432
Página 1 de 432 : SECRETARIA DE INFRAESTRUCTURA SUBSECRETARIA TECNICA DIRECCION DE COSTOS Fecha: AGOSTO DEL 2008 TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONES Código Concepto Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8 A Agua Potable y Alcantarillado A05 Obra Civil A0501 Limpia y trazo 1308000010 M2 $9.78 $9.78 $9.78 $9.78 $11.65 $10.70 $9.78 $10.63 NECESARIO PARA SU CORRECTA EJECUCION. 1308000013 M2 $8.02 $8.02 $8.02 $8.02 $9.06 $8.55 $8.02 $8.50 1308000023 M2 $4.98 $4.98 $4.98 $4.98 $5.79 $5.37 $4.98 $5.34 1308000033 M $66.20 $66.20 $66.20 $66.20 $73.27 $69.74 $66.20 $69.38 1308000043 M $54.74 $54.74 $54.74 $54.74 $60.75 $57.73 $54.74 $57.43 1308000045 M $72.60 $72.60 $72.60 $72.60 $79.89 $76.25 $72.60 $75.89 Total Preliminares A0502 Mamposterias de Piedra 1301000013 M3 $1,300.40 $1,319.90 $1,300.40 $1,300.40 $1,429.96 $1,365.18 $1,300.40 $1,341.16 NECESARIO PARA SU CORRECTA EJECUCION. DESMONTE, LIMPIA, TRAZO Y NIVELACION DE LINEA DE CONDUCCION, ESTABLECIENDO EJES DE REFERENCIAS Y BANCOS DE NIVEL, CON EQUIPO TOPOGRAFICO INCLUYE: LIMPIA A MANO CON HERRAMIENTA MANUAL, ACARREO DE LA MALEZA FUERA DEL EJE DEL TRAZO. INCLUYE TODO LO LIMPIEZA, TRAZO Y NIVELACION EN TERRENO PARA DESPLANTE DE ESTRUCTURAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. TRAZO Y NIVELACION EXCLUSIVAMENTE EN CALLES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. TRAZO Y CORTE HASTA 5CM ESPESOR CON CORTADORA DE DISCO EN CONCRETO HIDRAULICO; INCLUYE: 2 LINEAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. TRAZO Y CORTE HASTA 5CM ESPESOR CON CORTADORA DE DISCO EN PAVIMENTO ASFALTICO; INCLUYE: 2 LINEAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. TRAZO Y CORTE HASTA 5CM ESPESOR CON CORTADORA DE DISCO EN BANQUETA DE CONCRETO; INCLUYE: 2 LINEAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. MURO DE MAMPOSTERIA DE 3A. CON ESPESOR MENOR DE 0.60 M., UTILIZANDO PIEDRA BRAZA CON PARAMENTOS ROSTREADOS, JUNTEADA CON MORTERO CEMENTO-ARENA 1:3, INCLUYE: INCLUYE: ACARREO DEL MATERIAL A 20 MTS. MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO

Tab Agua Pot y Alc 2008 Excel 05 08 08

Embed Size (px)

Citation preview

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 1 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo A A05 A0501 1308000010 Obra Civil Limpia y trazo DESMONTE, LIMPIA, TRAZO Y NIVELACION DE LINEA DE CONDUCCION, ESTABLECIENDO EJES DE REFERENCIAS Y BANCOS DE NIVEL, CON EQUIPO TOPOGRAFICO INCLUYE: LIMPIA A MANO CON HERRAMIENTA MANUAL, ACARREO DE LA MALEZA FUERA DEL EJE DEL TRAZO. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. LIMPIEZA, TRAZO Y NIVELACION EN TERRENO PARA DESPLANTE DE ESTRUCTURAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. TRAZO Y NIVELACION EXCLUSIVAMENTE EN CALLES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. TRAZO Y CORTE HASTA 5CM ESPESOR CON CORTADORA DE DISCO EN CONCRETO HIDRAULICO; INCLUYE: 2 LINEAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. TRAZO Y CORTE HASTA 5CM ESPESOR CON CORTADORA DE DISCO EN PAVIMENTO ASFALTICO; INCLUYE: 2 LINEAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. TRAZO Y CORTE HASTA 5CM ESPESOR CON CORTADORA DE DISCO EN BANQUETA DE CONCRETO; INCLUYE: 2 LINEAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Total Preliminares A0502 1301000013 Mamposterias de Piedra MURO DE MAMPOSTERIA DE 3A. CON ESPESOR MENOR DE 0.60 M., UTILIZANDO PIEDRA BRAZA CON PARAMENTOS ROSTREADOS, JUNTEADA CON MORTERO CEMENTO-ARENA 1:3, INCLUYE: INCLUYE: ACARREO DEL MATERIAL A 20 MTS. MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. MURO DE MAMPOSTERIA CON ESPESOR DE 0.61 M. A 1.00 M. DE 3A., UTILIZANDO PIEDRA BRAZA CON PARAMENTOS ROSTREADOS, JUNTEADA CON MORTERO CEMENTO-ARENA 1:3, INCLUYE: ACARREO DEL MATERIAL A 20 MTS. MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO M3 $1,300.40 $1,319.90 $1,300.40 $1,300.40 $1,429.96 $1,365.18 $1,300.40 $1,341.16 M2 $9.78 $9.78 $9.78 $9.78 $11.65 $10.70 $9.78 $10.63 Concepto Agua Potable y Alcantarillado Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8

1308000013

M2

$8.02

$8.02

$8.02

$8.02

$9.06

$8.55

$8.02

$8.50

1308000023

M2

$4.98

$4.98

$4.98

$4.98

$5.79

$5.37

$4.98

$5.34

1308000033

M

$66.20

$66.20

$66.20

$66.20

$73.27

$69.74

$66.20

$69.38

1308000043

M

$54.74

$54.74

$54.74

$54.74

$60.75

$57.73

$54.74

$57.43

1308000045

M

$72.60

$72.60

$72.60

$72.60

$79.89

$76.25

$72.60

$75.89

1301000023

M3

$1,263.70

$1,283.20

$1,263.70

$1,263.70

$1,385.90

$1,324.81

$1,263.70

$1,301.14

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 2 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo Concepto NECESARIO PARA SU CORRECTA EJECUCION. 1301000033 MUROS DE MAMPOSTERIA JUNTEADA CON MORTERO CEMENTO ARENA 1:3, MENORES DE 0.60 M. DE ESPESOR (EXCLUSI VAMENTE PARA ESTRUCTURAS EN CONTACTO CON AGUA). INCLUYE: , ACARREO DEL MATERIAL A 20 MTS. MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1301000043 MUROS DE MAMPOSTERIA JUNTEADA CON MORTERO CEMENTO ARENA 1:3, DE 0.61 A 1.00 M. DE ESPESOR (EXCLUSIVA MENTE PARA ESTRUCTURAS EN CONTACTO CON AGUA). INCLUYE: ACARREO DEL MATERIAL A 20 MTS. MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ZAMPEADO CON PIEDRA BRAZA JUNTEADA CON MORTERO CEMENTO ARENA 1:5. INCLUYE: ACARREO DEL MATERIAL A 20 MTS. MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ZAMPEADO CON PIEDRA BRAZA JUNTEADA CON MORTERO CEMENTO ARENA 1:3. INCLUYE: ACARREO DEL MATERIAL A 20 MTS. MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Total Preliminares A0503 1305000013 Muros de Tabique MURO DE TABIQUE ROJO RECOCIDO DE 3.00 HASTA 6.00 M. DE ALTURA, DE 0.14 M DE ESPESOR ACABADO COMN JUNTEADO CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: DESCARGA, MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M2 $265.59 $265.59 $265.59 $265.59 $294.15 $279.88 $265.59 $278.44 M3 $1,300.40 $1,319.90 $1,300.40 $1,300.40 $1,429.96 $1,365.18 $1,300.40 $1,341.16 M3 $1,328.72 $1,348.22 $1,328.72 $1,328.72 $1,463.91 $1,396.30 $1,328.72 $1,372.00 Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8

1302000013

M3

$767.04

$786.55

$767.04

$767.04

$827.35

$797.19

$767.04

$776.64

1302000023

M3

$1,063.95

$1,083.46

$1,063.95

$1,063.95

$1,164.52

$1,114.23

$1,063.95

$1,091.67

1305000023

MURO DE TABIQUE ROJO RECOCIDO DE 0.21 M DE ESPESOR, DE 0.00 HASTA 3.00 M. DE ALTURA, ACABADO COMN JUNTEADO CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: DESCARGA, MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M2

$344.71

$344.71

$344.71

$344.71

$375.93

$360.33

$344.71

$358.77

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 3 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1305000033 Concepto MURO DE TABIQUE ROJO RECOCIDO DE 0.21 M DE ESPESOR, DE 3.00 HASTA 6.00 M. DE ALTURA, ACABADO COMN JUNTEADO CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: DESCARGA, MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. MURO DE TABIQUE ROJO RECOCIDO, HASTA 3.00 M. DE ALTURA, ACABADO COMN, JUNTEADO CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: DESCARGA, MATERIALES, MANO DE OBRA Y HERRAMIENTA. MURO DE TABIQUE DE 0.28 M. DE ESPESOR. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1305000053 MURO DE TABIQUE ROJO RECOCIDO, HASTA 3.00 M. DE ALTURA, ACABADO COMN, JUNTEADO CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: DESCARGA, MATERIALES, MANO DE OBRA Y HERRAMIENTA. MURO DE TABIQUE DE 0.14 M. DE ESPESOR. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. MURO DE TABIQUE ROJO RECOCIDO, ACABADO COMN, JUNTEADO CON MORTERO CEMENTO ARENA 1-5, PARA TANQUE ELEVADO INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA. MURO DE TABIQUE DE 0.14 M. DE ESPESOR PARA TANQUE ELEVADO DE 6.00 A 10.00 M. DE ALTURA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. MURO DE TABIQUE ROJO RECOCIDO, ACABADO COMN, JUNTEADO CON MORTERO CEMENTO ARENA 1-5, PARA TANQUE ELEVADO INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.MUROS DE TABIQUE DE 0.21 M. DE ESPESOR PARA TANQUE ELEVADO DE 6.00 A 10.00 M. DE ALTURA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. MURO DE TABIQUE ROJO RECOCIDO, ACABADO COMN, JUNTEADO CON MORTERO CEMENTO ARENA 1-5, PARA TANQUE ELEVADO INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA. MURO DE TABIQUE DE 0.21 M. DE ESPESOR PARA TANQUE ELEVADO DE 10.00 A 15.00 M. DE ALTURA. INCLUYE M2 $234.15 $234.15 $234.15 $234.15 $256.58 $245.37 $234.15 $244.25 Unidad M2 Region I $362.69 Region 2 $362.69 Region 3 $362.69 Region 4 $362.69 Region 5 $397.42 Region 6 $380.07 Region 7 $362.69 Region 8 $378.33

1305000043

M2

$405.04

$405.04

$405.04

$405.04

$436.25

$420.65

$405.04

$419.09

1306000013

M2

$302.57

$302.57

$302.57

$302.57

$338.42

$320.49

$302.57

$318.71

1306000023

M2

$416.76

$416.76

$416.76

$416.76

$462.16

$439.46

$416.76

$437.18

1306000025

M2

$307.00

$307.00

$307.00

$307.00

$343.74

$325.38

$307.00

$323.53

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 4 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo TODO LO EJECUCION. 1306000043 Concepto NECESARIO PARA SU CORRECTA Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8

MURO DE TABIQUEROJO RECOCIDO, ACABADO COMN, JUNTEADO CON MORTERO CEMENTO ARENA 1-5, PARA TANQUE ELEVADO INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA. MURO DE TABIQUE DE 0.21 M. DE ESPESOR PARA TANQUE ELEVADO DE 10.00 A 15.00 M. DE ALTURA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Total Muros de Tabique

M2

$425.00

$425.00

$425.00

$425.00

$471.90

$448.47

$425.00

$446.12

A0504 1307000013

Concretos CONCRETO F c=100 KG/CM2 FABRICADO A MANO EN OBRA PARA CIMENTACIN. EL TAMAO MXIMO DEL AGREGADO SER DE (3/4") EL BANCO DE AGREGADOS DEBERA SER APROBADO POR LA SECRETARIA. INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA MENOR, ACARREO, MUESTREO, COLADO, VIBRADO, CURADO Y DESPERDICIOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M3

$1,427.33

$1,427.33

$1,427.33

$1,427.33

$1,512.31

$1,469.82

$1,427.33

$1,465.57

1307000023

CONCRETO F c=150 KG/CM2 FABRICADO CON MAQUINA REVOLVEDORA EN OBRA PARA CIMENTACIN. EL TAMAO MXIMO DEL AGREGADO SER DE (3/4") EL BANCO DE AGREGADOS DEBERA SER APROBADO POR LA SECRETARIA. INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR, ACARREO, MUESTREO, COLADO, VIBRADO, CURADO Y DESPERDICIOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CONCRETO F c=175 KG/CM2 FABRICADO CON MAQUINA REVOLVEDORA EN OBRA PARA CIMENTACIN. EL TAMAO MXIMO DEL AGREGADO SER DE (3/4") EL BANCO DE AGREGADOS DEBERA SER APROBADO POR LA SECRETARIA. INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR, ACARREO, MUESTREO, COLADO, VIBRADO, CURADO Y DESPERDICIOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M3

$1,570.98

$1,570.98

$1,570.98

$1,570.98

$1,660.57

$1,615.78

$1,570.98

$1,611.29

1307000033

M3

$1,613.34

$1,613.34

$1,613.34

$1,613.34

$1,703.53

$1,658.44

$1,613.34

$1,653.92

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 5 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1307000043 Concepto CONCRETO F c=200 KG/CM2 FABRICADO CON MAQUINA REVOLVEDORA EN OBRA PARA CIMENTACIN. EL TAMAO MXIMO DEL AGREGADO SER DE (3/4") EL BANCO DE AGREGADOS DEBERA SER APROBADO POR LA SECRETARIA. INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR, ACARREO, MUESTREO, COLADO, VIBRADO, CURADO Y DESPERDICIOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CONCRETO F c=250 KG/CM2 FABRICADO CON MAQUINA REVOLVEDORA EN OBRA PARA CIMENTACIN. EL TAMAO MXIMO DEL AGREGADO SER DE (3/4") EL BANCO DE AGREGADOS DEBERA SER APROBADO POR LA SECRETARIA. INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA MENOR, ACARREO, MUESTREO, COLADO, VIBRADO, CURADO Y DESPERDICIOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ELEVACION DE CONCRETO CON MALACATE EN TANQUE ELEVADO DE 6.00 A 10.00 M. DE ALTURA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ELEVACION DE CONCRETO CON MALACATE EN TANQUE ELEVADO DE 10.00 A 15.00 M. DE ALTURA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Unidad M3 Region I $1,666.44 Region 2 $1,666.44 Region 3 $1,666.44 Region 4 $1,666.44 Region 5 $1,755.61 Region 6 $1,711.03 Region 7 $1,666.44 Region 8 $1,706.56

1307000053

M3

$1,761.11

$1,761.11

$1,761.11

$1,761.11

$1,850.29

$1,805.68

$1,761.11

$1,801.23

1310000013

M3

$164.56

$164.56

$164.56

$164.56

$191.74

$178.14

$164.56

$176.78

1310000023

M3

$194.49

$194.49

$194.49

$194.49

$226.59

$210.52

$194.49

$208.94

Total Concretos A0505 1313000013 Cimbras CIMBRA PARA CIMENTACION EN ZAPATAS ACABADO COMUN CON MADERA DE PINO DE 3a. MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE: MATERIALES, MANO DE OBRA EN HABILITADO, CIMBRADO Y DESCIMBRADO Y MANIOBRA LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA PARA CIMENTACION EN CONTRATRABE ACABADO COMUN CON MADERA DE PINO DE 3a. MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE: MATERIALES, MANO DE OBRA EN HABILITADO, CIMBRADO Y DESCIMBRADO Y MANIOBRA LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M2 $128.04 $128.04 $128.04 $128.04 $145.57 $136.80 $128.04 $135.92

1313000023

M2

$168.45

$168.45

$168.45

$168.45

$187.38

$177.91

$168.45

$176.98

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 6 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1313000033 Concepto CIMBRA PARA CIMENTACIN EN CONTRATRABE CON CIMBRATRIPLAY DE PINO DE 16 MM. Y MADERA DE PINO DE 3A. ACABADO APARENTE, MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE: MATERIA LES, MANO DE OBRA EN HABILITADO, CIMBRADO Y DESCIMBRADO. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA DE MADERA CASTILLOS, CADENAS, DALAS ACABADO COMUN CON MADERA DE PINO DE 3a. MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE: MATERIALES, MANO DE OBRA EN HABILITADO, CIMBRADO Y DESCIMBRADO Y MANIOBRA LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA DE MADERA CASTILLOS, CADENAS, DALAS ACABADO APARENTE CON CIMBRAPLAY Y MADERA DE 3a. MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE: MATERIALES, MANO DE OBRA EN HABILITADO, CIMBRADO Y DESCIMBRADO Y MANIOBRA LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA DE MADERA EN COLUMNAS ACABADO COMUN MADERA DE 3a. HASTA 3.00 M DE ALTURA, MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE: MATERIALES, MANO DE OBRA EN HABILITADO, CIMBRADO Y DESCIMBRADO Y MANIOBRA LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA DE MADERA EN COLUMNAS ACABADO APARENTE CON CIMBRAPLAY Y MADERA DE 3a. HASTA 3.00 M DE ALTURA. MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE: MATERIALES, MANO DE OBRA EN HABILITADO, CIMBRADO Y DESCIMBRADO Y MANIOBRA LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1316000013 CIMBRA PARA LOSA ACABADO COMUN CON MADERA DE PINO DE 3a. HASTA 3.60M DE ALTURA MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE: MATERIA LES, MANO DE OBRA EN HABILITADO, CIMBRADO Y DESCIMBRADO. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M2 $188.03 $188.03 $188.03 $188.03 $207.22 $197.61 $188.03 $196.66 Unidad M2 Region I $173.50 Region 2 $173.50 Region 3 $173.50 Region 4 $173.50 Region 5 $192.43 Region 6 $182.96 Region 7 $173.50 Region 8 $182.02

1314000013

M2

$178.50

$178.50

$178.50

$178.50

$197.44

$187.96

$178.50

$187.02

1314000023

M2

$213.23

$213.23

$213.23

$213.23

$237.35

$225.29

$213.23

$224.07

1315000013

M2

$145.66

$145.66

$145.66

$145.66

$166.31

$155.99

$145.66

$154.97

1315000023

M2

$159.50

$159.50

$159.50

$159.50

$178.44

$168.96

$159.50

$168.03

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 7 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1316000023 Concepto CIMBRA PARA LOSA CON CIMBRATRIPLAY DE PINO DE 16 MM. Y MADERA DE PINO DE 3A. HASTA 3.60 MTS. ACABADO APARENTE, MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE: MATERIA LES, MANO DE OBRA EN HABILITADO, CIMBRADO Y DESCIMBRADO. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA PARA LOSAS Y TRABES DE ENTREPISO APARENTE CON CIMBRAPLAY DE PINO DE 16 MM.; INCLUYE: CIMBRADO Y DESCIMBRADO (ESTRUCTURAS DE CONCRETO.), HERRAMIENTA, ANDAMIOS, MADERA DE PINO DE TERCERA PARA SOPORTE, CONTRAVENTEO Y ARRASTRES (BARROTES, POLINES Y CHAFLANES). INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA PARA LOSAS Y TRABES DE ENTREPISO ACABADO COMUN CON MADERA DE PINO; INCLUYE: CIMBRADO, DESCIMBRADO, HERRAMIENTA, ANDAMIOS, MADERA DE PINO DE TERCERA PARA SOPORTE, CONTRAVENTEO Y ARRASTRES (POLINES, BARROTES Y CHAFLANES). INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA PARA LOSAS Y TRABES DE AZOTEA ACABADO COMUN CON MADERA DE PINO; INCLUYE: CIMBRADO, DESCIMBRADO, HERRAMIENTA, ANDAMIOS, MADERA DE PINO DE TERCERA PARA SOPORTE, CONTRAVENTEO Y ARRASTRES (POLINES, BARROTES Y CHAFLANES). INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA PARA LOSAS Y TRABES DE AZOTEA APARENTE CON CIMBRAPLAY Y MADERA DE 3a. MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE: MATERIA LES, MANO DE OBRA EN HABILITADO, CIMBRADO Y DESCIMBRADO. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA EN MUROS HASTA 3.00 M. DE ALTURA ACABADO COMUN CON MADERA DE PINO; INCLUYE: CIMBRADO, DESCIMBRADO, HERRAMIENTA, ANDAMIOS, MADERA DE PINO DE TERCERA PARA SOPORTE, CONTRAVENTEO Y ARRASTRES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Unidad M2 Region I $191.88 Region 2 $191.88 Region 3 $191.88 Region 4 $191.88 Region 5 $210.83 Region 6 $201.34 Region 7 $191.88 Region 8 $200.42

1316000033

M2

$204.04

$204.04

$204.04

$204.04

$225.40

$214.71

$204.04

$213.65

1316000043

M2

$200.91

$200.91

$200.91

$200.91

$222.26

$211.58

$200.91

$210.51

1316000053

M2

$213.59

$213.59

$213.59

$213.59

$234.94

$224.26

$213.59

$223.19

1316000063

M2

$220.67

$220.67

$220.67

$220.67

$244.78

$232.72

$220.67

$231.51

1317000013

M2

$186.34

$186.34

$186.34

$186.34

$210.64

$198.48

$186.34

$197.27

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 8 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1317000023 Concepto CIMBRA EN MUROS HASTA 3.00 M. DE ALTURA ACABADO APARENTE CON CIMBRAPLAY Y MADERA DE PINO DE 3a. INCLUYE: CIMBRADO, DESCIMBRADO, HERRAMIENTA, ANDAMIOS, MADERA DE PINO DE TERCERA PARA SOPORTE, CONTRAVENTEO Y ARRASTRES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA EN MUROS DE 3.0 A 6.0M DE ALTURA, ACABADO COMUN CON MADERA DE PINO; INCLUYE: CIMBRADO, DESCIMBRADO, HERRAMIENTA, ANDAMIOS, MADERA DE PINO DE TERCERA PARA SOPORTE, CONTRAVENTEO Y ARRASTRES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA PARA TRABES Y COLUMNAS DE 6 A 10M DE ALTURA. PARA TANQUES ELEVADOS, ACABADO COMUN CON MADERA DE PINO; INCLUYE: CIMBRADO, DESCIMBRADO, HERRAMIENTA, ANDAMIOS, MADERA DE PINO DE TERCERA PARA SOPORTE, CONTRAVENTEO Y ARRASTRES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA PARA TRABES Y COLUMNAS DE 10 A 15 M. DE ALTURA PARA TANQUES ELEVADOS ACABADO COMUN CON MADERA DE PINO; INCLUYE: CIMBRADO, DESCIMBRADO, HERRAMIENTA, ANDAMIOS, MADERA DE PINO DE TERCERA PARA SOPORTE, CONTRAVENTEO Y ARRASTRES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA PARA LOSA DE 6 A 10M DE ALTURA. PARA TANQUES ELEVADOS, ACABADO COMUN CON MADERA DE PINO; INCLUYE: CIMBRADO, DESCIMBRADO, HERRAMIENTA, ANDAMIOS, MADERA DE PINO DE TERCERA PARA SOPORTE, CONTRAVENTEO Y ARRASTRES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CIMBRA PARA LOSAS DE 10 A 15 M. DE ALTURA PARA TANQUES ELEVADOS ACABADO COMUN CON MADERA DE PINO; INCLUYE: CIMBRADO, DESCIMBRADO, HERRAMIENTA, ANDAMIOS, MADERA DE PINO DE TERCERA PARA SOPORTE, CONTRAVENTEO Y ARRASTRES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. : Unidad M2 Region I $177.23 Region 2 $177.23 Region 3 $177.23 Region 4 $177.23 Region 5 $198.77 Region 6 $187.99 Region 7 $177.23 Region 8 $186.92

1318000013

M2

$184.80

$184.80

$184.80

$184.80

$211.71

$198.26

$184.80

$196.91

1319000013

M2

$223.17

$223.17

$223.17

$223.17

$254.86

$239.03

$223.17

$237.43

1320000013

M2

$250.99

$250.99

$250.99

$250.99

$288.25

$269.62

$250.99

$267.78

1321000013

M2

$263.93

$263.93

$263.93

$263.93

$295.08

$279.53

$263.93

$277.96

1322000013

M2

$279.12

$279.12

$279.12

$279.12

$313.30

$296.21

$279.12

$294.51

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 9 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo Total Cimbras A0506 1212000011 Acero de Refuerzo ACERO PARA REFUERZO EN CIMENTACIN CON VARILLA NO.2 Fy = 2400 KG/CM2, INCLUYE: SUMINISTRO EN OBRA, ACARREOS INTERNOS, HABILITADO, COLOCACIN, AMARRE, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES EN CUALQUIER ELEMENTO ESTRUCTURAL, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO PARA REFUERZO EN CIMENTACIN CON VARILLA NO. 3 Fy = 4200 KG/CM2, INCLUYE: SUMINISTRO EN OBRA, ACARREOS INTERNOS, HABILITADO, COLOCACIN, AMARRE, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES EN CUALQUIER ELEMENTO ESTRUCTURAL, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO PARA REFUERZO EN CIMENTACIN CON VARILLA NO.4, 5, 6 AL 12 Fy=4200 KG/CM2, INCLUYE: SUMINISTRO EN OBRA, ACARREOS INTERNOS, HABILITADO, COLOCACIN, AMARRE, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO DE REFUERZO EN MUROS Y COLUMNAS CON VARILLA DEL No. 2, Fy=2400 KG/CM2, DE 0.00 A 3.00 METROS DE ALTURA; INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO DE REFUERZO EN MUROS Y COLUMNAS, CON VARILLA DEL No. 3 Fy=4000 KG/CM2, DE 0.00 A 3.00 MTS. DE ALTURA; INCLUYE: SUMINISTRO EN OBRA, ACARREOS INTERNOS, HABILITADO, COLOCACIN AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. KG $28.23 $28.23 $28.23 $28.23 $30.11 $29.18 $28.23 $29.08 Concepto Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8

1212000021

KG

$26.61

$26.61

$26.61

$26.61

$28.08

$27.33

$26.61

$27.26

1212000031

KG

$24.94

$24.94

$24.94

$24.94

$26.19

$25.56

$24.94

$25.50

1303000011

KG

$28.23

$28.23

$28.23

$28.23

$30.11

$29.18

$28.23

$29.08

1303000021

KG

$25.33

$25.33

$25.33

$25.33

$26.61

$25.95

$25.33

$25.90

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 10 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1303000031 Concepto ACERO DE REFUERZO EN MUROS Y COLUMNAS, CON VARILLA DEL No. 4 AL 12, Fy=4000 KG/CM2, DE 0.00 A 3.00 MTS. DE ALTURA; INCLUYE: SUMINISTRO EN OBRA, ACARREOS INTERNOS, HABILITADO, COLOCACIN AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Unidad KG Region I $24.06 Region 2 $24.06 Region 3 $24.06 Region 4 $24.06 Region 5 $25.11 Region 6 $24.59 Region 7 $24.06 Region 8 $24.54

1303000041

ACERO DE REFUERZO EN MUROS Y COLUMNAS CON VARILLA DEL NO. 2, Fy=2400 KG/CM2, DE 3.00 A 6.00 METROS DE ALTURA; INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO DE REFUERZO EN MUROS Y COLUMNAS CON VARILLA DEL No. 3, Fy=4000 KG/CM2, DE 3.00 A 6.00 METROS DE ALTURA; INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO DE REFUERZO EN MUROS Y COLUMNAS CON VARILLA DEL No. 4 AL 12, Fy=4000 KG/CM2, DE 3.00 A 6.00 METROS DE ALTURA; INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO DE REFUERZO EN MUROS Y COLUMNAS CON VARILLA DEL No. 2, Fy=2400 KG/CM2, DE 6.00 A 12.00 METROS DE ALTURA; INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

KG

$29.57

$29.57

$29.57

$29.57

$31.72

$30.64

$29.57

$30.53

1303000051

KG

$26.04

$26.04

$26.04

$26.04

$27.44

$26.73

$26.04

$26.67

1303000061

KG

$24.69

$24.69

$24.69

$24.69

$25.88

$25.30

$24.69

$25.23

1303000071

KG

$30.39

$30.39

$30.39

$30.39

$32.69

$31.54

$30.39

$31.44

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 11 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1303000081 Concepto ACERO DE REFUERZO EN MUROS Y COLUMNAS CON VARILLA DEL No. 3, Fy=4000 KG/CM2, DE 6.00 A 12.00 METROS DE ALTURA; INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO DE REFUERZO EN MUROS Y COLUMNAS CON VARILLA DEL No 4 AL 12, Fy=4000 KG/CM2, DE 6.00 A 12.00 MTS. DE ALTURA; INCLUYE: .SUMINISTRO EN OBRA, ACARREOS INTERNOS, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Unidad KG Region I $27.44 Region 2 $27.44 Region 3 $27.44 Region 4 $27.44 Region 5 $29.08 Region 6 $28.24 Region 7 $27.44 Region 8 $28.15

1303000091

KG

$25.83

$25.83

$25.83

$25.83

$27.25

$26.55

$25.83

$26.48

1303000092

ACERO DE REFUERZO EN ESTRUCTURA CON ALAMBRON No. 2 Fy= 2400 KG/CM2 INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, SILLETAS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO DE REFUERZO EN ESTRUCTURA DIMETRO No. 3 Fy= 4200 KG/CM2 INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, SILLETAS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO DE REFUERZO EN ESTRUCTURA DIMETRO. No. 4 Fy=4200 KG/CM2; INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, CHABILITADO, COLOCACIN AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, SILLETAS, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO DE REFUERZO EN LOSAS Y TRABES DE ENTREPISO CON VARILLA NUM.2 Fy=2400 KG/CM2, INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE

KG

$27.69

$27.69

$27.69

$27.69

$29.46

$28.58

$27.69

$28.47

1303000093

KG

$25.33

$25.33

$25.33

$25.33

$26.61

$25.95

$25.33

$25.90

1303000094

KG

$24.06

$24.06

$24.06

$24.06

$25.11

$24.59

$24.06

$24.54

1310000011

KG

$27.21

$27.21

$27.21

$27.21

$28.86

$28.02

$27.21

$27.94

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 12 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo TODO LO EJECUCION. 1310000021 Concepto NECESARIO PARA SU CORRECTA Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8

ACERO DE REFUERZO EN LOSAS Y TRABES DE ENTREPISO CON VARILLA No. 3 Fy=4000 KG/CM2; INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO DE REFUERZO EN LOSAS Y TRABES DE ENTREPISO CON VARILLA NO. 4 AL 12 Fy=4000 KG/CM2; INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO DE REFUERZO EN LOSAS Y TRABES DE AZOTEA CON VARILLA NO. 2 Fy= 2400 KG/CM2>; INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO EJECUCION. NECESARIO PARA SU CORRECTA

KG

$25.33

$25.33

$25.33

$25.33

$26.61

$25.95

$25.33

$25.90

1310000031

KG

$24.06

$24.06

$24.06

$24.06

$25.11

$24.59

$24.06

$24.54

1310000041

KG

$27.21

$27.21

$27.21

$27.21

$28.86

$28.02

$27.21

$27.94

1310000051

ACERO DE REFUERZO EN LOSAS Y TRABES DE AZOTEA CON VARILLA NUM. 3 Fy=4000 KG/CM2; INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO DE REFUERZO EN LOSAS Y TRABES DE AZOTEA CON VARILLA NMS.4, 5,6, AL 12, Fy=4000 KG/CM2; INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

KG

$25.33

$25.33

$25.33

$25.33

$26.61

$25.95

$25.33

$25.90

1310000061

KG

$24.06

$24.06

$24.06

$24.06

$25.11

$24.59

$24.06

$24.54

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 13 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1508000011 Concepto ACERO PARA REFUERZO EN CADENAS Y CASTILLOS, CON VARILLA DEL NO. 2 FY= 2400 KG/CM2, INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO PARA REFUERZO EN CADENAS Y CASTILLOS CON VARILLA No. 3 FY=4000 KG/CM2. INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA.. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ACERO PARA REFUERZO EN CADENAS Y CASTILLOS CON VARILLAS DEL No. 4 AL 12 FY=4000 KG/CM2. INCLUYE: ACARREOS INTERNOS, SUMINISTRO EN OBRA, HABILITADO, COLOCACIN, AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS, DOBLECES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Total Acero de Refuerzo A0507 1324000013 Acabados APLANADOS Y EMBOQUILLADOS, CON TODOS LOS MATERIA LES Y MANO DE OBRA, INCLUYE OBTENCION, CRIBADO DE ARENA, DESCARGA, ACARREO, ALMACENAMIENTO DEL CEMENTO Y CALHIDRA, FABRICACION DEL MORTERO, COLOCACION DEL APLANADO Y TERMINADO DE LA SUPERFICIE. APLANADO CON MORTERO CEMENTO-ARENA 1:5 DE 1.5 CM. DE ESPESOR. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1324000023 APLANADO DE MURO CON MORTERO CEMENTOARENA 1:3, ACABADO PULIDO; INCLUYE: REMATES, BOQUILLAS, PREPARACION DE LA SUPERFICIE, PLOMEADO, ANDAMIOS Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M2 $131.28 $131.28 $131.28 $131.28 $150.51 $140.89 $131.28 $139.92 M2 $110.82 $110.82 $110.82 $110.82 $130.05 $120.42 $110.82 $119.45 Unidad KG Region I $27.69 Region 2 $27.69 Region 3 $27.69 Region 4 $27.69 Region 5 $29.46 Region 6 $28.58 Region 7 $27.69 Region 8 $28.47

1508000021

KG

$25.63

$25.63

$25.63

$25.63

$26.91

$26.27

$25.63

$26.19

1508000031

KG

$24.25

$24.25

$24.25

$24.25

$25.35

$24.81

$24.25

$24.75

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 14 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1324000033 Concepto APLANADO DE MURO CON MORTERO CEMENTOARENA 1:5, ACABADO PULIDO; INCLUYE: REMATES, BOQUILLAS, PREPARACION DE LA SUPERFICIE, PLOMEADO, ANDAMIOS Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. APLANADO EN COLUMNA CON MORTERO CEMENTOCAL-ARENA 1:2:6 A PLOMO Y REGLA, ACABADO CON PLANA DE MADERA; INCLUYE: REMATES, BOQUILLAS, PREPARACION DE LA SUPERFICIE, PLOMEADO, ANDAMIOS Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. APLANADO DE MURO CON MORTERO CEMENTO-CALARENA 1:2:6 A PLOMO Y REGLA, ACABADO ESPONJEADO; INCLUYE: REMATES, BOQUILLAS, PREPARACION DE LA SUPERFICIE, PLOMEADO, ANDAMIOS Y MANO DE OBRA. (0.00 A 3.00 M DE ALTURA). INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. APLANADO DE MURO CON MORTERO CEMENTO-CALARENA 1:2:6 A PLOMO Y REGLA, ACABADO ESPONJEADO; INCLUYE: EMBOQUILLADOS, REMATES, FORJADO RUSTICO, PREPARACION DE LA SUPERFICIE, ANDAMIOS Y MANO DE OBRA DE (3.00 A 6.00 M DE ALTURA). INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. APLANADO DE MURO CON MORTERO CEMENTO-CALARENA 1:2:6 A PLOMO Y REGLA, ACABADO ESPONJEADO; INCLUYE: EMBOQUILLADOS, REMATES, FORJADO RUSTICO, PREPARACION DE LA SUPERFICIE, ANDAMIOS Y MANO DE OBRA DE (6.00 A 12.00 M DE ALTURA). INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. APLANADO EN PLAFON CON MORTERO CEMENTOCAL-ARENA 1:2:6 A NIVEL Y REGLA, ACABADO ESPONJEADO; INCLUYE: REMATES, BOQUILLAS, FORJADO RUSTICO, PREPARACION DE LA SUPERFICIE, ANDAMIOS Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Unidad M2 Region I $139.79 Region 2 $139.79 Region 3 $139.79 Region 4 $139.79 Region 5 $162.21 Region 6 $151.01 Region 7 $139.79 Region 8 $149.90

1324000043

M2

$118.19

$118.19

$118.19

$118.19

$135.71

$126.96

$118.19

$126.08

1324000053

M2

$129.40

$129.40

$129.40

$129.40

$149.11

$139.26

$129.40

$138.28

1324000063

M2

$146.37

$146.37

$146.37

$146.37

$169.17

$157.77

$146.37

$156.64

1324000073

M2

$171.63

$171.63

$171.63

$171.63

$198.77

$185.20

$171.63

$183.86

1324000083

M2

$130.96

$130.96

$130.96

$130.96

$150.93

$140.95

$130.96

$139.95

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 15 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1324000093 Concepto APLANADO DE MURO ACABADO CERROTEADO CON CONCRETO F'c=100 KG/CM2, INCLUYE: PLOMEADO, ANDAMIOS, BOQUILLAS, PREPARACION DE LA SUPERFICIE Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. APLANADO DE MURO ACABADO CERROTEADO CON CONCRETO F'c=150 KG/CM2, INCLUYE: PLOMEADO, ANDAMIOS, BOQUILLAS, PREPARACION DE LA SUPERFICIE Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EMBOQUILLADO DE MEZCLA EN MUROS CON MORTERO CEMENTO-CAL-ARENA 1:3:12; INCLUYE: HERRAMIENTA, MATERIALES, ANDAMIOS Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EMBOQUILLADO DE MEZCLA CON MORTERO CEMENTO-CAL-ARENA1:2:6; INCLUYE: HERRAMIENTA, MATERIALES, ANDAMIOS, Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EMBOQUILLADO DE MEZCLA EN MUROS CON MORTERO CEMENTO ARENA 1:5; INCLUYE: MATERIALES, ANDAMIOS, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EMBOQUILLADO CON MORTERO CEMENTO-ARENA1:5 DE SECCION TRIANGULAR DE 10 CM. ACABADO PULIDO. INCLUYE: MATERIALES, ANDAMIOS, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. CHAFLAN DE CONCRETO CON IMPERMEABILIZANTE INTEGRAL FESTERGRAL O SIMILAR DE 10 CM. SECCION TRIANGULAR ACABADO PULIDO CON CONCRETO F'c=150 KG/CM2. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ENTORTADO EN AZOTEA CON MORTERO CEMENTOARENA 1:5; INCLUYE: ACARREOS, HERRAMIENTA Y MANO DE OBRA. CON UN ESPESOR PROMEDIO DE 6 CM. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Unidad M2 Region I $170.38 Region 2 $170.38 Region 3 $170.38 Region 4 $170.38 Region 5 $196.46 Region 6 $183.41 Region 7 $170.38 Region 8 $182.13

1324000103

M2

$174.31

$174.31

$174.31

$174.31

$200.42

$187.37

$174.31

$186.08

1324000113

M

$41.25

$41.25

$41.25

$41.25

$48.94

$45.10

$41.25

$44.71

1324000123

M

$42.18

$42.18

$42.18

$42.18

$49.89

$46.03

$42.18

$45.65

1324000133

M

$41.69

$41.69

$41.69

$41.69

$49.39

$45.54

$41.69

$45.15

1324000143

M

$54.15

$54.15

$54.15

$54.15

$64.40

$59.27

$54.15

$58.76

1324000153

M

$44.76

$44.76

$44.76

$44.76

$52.44

$48.59

$44.76

$48.20

1324000163

M2

$122.98

$122.98

$122.98

$122.98

$135.91

$129.45

$122.98

$128.81

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 16 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1324000173 Concepto SUMINISTRO Y COLOCACION DE PINTURA VINILICA DE 5000 CICLOS DE LAVADO COMO MINIMO CALIDAD "A" SEGUN LA NOM-U-97-1981 EN PLAFONES DE CONCRETO APARENTE, INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE, MATERIALES, MANO DE OBRA, HERRAMIENTA Y ANDAMIOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1324000183 SUMINISTRO Y COLOCACION DE PINTURA VINILICA DE 5000 CICLOS DE LAVADO COMO MINIMO CALIDAD "A" SEGUN LA NOM-U-97-1981 EN MUROS APLANADO DE MEZCLA, INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE, MATERIALES, MANO DE OBRA, HERRAMIENTA Y ANDAMIOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. SUMINISTRO Y COLOCACION DE PINTURA VINILICA DE 5000 CICLOS DE LAVADO COMO MINIMO CALIDAD "A" SEGUN LA NOM-U-97-1981 EN COLUMNAS Y TRABES DE CONCRETO APARENTE, INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE, MATERIALES, MANO DE OBRA, HERRAMIENTA Y ANDAMIOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. SUMINISTRO Y COLOCACION DE PINTURA ESMALTE CON RESISTENCIA DE 200 HORAS MINIMAS DE INTEMPERISMO ACELERADO Y 100 HORAS MINIMO DE CAMARA SALINA, EN LARGUEROS Y MONTENES, INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE, MATERIALES, MANO DE OBRA, HERRAMIENTA Y ANDAMIOS. A CUALQUIER ALTURA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. SUMINISTRO Y COLOCACION DE PINTURA ESMALTE CON RESISTENCIA DE 200 HORAS MINIMAS DE INTEMPERISMO ACELERADO Y 100 HORAS MINIMO DE CAMARA SALINA EN MALLA DE ALAMBRE No. 8 DE 4x4Cm, INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE, MATERIALES, MANO DE OBRA, HERRAMIENTA Y ANDAMIOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M2 $45.58 $45.58 $45.58 $45.58 $49.85 $47.70 $45.58 $47.49 Unidad M2 Region I $40.73 Region 2 $40.73 Region 3 $40.73 Region 4 $40.73 Region 5 $45.00 Region 6 $42.85 Region 7 $40.73 Region 8 $42.64

1324000193

M2

$51.70

$51.70

$51.70

$51.70

$57.38

$54.55

$51.70

$54.25

1324000203

ML

$126.41

$126.41

$126.41

$126.41

$144.92

$135.67

$126.41

$134.75

1324000213

M2

$92.69

$92.69

$92.69

$92.69

$104.79

$98.73

$92.69

$98.14

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 17 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1324000223 Concepto SUMINISTRO Y COLOCACION DE PINTURA CON RESISTENCIA DE 200 HORAS MINIMAS DE INTEMPERISMO ACELERADO Y 100 HORAS MINIMO DE CAMARA SALINA. EN PUERTAS Y MAMPARAS DE LAMINA ESTRIADA, INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE, MATERIALES, MANO DE OBRA, HERRAMIENTA Y ANDAMIOS. SUMINISTRO Y COLOCACION DE PINTURA ESMALTE CON RESISTENCIA DE 200 HORAS MINIMAS DE INTEMPERISMO ACELERADO Y 100 HORAS MINIMO DE CAMARA SALINA, EN VENTANERA METLICA POR DOS LADOS, INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE, MATERIALES, MANO DE OBRA, HERRAMIENTA Y ANDAMIOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1324000243 SUMINISTRO Y COLOCACION DE PINTURA ESMALTE CON RESISTENCIA DE 200 HORAS MINIMAS DE INTEMPERISMO ACELERADO Y 100 HORAS MINIMO DE CAMARA SALINA, EN ESTRUCTURA APLICADA A 6.00M DE ALTURA (TRABES, COLUMNAS, LARGUEROS), INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE, MATERIALES, MANO DE OBRA, HERRAMIENTA Y ANDAMIOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1324000253 IMPERMEABILIZACIN (FESTER O SIMILAR EN CALIDAD Y COSTO) EN FRIO CON UNA CAPA DE MICROPRIMER O ACRITON ELIDER DILUIDO EN AGUA AL 19:1 O SIMILAR, 2 CAPAS DE MICROFEST O 2 CAPAS DE ACRITON ELIDER O SIMILAR, UNA CAPA DE MEMBRANA FESTERFLEX O UNA CAPA DE MALLA REVOFLEX O SIMILAR, ACABADO CON DOS MANOS DE FESTER BLANC COLOR BLANCO, TERRACOTA O SIMILAR, INCLUYE: LIMPIEZA Y PREPARACIN DE LA SUPERFICIE, ACARREOS VERTICALES A CUALQUIER ALTURA (GARANTA DE 3 AOS). INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. SUMINISTRO Y COLOCACION DE IMPERMEABILIZANTE PREFABRICADO CON AERO UNIPLAS APP PLUS 3.5 VG ROJO DE FIBRA DE VIDRIO GRANULADO DE 3.5 MM. HACIENDO TRASLAPES DE 0.10 M. EN AMBOS SENTIDOS; APLICADO POR MEDIO DE TERMOFUSION A BASE DE FUEGO DE SOPLETE DE GAS M2 $123.66 $123.66 $123.66 $123.66 $131.14 $127.39 $123.66 $127.02 M2 $130.22 $130.22 $130.22 $130.22 $148.72 $139.48 $130.22 $138.56 Unidad M2 Region I $108.26 Region 2 $108.26 Region 3 $108.26 Region 4 $108.26 Region 5 $123.12 Region 6 $115.69 Region 7 $108.26 Region 8 $114.94

1324000233

M2

$96.16

$96.16

$96.16

$96.16

$108.61

$102.38

$96.16

$101.77

1324000263

M2

$120.42

$120.42

$120.42

$120.42

$126.39

$123.41

$120.42

$123.12

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 18 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo Concepto BUTANO, LA MEMBRANA PREFABRICADA DEBERA DE CUMPLIR CON LOS PARAMETROS F:1:T SEALADOS POR LA "U.A.T.C F412T3 Y DEBERA DE PRESENTAR UNA GARANTIA POR ESCRITO DE 5 AOS, INCLUYE: LIMPIEZA, PREPARACION DE LA SUPERFICIE, APLICACION DE ELASTON PRIMARIO (SELLO DE IMPRIGNACIN), SELLADO Y CALAFATEADO DE FISURAS Y GRIETAS A BASE DE CEMENTO PLASTICO ELASTON SELLADOR. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1324000273 IMPERMEABILIZANTE INTEGRAL "FESTERGRAL" O SIMILAR EN CALIDAD Y COSTO, EN ELEMENTOS DE CONCRETO ARMADO A RAZN DE 1.50 KG. POR CADA 50 KG. DE CEMENTO, EN CONCRETO F c=150 KG/CM2; INCLUYE: MATERIALES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M3 $154.08 $154.08 $154.08 $154.08 $157.88 $155.98 $154.08 $155.78 Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8

1324000283

IMPERMEABILIZANTE INTEGRAL "FESTERGRAL " O SIMILAR EN CALIDAD Y COSTO, EN ELEMENTOS DE CONCRETO ARMADO A RAZN DE 1.50 KG. POR CADA 50 KG. DE CEMENTO, EN CONCRETO F c=200 KG/CM; INCLUYE: MATERIALES, HERRAMIENTA MENOR Y MANO DE OBRA.. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. IMPERMEABILIZANTE INTEGRAL "FESTERGRAL" O SIMILAR EN CALIDAD Y COSTO, EN ELEMENTOS DE CONCRETO ARMADO A RAZN DE 1.50 KG. POR CADA 50 KG. DE CEMENTO EN CONCRETO F c=250 KG/CMS; INCLUYE: MATERIALES, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. SUMINISTRO Y COLOCACIN DE BANDA DE 100 MM. (4"), DE ANCHO, DE CLORURO DE POLIVINILO (P.V.C.), PARA JUNTAS FRAS DE CONSTRUCCIN EN CISTERNAS Y TANQUES; INCLUYE: AJUSTES, COLOCACIN, TENSADO, DESPERDICIOS, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. SUMINISTRO Y COLOCACIN DE BANDA DE 150 MM. (6"), DE ANCHO, DE CLORURO DE POLIVINILO (P.V.C.), PARA JUNTAS FRAS DE CONSTRUCCIN EN CISTERNAS Y TANQUES; INCLUYE: AJUSTES, COLOCACIN, TENSADO, DESPERDICIOS, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE

M3

$174.07

$174.07

$174.07

$174.07

$177.88

$175.97

$174.07

$175.77

1324000293

M3

$195.96

$195.96

$195.96

$195.96

$199.75

$197.86

$195.96

$197.66

1324000303

M

$104.30

$104.30

$104.30

$104.30

$109.44

$106.86

$104.30

$106.62

1324000313

M

$115.75

$115.75

$115.75

$115.75

$120.88

$118.31

$115.75

$118.06

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 19 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo TODO LO EJECUCION. 1324000323 Concepto NECESARIO PARA SU CORRECTA Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8

SUMINISTRO Y COLOCACIN DE BANDA DE CLORURO DE 220 MM. (9") DE ANCHO, DE POLIVINILO (P.V.C.), PARA JUNTAS FRAS DE CONSTRUCCIN EN CISTERNAS Y TANQUES; INCLUYE: AJUSTES, COLOCACIN, TENSADO, DESPERDICIO, HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. IMPERMEABILIZACION SUPERFICIAL DE TANQUES, CON MORTERO DE CEMENTO-ARENA 1:3 Y ADITIVO INTEGRAL, CON UN ESPESOR DE 2.5 CMS. Total Acabados

M

$183.32

$183.32

$183.32

$183.32

$188.46

$185.88

$183.32

$185.63

1324000333

M2

$104.98

$104.98

$104.98

$104.98

$117.80

$111.39

$104.98

$110.75

A0508 1606000010

Herreria SUMINISTRO Y COLOCACIN DE VENTANA UN FIJO. ARMADO CON PERFILES TUBULARES CAL. 18, MARCA PROLAMSA, NUMERO 121 Y 154, CON APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, TORNILLOS, FIJACIN, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M2

$1,051.81

$1,051.81

$1,051.81

$1,051.81

$1,144.78

$1,098.28

$1,051.81

$1,093.64

1606000020

SUMINISTRO Y COLOCACIN DE VENTANA DE DOS FIJOS. ARMADO CON PERFILES TUBULARES CAL. 18, MARCA PROLAMSA, NUMERO 121, 127 Y 154, CON APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, TORNILLOS, FIJACIN, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. SUMINISTRO Y COLOCACIN DE VENTANA UN FIJO Y UN ABATIBLE. ARMADO CON PERFILES TUBULARES CAL. 18, MARCA PROLAMSA, NUMEROS: 106, 120, 144 Y 154, CON APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, INCLUYE: MATERIALES, ACARREOS,

M2

$861.74

$861.74

$861.74

$861.74

$960.74

$911.23

$861.74

$906.29

1606000030

M2

$942.56

$942.56

$942.56

$942.56

$1,041.55

$992.05

$942.56

$987.11

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 20 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo Concepto CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, TORNILLOS, BISAGRAS, MANIJA PORTACANDADO, FIJACIN, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1606000040 SUMINISTRO Y COLOCACIN DE VENTANA UN FIJO Y UN CORREDIZO. ARMADO CON PERFILES TUBULARES CAL. 18, MARCA PROLAMSA, NUMEROS: 101, 103, 121, 122, 123, 124, Y 154, CON APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, TORNILLOS, BISAGRAS, MANIJA PORTACANDADO, FIJACIN, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. SUMINISTRO Y COLOCACIN DE PUERTA ABATIBLE DE 1.00 ANCHO HASTA 2.20 M. DE ALTURA ARMADO CON PERFILES TUBULARES CAL. 20, MARCA PROLAMSA, NUMERO P-100, M-225, SOLERA DE FIERRO DE 1 X 1/8" Y TABLERO DE LMINA CON APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, BISAGRAS, TORNILLOS, FIJACIN, CERRADURA DE SOBREPONER MODELO 715 MARCA PHILLIPS, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M2 $997.95 $997.95 $997.95 $997.95 $1,096.95 $1,047.45 $997.95 $1,042.51 Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8

1606000050

PZA

$2,424.67

$2,424.67

$2,424.67

$2,424.67

$2,617.24

$2,520.96

$2,424.67

$2,511.33

1606000060

SUMINISTRO Y COLOCACIN DE PUERTA ABATIBLE DE 0.90 HASTA 2.20 M. DE ALTURA ARMADO CON PERFILES METLICOS; MARCO DE NGULO DE 1 1/4X1/8 DE PULGADA Y PUERTA DE NGULO DE 1 X 1/8 DE PULGADA Y TABLERO DE LMINA, CON APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, BISAGRAS, TORNILLOS, FIJACIN, CERRADURA DE SOBREPONER MODELO 715 MARCA PHILLIPS, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

PZA

$2,383.45

$2,383.45

$2,383.45

$2,383.45

$2,536.66

$2,460.05

$2,383.45

$2,452.41

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 21 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1606000070 Concepto SUMINISTRO Y COLOCACIN DE PUERTA ABATIBLE DE 1 HASTA 2.2 M. DE ALTURA ARMADA CON MARCO DE PTR DE 2 1/2X2 1/2 PULGADAS (VERDE) Y CONTRAMARCO DE NGULO DE 3/16 X 2 1/2 PULGADAS Y REJILLA LOUVER CON APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, BISAGRAS, TORNILLOS, FIJACIN, CERRADURA DE SOBREPONER MODELO 715 MARCA PHILLIPS, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. SUMINISTRO Y COLOCACIN DE PORTN DE 3.00 POR 2.40 M. DE ALTURA EN DOS HOJAS ABATIBLES ARMADO DE NGULO DE FIERRO DE 1 1/4X1/8 DE PULGADA Y TABLERO DE LMINA, CON APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, BISAGRAS, TORNILLOS, FIJACIN, CERRADURA DE SOBREPONER MODELO 715 MARCA PHILLIPS, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. SUMINISTRO Y COLOCACIN DE REJA METALICA DE 2.40 M. DE ALTURA A BASE DE POSTES DE PTR DE 3X3 VERDE, A CADA 2 M. CON 2 PERFILES HORIZONTALES PRINCIPALES DE PTR DE 3X2 VERDE , PERFILES VERTICALES DE 2.20 M. DE ALTURA, A CADA 0.20 M. DE TUBULAR CAL.18 DE 3X1 1/4 (PULGADAS), Y 1 PLACA DE ANCLAJE DE ACERO DE 0.15 POR 0.15 MTS. DE 3/8 DE PULGADA DE ESPESOR POR CADA POSTE INCLUYE: APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, FIJACIN, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1606000110 SUMINISTRO Y COLOCACIN DE ESCALERA MARINA FORMADA POR 8 ESCALONES DE REDONDO DE 3/4 DE PULGADA DE DIMETRO Y 0.90 M. DE DESARROLLO, SOLDADOS EN LOS EXTREMOS A PLACAS PREVIAMENTE AHOGADAS DE 0.10 POR 0.10 M. DE 3/8 DE PULGADA DE ESPESOR CON 2 ANCLAS PZA $2,007.06 $2,007.06 $2,007.06 $2,007.06 $2,239.32 $2,123.19 $2,007.06 $2,111.60 Unidad PZA Region I $4,874.63 Region 2 $4,874.63 Region 3 $4,874.63 Region 4 $4,874.63 Region 5 $5,151.44 Region 6 $5,013.03 Region 7 $4,874.63 Region 8 $4,999.22

1606000080

PZA

$5,335.65

$5,335.65

$5,335.65

$5,335.65

$5,751.18

$5,543.42

$5,335.65

$5,522.66

1606000090

M

$2,680.67

$2,680.67

$2,680.67

$2,680.67

$2,904.38

$2,792.54

$2,680.67

$2,781.37

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 22 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo Concepto DE VARILLA DE 3/8 DE PULGADA POR 0.10 M. DE DESARROLLO CADA UNA CON APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, INCLUYE: PLACAS, MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, FIJACIN, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1606000120 SUMINISTRO Y COLOCACIN DE ESCALERA MARINA FORMADA POR 5 ESCALONES DE REDONDO DE 3/4 DE PULGADA DE DIMETRO Y 0.90 M. DE DESARROLLO, SOLDADOS EN LOS EXTREMOS A PLACAS PREVIAMENTE AHOGADAS DE 0.10 POR 0.10 M. DE 3/8 DE PULGADA DE ESPESOR CON 2 ANCLAS DE VARILLA DE 3/8 DE PULGADA POR 0.10 M. DE DESARROLLO CADA UNA CON APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, INCLUYE: PLACAS, MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, FIJACIN, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. SUMINISTRO Y COLOCACIN DE ESCALERA VERTICAL DE 6 M. DE ALTURA Y 0.60 DE ANCHO, FABRICADA CON ALFARDAS DE NGULO DE 1/4X2 (PULGADAS), 30 ESCALONES DE REDONDO DE 3/4 (PULGADAS), Y 8 PLACAS DE ACERO DE 0.15 POR 0.10 MTS. DE 1/4 DE PULGADA DE ESPESOR CON 2 TAQUETES DE EXPANSIN DE 3/8 DE DIMETRO CADA PLACA, INCLUYE: APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, PLACAS, MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, FIJACIN, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. SUMINISTRO Y COLOCACIN DE ESCALERA VERTICAL DE 12.00 M. DE ALTURA Y 0.60 DE ANCHO, FABRICADA CON ALFARDAS DE NGULO DE 1/4X2 (PULGADAS), 60 ESCALONES DE REDONDO DE 3/4 (PULGADAS), Y 8 PLACAS DE ACERO DE 0.15 POR 0.10 MTS. DE 1/4 DE PULGADA DE PZA $1,254.43 $1,254.43 $1,254.43 $1,254.43 $1,399.57 $1,327.02 $1,254.43 $1,319.76 Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8

1606000130

PZA

$5,267.88

$5,267.88

$5,267.88

$5,267.88

$5,558.50

$5,413.19

$5,267.88

$5,398.69

1606000140

PZA

$9,293.95

$9,293.95

$9,293.95

$9,293.95

$9,801.39

$9,547.69

$9,293.95

$9,522.34

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 23 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo Concepto ESPESOR CON 2 TAQUETES DE EXPANSIN DE 3/8 DE DIMETRO CADA PLACA, INCLUYE: APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, PLACAS, MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, FIJACIN, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1606000150 SUMINISTRO Y COLOCACIN DE ESCALERA VERTICAL DE 15.00 M. DE ALTURA Y 0.60 DE ANCHO, FABRICADA CON ALFARDAS DE NGULO DE 1/4X2 (PULGADAS), 75 ESCALONES DE REDONDO DE 3/4 (PULGADAS), Y 8 PLACAS DE ACERO DE 0.15 POR 0.10 MTS. DE 1/4 DE PULGADA DE ESPESOR CON 2 TAQUETES DE EXPANSIN DE 3/8 DE DIMETRO CADA PLACA, INCLUYE: APLICACIN DE PRIMER ANTICORROSIVO Y ACABADO CON PINTURA DE ESMALTE, PLACAS, MATERIALES, ACARREOS, CORTES, DESPERDICIOS, APLICACIN DE SOLDADURA, ESMERILADO, FIJACIN, MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Total Herreria A0509 1328000013 Demoliciones DEMOLICION DE MAMPOSTERIA DE PIEDRA INCLUYE: MANO DE OBRA, HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. DEMOLICIONES DE CONCRETO REFORZADO CON VARILLAS No. 3 MALLALAC INCLUYE: MANO DE OBRA, HERRAMIENTA MENOR. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. DEMOLICIONES DE MUROS DE TABIQUE O BLOCK DE 14CM ESPESOR SIN INCLUIR CADENAS Y CASTILLOS. INCLUYE: MANO DE OBRA, HERRAMIENTA Y ACARREO EN CARRETILLA A 20M DE DISTANCIA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Total Demoliciones Total Obra Civil A10 A1001 1001000013 Preliminares RUPTURA DE PAVIMENTO RUPTURA DE EMPEDRADO, INCLUYE: SELECCION Y ESTIBA DEL MATERIAL EN LA OBRA INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M2 $17.73 $17.73 $17.73 $17.73 $21.28 $19.52 $17.73 $19.33 M3 $253.35 $253.35 $253.35 $253.35 $304.01 $278.68 $253.35 $276.15 PZA $11,306.98 $11,306.98 $11,306.98 $11,306.98 $11,922.80 $11,614.91 $11,306.98 $11,584.15 Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8

1328000023

M3

$425.63

$425.63

$425.63

$425.63

$510.73

$468.20

$425.63

$463.91

1328000033

M3

$118.23

$118.23

$118.23

$118.23

$141.87

$130.05

$118.23

$128.87

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 24 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1001000023 Concepto RUPTURA DE PAVIMENTO ADOQUINADO, INCLUYE: CARGA DEL MATERIAL A CAMION Y ACARREO EN 1ER. KM. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Unidad M2 Region I $27.12 Region 2 $27.12 Region 3 $27.12 Region 4 $27.12 Region 5 $31.51 Region 6 $29.32 Region 7 $27.12 Region 8 $29.10

1001000033

RUPTURA DE PAVIMENTO ASFALTICO A MANO. INCLUYE: CARGA DEL MATERIAL A CAMION Y ACARREO EN 1ER. KM. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. RUPTURA DE PAVIMENTO DE CONCRETO A MANO, INCLUYE: CARGA DEL MATERIAL A CAMION Y ACARREO EN 1ER. KM. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. RUPTURA DE BANQUETA DE CONCRETO, INCLUYE: CARGA DEL MATERIAL A CAMION Y ACARREO EN 1ER. KM. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Total RUPTURA DE PAVIMENTO

M3

$306.29

$306.29

$306.29

$306.29

$356.36

$331.32

$306.29

$328.83

1001000043

M3

$375.49

$375.49

$375.49

$375.49

$438.55

$407.02

$375.49

$403.89

1001000053

M3

$389.50

$389.50

$389.50

$389.50

$455.37

$422.41

$389.50

$419.15

A1002 1002000013

REPOSICION DE PAVIMENTOS REPOSICION DE EMPEDRADO EN SECO, UTILIZANDO EL MATERIAL PRODUCTO DE LA RUPTURA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. REPOSICION DE EMPEDRADO JUNTEADO CON MORTERO CEMENTO-ARENA 1:5 UTILIZANDO EL MATERIAL PRODUCTO DE LA RUPTURA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. REPOSICION DE PAVIMENTO ADOQUINADO EN SECO UTILIZANDO MATERIAL SANO PRODUCTO DE LA RUPTURA Y MATERIAL NUEVO DE REPOSICION; INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. REPOSICION DE PAVIMENTO ADOQUINADO, JUNTEADO CON MORTERO CEMENTO-ARENA 1:5, UTILIZANDO MATERIAL SANO PRODUCTO DE LA RUPTURA Y MATERIAL NUEVO DE REPOSICION; INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M2

$64.15

$64.15

$64.15

$64.15

$76.96

$70.56

$64.15

$69.92

1002000023

M2

$104.76

$104.76

$104.76

$104.76

$120.15

$112.46

$104.76

$111.69

1002000033

M2

$128.97

$128.97

$128.97

$128.97

$146.06

$137.51

$128.97

$136.66

1002000043

M2

$143.19

$143.19

$143.19

$143.19

$162.41

$152.80

$143.19

$151.84

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 25 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1002000053 Concepto REPOSICION DE PAVIMENTO ASFALTICO, CON CARPETA DE 0.05 M. DE ESPESOR, INCLUYENDO BASE DE GRAVA CEMENTADA DE 0.20 M. DE ESPESOR; INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. REPOSICION DE PAVIMENTO DE CONCRETO DE F'C=150 KG/CM2 DE 0.08 M. DE ESPESOR. INCLUYE: BASE DE GRAVA CEMENTADA DE 0.20 M. DE ESPESOR, CIMBRA COMUN EN FRONTERAS, CELOTEX EN JUNTAS Y ACARREOS DE PETREOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1002000073 REPOSICION DE PAVIMENTO DE CONCRETO DE F'C=150 KG/CM2 DE 0.10 M. DE ESPESOR INCLUYE: BASE DE GRAVA CEMENTADA DE 0.20 M. DE ESPESOR, CIMBRA COMUN EN FRONTERAS Y ACARREOS DE PETREOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. REPOSICION DE PAVIMENTO DE CONCRETO DE F'C=150 KG/CM2 0.15 M. DE ESPESOR. INCLUYE BASE DE GRAVA CEMENTADA DE 0.20 M. DE ESPESOR, CIMBRA COMUN EN FRONTERAS Y ACARREOS DE PETREOS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. REPOSICION DE BANQUETA DE CONCRETO DE F'C=150 KG/CM2 DE 0.08 M. DE ESPESOR (NO INCLUYE BASE). INCLUYE: ACARREO. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Total REPOSICION DE PAVIMENTOS A1010 1010000010 EXCAVACION PARA ESTRUCTURA EXCAVACION A MANO PARA DESPLANTE DE ESTRUCTURAS, EN MATERIAL "A", EN AGUA, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, ACARREO HASTA 10 M. DENTRO DE LA MISMA Y TRASPALEOS VERTICALES PARA SU EXTRACCION. DE 0.00 A 2.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M3 $133.00 $133.00 $133.00 $133.00 $159.62 $146.32 $133.00 $144.98 M2 $319.84 $319.84 $319.84 $319.84 $339.51 $329.66 $319.84 $328.68 Unidad M2 Region I $286.33 Region 2 $286.33 Region 3 $286.33 Region 4 $286.33 Region 5 $308.69 Region 6 $297.53 Region 7 $286.33 Region 8 $296.39

1002000063

M2

$291.06

$291.06

$291.06

$291.06

$310.22

$300.63

$291.06

$299.67

1002000083

M2

$343.13

$343.13

$343.13

$343.13

$365.73

$354.41

$343.13

$353.29

1002000093

M2

$188.04

$188.04

$188.04

$188.04

$204.23

$196.12

$188.04

$195.32

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 26 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1010000020 Concepto EXCAVACION A MANO PARA DESPLANTE DE ESTRUCTURAS, EN MATERIAL "A", EN AGUA, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, ACARREO HASTA 10 M. DENTRO DE LA MISMA Y TRASPALEOS VERTICALES PARA SU EXTRACCION. DE 2.00 A 3.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION A MANO PARA DESPLANTE DE ESTRUCTURAS, EN MATERIAL "A", EN AGUA, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, ACARREO HASTA 10 M. DENTRO DE LA MISMA Y TRASPALEOS VERTICALES PARA SU EXTRACCION. DE 3.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION A MANO PARA DESPLANTE DE ESTRUCTURAS, EN MATERIAL "A", EN SECO, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, ACARREO, HASTA 10 M. DENTRO DE LA MISMA Y TRASPALEOS VERTICALES PARA SU EXTRACCION. DE 0.00 A 2.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1010000050 EXCAVACION A MANO PARA DESPLANTE DE ESTRUCTURAS, EN MATERIAL "A", EN SECO, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, ACARREO, HASTA 10 M. DENTRO DE LA MISMA Y TRASPALEOS VERTICALES PARA SU EXTRACCION. DE 2.00 A 3.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION A MANO PARA DESPLANTE DE ESTRUCTURAS, EN MATERIAL "A", EN SECO, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, ACARREO, HASTA 10 M. DENTRO DE LA MISMA Y TRASPALEOS VERTICALES PARA SU EXTRACCION. DE 3.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M3 $106.39 $106.39 $106.39 $106.39 $127.69 $117.04 $106.39 $115.99 Unidad M3 Region I $147.79 Region 2 $147.79 Region 3 $147.79 Region 4 $147.79 Region 5 $177.34 Region 6 $162.56 Region 7 $147.79 Region 8 $161.09

1010000030

M3

$177.34

$177.34

$177.34

$177.34

$212.81

$195.08

$177.34

$193.31

1010000040

M3

$88.68

$88.68

$88.68

$88.68

$106.39

$97.54

$88.68

$96.65

1010000060

M3

$133.00

$133.00

$133.00

$133.00

$159.62

$146.32

$133.00

$144.98

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 27 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1010000070 Concepto EXCAVACION A MANO PARA DESPLANTE DE ESTRUCTURAS, EN MATERIAL "B", EN AGUA, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION Y TRASPALEOS VERTICALES PARA SU EXTRACCION. DE 0.00 A 2.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION A MANO PARA DESPLANTE DE ESTRUCTURAS, EN MATERIAL "B", EN AGUA, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION Y TRASPALEOS VERTICALES PARA SU EXTRACCION. DE 2.00 A 3.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION A MANO PARA DESPLANTE DE ESTRUCTURAS, EN MATERIAL "B", EN AGUA, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION Y TRASPALEOS VERTICALES PARA SU EXTRACCION. DE 3.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION A MANO PARA DESPLANTE DE ESTRUCTURAS, EN MATERIAL "B", EN SECO, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, ACARREO HASTA 10 M. DENTRO DE LA MISMA Y TRASPALEOS VERTICALES PARA SU EXTRACCION. DE 0.00 A 2.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1010000110 EXCAVACION A MANO PARA DESPLANTE DE ESTRUCTURAS, EN MATERIAL "B", EN SECO, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, ACARREO HASTA 10 M. DENTRO DE LA MISMA Y TRASPALEOS VERTICALES PARA SU EXTRACCION. DE 2.00 A 3.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M3 $147.79 $147.79 $147.79 $147.79 $177.34 $162.56 $147.79 $161.09 Unidad M3 Region I $147.79 Region 2 $147.79 Region 3 $147.79 Region 4 $147.79 Region 5 $177.34 Region 6 $162.56 Region 7 $147.79 Region 8 $161.09

1010000080

M3

$166.25

$166.25

$166.25

$166.25

$199.50

$182.89

$166.25

$181.22

1010000090

M3

$190.01

$190.01

$190.01

$190.01

$228.02

$209.01

$190.01

$207.11

1010000100

M3

$133.00

$133.00

$133.00

$133.00

$159.62

$146.32

$133.00

$144.98

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 28 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1010000120 Concepto EXCAVACION A MANO PARA DESPLANTE DE ESTRUCTURAS, EN MATERIAL "B", EN SECO, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, ACARREO HASTA 10 M. DENTRO DE LA MISMA Y TRASPALEOS VERTICALES PARA SU EXTRACCION. DE 3.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION CON APOYO DE EQUIPO MANUAL Y MECANICO PARA DESPLANTE DE ESTRUCTURAS EN MATERIAL "C" EN SECO CON EXTRACCION DE REZAGA A MANO, INCLUYE AFLOJE, AMACICE, LIMPIEZA DE PLANTILLA Y TALUDES, DE 0.00 A 2.00 MTS. DE PROFUNDIDAD INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION CON APOYO DE EQUIPO MANUAL Y MECANICO PARA DESPLANTE DE ESTRUCTURAS EN MATERIAL "C" EN SECO CON EXTRACCION DE REZAGA A MANO, INCLUYE AFLOJE, AMACICE, LIMPIEZA DE PLANTILLA Y TALUDES, DE 2.00 A 4.00 MTS. DE PROFUNDIDAD INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Total EXCAVACION PARA ESTRUCTURA A1011 1011000010 EXCAVACION EN ZANJA EXCAVACION A MANO PARA ZANJAS EN MATERIAL "A" EN AGUA INCLUYE AFLOJE Y EXTRACCION DE MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, TRASPALEOS VERTICALES PARA SU EXTRACCION Y CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA. DE 0.00 A 2.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION A MANO PARA ZANJAS EN MATERIAL "A" EN AGUA INCLUYE AFLOJE Y EXTRACCION DE MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, TRASPALEOS VERTICALES PARA SU EXTRACCION Y CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA. DE 2.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M3 $133.00 $133.00 $133.00 $133.00 $159.62 $146.32 $133.00 $144.98 Unidad M3 Region I $166.25 Region 2 $166.25 Region 3 $166.25 Region 4 $166.25 Region 5 $199.50 Region 6 $182.89 Region 7 $166.25 Region 8 $181.22

1010000130

M3

$167.65

$167.65

$167.65

$167.65

$178.87

$173.27

$167.65

$172.70

1010000140

M3

$242.50

$242.50

$242.50

$242.50

$260.65

$251.58

$242.50

$250.69

1011000020

M3

$156.49

$156.49

$156.49

$156.49

$187.77

$172.13

$156.49

$170.56

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 29 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1011000030 Concepto EXCAVACION CON MAQUINA PARA ZANJAS EN MATERIAL "A" EN AGUA, AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, CARGA A CAMION O A UN LADO DE LA ZANJA, INCLUYE: CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA, DE 0.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION CON MAQUINA PARA ZANJAS EN MATERIAL "A" EN AGUA, AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, CARGA A CAMION O A UN LADO DE LA ZANJA, INCLUYE: CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA, DE 4.00 A 6.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION A MANO PARA ZANJAS EN MATERIAL "A" EN SECO INCLUYE AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA, TALUDES, REMOCION, TRASPALEOS Y VERTICALES PARA SU EXTRACCION Y CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA. DE 0.00 A 2.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION A MANO PARA ZANJAS EN MATERIAL "A" EN SECO INCLUYE AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA, TALUDES, REMOCION, TRASPALEOS Y VERTICALES PARA SU EXTRACCION Y CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA. DE 2.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION CON MAQUINA PARA ZANJAS, EN MATERIAL "A", EN SECO, CON AFLOJE Y EXTRACCION DEL MATERIAL AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION CARGA A CAMION O A UN LADO DE LA ZANJA, INCLUYENDO ACARREO A 10 M. DEL EJE DE LA MISMA Y CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA. DE 4.00 A 6.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Unidad M3 Region I $26.14 Region 2 $26.14 Region 3 $26.14 Region 4 $26.14 Region 5 $28.30 Region 6 $27.24 Region 7 $26.14 Region 8 $27.13

1011000040

M3

$30.51

$30.51

$30.51

$30.51

$32.07

$31.29

$30.51

$31.22

1011000050

M3

$88.68

$88.68

$88.68

$88.68

$106.39

$97.54

$88.68

$96.65

1011000060

M3

$118.23

$118.23

$118.23

$118.23

$141.87

$130.05

$118.23

$128.87

1011000080

M3

$30.01

$30.01

$30.01

$30.01

$31.48

$30.74

$30.01

$30.66

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 30 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1011000090 Concepto EXCAVACION A MANO PARA ZANJAS EN MATERIAL "B" EN AGUA. INCLUYE AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, TRASPALEOS VERTICALES PARA SU EXTRACCION Y CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTOR Unidad M3 Region I $147.79 Region 2 $147.79 Region 3 $147.79 Region 4 $147.79 Region 5 $177.34 Region 6 $162.56 Region 7 $147.79 Region 8 $161.09

1011000100

EXCAVACION A MANO PARA ZANJAS EN MATERIAL "B" EN AGUA. INCLUYE AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, TRASPALEOS VERTICALES PARA SU EXTRACCION Y CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA. DE 2.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION CON MAQUINA PARA ZANJAS EN MATERIAL "B", EN AGUA, CON AFLOJE Y EXTRACCION DEL MATERIAL AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION CARGA A CAMION O A UN LADO DE LA ZANJA, INCLUYE: CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA. DE 0.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION CON MAQUINA PARA ZANJAS EN MATERIAL "B" EN AGUA, AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, CARGA A CAMION O A UN LADO DE LA ZANJA, INCLUYE: CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA: DE 4.00 A 6.00 M. DE PROFUNDIDAD INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION A MANO PARA ZANJAS EN MATERIAL "B" EN SECO INCLUYE AFLOJE EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, TRASPALEOS VERTICALES PARA SU EXTRACCION Y CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA

M3

$166.25

$166.25

$166.25

$166.25

$199.50

$182.89

$166.25

$181.22

1011000110

M3

$30.36

$30.36

$30.36

$30.36

$32.80

$31.57

$30.36

$31.44

1011000120

M3

$37.50

$37.50

$37.50

$37.50

$39.35

$38.42

$37.50

$38.32

1011000130

M3

$133.00

$133.00

$133.00

$133.00

$159.62

$146.32

$133.00

$144.98

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 31 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1011000140 Concepto EXCAVACION A MANO PARA ZANJAS EN MATERIAL "B" EN SECO INCLUYE AFLOJE EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, TRASPALEOS VERTICALES PARA SU EXTRACCION Y CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA Unidad M3 Region I $156.49 Region 2 $156.49 Region 3 $156.49 Region 4 $156.49 Region 5 $187.77 Region 6 $172.13 Region 7 $156.49 Region 8 $170.56

1011000150

EXCAVACION CON MAQUINA PARA ZANJAS EN MATERIAL "B", EN SECO, CON AFLOJE Y EXTRACCION DEL MATERIAL AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION CARGA A CAMION O A UN LADO DE LA ZANJA, INCLUYE: CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA. DE 0.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION CON MAQUINA PARA ZANJAS EN MATERIAL "B" EN SECO, AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLA Y TALUDES, REMOCION, CARGA A CAMION O A UN LADO DE LA ZANJA, INCLUYE: CONSERVACION DE LA EXCAVACION HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA DE 4.00 A 6.00 M. DE PROFUNDIDAD. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. EXCAVACION CON APOYO DE EQUIPO MANUAL Y MECANICO PARA ZANJAS EN MATERIAL "C" EN SECO, CON EXTRACCION DE REZAGA A MANO, INCLUYE: AFLOJE, AMACICE, LIMPIEZA DE PLANTILLA Y TALUDES, ACARREO A 10 M DEL EJE DE LA MISMA Y CONSERVACION DE LA EXCAVACION HASTA LA

M3

$24.76

$24.76

$24.76

$24.76

$26.88

$25.80

$24.76

$25.71

1011000160

M3

$30.01

$30.01

$30.01

$30.01

$31.48

$30.74

$30.01

$30.66

1011000170

M3

$205.94

$205.94

$205.94

$205.94

$221.88

$213.91

$205.94

$213.11

1011000180

EXCAVACION CON APOYO DE EQUIPO MANUAL Y MECANICO PARA ZANJAS EN MATERIAL "C" EN SECO, CON EXTRACCION DE REZAGA A MANO, INCLUYE: AFLOJE, AMACICE, LIMPIEZA DE PLANTILLA Y TALUDES, ACARREO A 10 M DEL EJE DE LA MISMA Y CONSERVACION DE LA EXCAVACION HASTA LA

M3

$242.50

$242.50

$242.50

$242.50

$260.65

$251.58

$242.50

$250.69

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 32 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo A1020 1020000010 Concepto Total EXCAVACION EN ZANJA RELLENOS PLANTILLA APISONADA CON PISON DE MANO, EN ZANJAS, INCLUYENDO SELECCION DEL MATERIAL PRODUCTO DE LA EXCAVACION, COLOCACION DE LA PLANTILLA Y CONSTRUCCION DEL APOYO SEMICIRCULAR, PARA PERMITIR EL APOYO COMPLETO DE LA TUBERIA. PLANTILLA CON MATERIAL "A" Y/O M3 $106.39 $106.39 $106.39 $106.39 $127.69 $117.04 $106.39 $115.99 Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8

1020000013

RELLENO A VOLTEO EN ZANJAS UTILIZANDO MATERIAL PRODUCTO DE EXCAVACION: RELLENO A VOLTEO, CON PALA DE MANO. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. RELLENO COMPACTADO EN ZANJAS CON PIZON DE MANO UTILIZANDO MATERIAL PRODUCTO DE EXCAVACION, INCLUYE: AGUA PARA SU HUMEDAD OPTIMA, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. RELLENO A VOLTEO EN ZANJAS UTILIZANDO MATERIAL PRODUCTO DE EXCAVACION. RELLENO A VOLTEO CON EQUIPO MECANICO INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. RELLENO APISONADO Y COMPACTADO CON MATERIAL MEJORADO EN CAPAS DE 0.20 M. DE ESPESOR AL 85% PRUEBA PROCTOR. CON EQUIPO MANUAL INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. RELLENO APISONADO Y COMPACTADO CON MATERIAL MEJORADO EN CAPAS DE 0.20 M. DE ESPESOR AL 90% PRUEBA PROCTOR. CON EQUIPO MANUAL INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. RELLENO APISONADO Y COMPACTADO CON MATERIAL MEJORADO EN CAPAS DE 0.20 M. DE ESPESOR AL 95% PRUEBA PROCTOR. CON EQUIPO MANUAL INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M3

$44.33

$44.33

$44.33

$44.33

$53.19

$48.76

$44.33

$48.32

1020000023

M3

$72.63

$72.63

$72.63

$72.63

$86.23

$79.42

$72.63

$78.75

1020000033

M3

$10.17

$10.17

$10.17

$10.17

$10.89

$10.53

$10.17

$10.50

1020000043

M3

$325.63

$325.63

$325.63

$325.63

$346.13

$335.87

$325.63

$334.86

1020000053

M3

$272.47

$272.47

$272.47

$272.47

$282.62

$277.55

$272.47

$277.03

1020000063

M3

$331.25

$331.25

$331.25

$331.25

$352.54

$341.90

$331.25

$340.83

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 33 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo Total RELLENOS A1021 1021000013 BOMBEO DE ACHIQUE BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE, CON OPERACION. PROPIEDAD DEL CONTRATISTA. BOMBA DE 50.8 MM. (2") DIAMETRO. Y 4 H.P. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE, CON OPERACION. BOMBA DE 76.2 MM. (3") DIAMETRO. Y 8 H.P. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE, CON OPERACION. BOMBA DE 101.6 MM. (4") DIAMETRO. Y 12 H.P. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Hora $60.39 $60.39 $60.39 $60.39 $69.74 $65.06 $60.39 $64.58 Concepto Unidad Region I Region 2 Region 3 Region 4 Region 5 Region 6 Region 7 Region 8

1021000023

Hora

$73.01

$73.01

$73.01

$73.01

$82.36

$77.67

$73.01

$77.22

1021000033

Hora

$81.06

$81.06

$81.06

$81.06

$93.24

$87.13

$81.06

$86.54

Total BOMBEO DE ACHIQUE A1024 1024000010 ADEMES ADEME CERRADO DE MADERA HASTA 2.50 M. DE PROFUNDIDAD CON FORRO VERTICAL DE TABLON DE MADERA 2" ESPESOR, REFUERZO (ARRASTRE) HORIZONTAL CON BARROTES, POLINES PARA CUAS DE APOYO INCLUYE: MATERIALES, MANO DE OBRA PARA SU FABRICACION, COLOCACION Y RETIRO, HERRAMIENTA MENOR. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ADEME CERRADO DE MADERA HASTA 3.00 M. DE PROFUNDIDAD CON FORRO VERTICAL DE TABLON DE MADERA 2" ESPESOR, REFUERZO (ARRASTRE) HORIZONTAL CON BARROTES, POLINES PARA CUAS DE APOYO INCLUYE: MATERIALES, MANO DE OBRA PARA SU FABRICACION, COLOCACION Y RETIRO, HERRAMIENTA MENOR. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ADEME ABIERTO DE MADERA HASTA 2.50 M. DE PROFUNDIDAD CON FORRO VERTICAL DE TABLON DE MADERA 2" ESPESOR SEPARADO 30CM ENTRE TABLON Y TABLON, REFUERZO (ARRASTRE) HORIZONTAL CON BARROTES, POLINES PARA CUAS DE APOYO INCLUYE: MATERIALES, MANO DE OBRA PARA SU FABRICACION, COLOCACION Y RETIRO, HERRAMIENTA MENOR. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M2 $84.52 $84.52 $84.52 $84.52 $94.78 $89.63 $84.52 $89.13

1024000012

M2

$97.35

$97.35

$97.35

$97.35

$110.17

$103.75

$97.35

$103.11

1024000013

M2

$66.68

$66.68

$66.68

$66.68

$75.73

$71.21

$66.68

$70.76

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 34 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1024000023 Concepto ADEME ABIERTO DE MADERA HASTA 3.00 M. DE PROFUNDIDAD CON FORRO VERTICAL DE TABLON DE MADERA 2" ESPESOR SEPARADO 30CM ENTRE TABLON Y TABLON, REFUERZO (ARRASTRE) HORIZONTAL CON BARROTES, POLINES PARA CUAS DE APOYO INCLUYE: MATERIALES, MANO DE OBRA PARA SU FABRICACION, COLOCACION Y RETIRO, HERRAMIENTA MENOR. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ADEME METALICO CERRADO HASTA UNA PROFUNDIDAD DE EXCAVACION DE 4.40 M. CON PERFIL "C" ESTANDAR DE 12" (305mm) Y 30.80Kg/M. INCLUYE:COLOCACION Y DESMANTELAMIENTO CON EQUIPO MECANICO, FLETES Y MANIOBRAS LOCALES DE MATERIALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. ADEME METALICO ABIERTO HASTA UNA PROFUNDIDAD DE EXCAVACION DE 4.40 M. CON PERFIL "C" ESTANDAR DE 12" (305mm) Y 30.80Kg/M SEPARADOS 30CM. ENTRE PERFIL Y PERFIL. INCLUYE:COLOCACION Y DESMANTELAMIENTO CON EQUIPO MECANICO, FLETES Y MANIOBRAS LOCALES DE MATERIALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. 1024000053 ATAGUIAS CON SACO DE ARENA O ARCILLA DEL LUGAR CON SECCION DE 1.00 MT. DE BASE POR 1.20 MTS. DE ALTO UTILIZANDO 20 SACOS DE 0.50X0.40X0.30 MTS. POR ML. INCLUYE: COSTOS DE SACOS, MATERIALES, LLENADO DE LOS SACOS COLOCACION Y RETIRO DE LOS MATERIALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Total ADEMES Total Preliminares A11 A1105 1105000013 Agua Potable Instalacion Tuberia PVC INSTALACION, JUNTEO Y PRUEBA DE TUBERIAS DE P.V.C. HIDRAULICA CEMENTAR DE 13 Y 19 MM. (1/2" Y 3/4" ) DE DIAMETRO, INCLUYE MANO DE OBRA, HERRAMIENTA MENOR. BAJADA DE MATERIAL, EQUIPO PARA PRUEBA Y MANIOBRAS LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M $10.31 $10.31 $10.31 $10.31 $12.15 $11.24 $10.31 $11.13 M $216.02 $216.02 $216.02 $216.02 $229.30 $222.67 $216.02 $221.99 Unidad M2 Region I $72.72 Region 2 $72.72 Region 3 $72.72 Region 4 $72.72 Region 5 $82.98 Region 6 $77.85 Region 7 $72.72 Region 8 $77.34

1024000033

M2

$259.64

$259.64

$259.64

$259.64

$263.58

$261.62

$259.64

$261.43

1024000043

M2

$152.69

$152.69

$152.69

$152.69

$155.30

$153.98

$152.69

$153.84

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 35 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1105000023 Concepto INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DE P.V.C. HIDRAULICO CEMENTAR DE 25 MM. (1") DE DIAMETRO; INCLUYE: BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DE P.V.C. HIDRAULICA CEMENTAR DE 32 MM. (1 1/4") DE DIAMETRO, INCLUYE BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DE P.V.C. CON CAMPANA DE 38 MM. (1 1/2") DE DIAMETRO, INCLUYE BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DE P.V.C. CON CAMPANA DE 50 MM. (2") DE DIAMETRO, INCLUYE BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DE P.V.C. CON CAMPANA DE 63 MM. (2 1/2") DE DIAMETRO, INCLUYE BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. Unidad M Region I $11.60 Region 2 $11.60 Region 3 $11.60 Region 4 $11.60 Region 5 $13.48 Region 6 $12.52 Region 7 $11.60 Region 8 $12.43

1105000033

M

$12.95

$12.95

$12.95

$12.95

$14.91

$13.92

$12.95

$13.83

1105000043

M

$10.94

$10.94

$10.94

$10.94

$12.98

$11.95

$10.94

$11.86

1105000053

M

$11.83

$11.83

$11.83

$11.83

$14.02

$12.93

$11.83

$12.81

1105000063

M

$12.79

$12.79

$12.79

$12.79

$15.12

$13.95

$12.79

$13.82

1105000073

INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DE P.V.C. CON CAMPANA DE 75 MM. (3") DE DIAMETRO, INCLUYE BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DE P.V.C. CON CAMPANA DE100 MM. (4") DE DIAMETRO, INCLUYE BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M

$15.01

$15.01

$15.01

$15.01

$17.71

$16.36

$15.01

$16.24

1105000083

M

$17.29

$17.29

$17.29

$17.29

$20.37

$18.82

$17.29

$18.68

:

SECRETARIA DE INFRAESTRUCTURASUBSECRETARIA TECNICADIRECCION DE COSTOSFecha: AGOSTO DEL 2008

Pgina 36 de 430

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2008 POR REGIONESCdigo 1105000093 Concepto INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DE P.V.C. CON CAMPANA DE 160 MM. (6") DE DIAMETRO, INCLUYE BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. INS