 5.3.6 On-l ine transmission control

85 5.3.7 Beam profi le monitor design

86 5.3.8 Collimators study

FZJ

FZJ,IN2P3-Orsay

FZJ,IN2P3-Orsay

IAP-FU

IAP-FU

CERN

CERN

CERN

CERN

CERN

CERN

CERN,CEA,LPSC

CERN,CEA,LPSC

RAL

RAL

RAL

RAL

IAP-FU

CEA

GSI

CERN

FZJ

GSI,RAL,IAP-FU,CEA,CERN,LPSC

GSI

GSI

GSI

GSI

GSI

GSI

CERN

GSI

FZJ

CERN

12 01 02 03 04 05 06 07 08 09 10 11 12 01 02 03 04 05 06 07 08 09 10 11 122003 2004 2005