Página 1 de 258 SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACION DIRECCION DE COSTOS Fecha: 01-Jul-13 Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 Lugar: CHIAPAS. TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV A Agua Potable y Alcantarillado A05 Obra Civil A0501 Limpia y trazo 1308000010 DESMONTE, LIMPIA, TRAZO Y NIVELACION DE LINEA DE CONDUCCION, ESTABLECIENDO EJES DE REFERENCIAS Y BANCOS DE NIVEL, CON EQUIPO TOPOGRAFICO INCLUYE: LIMPIA A MANO CON HERRAMIENTA MANUAL, ACARREO DE LA MALEZA FUERA DEL EJE DEL TRAZO. INCLUYE TODO LO M2 $13.52 $13.52 $13.52 $13.52 $13.52 $13.52 $13.52 $16.85 $13.59 $13.59 $13.59 $13.59 $13.59 $13.59 $13.59 NECESARIO PARA SU CORRECTA EJECUCION. 1308000013 LIMPIEZA, TRAZO Y NIVELACION EN TERRENO PARA DESPLANTE DE ESTRUCTURAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M2 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $10.88 $8.74 $8.74 $8.74 $8.74 $8.74 $8.74 $8.74 1308000023 TRAZO Y NIVELACION EXCLUSIVAMENTE EN CALLES. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M2 $6.51 $6.51 $6.51 $6.51 $6.51 $6.51 $6.51 $7.96 $6.52 $6.52 $6.52 $6.52 $6.52 $6.52 $6.52 1308000033 TRAZO Y CORTE HASTA 5CM ESPESOR CON CORTADORA DE DISCO EN CONCRETO HIDRAULICO; INCLUYE: 2 LINEAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M $87.06 $87.06 $87.06 $87.06 $87.06 $87.06 $87.06 $99.85 $87.35 $87.35 $87.35 $87.35 $87.35 $87.35 $87.35 1308000043 TRAZO Y CORTE HASTA 5CM ESPESOR CON CORTADORA DE DISCO EN PAVIMENTO ASFALTICO; INCLUYE: 2 LINEAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M $72.17 $72.17 $72.17 $72.17 $72.17 $72.17 $72.17 $83.05 $72.43 $72.43 $72.43 $72.43 $72.43 $72.43 $72.43 1308000045 TRAZO Y CORTE HASTA 5CM ESPESOR CON CORTADORA DE DISCO EN BANQUETA DE CONCRETO; INCLUYE: 2 LINEAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION. M $95.95 $95.95 $95.95 $95.95 $95.95 $95.95 $95.95 $109.10 $96.26 $96.26 $96.26 $96.26 $96.26 $96.26 $96.26 Total Preliminares A0502 Mamposterias de Piedra 1301000013 MURO DE MAMPOSTERIA DE 3A. CON ESPESOR MENOR DE 0.60 M., UTILIZANDO PIEDRA BRAZA CON PARAMENTOS ROSTREADOS, JUNTEADA CON MORTERO CEMENTO-ARENA 1:3, INCLUYE: INCLUYE: ACARREO DEL MATERIAL A 20 MTS. MATERIALES, MANO DE OBRA Y HERRAMIENTA. INCLUYE TODO LO M3 $1,436.84 $1,436.84 $1,436.84 $1,436.84 $1,436.84 $1,436.84 $1,436.84 $1,629.55 $1,440.12 $1,440.12 $1,440.12 $1,440.12 $1,440.12 $1,440.12 $1,440.12 NECESARIO PARA SU CORRECTA EJECUCION. :

TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Embed Size (px)

Citation preview

Page 1: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 1 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

A Agua Potable y Alcantarillado

A05 Obra Civil

A0501 Limpia y trazo1308000010 DESMONTE, LIMPIA, TRAZO Y NIVELACION DE LINEA

DE CONDUCCION, ESTABLECIENDO EJES DEREFERENCIAS Y BANCOS DE NIVEL, CON EQUIPOTOPOGRAFICO INCLUYE: LIMPIA A MANO CONHERRAMIENTA MANUAL, ACARREO DE LA MALEZAFUERA DEL EJE DEL TRAZO. INCLUYE TODO LO

M2 $13.52 $13.52 $13.52 $13.52 $13.52 $13.52 $13.52 $16.85 $13.59 $13.59 $13.59 $13.59 $13.59 $13.59 $13.59

NECESARIO PARA SU CORRECTA EJECUCION.

1308000013 LIMPIEZA, TRAZO Y NIVELACION EN TERRENO PARADESPLANTE DE ESTRUCTURAS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M2 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $10.88 $8.74 $8.74 $8.74 $8.74 $8.74 $8.74 $8.74

1308000023 TRAZO Y NIVELACION EXCLUSIVAMENTE ENCALLES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M2 $6.51 $6.51 $6.51 $6.51 $6.51 $6.51 $6.51 $7.96 $6.52 $6.52 $6.52 $6.52 $6.52 $6.52 $6.52

1308000033 TRAZO Y CORTE HASTA 5CM ESPESOR CONCORTADORA DE DISCO EN CONCRETOHIDRAULICO; INCLUYE: 2 LINEAS. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M $87.06 $87.06 $87.06 $87.06 $87.06 $87.06 $87.06 $99.85 $87.35 $87.35 $87.35 $87.35 $87.35 $87.35 $87.35

1308000043 TRAZO Y CORTE HASTA 5CM ESPESOR CONCORTADORA DE DISCO EN PAVIMENTO ASFALTICO;INCLUYE: 2 LINEAS. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M $72.17 $72.17 $72.17 $72.17 $72.17 $72.17 $72.17 $83.05 $72.43 $72.43 $72.43 $72.43 $72.43 $72.43 $72.43

1308000045 TRAZO Y CORTE HASTA 5CM ESPESOR CONCORTADORA DE DISCO EN BANQUETA DECONCRETO; INCLUYE: 2 LINEAS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $95.95 $95.95 $95.95 $95.95 $95.95 $95.95 $95.95 $109.10 $96.26 $96.26 $96.26 $96.26 $96.26 $96.26 $96.26

Total Preliminares

A0502 Mamposterias de Piedra1301000013 MURO DE MAMPOSTERIA DE 3A. CON ESPESOR

MENOR DE 0.60 M., UTILIZANDO PIEDRA BRAZACON PARAMENTOS ROSTREADOS, JUNTEADA CONMORTERO CEMENTO-ARENA 1:3, INCLUYE:INCLUYE: ACARREO DEL MATERIAL A 20 MTS.MATERIALES, MANO DE OBRA Y HERRAMIENTA.INCLUYE TODO LO

M3 $1,436.84 $1,436.84 $1,436.84 $1,436.84 $1,436.84 $1,436.84 $1,436.84 $1,629.55 $1,440.12 $1,440.12 $1,440.12 $1,440.12 $1,440.12 $1,440.12 $1,440.12

NECESARIO PARA SU CORRECTA EJECUCION.

:

Page 2: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 2 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1301000023 MURO DE MAMPOSTERIA CON ESPESOR DE 0.61 M.A 1.00 M. DE 3A., UTILIZANDO PIEDRA BRAZA CONPARAMENTOS ROSTREADOS, JUNTEADA CONMORTERO CEMENTO-ARENA 1:3, INCLUYE:ACARREO DEL MATERIAL A 20 MTS. MATERIALES,MANO DE OBRA Y HERRAMIENTA. INCLUYE TODOLO

M3 $1,397.78 $1,397.78 $1,397.78 $1,397.78 $1,397.78 $1,397.78 $1,397.78 $1,574.89 $1,400.80 $1,400.80 $1,400.80 $1,400.80 $1,400.80 $1,400.80 $1,400.80

NECESARIO PARA SU CORRECTA EJECUCION.

1301000033 MUROS DE MAMPOSTERIA JUNTEADA CONMORTERO CEMENTO ARENA 1:3, MENORES DE 0.60M. DE ESPESOR (EXCLUSI VAMENTE PARAESTRUCTURAS EN CONTACTO CON AGUA).INCLUYE: , ACARREO DEL MATERIAL A 20 MTS.MATERIALES, MANO DE OBRA Y HERRAMIENTA.INCLUYE TODO LO

M3 $1,466.93 $1,466.93 $1,466.93 $1,466.93 $1,466.93 $1,466.93 $1,466.93 $1,671.71 $1,470.42 $1,470.42 $1,470.42 $1,470.42 $1,470.42 $1,470.42 $1,470.42

NECESARIO PARA SU CORRECTA EJECUCION.

1301000043 MUROS DE MAMPOSTERIA JUNTEADA CONMORTERO CEMENTO ARENA 1:3, DE 0.61 A 1.00 M.DE ESPESOR (EXCLUSIVA MENTE PARAESTRUCTURAS EN CONTACTO CON AGUA).INCLUYE: ACARREO DEL MATERIAL A 20 MTS.MATERIALES, MANO DE OBRA Y HERRAMIENTA.INCLUYE TODO LO NECESARIO

M3 $1,436.84 $1,436.84 $1,436.84 $1,436.84 $1,436.84 $1,436.84 $1,436.84 $1,629.55 $1,440.12 $1,440.12 $1,440.12 $1,440.12 $1,440.12 $1,440.12 $1,440.12

PARA SU CORRECTA EJECUCION.

1302000013 ZAMPEADO CON PIEDRA BRAZA JUNTEADA CONMORTERO CEMENTO ARENA 1:5. INCLUYE:ACARREO DEL MATERIAL A 20 MTS. MATERIALES,MANO DE OBRA Y HERRAMIENTA. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M3 $867.54 $867.54 $867.54 $867.54 $867.54 $867.54 $867.54 $906.91 $868.49 $868.49 $868.49 $868.49 $868.49 $868.49 $868.49

1302000023 ZAMPEADO CON PIEDRA BRAZA JUNTEADA CONMORTERO CEMENTO ARENA 1:3. INCLUYE:ACARREO DEL MATERIAL A 20 MTS. MATERIALES,MANO DE OBRA Y HERRAMIENTA. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M3 $1,174.55 $1,174.55 $1,174.55 $1,174.55 $1,174.55 $1,174.55 $1,174.55 $1,305.59 $1,176.80 $1,176.80 $1,176.80 $1,176.80 $1,176.80 $1,176.80 $1,176.80

Total Preliminares

A0503 Muros de Tabique

:

Page 3: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 3 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1305000013 MURO DE TABIQUE ROJO RECOCIDO DE 3.00 HASTA6.00 M. DE ALTURA, DE 0.14 M DE ESPESORACABADO COMÚN JUNTEADO CON MORTEROCEMENTO-ARENA 1:5, INCLUYE: DESCARGA,MATERIALES, MANO DE OBRA Y HERRAMIENTA.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M2 $337.01 $337.01 $337.01 $337.01 $337.01 $337.01 $337.01 $397.80 $338.04 $338.04 $338.04 $338.04 $338.04 $338.04 $338.04

1305000023 MURO DE TABIQUE ROJO RECOCIDO DE 0.21 M DEESPESOR, DE 0.00 HASTA 3.00 M. DE ALTURA,ACABADO COMÚN JUNTEADO CON MORTEROCEMENTO-ARENA 1:5, INCLUYE: DESCARGA,MATERIALES, MANO DE OBRA Y HERRAMIENTA.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M2 $447.04 $447.04 $447.04 $447.04 $447.04 $447.04 $447.04 $513.49 $448.15 $448.15 $448.15 $448.15 $448.15 $448.15 $448.15

1305000033 MURO DE TABIQUE ROJO RECOCIDO DE 0.21 M DEESPESOR, DE 3.00 HASTA 6.00 M. DE ALTURA,ACABADO COMÚN JUNTEADO CON MORTEROCEMENTO-ARENA 1:5, INCLUYE: DESCARGA,MATERIALES, MANO DE OBRA Y HERRAMIENTA.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M2 $466.18 $466.18 $466.18 $466.18 $466.18 $466.18 $466.18 $540.10 $467.45 $467.45 $467.45 $467.45 $467.45 $467.45 $467.45

1305000043 MURO DE TABIQUE ROJO RECOCIDO, HASTA 3.00 M. DE ALTURA, ACABADO COMÚN, JUNTEADO CONMORTERO CEMENTO-ARENA 1:5, INCLUYE:DESCARGA, MATERIALES, MANO DE OBRA YHERRAMIENTA. MURO DE TABIQUE DE 0.28 M. DEESPESOR. INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M2 $535.75 $535.75 $535.75 $535.75 $535.75 $535.75 $535.75 $602.19 $536.86 $536.86 $536.86 $536.86 $536.86 $536.86 $536.86

EJECUCION.

1305000053 MURO DE TABIQUE ROJO RECOCIDO, HASTA 3.00 M. DE ALTURA, ACABADO COMÚN, JUNTEADO CONMORTERO CEMENTO-ARENA 1:5, INCLUYE:DESCARGA, MATERIALES, MANO DE OBRA YHERRAMIENTA. MURO DE TABIQUE DE 0.14 M. DEESPESOR. INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M2 $303.51 $303.51 $303.51 $303.51 $303.51 $303.51 $303.51 $351.24 $304.32 $304.32 $304.32 $304.32 $304.32 $304.32 $304.32

EJECUCION.

:

Page 4: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 4 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1306000013 MURO DE TABIQUE ROJO RECOCIDO, ACABADOCOMÚN, JUNTEADO CON MORTERO CEMENTOARENA 1-5, PARA TANQUE ELEVADO INCLUYE:MATERIALES, MANO DE OBRA Y HERRAMIENTA.MURO DE TABIQUE DE 0.14 M. DE ESPESOR PARATANQUE ELEVADO DE 6.00 A 10.00 M. DE ALTURA.INCLUYE

M2 $381.59 $381.59 $381.59 $381.59 $381.59 $381.59 $381.59 $456.71 $382.92 $382.92 $382.92 $382.92 $382.92 $382.92 $382.92

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1306000023 MURO DE TABIQUE ROJO RECOCIDO, ACABADOCOMÚN, JUNTEADO CON MORTERO CEMENTOARENA 1-5, PARA TANQUE ELEVADO INCLUYE:MATERIALES, MANO DE OBRA YHERRAMIENTA.MUROS DE TABIQUE DE 0.21 M. DEESPESOR PARA TANQUE ELEVADO DE 6.00 A 10.00M. DE ALTURA. INCLUYE

M2 $531.12 $531.12 $531.12 $531.12 $531.12 $531.12 $531.12 $625.99 $532.81 $532.81 $532.81 $532.81 $532.81 $532.81 $532.81

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1306000025 MURO DE TABIQUE ROJO RECOCIDO, ACABADOCOMÚN, JUNTEADO CON MORTERO CEMENTOARENA 1-5, PARA TANQUE ELEVADO INCLUYE:MATERIALES, MANO DE OBRA Y HERRAMIENTA.MURO DE TABIQUE DE 0.21 M. DE ESPESOR PARATANQUE ELEVADO DE 10.00 A 15.00 M. DE ALTURA.INCLUYE

M2 $387.35 $387.35 $387.35 $387.35 $387.35 $387.35 $387.35 $464.12 $388.70 $388.70 $388.70 $388.70 $388.70 $388.70 $388.70

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1306000043 MURO DE TABIQUEROJO RECOCIDO, ACABADOCOMÚN, JUNTEADO CON MORTERO CEMENTOARENA 1-5, PARA TANQUE ELEVADO INCLUYE:MATERIALES, MANO DE OBRA Y HERRAMIENTA.MURO DE TABIQUE DE 0.21 M. DE ESPESOR PARATANQUE ELEVADO DE 10.00 A 15.00 M. DE ALTURA.INCLUYE

M2 $541.53 $541.53 $541.53 $541.53 $541.53 $541.53 $541.53 $639.24 $543.31 $543.31 $543.31 $543.31 $543.31 $543.31 $543.31

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

Total Muros de Tabique

A0504 Concretos

:

Page 5: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 5 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1307000013 CONCRETO F c=100 KG/CM2 FABRICADO A MANOEN OBRA PARA CIMENTACIÓN. EL TAMAÑO MÁXIMO DEL AGREGADO SERÁ DE (3/4") EL BANCO DEAGREGADOS DEBERA SER APROBADO POR LASECRETARIA. INCLUYE: MATERIALES, MANO DEOBRA, HERRAMIENTA MENOR, ACARREO,MUESTREO,

M3 $1,654.06 $1,654.06 $1,654.06 $1,654.06 $1,654.06 $1,654.06 $1,654.06 $1,820.29 $1,657.61 $1,657.61 $1,657.61 $1,657.61 $1,657.61 $1,657.61 $1,657.61

COLADO, VIBRADO, CURADO Y DESPERDICIOS.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1307000023 CONCRETO F c=150 KG/CM2 FABRICADO CONMAQUINA REVOLVEDORA EN OBRA PARACIMENTACIÓN. EL TAMAÑO MÁXIMO DELAGREGADO SERÁ DE (3/4") EL BANCO DEAGREGADOS DEBERA SER APROBADO POR LASECRETARIA. INCLUYE: MATERIALES, MANO DEOBRA, EQUIPO, HERRAMIENTA MENOR,

M3 $1,828.18 $1,828.18 $1,828.18 $1,828.18 $1,828.18 $1,828.18 $1,828.18 $2,002.57 $1,831.91 $1,831.91 $1,831.91 $1,831.91 $1,831.91 $1,831.91 $1,831.91

ACARREO, MUESTREO, COLADO, VIBRADO,CURADO Y DESPERDICIOS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1307000033 CONCRETO F c=175 KG/CM2 FABRICADO CONMAQUINA REVOLVEDORA EN OBRA PARACIMENTACIÓN. EL TAMAÑO MÁXIMO DELAGREGADO SERÁ DE (3/4") EL BANCO DEAGREGADOS DEBERA SER APROBADO POR LASECRETARIA. INCLUYE: MATERIALES, MANO DEOBRA, EQUIPO, HERRAMIENTA MENOR,

M3 $1,881.45 $1,881.45 $1,881.45 $1,881.45 $1,881.45 $1,881.45 $1,881.45 $2,056.86 $1,885.18 $1,885.18 $1,885.18 $1,885.18 $1,885.18 $1,885.18 $1,885.18

ACARREO, MUESTREO, COLADO, VIBRADO,CURADO Y DESPERDICIOS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1307000043 CONCRETO F c=200 KG/CM2 FABRICADO CONMAQUINA REVOLVEDORA EN OBRA PARACIMENTACIÓN. EL TAMAÑO MÁXIMO DELAGREGADO SERÁ DE (3/4") EL BANCO DEAGREGADOS DEBERA SER APROBADO POR LASECRETARIA. INCLUYE: MATERIALES, MANO DEOBRA, EQUIPO, HERRAMIENTA MENOR,

M3 $1,945.93 $1,945.93 $1,945.93 $1,945.93 $1,945.93 $1,945.93 $1,945.93 $2,119.55 $1,949.64 $1,949.64 $1,949.64 $1,949.64 $1,949.64 $1,949.64 $1,949.64

ACARREO, MUESTREO, COLADO, VIBRADO,CURADO Y DESPERDICIOS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

:

Page 6: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 6 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1307000053 CONCRETO F c=250 KG/CM2 FABRICADO CONMAQUINA REVOLVEDORA EN OBRA PARACIMENTACIÓN. EL TAMAÑO MÁXIMO DELAGREGADO SERÁ DE (3/4") EL BANCO DEAGREGADOS DEBERA SER APROBADO POR LASECRETARIA. INCLUYE: MATERIALES, MANO DEOBRA, EQUIPO, HERRAMIENTA MENOR,

M3 $2,062.41 $2,062.41 $2,062.41 $2,062.41 $2,062.41 $2,062.41 $2,062.41 $2,236.03 $2,066.13 $2,066.13 $2,066.13 $2,066.13 $2,066.13 $2,066.13 $2,066.13

ACARREO, MUESTREO, COLADO, VIBRADO,CURADO Y DESPERDICIOS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1310000013 ELEVACION DE CONCRETO CON MALACATE ENTANQUE ELEVADO DE 6.00 A 10.00 M. DE ALTURAINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M3 $198.72 $198.72 $198.72 $198.72 $198.72 $198.72 $198.72 $247.87 $199.84 $199.84 $199.84 $199.84 $199.84 $199.84 $199.84

1310000023 ELEVACION DE CONCRETO CON MALACATE ENTANQUE ELEVADO DE 10.00 A 15.00 M. DE ALTURA.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M3 $234.86 $234.86 $234.86 $234.86 $234.86 $234.86 $234.86 $292.93 $236.18 $236.18 $236.18 $236.18 $236.18 $236.18 $236.18

Total Concretos

A0505 Cimbras1313000013 CIMBRA PARA CIMENTACION EN ZAPATAS

ACABADO COMUN CON MADERA DE PINO DE 3a.MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE:MATERIALES, MANO DE OBRA EN HABILITADO,CIMBRADO Y DESCIMBRADO Y MANIOBRALOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M2 $156.61 $156.61 $156.61 $156.61 $156.61 $156.61 $156.61 $193.31 $157.27 $157.27 $157.27 $157.27 $157.27 $157.27 $157.27

EJECUCION.

1313000023 CIMBRA PARA CIMENTACION EN CONTRATRABEACABADO COMUN CON MADERA DE PINO DE 3a.MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE:MATERIALES, MANO DE OBRA EN HABILITADO,CIMBRADO Y DESCIMBRADO Y MANIOBRALOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M2 $195.82 $195.82 $195.82 $195.82 $195.82 $195.82 $195.82 $235.13 $196.53 $196.53 $196.53 $196.53 $196.53 $196.53 $196.53

EJECUCION.

:

Page 7: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 7 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1313000033 CIMBRA PARA CIMENTACIÓN EN CONTRATRABECON CIMBRATRIPLAY DE PINO DE 16 MM. YMADERA DE PINO DE 3A. ACABADO APARENTE,MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE:MATERIA LES, MANO DE OBRA EN HABILITADO,CIMBRADO Y DESCIMBRADO. INCLUYE TODO LONECESARIO

M2 $312.85 $312.85 $312.85 $312.85 $312.85 $312.85 $312.85 $352.18 $313.57 $313.57 $313.57 $313.57 $313.57 $313.57 $313.57

PARA SU CORRECTA EJECUCION.

1314000013 CIMBRA DE MADERA CASTILLOS, CADENAS, DALASACABADO COMUN CON MADERA DE PINO DE 3a.MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE:MATERIALES, MANO DE OBRA EN HABILITADO,CIMBRADO Y DESCIMBRADO Y MANIOBRALOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M2 $209.63 $209.63 $209.63 $209.63 $209.63 $209.63 $209.63 $248.95 $210.34 $210.34 $210.34 $210.34 $210.34 $210.34 $210.34

EJECUCION.

1314000023 CIMBRA DE MADERA CASTILLOS, CADENAS, DALASACABADO APARENTE CON CIMBRAPLAY Y MADERADE 3a. MEDIDA POR SUPERFICIE DE CONTACTO,INCLUYE: MATERIALES, MANO DE OBRA ENHABILITADO, CIMBRADO Y DESCIMBRADO YMANIOBRA LOCALES. INCLUYE TODO LONECESARIO PARA SU

M2 $358.25 $358.25 $358.25 $358.25 $358.25 $358.25 $358.25 $408.98 $359.12 $359.12 $359.12 $359.12 $359.12 $359.12 $359.12

CORRECTA EJECUCION.

1315000013 CIMBRA DE MADERA EN COLUMNAS ACABADOCOMUN MADERA DE 3a. HASTA 3.00 M DE ALTURA,MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE:MATERIALES, MANO DE OBRA EN HABILITADO,CIMBRADO Y DESCIMBRADO Y MANIOBRALOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M2 $183.36 $183.36 $183.36 $183.36 $183.36 $183.36 $183.36 $226.33 $184.14 $184.14 $184.14 $184.14 $184.14 $184.14 $184.14

EJECUCION.

1315000023 CIMBRA DE MADERA EN COLUMNAS ACABADOAPARENTE CON CIMBRAPLAY Y MADERA DE 3a.HASTA 3.00 M DE ALTURA. MEDIDA PORSUPERFICIE DE CONTACTO, INCLUYE:MATERIALES, MANO DE OBRA EN HABILITADO,CIMBRADO Y DESCIMBRADO Y MANIOBRALOCALES. INCLUYE TODO LO

M2 $289.84 $289.84 $289.84 $289.84 $289.84 $289.84 $289.84 $329.16 $290.55 $290.55 $290.55 $290.55 $290.55 $290.55 $290.55

NECESARIO PARA SU CORRECTA EJECUCION.

:

Page 8: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 8 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1316000013 CIMBRA PARA LOSA ACABADO COMUN CONMADERA DE PINO DE 3a. HASTA 3.60M DE ALTURAMEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE:MATERIA LES, MANO DE OBRA EN HABILITADO,CIMBRADO Y DESCIMBRADO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M2 $235.08 $235.08 $235.08 $235.08 $235.08 $235.08 $235.08 $274.88 $235.82 $235.82 $235.82 $235.82 $235.82 $235.82 $235.82

1316000023 CIMBRA PARA LOSA CON CIMBRATRIPLAY DE PINODE 16 MM. Y MADERA DE PINO DE 3A. HASTA 3.60MTS. ACABADO APARENTE, MEDIDA PORSUPERFICIE DE CONTACTO, INCLUYE: MATERIALES, MANO DE OBRA EN HABILITADO, CIMBRADO YDESCIMBRADO. INCLUYE TODO LO NECESARIOPARA

M2 $344.00 $344.00 $344.00 $344.00 $344.00 $344.00 $344.00 $383.32 $344.71 $344.71 $344.71 $344.71 $344.71 $344.71 $344.71

SU CORRECTA EJECUCION.

1316000033 CIMBRA PARA LOSAS Y TRABES DE ENTREPISOAPARENTE CON CIMBRAPLAY DE PINO DE 16 MM.;INCLUYE: CIMBRADO Y DESCIMBRADO(ESTRUCTURAS DE CONCRETO.), HERRAMIENTA,ANDAMIOS, MADERA DE PINO DE TERCERA PARASOPORTE, CONTRAVENTEO Y ARRASTRES(BARROTES, POLINES Y

M2 $355.25 $355.25 $355.25 $355.25 $355.25 $355.25 $355.25 $400.15 $356.05 $356.05 $356.05 $356.05 $356.05 $356.05 $356.05

CHAFLANES). INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

1316000043 CIMBRA PARA LOSAS Y TRABES DE ENTREPISOACABADO COMUN CON MADERA DE PINO; INCLUYE:CIMBRADO, DESCIMBRADO, HERRAMIENTA,ANDAMIOS, MADERA DE PINO DE TERCERA PARASOPORTE, CONTRAVENTEO Y ARRASTRES(POLINES, BARROTES Y CHAFLANES). INCLUYETODO LO NECESARIO

M2 $246.19 $246.19 $246.19 $246.19 $246.19 $246.19 $246.19 $291.08 $246.97 $246.97 $246.97 $246.97 $246.97 $246.97 $246.97

PARA SU CORRECTA EJECUCION.

1316000053 CIMBRA PARA LOSAS Y TRABES DE AZOTEAACABADO COMUN CON MADERA DE PINO; INCLUYE:CIMBRADO, DESCIMBRADO, HERRAMIENTA,ANDAMIOS, MADERA DE PINO DE TERCERA PARASOPORTE, CONTRAVENTEO Y ARRASTRES(POLINES, BARROTES Y CHAFLANES). INCLUYETODO LO NECESARIO

M2 $261.41 $261.41 $261.41 $261.41 $261.41 $261.41 $261.41 $306.31 $262.21 $262.21 $262.21 $262.21 $262.21 $262.21 $262.21

:

Page 9: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 9 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

PARA SU CORRECTA EJECUCION.

1316000063 CIMBRA PARA LOSAS Y TRABES DE AZOTEAAPARENTE CON CIMBRAPLAY Y MADERA DE 3a.MEDIDA POR SUPERFICIE DE CONTACTO, INCLUYE:MATERIA LES, MANO DE OBRA EN HABILITADO,CIMBRADO Y DESCIMBRADO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M2 $374.23 $374.23 $374.23 $374.23 $374.23 $374.23 $374.23 $424.97 $375.11 $375.11 $375.11 $375.11 $375.11 $375.11 $375.11

1317000013 CIMBRA EN MUROS HASTA 3.00 M. DE ALTURAACABADO COMUN CON MADERA DE PINO; INCLUYE:CIMBRADO, DESCIMBRADO, HERRAMIENTA,ANDAMIOS, MADERA DE PINO DE TERCERA PARASOPORTE, CONTRAVENTEO Y ARRASTRES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M2 $213.44 $213.44 $213.44 $213.44 $213.44 $213.44 $213.44 $264.59 $214.34 $214.34 $214.34 $214.34 $214.34 $214.34 $214.34

1317000023 CIMBRA EN MUROS HASTA 3.00 M. DE ALTURAACABADO APARENTE CON CIMBRAPLAY Y MADERADE PINO DE 3a. INCLUYE: CIMBRADO,DESCIMBRADO, HERRAMIENTA, ANDAMIOS,MADERA DE PINO DE TERCERA PARA SOPORTE,CONTRAVENTEO Y ARRASTRES. INCLUYE TODO LONECESARIO PARA SU

M2 $308.87 $308.87 $308.87 $308.87 $308.87 $308.87 $308.87 $354.17 $309.67 $309.67 $309.67 $309.67 $309.67 $309.67 $309.67

CORRECTA EJECUCION.

1318000013 CIMBRA EN MUROS DE 3.0 A 6.0M DE ALTURA,ACABADO COMUN CON MADERA DE PINO; INCLUYE:CIMBRADO, DESCIMBRADO, HERRAMIENTA,ANDAMIOS, MADERA DE PINO DE TERCERA PARASOPORTE, CONTRAVENTEO Y ARRASTRES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M2 $224.16 $224.16 $224.16 $224.16 $224.16 $224.16 $224.16 $280.68 $225.18 $225.18 $225.18 $225.18 $225.18 $225.18 $225.18

1319000013 CIMBRA PARA TRABES Y COLUMNAS DE 6 A 10M DEALTURA. PARA TANQUES ELEVADOS, ACABADOCOMUN CON MADERA DE PINO; INCLUYE:CIMBRADO, DESCIMBRADO, HERRAMIENTA,ANDAMIOS, MADERA DE PINO DE TERCERA PARASOPORTE, CONTRAVENTEO Y ARRASTRES.INCLUYE TODO LO

M2 $272.40 $272.40 $272.40 $272.40 $272.40 $272.40 $272.40 $337.73 $273.62 $273.62 $273.62 $273.62 $273.62 $273.62 $273.62

NECESARIO PARA SU CORRECTA EJECUCION.

:

Page 10: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 10 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1320000013 CIMBRA PARA TRABES Y COLUMNAS DE 10 A 15 M.DE ALTURA PARA TANQUES ELEVADOS ACABADOCOMUN CON MADERA DE PINO; INCLUYE:CIMBRADO, DESCIMBRADO, HERRAMIENTA,ANDAMIOS, MADERA DE PINO DE TERCERA PARASOPORTE, CONTRAVENTEO Y ARRASTRES.INCLUYE TODO LO

M2 $303.94 $303.94 $303.94 $303.94 $303.94 $303.94 $303.94 $380.66 $305.37 $305.37 $305.37 $305.37 $305.37 $305.37 $305.37

NECESARIO PARA SU CORRECTA EJECUCION.

1321000013 CIMBRA PARA LOSA DE 6 A 10M DE ALTURA. PARATANQUES ELEVADOS, ACABADO COMUN CONMADERA DE PINO; INCLUYE: CIMBRADO,DESCIMBRADO, HERRAMIENTA, ANDAMIOS,MADERA DE PINO DE TERCERA PARA SOPORTE,CONTRAVENTEO Y ARRASTRES. INCLUYE TODO LONECESARIO PARA SU

M2 $319.29 $319.29 $319.29 $319.29 $319.29 $319.29 $319.29 $383.60 $320.48 $320.48 $320.48 $320.48 $320.48 $320.48 $320.48

CORRECTA EJECUCION.

1322000013 CIMBRA PARA LOSAS DE 10 A 15 M. DE ALTURAPARA TANQUES ELEVADOS ACABADO COMUN CONMADERA DE PINO; INCLUYE: CIMBRADO,DESCIMBRADO, HERRAMIENTA, ANDAMIOS,MADERA DE PINO DE TERCERA PARA SOPORTE,CONTRAVENTEO Y ARRASTRES. INCLUYE TODO LONECESARIO PARA SU

M2 $337.14 $337.14 $337.14 $337.14 $337.14 $337.14 $337.14 $407.51 $338.45 $338.45 $338.45 $338.45 $338.45 $338.45 $338.45

CORRECTA EJECUCION.

Total Cimbras

A0506 Acero de Refuerzo1212000011 ACERO PARA REFUERZO EN CIMENTACIÓN CON

VARILLA NO.2 Fy = 2400 KG/CM2, INCLUYE:SUMINISTRO EN OBRA, ACARREOS INTERNOS,HABILITADO, COLOCACIÓN, AMARRE, GANCHOS,TRASLAPES, DESPERDICIOS, DOBLECES ENCUALQUIER ELEMENTO ESTRUCTURAL,HERRAMIENTA MENOR Y MANO

KG $31.16 $31.16 $31.16 $31.16 $31.16 $31.16 $31.16 $35.26 $31.24 $31.24 $31.24 $31.24 $31.24 $31.24 $31.24

DE OBRA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

:

Page 11: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 11 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1212000021 ACERO PARA REFUERZO EN CIMENTACIÓN CONVARILLA NO. 3 Fy = 4200 KG/CM2, INCLUYE:SUMINISTRO EN OBRA, ACARREOS INTERNOS,HABILITADO, COLOCACIÓN, AMARRE, GANCHOS,TRASLAPES, DESPERDICIOS, DOBLECES ENCUALQUIER ELEMENTO ESTRUCTURAL,HERRAMIENTA MENOR Y

KG $28.23 $28.23 $28.23 $28.23 $28.23 $28.23 $28.23 $31.51 $28.29 $28.29 $28.29 $28.29 $28.29 $28.29 $28.29

MANO DE OBRA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1212000031 ACERO PARA REFUERZO EN CIMENTACIÓN CONVARILLA NO.4, 5, 6 AL 12 Fy=4200 KG/CM2, INCLUYE:SUMINISTRO EN OBRA, ACARREOS INTERNOS,HABILITADO, COLOCACIÓN, AMARRE, GANCHOS,TRASLAPES, DESPERDICIOS, DOBLECES,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO

KG $24.46 $24.46 $24.46 $24.46 $24.46 $24.46 $24.46 $27.18 $24.50 $24.50 $24.50 $24.50 $24.50 $24.50 $24.50

LO NECESARIO PARA SU CORRECTA EJECUCION.

1303000011 ACERO DE REFUERZO EN MUROS Y COLUMNASCON VARILLA DEL No. 2, Fy=2400 KG/CM2, DE 0.00 A3.00 METROS DE ALTURA; INCLUYE: ACARREOSINTERNOS, SUMINISTRO EN OBRA, HABILITADO,COLOCACIÓN, AMARRES, GANCHOS, TRASLAPES,DESPERDICIOS, DOBLECES, HERRAMIENTA

KG $31.16 $31.16 $31.16 $31.16 $31.16 $31.16 $31.16 $35.26 $31.24 $31.24 $31.24 $31.24 $31.24 $31.24 $31.24

MENOR Y MANO DE OBRA. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1303000021 ACERO DE REFUERZO EN MUROS Y COLUMNAS,CON VARILLA DEL No. 3 Fy=4000 KG/CM2, DE 0.00 A3.00 MTS. DE ALTURA; INCLUYE: SUMINISTRO ENOBRA, ACARREOS INTERNOS, HABILITADO,COLOCACIÓN AMARRES, GANCHOS, TRASLAPES,DESPERDICIOS, DOBLECES, HERRAMIENTAMENOR Y

KG $26.88 $26.88 $26.88 $26.88 $26.88 $26.88 $26.88 $29.60 $26.92 $26.92 $26.92 $26.92 $26.92 $26.92 $26.92

MANO DE OBRA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1303000031 ACERO DE REFUERZO EN MUROS Y COLUMNAS,CON VARILLA DEL No. 4 AL 12, Fy=4000 KG/CM2, DE0.00 A 3.00 MTS. DE ALTURA; INCLUYE: SUMINISTROEN OBRA, ACARREOS INTERNOS, HABILITADO,COLOCACIÓN AMARRES, GANCHOS, TRASLAPES,DESPERDICIOS, DOBLECES, HERRAMIENTA

KG $23.47 $23.47 $23.47 $23.47 $23.47 $23.47 $23.47 $25.81 $23.51 $23.51 $23.51 $23.51 $23.51 $23.51 $23.51

:

Page 12: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 12 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

MENOR Y MANO DE OBRA. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1303000041 ACERO DE REFUERZO EN MUROS Y COLUMNASCON VARILLA DEL NO. 2, Fy=2400 KG/CM2, DE 3.00 A6.00 METROS DE ALTURA; INCLUYE: ACARREOSINTERNOS, SUMINISTRO EN OBRA, HABILITADO,COLOCACIÓN AMARRES, GANCHOS, TRASLAPES,DESPERDICIOS, DOBLECES, HERRAMIENTAMENOR

KG $32.62 $32.62 $32.62 $32.62 $32.62 $32.62 $32.62 $37.30 $32.70 $32.70 $32.70 $32.70 $32.70 $32.70 $32.70

Y MANO DE OBRA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1303000051 ACERO DE REFUERZO EN MUROS Y COLUMNASCON VARILLA DEL No. 3, Fy=4000 KG/CM2, DE 3.00 A6.00 METROS DE ALTURA; INCLUYE: ACARREOSINTERNOS, SUMINISTRO EN OBRA, HABILITADO,COLOCACIÓN, AMARRES, GANCHOS, TRASLAPES,DESPERDICIOS, DOBLECES, HERRAMIENTA

KG $27.62 $27.62 $27.62 $27.62 $27.62 $27.62 $27.62 $30.65 $27.68 $27.68 $27.68 $27.68 $27.68 $27.68 $27.68

MENOR Y MANO DE OBRA. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1303000061 ACERO DE REFUERZO EN MUROS Y COLUMNASCON VARILLA DEL No. 4 AL 12, Fy=4000 KG/CM2, DE3.00 A 6.00 METROS DE ALTURA; INCLUYE:ACARREOS INTERNOS, SUMINISTRO EN OBRA,HABILITADO, COLOCACIÓN AMARRES, GANCHOS,TRASLAPES, DESPERDICIOS, DOBLECES,HERRAMIENTA

KG $24.19 $24.19 $24.19 $24.19 $24.19 $24.19 $24.19 $26.80 $24.22 $24.22 $24.22 $24.22 $24.22 $24.22 $24.22

MENOR Y MANO DE OBRA. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1303000071 ACERO DE REFUERZO EN MUROS Y COLUMNASCON VARILLA DEL No. 2, Fy=2400 KG/CM2, DE 6.00 A12.00 METROS DE ALTURA; INCLUYE: ACARREOSINTERNOS, SUMINISTRO EN OBRA, HABILITADO,COLOCACIÓN, AMARRES, GANCHOS, TRASLAPES,DESPERDICIOS, HERRAMIENTA MENOR Y MANO

KG $33.53 $33.53 $33.53 $33.53 $33.53 $33.53 $33.53 $38.56 $33.62 $33.62 $33.62 $33.62 $33.62 $33.62 $33.62

DE OBRA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

:

Page 13: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 13 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1303000081 ACERO DE REFUERZO EN MUROS Y COLUMNASCON VARILLA DEL No. 3, Fy=4000 KG/CM2, DE 6.00 A12.00 METROS DE ALTURA; INCLUYE: ACARREOSINTERNOS, SUMINISTRO EN OBRA, HABILITADO,COLOCACIÓN, AMARRES, GANCHOS, TRASLAPES,DESPERDICIOS, HERRAMIENTA MENOR Y MANO

KG $29.15 $29.15 $29.15 $29.15 $29.15 $29.15 $29.15 $32.78 $29.21 $29.21 $29.21 $29.21 $29.21 $29.21 $29.21

DE OBRA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1303000091 ACERO DE REFUERZO EN MUROS Y COLUMNASCON VARILLA DEL No 4 AL 12, Fy=4000 KG/CM2, DE6.00 A 12.00 MTS. DE ALTURA; INCLUYE:.SUMINISTRO EN OBRA, ACARREOS INTERNOS,HABILITADO, COLOCACIÓN, AMARRES, GANCHOS,TRASLAPES, DESPERDICIOS, DOBLECES,HERRAMIENTA

KG $25.42 $25.42 $25.42 $25.42 $25.42 $25.42 $25.42 $28.55 $25.47 $25.47 $25.47 $25.47 $25.47 $25.47 $25.47

MENOR Y MANO DE OBRA. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1303000092 ACERO DE REFUERZO EN ESTRUCTURA CONALAMBRON No. 2 Fy= 2400 KG/CM2 INCLUYE:ACARREOS INTERNOS, SUMINISTRO EN OBRA,HABILITADO, COLOCACIÓN AMARRES, GANCHOS,TRASLAPES, DESPERDICIOS, SILLETAS, DOBLECES,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

KG $30.56 $30.56 $30.56 $30.56 $30.56 $30.56 $30.56 $34.42 $30.63 $30.63 $30.63 $30.63 $30.63 $30.63 $30.63

NECESARIO PARA SU CORRECTA EJECUCION.

1303000093 ACERO DE REFUERZO EN ESTRUCTURA DIÁMETRONo. 3 Fy= 4200 KG/CM2 INCLUYE: ACARREOSINTERNOS, SUMINISTRO EN OBRA, HABILITADO,COLOCACIÓN, AMARRES, GANCHOS, TRASLAPES,DESPERDICIOS, SILLETAS, DOBLECES,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

KG $26.88 $26.88 $26.88 $26.88 $26.88 $26.88 $26.88 $29.60 $26.92 $26.92 $26.92 $26.92 $26.92 $26.92 $26.92

NECESARIO PARA SU CORRECTA EJECUCION.

1303000094 ACERO DE REFUERZO EN ESTRUCTURA DIÁMETRO.No. 4 Fy=4200 KG/CM2; INCLUYE: ACARREOSINTERNOS, SUMINISTRO EN OBRA, CHABILITADO,COLOCACIÓN AMARRES, GANCHOS, TRASLAPES,DESPERDICIOS, DOBLECES, SILLETAS,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

KG $23.47 $23.47 $23.47 $23.47 $23.47 $23.47 $23.47 $25.81 $23.51 $23.51 $23.51 $23.51 $23.51 $23.51 $23.51

NECESARIO PARA SU CORRECTA EJECUCION.

:

Page 14: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 14 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1310000011 ACERO DE REFUERZO EN LOSAS Y TRABES DEENTREPISO CON VARILLA NUM.2 Fy=2400 KG/CM2,INCLUYE: ACARREOS INTERNOS, SUMINISTRO ENOBRA, HABILITADO, COLOCACIÓN, AMARRES,GANCHOS, TRASLAPES, DESPERDICIOS,DOBLECES, HERRAMIENTA MENOR Y MANO DEOBRA. INCLUYE

KG $30.03 $30.03 $30.03 $30.03 $30.03 $30.03 $30.03 $33.67 $30.09 $30.09 $30.09 $30.09 $30.09 $30.09 $30.09

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1310000021 ACERO DE REFUERZO EN LOSAS Y TRABES DEENTREPISO CON VARILLA No. 3 Fy=4000 KG/CM2;INCLUYE: ACARREOS INTERNOS, SUMINISTRO ENOBRA, HABILITADO, COLOCACIÓN, AMARRES,GANCHOS, TRASLAPES, DESPERDICIOS,DOBLECES, HERRAMIENTA MENOR Y MANO DEOBRA. INCLUYE

KG $26.88 $26.88 $26.88 $26.88 $26.88 $26.88 $26.88 $29.60 $26.92 $26.92 $26.92 $26.92 $26.92 $26.92 $26.92

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1310000031 ACERO DE REFUERZO EN LOSAS Y TRABES DEENTREPISO CON VARILLA NO. 4 AL 12 Fy=4000KG/CM2; INCLUYE: ACARREOS INTERNOS,SUMINISTRO EN OBRA, HABILITADO, COLOCACIÓN,AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS,DOBLECES, HERRAMIENTA MENOR Y MANO DEOBRA.

KG $23.47 $23.47 $23.47 $23.47 $23.47 $23.47 $23.47 $25.81 $23.51 $23.51 $23.51 $23.51 $23.51 $23.51 $23.51

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1310000041 ACERO DE REFUERZO EN LOSAS Y TRABES DEAZOTEA CON VARILLA NO. 2 Fy= 2400 KG/CM2>;INCLUYE: ACARREOS INTERNOS, SUMINISTRO ENOBRA, HABILITADO, COLOCACIÓN, AMARRES,GANCHOS, TRASLAPES, DESPERDICIOS,DOBLECES, HERRAMIENTA MENOR Y MANO DEOBRA. INCLUYE

KG $30.03 $30.03 $30.03 $30.03 $30.03 $30.03 $30.03 $33.67 $30.09 $30.09 $30.09 $30.09 $30.09 $30.09 $30.09

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1310000051 ACERO DE REFUERZO EN LOSAS Y TRABES DEAZOTEA CON VARILLA NUM. 3 Fy=4000 KG/CM2;INCLUYE: ACARREOS INTERNOS, SUMINISTRO ENOBRA, HABILITADO, COLOCACIÓN, AMARRES,GANCHOS, TRASLAPES, DESPERDICIOS,DOBLECES, HERRAMIENTA MENOR Y MANO DEOBRA. INCLUYE

KG $26.88 $26.88 $26.88 $26.88 $26.88 $26.88 $26.88 $29.60 $26.92 $26.92 $26.92 $26.92 $26.92 $26.92 $26.92

:

Page 15: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 15 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1310000061 ACERO DE REFUERZO EN LOSAS Y TRABES DEAZOTEA CON VARILLA NÚMS.4, 5,6, AL 12, Fy=4000KG/CM2; INCLUYE: ACARREOS INTERNOS,SUMINISTRO EN OBRA, HABILITADO, COLOCACIÓN,AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS,DOBLECES, HERRAMIENTA MENOR Y MANO DE

KG $23.47 $23.47 $23.47 $23.47 $23.47 $23.47 $23.47 $25.81 $23.51 $23.51 $23.51 $23.51 $23.51 $23.51 $23.51

OBRA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1508000011 ACERO PARA REFUERZO EN CADENAS YCASTILLOS, CON VARILLA DEL NO. 2 FY= 2400KG/CM2, INCLUYE: ACARREOS INTERNOS,SUMINISTRO EN OBRA, HABILITADO, COLOCACIÓN,AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS,DOBLECES, HERRAMIENTA MENOR Y MANO DEOBRA. INCLUYE

KG $30.56 $30.56 $30.56 $30.56 $30.56 $30.56 $30.56 $34.42 $30.63 $30.63 $30.63 $30.63 $30.63 $30.63 $30.63

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1508000021 ACERO PARA REFUERZO EN CADENAS YCASTILLOS CON VARILLA No. 3 FY=4000 KG/CM2.INCLUYE: ACARREOS INTERNOS, SUMINISTRO ENOBRA, HABILITADO, COLOCACIÓN, AMARRES,GANCHOS, TRASLAPES, DESPERDICIOS,DOBLECES, HERRAMIENTA MENOR Y MANO DEOBRA.. INCLUYE TODO LO

KG $27.16 $27.16 $27.16 $27.16 $27.16 $27.16 $27.16 $30.02 $27.22 $27.22 $27.22 $27.22 $27.22 $27.22 $27.22

NECESARIO PARA SU CORRECTA EJECUCION.

1508000031 ACERO PARA REFUERZO EN CADENAS YCASTILLOS CON VARILLAS DEL No. 4 AL 12 FY=4000KG/CM2. INCLUYE: ACARREOS INTERNOS,SUMINISTRO EN OBRA, HABILITADO, COLOCACIÓN,AMARRES, GANCHOS, TRASLAPES, DESPERDICIOS,DOBLECES, HERRAMIENTA MENOR Y MANO DEOBRA.

KG $23.69 $23.69 $23.69 $23.69 $23.69 $23.69 $23.69 $26.11 $23.73 $23.73 $23.73 $23.73 $23.73 $23.73 $23.73

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Total Acero de Refuerzo

:

Page 16: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 16 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

A0507 Acabados1324000013 APLANADOS Y EMBOQUILLADOS, CON TODOS LOS

MATERIA LES Y MANO DE OBRA, INCLUYEOBTENCION, CRIBADO DE ARENA, DESCARGA,ACARREO, ALMACENAMIENTO DEL CEMENTO YCALHIDRA, FABRICACION DEL MORTERO,COLOCACION DEL APLANADO Y TERMINADO DE LASUPERFICIE. APLANADO

M2 $119.26 $119.26 $119.26 $119.26 $119.26 $119.26 $119.26 $160.20 $119.95 $119.95 $119.95 $119.95 $119.95 $119.95 $119.95

CON MORTERO CEMENTO-ARENA 1:5 DE 1.5 CM. DEESPESOR. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1324000023 APLANADO DE MURO CON MORTERO CEMENTO-ARENA 1:3, ACABADO PULIDO; INCLUYE: REMATES,BOQUILLAS, PREPARACION DE LA SUPERFICIE,PLOMEADO, ANDAMIOS Y MANO DE OBRA. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M2 $143.85 $143.85 $143.85 $143.85 $143.85 $143.85 $143.85 $184.80 $144.53 $144.53 $144.53 $144.53 $144.53 $144.53 $144.53

1324000033 APLANADO DE MURO CON MORTERO CEMENTO-ARENA 1:5, ACABADO PULIDO; INCLUYE: REMATES,BOQUILLAS, PREPARACION DE LA SUPERFICIE,PLOMEADO, ANDAMIOS Y MANO DE OBRA. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M2 $151.43 $151.43 $151.43 $151.43 $151.43 $151.43 $151.43 $199.16 $152.25 $152.25 $152.25 $152.25 $152.25 $152.25 $152.25

1324000043 APLANADO EN COLUMNA CON MORTERO CEMENTO-CAL-ARENA 1:2:6 A PLOMO Y REGLA, ACABADO CONPLANA DE MADERA; INCLUYE: REMATES,BOQUILLAS, PREPARACION DE LA SUPERFICIE,PLOMEADO, ANDAMIOS Y MANO DE OBRA. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M2 $130.95 $130.95 $130.95 $130.95 $130.95 $130.95 $130.95 $168.29 $131.58 $131.58 $131.58 $131.58 $131.58 $131.58 $131.58

1324000053 APLANADO DE MURO CON MORTERO CEMENTO-CAL-ARENA 1:2:6 A PLOMO Y REGLA, ACABADOESPONJEADO; INCLUYE: REMATES, BOQUILLAS,PREPARACION DE LA SUPERFICIE, PLOMEADO,ANDAMIOS Y MANO DE OBRA. (0.00 A 3.00 M DEALTURA). INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M2 $142.92 $142.92 $142.92 $142.92 $142.92 $142.92 $142.92 $184.89 $143.62 $143.62 $143.62 $143.62 $143.62 $143.62 $143.62

EJECUCION.

:

Page 17: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 17 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1324000063 APLANADO DE MURO CON MORTERO CEMENTO-CAL-ARENA 1:2:6 A PLOMO Y REGLA, ACABADOESPONJEADO; INCLUYE: EMBOQUILLADOS,REMATES, FORJADO RUSTICO, PREPARACION DELA SUPERFICIE, ANDAMIOS Y MANO DE OBRA DE(3.00 A 6.00 M DE ALTURA). INCLUYE TODO LONECESARIO

M2 $161.09 $161.09 $161.09 $161.09 $161.09 $161.09 $161.09 $209.60 $161.91 $161.91 $161.91 $161.91 $161.91 $161.91 $161.91

PARA SU CORRECTA EJECUCION.

1324000073 APLANADO DE MURO CON MORTERO CEMENTO-CAL-ARENA 1:2:6 A PLOMO Y REGLA, ACABADOESPONJEADO; INCLUYE: EMBOQUILLADOS,REMATES, FORJADO RUSTICO, PREPARACION DELA SUPERFICIE, ANDAMIOS Y MANO DE OBRA DE(6.00 A 12.00 M DE ALTURA). INCLUYE TODO LONECESARIO

M2 $188.21 $188.21 $188.21 $188.21 $188.21 $188.21 $188.21 $245.99 $189.18 $189.18 $189.18 $189.18 $189.18 $189.18 $189.18

PARA SU CORRECTA EJECUCION.

1324000083 APLANADO EN PLAFON CON MORTERO CEMENTO-CAL-ARENA 1:2:6 A NIVEL Y REGLA, ACABADOESPONJEADO; INCLUYE: REMATES, BOQUILLAS,FORJADO RUSTICO, PREPARACION DE LASUPERFICIE, ANDAMIOS Y MANO DE OBRA.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M2 $144.47 $144.47 $144.47 $144.47 $144.47 $144.47 $144.47 $187.01 $145.18 $145.18 $145.18 $145.18 $145.18 $145.18 $145.18

1324000093 APLANADO DE MURO ACABADO CERROTEADO CONCONCRETO F'c=100 KG/CM2, INCLUYE: PLOMEADO,ANDAMIOS, BOQUILLAS, PREPARACION DE LASUPERFICIE Y MANO DE OBRA. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M2 $183.84 $183.84 $183.84 $183.84 $183.84 $183.84 $183.84 $239.35 $184.77 $184.77 $184.77 $184.77 $184.77 $184.77 $184.77

1324000103 APLANADO DE MURO ACABADO CERROTEADO CONCONCRETO F'c=150 KG/CM2, INCLUYE: PLOMEADO,ANDAMIOS, BOQUILLAS, PREPARACION DE LASUPERFICIE Y MANO DE OBRA. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M2 $188.69 $188.69 $188.69 $188.69 $188.69 $188.69 $188.69 $244.19 $189.62 $189.62 $189.62 $189.62 $189.62 $189.62 $189.62

1324000113 EMBOQUILLADO DE MEZCLA EN MUROS CONMORTERO CEMENTO-CAL-ARENA 1:3:12; INCLUYE:HERRAMIENTA, MATERIALES, ANDAMIOS Y MANODE OBRA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $44.59 $44.59 $44.59 $44.59 $44.59 $44.59 $44.59 $60.97 $44.86 $44.86 $44.86 $44.86 $44.86 $44.86 $44.86

:

Page 18: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 18 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1324000123 EMBOQUILLADO DE MEZCLA CON MORTEROCEMENTO-CAL-ARENA1:2:6; INCLUYE:HERRAMIENTA, MATERIALES, ANDAMIOS, Y MANODE OBRA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $45.76 $45.76 $45.76 $45.76 $45.76 $45.76 $45.76 $62.14 $46.04 $46.04 $46.04 $46.04 $46.04 $46.04 $46.04

1324000133 EMBOQUILLADO DE MEZCLA EN MUROS CONMORTERO CEMENTO ARENA 1:5; INCLUYE:MATERIALES, ANDAMIOS, HERRAMIENTA MENOR YMANO DE OBRA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M $44.92 $44.92 $44.92 $44.92 $44.92 $44.92 $44.92 $61.30 $45.20 $45.20 $45.20 $45.20 $45.20 $45.20 $45.20

1324000143 EMBOQUILLADO CON MORTERO CEMENTO-ARENA1:5 DE SECCION TRIANGULAR DE 10 CM.ACABADO PULIDO. INCLUYE: MATERIALES,ANDAMIOS, HERRAMIENTA MENOR Y MANO DEOBRA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $58.12 $58.12 $58.12 $58.12 $58.12 $58.12 $58.12 $79.97 $58.50 $58.50 $58.50 $58.50 $58.50 $58.50 $58.50

1324000153 CHAFLAN DE CONCRETO CON IMPERMEABILIZANTEINTEGRAL FESTERGRAL O SIMILAR DE 10 CM.SECCION TRIANGULAR ACABADO PULIDO CONCONCRETO F'c=150 KG/CM2. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $49.63 $49.63 $49.63 $49.63 $49.63 $49.63 $49.63 $66.01 $49.91 $49.91 $49.91 $49.91 $49.91 $49.91 $49.91

1324000163 ENTORTADO EN AZOTEA CON MORTERO CEMENTO-ARENA 1:5; INCLUYE: ACARREOS, HERRAMIENTA YMANO DE OBRA. CON UN ESPESOR PROMEDIO DE 6CM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M2 $139.52 $139.52 $139.52 $139.52 $139.52 $139.52 $139.52 $166.27 $140.00 $140.00 $140.00 $140.00 $140.00 $140.00 $140.00

1324000173 SUMINISTRO Y COLOCACION DE PINTURA VINILICADE 5000 CICLOS DE LAVADO COMO MINIMOCALIDAD "A" SEGUN LA NOM-U-97-1981 ENPLAFONES DE CONCRETO APARENTE, INCLUYE:LIMPIEZA, PREPARACION DE LA SUPERFICIE,MATERIALES, MANO DE OBRA, HERRAMIENTA YANDAMIOS.

M2 $52.07 $52.07 $52.07 $52.07 $52.07 $52.07 $52.07 $61.68 $52.25 $52.25 $52.25 $52.25 $52.25 $52.25 $52.25

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

:

Page 19: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 19 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1324000183 SUMINISTRO Y COLOCACION DE PINTURA VINILICADE 5000 CICLOS DE LAVADO COMO MINIMOCALIDAD "A" SEGUN LA NOM-U-97-1981 EN MUROSAPLANADO DE MEZCLA, INCLUYE: LIMPIEZA,PREPARACION DE LA SUPERFICIE, MATERIALES,MANO DE OBRA, HERRAMIENTA Y ANDAMIOS.INCLUYE

M2 $50.61 $50.61 $50.61 $50.61 $50.61 $50.61 $50.61 $60.22 $50.78 $50.78 $50.78 $50.78 $50.78 $50.78 $50.78

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1324000193 SUMINISTRO Y COLOCACION DE PINTURA VINILICADE 5000 CICLOS DE LAVADO COMO MINIMOCALIDAD "A" SEGUN LA NOM-U-97-1981 ENCOLUMNAS Y TRABES DE CONCRETO APARENTE,INCLUYE: LIMPIEZA, PREPARACION DE LASUPERFICIE, MATERIALES, MANO DE OBRA,HERRAMIENTA Y

M2 $64.23 $64.23 $64.23 $64.23 $64.23 $64.23 $64.23 $77.00 $64.46 $64.46 $64.46 $64.46 $64.46 $64.46 $64.46

ANDAMIOS. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

1324000203 SUMINISTRO Y COLOCACION DE PINTURA ESMALTECON RESISTENCIA DE 200 HORAS MINIMAS DEINTEMPERISMO ACELERADO Y 100 HORAS MINIMODE CAMARA SALINA, EN LARGUEROS Y MONTENES,INCLUYE: LIMPIEZA, PREPARACION DE LASUPERFICIE, MATERIALES, MANO DE OBRA,

ML $137.10 $137.10 $137.10 $137.10 $137.10 $137.10 $137.10 $178.77 $137.80 $137.80 $137.80 $137.80 $137.80 $137.80 $137.80

HERRAMIENTA Y ANDAMIOS. A CUALQUIER ALTURA.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1324000213 SUMINISTRO Y COLOCACION DE PINTURA ESMALTECON RESISTENCIA DE 200 HORAS MINIMAS DEINTEMPERISMO ACELERADO Y 100 HORAS MINIMODE CAMARA SALINA EN MALLA DE ALAMBRE No. 8DE 4x4Cm, INCLUYE: LIMPIEZA, PREPARACION DELA SUPERFICIE, MATERIALES, MANO DE OBRA,

M2 $99.16 $99.16 $99.16 $99.16 $99.16 $99.16 $99.16 $126.46 $99.64 $99.64 $99.64 $99.64 $99.64 $99.64 $99.64

HERRAMIENTA Y ANDAMIOS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

:

Page 20: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 20 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1324000223 SUMINISTRO Y COLOCACION DE PINTURA CONRESISTENCIA DE 200 HORAS MINIMAS DEINTEMPERISMO ACELERADO Y 100 HORAS MINIMODE CAMARA SALINA. EN PUERTAS Y MAMPARAS DELAMINA ESTRIADA, INCLUYE: LIMPIEZA,PREPARACION DE LA SUPERFICIE, MATERIALES,MANO DE OBRA,

M2 $116.62 $116.62 $116.62 $116.62 $116.62 $116.62 $116.62 $150.13 $117.21 $117.21 $117.21 $117.21 $117.21 $117.21 $117.21

HERRAMIENTA Y ANDAMIOS.

1324000233 SUMINISTRO Y COLOCACION DE PINTURA ESMALTECON RESISTENCIA DE 200 HORAS MINIMAS DEINTEMPERISMO ACELERADO Y 100 HORAS MINIMODE CAMARA SALINA, EN VENTANERÍA METÁLICAPOR DOS LADOS, INCLUYE: LIMPIEZA,PREPARACION DE LA SUPERFICIE, MATERIALES,MANO DE

M2 $102.97 $102.97 $102.97 $102.97 $102.97 $102.97 $102.97 $131.01 $103.46 $103.46 $103.46 $103.46 $103.46 $103.46 $103.46

OBRA, HERRAMIENTA Y ANDAMIOS. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

1324000243 SUMINISTRO Y COLOCACION DE PINTURA ESMALTECON RESISTENCIA DE 200 HORAS MINIMAS DEINTEMPERISMO ACELERADO Y 100 HORAS MINIMODE CAMARA SALINA, EN ESTRUCTURA APLICADA A6.00M DE ALTURA (TRABES, COLUMNAS,LARGUEROS), INCLUYE: LIMPIEZA, PREPARACIONDE LA

M2 $139.69 $139.69 $139.69 $139.69 $139.69 $139.69 $139.69 $181.37 $140.40 $140.40 $140.40 $140.40 $140.40 $140.40 $140.40

SUPERFICIE, MATERIALES, MANO DE OBRA,HERRAMIENTA Y ANDAMIOS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1324000253 IMPERMEABILIZACIÓN (FESTER O SIMILAR ENCALIDAD Y COSTO) EN FRIO CON UNA CAPA DEMICROPRIMER O ACRITON ELIDER DILUIDO ENAGUA AL 19:1 O SIMILAR, 2 CAPAS DE MICROFEST O 2 CAPAS DE ACRITON ELIDER O SIMILAR, UNA CAPADE MEMBRANA FESTERFLEX O UNA CAPA DE

M2 $224.77 $224.77 $224.77 $224.77 $224.77 $224.77 $224.77 $241.15 $225.05 $225.05 $225.05 $225.05 $225.05 $225.05 $225.05

MALLA REVOFLEX O SIMILAR, ACABADO CON DOSMANOS DE FESTER BLANC COLOR BLANCO,TERRACOTA O SIMILAR, INCLUYE: LIMPIEZA YPREPARACIÓN DE LA SUPERFICIE, ACARREOSVERTICALES A CUALQUIER ALTURA (GARANTÍA DE 3AÑOS). INCLUYE TODO LO NECESARIO PARA SUCORRECTA

:

Page 21: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 21 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

EJECUCION.

1324000263 SUMINISTRO Y COLOCACION DEIMPERMEABILIZANTE PREFABRICADO SBS ROJODE FIBRA DE VIDRIO GRANULADO DE 3.5 MM.HACIENDO TRASLAPES DE 0.10 M. EN AMBOSSENTIDOS; APLICADO POR MEDIO DETERMOFUSION A BASE DE FUEGO DE SOPLETE DEGAS BUTANO, LA MEMBRANA

M2 $161.79 $161.79 $161.79 $161.79 $161.79 $161.79 $161.79 $174.89 $162.01 $162.01 $162.01 $162.01 $162.01 $162.01 $162.01

PREFABRICADA DEBERA DE CUMPLIR CON LOSPARAMETROS F:1:T SEÑALADOS POR LA "U.A.T.CF412T3 Y DEBERA DE PRESENTAR UNA GARANTIAPOR ESCRITO DE 5 AÑOS, INCLUYE: LIMPIEZA,PREPARACION DE LA SUPERFICIE, APLICACION DESELLO DE IMPRIGNACIÓN, SELLADO YCALAFATEADO

DE FISURAS, GRIETAS A BASE DE CEMENTOPLASTICO ELASTON SELLADOR Y TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1324000273 IMPERMEABILIZANTE INTEGRAL "FESTERGRAL" OSIMILAR EN CALIDAD Y COSTO, EN ELEMENTOS DECONCRETO ARMADO A RAZÓN DE 1.50 KG. PORCADA 50 KG. DE CEMENTO, EN CONCRETO F c=150KG/CM2; INCLUYE: MATERIALES, HERRAMIENTAMENOR Y MANO DE OBRA. INCLUYE TODO LO

M3 $463.73 $463.73 $463.73 $463.73 $463.73 $463.73 $463.73 $470.75 $463.90 $463.90 $463.90 $463.90 $463.90 $463.90 $463.90

NECESARIO PARA SU CORRECTA EJECUCION.

1324000283 IMPERMEABILIZANTE INTEGRAL "FESTERGRAL " OSIMILAR EN CALIDAD Y COSTO, EN ELEMENTOS DECONCRETO ARMADO A RAZÓN DE 1.50 KG. PORCADA 50 KG. DE CEMENTO, EN CONCRETO F c=200KG/CM; INCLUYE: MATERIALES, HERRAMIENTAMENOR Y MANO DE OBRA.. INCLUYE TODO LO

M3 $528.70 $528.70 $528.70 $528.70 $528.70 $528.70 $528.70 $535.74 $528.89 $528.89 $528.89 $528.89 $528.89 $528.89 $528.89

NECESARIO PARA SU CORRECTA EJECUCION.

1324000293 IMPERMEABILIZANTE INTEGRAL "FESTERGRAL" OSIMILAR EN CALIDAD Y COSTO, EN ELEMENTOS DECONCRETO ARMADO A RAZÓN DE 1.50 KG. PORCADA 50 KG. DE CEMENTO EN CONCRETO F c=250KG/CMS; INCLUYE: MATERIALES, HERRAMIENTAMENOR Y MANO DE OBRA. INCLUYE TODO LO

M3 $599.84 $599.84 $599.84 $599.84 $599.84 $599.84 $599.84 $606.86 $600.01 $600.01 $600.01 $600.01 $600.01 $600.01 $600.01

:

Page 22: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 22 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

NECESARIO PARA SU CORRECTA EJECUCION.

1324000303 SUMINISTRO Y COLOCACIÓN DE BANDA DE 100 MM.(4"), DE ANCHO, DE CLORURO DE POLIVINILO(P.V.C.), PARA JUNTAS FRÍAS DE CONSTRUCCIÓNEN CISTERNAS Y TANQUES; INCLUYE: AJUSTES,COLOCACIÓN, TENSADO, DESPERDICIOS,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE

M $118.81 $118.81 $118.81 $118.81 $118.81 $118.81 $118.81 $129.73 $119.00 $119.00 $119.00 $119.00 $119.00 $119.00 $119.00

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1324000313 SUMINISTRO Y COLOCACIÓN DE BANDA DE 150 MM.(6"), DE ANCHO, DE CLORURO DE POLIVINILO(P.V.C.), PARA JUNTAS FRÍAS DE CONSTRUCCIÓNEN CISTERNAS Y TANQUES; INCLUYE: AJUSTES,COLOCACIÓN, TENSADO, DESPERDICIOS,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE

M $130.07 $130.07 $130.07 $130.07 $130.07 $130.07 $130.07 $140.99 $130.27 $130.27 $130.27 $130.27 $130.27 $130.27 $130.27

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1324000323 SUMINISTRO Y COLOCACIÓN DE BANDA DECLORURO DE 220 MM. (9") DE ANCHO, DEPOLIVINILO (P.V.C.), PARA JUNTAS FRÍAS DECONSTRUCCIÓN EN CISTERNAS Y TANQUES;INCLUYE: AJUSTES, COLOCACIÓN, TENSADO,DESPERDICIO, HERRAMIENTA MENOR Y MANO DEOBRA. INCLUYE TODO

M $182.53 $182.53 $182.53 $182.53 $182.53 $182.53 $182.53 $193.45 $182.72 $182.72 $182.72 $182.72 $182.72 $182.72 $182.72

LO NECESARIO PARA SU CORRECTA EJECUCION.

1324000333 IMPERMEABILIZACION SUPERFICIAL DE TANQUES,CON MORTERO DE CEMENTO-ARENA 1:3 Y ADITIVOINTEGRAL, CON UN ESPESOR DE 2.5 CMS.

M2 $129.85 $129.85 $129.85 $129.85 $129.85 $129.85 $129.85 $157.16 $130.33 $130.33 $130.33 $130.33 $130.33 $130.33 $130.33

Total Acabados

A0508 Herreria1606000010 SUMINISTRO Y COLOCACIÓN DE VENTANA UN FIJO.

ARMADO CON PERFILES TUBULARES CAL. 18,MARCA PROLAMSA, NUMERO 121 Y 154, CONAPLICACIÓN DE PRIMER ANTICORROSIVO YACABADO CON PINTURA DE ESMALTE, INCLUYE:MATERIALES, ACARREOS, CORTES,DESPERDICIOS,

M2 $1,110.02 $1,110.02 $1,110.02 $1,110.02 $1,110.02 $1,110.02 $1,110.02 $1,314.79 $1,113.52 $1,113.52 $1,113.52 $1,113.52 $1,113.52 $1,113.52 $1,113.52

:

Page 23: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 23 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

APLICACIÓN DE SOLDADURA, ESMERILADO,TORNILLOS, FIJACIÓN, MANO DE OBRA, EQUIPO YHERRAMIENTA INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1606000020 SUMINISTRO Y COLOCACIÓN DE VENTANA DE DOSFIJOS. ARMADO CON PERFILES TUBULARES CAL.18, MARCA PROLAMSA, NUMERO 121, 127 Y 154,CON APLICACIÓN DE PRIMER ANTICORROSIVO YACABADO CON PINTURA DE ESMALTE, INCLUYE:MATERIALES, ACARREOS, CORTES,

M2 $905.13 $905.13 $905.13 $905.13 $905.13 $905.13 $905.13 $1,123.53 $908.84 $908.84 $908.84 $908.84 $908.84 $908.84 $908.84

DESPERDICIOS, APLICACIÓN DE SOLDADURA,ESMERILADO, TORNILLOS, FIJACIÓN, MANO DEOBRA, EQUIPO Y HERRAMIENTA INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1606000030 SUMINISTRO Y COLOCACIÓN DE VENTANA UN FIJOY UN ABATIBLE. ARMADO CON PERFILESTUBULARES CAL. 18, MARCA PROLAMSA,NUMEROS: 106, 120, 144 Y 154, CON APLICACIÓNDE PRIMER ANTICORROSIVO Y ACABADO CONPINTURA DE ESMALTE, INCLUYE: MATERIALES,ACARREOS,

M2 $978.99 $978.99 $978.99 $978.99 $978.99 $978.99 $978.99 $1,197.40 $982.72 $982.72 $982.72 $982.72 $982.72 $982.72 $982.72

CORTES, DESPERDICIOS, APLICACIÓN DESOLDADURA, ESMERILADO, TORNILLOS,BISAGRAS, MANIJA PORTACANDADO, FIJACIÓN,MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1606000040 SUMINISTRO Y COLOCACIÓN DE VENTANA UN FIJOY UN CORREDIZO. ARMADO CON PERFILESTUBULARES CAL. 18, MARCA PROLAMSA,NUMEROS: 101, 103, 121, 122, 123, 124, Y 154, CONAPLICACIÓN DE PRIMER ANTICORROSIVO YACABADO CON PINTURA DE ESMALTE, INCLUYE:

M2 $1,022.50 $1,022.50 $1,022.50 $1,022.50 $1,022.50 $1,022.50 $1,022.50 $1,240.91 $1,026.22 $1,026.22 $1,026.22 $1,026.22 $1,026.22 $1,026.22 $1,026.22

MATERIALES, ACARREOS, CORTES,DESPERDICIOS, APLICACIÓN DE SOLDADURA,ESMERILADO, TORNILLOS, BISAGRAS, MANIJAPORTACANDADO, FIJACIÓN, MANO DE OBRA,EQUIPO Y HERRAMIENTA INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

:

Page 24: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 24 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1606000050 SUMINISTRO Y COLOCACIÓN DE PUERTAABATIBLE DE 1.00 ANCHO HASTA 2.20 M. DEALTURA ARMADO CON PERFILES TUBULARES CAL.20, MARCA PROLAMSA, NUMERO P-100, M-225,SOLERA DE FIERRO DE 1 X 1/8" Y TABLERO DELÁMINA CON APLICACIÓN DE PRIMERANTICORROSIVO Y

PZA $2,420.91 $2,420.91 $2,420.91 $2,420.91 $2,420.91 $2,420.91 $2,420.91 $2,845.78 $2,428.17 $2,428.17 $2,428.17 $2,428.17 $2,428.17 $2,428.17 $2,428.17

ACABADO CON PINTURA DE ESMALTE, INCLUYE:MATERIALES, ACARREOS, CORTES,DESPERDICIOS, APLICACIÓN DE SOLDADURA,ESMERILADO, BISAGRAS, TORNILLOS, FIJACIÓN,CERRADURA DE SOBREPONER MODELO 715MARCA PHILLIPS, MANO DE OBRA, EQUIPO YHERRAMIENTA INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1606000060 SUMINISTRO Y COLOCACIÓN DE PUERTA ABATIBLEDE 0.90 HASTA 2.20 M. DE ALTURA ARMADO CONPERFILES METÁLICOS; MARCO DE ÁNGULO DE 11/4X1/8 DE PULGADA Y PUERTA DE ÁNGULO DE 1 X1/8 DE PULGADA Y TABLERO DE LÁMINA, CONAPLICACIÓN DE PRIMER ANTICORROSIVO Y

PZA $2,324.09 $2,324.09 $2,324.09 $2,324.09 $2,324.09 $2,324.09 $2,324.09 $2,661.97 $2,329.85 $2,329.85 $2,329.85 $2,329.85 $2,329.85 $2,329.85 $2,329.85

ACABADO CON PINTURA DE ESMALTE, INCLUYE:MATERIALES, ACARREOS, CORTES,DESPERDICIOS, APLICACIÓN DE SOLDADURA,ESMERILADO, BISAGRAS, TORNILLOS, FIJACIÓN,CERRADURA DE SOBREPONER MODELO 715MARCA PHILLIPS, MANO DE OBRA, EQUIPO YHERRAMIENTA INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1606000070 SUMINISTRO Y COLOCACIÓN DE PUERTA ABATIBLEDE 1 HASTA 2.2 M. DE ALTURA ARMADA CONMARCO DE PTR DE 2 1/2X2 1/2 PULGADAS (VERDE)Y CONTRAMARCO DE ÁNGULO DE 3/16 X 2 1/2PULGADAS Y REJILLA LOUVER CON APLICACIÓN DE PRIMER ANTICORROSIVO Y ACABADO CON

PZA $4,584.03 $4,584.03 $4,584.03 $4,584.03 $4,584.03 $4,584.03 $4,584.03 $5,196.69 $4,594.48 $4,594.48 $4,594.48 $4,594.48 $4,594.48 $4,594.48 $4,594.48

PINTURA DE ESMALTE, INCLUYE: MATERIALES,ACARREOS, CORTES, DESPERDICIOS,APLICACIÓN DE SOLDADURA, ESMERILADO,BISAGRAS, TORNILLOS, FIJACIÓN, CERRADURA DESOBREPONER MODELO 715 MARCA PHILLIPS,MANO DE OBRA, EQUIPO Y HERRAMIENTA INCLUYETODO LO

:

Page 25: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 25 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

NECESARIO PARA SU CORRECTA EJECUCION.

1606000080 SUMINISTRO Y COLOCACIÓN DE PORTÓN DE3.00 POR 2.40 M. DE ALTURA EN DOS HOJASABATIBLES ARMADO DE ÁNGULO DE FIERRO DE 11/4X1/8 DE PULGADA Y TABLERO DE LÁMINA, CONAPLICACIÓN DE PRIMER ANTICORROSIVO YACABADO CON PINTURA DE ESMALTE, INCLUYE:

PZA $5,312.32 $5,312.32 $5,312.32 $5,312.32 $5,312.32 $5,312.32 $5,312.32 $6,231.40 $5,327.99 $5,327.99 $5,327.99 $5,327.99 $5,327.99 $5,327.99 $5,327.99

MATERIALES, ACARREOS, CORTES,DESPERDICIOS, APLICACIÓN DE SOLDADURA,ESMERILADO, BISAGRAS, TORNILLOS, FIJACIÓN,CERRADURA DE SOBREPONER MODELO 715MARCA PHILLIPS, MANO DE OBRA, EQUIPO YHERRAMIENTA INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1606000090 SUMINISTRO Y COLOCACIÓN DE REJA METALICADE 2.40 M. DE ALTURA A BASE DE POSTES DE PTRDE 3X3 VERDE, A CADA 2 M. CON 2 PERFILESHORIZONTALES PRINCIPALES DE PTR DE 3X2VERDE , PERFILES VERTICALES DE 2.20 M. DEALTURA, A CADA 0.20 M. DE TUBULAR CAL.18

M $2,497.77 $2,497.77 $2,497.77 $2,497.77 $2,497.77 $2,497.77 $2,497.77 $2,990.64 $2,506.17 $2,506.17 $2,506.17 $2,506.17 $2,506.17 $2,506.17 $2,506.17

DE 3X1 1/4 (PULGADAS), Y 1 PLACA DE ANCLAJE DEACERO DE 0.15 POR 0.15 MTS. DE 3/8 DE PULGADADE ESPESOR POR CADA POSTE INCLUYE:APLICACIÓN DE PRIMER ANTICORROSIVO YACABADO CON PINTURA DE ESMALTE,MATERIALES, ACARREOS, CORTES,DESPERDICIOS, APLICACIÓN

DE SOLDADURA, ESMERILADO, FIJACIÓN, MANODE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

1606000110 SUMINISTRO Y COLOCACIÓN DE ESCALERAMARINA FORMADA POR 8 ESCALONES DEREDONDO DE 3/4 DE PULGADA DE DIÁMETRO Y0.90 M. DE DESARROLLO, SOLDADOS EN LOSEXTREMOS A PLACAS PREVIAMENTE AHOGADASDE 0.10 POR 0.10 M. DE 3/8 DE PULGADA DEESPESOR CON 2 ANCLAS

PZA $2,043.77 $2,043.77 $2,043.77 $2,043.77 $2,043.77 $2,043.77 $2,043.77 $2,553.07 $2,052.47 $2,052.47 $2,052.47 $2,052.47 $2,052.47 $2,052.47 $2,052.47

:

Page 26: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 26 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

DE VARILLA DE 3/8 DE PULGADA POR 0.10 M. DEDESARROLLO CADA UNA CON APLICACIÓN DEPRIMER ANTICORROSIVO Y ACABADO CONPINTURA DE ESMALTE, INCLUYE: PLACAS,MATERIALES, ACARREOS, CORTES,DESPERDICIOS, APLICACIÓN DE SOLDADURA,ESMERILADO, FIJACIÓN, MANODE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

1606000120 SUMINISTRO Y COLOCACIÓN DE ESCALERAMARINA FORMADA POR 5 ESCALONES DEREDONDO DE 3/4 DE PULGADA DE DIÁMETRO Y0.90 M. DE DESARROLLO, SOLDADOS EN LOSEXTREMOS A PLACAS PREVIAMENTE AHOGADASDE 0.10 POR 0.10 M. DE 3/8 DE PULGADA DEESPESOR CON 2 ANCLAS

PZA $1,277.35 $1,277.35 $1,277.35 $1,277.35 $1,277.35 $1,277.35 $1,277.35 $1,595.68 $1,282.79 $1,282.79 $1,282.79 $1,282.79 $1,282.79 $1,282.79 $1,282.79

DE VARILLA DE 3/8 DE PULGADA POR 0.10 M. DEDESARROLLO CADA UNA CON APLICACIÓN DEPRIMER ANTICORROSIVO Y ACABADO CONPINTURA DE ESMALTE, INCLUYE: PLACAS,MATERIALES, ACARREOS, CORTES,DESPERDICIOS, APLICACIÓN DE SOLDADURA,ESMERILADO, FIJACIÓN, MANO

DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

1606000130 SUMINISTRO Y COLOCACIÓN DE ESCALERAVERTICAL DE 6 M. DE ALTURA Y 0.60 DE ANCHO,FABRICADA CON ALFARDAS DE ÁNGULO DE 1/4X2(PULGADAS), 30 ESCALONES DE REDONDO DE 3/4(PULGADAS), Y 8 PLACAS DE ACERO DE 0.15 POR0.10 MTS. DE 1/4 DE PULGADA DE ESPESOR

PZA $5,040.87 $5,040.87 $5,040.87 $5,040.87 $5,040.87 $5,040.87 $5,040.87 $5,681.77 $5,051.82 $5,051.82 $5,051.82 $5,051.82 $5,051.82 $5,051.82 $5,051.82

CON 2 TAQUETES DE EXPANSIÓN DE 3/8 DEDIÁMETRO CADA PLACA, INCLUYE: APLICACIÓN DEPRIMER ANTICORROSIVO Y ACABADO CONPINTURA DE ESMALTE, PLACAS, MATERIALES,ACARREOS, CORTES, DESPERDICIOS, APLICACIÓNDE SOLDADURA, ESMERILADO, FIJACIÓN, MANODE OBRA,

EQUIPO Y HERRAMIENTA INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

:

Page 27: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 27 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1606000140 SUMINISTRO Y COLOCACIÓN DE ESCALERAVERTICAL DE 12.00 M. DE ALTURA Y 0.60 DEANCHO, FABRICADA CON ALFARDAS DE ÁNGULODE 1/4X2 (PULGADAS), 60 ESCALONES DEREDONDO DE 3/4 (PULGADAS), Y 8 PLACAS DEACERO DE 0.15 POR 0.10 MTS. DE 1/4 DE PULGADADE

PZA $8,852.62 $8,852.62 $8,852.62 $8,852.62 $8,852.62 $8,852.62 $8,852.62 $9,971.68 $8,871.70 $8,871.70 $8,871.70 $8,871.70 $8,871.70 $8,871.70 $8,871.70

ESPESOR CON 2 TAQUETES DE EXPANSIÓN DE 3/8DE DIÁMETRO CADA PLACA, INCLUYE: APLICACIÓNDE PRIMER ANTICORROSIVO Y ACABADO CONPINTURA DE ESMALTE, PLACAS, MATERIALES,ACARREOS, CORTES, DESPERDICIOS, APLICACIÓNDE SOLDADURA, ESMERILADO, FIJACIÓN, MANO

DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

1606000150 SUMINISTRO Y COLOCACIÓN DE ESCALERAVERTICAL DE 15.00 M. DE ALTURA Y 0.60 DEANCHO, FABRICADA CON ALFARDAS DE ÁNGULODE 1/4X2 (PULGADAS), 75 ESCALONES DEREDONDO DE 3/4 (PULGADAS), Y 8 PLACAS DEACERO DE 0.15 POR 0.10 MTS. DE 1/4 DE PULGADADE

PZA $10,758.50 $10,758.50 $10,758.50 $10,758.50 $10,758.50 $10,758.50 $10,758.50 $12,116.67 $10,781.67 $10,781.67 $10,781.67 $10,781.67 $10,781.67 $10,781.67 $10,781.67

ESPESOR CON 2 TAQUETES DE EXPANSIÓN DE 3/8DE DIÁMETRO CADA PLACA, INCLUYE: APLICACIÓNDE PRIMER ANTICORROSIVO Y ACABADO CONPINTURA DE ESMALTE, PLACAS, MATERIALES,ACARREOS, CORTES, DESPERDICIOS, APLICACIÓNDE SOLDADURA, ESMERILADO, FIJACIÓN, MANO

DE OBRA, EQUIPO Y HERRAMIENTA INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

Total Herreria

A0509 Demoliciones1328000013 DEMOLICION DE MAMPOSTERIA DE PIEDRA

INCLUYE: MANO DE OBRA, HERRAMIENTA. INCLUYETODO LO NECESARIO PARA SU CORRECTA

M3 $329.25 $329.25 $329.25 $329.25 $329.25 $329.25 $329.25 $423.01 $331.50 $331.50 $331.50 $331.50 $331.50 $331.50 $331.50

1328000023 DEMOLICIONES DE CONCRETO REFORZADO CONVARILLAS No. 3 ó MALLALAC INCLUYE: MANO DEOBRA, HERRAMIENTA MENOR. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M3 $553.16 $553.16 $553.16 $553.16 $553.16 $553.16 $553.16 $710.64 $556.92 $556.92 $556.92 $556.92 $556.92 $556.92 $556.92

:

Page 28: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 28 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1328000033 DEMOLICIONES DE MUROS DE TABIQUE O BLOCKDE 14CM ESPESOR SIN INCLUIR CADENAS YCASTILLOS. INCLUYE: MANO DE OBRA,HERRAMIENTA Y ACARREO EN CARRETILLA A 20MDE DISTANCIA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M3 $153.66 $153.66 $153.66 $153.66 $153.66 $153.66 $153.66 $197.41 $154.70 $154.70 $154.70 $154.70 $154.70 $154.70 $154.70

Total Demoliciones

Total Obra Civil

A10 Preliminares

A1001 RUPTURA DE PAVIMENTO1001000013 RUPTURA DE EMPEDRADO, INCLUYE: SELECCION Y

ESTIBA DEL MATERIAL EN LA OBRA INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M2 $23.04 $23.04 $23.04 $23.04 $23.04 $23.04 $23.04 $29.60 $23.21 $23.21 $23.21 $23.21 $23.21 $23.21 $23.21

1001000023 RUPTURA DE PAVIMENTO ADOQUINADO, INCLUYE:CARGA DEL MATERIAL A CAMION Y ACARREO EN1ER. KM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M2 $33.56 $33.56 $33.56 $33.56 $33.56 $33.56 $33.56 $41.66 $33.77 $33.77 $33.77 $33.77 $33.77 $33.77 $33.77

1001000033 RUPTURA DE PAVIMENTO ASFALTICO A MANO.INCLUYE: CARGA DEL MATERIAL A CAMION YACARREO EN 1ER. KM. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M3 $379.88 $379.88 $379.88 $379.88 $379.88 $379.88 $379.88 $472.33 $382.10 $382.10 $382.10 $382.10 $382.10 $382.10 $382.10

1001000043 RUPTURA DE PAVIMENTO DE CONCRETO A MANO,INCLUYE: CARGA DEL MATERIAL A CAMION YACARREO EN 1ER. KM. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M3 $468.43 $468.43 $468.43 $468.43 $468.43 $468.43 $468.43 $584.88 $471.24 $471.24 $471.24 $471.24 $471.24 $471.24 $471.24

1001000053 RUPTURA DE BANQUETA DE CONCRETO, INCLUYE:CARGA DEL MATERIAL A CAMION Y ACARREO EN1ER. KM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M3 $486.61 $486.61 $486.61 $486.61 $486.61 $486.61 $486.61 $608.26 $489.56 $489.56 $489.56 $489.56 $489.56 $489.56 $489.56

Total RUPTURA DE PAVIMENTO

A1002 REPOSICION DE PAVIMENTOS1002000013 REPOSICION DE EMPEDRADO EN SECO,

UTILIZANDO EL MATERIAL PRODUCTO DE LARUPTURA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M2 $68.22 $68.22 $68.22 $68.22 $68.22 $68.22 $68.22 $95.53 $68.69 $68.69 $68.69 $68.69 $68.69 $68.69 $68.69

:

Page 29: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 29 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1002000023 REPOSICION DE EMPEDRADO JUNTEADO CONMORTERO CEMENTO-ARENA 1:5 UTILIZANDO ELMATERIAL PRODUCTO DE LA RUPTURA. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M2 $114.09 $114.09 $114.09 $114.09 $114.09 $114.09 $114.09 $146.84 $114.66 $114.66 $114.66 $114.66 $114.66 $114.66 $114.66

1002000033 REPOSICION DE PAVIMENTO ADOQUINADO ENSECO UTILIZANDO MATERIAL SANO PRODUCTO DELA RUPTURA Y MATERIAL NUEVO DE REPOSICION;INCLUYE: MATERIALES, MANO DE OBRA YHERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M2 $140.66 $140.66 $140.66 $140.66 $140.66 $140.66 $140.66 $177.07 $141.27 $141.27 $141.27 $141.27 $141.27 $141.27 $141.27

1002000043 REPOSICION DE PAVIMENTO ADOQUINADO,JUNTEADO CON MORTERO CEMENTO-ARENA 1:5,UTILIZANDO MATERIAL SANO PRODUCTO DE LARUPTURA Y MATERIAL NUEVO DE REPOSICION;INCLUYE: MATERIALES, MANO DE OBRA YHERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA

M2 $156.12 $156.12 $156.12 $156.12 $156.12 $156.12 $156.12 $197.06 $156.82 $156.82 $156.82 $156.82 $156.82 $156.82 $156.82

EJECUCION.

1002000053 REPOSICION DE PAVIMENTO ASFALTICO, CONCARPETA DE 0.05 M. DE ESPESOR, INCLUYENDOBASE DE GRAVA CEMENTADA DE 0.20 M. DEESPESOR; INCLUYE: MATERIALES, MANO DE OBRAY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M2 $359.79 $359.79 $359.79 $359.79 $359.79 $359.79 $359.79 $406.48 $360.62 $360.62 $360.62 $360.62 $360.62 $360.62 $360.62

1002000063 REPOSICION DE PAVIMENTO DE CONCRETO DEF'C=150 KG/CM2 DE 0.08 M. DE ESPESOR. INCLUYE:BASE DE GRAVA CEMENTADA DE 0.20 M. DEESPESOR, COMPACTADA AL 95 %, CIMBRA COMUNEN FRONTERAS, CELOTEX EN JUNTAS Y ACARREOSDE PETREOS. INCLUYE TODO LO NECESARIO PARA

M2 $316.49 $316.49 $316.49 $316.49 $316.49 $316.49 $316.49 $356.15 $317.21 $317.21 $317.21 $317.21 $317.21 $317.21 $317.21

SU CORRECTA EJECUCION.

1002000073 REPOSICION DE PAVIMENTO DE CONCRETO DEF'C=150 KG/CM2 DE 0.10 M. DE ESPESOR INCLUYE:BASE DE GRAVA CEMENTADA DE 0.20 M. DEESPESOR, COMPACTADA AL 95 %, CIMBRA COMUNEN FRONTERAS Y ACARREOS DE PETREOS.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M2 $349.19 $349.19 $349.19 $349.19 $349.19 $349.19 $349.19 $389.71 $349.92 $349.92 $349.92 $349.92 $349.92 $349.92 $349.92

EJECUCION.

:

Page 30: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 30 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1002000083 REPOSICION DE PAVIMENTO DE CONCRETO DEF'C=150 KG/CM2 DE 0.15 M. DE ESPESORCOMPACTADA AL 95%; INCLUYE BASE DE GRAVACEMENTADA DE 0.20 M. DE ESPESOR,COMPACTADA AL 95%, CIMBRA COMUN ENFRONTERAS Y ACARREOS DE PETREOS. INCLUYETODO LO NECESARIO PARA SU

M2 $422.33 $422.33 $422.33 $422.33 $422.33 $422.33 $422.33 $467.09 $423.12 $423.12 $423.12 $423.12 $423.12 $423.12 $423.12

CORRECTA EJECUCION.

1002000093 REPOSICION DE BANQUETA DE CONCRETO DEF'C=150 KG/CM2 DE 0.08 M. DE ESPESOR (NOINCLUYE BASE). INCLUYE: ACARREO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M2 $208.09 $208.09 $208.09 $208.09 $208.09 $208.09 $208.09 $242.26 $208.70 $208.70 $208.70 $208.70 $208.70 $208.70 $208.70

Total REPOSICION DE PAVIMENTOS

A1010 EXCAVACION PARA ESTRUCTURA1010000010 EXCAVACION A MANO PARA DESPLANTE DE

ESTRUCTURAS, EN MATERIAL "A", EN AGUA, CONAFLOJE Y EXTRACCION DEL MATERIAL, AMACICE OLIMPIEZA DE PLANTILLA Y TALUDES, REMOCION,ACARREO HASTA 10 M. DENTRO DE LA MISMA YTRASPALEOS VERTICALES PARA SU EXTRACCION.DE

M3 $172.86 $172.86 $172.86 $172.86 $172.86 $172.86 $172.86 $222.08 $174.04 $174.04 $174.04 $174.04 $174.04 $174.04 $174.04

0.00 A 2.00 M. DE PROFUNDIDAD. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1010000020 EXCAVACION A MANO PARA DESPLANTE DEESTRUCTURAS, EN MATERIAL "A", EN AGUA, CONAFLOJE Y EXTRACCION DEL MATERIAL, AMACICE OLIMPIEZA DE PLANTILLA Y TALUDES, REMOCION,ACARREO HASTA 10 M. DENTRO DE LA MISMA YTRASPALEOS VERTICALES PARA SU EXTRACCION.DE

M3 $192.06 $192.06 $192.06 $192.06 $192.06 $192.06 $192.06 $246.74 $193.39 $193.39 $193.39 $193.39 $193.39 $193.39 $193.39

2.00 A 3.00 M. DE PROFUNDIDAD. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

:

Page 31: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 31 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1010000030 EXCAVACION A MANO PARA DESPLANTE DEESTRUCTURAS, EN MATERIAL "A", EN AGUA, CONAFLOJE Y EXTRACCION DEL MATERIAL, AMACICE OLIMPIEZA DE PLANTILLA Y TALUDES, REMOCION,ACARREO HASTA 10 M. DENTRO DE LA MISMA YTRASPALEOS VERTICALES PARA SU EXTRACCION.DE

M3 $230.48 $230.48 $230.48 $230.48 $230.48 $230.48 $230.48 $296.11 $232.05 $232.05 $232.05 $232.05 $232.05 $232.05 $232.05

3.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1010000040 EXCAVACION A MANO PARA DESPLANTE DEESTRUCTURAS, EN MATERIAL "A", EN SECO, CONAFLOJE Y EXTRACCION DEL MATERIAL, AMACICE OLIMPIEZA DE PLANTILLA Y TALUDES, REMOCION,ACARREO, HASTA 10 M. DENTRO DE LA MISMA YTRASPALEOS VERTICALES PARA SU EXTRACCION.DE

M3 $115.25 $115.25 $115.25 $115.25 $115.25 $115.25 $115.25 $148.05 $116.03 $116.03 $116.03 $116.03 $116.03 $116.03 $116.03

0.00 A 2.00 M. DE PROFUNDIDAD. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1010000050 EXCAVACION A MANO PARA DESPLANTE DEESTRUCTURAS, EN MATERIAL "A", EN SECO, CONAFLOJE Y EXTRACCION DEL MATERIAL, AMACICE OLIMPIEZA DE PLANTILLA Y TALUDES, REMOCION,ACARREO, HASTA 10 M. DENTRO DE LA MISMA YTRASPALEOS VERTICALES PARA SU EXTRACCION.DE

M3 $138.30 $138.30 $138.30 $138.30 $138.30 $138.30 $138.30 $177.67 $139.24 $139.24 $139.24 $139.24 $139.24 $139.24 $139.24

2.00 A 3.00 M. DE PROFUNDIDAD. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1010000060 EXCAVACION A MANO PARA DESPLANTE DEESTRUCTURAS, EN MATERIAL "A", EN SECO, CONAFLOJE Y EXTRACCION DEL MATERIAL, AMACICE OLIMPIEZA DE PLANTILLA Y TALUDES, REMOCION,ACARREO, HASTA 10 M. DENTRO DE LA MISMA YTRASPALEOS VERTICALES PARA SU EXTRACCION.DE

M3 $172.86 $172.86 $172.86 $172.86 $172.86 $172.86 $172.86 $222.08 $174.04 $174.04 $174.04 $174.04 $174.04 $174.04 $174.04

3.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

:

Page 32: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 32 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1010000070 EXCAVACION A MANO PARA DESPLANTE DEESTRUCTURAS, EN MATERIAL "B", EN AGUA, CONAFLOJE Y EXTRACCION DEL MATERIAL, AMACICE OLIMPIEZA DE PLANTILLA Y TALUDES, REMOCION YTRASPALEOS VERTICALES PARA SU EXTRACCION.DE 0.00 A 2.00 M. DE PROFUNDIDAD. INCLUYE

M3 $192.06 $192.06 $192.06 $192.06 $192.06 $192.06 $192.06 $246.74 $193.39 $193.39 $193.39 $193.39 $193.39 $193.39 $193.39

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1010000080 EXCAVACION A MANO PARA DESPLANTE DEESTRUCTURAS, EN MATERIAL "B", EN AGUA, CONAFLOJE Y EXTRACCION DEL MATERIAL, AMACICE OLIMPIEZA DE PLANTILLA Y TALUDES, REMOCION YTRASPALEOS VERTICALES PARA SU EXTRACCION.DE 2.00 A 3.00 M. DE PROFUNDIDAD. INCLUYE

M3 $216.08 $216.08 $216.08 $216.08 $216.08 $216.08 $216.08 $277.61 $217.54 $217.54 $217.54 $217.54 $217.54 $217.54 $217.54

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1010000090 EXCAVACION A MANO PARA DESPLANTE DEESTRUCTURAS, EN MATERIAL "B", EN AGUA, CONAFLOJE Y EXTRACCION DEL MATERIAL, AMACICE OLIMPIEZA DE PLANTILLA Y TALUDES, REMOCION YTRASPALEOS VERTICALES PARA SU EXTRACCION.DE 3.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE

M3 $246.95 $246.95 $246.95 $246.95 $246.95 $246.95 $246.95 $317.26 $248.64 $248.64 $248.64 $248.64 $248.64 $248.64 $248.64

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1010000100 EXCAVACION A MANO PARA DESPLANTE DEESTRUCTURAS, EN MATERIAL "B", EN SECO, CONAFLOJE Y EXTRACCION DEL MATERIAL, AMACICE OLIMPIEZA DE PLANTILLA Y TALUDES, REMOCION,ACARREO HASTA 10 M. DENTRO DE LA MISMA YTRASPALEOS VERTICALES PARA SU EXTRACCION.DE

M3 $172.86 $172.86 $172.86 $172.86 $172.86 $172.86 $172.86 $222.08 $174.04 $174.04 $174.04 $174.04 $174.04 $174.04 $174.04

0.00 A 2.00 M. DE PROFUNDIDAD. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1010000110 EXCAVACION A MANO PARA DESPLANTE DEESTRUCTURAS, EN MATERIAL "B", EN SECO, CONAFLOJE Y EXTRACCION DEL MATERIAL, AMACICE OLIMPIEZA DE PLANTILLA Y TALUDES, REMOCION,ACARREO HASTA 10 M. DENTRO DE LA MISMA YTRASPALEOS VERTICALES PARA SU EXTRACCION.DE

M3 $192.06 $192.06 $192.06 $192.06 $192.06 $192.06 $192.06 $246.74 $193.39 $193.39 $193.39 $193.39 $193.39 $193.39 $193.39

:

Page 33: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 33 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2.00 A 3.00 M. DE PROFUNDIDAD. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1010000120 EXCAVACION A MANO PARA DESPLANTE DEESTRUCTURAS, EN MATERIAL "B", EN SECO, CONAFLOJE Y EXTRACCION DEL MATERIAL, AMACICE OLIMPIEZA DE PLANTILLA Y TALUDES, REMOCION,ACARREO HASTA 10 M. DENTRO DE LA MISMA YTRASPALEOS VERTICALES PARA SU EXTRACCION.DE

M3 $216.08 $216.08 $216.08 $216.08 $216.08 $216.08 $216.08 $277.61 $217.54 $217.54 $217.54 $217.54 $217.54 $217.54 $217.54

3.00 A 4.00 M. DE PROFUNDIDAD. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1010000130 EXCAVACION CON APOYO DE EQUIPO MANUAL YMECANICO PARA DESPLANTE DE ESTRUCTURAS ENMATERIAL "C" EN SECO CON EXTRACCION DEREZAGA A MANO, INCLUYE AFLOJE, AMACICE,LIMPIEZA DE PLANTILLA Y TALUDES, DE 0.00 A 2.00MTS. DE PROFUNDIDAD INCLUYE TODO LO

M3 $241.22 $241.22 $241.22 $241.22 $241.22 $241.22 $241.22 $252.54 $241.60 $241.60 $241.60 $241.60 $241.60 $241.60 $241.60

NECESARIO PARA SU CORRECTA EJECUCION.

1010000140 EXCAVACION CON APOYO DE EQUIPO MANUAL YMECANICO PARA DESPLANTE DE ESTRUCTURAS ENMATERIAL "C" EN SECO CON EXTRACCION DEREZAGA A MANO, INCLUYE AFLOJE, AMACICE,LIMPIEZA DE PLANTILLA Y TALUDES, DE 2.00 A 4.00MTS. DE PROFUNDIDAD INCLUYE TODO LO

M3 $332.70 $332.70 $332.70 $332.70 $332.70 $332.70 $332.70 $357.39 $333.39 $333.39 $333.39 $333.39 $333.39 $333.39 $333.39

NECESARIO PARA SU CORRECTA EJECUCION.

Total EXCAVACION PARA ESTRUCTURA

A1011 EXCAVACION EN ZANJA1011000010 EXCAVACION A MANO PARA ZANJAS EN MATERIAL

"A" EN AGUA INCLUYE AFLOJE Y EXTRACCION DEMATERIAL, AMACICE O LIMPIEZA DE PLANTILLA YTALUDES, REMOCION, TRASPALEOS VERTICALESPARA SU EXTRACCION Y CONSERVACION DE LAEXCAVACION HASTA LA INSTALACION

M3 $172.86 $172.86 $172.86 $172.86 $172.86 $172.86 $172.86 $222.08 $174.04 $174.04 $174.04 $174.04 $174.04 $174.04 $174.04

SATISFACTORIA DE LA TUBERIA. DE 0.00 A 2.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 34: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 34 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1011000020 EXCAVACION A MANO PARA ZANJAS EN MATERIAL"A" EN AGUA INCLUYE AFLOJE Y EXTRACCION DEMATERIAL, AMACICE O LIMPIEZA DE PLANTILLA YTALUDES, REMOCION, TRASPALEOS VERTICALESPARA SU EXTRACCION Y CONSERVACION DE LAEXCAVACION HASTA LA INSTALACION

M3 $203.36 $203.36 $203.36 $203.36 $203.36 $203.36 $203.36 $261.28 $204.77 $204.77 $204.77 $204.77 $204.77 $204.77 $204.77

SATISFACTORIA DE LA TUBERIA. DE 2.00 A 4.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1011000030 EXCAVACION CON MAQUINA PARA ZANJAS ENMATERIAL "A" EN AGUA, AFLOJE Y EXTRACCIONDEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLAY TALUDES, REMOCION, CARGA A CAMION O A UNLADO DE LA ZANJA, INCLUYE: CONSERVACION DELA EXCAVACION HASTA LA INSTALACION

M3 $36.34 $36.34 $36.34 $36.34 $36.34 $36.34 $36.34 $38.64 $36.43 $36.43 $36.43 $36.43 $36.43 $36.43 $36.43

SATISFACTORIA DE LA TUBERIA, DE 0.00 A 4.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1011000040 EXCAVACION CON MAQUINA PARA ZANJAS ENMATERIAL "A" EN AGUA, AFLOJE Y EXTRACCIONDEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLAY TALUDES, REMOCION, CARGA A CAMION O A UNLADO DE LA ZANJA, INCLUYE: CONSERVACION DELA EXCAVACION HASTA LA INSTALACION

M3 $52.58 $52.58 $52.58 $52.58 $52.58 $52.58 $52.58 $54.38 $52.64 $52.64 $52.64 $52.64 $52.64 $52.64 $52.64

SATISFACTORIA DE LA TUBERIA, DE 4.00 A 6.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1011000050 EXCAVACION A MANO PARA ZANJAS EN MATERIAL"A" EN SECO INCLUYE AFLOJE Y EXTRACCION DELMATERIAL, AMACICE O LIMPIEZA DE PLANTILLA,TALUDES, REMOCION, TRASPALEOS Y VERTICALESPARA SU EXTRACCION Y CONSERVACION DE LAEXCAVACION HASTA LA INSTALACION

M3 $115.25 $115.25 $115.25 $115.25 $115.25 $115.25 $115.25 $148.05 $116.03 $116.03 $116.03 $116.03 $116.03 $116.03 $116.03

SATISFACTORIA DE LA TUBERIA. DE 0.00 A 2.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 35: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 35 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1011000060 EXCAVACION A MANO PARA ZANJAS EN MATERIAL"A" EN SECO INCLUYE AFLOJE Y EXTRACCION DELMATERIAL, AMACICE O LIMPIEZA DE PLANTILLA,TALUDES, REMOCION, TRASPALEOS Y VERTICALESPARA SU EXTRACCION Y CONSERVACION DE LAEXCAVACION HASTA LA INSTALACION

M3 $153.66 $153.66 $153.66 $153.66 $153.66 $153.66 $153.66 $197.41 $154.70 $154.70 $154.70 $154.70 $154.70 $154.70 $154.70

SATISFACTORIA DE LA TUBERIA. DE 2.00 A 4.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1011000080 EXCAVACION CON MAQUINA PARA ZANJAS, ENMATERIAL "A", EN SECO, CON AFLOJE YEXTRACCION DEL MATERIAL AMACICE O LIMPIEZADE PLANTILLA Y TALUDES, REMOCION CARGA ACAMION O A UN LADO DE LA ZANJA, INCLUYENDOACARREO A 10 M. DEL EJE DE LA MISMA YCONSERVACION

M3 $51.92 $51.92 $51.92 $51.92 $51.92 $51.92 $51.92 $53.53 $51.97 $51.97 $51.97 $51.97 $51.97 $51.97 $51.97

DE LA EXCAVACION HASTA LA INSTALACIONSATISFACTORIA DE LA TUBERIA. DE 4.00 A 6.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1011000090 EXCAVACION A MANO PARA ZANJAS EN MATERIAL"B" EN AGUA. INCLUYE AFLOJE Y EXTRACCION DELMATERIAL, AMACICE O LIMPIEZA DE PLANTILLA YTALUDES, REMOCION, TRASPALEOS VERTICALESPARA SU EXTRACCION Y CONSERVACION DE LAEXCAVACION HASTA LA INSTALACION

M3 $192.06 $192.06 $192.06 $192.06 $192.06 $192.06 $192.06 $246.74 $193.39 $193.39 $193.39 $193.39 $193.39 $193.39 $193.39

SATISFACTORIA DE LA TUBERIA. DE 0.00 A 2.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1011000100 EXCAVACION A MANO PARA ZANJAS EN MATERIAL"B" EN AGUA. INCLUYE AFLOJE Y EXTRACCION DELMATERIAL, AMACICE O LIMPIEZA DE PLANTILLA YTALUDES, REMOCION, TRASPALEOS VERTICALESPARA SU EXTRACCION Y CONSERVACION DE LAEXCAVACION HASTA LA INSTALACION

M3 $216.08 $216.08 $216.08 $216.08 $216.08 $216.08 $216.08 $277.61 $217.54 $217.54 $217.54 $217.54 $217.54 $217.54 $217.54

SATISFACTORIA DE LA TUBERIA. DE 2.00 A 4.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 36: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 36 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1011000110 EXCAVACION CON MAQUINA PARA ZANJAS ENMATERIAL "B", EN AGUA, CON AFLOJE YEXTRACCION DEL MATERIAL AMACICE O LIMPIEZADE PLANTILLA Y TALUDES, REMOCION CARGA ACAMION O A UN LADO DE LA ZANJA, INCLUYE:CONSERVACION DE LA EXCAVACION HASTA LAINSTALACION

M3 $42.26 $42.26 $42.26 $42.26 $42.26 $42.26 $42.26 $44.76 $42.34 $42.34 $42.34 $42.34 $42.34 $42.34 $42.34

SATISFACTORIA DE LA TUBERIA. DE 0.00 A 4.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1011000120 EXCAVACION CON MAQUINA PARA ZANJAS ENMATERIAL "B" EN AGUA, AFLOJE Y EXTRACCIONDEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLAY TALUDES, REMOCION, CARGA A CAMION O A UNLADO DE LA ZANJA, INCLUYE: CONSERVACION DELA EXCAVACION HASTA LA INSTALACION

M3 $64.89 $64.89 $64.89 $64.89 $64.89 $64.89 $64.89 $66.92 $64.96 $64.96 $64.96 $64.96 $64.96 $64.96 $64.96

SATISFACTORIA DE LA TUBERIA: DE 4.00 A 6.00 M.DE PROFUNDIDAD INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1011000130 EXCAVACION A MANO PARA ZANJAS EN MATERIAL"B" EN SECO INCLUYE AFLOJE EXTRACCION DELMATERIAL, AMACICE O LIMPIEZA DE PLANTILLA YTALUDES, REMOCION, TRASPALEOS VERTICALESPARA SU EXTRACCION Y CONSERVACION DE LAEXCAVACION HASTA LA INSTALACION

M3 $172.86 $172.86 $172.86 $172.86 $172.86 $172.86 $172.86 $222.08 $174.04 $174.04 $174.04 $174.04 $174.04 $174.04 $174.04

SATISFACTORIA DE LA TUBERIA. DE 0.00 A 2.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1011000140 EXCAVACION A MANO PARA ZANJAS EN MATERIAL"B" EN SECO INCLUYE AFLOJE EXTRACCION DELMATERIAL, AMACICE O LIMPIEZA DE PLANTILLA YTALUDES, REMOCION, TRASPALEOS VERTICALESPARA SU EXTRACCION Y CONSERVACION DE LAEXCAVACION HASTA LA INSTALACION

M3 $203.36 $203.36 $203.36 $203.36 $203.36 $203.36 $203.36 $261.28 $204.77 $204.77 $204.77 $204.77 $204.77 $204.77 $204.77

SATISFACTORIA DE LA TUBERIA. DE 2.00 A 4.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 37: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 37 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1011000150 EXCAVACION CON MAQUINA PARA ZANJAS ENMATERIAL "B", EN SECO, CON AFLOJE YEXTRACCION DEL MATERIAL AMACICE O LIMPIEZADE PLANTILLA Y TALUDES, REMOCION CARGA ACAMION O A UN LADO DE LA ZANJA, INCLUYE:CONSERVACION DE LA EXCAVACION HASTA LAINSTALACION

M3 $34.38 $34.38 $34.38 $34.38 $34.38 $34.38 $34.38 $36.68 $34.45 $34.45 $34.45 $34.45 $34.45 $34.45 $34.45

SATISFACTORIA DE LA TUBERIA. DE 0.00 A 4.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1011000160 EXCAVACION CON MAQUINA PARA ZANJAS ENMATERIAL "B" EN SECO, AFLOJE Y EXTRACCIONDEL MATERIAL, AMACICE O LIMPIEZA DE PLANTILLAY TALUDES, REMOCION, CARGA A CAMION O A UNLADO DE LA ZANJA, INCLUYE: CONSERVACION DELA EXCAVACION HASTA LA INSTALACION

M3 $51.92 $51.92 $51.92 $51.92 $51.92 $51.92 $51.92 $53.53 $51.97 $51.97 $51.97 $51.97 $51.97 $51.97 $51.97

SATISFACTORIA DE LA TUBERIA DE 4.00 A 6.00 M.DE PROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1011000170 EXCAVACION CON APOYO DE EQUIPO MANUAL YMECANICO PARA ZANJAS EN MATERIAL "C" ENSECO, CON EXTRACCION DE REZAGA A MANO,INCLUYE: AFLOJE, AMACICE, LIMPIEZA DEPLANTILLA Y TALUDES, ACARREO A 10 M DEL EJEDE LA MISMA Y CONSERVACION DE LAEXCAVACION HASTA

M3 $281.51 $281.51 $281.51 $281.51 $281.51 $281.51 $281.51 $303.58 $282.14 $282.14 $282.14 $282.14 $282.14 $282.14 $282.14

LA INSTALACION SATISFACTORIA DE LA TUBERIADE 0.00 A 2.00 MTS. DE PROFUNDIDAD INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1011000180 EXCAVACION CON APOYO DE EQUIPO MANUAL YMECANICO PARA ZANJAS EN MATERIAL "C" ENSECO, CON EXTRACCION DE REZAGA A MANO,INCLUYE: AFLOJE, AMACICE, LIMPIEZA DEPLANTILLA Y TALUDES, ACARREO A 10 M DEL EJEDE LA MISMA Y CONSERVACION DE LAEXCAVACION HASTA

M3 $332.70 $332.70 $332.70 $332.70 $332.70 $332.70 $332.70 $357.39 $333.39 $333.39 $333.39 $333.39 $333.39 $333.39 $333.39

LA INSTALACION SATISFACTORIA DE LA TUBERIA:DE 2.00 A 4.00 MTS. DE PROFUNDIDAD INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

:

Page 38: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 38 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

Total EXCAVACION EN ZANJA

A1020 RELLENOS1020000010 PLANTILLA APISONADA CON PISON DE MANO, EN

ZANJAS, INCLUYENDO SELECCION DEL MATERIALPRODUCTO DE LA EXCAVACION, COLOCACION DELA PLANTILLA Y CONSTRUCCION DEL APOYOSEMICIRCULAR, PARA PERMITIR EL APOYOCOMPLETO DE LA TUBERIA. PLANTILLA CONMATERIAL "A"

M3 $138.30 $138.30 $138.30 $138.30 $138.30 $138.30 $138.30 $177.67 $139.24 $139.24 $139.24 $139.24 $139.24 $139.24 $139.24

Y/O "B" INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1020000013 RELLENO A VOLTEO EN ZANJAS UTILIZANDOMATERIAL PRODUCTO DE EXCAVACION: RELLENO AVOLTEO, CON PALA DE MANO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M3 $57.62 $57.62 $57.62 $57.62 $57.62 $57.62 $57.62 $74.02 $58.01 $58.01 $58.01 $58.01 $58.01 $58.01 $58.01

1020000023 RELLENO COMPACTADO EN ZANJAS CON PIZON DEMANO UTILIZANDO MATERIAL PRODUCTO DEEXCAVACION; INCLUYE: AGUA PARA SU HUMEDADOPTIMA, MANO DE OBRA Y HERRAMIENTA.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M3 $93.31 $93.31 $93.31 $93.31 $93.31 $93.31 $93.31 $118.38 $93.91 $93.91 $93.91 $93.91 $93.91 $93.91 $93.91

1020000033 RELLENO A VOLTEO EN ZANJAS UTILIZANDOMATERIAL PRODUCTO DE EXCAVACION. RELLENO AVOLTEO CON EQUIPO MECANICO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M3 $14.25 $14.25 $14.25 $14.25 $14.25 $14.25 $14.25 $14.81 $14.27 $14.27 $14.27 $14.27 $14.27 $14.27 $14.27

1020000043 RELLENO APISONADO Y COMPACTADO CONMATERIAL DE BANCO EN CAPAS DE 0.20 M. DEESPESOR AL 85% PRUEBA PROCTOR. CON EQUIPOMANUAL INCLUYE: MATERIALES, MANO DE OBRA YHERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M3 $240.75 $240.75 $240.75 $240.75 $240.75 $240.75 $240.75 $258.80 $241.18 $241.18 $241.18 $241.18 $241.18 $241.18 $241.18

:

Page 39: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 39 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1020000053 RELLENO APISONADO Y COMPACTADO CONMATERIAL DE BANCO EN CAPAS DE 0.20 M. DEESPESOR AL 90% PRUEBA PROCTOR. CON EQUIPOMANUAL INCLUYE: MATERIALES, MANO DE OBRA YHERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M3 $243.19 $243.19 $243.19 $243.19 $243.19 $243.19 $243.19 $262.47 $243.65 $243.65 $243.65 $243.65 $243.65 $243.65 $243.65

1020000063 RELLENO APISONADO Y COMPACTADO CONMATERIAL DE BANCO EN CAPAS DE 0.20 M. DEESPESOR AL 95% PRUEBA PROCTOR. CON EQUIPOMANUAL INCLUYE: MATERIALES, MANO DE OBRA YHERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M3 $252.75 $252.75 $252.75 $252.75 $252.75 $252.75 $252.75 $273.97 $253.24 $253.24 $253.24 $253.24 $253.24 $253.24 $253.24

Total RELLENOS

A1021 BOMBEO DE ACHIQUE1021000013 BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE,

CON OPERACION. PROPIEDAD DEL CONTRATISTA.BOMBA DE 50.8 MM. (2") DIAMETRO. Y 4 H.P.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Hora $68.53 $68.53 $68.53 $68.53 $68.53 $68.53 $68.53 $85.10 $68.89 $68.89 $68.89 $68.89 $68.89 $68.89 $68.89

1021000023 BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE,CON OPERACION. BOMBA DE 76.2 MM. (3")DIAMETRO. Y 8 H.P. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

Hora $84.55 $84.55 $84.55 $84.55 $84.55 $84.55 $84.55 $101.12 $84.91 $84.91 $84.91 $84.91 $84.91 $84.91 $84.91

1021000033 BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE,CON OPERACION. BOMBA DE 101.6 MM. (4")DIAMETRO. Y 12 H.P. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

Hora $131.93 $131.93 $131.93 $131.93 $131.93 $131.93 $131.93 $153.80 $132.41 $132.41 $132.41 $132.41 $132.41 $132.41 $132.41

Total BOMBEO DE ACHIQUE

A1024 ADEMES1024000010 ADEME CERRADO DE MADERA HASTA 2.50 M. DE

PROFUNDIDAD CON FORRO VERTICAL DE TABLONDE MADERA 2" ESPESOR, REFUERZO (ARRASTRE)HORIZONTAL CON BARROTES, POLINES PARACUÑAS DE APOYO INCLUYE: MATERIALES, MANODE OBRA PARA SU FABRICACION, COLOCACION Y

M2 $96.43 $96.43 $96.43 $96.43 $96.43 $96.43 $96.43 $118.29 $96.80 $96.80 $96.80 $96.80 $96.80 $96.80 $96.80

RETIRO, HERRAMIENTA MENOR. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

:

Page 40: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 40 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1024000012 ADEME CERRADO DE MADERA HASTA 3.00 M. DEPROFUNDIDAD CON FORRO VERTICAL DE TABLONDE MADERA 2" ESPESOR, REFUERZO (ARRASTRE)HORIZONTAL CON BARROTES, POLINES PARACUÑAS DE APOYO INCLUYE: MATERIALES, MANODE OBRA PARA SU FABRICACION, COLOCACION Y

M2 $109.53 $109.53 $109.53 $109.53 $109.53 $109.53 $109.53 $136.83 $110.00 $110.00 $110.00 $110.00 $110.00 $110.00 $110.00

RETIRO, HERRAMIENTA MENOR. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1024000013 ADEME ABIERTO DE MADERA HASTA 2.50 M. DEPROFUNDIDAD CON FORRO VERTICAL DE TABLONDE MADERA 2" ESPESOR SEPARADO 30CM ENTRETABLON Y TABLON, REFUERZO (ARRASTRE)HORIZONTAL CON BARROTES, POLINES PARACUÑAS DE APOYO INCLUYE: MATERIALES, MANODE OBRA PARA

M2 $75.02 $75.02 $75.02 $75.02 $75.02 $75.02 $75.02 $94.29 $75.34 $75.34 $75.34 $75.34 $75.34 $75.34 $75.34

SU FABRICACION, COLOCACION Y RETIRO,HERRAMIENTA MENOR. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1024000023 ADEME ABIERTO DE MADERA HASTA 3.00 M. DEPROFUNDIDAD CON FORRO VERTICAL DE TABLONDE MADERA 2" ESPESOR SEPARADO 30CM ENTRETABLON Y TABLON, REFUERZO (ARRASTRE)HORIZONTAL CON BARROTES, POLINES PARACUÑAS DE APOYO INCLUYE: MATERIALES, MANODE OBRA PARA

M2 $81.10 $81.10 $81.10 $81.10 $81.10 $81.10 $81.10 $102.94 $81.47 $81.47 $81.47 $81.47 $81.47 $81.47 $81.47

SU FABRICACION, COLOCACION Y RETIRO,HERRAMIENTA MENOR. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1024000033 ADEME METALICO CERRADO HASTA UNAPROFUNDIDAD DE EXCAVACION DE 4.40 M. CONPERFIL "C" ESTANDAR DE 12" (305mm) Y 30.80Kg/M.INCLUYE:COLOCACION Y DESMANTELAMIENTO CONEQUIPO MECANICO, FLETES Y MANIOBRASLOCALES DE MATERIALES. INCLUYE TODO LONECESARIO PARA

M2 $294.31 $294.31 $294.31 $294.31 $294.31 $294.31 $294.31 $300.24 $294.45 $294.45 $294.45 $294.45 $294.45 $294.45 $294.45

SU CORRECTA EJECUCION.

:

Page 41: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 41 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1024000043 ADEME METALICO ABIERTO HASTA UNAPROFUNDIDAD DE EXCAVACION DE 4.40 M. CONPERFIL "C" ESTANDAR DE 12" (305mm) Y 30.80Kg/MSEPARADOS 30CM. ENTRE PERFIL Y PERFIL.INCLUYE:COLOCACION Y DESMANTELAMIENTO CONEQUIPO MECANICO, FLETES Y MANIOBRASLOCALES DE

M2 $176.11 $176.11 $176.11 $176.11 $176.11 $176.11 $176.11 $180.07 $176.19 $176.19 $176.19 $176.19 $176.19 $176.19 $176.19

MATERIALES. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

1024000053 ATAGUIAS CON SACO DE ARENA O ARCILLA DELLUGAR CON SECCION DE 1.00 MT. DE BASE POR1.20 MTS. DE ALTO UTILIZANDO 20 SACOS DE0.50X0.40X0.30 MTS. POR ML. INCLUYE: COSTOS DESACOS, MATERIALES, LLENADO DE LOS SACOSCOLOCACION Y RETIRO DE LOS MATERIALES.

M $176.04 $176.04 $176.04 $176.04 $176.04 $176.04 $176.04 $200.64 $176.62 $176.62 $176.62 $176.62 $176.62 $176.62 $176.62

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Total ADEMES

Total Preliminares

A11 Agua Potable

A1105 Instalacion Tuberia PVC1105000013 INSTALACION, JUNTEO Y PRUEBA DE TUBERIAS DE

P.V.C. HIDRAULICA CEMENTAR DE 13 Y 19 MM. (1/2"Y 3/4" ) DE DIAMETRO, INCLUYE MANO DE OBRA,HERRAMIENTA MENOR. BAJADA DE MATERIAL,EQUIPO PARA PRUEBA Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SU

M $11.62 $11.62 $11.62 $11.62 $11.62 $11.62 $11.62 $15.43 $11.70 $11.70 $11.70 $11.70 $11.70 $11.70 $11.70

CORRECTA EJECUCION.

1105000023 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. HIDRAULICO CEMENTAR DE 25 MM. (1") DEDIAMETRO; INCLUYE: BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $13.34 $13.34 $13.34 $13.34 $13.34 $13.34 $13.34 $17.21 $13.39 $13.39 $13.39 $13.39 $13.39 $13.39 $13.39

:

Page 42: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 42 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1105000033 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. HIDRAULICA CEMENTAR DE 32 MM. (1 1/4")DE DIAMETRO, INCLUYE BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $15.00 $15.00 $15.00 $15.00 $15.00 $15.00 $15.00 $19.03 $15.05 $15.05 $15.05 $15.05 $15.05 $15.05 $15.05

1105000043 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE 38 MM. (1 1/2") DEDIAMETRO, INCLUYE BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $12.22 $12.22 $12.22 $12.22 $12.22 $12.22 $12.22 $16.44 $12.30 $12.30 $12.30 $12.30 $12.30 $12.30 $12.30

1105000053 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE 50 MM. (2") DE DIAMETRO,INCLUYE BAJADA DE MATERIAL Y EQUIPO PARAPRUEBAS Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M $13.21 $13.21 $13.21 $13.21 $13.21 $13.21 $13.21 $17.75 $13.30 $13.30 $13.30 $13.30 $13.30 $13.30 $13.30

1105000063 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE 63 MM. (2 1/2") DEDIAMETRO, INCLUYE BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $14.28 $14.28 $14.28 $14.28 $14.28 $14.28 $14.28 $19.13 $14.36 $14.36 $14.36 $14.36 $14.36 $14.36 $14.36

1105000073 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE 75 MM. (3") DE DIAMETRO,INCLUYE BAJADA DE MATERIAL Y EQUIPO PARAPRUEBAS Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M $16.76 $16.76 $16.76 $16.76 $16.76 $16.76 $16.76 $22.32 $16.90 $16.90 $16.90 $16.90 $16.90 $16.90 $16.90

1105000083 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE100 MM. (4") DE DIAMETRO,INCLUYE BAJADA DE MATERIAL Y EQUIPO PARAPRUEBAS Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M $19.33 $19.33 $19.33 $19.33 $19.33 $19.33 $19.33 $25.67 $19.48 $19.48 $19.48 $19.48 $19.48 $19.48 $19.48

1105000093 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE 160 MM. (6") DEDIAMETRO, INCLUYE BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $24.67 $24.67 $24.67 $24.67 $24.67 $24.67 $24.67 $32.41 $24.82 $24.82 $24.82 $24.82 $24.82 $24.82 $24.82

:

Page 43: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 43 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1105000103 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE 200 MM. (8") DEDIAMETRO, INCLUYE BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $30.43 $30.43 $30.43 $30.43 $30.43 $30.43 $30.43 $40.34 $30.62 $30.62 $30.62 $30.62 $30.62 $30.62 $30.62

1105000113 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE 250 MM. (10") DEDIAMETRO, INCLUYE BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $39.63 $39.63 $39.63 $39.63 $39.63 $39.63 $39.63 $52.33 $39.89 $39.89 $39.89 $39.89 $39.89 $39.89 $39.89

1105000123 INSTALACION, JUNTEO Y PRUEBA DE TUBERIAS DEP.V.C. CON CAMPANA DE 305 MM. (12") DEDIAMETRO, INCLUYE BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $48.41 $48.41 $48.41 $48.41 $48.41 $48.41 $48.41 $63.65 $48.68 $48.68 $48.68 $48.68 $48.68 $48.68 $48.68

1105000133 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE 355 MM. (14") DEDIAMETRO, INCLUYE BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $56.06 $56.06 $56.06 $56.06 $56.06 $56.06 $56.06 $73.44 $56.39 $56.39 $56.39 $56.39 $56.39 $56.39 $56.39

1105000143 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE 400 MM. (16") DEDIAMETRO, INCLUYE BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $64.36 $64.36 $64.36 $64.36 $64.36 $64.36 $64.36 $84.15 $64.74 $64.74 $64.74 $64.74 $64.74 $64.74 $64.74

1105000153 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE 450 MM. (18") DEDIAMETRO, INCLUYE BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $91.10 $91.10 $91.10 $91.10 $91.10 $91.10 $91.10 $118.50 $91.63 $91.63 $91.63 $91.63 $91.63 $91.63 $91.63

:

Page 44: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 44 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1105000163 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE 500 MM. (20") DEDIAMETRO, INCLUYE BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $105.41 $105.41 $105.41 $105.41 $105.41 $105.41 $105.41 $136.96 $106.05 $106.05 $106.05 $106.05 $106.05 $106.05 $106.05

1105000173 INSTALACION, JUNTEO Y PRUEBA DE TUBERIA DEP.V.C. CON CAMPANA DE 630 MM. (24") DEDIAMETRO, INCLUYE BAJADA DE MATERIAL YEQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $105.02 $105.02 $105.02 $105.02 $105.02 $105.02 $105.02 $135.23 $105.59 $105.59 $105.59 $105.59 $105.59 $105.59 $105.59

Total Instalacion Tuberia PVC

A1106 Instalacion Tuberia Polietileno Alta Densidad1106000013 INSTALACION, JUNTEO Y PRUEBA DE TUBERIAS DE

POLIETILENO, DE ALTA DENSIDAD, DE 19 Y 13 MM.(3/4" Y 1/2") DE DIAMETRO. INCLUYE: BAJADO DEMATERIAL, EQUIPO PARA PRUEBAS Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $4.77 $4.77 $4.77 $4.77 $4.77 $4.77 $4.77 $6.52 $4.80 $4.80 $4.80 $4.80 $4.80 $4.80 $4.80

1106000023 INSTALACION, JUNTEO Y PRUEBA DE TUBERIAS DEPOLIETILENO, DE ALTA DENSIDAD, DE 25 MM. (1")DE DIAMETRO. INCLUYE: BAJADO DE MATERIAL,EQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $5.01 $5.01 $5.01 $5.01 $5.01 $5.01 $5.01 $6.86 $5.07 $5.07 $5.07 $5.07 $5.07 $5.07 $5.07

1106000033 INSTALACION, JUNTEO Y PRUEBA DE TUBERIAS DEPOLIETILENO, DE ALTA DENSIDAD, DE 32 MM. (11/4") DE DIAMETRO. INCLUYE: BAJADO DEMATERIAL, EQUIPO PARA PRUEBAS Y MANIOBRASLOCALES. TUBERIA DE 32 MM. (1 1/4") DE DIAM.INCLUYE TODO LO NECESARIO PARA SU

M $5.83 $5.83 $5.83 $5.83 $5.83 $5.83 $5.83 $7.95 $5.86 $5.86 $5.86 $5.86 $5.86 $5.86 $5.86

CORRECTA EJECUCION.

:

Page 45: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 45 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1106000043 INSTALACION, JUNTEO Y PRUEBA DE TUBERIAS DEPOLIETILENO, DE ALTA DENSIDAD, DE 38 MM. (11/2") DE DIAMETRO. INCLUYE: BAJADO DEMATERIAL, EQUIPO PARA PRUEBAS Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $5.83 $5.83 $5.83 $5.83 $5.83 $5.83 $5.83 $7.95 $5.86 $5.86 $5.86 $5.86 $5.86 $5.86 $5.86

1106000053 INSTALACION, JUNTEO Y PRUEBA DE TUBERIAS DEPOLIETILENO, DE ALTA DENSIDAD, DE 51 MM. (2")DE DIAMETRO. INCLUYE: BAJADO DE MATERIAL,EQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $5.83 $5.83 $5.83 $5.83 $5.83 $5.83 $5.83 $7.95 $5.86 $5.86 $5.86 $5.86 $5.86 $5.86 $5.86

1106000063 INSTALACION, JUNTEO Y PRUEBA DE TUBERIAS DEPOLIETILENO, DE ALTA DENSIDAD, DE 64 MM. (21/2") DE DIAMETRO. INCLUYE: BAJADO DEMATERIAL, EQUIPO PARA PRUEBAS Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $6.40 $6.40 $6.40 $6.40 $6.40 $6.40 $6.40 $8.74 $6.45 $6.45 $6.45 $6.45 $6.45 $6.45 $6.45

1106000073 INSTALACION, JUNTEO Y PRUEBA DE TUBERIAS DEPOLIETILENO, DE ALTA DENSIDAD, DE 76 MM. (3")DE DIAMETRO. INCLUYE: BAJADO DE MATERIAL,EQUIPO PARA PRUEBAS Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $6.98 $6.98 $6.98 $6.98 $6.98 $6.98 $6.98 $9.54 $7.01 $7.01 $7.01 $7.01 $7.01 $7.01 $7.01

Total Instalacion Tuberia Polietileno Alta Den

A1107 Instalacion de Piezas Especiales FoFo1107000010 INSTALACION DE PIEZAS ESPECIALES DE FO.FO. 0"

A 3" DE DIAMETRO. INCLUYE: INSTALACION,PRUEBA HIDROSTATICA JUNTO CON TUBERIA YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

Kg $6.83 $6.83 $6.83 $6.83 $6.83 $6.83 $6.83 $9.56 $6.88 $6.88 $6.88 $6.88 $6.88 $6.88 $6.88

1107000013 INSTALACION DE PIEZAS ESPECIALES DE FO.FO. DE4" A 12" DE DIAMETRO. INCLUYE: INSTALACION,PRUEBA HIDROSTATICA JUNTO CON TUBERIA YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

Kg $7.76 $7.76 $7.76 $7.76 $7.76 $7.76 $7.76 $10.62 $7.82 $7.82 $7.82 $7.82 $7.82 $7.82 $7.82

:

Page 46: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 46 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1107000015 INSTALACION DE PIEZAS ESPECIALES DE FO.FO. DE14" A 36" DE DIAMETRO. INCLUYE: INSTALACION,PRUEBA HIDROSTATICA JUNTO CON TUBERIA YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

Kg $8.33 $8.33 $8.33 $8.33 $8.33 $8.33 $8.33 $11.37 $8.38 $8.38 $8.38 $8.38 $8.38 $8.38 $8.38

1107000033 INSTALACION DE PIEZAS ESPECIALES DE FO.FO. YG.B.P. PIEZAS DE CONEXION Y/O REPARACIONINCLUYE: INSTALACION, PRUEBA HIDROSTATICAJUNTO CON TUBERIA Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

KG $9.85 $9.85 $9.85 $9.85 $9.85 $9.85 $9.85 $13.81 $9.93 $9.93 $9.93 $9.93 $9.93 $9.93 $9.93

Total Instalacion de Piezas Especiales

A1109 Instalacion de Valvulas Secccionamiento1109000013 INSTALACION DE VALVULAS DE SECCIONAMIENTO

DE 38 MM. (1 1/2") VASTAGO FIJO, INCLUYE:LIMPIEZA E INSTALACION DE LA PIEZA, ASI COMOPRUEBA HIDROSTATICA (JUNTO CON TUBERIA).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $68.35 $68.35 $68.35 $68.35 $68.35 $68.35 $68.35 $95.61 $68.74 $68.74 $68.74 $68.74 $68.74 $68.74 $68.74

1109000023 INSTALACION DE VALVULA DE SECCIONAMIENTODE 51 MM. (2") VASTAGO FIJO, INCLUYE: LIMPIEZA EINSTALACION DE LA PIEZA, ASI COMO PRUEBASHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $82.02 $82.02 $82.02 $82.02 $82.02 $82.02 $82.02 $114.73 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48

1109000033 INSTALACION DE VALVULA DE SECCIONAMIENTODE 63 MM. (2 1/2") VASTAGO FIJO, INCLUYE:LIMPIEZA E INSTALACION DE LA PIEZA, ASI COMOPRUEBA HIDROSTATICA (JUNTO CON TUBERIA).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $109.36 $109.36 $109.36 $109.36 $109.36 $109.36 $109.36 $152.98 $109.97 $109.97 $109.97 $109.97 $109.97 $109.97 $109.97

1109000043 INSTALACION DE VALVULAS DE SECCIONAMIENTODE 76 MM. (3") VASTAGO FIJO, INCLUYE: LIMPIEZA EINSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $150.38 $150.38 $150.38 $150.38 $150.38 $150.38 $150.38 $210.35 $151.22 $151.22 $151.22 $151.22 $151.22 $151.22 $151.22

:

Page 47: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 47 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1109000053 INSTALACION DE VALVULAS DE SECCIONAMIENTODE 102 MM. (4") VASTAGO FIJO, INCLUYE: LIMPIEZAE INSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $264.17 $264.17 $264.17 $264.17 $264.17 $264.17 $264.17 $360.78 $265.92 $265.92 $265.92 $265.92 $265.92 $265.92 $265.92

1109000063 INSTALACION DE VALVULA DE SECCIONAMIENTODE 152 MM. (6") VASTAGO FIJO, INCLUYE: LIMPIEZAE INSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $512.79 $512.79 $512.79 $512.79 $512.79 $512.79 $512.79 $700.34 $516.17 $516.17 $516.17 $516.17 $516.17 $516.17 $516.17

1109000073 INSTALACION DE VALVULA DE SECCIONAMIENTODE 203 MM. (8") VASTAGO FIJO, INCLUYE: LIMPIEZAE INSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $963.43 $963.43 $963.43 $963.43 $963.43 $963.43 $963.43 $1,315.79 $969.77 $969.77 $969.77 $969.77 $969.77 $969.77 $969.77

1109000083 INSTALACION DE VALVULA DE SECCIONAMIENTODE 254 MM. (10") VASTAGO FIJO, INCLUYE: LIMPIEZAE INSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $1,390.76 $1,390.76 $1,390.76 $1,390.76 $1,390.76 $1,390.76 $1,390.76 $1,899.40 $1,399.93 $1,399.93 $1,399.93 $1,399.93 $1,399.93 $1,399.93 $1,399.93

1109000093 INSTALACION DE VALVULA DE SECCIONAMIENTODE 305 MM. (12") VASTAGO FIJO, INCLUYE: LIMPIEZAE INSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $2,152.17 $2,152.17 $2,152.17 $2,152.17 $2,152.17 $2,152.17 $2,152.17 $2,939.29 $2,166.35 $2,166.35 $2,166.35 $2,166.35 $2,166.35 $2,166.35 $2,166.35

1109000103 INSTALACION DE VALVULA DE SECCIONAMIENTODE 356 MM. (14") VASTAGO FIJO, INCLUYE: LIMPIEZAE INSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $3,544.31 $3,544.31 $3,544.31 $3,544.31 $3,544.31 $3,544.31 $3,544.31 $4,842.07 $3,571.57 $3,571.57 $3,571.57 $3,571.57 $3,571.57 $3,571.57 $3,571.57

:

Page 48: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 48 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1109000113 INSTALACION DE VALVULA DE SECCIONAMIENTODE 406 MM. (16") VASTAGO FIJO, INCLUYE: LIMPIEZAE INSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $4,784.00 $4,784.00 $4,784.00 $4,784.00 $4,784.00 $4,784.00 $4,784.00 $6,535.66 $4,820.80 $4,820.80 $4,820.80 $4,820.80 $4,820.80 $4,820.80 $4,820.80

1109000123 INSTALACION DE VALVULA DE SECCIONAMIENTODE 456 MM. (18") VASTAGO FIJO, INCLUYE: LIMPIEZAE INSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $6,988.79 $6,988.79 $6,988.79 $6,988.79 $6,988.79 $6,988.79 $6,988.79 $9,547.76 $7,042.54 $7,042.54 $7,042.54 $7,042.54 $7,042.54 $7,042.54 $7,042.54

1109000133 INSTALACION DE VALVULA DE SECCIONAMIENTODE 508 MM. (20") VASTAGO FIJO, INCLUYE: LIMPIEZAE INSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $8,819.18 $8,819.18 $8,819.18 $8,819.18 $8,819.18 $8,819.18 $8,819.18 $12,048.36 $8,887.02 $8,887.02 $8,887.02 $8,887.02 $8,887.02 $8,887.02 $8,887.02

1109000143 INSTALACION DE VALVULA DE SECCIONAMIENTODE 610 MM. (24") VASTAGO FIJO, INCLUYE: LIMPIEZAE INSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $14,476.78 $14,476.78 $14,476.78 $14,476.78 $14,476.78 $14,476.78 $14,476.78 $19,777.51 $14,588.12 $14,588.12 $14,588.12 $14,588.12 $14,588.12 $14,588.12 $14,588.12

1109000153 INSTALACION DE VALVULA DE SECCIONAMIENTODE 760 MM. (30") VASTAGO FIJO, INCLUYE: LIMPIEZAE INSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $20,799.97 $20,799.97 $20,799.97 $20,799.97 $20,799.97 $20,799.97 $20,799.97 $28,415.95 $20,959.96 $20,959.96 $20,959.96 $20,959.96 $20,959.96 $20,959.96 $20,959.96

1109000200 INSTALACION DE VALVULAS DE SECCIONAMIENTODE 38 MM. (1 1/2") VASTAGO SALIENTE, INCLUYE:LIMPIEZA E INSTALACION DE LA PIEZA, ASI COMOPRUEBA HIDROSTATICA (JUNTO CON TUBERIA).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $102.53 $102.53 $102.53 $102.53 $102.53 $102.53 $102.53 $143.42 $103.10 $103.10 $103.10 $103.10 $103.10 $103.10 $103.10

:

Page 49: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 49 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1109000210 INSTALACION DE VALVULA DE SECCIONAMIENTODE 51 MM. (2") VASTAGO SALIENTE, INCLUYE:LIMPIEZA E INSTALACION DE LA PIEZA, ASI COMOPRUEBAS HIDROSTATICA (JUNTO CON TUBERIA).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $116.19 $116.19 $116.19 $116.19 $116.19 $116.19 $116.19 $162.54 $116.85 $116.85 $116.85 $116.85 $116.85 $116.85 $116.85

1109000220 INSTALACION DE VALVULA DE SECCIONAMIENTODE 63 MM. (2 1/2") VASTAGO SALIENTE, INCLUYE:LIMPIEZA E INSTALACION DE LA PIEZA, ASI COMOPRUEBA HIDROSTATICA (JUNTO CON TUBERIA).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $150.38 $150.38 $150.38 $150.38 $150.38 $150.38 $150.38 $210.35 $151.22 $151.22 $151.22 $151.22 $151.22 $151.22 $151.22

1109000230 INSTALACION DE VALVULAS DE SECCIONAMIENTODE 76 MM. (3") VASTAGO SALIENTE, INCLUYE:LIMPIEZA E INSTALACION DE LA PIEZA, ASI COMOPRUEBA HIDROSTATICA (JUNTO CON TUBERIA).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $184.55 $184.55 $184.55 $184.55 $184.55 $184.55 $184.55 $258.17 $185.58 $185.58 $185.58 $185.58 $185.58 $185.58 $185.58

1109000240 INSTALACION DE VALVULAS DE SECCIONAMIENTODE 102 MM. (4") VASTAGO SALIENTE, INCLUYE:LIMPIEZA E INSTALACION DE LA PIEZA, ASI COMOPRUEBA HIDROSTATICA (JUNTO CON TUBERIA).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $310.78 $310.78 $310.78 $310.78 $310.78 $310.78 $310.78 $424.45 $312.83 $312.83 $312.83 $312.83 $312.83 $312.83 $312.83

1109000250 INSTALACION DE VALVULA DE SECCIONAMIENTODE 152 MM. (6") VASTAGO SALIENTE, INCLUYE:LIMPIEZA E INSTALACION DE LA PIEZA, ASI COMOPRUEBA HIDROSTATICA (JUNTO CON TUBERIA).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $629.33 $629.33 $629.33 $629.33 $629.33 $629.33 $629.33 $859.51 $633.49 $633.49 $633.49 $633.49 $633.49 $633.49 $633.49

1109000260 INSTALACION DE VALVULA DE SECCIONAMIENTODE 203 MM. (8") DE DIAMETRO, INCLUYE: LIMPIEZAE INSTALACION DE LA PIEZA, ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $1,180.98 $1,180.98 $1,180.98 $1,180.98 $1,180.98 $1,180.98 $1,180.98 $1,612.91 $1,188.76 $1,188.76 $1,188.76 $1,188.76 $1,188.76 $1,188.76 $1,188.76

:

Page 50: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 50 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1109000270 INSTALACION DE VALVULA DE SECCIONAMIENTODE 254 MM. (10") VASTAGO SALIENTE, INCLUYE:LIMPIEZA E INSTALACION DE LA PIEZA, ASI COMOPRUEBA HIDROSTATICA (JUNTO CON TUBERIA).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,740.39 $1,740.39 $1,740.39 $1,740.39 $1,740.39 $1,740.39 $1,740.39 $2,376.91 $1,751.86 $1,751.86 $1,751.86 $1,751.86 $1,751.86 $1,751.86 $1,751.86

1109000280 INSTALACION DE VALVULA DE SECCIONAMIENTODE 305 MM. (12") VASTAGO SALIENTE, INCLUYE:LIMPIEZA E INSTALACION DE LA PIEZA, ASI COMOPRUEBA HIDROSTATICA (JUNTO CON TUBERIA).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,014.60 $3,014.60 $3,014.60 $3,014.60 $3,014.60 $3,014.60 $3,014.60 $4,117.14 $3,034.46 $3,034.46 $3,034.46 $3,034.46 $3,034.46 $3,034.46 $3,034.46

Total Instalacion de Valvulas Secc.

A1110 Instalacion de Valvulas Check1110000013 INSTALACION DE VALVULA CHECK DE 51 MM (2")

INCLUYE: LIMPIEZA E INSTALACION DE LAS PIEZAS,ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $82.02 $82.02 $82.02 $82.02 $82.02 $82.02 $82.02 $114.73 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48

1110000023 INSTALACION DE VALVULA CHECK DE 64 MM (2 1/2")DE DIAMETRO INCLUYE: LIMPIEZA E INSTALACIONDE LAS PIEZAS, ASI COMO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $123.04 $123.04 $123.04 $123.04 $123.04 $123.04 $123.04 $172.10 $123.73 $123.73 $123.73 $123.73 $123.73 $123.73 $123.73

1110000033 INSTALACION DE VALVULA CHECK DE 75 MM (3") DEDIAMETRO INCLUYE: LIMPIEZA E INSTALACION DELAS PIEZAS, ASI COMO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA) INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $164.05 $164.05 $164.05 $164.05 $164.05 $164.05 $164.05 $229.48 $164.96 $164.96 $164.96 $164.96 $164.96 $164.96 $164.96

1110000043 INSTALACION DE VALVULA CHECK DE 102 MM (4")DE DIAMETRO INCLUYE: LIMPIEZA E INSTALACIONDE LAS PIEZAS, ASI COMO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA) INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $341.87 $341.87 $341.87 $341.87 $341.87 $341.87 $341.87 $466.90 $344.11 $344.11 $344.11 $344.11 $344.11 $344.11 $344.11

:

Page 51: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 51 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1110000053 INSTALACION DE VALVULA CHECK DE 152 MM (6")DE DIAMETRO INCLUYE: LIMPIEZA E INSTALACIONDE LAS PIEZAS, ASI COMO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $512.79 $512.79 $512.79 $512.79 $512.79 $512.79 $512.79 $700.34 $516.17 $516.17 $516.17 $516.17 $516.17 $516.17 $516.17

1110000063 INSTALACION DE VALVULA CHECK DE 203 MM (8")DE DIAMETRO INCLUYE: LIMPIEZA E INSTALACIONDE LAS PIEZAS, ASI COMO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,087.74 $1,087.74 $1,087.74 $1,087.74 $1,087.74 $1,087.74 $1,087.74 $1,485.56 $1,094.92 $1,094.92 $1,094.92 $1,094.92 $1,094.92 $1,094.92 $1,094.92

1110000073 INSTALACION DE VALVULA CHECK DE 254 MM (10")DE DIAMETRO INCLUYE: LIMPIEZA E INSTALACIONDE LAS PIEZAS, ASI COMO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,616.07 $1,616.07 $1,616.07 $1,616.07 $1,616.07 $1,616.07 $1,616.07 $2,207.12 $1,626.73 $1,626.73 $1,626.73 $1,626.73 $1,626.73 $1,626.73 $1,626.73

1110000083 INSTALACION DE VALVULA CHECK DE 305 MM (12")DE DIAMETRO INCLUYE: LIMPIEZA E INSTALACIONDE LAS PIEZAS, ASI COMO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $2,214.32 $2,214.32 $2,214.32 $2,214.32 $2,214.32 $2,214.32 $2,214.32 $3,024.18 $2,228.93 $2,228.93 $2,228.93 $2,228.93 $2,228.93 $2,228.93 $2,228.93

Total Instalacion de Valvulas Check

A1112 Cajas para Operacion de Valvulas1112000013 CAJAS PARA OPERACION DE VALVULAS DE MURO

DE TABIQUE RECOCIDO JUNTEADO CON MORTEROCEMENTO-ARENA 1:3. CON TAPA DE CONCRETOF'c= 200 Kg/Cm2 DE 10Cm. ESPESOR. INCLUYE:PLANTILLA DE CONCRETO F'c= 100 Kg/CM2 DE 6CMESPESOR. PISO DE CONCRETO F'c= 150 Kg/CM2

Caja $1,503.25 $1,503.25 $1,503.25 $1,503.25 $1,503.25 $1,503.25 $1,503.25 $1,813.40 $1,508.52 $1,508.52 $1,508.52 $1,508.52 $1,508.52 $1,508.52 $1,508.52

DE 7 CM ESPESOR REFORZADO CON VARILLA No. 3A CADA 25 CM. AMBOS LADOS. APLANADOINTERIOR CON MORTERO CEMENTO-ARENA 1:3ACABADO PULIDO FINO. CIMBRA DE MADERA.(SEGUN PLANO TIPO V.C. 1958). CAJA CON TAPAPARA OPERACION DE VALVULA TIPO 1, DE 25 A 50MM. DE

DIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

:

Page 52: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 52 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1112000015 CAJAS PARA OPERACION DE VALVULAS DE MURODE TABICON JUNTEADO CON MORTERO CEMENTO-ARENA 1:3. CON TAPA DE CONCRETO F'c= 200Kg/Cm2 DE 10Cm. ESPESOR. INCLUYE: PLANTILLADE CONCRETO F'c= 100 Kg/CM2 DE 6CM ESPESOR.PISO DE CONCRETO F'c= 150 Kg/CM2 DE 7 CM

Caja $1,549.93 $1,549.93 $1,549.93 $1,549.93 $1,549.93 $1,549.93 $1,549.93 $1,867.73 $1,555.34 $1,555.34 $1,555.34 $1,555.34 $1,555.34 $1,555.34 $1,555.34

ESPESOR REFORZADO CON VARILLA No. 3 A CADA25 CM. AMBOS LADOS. APLANADO INTERIOR CONMORTERO CEMENTO-ARENA 1:3 ACABADO PULIDOFINO. CIMBRA DE MADERA. (SEGUN PLANO TIPOV.C. 1958). CAJA CON TAPA PARA OPERACION DEVALVULA TIPO 1, DE 25 A 50 MM. DE DIAM.

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1112000023 CAJAS PARA OPERACION DE VALVULAS DE MURODE TABIQUE RECOCIDO JUNTEADO CON MORTEROCEMENTO-ARENA 1:3. CON TAPA DE CONCRETOF'c= 200 Kg/Cm2 DE 10Cm. ESPESOR. INCLUYE:PLANTILLA DE CONCRETO F'c= 100 Kg/CM2 DE 6CMESPESOR. PISO DE CONCRETO F'c= 150 Kg/CM2

Caja $2,268.69 $2,268.69 $2,268.69 $2,268.69 $2,268.69 $2,268.69 $2,268.69 $2,715.56 $2,276.24 $2,276.24 $2,276.24 $2,276.24 $2,276.24 $2,276.24 $2,276.24

DE 7 CM ESPESOR REFORZADO CON VARILLA No. 3A CADA 25 CM. AMBOS LADOS. APLANADOINTERIOR CON MORTERO CEMENTO-ARENA 1:3ACABADO PULIDO FINO. CIMBRA DE MADERA.(SEGUN PLANO TIPO V.C. 1958).CAJA CON TAPAPARA OPERACION DE VALVULA TIPO 2, DE 60 A 75MM. DE

DIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1112000025 CAJAS PARA OPERACION DE VALVULAS DE MURODE TABICON JUNTEADO CON MORTERO CEMENTO-ARENA 1:3. CON TAPA DE CONCRETO F'c= 200Kg/Cm2 DE 10Cm. ESPESOR. INCLUYE: PLANTILLADE CONCRETO F'c= 100 Kg/CM2 DE 6CM ESPESOR.PISO DE CONCRETO F'c= 150 Kg/CM2 DE 7 CM

Caja $2,359.82 $2,359.82 $2,359.82 $2,359.82 $2,359.82 $2,359.82 $2,359.82 $2,821.63 $2,367.65 $2,367.65 $2,367.65 $2,367.65 $2,367.65 $2,367.65 $2,367.65

:

Page 53: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 53 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

ESPESOR REFORZADO CON VARILLA No. 3 A CADA25 CM. AMBOS LADOS. APLANADO INTERIOR CONMORTERO CEMENTO-ARENA 1:3 ACABADO PULIDOFINO. CIMBRA DE MADERA. (SEGUN PLANO TIPOV.C. 1958).CAJA CON TAPA PARA OPERACION DEVALVULA TIPO 2, DE 60 A 75 MM. DE DIAM.

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1112000033 CAJAS PARA OPERACION DE VALVULAS DE MURODE TABIQUE RECOCIDO JUNTEADO CON MORTEROCEMENTO-ARENA 1:3. CON TAPA DE CONCRETOF'c= 200 Kg/Cm2 DE 10Cm. ESPESOR. INCLUYE:PLANTILLA DE CONCRETO F'c= 100 Kg/CM2 DE 6CMESPESOR. PISO DE CONCRETO F'c= 150 Kg/CM2

Caja $2,588.46 $2,588.46 $2,588.46 $2,588.46 $2,588.46 $2,588.46 $2,588.46 $3,105.09 $2,597.19 $2,597.19 $2,597.19 $2,597.19 $2,597.19 $2,597.19 $2,597.19

DE 7 CM ESPESOR REFORZADO CON VARILLA No. 3A CADA 25 CM. AMBOS LADOS. APLANADOINTERIOR CON MORTERO CEMENTO-ARENA 1:3ACABADO PULIDO FINO. CIMBRA DE MADERA.(SEGUN PLANO TIPO V.C. 1958).CAJA CON TAPAPARA OPERACION DE VALVULA TIPO 3, DE 100 A 150MM. DE

DIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1112000035 CAJAS PARA OPERACION DE VALVULAS DEMURO DE TABICON JUNTEADO CON MORTEROCEMENTO-ARENA 1:3. CON TAPA DE CONCRETOF'c= 200 Kg/Cm2 DE 10Cm. ESPESOR. INCLUYE:PLANTILLA DE CONCRETO F'c= 100 Kg/CM2 DE 6CMESPESOR. PISO DE CONCRETO F'c= 150 Kg/CM2 DE7 CM

Caja $2,692.93 $2,692.93 $2,692.93 $2,692.93 $2,692.93 $2,692.93 $2,692.93 $3,226.68 $2,702.00 $2,702.00 $2,702.00 $2,702.00 $2,702.00 $2,702.00 $2,702.00

ESPESOR REFORZADO CON VARILLA No. 3 A CADA25 CM. AMBOS LADOS. APLANADO INTERIOR CONMORTERO CEMENTO-ARENA 1:3 ACABADO PULIDOFINO. CIMBRA DE MADERA. (SEGUN PLANO TIPOV.C. 1958).CAJA CON TAPA PARA OPERACION DEVALVULA TIPO 3, DE 100 A 150 MM. DE DIAM.

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

:

Page 54: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 54 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1112000043 CAJAS PARA OPERACION DE VALVULAS DEMURO DE TABIQUE RECOCIDO CON MORTEROCEMENTO-ARENA 1:3. CON TAPA DE CONCRETOF'c= 200 Kg/Cm2 DE 10Cm. ESPESOR. INCLUYE:PLANTILLA DE CONCRETO F'c= 100 Kg/CM2 DE 6CMESPESOR. PISO DE CONCRETO F'c= 150 Kg/CM2 DE7 CM

Caja $2,719.46 $2,719.46 $2,719.46 $2,719.46 $2,719.46 $2,719.46 $2,719.46 $3,264.64 $2,728.68 $2,728.68 $2,728.68 $2,728.68 $2,728.68 $2,728.68 $2,728.68

ESPESOR REFORZADO CON VARILLA No. 3 A CADA25 CM. AMBOS LADOS. APLANADO INTERIOR CONMORTERO CEMENTO-ARENA 1:3 ACABADO PULIDOFINO. CIMBRA DE MADERA. (SEGUN PLANO TIPOV.C. 1958).CAJA CON TAPA PARA OPERACION DEVALVULA TIPO 4, DE 200 MM. DE DIAM. INCLUYE

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1112000045 CAJAS PARA OPERACION DE VALVULAS DEMURO DE TABICON JUNTEADO CON MORTEROCEMENTO-ARENA 1:3. CON TAPA DE CONCRETOF'c= 200 Kg/Cm2 DE 10Cm. ESPESOR. INCLUYE:PLANTILLA DE CONCRETO F'c= 100 Kg/CM2 DE 6CMESPESOR. PISO DE CONCRETO F'c= 150 Kg/CM2 DE7 CM

Caja $2,835.04 $2,835.04 $2,835.04 $2,835.04 $2,835.04 $2,835.04 $2,835.04 $3,399.17 $2,844.63 $2,844.63 $2,844.63 $2,844.63 $2,844.63 $2,844.63 $2,844.63

ESPESOR REFORZADO CON VARILLA No. 3 A CADA25 CM. AMBOS LADOS. APLANADO INTERIOR CONMORTERO CEMENTO-ARENA 1:3 ACABADO PULIDOFINO. CIMBRA DE MADERA. (SEGUN PLANO TIPOV.C. 1958).CAJA CON TAPA PARA OPERACION DEVALVULA TIPO 4, DE 200 MM. DE DIAM. INCLUYE

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

Total Cajas para OPeracion de Valvulas

A1113 Instalacion de Contramarcos y Tomas Domiciliarias1113000012 INSTALACION DE CONTRAMARCO SENCILLO

CENTRADO O DESCENTRADO DE 0.80 M. CONCANAL DE PERALTE R DE 10.16CM (4").INCLUYE:MANO DE OBRA Y HERRAMIENTA MENOR. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $168.82 $168.82 $168.82 $168.82 $168.82 $168.82 $168.82 $236.37 $169.96 $169.96 $169.96 $169.96 $169.96 $169.96 $169.96

:

Page 55: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 55 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1113000013 INSTALACION DE CONTRAMARCO SENCILLOCENTRADO O DESCENTRADO DE 0.90 M. CONCANAL DE PERALTE R DE 10.16CM (4"). INCLUYE:MANO DE OBRA Y HERRAMIENTA MENOR. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $168.82 $168.82 $168.82 $168.82 $168.82 $168.82 $168.82 $236.37 $169.96 $169.96 $169.96 $169.96 $169.96 $169.96 $169.96

1113000014 INSTALACION DE CONTRAMARCO SENCILLOCENTRADO O DESCENTRADO DE 1.05 M. CONCANAL DE PERALTE R DE 10.16CM (4"). INCLUYE:MANO DE OBRA Y HERRAMIENTA MENOR. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $168.82 $168.82 $168.82 $168.82 $168.82 $168.82 $168.82 $236.37 $169.96 $169.96 $169.96 $169.96 $169.96 $169.96 $169.96

1113000023 INSTALACION DE CONTRAMARCO SENCILLOCENTRADO O DESCENTRADO DE 1.10 M. CONCANAL DE PERALTE R DE 10.16CM (4"). INCLUYE:MANO DE OBRA Y HERRAMIENTA MENOR. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $168.82 $168.82 $168.82 $168.82 $168.82 $168.82 $168.82 $236.37 $169.96 $169.96 $169.96 $169.96 $169.96 $169.96 $169.96

1113000033 INSTALACION DE CONTRAMARCO SENCILLOCENTRADO O DESCENTRADO DE 1.30M. CONCANAL DE PERALTE R DE 10.16CM (4"). INCLUYE:MANO DE OBRA Y HERRAMIENTA MENOR. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $168.82 $168.82 $168.82 $168.82 $168.82 $168.82 $168.82 $236.37 $169.96 $169.96 $169.96 $169.96 $169.96 $169.96 $169.96

1113000043 INSTALACION DE CONTRAMARCO SENCILLOCENTRADO O DESCENTRADO DE 1.40 M. CONCANAL DE PERALTE R DE 10.16CM (4"). INCLUYE:MANO DE OBRA Y HERRAMIENTA MENOR. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $168.82 $168.82 $168.82 $168.82 $168.82 $168.82 $168.82 $236.37 $169.96 $169.96 $169.96 $169.96 $169.96 $169.96 $169.96

1113000053 INSTALACION DE CONTRAMARCO SENCILLOCENTRADO O DESCENTRADO DE 1.80 M. CONCANAL DE PERALTE R DE 10.16CM (4"). INCLUYE:MANO DE OBRA Y HERRAMIENTA MENOR. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $181.95 $181.95 $181.95 $181.95 $181.95 $181.95 $181.95 $254.77 $183.19 $183.19 $183.19 $183.19 $183.19 $183.19 $183.19

:

Page 56: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 56 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1113000063 INSTALACION DE CONTRAMARCO SENCILLOCENTRADO O DESCENTRADO DE 2.10M. CONCANAL DE PERALTE R DE 10.16CM (4"). INCLUYE:MANO DE OBRA Y HERRAMIENTA MENOR. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $204.70 $204.70 $204.70 $204.70 $204.70 $204.70 $204.70 $286.59 $206.09 $206.09 $206.09 $206.09 $206.09 $206.09 $206.09

1113000072 INSTALACION DE CONTRAMARCO DOBLE DE 1.40 M.CON CANAL DE PERALTE R DE 10.16CM (4").INCLUYE: MANO DE OBRA Y HERRAMIENTA MENOR.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $210.84 $210.84 $210.84 $210.84 $210.84 $210.84 $210.84 $295.19 $212.28 $212.28 $212.28 $212.28 $212.28 $212.28 $212.28

1113000073 INSTALACION DE CONTRAMARCO DOBLE DE 1.80 M.CON CANAL DE PERALTE R DE 10.16CM (4").INCLUYE: MANO DE OBRA Y HERRAMIENTA MENOR.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $210.84 $210.84 $210.84 $210.84 $210.84 $210.84 $210.84 $295.19 $212.28 $212.28 $212.28 $212.28 $212.28 $212.28 $212.28

1113000074 INSTALACION DE CONTRAMARCO DOBLE DE 2.10 M.CON CANAL DE PERALTE R DE 10.16CM (4").INCLUYE: MANO DE OBRA Y HERRAMIENTA MENOR.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $272.93 $272.93 $272.93 $272.93 $272.93 $272.93 $272.93 $382.12 $274.77 $274.77 $274.77 $274.77 $274.77 $274.77 $274.77

1113000075 INSTALACION DE CONTRAMARCO DOBLE DE 1.80 M.CON CANAL DE PERALTE R DE 15.24CM (6").INCLUYE: MANO DE OBRA Y HERRAMIENTA MENOR.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $327.50 $327.50 $327.50 $327.50 $327.50 $327.50 $327.50 $458.55 $329.75 $329.75 $329.75 $329.75 $329.75 $329.75 $329.75

1113000076 INSTALACION DE CONTRAMARCO DOBLE DE 2.10 M.CON CANAL DE PERALTE R DE 15.24CM (6").INCLUYE: MANO DE OBRA Y HERRAMIENTA MENOR.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $327.50 $327.50 $327.50 $327.50 $327.50 $327.50 $327.50 $458.55 $329.75 $329.75 $329.75 $329.75 $329.75 $329.75 $329.75

1113000083 INSTALACION DE CONTRAMARCO SENCILLOCENTRADO O DESCENTRADO DE 1.40 M. CONCANAL DE PERALTE R DE 15.24CM (6"). INCLUYE:MANO DE OBRA Y HERRAMIENTA MENOR. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $292.41 $292.41 $292.41 $292.41 $292.41 $292.41 $292.41 $409.43 $294.41 $294.41 $294.41 $294.41 $294.41 $294.41 $294.41

:

Page 57: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 57 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1113000084 INSTALACION DE CONTRAMARCO SENCILLOCENTRADO O DESCENTRADO DE 1.80 M. CONCANAL DE PERALTE R DE 15.24CM (6"). INCLUYE:MANO DE OBRA Y HERRAMIENTA MENOR. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $327.50 $327.50 $327.50 $327.50 $327.50 $327.50 $327.50 $458.55 $329.75 $329.75 $329.75 $329.75 $329.75 $329.75 $329.75

1113000085 INSTALACION DE CONTRAMARCO SENCILLOCENTRADO O DESCENTRADO DE 2.10 M. CONCANAL DE PERALTE R DE 15.24CM (6"). INCLUYE:MANO DE OBRA Y HERRAMIENTA MENOR. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $327.50 $327.50 $327.50 $327.50 $327.50 $327.50 $327.50 $458.55 $329.75 $329.75 $329.75 $329.75 $329.75 $329.75 $329.75

1113000093 INSTALACION DE MARCO CON TAPA PARA CAJA DEVALVULA TIPO ESTANDAR (75 KG) INCLUYE: MANODE OBRA Y HERRAMIENTA MENOR. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $204.70 $204.70 $204.70 $204.70 $204.70 $204.70 $204.70 $286.59 $206.09 $206.09 $206.09 $206.09 $206.09 $206.09 $206.09

1113000094 INSTALACION DE MARCO CON TAPA PARA CAJA DEVALVULA TIPO PESADO (110 KG) INCLUYE: MANODE OBRA Y HERRAMIENTA MENOR. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $327.50 $327.50 $327.50 $327.50 $327.50 $327.50 $327.50 $458.55 $329.75 $329.75 $329.75 $329.75 $329.75 $329.75 $329.75

1113000095 INSTALACION DE MARCO CON TAPA PARA CAJA DEVALVULA TIPO PESADO (130 KG) INCLUYE: MANODE OBRA Y HERRAMIENTA MENOR. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $409.39 $409.39 $409.39 $409.39 $409.39 $409.39 $409.39 $573.20 $412.18 $412.18 $412.18 $412.18 $412.18 $412.18 $412.18

1113000096 INSTALACION DE MARCO CON TAPA PARA CAJA DEVALVULA TIPO PESADO (122 KG) INCLUYE: MANODE OBRA Y HERRAMIENTA MENOR. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $409.39 $409.39 $409.39 $409.39 $409.39 $409.39 $409.39 $573.20 $412.18 $412.18 $412.18 $412.18 $412.18 $412.18 $412.18

1114000013 INSTALACION DE TOMAS DOMICILIARIAS DE 13 MM(1/2") DE DIAMETRO TIPO 2 DE COBRE FLEXIBLE YCOBRE RIGIDO (V.C.1362).. INCLUYE: MANO DEOBRA, HERRAMIENTA MENOR Y PRUEBAS. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $204.70 $204.70 $204.70 $204.70 $204.70 $204.70 $204.70 $286.59 $206.09 $206.09 $206.09 $206.09 $206.09 $206.09 $206.09

:

Page 58: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 58 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1114000023 INSTALACION DE TOMAS DOMICILIARIAS DE 13 MM(1/2") DE DIAMETRO TIPO 4-C DE PLASTICOFLEXIBLE Y FIERRO GALVANIZADO (V.C. 1975).INCLUYE: MANO DE OBRA, HERRAMIENTA MENOR YPRUEBAS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $181.95 $181.95 $181.95 $181.95 $181.95 $181.95 $181.95 $254.77 $183.19 $183.19 $183.19 $183.19 $183.19 $183.19 $183.19

1114000033 INSTALACION DE TOMAS DOMICILIARIAS DE 13 MM(1/2") DE DIAMETRO TIPO 5 DE COBRE FLEXIBLE YFIERRO GALVANIZADO (V.C.2065). INCLUYE: MANODE OBRA, HERRAMIENTA MENOR Y PRUEBAS.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $233.94 $233.94 $233.94 $233.94 $233.94 $233.94 $233.94 $327.55 $235.53 $235.53 $235.53 $235.53 $235.53 $235.53 $235.53

Total Instalcion de Contramarcos y Tomas Domic

A1115 Instalacion de Tuberia Fierro Galvanizado1115000013 INSTALACION Y PRUEBA DE TUBERIA DE FIERRO

GALVANIZADO DE 13 MM. (1/2") DE DIAMETRO,INCLUYE: MANO DE OBRA, FLETES Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $10.39 $10.39 $10.39 $10.39 $10.39 $10.39 $10.39 $13.93 $10.45 $10.45 $10.45 $10.45 $10.45 $10.45 $10.45

1115000023 INSTALACION Y PRUEBA DE TUBERIA DE FIERROGALVANIZADO DE 19 MM. (3/4") DE DIAMETRO,INCLUYE: MANO DE OBRA, FLETES Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $14.51 $14.51 $14.51 $14.51 $14.51 $14.51 $14.51 $19.75 $14.60 $14.60 $14.60 $14.60 $14.60 $14.60 $14.60

1115000033 INSTALACION Y PRUEBA DE TUBERIA DE FIERROGALVANIZADO DE 25 MM. (1") DE DIAMETRO,INCLUYE: MANO DE OBRA, FLETES Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $16.47 $16.47 $16.47 $16.47 $16.47 $16.47 $16.47 $22.45 $16.59 $16.59 $16.59 $16.59 $16.59 $16.59 $16.59

1115000043 INSTALACION Y PRUEBA DE TUBERIA DE FIERROGALVANIZADO DE 32 MM. (1 1/4") DE DIAMETRO,INCLUYE: MANO DE OBRA, FLETES Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $18.85 $18.85 $18.85 $18.85 $18.85 $18.85 $18.85 $25.66 $18.97 $18.97 $18.97 $18.97 $18.97 $18.97 $18.97

:

Page 59: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 59 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1115000053 INSTALACION Y PRUEBA DE TUBERIA DE FIERROGALVANIZADO DE 38 MM. (1 1/2") DE DIAMETRO,INCLUYE: MANO DE OBRA, FLETES Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $22.87 $22.87 $22.87 $22.87 $22.87 $22.87 $22.87 $30.97 $23.00 $23.00 $23.00 $23.00 $23.00 $23.00 $23.00

1115000063 INSTALACION Y PRUEBA DE TUBERIA DE FIERROGALVANIZADO DE 51 MM. (2") DE DIAMETRO,INCLUYE: MANO DE OBRA, FLETES Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $32.72 $32.72 $32.72 $32.72 $32.72 $32.72 $32.72 $44.40 $32.95 $32.95 $32.95 $32.95 $32.95 $32.95 $32.95

1115000073 INSTALACION Y PRUEBA DE TUBERIA DE FIERROGALVANIZADO DE 64 MM. (2 1/2") DE DIAMETRO,INCLUYE: MANO DE OBRA, FLETES Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $40.52 $40.52 $40.52 $40.52 $40.52 $40.52 $40.52 $54.99 $40.77 $40.77 $40.77 $40.77 $40.77 $40.77 $40.77

1115000083 INSTALACION Y PRUEBA DE TUBERIA DE FIERROGALVANIZADO DE 76 MM. (3") DE DIAMETRO,INCLUYE: MANO DE OBRA, FLETES Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $53.65 $53.65 $53.65 $53.65 $53.65 $53.65 $53.65 $72.90 $54.01 $54.01 $54.01 $54.01 $54.01 $54.01 $54.01

1115000093 INSTALACION Y PRUEBA DE TUBERIA DE FIERROGALVANIZADO DE 102 MM. (4") DE DIAMETRO,INCLUYE: MANO DE OBRA, FLETES Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $76.40 $76.40 $76.40 $76.40 $76.40 $76.40 $76.40 $103.75 $76.92 $76.92 $76.92 $76.92 $76.92 $76.92 $76.92

1115000103 INSTALACION DE PIEZAS ESPECIALES DE FIERROGALVANIZADO, INCLUYE: MANO DE OBRA, FLETES,MANIOBRAS LOCALES Y PRUEBAS. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

Kg $14.56 $14.56 $14.56 $14.56 $14.56 $14.56 $14.56 $20.40 $14.66 $14.66 $14.66 $14.66 $14.66 $14.66 $14.66

Total Instalacion de Tuberia Fierro Galvanizad

A1116 Instalacion de Tuberia Acero Soldable1116000013 INSTALACION DE TUBERIA DE ACERO SOLDABLE DE

6" DE DIAMETRO Y 1/4" DE ESPESOR INCLUYE:PRESENTACION, ALINEACION, CORTE, BISELADO YSOLDADURA, INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

Junta $285.38 $285.38 $285.38 $285.38 $285.38 $285.38 $285.38 $347.40 $286.57 $286.57 $286.57 $286.57 $286.57 $286.57 $286.57

:

Page 60: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 60 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1116000014 INSTALACION DE TUBERIA DE ACERO SOLDABLE DE 8" DE DIAMETRO Y 1/4" DE ESPESOR INCLUYE:PRESENTACION, ALINEACION, CORTE, BISELADO YSOLDADURA, INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

Junta $356.99 $356.99 $356.99 $356.99 $356.99 $356.99 $356.99 $429.59 $358.35 $358.35 $358.35 $358.35 $358.35 $358.35 $358.35

1116000015 INSTALACION DE TUBERIA DE ACERO SOLDABLE DE 10" DE DIAMETRO Y 1/4" DE ESPESOR INCLUYE:PRESENTACION, ALINEACION, CORTE, BISELADO YSOLDADURA.INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

Junta $364.15 $364.15 $364.15 $364.15 $364.15 $364.15 $364.15 $424.64 $365.28 $365.28 $365.28 $365.28 $365.28 $365.28 $365.28

1116000016 INSTALACION DE TUBERIA DE ACERO SOLDABLE DE 12" DE DIAMETRO Y 1/4" DE ESPESOR INCLUYE:PRESENTACION, ALINEACION, CORTE, BISELADO YSOLDADURA. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

Junta $465.75 $465.75 $465.75 $465.75 $465.75 $465.75 $465.75 $548.64 $467.30 $467.30 $467.30 $467.30 $467.30 $467.30 $467.30

1116000017 INSTALACION DE TUBERIA DE ACERO SOLDABLE DE 14" DE DIAMETRO Y 1/4" DE ESPESOR INCLUYE:PRESENTACION, ALINEACION, CORTE, BISELADO, YSOLDADURA. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

Junta $594.12 $594.12 $594.12 $594.12 $594.12 $594.12 $594.12 $708.97 $596.28 $596.28 $596.28 $596.28 $596.28 $596.28 $596.28

1116000018 INSTALACION DE TUBERIA DE ACERO SOLDABLE DE 16" DE DIAMETRO Y 1/4" DE ESPESOR INCLUYE:PRESENTACION, ALINEACION, CORTE, BISELADO, YSOLDADURA, INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

Junta $747.57 $747.57 $747.57 $747.57 $747.57 $747.57 $747.57 $903.86 $750.50 $750.50 $750.50 $750.50 $750.50 $750.50 $750.50

1116000019 INSTALACION DE TUBERIA DE ACERO SOLDABLE DE 18" DE DIAMETRO Y 1/4" DE ESPESOR INCLUYE:PRESENTACION, ALINEACION, CORTE, BISELADO, YSOLDADURA, INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

Junta $927.02 $927.02 $927.02 $927.02 $927.02 $927.02 $927.02 $1,134.30 $930.93 $930.93 $930.93 $930.93 $930.93 $930.93 $930.93

1116000023 INSTALACION DE TUBERIA DE ACERO SOLDABLE DE 6" DE DIAMETRO Y 1/4" DE ESPESOR, INCLUYE:PRESENTACION, CORTE, BISELADO, ALINEACION,SOLDADURA EN JUNTA( FONDEO, PASO CALIENTE YCORDON DE VISTA); FLETES Y ACARREOS DETODOS LOS MATERIALES, MANIOBRAS LOCALES

M $83.69 $83.69 $83.69 $83.69 $83.69 $83.69 $83.69 $96.38 $83.93 $83.93 $83.93 $83.93 $83.93 $83.93 $83.93

:

Page 61: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 61 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

Y TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1116000033 INSTALACION DE TUBERIA DE ACERO SOLDABLE DE 8" DE DIAMETRO Y 1/4" DE ESPESOR, INCLUYE:PRESENTACION, CORTE, BISELADO, ALINEACION,SOLDADURA EN JUNTA( FONDEO, PASO CALIENTE YCORDON DE VISTA); FLETES Y ACARREOS DETODOS LOS MATERIALES, MANIOBRAS LOCALES

M $116.52 $116.52 $116.52 $116.52 $116.52 $116.52 $116.52 $132.38 $116.83 $116.83 $116.83 $116.83 $116.83 $116.83 $116.83

Y TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

1116000043 INSTALACION DE TUBERIA DE ACERO SOLDABLE DE 10" DE DIAMETRO Y 1/4" DE ESPESOR, INCLUYE:PRESENTACION, CORTE, BISELADO, ALINEACION,SOLDADURA EN JUNTA( FONDEO, PASO CALIENTE YCORDON DE VISTA); FLETES Y ACARREOS DETODOS LOS MATERIALES, MANIOBRAS

M $134.69 $134.69 $134.69 $134.69 $134.69 $134.69 $134.69 $153.34 $135.04 $135.04 $135.04 $135.04 $135.04 $135.04 $135.04

LOCALES Y TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1116000053 INSTALACION DE TUBERIA DE ACERO SOLDABLE DE 12" DE DIA METRO Y 1/4" DE ESPESOR, INCLUYE:PRESENTACION, CORTE, BISELADO, ALINEACION,SOLDADURA EN JUNTA( FONDEO, PASO CALIENTE YCORDON DE VISTA); FLETES Y ACARREOS DETODOS LOS MATERIALES, MANIOBRAS

M $158.33 $158.33 $158.33 $158.33 $158.33 $158.33 $158.33 $179.47 $158.74 $158.74 $158.74 $158.74 $158.74 $158.74 $158.74

LOCALES Y TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1116000063 CORTE Y BISELADO DE TUBERIA DE ACEROSOLDABLE DE 6" DE DIAMETRO Y 1/4" DE ESPESOR,INCLUYE: MATERIALES, MANO DE OBRA Y EQUIPO,ASI COMO EL MANEJO DE PIEZAS A TRATAR.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $32.07 $32.07 $32.07 $32.07 $32.07 $32.07 $32.07 $42.64 $32.26 $32.26 $32.26 $32.26 $32.26 $32.26 $32.26

1116000073 CORTE Y BISELADO DE TUBERIA DE ACEROSOLDABLE DE 8" DE DIAMETRO Y 1/4" DE ESPESOR,INCLUYE: TODOS LOS MATERIALES, MANO DE OBRA Y EQUIPO, ASI COMO EL MANEJO DE PIEZAS ATRATAR. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $40.35 $40.35 $40.35 $40.35 $40.35 $40.35 $40.35 $53.04 $40.59 $40.59 $40.59 $40.59 $40.59 $40.59 $40.59

:

Page 62: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 62 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1116000083 CORTE Y BISELADO DE TUBERIA DE ACEROSOLDABLE DE 10" DE DIAMETRO Y 1/4" DEESPESOR, INCLUYE: TODOS LOS MATERIALES,MANO DE OBRA Y EQUIPO, ASI COMO EL MANEJODE PIEZAS A TRATAR. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $50.45 $50.45 $50.45 $50.45 $50.45 $50.45 $50.45 $66.30 $50.75 $50.75 $50.75 $50.75 $50.75 $50.75 $50.75

1116000093 CORTE Y BISELADO DE TUBERIA DE ACEROSOLDABLE, DE 12" DE DIAMETRO Y 1/4" DEESPESOR, INCLUYE: TODOS LOS MATERIALES,MANO DE OBRA Y EQUIPO, ASI COMO EL MA NEJODE PIEZAS A TRATAR. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $66.34 $66.34 $66.34 $66.34 $66.34 $66.34 $66.34 $87.47 $66.74 $66.74 $66.74 $66.74 $66.74 $66.74 $66.74

1116000233 SUMINISTRO Y COLOCACION DE PINTURAANTICORROSIVA MCA. COMEX O SIMILAR ENCALIDAD Y COSTO APLICADA SOBRE TUBERIA DEACERO Y PIEZAS ESPECIALES, INCL.: LIMPIEZACON CEPILLO DE ACERO, MATERIALES, MANO DEOBRA Y HERRAMIENTA MENOR. INCLUYE TODO LO

M2 $70.03 $70.03 $70.03 $70.03 $70.03 $70.03 $70.03 $90.52 $70.39 $70.39 $70.39 $70.39 $70.39 $70.39 $70.39

NECESARIO PARA SU CORRECTA EJECUCION.

Total Instalacion de Tuberia Acero Soldable

A1117 Instalacion de Piezas Especiales de PVC1117000010 INSTALACION, JUNTEO Y PRUEBA PARA PIEZAS

ESPECIALES DE P.V.C. DE 13MM A 32 MM. (1/2" A 11/4" ) DE DIAMETRO, INCLUYE: COLOCACION DELLUBRICANTE Y ANILLOS DE HULE, MANO DE OBRA,HERRAMIENTA MENOR. BAJADA DE MATERIAL,EQUIPO PARA PRUEBA Y MANIOBRAS

PZA $13.65 $13.65 $13.65 $13.65 $13.65 $13.65 $13.65 $19.10 $13.73 $13.73 $13.73 $13.73 $13.73 $13.73 $13.73

LOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1117000013 INSTALACION, JUNTEO Y PRUEBA PARA PIEZASESPECIALES DE P.V.C. Y ABRAZADERAS PARATOMAS DOMICILIARIAS DE 38MM A 100 MM. (1 1/2"A 4" ) DE DIAMETRO, INCLUYE: COLOCACION DELLUBRICANTE Y ANILLOS DE HULE, MANO DE OBRA,HERRAMIENTA MENOR. BAJADA DE

PZA $40.94 $40.94 $40.94 $40.94 $40.94 $40.94 $40.94 $57.31 $41.21 $41.21 $41.21 $41.21 $41.21 $41.21 $41.21

:

Page 63: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 63 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

MATERIAL, EQUIPO PARA PRUEBA Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1117000023 INSTALACION, JUNTEO Y PRUEBA PARA PIEZASESPECIALES DE PVC Y ABRAZADERAS PARA TOMASDOMICILIARIAS DE 150MM A 250 MM. (6" A 10" ) DEDIAMETRO, INCLUYE: COLOCACION DELLUBRICANTE Y ANILLOS DE HULE, MANO DE OBRA,HERRAMIENTA MENOR. BAJADA DE MATERIAL,

PZA $54.58 $54.58 $54.58 $54.58 $54.58 $54.58 $54.58 $76.42 $54.95 $54.95 $54.95 $54.95 $54.95 $54.95 $54.95

EQUIPO PARA PRUEBA Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1117000033 INSTALACION, JUNTEO Y PRUEBA PARA PIEZASESPECIALES DE P.V.C. DE 305MM A 355MM (12" A14" ) DE DIAMETRO, INCLUYE: COLOCACION DELLUBRICANTE Y ANILLOS DE HULE, MANO DE OBRA,HERRAMIENTA MENOR. BAJADA DE MATERIAL,EQUIPO PARA PRUEBA Y MANIOBRAS LOCALES.

PZA $81.87 $81.87 $81.87 $81.87 $81.87 $81.87 $81.87 $114.64 $82.45 $82.45 $82.45 $82.45 $82.45 $82.45 $82.45

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Total Instalacion de Piezas Especiales de PVC

A1121 Sum. e Inst. Tuberia pvc Hidraulico y Sanitario

A112101 Sum. e Inst. de Tuberia PVC Hidraulico1121000013 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DE

TUBERIA P.V.C., CON CAMPANA DE 13 MM. (1/2") DEDIAMETRO, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

M $18.42 $18.42 $18.42 $18.42 $18.42 $18.42 $18.42 $22.24 $18.50 $18.50 $18.50 $18.50 $18.50 $18.50 $18.50

EJECUCION.

1121000023 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 19 MM. (3/4") DEDIAMETRO, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

M $18.97 $18.97 $18.97 $18.97 $18.97 $18.97 $18.97 $22.78 $19.04 $19.04 $19.04 $19.04 $19.04 $19.04 $19.04

EJECUCION.

:

Page 64: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 64 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1121000033 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 25 MM. (1") DEDIAMETRO RD-26, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBAS, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $22.05 $22.05 $22.05 $22.05 $22.05 $22.05 $22.05 $25.90 $22.09 $22.09 $22.09 $22.09 $22.09 $22.09 $22.09

EJECUCION.

1121000043 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 32 MM. (1 1/4")DE DIAMETRO RD-26, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBA, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $25.62 $25.62 $25.62 $25.62 $25.62 $25.62 $25.62 $29.66 $25.67 $25.67 $25.67 $25.67 $25.67 $25.67 $25.67

EJECUCION.

1121000053 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 38 MM. (1 1/2")DE DIAMETRO RD-26, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBA, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $27.47 $27.47 $27.47 $27.47 $27.47 $27.47 $27.47 $31.69 $27.54 $27.54 $27.54 $27.54 $27.54 $27.54 $27.54

EJECUCION.

1121000063 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 50 MM. (2") DEDIAMETRO RD-26, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBA, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $34.89 $34.89 $34.89 $34.89 $34.89 $34.89 $34.89 $39.43 $34.98 $34.98 $34.98 $34.98 $34.98 $34.98 $34.98

EJECUCION.

1121000073 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 63 MM. (2 1/2")DE DIAMETRO RD-26, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBA, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $46.27 $46.27 $46.27 $46.27 $46.27 $46.27 $46.27 $51.12 $46.35 $46.35 $46.35 $46.35 $46.35 $46.35 $46.35

EJECUCION.

:

Page 65: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 65 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1121000083 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 63 MM. (2 1/2")DE DIAMETRO RD-32.5, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBA, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SU

M $37.96 $37.96 $37.96 $37.96 $37.96 $37.96 $37.96 $42.82 $38.04 $38.04 $38.04 $38.04 $38.04 $38.04 $38.04

CORRECTA EJECUCION.

1121000093 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 75 MM. (3") DEDIAMETRO RD-26, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBA, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $71.11 $71.11 $71.11 $71.11 $71.11 $71.11 $71.11 $76.68 $71.24 $71.24 $71.24 $71.24 $71.24 $71.24 $71.24

EJECUCION.

1121000103 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 75 MM. (3") DEDIAMETRO RD-32.5, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBA, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $52.12 $52.12 $52.12 $52.12 $52.12 $52.12 $52.12 $57.67 $52.25 $52.25 $52.25 $52.25 $52.25 $52.25 $52.25

EJECUCION.

1121000113 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 100 MM. (4") DEDIAMETRO RD-26, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBA, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $105.07 $105.07 $105.07 $105.07 $105.07 $105.07 $105.07 $111.41 $105.21 $105.21 $105.21 $105.21 $105.21 $105.21 $105.21

EJECUCION.

1121000123 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 100 MM. (4") DEDIAMETRO RD-32.5, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBAS, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $77.07 $77.07 $77.07 $77.07 $77.07 $77.07 $77.07 $83.42 $77.22 $77.22 $77.22 $77.22 $77.22 $77.22 $77.22

EJECUCION.

:

Page 66: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 66 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1121000133 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 100 MM. (4") DEDIAMETRO RD-41, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBAS, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $66.72 $66.72 $66.72 $66.72 $66.72 $66.72 $66.72 $73.07 $66.86 $66.86 $66.86 $66.86 $66.86 $66.86 $66.86

EJECUCION.

1121000143 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 150 MM. (6") DEDIAMETRO RD-26, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBAS, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $176.56 $176.56 $176.56 $176.56 $176.56 $176.56 $176.56 $184.31 $176.71 $176.71 $176.71 $176.71 $176.71 $176.71 $176.71

EJECUCION.

1121000153 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 150 MM. (6") DEDIAMETRO RD-32.5, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBAS, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $147.35 $147.35 $147.35 $147.35 $147.35 $147.35 $147.35 $155.09 $147.50 $147.50 $147.50 $147.50 $147.50 $147.50 $147.50

EJECUCION.

1121000163 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 150 MM. (6") DEDIAMETRO RD-41, INCLUYE: ANILLOS,LUBRICANTES, BAJADA DE MATERIAL Y EQUIPOPARA PRUEBAS, FLETES Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M $124.85 $124.85 $124.85 $124.85 $124.85 $124.85 $124.85 $132.60 $125.01 $125.01 $125.01 $125.01 $125.01 $125.01 $125.01

EJECUCION.

1121000173 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 200 MM. (8") DEDIAMETRO C-5, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA

M $137.11 $137.11 $137.11 $137.11 $137.11 $137.11 $137.11 $147.01 $137.29 $137.29 $137.29 $137.29 $137.29 $137.29 $137.29

EJECUCION.

:

Page 67: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 67 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1121000183 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 200 MM. (8") DEDIAMETRO C-7, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA

M $175.70 $175.70 $175.70 $175.70 $175.70 $175.70 $175.70 $185.58 $175.87 $175.87 $175.87 $175.87 $175.87 $175.87 $175.87

EJECUCION.

1121000193 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 200 MM. (8") DEDIAMETRO C-10, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA

M $227.11 $227.11 $227.11 $227.11 $227.11 $227.11 $227.11 $237.01 $227.30 $227.30 $227.30 $227.30 $227.30 $227.30 $227.30

EJECUCION.

1121000203 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 250 MM. (10") DEDIAMETRO C-5, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA

M $207.21 $207.21 $207.21 $207.21 $207.21 $207.21 $207.21 $219.89 $207.46 $207.46 $207.46 $207.46 $207.46 $207.46 $207.46

EJECUCION.

1121000213 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 250 MM. (10") DEDIAMETRO C-7, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA

M $265.89 $265.89 $265.89 $265.89 $265.89 $265.89 $265.89 $278.58 $266.16 $266.16 $266.16 $266.16 $266.16 $266.16 $266.16

EJECUCION.

1121000223 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 250 MM. (10") DEDIAMETRO C-10, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA

M $346.36 $346.36 $346.36 $346.36 $346.36 $346.36 $346.36 $359.04 $346.61 $346.61 $346.61 $346.61 $346.61 $346.61 $346.61

EJECUCION.

:

Page 68: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 68 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1121000233 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 305 MM. (12") DEDIAMETRO C-5, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA

M $312.66 $312.66 $312.66 $312.66 $312.66 $312.66 $312.66 $327.88 $312.92 $312.92 $312.92 $312.92 $312.92 $312.92 $312.92

EJECUCION.

1121000243 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 305 MM. (12") DEDIAMETRO C-7, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA

M $408.27 $408.27 $408.27 $408.27 $408.27 $408.27 $408.27 $423.51 $408.53 $408.53 $408.53 $408.53 $408.53 $408.53 $408.53

EJECUCION.

1121000253 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 305 MM. (12") DEDIAMETRO C-10, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA

M $538.05 $538.05 $538.05 $538.05 $538.05 $538.05 $538.05 $553.27 $538.32 $538.32 $538.32 $538.32 $538.32 $538.32 $538.32

EJECUCION.

1121000263 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 355 MM. (14") DEDIAMETRO C-5, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA

M $411.01 $411.01 $411.01 $411.01 $411.01 $411.01 $411.01 $428.40 $411.33 $411.33 $411.33 $411.33 $411.33 $411.33 $411.33

EJECUCION.

1121000273 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 355 MM. (14") DEDIAMETRO C-7, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA

M $550.70 $550.70 $550.70 $550.70 $550.70 $550.70 $550.70 $568.10 $551.05 $551.05 $551.05 $551.05 $551.05 $551.05 $551.05

EJECUCION.

:

Page 69: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 69 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1121000283 SUMINISTRO, INSTALACION, JUNTEO Y PRUEBA DETUBERIA P.V.C., CON CAMPANA DE 355 MM. (14") DEDIAMETRO C-10, INCLUYE: ANILLOS, LUBRICANTES,BAJADA DE MATERIAL Y EQUIPO PARA PRUEBAS,FLETES Y MANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA

M $707.68 $707.68 $707.68 $707.68 $707.68 $707.68 $707.68 $725.08 $708.01 $708.01 $708.01 $708.01 $708.01 $708.01 $708.01

EJECUCION.

Total Sum. e Instalacion de Tuberia PVC c/camp

A112102 Sum. e Inst. de Tuberia PVC Sanitario1121000293 SUMINISTRO E INSTALACION DE TUBERIA DE P.V.C.

SANITARIO (ALCANTARILLADO) DE 160 MM. (6") DEDIAM. SERIE 25; INCL.: BAJADA DE MATERIALES YEQUIPO PARA PRUEBAS, FLETES A UN KM. YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $114.05 $114.05 $114.05 $114.05 $114.05 $114.05 $114.05 $121.79 $114.20 $114.20 $114.20 $114.20 $114.20 $114.20 $114.20

1121000303 SUMINISTRO E INSTALACION DE TUBERIA DE P.V.C.SANITARIO (ALCANTARILLADO) DE 200 MM. (8") DEDIAM. SERIE 25; INCL.: BAJADA DE MATERIALES YEQUIPO PARA PRUEBAS, FLETES A UN KM. YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $169.67 $169.67 $169.67 $169.67 $169.67 $169.67 $169.67 $179.58 $169.85 $169.85 $169.85 $169.85 $169.85 $169.85 $169.85

1121000313 SUMINISTRO E INSTALACION DE TUBERIA DE P.V.C.SANITARIO (ALCANTARILLADO) DE 250 MM. (10") DEDIAM., SERIE 25; INCL.: BAJADA DE MATERIALES YEQUIPO PARA PRUEBA, FLETES A UN KM. YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $260.10 $260.10 $260.10 $260.10 $260.10 $260.10 $260.10 $272.78 $260.35 $260.35 $260.35 $260.35 $260.35 $260.35 $260.35

1121000323 SUMINISTRO E INSTALACION DE TUBERIA DE P.V.C.SANITARIO (ALCANTARILLADO) DE 315 MM. (12")DE DIAM. SERIE 25; INCL.: BAJADA DE MATERIALESY EQUIPO PARA PRUEBA, FLETES A UN KM. YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $399.78 $399.78 $399.78 $399.78 $399.78 $399.78 $399.78 $415.02 $400.05 $400.05 $400.05 $400.05 $400.05 $400.05 $400.05

1121000333 SUMINISTRO E INSTALACION DE TUBERIA DE P.V.C.SANITARIO (ALCANTARILLADO) DE 355 MM. (14") DEDIAM., SERIE 25; INCL.: BAJADA DE MATERIALES YEQUIPO PARA PRUEBAS, FLETES A UN KM. YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $515.94 $515.94 $515.94 $515.94 $515.94 $515.94 $515.94 $533.34 $516.27 $516.27 $516.27 $516.27 $516.27 $516.27 $516.27

:

Page 70: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 70 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1121000343 SUMINISTRO E INSTALACION DE TUBERIA DE P.V.C.SANITARIO (ALCANTARILLADO) DE 400 MM. (16") DEDIAM., SERIE 25; INCL.: BAJADA DE MATERIALES YEQUIPO PARA PRUEBAS, FLETES A UN KM. YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $641.90 $641.90 $641.90 $641.90 $641.90 $641.90 $641.90 $661.68 $642.27 $642.27 $642.27 $642.27 $642.27 $642.27 $642.27

1121000353 SUMINISTRO E INSTALACION DE TUBERIA DE P.V.C.SANITARIO (ALCANTARILLADO) DE 450 MM. (18") DEDIAM., SERIE 25; INCL.: BAJADA DE MATERIALES YEQUIPO PARA PRUEBAS, FLETES A UN KM. YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $816.73 $816.73 $816.73 $816.73 $816.73 $816.73 $816.73 $844.13 $817.25 $817.25 $817.25 $817.25 $817.25 $817.25 $817.25

1121000363 SUMINISTRO E INSTALACION DE TUBERIA DE P.V.C.SANITARIO (ALCANTARILLADO) DE 500 MM. (20") DEDIAM., SERIE 25; INCL.: BAJADA DE MATERIALES YEQUIPO PARA PRUEBAS, FLETES A UN KM. YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $1,014.47 $1,014.47 $1,014.47 $1,014.47 $1,014.47 $1,014.47 $1,014.47 $1,046.01 $1,015.11 $1,015.11 $1,015.11 $1,015.11 $1,015.11 $1,015.11 $1,015.11

1121000373 SUMINISTRO E INSTALACION DE TUBERIA DE P.V.C.SANITARIO (ALCANTARILLADO) DE 630 MM. (24") DEDIAM., SERIE 25; INCL.: BAJADA DE MATERIALES YEQUIPO PARA PRUEBAS, FLETES A UN KM. YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $1,544.21 $1,544.21 $1,544.21 $1,544.21 $1,544.21 $1,544.21 $1,544.21 $1,574.42 $1,544.78 $1,544.78 $1,544.78 $1,544.78 $1,544.78 $1,544.78 $1,544.78

1124002033 SUMINISTRO E INSTALACION DE SILLETA DE P.V.C.SANITARIO (ALCANTARILLADO) DE 200 MM. (8") DEDIAMETRO CON SALIDA DE 150 MM. (6") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $310.27 $310.27 $310.27 $310.27 $310.27 $310.27 $310.27 $343.03 $310.85 $310.85 $310.85 $310.85 $310.85 $310.85 $310.85

1124002053 SUMINISTRO E INSTALACION DE CODO DE P.V.C.SANITARIO (ALCANTARILLADO) DE 45 G. X 150 MM.(6") DE DIAMETRO . INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $213.90 $213.90 $213.90 $213.90 $213.90 $213.90 $213.90 $246.67 $214.48 $214.48 $214.48 $214.48 $214.48 $214.48 $214.48

Total Sum. e Inst. de tuberia PVC Sanitarios

Total Sum. e Inst. Tuberia pvc Hidraulico y Sa

:

Page 71: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 71 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

A1122 Sum. e Inst. de Tuberia Polietileno Alta Densidad1122000013 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIA

DE POLIETILENO DE ALTA DENSIDAD DE 13 MM.(1/2") DE DIAMETRO RD-9, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $17.67 $17.67 $17.67 $17.67 $17.67 $17.67 $17.67 $19.41 $17.69 $17.69 $17.69 $17.69 $17.69 $17.69 $17.69

1122000023 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 13 MM.(1/2") DE DIAMETRO RD-11.5, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $15.27 $15.27 $15.27 $15.27 $15.27 $15.27 $15.27 $17.00 $15.30 $15.30 $15.30 $15.30 $15.30 $15.30 $15.30

1122000033 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 19 MM.(3/4") DE DIAMETRO RD-9, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $24.98 $24.98 $24.98 $24.98 $24.98 $24.98 $24.98 $26.73 $25.02 $25.02 $25.02 $25.02 $25.02 $25.02 $25.02

1122000043 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 19 MM.(3/4") DE DIAMETRO RD-11.5, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $21.37 $21.37 $21.37 $21.37 $21.37 $21.37 $21.37 $23.12 $21.40 $21.40 $21.40 $21.40 $21.40 $21.40 $21.40

1122000053 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 25 MM. (1")DE DIAMETRO RD-9, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $33.96 $33.96 $33.96 $33.96 $33.96 $33.96 $33.96 $35.81 $34.01 $34.01 $34.01 $34.01 $34.01 $34.01 $34.01

1122000063 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 25 MM. (1")DE DIAMETRO RD-11.5, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES.TUBERIA DE 25 MM. (1") DEDIAMETRO RD-11.5 INCLUYE TODO LO

M $18.45 $18.45 $18.45 $18.45 $18.45 $18.45 $18.45 $20.31 $18.51 $18.51 $18.51 $18.51 $18.51 $18.51 $18.51

NECESARIO PARA SU CORRECTA EJECUCION.

:

Page 72: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 72 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1122000073 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 25 MM. (1")DE DIAMETRO RD-15, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $22.39 $22.39 $22.39 $22.39 $22.39 $22.39 $22.39 $24.23 $22.44 $22.44 $22.44 $22.44 $22.44 $22.44 $22.44

1122000083 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 32 MM. (11/4") DE DIAMETRO RD-9, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $52.23 $52.23 $52.23 $52.23 $52.23 $52.23 $52.23 $54.36 $52.28 $52.28 $52.28 $52.28 $52.28 $52.28 $52.28

1122000093 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 32 MM. (11/4") DE DIAMETRO RD-15, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $21.60 $21.60 $21.60 $21.60 $21.60 $21.60 $21.60 $23.73 $21.64 $21.64 $21.64 $21.64 $21.64 $21.64 $21.64

1122000103 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 38 MM. (11/2") DE DIAMETRO RD-9, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $65.86 $65.86 $65.86 $65.86 $65.86 $65.86 $65.86 $67.98 $65.89 $65.89 $65.89 $65.89 $65.89 $65.89 $65.89

1122000113 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 38 MM. (11/2") DE DIAMETRO RD-11.5, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $55.97 $55.97 $55.97 $55.97 $55.97 $55.97 $55.97 $58.09 $56.00 $56.00 $56.00 $56.00 $56.00 $56.00 $56.00

1122000123 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 38 MM. (11/2") DE DIAMETRO RD-15, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $42.27 $42.27 $42.27 $42.27 $42.27 $42.27 $42.27 $44.38 $42.31 $42.31 $42.31 $42.31 $42.31 $42.31 $42.31

:

Page 73: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 73 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1122000133 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 51 MM. (2")DE DIAMETRO RD-9, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $98.88 $98.88 $98.88 $98.88 $98.88 $98.88 $98.88 $101.01 $98.93 $98.93 $98.93 $98.93 $98.93 $98.93 $98.93

1122000143 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 51 MM. (2")DE DIAMETRO RD-11.5, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $84.05 $84.05 $84.05 $84.05 $84.05 $84.05 $84.05 $86.18 $84.08 $84.08 $84.08 $84.08 $84.08 $84.08 $84.08

1122000153 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 51 MM. (2")DE DIAMETRO RD-15, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $63.03 $63.03 $63.03 $63.03 $63.03 $63.03 $63.03 $65.16 $63.07 $63.07 $63.07 $63.07 $63.07 $63.07 $63.07

1122000163 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 64 MM. (21/2") DE DIAMETRO RD-26, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $31.04 $31.04 $31.04 $31.04 $31.04 $31.04 $31.04 $33.39 $31.10 $31.10 $31.10 $31.10 $31.10 $31.10 $31.10

1122000173 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 64 MM. (21/2") DE DIAMETRO RD-32.5, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $29.20 $29.20 $29.20 $29.20 $29.20 $29.20 $29.20 $31.54 $29.24 $29.24 $29.24 $29.24 $29.24 $29.24 $29.24

1122000183 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 76 MM. (3")DE DIAMETRO RD-26, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $38.92 $38.92 $38.92 $38.92 $38.92 $38.92 $38.92 $41.49 $38.97 $38.97 $38.97 $38.97 $38.97 $38.97 $38.97

:

Page 74: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 74 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1122000193 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE POLIETILENO DE ALTA DENSIDAD DE 76 MM. (3")DE DIAMETRO RD-32.5, INCLUYE: BAJADO DEMATERIAL Y EQUIPO PARA PRUEBAS, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $38.18 $38.18 $38.18 $38.18 $38.18 $38.18 $38.18 $40.74 $38.23 $38.23 $38.23 $38.23 $38.23 $38.23 $38.23

Total Sum. e Inst. de Tuberia Polietileno Alta

A1123 Sum. e Inst. Pzas. Especiales Fo.Fo.

A112301 Sum. e Inst. de Tapa Ciega de FoFo1123000010 SUMINISTRO E INSTALACION DE PIEZAS

ESPECIALES DE Fo.Fo. 2" A 3" DE DIAMETRO(CARRETES, CODOS, EXTREMIDADES, TEES, CRUZ,REDUCCIONES, BRIDAS) INCLUYE: LIMPIEZA EINSTALACION DE PIEZAS, PRUEBAS HIDROSTATICAJUNTO CON TUBERIA, ACARREO Y MANIOBRASLOCALES.

Kg $60.85 $60.85 $60.85 $60.85 $60.85 $60.85 $60.85 $63.58 $60.90 $60.90 $60.90 $60.90 $60.90 $60.90 $60.90

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1123000013 SUMINISTRO E INSTALACION DE PIEZASESPECIALES DE Fo.Fo. DE 4" A 12" DE DIAMETRO(CARRETES, CODOS, EXTREMIDADES, TEES, CRUZ,REDUCCIONES, BRIDAS) INCLUYE: LIMPIEZA EINSTALACION DE PIEZAS, PRUEBAS HIDROSTATICAJUNTO CON TUBERIA, ACARREO Y MANIOBRAS

Kg $72.79 $72.79 $72.79 $72.79 $72.79 $72.79 $72.79 $75.64 $72.84 $72.84 $72.84 $72.84 $72.84 $72.84 $72.84

LOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1123000015 SUMINISTRO E INSTALACION DE PIEZASESPECIALES DE Fo.Fo. DE 14" A 24" DE DIAMETRO(CARRETES, CODOS, EXTREMIDADES, TEES, CRUZ,REDUCCIONES, BRIDAS) INCLUYE: LIMPIEZA EINSTALACION DE PIEZAS, PRUEBAS HIDROSTATICAJUNTO CON TUBERIA, ACARREO Y MANIOBRAS

Kg $79.36 $79.36 $79.36 $79.36 $79.36 $79.36 $79.36 $82.40 $79.43 $79.43 $79.43 $79.43 $79.43 $79.43 $79.43

LOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1123000023 SUMINISTRO E INSTALACION DE PIEZASESPECIALES DE Fo.Fo. DE 30" a 36" DE DIAMETRO(CARRETES, CODOS, EXTREMIDADES, TEES, CRUZ,REDUCCIONES, BRIDAS) INCLUYE: LIMPIEZA EINSTALACION DE PIEZAS, PRUEBAS HIDROSTATICAJUNTO CON TUBERIA, ACARREO Y MANIOBRAS

Kg $88.32 $88.32 $88.32 $88.32 $88.32 $88.32 $88.32 $91.36 $88.39 $88.39 $88.39 $88.39 $88.39 $88.39 $88.39

:

Page 75: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 75 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

LOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1123000033 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 51MM. (2") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $191.41 $191.41 $191.41 $191.41 $191.41 $191.41 $191.41 $196.86 $191.49 $191.49 $191.49 $191.49 $191.49 $191.49 $191.49

1123000043 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 65MM. (2 1/2") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $287.12 $287.12 $287.12 $287.12 $287.12 $287.12 $287.12 $295.29 $287.24 $287.24 $287.24 $287.24 $287.24 $287.24 $287.24

1123000053 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 76MM. (3") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $386.63 $386.63 $386.63 $386.63 $386.63 $386.63 $386.63 $396.73 $386.79 $386.79 $386.79 $386.79 $386.79 $386.79 $386.79

1123000063 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 102 MM. (4") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $228.25 $228.25 $228.25 $228.25 $228.25 $228.25 $228.25 $246.72 $228.58 $228.58 $228.58 $228.58 $228.58 $228.58 $228.58

1123000073 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 152 MM. (6") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $987.88 $987.88 $987.88 $987.88 $987.88 $987.88 $987.88 $1,017.71 $988.41 $988.41 $988.41 $988.41 $988.41 $988.41 $988.41

:

Page 76: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 76 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123000083 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 203 MM. (8") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,594.98 $1,594.98 $1,594.98 $1,594.98 $1,594.98 $1,594.98 $1,594.98 $1,646.12 $1,595.90 $1,595.90 $1,595.90 $1,595.90 $1,595.90 $1,595.90 $1,595.90

1123000093 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 254 MM. (10") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $2,389.96 $2,389.96 $2,389.96 $2,389.96 $2,389.96 $2,389.96 $2,389.96 $2,464.70 $2,391.31 $2,391.31 $2,391.31 $2,391.31 $2,391.31 $2,391.31 $2,391.31

1123000103 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 305 MM. (12") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $3,186.47 $3,186.47 $3,186.47 $3,186.47 $3,186.47 $3,186.47 $3,186.47 $3,288.18 $3,188.29 $3,188.29 $3,188.29 $3,188.29 $3,188.29 $3,188.29 $3,188.29

1123000113 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 356 MM. (14") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $5,991.15 $5,991.15 $5,991.15 $5,991.15 $5,991.15 $5,991.15 $5,991.15 $6,133.71 $5,994.14 $5,994.14 $5,994.14 $5,994.14 $5,994.14 $5,994.14 $5,994.14

1123000123 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 406 MM. (16") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $7,910.89 $7,910.89 $7,910.89 $7,910.89 $7,910.89 $7,910.89 $7,910.89 $8,101.31 $7,914.90 $7,914.90 $7,914.90 $7,914.90 $7,914.90 $7,914.90 $7,914.90

1123000133 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 457 MM. (18") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $9,540.78 $9,540.78 $9,540.78 $9,540.78 $9,540.78 $9,540.78 $9,540.78 $9,768.35 $9,545.57 $9,545.57 $9,545.57 $9,545.57 $9,545.57 $9,545.57 $9,545.57

:

Page 77: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 77 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123000143 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 508 MM. (20") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $12,266.20 $12,266.20 $12,266.20 $12,266.20 $12,266.20 $12,266.20 $12,266.20 $12,560.17 $12,272.38 $12,272.38 $12,272.38 $12,272.38 $12,272.38 $12,272.38 $12,272.38

1123000153 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 610 MM. (24") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $12,391.72 $12,391.72 $12,391.72 $12,391.72 $12,391.72 $12,391.72 $12,391.72 $12,830.71 $12,400.95 $12,400.95 $12,400.95 $12,400.95 $12,400.95 $12,400.95 $12,400.95

1123000163 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 762 MM. (30") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $21,771.62 $21,771.62 $21,771.62 $21,771.62 $21,771.62 $21,771.62 $21,771.62 $22,497.86 $21,786.87 $21,786.87 $21,786.87 $21,786.87 $21,786.87 $21,786.87 $21,786.87

1123000173 SUMINISTRO E INSTALACION DE TAPA CIEGA DE 914 MM. (36") DE DIAMETRO DE Fo.Fo., INCLUYE:LIMPIEZA E INSTALACION DE PIEZAS, PRUEBAHIDROSTATICA JUNTO CON TUBERIA, ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $35,725.50 $35,725.50 $35,725.50 $35,725.50 $35,725.50 $35,725.50 $35,725.50 $36,863.03 $35,749.41 $35,749.41 $35,749.41 $35,749.41 $35,749.41 $35,749.41 $35,749.41

Total Sum. e Inst. de Piezas Especiales

A112302 Sum. e Inst. de Junta Gibault y Junta Mecanica Universal1123000483 SUMINISTRO E INSTALACION DE JUNTA GIBAULT

COMPLETA 51 MM. (2") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $185.90 $185.90 $185.90 $185.90 $185.90 $185.90 $185.90 $196.58 $186.12 $186.12 $186.12 $186.12 $186.12 $186.12 $186.12

1123000493 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 63 MM. (2 1/2") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $192.80 $192.80 $192.80 $192.80 $192.80 $192.80 $192.80 $206.25 $193.07 $193.07 $193.07 $193.07 $193.07 $193.07 $193.07

:

Page 78: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 78 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

EJECUCION.

1123000503 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 76 MM. (3") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $242.48 $242.48 $242.48 $242.48 $242.48 $242.48 $242.48 $259.10 $242.80 $242.80 $242.80 $242.80 $242.80 $242.80 $242.80

1123000513 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 102 MM. (4") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $331.84 $331.84 $331.84 $331.84 $331.84 $331.84 $331.84 $354.38 $332.28 $332.28 $332.28 $332.28 $332.28 $332.28 $332.28

EJECUCION.

1123000523 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 152 MM. (6") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA, (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $493.25 $493.25 $493.25 $493.25 $493.25 $493.25 $493.25 $534.78 $494.05 $494.05 $494.05 $494.05 $494.05 $494.05 $494.05

EJECUCION.

1123000533 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 203 MM. (8") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA, (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $742.49 $742.49 $742.49 $742.49 $742.49 $742.49 $742.49 $803.80 $743.67 $743.67 $743.67 $743.67 $743.67 $743.67 $743.67

EJECUCION.

1123000543 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 254 MM. (10") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA, (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $965.05 $965.05 $965.05 $965.05 $965.05 $965.05 $965.05 $1,044.95 $966.61 $966.61 $966.61 $966.61 $966.61 $966.61 $966.61

EJECUCION.

:

Page 79: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 79 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123000553 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 305 MM. (12") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $1,124.20 $1,124.20 $1,124.20 $1,124.20 $1,124.20 $1,124.20 $1,124.20 $1,223.08 $1,126.12 $1,126.12 $1,126.12 $1,126.12 $1,126.12 $1,126.12 $1,126.12

EJECUCION.

1123000563 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 356 MM. (14") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA, (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $2,126.61 $2,126.61 $2,126.61 $2,126.61 $2,126.61 $2,126.61 $2,126.61 $2,314.48 $2,130.26 $2,130.26 $2,130.26 $2,130.26 $2,130.26 $2,130.26 $2,130.26

EJECUCION.

1123000573 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 406 MM. (16") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA, (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $3,020.15 $3,020.15 $3,020.15 $3,020.15 $3,020.15 $3,020.15 $3,020.15 $3,202.07 $3,023.67 $3,023.67 $3,023.67 $3,023.67 $3,023.67 $3,023.67 $3,023.67

EJECUCION.

1123000583 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 450 MM. (18") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $3,978.39 $3,978.39 $3,978.39 $3,978.39 $3,978.39 $3,978.39 $3,978.39 $4,224.81 $3,983.18 $3,983.18 $3,983.18 $3,983.18 $3,983.18 $3,983.18 $3,983.18

EJECUCION.

1123000593 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 508 MM. (20") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $4,782.03 $4,782.03 $4,782.03 $4,782.03 $4,782.03 $4,782.03 $4,782.03 $5,070.75 $4,787.63 $4,787.63 $4,787.63 $4,787.63 $4,787.63 $4,787.63 $4,787.63

EJECUCION.

:

Page 80: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 80 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123000603 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 610 MM. (24") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $5,560.57 $5,560.57 $5,560.57 $5,560.57 $5,560.57 $5,560.57 $5,560.57 $5,956.08 $5,568.24 $5,568.24 $5,568.24 $5,568.24 $5,568.24 $5,568.24 $5,568.24

EJECUCION.

1123000613 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 750 MM. (30") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $10,254.93 $10,254.93 $10,254.93 $10,254.93 $10,254.93 $10,254.93 $10,254.93 $10,939.17 $10,268.21 $10,268.21 $10,268.21 $10,268.21 $10,268.21 $10,268.21 $10,268.21

EJECUCION.

1123000623 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA 914 MM. (36") DE DIAMETRO, A-5, A-7,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $11,618.75 $11,618.75 $11,618.75 $11,618.75 $11,618.75 $11,618.75 $11,618.75 $12,637.21 $11,638.52 $11,638.52 $11,638.52 $11,638.52 $11,638.52 $11,638.52 $11,638.52

EJECUCION.

1123000633 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 51 MM (2") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $163.71 $163.71 $163.71 $163.71 $163.71 $163.71 $163.71 $174.37 $163.90 $163.90 $163.90 $163.90 $163.90 $163.90 $163.90

1123000643 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 63 MM (2 1/2") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $170.60 $170.60 $170.60 $170.60 $170.60 $170.60 $170.60 $184.06 $170.86 $170.86 $170.86 $170.86 $170.86 $170.86 $170.86

:

Page 81: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 81 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123000653 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 76 MM (3") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $214.24 $214.24 $214.24 $214.24 $214.24 $214.24 $214.24 $230.85 $214.56 $214.56 $214.56 $214.56 $214.56 $214.56 $214.56

1123000663 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 102 MM (4") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $293.00 $293.00 $293.00 $293.00 $293.00 $293.00 $293.00 $315.54 $293.44 $293.44 $293.44 $293.44 $293.44 $293.44 $293.44

1123000673 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 152 MM (6") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $438.49 $438.49 $438.49 $438.49 $438.49 $438.49 $438.49 $480.03 $439.30 $439.30 $439.30 $439.30 $439.30 $439.30 $439.30

1123000683 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 203 MM (8") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBA HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $659.65 $659.65 $659.65 $659.65 $659.65 $659.65 $659.65 $720.96 $660.85 $660.85 $660.85 $660.85 $660.85 $660.85 $660.85

1123000693 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 254 MM (10") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZAS,PRUEBA HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $857.45 $857.45 $857.45 $857.45 $857.45 $857.45 $857.45 $937.35 $858.99 $858.99 $858.99 $858.99 $858.99 $858.99 $858.99

1123000703 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 305 MM (12") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,124.20 $1,124.20 $1,124.20 $1,124.20 $1,124.20 $1,124.20 $1,124.20 $1,223.08 $1,126.12 $1,126.12 $1,126.12 $1,126.12 $1,126.12 $1,126.12 $1,126.12

:

Page 82: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 82 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123000713 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 356 MM (14") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,893.62 $1,893.62 $1,893.62 $1,893.62 $1,893.62 $1,893.62 $1,893.62 $2,081.51 $1,897.29 $1,897.29 $1,897.29 $1,897.29 $1,897.29 $1,897.29 $1,897.29

1123000723 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 406 MM (16") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $2,934.36 $2,934.36 $2,934.36 $2,934.36 $2,934.36 $2,934.36 $2,934.36 $3,116.30 $2,937.90 $2,937.90 $2,937.90 $2,937.90 $2,937.90 $2,937.90 $2,937.90

1123000733 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 457 MM (18") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $4,105.86 $4,105.86 $4,105.86 $4,105.86 $4,105.86 $4,105.86 $4,105.86 $4,352.27 $4,110.65 $4,110.65 $4,110.65 $4,110.65 $4,110.65 $4,110.65 $4,110.65

1123000743 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 508 MM (20") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $4,344.35 $4,344.35 $4,344.35 $4,344.35 $4,344.35 $4,344.35 $4,344.35 $4,633.09 $4,349.95 $4,349.95 $4,349.95 $4,349.95 $4,349.95 $4,349.95 $4,349.95

1123000753 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 610 MM (24") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $6,938.61 $6,938.61 $6,938.61 $6,938.61 $6,938.61 $6,938.61 $6,938.61 $7,334.13 $6,946.29 $6,946.29 $6,946.29 $6,946.29 $6,946.29 $6,946.29 $6,946.29

1123000763 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 762 MM (30") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $9,028.08 $9,028.08 $9,028.08 $9,028.08 $9,028.08 $9,028.08 $9,028.08 $9,712.34 $9,041.38 $9,041.38 $9,041.38 $9,041.38 $9,041.38 $9,041.38 $9,041.38

:

Page 83: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 83 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123000773 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 914 MM (36") DE DIAMETRO A-10,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $12,180.26 $12,180.26 $12,180.26 $12,180.26 $12,180.26 $12,180.26 $12,180.26 $13,198.74 $12,200.04 $12,200.04 $12,200.04 $12,200.04 $12,200.04 $12,200.04 $12,200.04

1123000783 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 51 MM (2") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $163.71 $163.71 $163.71 $163.71 $163.71 $163.71 $163.71 $174.37 $163.90 $163.90 $163.90 $163.90 $163.90 $163.90 $163.90

1123000793 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 63 MM (2 1/2") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $170.60 $170.60 $170.60 $170.60 $170.60 $170.60 $170.60 $184.06 $170.86 $170.86 $170.86 $170.86 $170.86 $170.86 $170.86

1123000803 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 76 MM (3") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $214.24 $214.24 $214.24 $214.24 $214.24 $214.24 $214.24 $230.85 $214.56 $214.56 $214.56 $214.56 $214.56 $214.56 $214.56

1123000813 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 102 MM (4") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $293.00 $293.00 $293.00 $293.00 $293.00 $293.00 $293.00 $315.54 $293.44 $293.44 $293.44 $293.44 $293.44 $293.44 $293.44

1123000823 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 152 MM (6") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $438.49 $438.49 $438.49 $438.49 $438.49 $438.49 $438.49 $480.03 $439.30 $439.30 $439.30 $439.30 $439.30 $439.30 $439.30

:

Page 84: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 84 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123000833 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 203 MM (8") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $659.65 $659.65 $659.65 $659.65 $659.65 $659.65 $659.65 $720.96 $660.85 $660.85 $660.85 $660.85 $660.85 $660.85 $660.85

1123000843 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 254 MM (10") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $857.45 $857.45 $857.45 $857.45 $857.45 $857.45 $857.45 $937.35 $858.99 $858.99 $858.99 $858.99 $858.99 $858.99 $858.99

1123000853 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 305 MM (12") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,124.20 $1,124.20 $1,124.20 $1,124.20 $1,124.20 $1,124.20 $1,124.20 $1,223.08 $1,126.12 $1,126.12 $1,126.12 $1,126.12 $1,126.12 $1,126.12 $1,126.12

1123000863 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 356 MM (14") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,893.62 $1,893.62 $1,893.62 $1,893.62 $1,893.62 $1,893.62 $1,893.62 $2,081.51 $1,897.29 $1,897.29 $1,897.29 $1,897.29 $1,897.29 $1,897.29 $1,897.29

1123000873 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 406 MM (16") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $3,026.60 $3,026.60 $3,026.60 $3,026.60 $3,026.60 $3,026.60 $3,026.60 $3,208.55 $3,030.13 $3,030.13 $3,030.13 $3,030.13 $3,030.13 $3,030.13 $3,030.13

1123000883 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 457 MM (18") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $4,225.80 $4,225.80 $4,225.80 $4,225.80 $4,225.80 $4,225.80 $4,225.80 $4,472.20 $4,230.58 $4,230.58 $4,230.58 $4,230.58 $4,230.58 $4,230.58 $4,230.58

:

Page 85: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 85 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123000893 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 508 MM (20") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $4,930.68 $4,930.68 $4,930.68 $4,930.68 $4,930.68 $4,930.68 $4,930.68 $5,219.40 $4,936.28 $4,936.28 $4,936.28 $4,936.28 $4,936.28 $4,936.28 $4,936.28

1123000903 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 610 MM (24") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $6,938.61 $6,938.61 $6,938.61 $6,938.61 $6,938.61 $6,938.61 $6,938.61 $7,334.13 $6,946.29 $6,946.29 $6,946.29 $6,946.29 $6,946.29 $6,946.29 $6,946.29

1123000913 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 762 MM (30") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $9,510.23 $9,510.23 $9,510.23 $9,510.23 $9,510.23 $9,510.23 $9,510.23 $10,194.48 $9,523.52 $9,523.52 $9,523.52 $9,523.52 $9,523.52 $9,523.52 $9,523.52

1123000923 SUMINISTRO E INSTALACION DE JUNTA GIBAULTCOMPLETA DE 914 MM (36") DE DIAMETRO A-14,INCLUYE: LIMPIEZA E INSTALACION DE PIEZA,PRUEBAS HIDROSTATICA (JUNTO CON TUBERIA),ACARREO Y MANIOBRAS LOCALES. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $13,064.11 $13,064.11 $13,064.11 $13,064.11 $13,064.11 $13,064.11 $13,064.11 $14,082.57 $13,083.88 $13,083.88 $13,083.88 $13,083.88 $13,083.88 $13,083.88 $13,083.88

1123000933 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 51 MM. (2") DE DIAMETRO, INCLUYE: LIMPIEZA EINSTALACION DE PIEZA, PRUEBAS HIDROSTATICA(JUNTO CON TUBERIA), ACARREO Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $265.85 $265.85 $265.85 $265.85 $265.85 $265.85 $265.85 $284.58 $266.17 $266.17 $266.17 $266.17 $266.17 $266.17 $266.17

1123000943 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 63 MM. (2 1/2") DE DIAMETRO, INCLUYE:LIMPIEZA E INSTALACION DE PIEZA, PRUEBASHIDROSTATICA (JUNTO CON TUBERIA), ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $423.74 $423.74 $423.74 $423.74 $423.74 $423.74 $423.74 $445.58 $424.11 $424.11 $424.11 $424.11 $424.11 $424.11 $424.11

:

Page 86: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 86 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123000953 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 76 MM. (3") DE DIAMETRO, INCLUYE: LIMPIEZA EINSTALACION DE PIEZA, PRUEBAS HIDROSTATICA(JUNTO CON TUBERIA), ACARREO Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $464.93 $464.93 $464.93 $464.93 $464.93 $464.93 $464.93 $489.96 $465.35 $465.35 $465.35 $465.35 $465.35 $465.35 $465.35

1123000963 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 102 MM. (4") DE DIAMETRO, INCLUYE: LIMPIEZAE INSTALACION DE PIEZA, PRUEBAS HIDROSTATICA(JUNTO CON TUBERIA), ACARREO Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $649.29 $649.29 $649.29 $649.29 $649.29 $649.29 $649.29 $680.49 $649.84 $649.84 $649.84 $649.84 $649.84 $649.84 $649.84

1123000973 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 152 MM. (6") DE DIAMETRO, INCLUYE: LIMPIEZAE INSTALACION DE PIEZA, PRUEBAS HIDROSTATICA(JUNTO CON TUBERIA), ACARREO Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $971.50 $971.50 $971.50 $971.50 $971.50 $971.50 $971.50 $1,015.19 $972.25 $972.25 $972.25 $972.25 $972.25 $972.25 $972.25

1123000983 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 203 MM. (8") DE DIAMETRO, INCLUYE: LIMPIEZAE INSTALACION DE PIEZA, PRUEBAS HIDROSTATICA(JUNTO CON TUBERIA), ACARREO Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,594.53 $1,594.53 $1,594.53 $1,594.53 $1,594.53 $1,594.53 $1,594.53 $1,649.13 $1,595.45 $1,595.45 $1,595.45 $1,595.45 $1,595.45 $1,595.45 $1,595.45

1123000993 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 254 MM. (10") DE DIAMETRO, INCLUYE: LIMPIEZAE INSTALACION DE PIEZA, PRUEBAS HIDROSTATICA(JUNTO CON TUBERIA), ACARREO Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,203.69 $2,203.69 $2,203.69 $2,203.69 $2,203.69 $2,203.69 $2,203.69 $2,288.89 $2,205.26 $2,205.26 $2,205.26 $2,205.26 $2,205.26 $2,205.26 $2,205.26

1123001003 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 305 MM. (12") DE DIAMETRO, INCLUYE: LIMPIEZAE INSTALACION DE PIEZA, PRUEBAS HIDROSTATICA(JUNTO CON TUBERIA), ACARREO Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,783.39 $2,783.39 $2,783.39 $2,783.39 $2,783.39 $2,783.39 $2,783.39 $2,889.91 $2,785.40 $2,785.40 $2,785.40 $2,785.40 $2,785.40 $2,785.40 $2,785.40

:

Page 87: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 87 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123001013 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 356 MM. (14") DE DIAMETRO, INCLUYE: LIMPIEZAE INSTALACION DE PIEZA, PRUEBAS HIDROSTATICA(JUNTO CON TUBERIA), ACARREO Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $5,185.42 $5,185.42 $5,185.42 $5,185.42 $5,185.42 $5,185.42 $5,185.42 $5,307.16 $5,187.69 $5,187.69 $5,187.69 $5,187.69 $5,187.69 $5,187.69 $5,187.69

1123001023 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 406 MM. (16") DE DIAMETRO, INCLUYE: LIMPIEZAE INSTALACION DE PIEZA, PRUEBAS HIDROSTATICA(JUNTO CON TUBERIA), ACARREO Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,900.47 $3,900.47 $3,900.47 $3,900.47 $3,900.47 $3,900.47 $3,900.47 $4,042.49 $3,903.13 $3,903.13 $3,903.13 $3,903.13 $3,903.13 $3,903.13 $3,903.13

1123001033 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 457 MM. (18") DE DIAMETRO, INCLUYE: LIMPIEZAE INSTALACION DE PIEZA, PRUEBAS HIDROSTATICA(JUNTO CON TUBERIA), ACARREO Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $5,443.06 $5,443.06 $5,443.06 $5,443.06 $5,443.06 $5,443.06 $5,443.06 $5,613.49 $5,446.25 $5,446.25 $5,446.25 $5,446.25 $5,446.25 $5,446.25 $5,446.25

1123001043 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 508 MM. (20") DE DIAMETRO, INCLUYE: LIMPIEZAE INSTALACION DE PIEZA, PRUEBAS HIDROSTATICA(JUNTO CON TUBERIA), ACARREO Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $6,609.84 $6,609.84 $6,609.84 $6,609.84 $6,609.84 $6,609.84 $6,609.84 $6,795.08 $6,613.29 $6,613.29 $6,613.29 $6,613.29 $6,613.29 $6,613.29 $6,613.29

1123001053 SUMINISTRO E INSTALACION DE JUNTA UNIVERSALDE 610 MM. (24") DE DIAMETRO, INCLUYE: LIMPIEZAE INSTALACION DE PIEZA, PRUEBAS HIDROSTATICA(JUNTO CON TUBERIA), ACARREO Y MANIOBRASLOCALES. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $8,784.40 $8,784.40 $8,784.40 $8,784.40 $8,784.40 $8,784.40 $8,784.40 $9,021.09 $8,788.81 $8,788.81 $8,788.81 $8,788.81 $8,788.81 $8,788.81 $8,788.81

Total Sum. e Inst. de Junta Gibault

A112303 Sum. e Inst. de Abrazadera completa 1/2" y 3/4"1123001213 SUMINISTRO E INSTALACION DE ABRAZADERA DE

INSERCION Fo.Fo. DE: 2" , 1/2" Y 3/4" INCLUYE:LIMPIEZA E INSTALACION DE PIEZA, PRUEBASHIDROSTATICA (JUNTO CON TUBERIA), ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $147.93 $147.93 $147.93 $147.93 $147.93 $147.93 $147.93 $153.47 $148.03 $148.03 $148.03 $148.03 $148.03 $148.03 $148.03

:

Page 88: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 88 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123001223 SUMINISTRO E INSTALACION DE ABRAZADERA DEINSERCION Fo.Fo. DE: 2 1/2" - 1/2" Y 3/4" INCLUYE:LIMPIEZA E INSTALACION DE PIEZA, PRUEBASHIDROSTATICA (JUNTO CON TUBERIA), ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $188.25 $188.25 $188.25 $188.25 $188.25 $188.25 $188.25 $195.76 $188.40 $188.40 $188.40 $188.40 $188.40 $188.40 $188.40

1123001233 SUMINISTRO E INSTALACION DE ABRAZADERA DEINSERCION Fo.Fo. DE: 3" - 1/2" Y 3/4" INCLUYE:LIMPIEZA E INSTALACION DE PIEZA, PRUEBASHIDROSTATICA (JUNTO CON TUBERIA), ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $196.89 $196.89 $196.89 $196.89 $196.89 $196.89 $196.89 $205.60 $197.05 $197.05 $197.05 $197.05 $197.05 $197.05 $197.05

1123001243 SUMINISTRO E INSTALACION DE ABRAZADERA DEINSERCION Fo.Fo. DE: 4" - 1/2" Y 3/4" INCLUYE:LIMPIEZA E INSTALACION DE PIEZA, PRUEBASHIDROSTATICA (JUNTO CON TUBERIA), ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $226.87 $226.87 $226.87 $226.87 $226.87 $226.87 $226.87 $237.95 $227.10 $227.10 $227.10 $227.10 $227.10 $227.10 $227.10

1123001253 SUMINISTRO E INSTALACION DE ABRAZADERA DEINSERCION Fo.Fo. DE: 6" - 1/2" Y 3/4" INCLUYE:LIMPIEZA E INSTALACION DE PIEZA, PRUEBASHIDROSTATICA (JUNTO CON TUBERIA), ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $283.29 $283.29 $283.29 $283.29 $283.29 $283.29 $283.29 $300.70 $283.62 $283.62 $283.62 $283.62 $283.62 $283.62 $283.62

1123001263 SUMINISTRO E INSTALACION DE ABRAZADERA DEINSERCION Fo.Fo. DE: 8" - 1/2" Y 3/4" INCLUYE:LIMPIEZA E INSTALACION DE PIEZA, PRUEBASHIDROSTATICA (JUNTO CON TUBERIA), ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $408.61 $408.61 $408.61 $408.61 $408.61 $408.61 $408.61 $432.34 $409.07 $409.07 $409.07 $409.07 $409.07 $409.07 $409.07

1123001273 SUMINISTRO E INSTALACION DE ABRAZADERA DEINSERCION Fo.Fo. DE: 10" - 1/2" Y 3/4" INCLUYE:LIMPIEZA E INSTALACION DE PIEZA, PRUEBASHIDROSTATICA (JUNTO CON TUBERIA), ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $526.80 $526.80 $526.80 $526.80 $526.80 $526.80 $526.80 $556.47 $527.37 $527.37 $527.37 $527.37 $527.37 $527.37 $527.37

:

Page 89: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 89 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123001283 SUMINISTRO E INSTALACION DE ABRAZADERA DEINSERCION Fo.Fo. DE: 12" - 1/2" Y 3/4" INCLUYE:LIMPIEZA E INSTALACION DE PIEZA, PRUEBASHIDROSTATICA (JUNTO CON TUBERIA), ACARREO YMANIOBRAS LOCALES. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $797.61 $797.61 $797.61 $797.61 $797.61 $797.61 $797.61 $842.70 $798.48 $798.48 $798.48 $798.48 $798.48 $798.48 $798.48

1123001293 SUMINISTRO E INSTALACION DE ABRAZADERACOMPLETA DE 1/2" Y 3/4" DE 356 MM. (14") DEDIAMETRO, INCLUYE: LIMPIEZA E INSTALACION DEPIEZA, PRUEBAS HIDROSTATICA (JUNTO CONTUBERIA), ACARREO Y MANIOBRAS LOCALES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

PZA $1,164.64 $1,164.64 $1,164.64 $1,164.64 $1,164.64 $1,164.64 $1,164.64 $1,255.61 $1,166.41 $1,166.41 $1,166.41 $1,166.41 $1,166.41 $1,166.41 $1,166.41

EJECUCION.

Total Sum. e Inst. de Abrazadera completa 1/2"

A112304 Sum. e Inst. de Contramarcos1123001303 SUMINISTRO Y COLOCACION DE CONTRA MARCO

TIPO SENCILLO CENTRADO O DESCENTRADO DE 4"X 80 CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,704.81 $1,704.81 $1,704.81 $1,704.81 $1,704.81 $1,704.81 $1,704.81 $1,772.36 $1,705.97 $1,705.97 $1,705.97 $1,705.97 $1,705.97 $1,705.97 $1,705.97

1123001313 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO SENCILLO CENTRADO O DESCENTRADO DE 4"X 90 CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,724.02 $1,724.02 $1,724.02 $1,724.02 $1,724.02 $1,724.02 $1,724.02 $1,791.56 $1,725.16 $1,725.16 $1,725.16 $1,725.16 $1,725.16 $1,725.16 $1,725.16

1123001323 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO SENCILLO CENTRADO O DESCENTRADO DE 4"X 110 CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,010.73 $2,010.73 $2,010.73 $2,010.73 $2,010.73 $2,010.73 $2,010.73 $2,078.28 $2,011.89 $2,011.89 $2,011.89 $2,011.89 $2,011.89 $2,011.89 $2,011.89

1123001333 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO SENCILLO CENTRADO O DESCENTRADO DE 4"X 130 CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,154.09 $2,154.09 $2,154.09 $2,154.09 $2,154.09 $2,154.09 $2,154.09 $2,221.65 $2,155.26 $2,155.26 $2,155.26 $2,155.26 $2,155.26 $2,155.26 $2,155.26

1123001343 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO SENCILLO CENTRADO O DESCENTRADO DE 4"X 140 CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,251.37 $2,251.37 $2,251.37 $2,251.37 $2,251.37 $2,251.37 $2,251.37 $2,318.92 $2,252.53 $2,252.53 $2,252.53 $2,252.53 $2,252.53 $2,252.53 $2,252.53

:

Page 90: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 90 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123001353 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO SENCILLO CENTRADO O DESCENTRADO DE 4"X 180 CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,884.03 $2,884.03 $2,884.03 $2,884.03 $2,884.03 $2,884.03 $2,884.03 $2,956.83 $2,885.27 $2,885.27 $2,885.27 $2,885.27 $2,885.27 $2,885.27 $2,885.27

1123001363 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO SENCILLO CENTRADO O DESCENTRADO 4" X210 CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,087.25 $3,087.25 $3,087.25 $3,087.25 $3,087.25 $3,087.25 $3,087.25 $3,169.14 $3,088.65 $3,088.65 $3,088.65 $3,088.65 $3,088.65 $3,088.65 $3,088.65

1123001373 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO SENCILLO CENTRADO O DESCENTRADO 6" X140 CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,651.13 $3,651.13 $3,651.13 $3,651.13 $3,651.13 $3,651.13 $3,651.13 $3,768.14 $3,653.12 $3,653.12 $3,653.12 $3,653.12 $3,653.12 $3,653.12 $3,653.12

1123001383 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO SENCILLO CENTRADO O DESCENTRADO DE 6"X 180 CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4,449.10 $4,449.10 $4,449.10 $4,449.10 $4,449.10 $4,449.10 $4,449.10 $4,580.14 $4,451.33 $4,451.33 $4,451.33 $4,451.33 $4,451.33 $4,451.33 $4,451.33

1123001393 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO SENCILLO CENTRADO O DESCENTRADO DE 6"X 210 CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4,953.42 $4,953.42 $4,953.42 $4,953.42 $4,953.42 $4,953.42 $4,953.42 $5,084.46 $4,955.65 $4,955.65 $4,955.65 $4,955.65 $4,955.65 $4,955.65 $4,955.65

1123001403 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO DOBLE DE 4" X 140 CMS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $2,912.92 $2,912.92 $2,912.92 $2,912.92 $2,912.92 $2,912.92 $2,912.92 $2,997.27 $2,914.34 $2,914.34 $2,914.34 $2,914.34 $2,914.34 $2,914.34 $2,914.34

1123001413 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO DOBLE DE 4" X 180 CMS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $3,369.88 $3,369.88 $3,369.88 $3,369.88 $3,369.88 $3,369.88 $3,369.88 $3,454.23 $3,371.32 $3,371.32 $3,371.32 $3,371.32 $3,371.32 $3,371.32 $3,371.32

1123001423 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO DOBLE DE 4" X 210 CMS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $3,155.47 $3,155.47 $3,155.47 $3,155.47 $3,155.47 $3,155.47 $3,155.47 $3,264.69 $3,157.34 $3,157.34 $3,157.34 $3,157.34 $3,157.34 $3,157.34 $3,157.34

1123001433 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO DOBLE DE 6" X 180 CMS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $5,877.57 $5,877.57 $5,877.57 $5,877.57 $5,877.57 $5,877.57 $5,877.57 $6,008.61 $5,879.81 $5,879.81 $5,879.81 $5,879.81 $5,879.81 $5,879.81 $5,879.81

:

Page 91: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 91 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123001443 SUMINISTRO Y COLOCACION DE CONTRA MARCOTIPO DOBLE DE 6" X 210 CMS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $6,895.17 $6,895.17 $6,895.17 $6,895.17 $6,895.17 $6,895.17 $6,895.17 $7,026.21 $6,897.41 $6,897.41 $6,897.41 $6,897.41 $6,897.41 $6,897.41 $6,897.41

1123001463 SUMINISTRO Y COLOCACION DE ESCALONES PARAPOZO DE VISITA TIPO D.D.F. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $186.35 $186.35 $186.35 $186.35 $186.35 $186.35 $186.35 $202.73 $186.63 $186.63 $186.63 $186.63 $186.63 $186.63 $186.63

1123001473 SUMINISTRO Y COLOCACION DE ESCALONES PARAPOZO DE VISITA STANDARD INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $142.31 $142.31 $142.31 $142.31 $142.31 $142.31 $142.31 $158.70 $142.58 $142.58 $142.58 $142.58 $142.58 $142.58 $142.58

Total Sum. e Inst. de Contramarcos

A112305 Sum. e Inst. de Brocales y Tapas1123001501 SUMINISTRO Y COLOCACION DE TAPAS PARA CAJA

DE VALVULA (MARCO C/TAPA STANDARD DE 50 X 50CMS.). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,497.17 $2,497.17 $2,497.17 $2,497.17 $2,497.17 $2,497.17 $2,497.17 $2,579.06 $2,498.56 $2,498.56 $2,498.56 $2,498.56 $2,498.56 $2,498.56 $2,498.56

1123001511 SUMINISTRO Y COLOCACION DE TAPAS PARA CAJADE VALVULA (MARCO C/TAPA PESADO DE 50 X 50CMS.). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,769.38 $3,769.38 $3,769.38 $3,769.38 $3,769.38 $3,769.38 $3,769.38 $3,933.19 $3,772.17 $3,772.17 $3,772.17 $3,772.17 $3,772.17 $3,772.17 $3,772.17

1123001521 SUMINISTRO Y COLOCACION DE TAPAS PARA CAJADE VALVULA (MARCO C/TAPA REFORZADO DE 50 X50 CMS.). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4,381.22 $4,381.22 $4,381.22 $4,381.22 $4,381.22 $4,381.22 $4,381.22 $4,545.03 $4,384.01 $4,384.01 $4,384.01 $4,384.01 $4,384.01 $4,384.01 $4,384.01

1123001531 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA LIGERO CIEGO DE 60 DE DIAM. Y80 KG INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,353.62 $2,353.62 $2,353.62 $2,353.62 $2,353.62 $2,353.62 $2,353.62 $2,435.50 $2,355.00 $2,355.00 $2,355.00 $2,355.00 $2,355.00 $2,355.00 $2,355.00

1123001541 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA LIGERO CIEGO DE 60 CMS DEDIAM. 95 KG. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $2,389.87 $2,389.87 $2,389.87 $2,389.87 $2,389.87 $2,389.87 $2,389.87 $2,471.76 $2,391.26 $2,391.26 $2,391.26 $2,391.26 $2,391.26 $2,391.26 $2,391.26

:

Page 92: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 92 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123001551 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA MEDIANO CIEGO DE 60 CMS DEDIAM. DE 115 KG. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $3,272.32 $3,272.32 $3,272.32 $3,272.32 $3,272.32 $3,272.32 $3,272.32 $3,381.54 $3,274.19 $3,274.19 $3,274.19 $3,274.19 $3,274.19 $3,274.19 $3,274.19

1123001561 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA MEDIANO CON REJILLA DE 60 CMS.DE DIAM. 110 KG INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $3,526.71 $3,526.71 $3,526.71 $3,526.71 $3,526.71 $3,526.71 $3,526.71 $3,635.90 $3,528.55 $3,528.55 $3,528.55 $3,528.55 $3,528.55 $3,528.55 $3,528.55

1123001571 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA MEDIANO CIEGO DE 60 CMS DE135 KG. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4,116.07 $4,116.07 $4,116.07 $4,116.07 $4,116.07 $4,116.07 $4,116.07 $4,225.28 $4,117.92 $4,117.92 $4,117.92 $4,117.92 $4,117.92 $4,117.92 $4,117.92

1123001581 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA PESADO CIEGO DE 60 CMS. DIAM.DE 165 KG INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $5,262.31 $5,262.31 $5,262.31 $5,262.31 $5,262.31 $5,262.31 $5,262.31 $5,426.12 $5,265.11 $5,265.11 $5,265.11 $5,265.11 $5,265.11 $5,265.11 $5,265.11

1123001591 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA PESADO CON REJILLA (ABIERTO)DE 60 CMS. DIAM. Y 130 KG. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $4,252.54 $4,252.54 $4,252.54 $4,252.54 $4,252.54 $4,252.54 $4,252.54 $4,416.34 $4,255.33 $4,255.33 $4,255.33 $4,255.33 $4,255.33 $4,255.33 $4,255.33

1123001601 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA No. 84 C.F.E. ARO Y TAPA. 135 KGINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,587.60 $3,587.60 $3,587.60 $3,587.60 $3,587.60 $3,587.60 $3,587.60 $3,696.81 $3,589.46 $3,589.46 $3,589.46 $3,589.46 $3,589.46 $3,589.46 $3,589.46

1123001611 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA No. 84 C.F.E MARCO Y TAPA DE 181KG INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4,007.46 $4,007.46 $4,007.46 $4,007.46 $4,007.46 $4,007.46 $4,007.46 $4,171.27 $4,010.26 $4,010.26 $4,010.26 $4,010.26 $4,010.26 $4,010.26 $4,010.26

1123001621 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA DE H. DUCTIL CIEGO 60 CMS. DIAM.70 KG INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,547.40 $2,547.40 $2,547.40 $2,547.40 $2,547.40 $2,547.40 $2,547.40 $2,629.29 $2,548.79 $2,548.79 $2,548.79 $2,548.79 $2,548.79 $2,548.79 $2,548.79

1123001631 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA DE H. DUCTIL CON REJILLA DE 60CM Y 65 KG INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $2,621.33 $2,621.33 $2,621.33 $2,621.33 $2,621.33 $2,621.33 $2,621.33 $2,703.23 $2,622.73 $2,622.73 $2,622.73 $2,622.73 $2,622.73 $2,622.73 $2,622.73

:

Page 93: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 93 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1123001641 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA DE POLIETILENO DE 40 KG.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,914.77 $1,914.77 $1,914.77 $1,914.77 $1,914.77 $1,914.77 $1,914.77 $1,996.67 $1,916.18 $1,916.18 $1,916.18 $1,916.18 $1,916.18 $1,916.18 $1,916.18

Total Sum. e Inst. de Brocales y Tapas

A112306 Sum. de Juntas Dresser1123001703 SUMINISTRO Y COLOCACION DE JUNTA DRESSER

ESTILO 38 DE 50 MM. (2") DE DIAMETRO INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $454.70 $454.70 $454.70 $454.70 $454.70 $454.70 $454.70 $468.26 $454.94 $454.94 $454.94 $454.94 $454.94 $454.94 $454.94

1123001713 SUMINISTRO Y COLOCACION DE JUNTA DRESSERESTILO 38 DE 63 MM. (2 1/2") DE DIAM. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $524.39 $524.39 $524.39 $524.39 $524.39 $524.39 $524.39 $541.44 $524.68 $524.68 $524.68 $524.68 $524.68 $524.68 $524.68

1123001723 SUMINISTRO Y COLOCACION DE JUNTA DRESSERESTILO 38 DE 75 MM. (3") DE DIAMETRO INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $640.44 $640.44 $640.44 $640.44 $640.44 $640.44 $640.44 $661.50 $640.79 $640.79 $640.79 $640.79 $640.79 $640.79 $640.79

1123001733 SUMINISTRO Y COLOCACION DE JUNTA DRESSERESTILO 38 DE 100 MM.(4") DE DIAMETRO INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $837.40 $837.40 $837.40 $837.40 $837.40 $837.40 $837.40 $866.01 $837.88 $837.88 $837.88 $837.88 $837.88 $837.88 $837.88

1123001743 SUMINISTRO Y COLOCACION DE JUNTA DRESSERESTILO 38 DE 150MM.(6") DE DIAMETRO INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $1,524.82 $1,524.82 $1,524.82 $1,524.82 $1,524.82 $1,524.82 $1,524.82 $1,577.49 $1,525.74 $1,525.74 $1,525.74 $1,525.74 $1,525.74 $1,525.74 $1,525.74

1123001753 SUMINISTRO Y COLOCACION DE JUNTA DRESSERESTILO 38 DE 200 MM.(8") DE DIAMETRO INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $2,269.52 $2,269.52 $2,269.52 $2,269.52 $2,269.52 $2,269.52 $2,269.52 $2,347.34 $2,270.84 $2,270.84 $2,270.84 $2,270.84 $2,270.84 $2,270.84 $2,270.84

Total Sum. de Juntas Dresser

Total Sum. e Inst. Pzas. Especiales Fo.Fo.

A1125 Sum. e Inst. de Valvulas Seccionamiento VF

:

Page 94: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 94 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1125000013 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 51 MM (2") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $3,134.88 $3,134.88 $3,134.88 $3,134.88 $3,134.88 $3,134.88 $3,134.88 $3,167.59 $3,135.34 $3,135.34 $3,135.34 $3,135.34 $3,135.34 $3,135.34 $3,135.34

CORRECTA EJECUCION.

1125000023 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 63 MM. (2 1/2") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $3,315.55 $3,315.55 $3,315.55 $3,315.55 $3,315.55 $3,315.55 $3,315.55 $3,359.17 $3,316.16 $3,316.16 $3,316.16 $3,316.16 $3,316.16 $3,316.16 $3,316.16

CORRECTA EJECUCION.

1125000033 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 76 MM. (3") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $4,068.76 $4,068.76 $4,068.76 $4,068.76 $4,068.76 $4,068.76 $4,068.76 $4,128.75 $4,069.61 $4,069.61 $4,069.61 $4,069.61 $4,069.61 $4,069.61 $4,069.61

CORRECTA EJECUCION.

1125000043 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 102 MM. (4") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $5,625.53 $5,625.53 $5,625.53 $5,625.53 $5,625.53 $5,625.53 $5,625.53 $5,722.15 $5,627.28 $5,627.28 $5,627.28 $5,627.28 $5,627.28 $5,627.28 $5,627.28

CORRECTA EJECUCION.

1125000053 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 152 MM. (6") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $9,044.49 $9,044.49 $9,044.49 $9,044.49 $9,044.49 $9,044.49 $9,044.49 $9,232.04 $9,047.86 $9,047.86 $9,047.86 $9,047.86 $9,047.86 $9,047.86 $9,047.86

CORRECTA EJECUCION.

:

Page 95: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 95 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1125000063 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 203 MM. (8") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $15,746.35 $15,746.35 $15,746.35 $15,746.35 $15,746.35 $15,746.35 $15,746.35 $16,098.70 $15,752.70 $15,752.70 $15,752.70 $15,752.70 $15,752.70 $15,752.70 $15,752.70

CORRECTA EJECUCION.

1125000073 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 254 MM. (10") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $24,454.78 $24,454.78 $24,454.78 $24,454.78 $24,454.78 $24,454.78 $24,454.78 $24,963.43 $24,463.95 $24,463.95 $24,463.95 $24,463.95 $24,463.95 $24,463.95 $24,463.95

CORRECTA EJECUCION.

1125000083 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 305 MM. (12") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $35,185.92 $35,185.92 $35,185.92 $35,185.92 $35,185.92 $35,185.92 $35,185.92 $35,973.04 $35,200.10 $35,200.10 $35,200.10 $35,200.10 $35,200.10 $35,200.10 $35,200.10

CORRECTA EJECUCION.

1125000093 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 356 MM. (14") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $72,006.84 $72,006.84 $72,006.84 $72,006.84 $72,006.84 $72,006.84 $72,006.84 $73,304.61 $72,034.11 $72,034.11 $72,034.11 $72,034.11 $72,034.11 $72,034.11 $72,034.11

CORRECTA EJECUCION.

1125000103 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 406 MM. (16") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $100,096.64 $100,096.64 $100,096.64 $100,096.64 $100,096.64 $100,096.64 $100,096.64 $101,848.30 $100,133.44 $100,133.44 $100,133.44 $100,133.44 $100,133.44 $100,133.44 $100,133.44

CORRECTA EJECUCION.

:

Page 96: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 96 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1125000113 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 456 MM.(18") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $137,940.43 $137,940.43 $137,940.43 $137,940.43 $137,940.43 $137,940.43 $137,940.43 $140,499.41 $137,994.20 $137,994.20 $137,994.20 $137,994.20 $137,994.20 $137,994.20 $137,994.20

CORRECTA EJECUCION.

1125000123 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 508 MM. (20") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $173,754.19 $173,754.19 $173,754.19 $173,754.19 $173,754.19 $173,754.19 $173,754.19 $176,983.37 $173,822.03 $173,822.03 $173,822.03 $173,822.03 $173,822.03 $173,822.03 $173,822.03

CORRECTA EJECUCION.

1125000133 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 610 MM. (24") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $308,387.53 $308,387.53 $308,387.53 $308,387.53 $308,387.53 $308,387.53 $308,387.53 $313,688.26 $308,498.89 $308,498.89 $308,498.89 $308,498.89 $308,498.89 $308,498.89 $308,498.89

CORRECTA EJECUCION.

1125000143 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/FCON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 762 MM. (30") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $491,833.68 $491,833.68 $491,833.68 $491,833.68 $491,833.68 $491,833.68 $491,833.68 $499,449.66 $491,993.68 $491,993.68 $491,993.68 $491,993.68 $491,993.68 $491,993.68 $491,993.68

CORRECTA EJECUCION.

Total Sum. e Inst. de Valvulas de Secc. VF

A1126 Sum. e Inst. de Valvulas Seccionamiento VS1126000013 SUMINISTRO E INSTALACION DE VALVULA DE

SECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 51 MM. (2") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $4,269.79 $4,269.79 $4,269.79 $4,269.79 $4,269.79 $4,269.79 $4,269.79 $4,316.14 $4,270.45 $4,270.45 $4,270.45 $4,270.45 $4,270.45 $4,270.45 $4,270.45

CORRECTA EJECUCION.

:

Page 97: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 97 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1126000023 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 63 MM. (2 1/2") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $5,243.16 $5,243.16 $5,243.16 $5,243.16 $5,243.16 $5,243.16 $5,243.16 $5,303.14 $5,244.01 $5,244.01 $5,244.01 $5,244.01 $5,244.01 $5,244.01 $5,244.01

CORRECTA EJECUCION.

1126000033 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 76 MM. (3") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $6,149.34 $6,149.34 $6,149.34 $6,149.34 $6,149.34 $6,149.34 $6,149.34 $6,222.95 $6,150.37 $6,150.37 $6,150.37 $6,150.37 $6,150.37 $6,150.37 $6,150.37

CORRECTA EJECUCION.

1126000043 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 102 MM. (4") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $8,386.29 $8,386.29 $8,386.29 $8,386.29 $8,386.29 $8,386.29 $8,386.29 $8,499.95 $8,388.33 $8,388.33 $8,388.33 $8,388.33 $8,388.33 $8,388.33 $8,388.33

CORRECTA EJECUCION.

1126000053 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 152 MM. (6") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $14,658.11 $14,658.11 $14,658.11 $14,658.11 $14,658.11 $14,658.11 $14,658.11 $14,888.28 $14,662.25 $14,662.25 $14,662.25 $14,662.25 $14,662.25 $14,662.25 $14,662.25

CORRECTA EJECUCION.

1126000063 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 203 MM. (8") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $29,007.23 $29,007.23 $29,007.23 $29,007.23 $29,007.23 $29,007.23 $29,007.23 $29,439.16 $29,015.00 $29,015.00 $29,015.00 $29,015.00 $29,015.00 $29,015.00 $29,015.00

CORRECTA EJECUCION.

:

Page 98: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 98 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1126000073 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 254 MM. (10") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $41,975.82 $41,975.82 $41,975.82 $41,975.82 $41,975.82 $41,975.82 $41,975.82 $42,612.34 $41,987.30 $41,987.30 $41,987.30 $41,987.30 $41,987.30 $41,987.30 $41,987.30

CORRECTA EJECUCION.

1126000083 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 305 MM. (12") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $61,655.13 $61,655.13 $61,655.13 $61,655.13 $61,655.13 $61,655.13 $61,655.13 $62,757.67 $61,675.00 $61,675.00 $61,675.00 $61,675.00 $61,675.00 $61,675.00 $61,675.00

CORRECTA EJECUCION.

1126000093 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 356 MM. (14") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $99,160.13 $99,160.13 $99,160.13 $99,160.13 $99,160.13 $99,160.13 $99,160.13 $100,457.90 $99,187.39 $99,187.39 $99,187.39 $99,187.39 $99,187.39 $99,187.39 $99,187.39

CORRECTA EJECUCION.

1126000103 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 406 MM. (16") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $157,989.47 $157,989.47 $157,989.47 $157,989.47 $157,989.47 $157,989.47 $157,989.47 $159,741.15 $158,026.27 $158,026.27 $158,026.27 $158,026.27 $158,026.27 $158,026.27 $158,026.27

CORRECTA EJECUCION.

1126000113 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 456 MM. (18") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $237,323.08 $237,323.08 $237,323.08 $237,323.08 $237,323.08 $237,323.08 $237,323.08 $239,882.06 $237,376.84 $237,376.84 $237,376.84 $237,376.84 $237,376.84 $237,376.84 $237,376.84

CORRECTA EJECUCION.

:

Page 99: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 99 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1126000123 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 508 MM. (20") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $308,854.48 $308,854.48 $308,854.48 $308,854.48 $308,854.48 $308,854.48 $308,854.48 $312,083.66 $308,922.31 $308,922.31 $308,922.31 $308,922.31 $308,922.31 $308,922.31 $308,922.31

CORRECTA EJECUCION.

1126000133 SUMINISTRO E INSTALACION DE VALVULA DESECCIONAMIENTO TIPO COMPUERTA DE Fo.Fo. V/S,CON BRIDA, INCLUYE: LIMPIEZA E INSTALACION DELA PIEZA ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) DE 610 MM. (24") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SU

PZA $474,501.53 $474,501.53 $474,501.53 $474,501.53 $474,501.53 $474,501.53 $474,501.53 $479,802.25 $474,612.88 $474,612.88 $474,612.88 $474,612.88 $474,612.88 $474,612.88 $474,612.88

CORRECTA EJECUCION.

Total Sum. e Inst. de Valvulas Seccionamiento

A1127 Sum. e Inst. de Valvulas Check1127000013 SUMINISTRO E INSTALACION DE VALVULA CHECK,

INCLUYE: LIMPIEZA E INSTALACION DE LAS PIEZAS,ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). VALVULA CHECK O SIMILAR EN CALIDADY COSTO DE 51MM (2") DE DIAM. INCLUYE TODO LONECESARIO PARA SU CORRECTA

PZA $3,649.77 $3,649.77 $3,649.77 $3,649.77 $3,649.77 $3,649.77 $3,649.77 $3,682.48 $3,650.22 $3,650.22 $3,650.22 $3,650.22 $3,650.22 $3,650.22 $3,650.22

EJECUCION.

1127000023 SUMINISTRO E INSTALACION DE VALVULA CHECK,INCLUYE: LIMPIEZA E INSTALACION DE LAS PIEZAS,ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). VALVULA CHECK O SIMILAR EN CALIDADY COSTO DE 64MM (2 1/2") DE DIAM. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $3,690.77 $3,690.77 $3,690.77 $3,690.77 $3,690.77 $3,690.77 $3,690.77 $3,739.84 $3,691.46 $3,691.46 $3,691.46 $3,691.46 $3,691.46 $3,691.46 $3,691.46

EJECUCION.

1127000033 SUMINISTRO E INSTALACION DE VALVULA CHECK,INCLUYE: LIMPIEZA E INSTALACION DE LAS PIEZAS,ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). VALVULA CHECK O SIMILAR EN CALIDADY COSTO DE 76MM (3") DE DIAM. INCLUYE TODO LONECESARIO PARA SU CORRECTA

PZA $4,591.32 $4,591.32 $4,591.32 $4,591.32 $4,591.32 $4,591.32 $4,591.32 $4,656.76 $4,592.25 $4,592.25 $4,592.25 $4,592.25 $4,592.25 $4,592.25 $4,592.25

EJECUCION.

:

Page 100: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 100 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1127000043 SUMINISTRO E INSTALACION DE VALVULA CHECK,INCLUYE: LIMPIEZA E INSTALACION DE LAS PIEZAS,ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). VALVULA CHECK O SIMILAR EN CALIDADY COSTO DE 102 (4") DE DIAM. INCLUYE TODO LONECESARIO PARA SU CORRECTA

PZA $6,605.09 $6,605.09 $6,605.09 $6,605.09 $6,605.09 $6,605.09 $6,605.09 $6,730.13 $6,607.35 $6,607.35 $6,607.35 $6,607.35 $6,607.35 $6,607.35 $6,607.35

EJECUCION.

1127000053 SUMINISTRO E INSTALACION DE VALVULA CHECK,INCLUYE: LIMPIEZA E INSTALACION DE LAS PIEZAS,ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). VALVULA CHECK O SIMILAR EN CALIDADY COSTO DE 152 MM. (6") DE DIAM. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $11,436.19 $11,436.19 $11,436.19 $11,436.19 $11,436.19 $11,436.19 $11,436.19 $11,623.73 $11,439.57 $11,439.57 $11,439.57 $11,439.57 $11,439.57 $11,439.57 $11,439.57

EJECUCION.

1127000063 SUMINISTRO E INSTALACION DE VALVULA CHECK,INCLUYE: LIMPIEZA E INSTALACION DE LAS PIEZAS,ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). VALVULA CHECK O SIMILAR EN CALIDADY COSTO DE 203 MM. (8") DE DIAM. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $21,624.46 $21,624.46 $21,624.46 $21,624.46 $21,624.46 $21,624.46 $21,624.46 $22,022.28 $21,631.63 $21,631.63 $21,631.63 $21,631.63 $21,631.63 $21,631.63 $21,631.63

EJECUCION.

1127000073 SUMINISTRO E INSTALACION DE VALVULA CHECK,INCLUYE: LIMPIEZA E INSTALACION DE LAS PIEZAS,ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). VALVULA CHECK O SIMILAR EN CALIDADY COSTO DE 254 MM. (10") DE DIAM. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $35,419.39 $35,419.39 $35,419.39 $35,419.39 $35,419.39 $35,419.39 $35,419.39 $36,010.44 $35,430.05 $35,430.05 $35,430.05 $35,430.05 $35,430.05 $35,430.05 $35,430.05

EJECUCION.

1127000083 SUMINISTRO E INSTALACION DE VALVULA CHECK,INCLUYE: LIMPIEZA E INSTALACION DE LAS PIEZAS,ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). VALVULA CHECK O SIMILAR EN CALIDADY COSTO DE 305 MM. (12") DE DIAM. INCLUYE TODOLO NECESARIO PARA SU CORRECTA

PZA $53,134.00 $53,134.00 $53,134.00 $53,134.00 $53,134.00 $53,134.00 $53,134.00 $53,943.85 $53,148.59 $53,148.59 $53,148.59 $53,148.59 $53,148.59 $53,148.59 $53,148.59

EJECUCION.

Total Sum. e Inst. de Valvulas Check

A1128 Sum. e Inst. de Tuberia de FoGo.

:

Page 101: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 101 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1128000013 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE FIERRO GALVANIZADO, INCLUYENDO MANO DEOBRA, FLETES, MANIOBRAS Y COPLE DE Fo.Go. DE13 MM. (1/2") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $48.60 $48.60 $48.60 $48.60 $48.60 $48.60 $48.60 $52.15 $48.66 $48.66 $48.66 $48.66 $48.66 $48.66 $48.66

1128000023 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE FIERRO GALVANIZADO, INCLUYENDO MANO DEOBRA, FLETES, MANIOBRAS Y COPLE DE DE 19 MM. (3/4") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M $72.03 $72.03 $72.03 $72.03 $72.03 $72.03 $72.03 $77.26 $72.11 $72.11 $72.11 $72.11 $72.11 $72.11 $72.11

1128000033 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE FIERRO GALVANIZADO, INCLUYENDO MANO DEOBRA, FLETES, MANIOBRAS Y COPLE DE 25 MM.(1") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M $96.36 $96.36 $96.36 $96.36 $96.36 $96.36 $96.36 $102.34 $96.47 $96.47 $96.47 $96.47 $96.47 $96.47 $96.47

1128000043 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE FIERRO GALVANIZADO, INCLUYENDO MANO DEOBRA, FLETES, MANIOBRAS Y COPLE DE 32 MM. (11/4") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M $127.27 $127.27 $127.27 $127.27 $127.27 $127.27 $127.27 $134.08 $127.39 $127.39 $127.39 $127.39 $127.39 $127.39 $127.39

1128000053 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE FIERRO GALVANIZADO, INCLUYENDO MANO DEOBRA, FLE TES, MANIOBRAS Y COPLE DE 38 MM. (11/2") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M $153.20 $153.20 $153.20 $153.20 $153.20 $153.20 $153.20 $161.30 $153.33 $153.33 $153.33 $153.33 $153.33 $153.33 $153.33

1128000063 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE FIERRO GALVANIZADO, INCLUYENDO MANO DEOBRA, FLE TES, MANIOBRAS Y COPLE DE 50 MM.(2") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M $204.71 $204.71 $204.71 $204.71 $204.71 $204.71 $204.71 $216.39 $204.94 $204.94 $204.94 $204.94 $204.94 $204.94 $204.94

1128000073 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE FIERRO GALVANIZADO, INCLUYENDO MANO DEOBRA, FLETES, MANIOBRAS Y COPLE DE 64 MM. (21/2") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M $316.45 $316.45 $316.45 $316.45 $316.45 $316.45 $316.45 $330.91 $316.70 $316.70 $316.70 $316.70 $316.70 $316.70 $316.70

:

Page 102: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 102 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1128000083 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE FIERRO GALVANIZADO, INCLUYENDO MANO DEOBRA, FLETES, MANIOBRAS Y COPLE DE 76 MM. (3")DE DIAMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

M $416.67 $416.67 $416.67 $416.67 $416.67 $416.67 $416.67 $435.91 $417.02 $417.02 $417.02 $417.02 $417.02 $417.02 $417.02

1128000093 SUMINISTRO, INSTALACION Y PRUEBA DE TUBERIADE FIERRO GALVANIZADO, INCLUYENDO MANO DEOBRA, FLETES, MANIOBRAS Y COPLE DE 102 MM.(4") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M $590.81 $590.81 $590.81 $590.81 $590.81 $590.81 $590.81 $618.16 $591.31 $591.31 $591.31 $591.31 $591.31 $591.31 $591.31

Total Sum. e Inst. de Tuberia de FoGo.

A1129 Sum. e Inst. de Piezas Especiales de FoGo.1129000013 SUMINISTRO Y COLOCACION DE PIEZAS

ESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. COPLE REFORZADO DE 13 MM (1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $5.78 $5.78 $5.78 $5.78 $5.78 $5.78 $5.78 $6.30 $5.78 $5.78 $5.78 $5.78 $5.78 $5.78 $5.78

1129000023 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. COPLE REFORZADO DE 19 MM (3/4") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $8.50 $8.50 $8.50 $8.50 $8.50 $8.50 $8.50 $9.33 $8.51 $8.51 $8.51 $8.51 $8.51 $8.51 $8.51

1129000033 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. COPLE REFORZADO DE 25 MM (1 ") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $17.00 $17.00 $17.00 $17.00 $17.00 $17.00 $17.00 $18.22 $17.01 $17.01 $17.01 $17.01 $17.01 $17.01 $17.01

1129000043 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. COPLE REFORZADO DE 32 MM (1 1/4") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $23.76 $23.76 $23.76 $23.76 $23.76 $23.76 $23.76 $25.79 $23.81 $23.81 $23.81 $23.81 $23.81 $23.81 $23.81

:

Page 103: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 103 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000053 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. COPLE REFORZADO DE 38 MM (1 1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $29.29 $29.29 $29.29 $29.29 $29.29 $29.29 $29.29 $31.64 $29.32 $29.32 $29.32 $29.32 $29.32 $29.32 $29.32

1129000063 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. COPLE REFORZADO DE 51 MM (2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $44.65 $44.65 $44.65 $44.65 $44.65 $44.65 $44.65 $48.55 $44.72 $44.72 $44.72 $44.72 $44.72 $44.72 $44.72

1129000073 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. COPLE REFORZADO DE 63 MM (2 1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $81.72 $81.72 $81.72 $81.72 $81.72 $81.72 $81.72 $86.88 $81.80 $81.80 $81.80 $81.80 $81.80 $81.80 $81.80

1129000083 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. COPLE REFORZADO DE 75 MM (3") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $130.26 $130.26 $130.26 $130.26 $130.26 $130.26 $130.26 $137.68 $130.37 $130.37 $130.37 $130.37 $130.37 $130.37 $130.37

1129000093 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. COPLE REFORZADO DE 102 MM (4") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $205.35 $205.35 $205.35 $205.35 $205.35 $205.35 $205.35 $217.23 $205.55 $205.55 $205.55 $205.55 $205.55 $205.55 $205.55

1129000103 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 1/2"x1/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $20.73 $20.73 $20.73 $20.73 $20.73 $20.73 $20.73 $21.09 $20.73 $20.73 $20.73 $20.73 $20.73 $20.73 $20.73

:

Page 104: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 104 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000113 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 1/2"x3/8"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $20.73 $20.73 $20.73 $20.73 $20.73 $20.73 $20.73 $21.09 $20.73 $20.73 $20.73 $20.73 $20.73 $20.73 $20.73

1129000123 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 3/4"X3/8"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $18.27 $18.27 $18.27 $18.27 $18.27 $18.27 $18.27 $19.02 $18.28 $18.28 $18.28 $18.28 $18.28 $18.28 $18.28

1129000124 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 3/4"X1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $14.46 $14.46 $14.46 $14.46 $14.46 $14.46 $14.46 $15.09 $14.48 $14.48 $14.48 $14.48 $14.48 $14.48 $14.48

1129000133 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 1"X3/8"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $28.70 $28.70 $28.70 $28.70 $28.70 $28.70 $28.70 $29.90 $28.71 $28.71 $28.71 $28.71 $28.71 $28.71 $28.71

1129000134 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 1"X1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $24.53 $24.53 $24.53 $24.53 $24.53 $24.53 $24.53 $25.41 $24.54 $24.54 $24.54 $24.54 $24.54 $24.54 $24.54

1129000135 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 1"X3/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $24.95 $24.95 $24.95 $24.95 $24.95 $24.95 $24.95 $26.00 $24.96 $24.96 $24.96 $24.96 $24.96 $24.96 $24.96

:

Page 105: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 105 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000143 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 1 1/4"X1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $58.75 $58.75 $58.75 $58.75 $58.75 $58.75 $58.75 $60.26 $58.79 $58.79 $58.79 $58.79 $58.79 $58.79 $58.79

1129000144 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 1 1/4"X3/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $59.76 $59.76 $59.76 $59.76 $59.76 $59.76 $59.76 $61.67 $59.80 $59.80 $59.80 $59.80 $59.80 $59.80 $59.80

1129000145 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 1 1/4"X1"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $61.37 $61.37 $61.37 $61.37 $61.37 $61.37 $61.37 $63.44 $61.40 $61.40 $61.40 $61.40 $61.40 $61.40 $61.40

1129000153 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 1 1/2"X1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $74.53 $74.53 $74.53 $74.53 $74.53 $74.53 $74.53 $76.39 $74.57 $74.57 $74.57 $74.57 $74.57 $74.57 $74.57

1129000154 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 1 1/2"X3/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $74.74 $74.74 $74.74 $74.74 $74.74 $74.74 $74.74 $76.68 $74.76 $74.76 $74.76 $74.76 $74.76 $74.76 $74.76

1129000155 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 1 1/2"X1"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $74.94 $74.94 $74.94 $74.94 $74.94 $74.94 $74.94 $76.94 $74.96 $74.96 $74.96 $74.96 $74.96 $74.96 $74.96

:

Page 106: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 106 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000156 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 1 1/2"X1 1/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $76.64 $76.64 $76.64 $76.64 $76.64 $76.64 $76.64 $79.32 $76.68 $76.68 $76.68 $76.68 $76.68 $76.68 $76.68

1129000163 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 2" X1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $91.30 $91.30 $91.30 $91.30 $91.30 $91.30 $91.30 $94.14 $91.35 $91.35 $91.35 $91.35 $91.35 $91.35 $91.35

1129000164 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 2"X3/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $61.07 $61.07 $61.07 $61.07 $61.07 $61.07 $61.07 $63.88 $61.13 $61.13 $61.13 $61.13 $61.13 $61.13 $61.13

1129000165 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 2"X1"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $91.79 $91.79 $91.79 $91.79 $91.79 $91.79 $91.79 $94.83 $91.83 $91.83 $91.83 $91.83 $91.83 $91.83 $91.83

1129000166 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 2"X1 1/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $94.71 $94.71 $94.71 $94.71 $94.71 $94.71 $94.71 $98.92 $94.79 $94.79 $94.79 $94.79 $94.79 $94.79 $94.79

1129000167 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 2"X1 1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $63.79 $63.79 $63.79 $63.79 $63.79 $63.79 $63.79 $67.26 $63.84 $63.84 $63.84 $63.84 $63.84 $63.84 $63.84

:

Page 107: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 107 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000173 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 2 1/2"X2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $107.18 $107.18 $107.18 $107.18 $107.18 $107.18 $107.18 $112.97 $107.28 $107.28 $107.28 $107.28 $107.28 $107.28 $107.28

1129000183 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 3"X2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $152.04 $152.04 $152.04 $152.04 $152.04 $152.04 $152.04 $159.42 $152.19 $152.19 $152.19 $152.19 $152.19 $152.19 $152.19

1129000184 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 3"X2 1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $159.19 $159.19 $159.19 $159.19 $159.19 $159.19 $159.19 $168.36 $159.35 $159.35 $159.35 $159.35 $159.35 $159.35 $159.35

1129000193 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION CAMPANA DE 4"X3"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $289.38 $289.38 $289.38 $289.38 $289.38 $289.38 $289.38 $303.41 $289.63 $289.63 $289.63 $289.63 $289.63 $289.63 $289.63

1129000203 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 1/2"x1/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.39 $13.39 $13.39 $13.39 $13.39 $13.39 $13.39 $13.60 $13.39 $13.39 $13.39 $13.39 $13.39 $13.39 $13.39

1129000213 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 1/2"x3/8"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $12.07 $12.07 $12.07 $12.07 $12.07 $12.07 $12.07 $12.21 $12.07 $12.07 $12.07 $12.07 $12.07 $12.07 $12.07

:

Page 108: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 108 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000214 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 3/4"x1/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.73 $13.73 $13.73 $13.73 $13.73 $13.73 $13.73 $14.09 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1129000223 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 3/4"X3/8"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.72 $13.72 $13.72 $13.72 $13.72 $13.72 $13.72 $14.06 $13.73 $13.73 $13.73 $13.73 $13.73 $13.73 $13.73

1129000224 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 3/4"X1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $14.73 $14.73 $14.73 $14.73 $14.73 $14.73 $14.73 $15.00 $14.73 $14.73 $14.73 $14.73 $14.73 $14.73 $14.73

1129000225 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 1"X3/8"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $32.05 $32.05 $32.05 $32.05 $32.05 $32.05 $32.05 $32.49 $32.07 $32.07 $32.07 $32.07 $32.07 $32.07 $32.07

1129000233 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 1"X1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $35.26 $35.26 $35.26 $35.26 $35.26 $35.26 $35.26 $35.82 $35.27 $35.27 $35.27 $35.27 $35.27 $35.27 $35.27

1129000234 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 1"X3/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $34.96 $34.96 $34.96 $34.96 $34.96 $34.96 $34.96 $35.39 $34.97 $34.97 $34.97 $34.97 $34.97 $34.97 $34.97

:

Page 109: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 109 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000243 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 1 1/4"X1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $35.29 $35.29 $35.29 $35.29 $35.29 $35.29 $35.29 $36.20 $35.31 $35.31 $35.31 $35.31 $35.31 $35.31 $35.31

1129000244 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 1 1/4"X3/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $35.96 $35.96 $35.96 $35.96 $35.96 $35.96 $35.96 $37.11 $35.98 $35.98 $35.98 $35.98 $35.98 $35.98 $35.98

1129000245 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 1 1/4"X1"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $36.04 $35.20 $35.20 $35.20 $35.20 $35.20 $35.20 $35.20

1129000253 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 1 1/2"X1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $56.70 $56.70 $56.70 $56.70 $56.70 $56.70 $56.70 $57.74 $56.72 $56.72 $56.72 $56.72 $56.72 $56.72 $56.72

1129000254 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 1 1/2"X3/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $56.97 $56.97 $56.97 $56.97 $56.97 $56.97 $56.97 $58.13 $57.00 $57.00 $57.00 $57.00 $57.00 $57.00 $57.00

1129000255 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 1 1/2"X1"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $56.99 $56.99 $56.99 $56.99 $56.99 $56.99 $56.99 $58.14 $57.01 $57.01 $57.01 $57.01 $57.01 $57.01 $57.01

:

Page 110: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 110 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000256 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 1 1/2"X1 1/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $56.05 $56.05 $56.05 $56.05 $56.05 $56.05 $56.05 $56.83 $56.07 $56.07 $56.07 $56.07 $56.07 $56.07 $56.07

1129000263 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 2" X1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $57.90 $57.90 $57.90 $57.90 $57.90 $57.90 $57.90 $59.57 $57.93 $57.93 $57.93 $57.93 $57.93 $57.93 $57.93

1129000264 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 2"X3/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $58.05 $58.05 $58.05 $58.05 $58.05 $58.05 $58.05 $59.78 $58.09 $58.09 $58.09 $58.09 $58.09 $58.09 $58.09

1129000265 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 2"X1"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $58.38 $58.38 $58.38 $58.38 $58.38 $58.38 $58.38 $60.22 $58.41 $58.41 $58.41 $58.41 $58.41 $58.41 $58.41

1129000266 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 2"X1 1/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $59.66 $59.66 $59.66 $59.66 $59.66 $59.66 $59.66 $62.01 $59.70 $59.70 $59.70 $59.70 $59.70 $59.70 $59.70

1129000267 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 2"X1 1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $58.13 $58.13 $58.13 $58.13 $58.13 $58.13 $58.13 $59.88 $58.17 $58.17 $58.17 $58.17 $58.17 $58.17 $58.17

:

Page 111: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 111 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000273 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 2 1/2"X1"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $101.74 $101.74 $101.74 $101.74 $101.74 $101.74 $101.74 $104.18 $101.77 $101.77 $101.77 $101.77 $101.77 $101.77 $101.77

1129000274 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 2 1/2"X1 1/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $102.26 $102.26 $102.26 $102.26 $102.26 $102.26 $102.26 $104.92 $102.31 $102.31 $102.31 $102.31 $102.31 $102.31 $102.31

1129000275 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 2 1/2"X1 1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $104.18 $104.18 $104.18 $104.18 $104.18 $104.18 $104.18 $107.60 $104.25 $104.25 $104.25 $104.25 $104.25 $104.25 $104.25

1129000276 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 2 1/2"X2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $101.23 $101.23 $101.23 $101.23 $101.23 $101.23 $101.23 $103.48 $101.27 $101.27 $101.27 $101.27 $101.27 $101.27 $101.27

1129000283 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 3"X1"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $140.51 $140.51 $140.51 $140.51 $140.51 $140.51 $140.51 $143.92 $140.58 $140.58 $140.58 $140.58 $140.58 $140.58 $140.58

1129000284 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 3"X1 1/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $134.21 $134.21 $134.21 $134.21 $134.21 $134.21 $134.21 $137.86 $134.28 $134.28 $134.28 $134.28 $134.28 $134.28 $134.28

:

Page 112: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 112 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000285 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 3 "X1 1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $143.39 $143.39 $143.39 $143.39 $143.39 $143.39 $143.39 $147.97 $143.47 $143.47 $143.47 $143.47 $143.47 $143.47 $143.47

1129000286 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 3"X2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $142.67 $142.67 $142.67 $142.67 $142.67 $142.67 $142.67 $146.96 $142.75 $142.75 $142.75 $142.75 $142.75 $142.75 $142.75

1129000287 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 3"X2 1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $142.56 $142.56 $142.56 $142.56 $142.56 $142.56 $142.56 $146.81 $142.65 $142.65 $142.65 $142.65 $142.65 $142.65 $142.65

1129000293 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 4"X1"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $271.69 $271.69 $271.69 $271.69 $271.69 $271.69 $271.69 $277.72 $271.80 $271.80 $271.80 $271.80 $271.80 $271.80 $271.80

1129000294 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 4"X1 1/4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $258.48 $258.48 $258.48 $258.48 $258.48 $258.48 $258.48 $264.58 $258.58 $258.58 $258.58 $258.58 $258.58 $258.58 $258.58

1129000295 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 4"X1 1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $271.86 $271.86 $271.86 $271.86 $271.86 $271.86 $271.86 $277.95 $271.96 $271.96 $271.96 $271.96 $271.96 $271.96 $271.96

:

Page 113: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 113 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000296 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 4"X2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $272.29 $272.29 $272.29 $272.29 $272.29 $272.29 $272.29 $278.55 $272.40 $272.40 $272.40 $272.40 $272.40 $272.40 $272.40

1129000297 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 4"X2 1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $273.06 $273.06 $273.06 $273.06 $273.06 $273.06 $273.06 $279.62 $273.16 $273.16 $273.16 $273.16 $273.16 $273.16 $273.16

1129000298 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 4"X3"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $274.22 $274.22 $274.22 $274.22 $274.22 $274.22 $274.22 $281.26 $274.35 $274.35 $274.35 $274.35 $274.35 $274.35 $274.35

1129000299 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 6"X2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $860.35 $860.35 $860.35 $860.35 $860.35 $860.35 $860.35 $878.02 $860.65 $860.65 $860.65 $860.65 $860.65 $860.65 $860.65

1129000300 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 6"X2 1/2"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $861.65 $861.65 $861.65 $861.65 $861.65 $861.65 $861.65 $879.84 $861.96 $861.96 $861.96 $861.96 $861.96 $861.96 $861.96

1129000301 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 6"X3"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $864.95 $864.95 $864.95 $864.95 $864.95 $864.95 $864.95 $884.47 $865.29 $865.29 $865.29 $865.29 $865.29 $865.29 $865.29

:

Page 114: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 114 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000302 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS: REDUCCION BUSHING DE 6"X4"DIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $868.76 $868.76 $868.76 $868.76 $868.76 $868.76 $868.76 $889.80 $869.13 $869.13 $869.13 $869.13 $869.13 $869.13 $869.13

1129000303 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES,PRUEBAS. CODO REFORZADO DE 10MM (3/8") X 45GRADOS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $5.08 $5.08 $5.08 $5.08 $5.08 $5.08 $5.08 $5.47 $5.09 $5.09 $5.09 $5.09 $5.09 $5.09 $5.09

1129000313 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 13MM (1/2") X 45GRADOS INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $17.48 $17.48 $17.48 $17.48 $17.48 $17.48 $17.48 $18.15 $17.51 $17.51 $17.51 $17.51 $17.51 $17.51 $17.51

1129000323 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 19MM (3/4") X 45GRADOS INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $23.45 $23.45 $23.45 $23.45 $23.45 $23.45 $23.45 $24.37 $23.46 $23.46 $23.46 $23.46 $23.46 $23.46 $23.46

1129000333 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE.MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 25MM (1") X 45GRADOS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $30.04 $30.04 $30.04 $30.04 $30.04 $30.04 $30.04 $31.50 $30.06 $30.06 $30.06 $30.06 $30.06 $30.06 $30.06

1129000343 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 32MM (1 1/4") X 45GRADOS INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $28.79 $28.79 $28.79 $28.79 $28.79 $28.79 $28.79 $30.84 $28.83 $28.83 $28.83 $28.83 $28.83 $28.83 $28.83

:

Page 115: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 115 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000353 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 38MM (1 1/2") X 45GRADOS INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $68.30 $68.30 $68.30 $68.30 $68.30 $68.30 $68.30 $71.08 $68.34 $68.34 $68.34 $68.34 $68.34 $68.34 $68.34

1129000363 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 51MM (2") X 45GRADOS INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $99.55 $99.55 $99.55 $99.55 $99.55 $99.55 $99.55 $104.32 $99.63 $99.63 $99.63 $99.63 $99.63 $99.63 $99.63

1129000373 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 63MM (2 1/2") X 45GRADOS INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $200.81 $200.81 $200.81 $200.81 $200.81 $200.81 $200.81 $208.14 $200.93 $200.93 $200.93 $200.93 $200.93 $200.93 $200.93

1129000383 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 75MM (3") X 45GRADOS INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $333.49 $333.49 $333.49 $333.49 $333.49 $333.49 $333.49 $345.20 $333.69 $333.69 $333.69 $333.69 $333.69 $333.69 $333.69

1129000393 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 102MM (4") X 45GRADOS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $612.97 $612.97 $612.97 $612.97 $612.97 $612.97 $612.97 $630.61 $613.28 $613.28 $613.28 $613.28 $613.28 $613.28 $613.28

1129000413 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 10MM (3/8") X 90GRADOS INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $5.19 $5.19 $5.19 $5.19 $5.19 $5.19 $5.19 $5.64 $5.21 $5.21 $5.21 $5.21 $5.21 $5.21 $5.21

:

Page 116: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 116 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000423 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 13MM (1/2") X 90GRADOS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $9.77 $9.77 $9.77 $9.77 $9.77 $9.77 $9.77 $10.42 $9.77 $9.77 $9.77 $9.77 $9.77 $9.77 $9.77

1129000433 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 19MM (3/4") X 90GRADOS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $16.91 $16.91 $16.91 $16.91 $16.91 $16.91 $16.91 $17.99 $16.93 $16.93 $16.93 $16.93 $16.93 $16.93 $16.93

1129000443 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 25MM (1") X 90GRADOS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $32.23 $32.23 $32.23 $32.23 $32.23 $32.23 $32.23 $33.86 $32.26 $32.26 $32.26 $32.26 $32.26 $32.26 $32.26

1129000453 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 32MM (1 1/4") X 90GRADOS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $28.09 $28.09 $28.09 $28.09 $28.09 $28.09 $28.09 $30.75 $28.14 $28.14 $28.14 $28.14 $28.14 $28.14 $28.14

1129000463 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 38MM (1 1/2") X 90GRADOS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $65.17 $65.17 $65.17 $65.17 $65.17 $65.17 $65.17 $68.53 $65.24 $65.24 $65.24 $65.24 $65.24 $65.24 $65.24

1129000473 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 51MM (2") X 90GRADOS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $94.61 $94.61 $94.61 $94.61 $94.61 $94.61 $94.61 $99.63 $94.71 $94.71 $94.71 $94.71 $94.71 $94.71 $94.71

:

Page 117: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 117 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000483 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 63MM (2 1/2") X 90GRADOS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $197.57 $197.57 $197.57 $197.57 $197.57 $197.57 $197.57 $207.08 $197.74 $197.74 $197.74 $197.74 $197.74 $197.74 $197.74

1129000493 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYEMANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 75MM (3") X 90GRADOS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $351.20 $351.20 $351.20 $351.20 $351.20 $351.20 $351.20 $364.20 $351.41 $351.41 $351.41 $351.41 $351.41 $351.41 $351.41

1129000503 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CODO REFORZADO DE 102MM (4") X 90GRADOS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $637.58 $637.58 $637.58 $637.58 $637.58 $637.58 $637.58 $660.88 $638.01 $638.01 $638.01 $638.01 $638.01 $638.01 $638.01

1129000523 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TEE REFORZADA DE 10MM (3/8") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $21.56 $21.56 $21.56 $21.56 $21.56 $21.56 $21.56 $22.23 $21.57 $21.57 $21.57 $21.57 $21.57 $21.57 $21.57

1129000533 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS.TEE REFORZADA DE 13MM ( 1/2" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $14.03 $14.03 $14.03 $14.03 $14.03 $14.03 $14.03 $15.03 $14.05 $14.05 $14.05 $14.05 $14.05 $14.05 $14.05

1129000543 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS.TEE REFORZADA DE 19 MM (3/4" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $22.45 $22.45 $22.45 $22.45 $22.45 $22.45 $22.45 $24.05 $22.49 $22.49 $22.49 $22.49 $22.49 $22.49 $22.49

:

Page 118: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 118 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000553 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TEE REFORZADA DE 25 MM (1") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $45.06 $42.79 $42.79 $42.79 $42.79 $42.79 $42.79 $42.79

1129000563 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TEE REFORZADA DE 32MM (1 1/4") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $85.85 $85.85 $85.85 $85.85 $85.85 $85.85 $85.85 $89.38 $85.91 $85.91 $85.91 $85.91 $85.91 $85.91 $85.91

1129000573 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TEE REFORZADA DE 38 MM (1 1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $96.16 $96.16 $96.16 $96.16 $96.16 $96.16 $96.16 $100.56 $96.24 $96.24 $96.24 $96.24 $96.24 $96.24 $96.24

1129000583 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS.TEE REFORZADA DE 51 MM (2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $143.90 $143.90 $143.90 $143.90 $143.90 $143.90 $143.90 $151.08 $144.02 $144.02 $144.02 $144.02 $144.02 $144.02 $144.02

1129000593 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TEE REFORZADA DE 63 MM (2 1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $439.66 $439.66 $439.66 $439.66 $439.66 $439.66 $439.66 $452.51 $439.89 $439.89 $439.89 $439.89 $439.89 $439.89 $439.89

1129000603 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TEE REFORZADA DE 75 MM (3") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $465.57 $465.57 $465.57 $465.57 $465.57 $465.57 $465.57 $483.91 $465.89 $465.89 $465.89 $465.89 $465.89 $465.89 $465.89

:

Page 119: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 119 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000613 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TEE REFORZADA DE 102 MM (4") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,052.98 $1,052.98 $1,052.98 $1,052.98 $1,052.98 $1,052.98 $1,052.98 $1,084.83 $1,053.56 $1,053.56 $1,053.56 $1,053.56 $1,053.56 $1,053.56 $1,053.56

1129000623 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON MACHO DE 10 MM (3/8") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $7.27 $7.27 $7.27 $7.27 $7.27 $7.27 $7.27 $7.41 $7.27 $7.27 $7.27 $7.27 $7.27 $7.27 $7.27

1129000633 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON MACHO DE 13 MM (1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3.11 $3.11 $3.11 $3.11 $3.11 $3.11 $3.11 $3.34 $3.11 $3.11 $3.11 $3.11 $3.11 $3.11 $3.11

1129000643 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON MACHO DE 19 MM (3/4") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4.16 $4.16 $4.16 $4.16 $4.16 $4.16 $4.16 $4.52 $4.16 $4.16 $4.16 $4.16 $4.16 $4.16 $4.16

1129000653 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON MACHO DE 25 MM (1") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $6.82 $6.82 $6.82 $6.82 $6.82 $6.82 $6.82 $7.49 $6.83 $6.83 $6.83 $6.83 $6.83 $6.83 $6.83

1129000663 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON MACHO DE 32MM (1 1/4") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $10.76 $10.76 $10.76 $10.76 $10.76 $10.76 $10.76 $11.82 $10.78 $10.78 $10.78 $10.78 $10.78 $10.78 $10.78

:

Page 120: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 120 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000673 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS.TAPON MACHO DE 38 MM (1 1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.36 $13.36 $13.36 $13.36 $13.36 $13.36 $13.36 $14.79 $13.39 $13.39 $13.39 $13.39 $13.39 $13.39 $13.39

1129000683 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON MACHO DE 51 MM (2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $20.46 $20.46 $20.46 $20.46 $20.46 $20.46 $20.46 $22.67 $20.49 $20.49 $20.49 $20.49 $20.49 $20.49 $20.49

1129000693 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON MACHO DE 63 MM (2 1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $37.31 $37.31 $37.31 $37.31 $37.31 $37.31 $37.31 $40.32 $37.35 $37.35 $37.35 $37.35 $37.35 $37.35 $37.35

1129000703 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON MACHO DE 75 MM (3") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $52.95 $52.95 $52.95 $52.95 $52.95 $52.95 $52.95 $57.46 $53.03 $53.03 $53.03 $53.03 $53.03 $53.03 $53.03

1129000713 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS.TAPON MACHO DE 102 (4") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $97.29 $97.29 $97.29 $97.29 $97.29 $97.29 $97.29 $106.50 $97.46 $97.46 $97.46 $97.46 $97.46 $97.46 $97.46

1129000723 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON HEMBRA DE 10 MM (3/8") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3.72 $3.72 $3.72 $3.72 $3.72 $3.72 $3.72 $3.92 $3.72 $3.72 $3.72 $3.72 $3.72 $3.72 $3.72

:

Page 121: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 121 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000733 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON HEMBRA DE 13 MM (1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4.45 $4.45 $4.45 $4.45 $4.45 $4.45 $4.45 $4.77 $4.45 $4.45 $4.45 $4.45 $4.45 $4.45 $4.45

1129000743 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS.TAPON HEMBRA DE 19 MM (3/4") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $7.42 $7.42 $7.42 $7.42 $7.42 $7.42 $7.42 $7.89 $7.43 $7.43 $7.43 $7.43 $7.43 $7.43 $7.43

1129000753 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS.TAPON HEMBRA DE 25 MM (1") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $11.02 $11.02 $11.02 $11.02 $11.02 $11.02 $11.02 $11.96 $11.03 $11.03 $11.03 $11.03 $11.03 $11.03 $11.03

1129000763 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON HEMBRA DE 32 MM (1 1/4") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $14.03 $14.03 $14.03 $14.03 $14.03 $14.03 $14.03 $15.28 $14.04 $14.04 $14.04 $14.04 $14.04 $14.04 $14.04

1129000773 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON HEMBRA DE 38 MM (1 1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $19.49 $19.49 $19.49 $19.49 $19.49 $19.49 $19.49 $21.18 $19.52 $19.52 $19.52 $19.52 $19.52 $19.52 $19.52

1129000783 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON HEMBRA DE 51 MM (2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $30.18 $30.18 $30.18 $30.18 $30.18 $30.18 $30.18 $33.14 $30.23 $30.23 $30.23 $30.23 $30.23 $30.23 $30.23

:

Page 122: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 122 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000793 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON HEMBRA DE 63 MM (2 1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $55.68 $55.68 $55.68 $55.68 $55.68 $55.68 $55.68 $59.42 $55.74 $55.74 $55.74 $55.74 $55.74 $55.74 $55.74

1129000803 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON HEMBRA DE 75 MM (3") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $80.79 $80.79 $80.79 $80.79 $80.79 $80.79 $80.79 $87.46 $80.92 $80.92 $80.92 $80.92 $80.92 $80.92 $80.92

1129000813 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TAPON HEMBRA DE Fo.Go. DE 102 MM(4") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $137.99 $137.99 $137.99 $137.99 $137.99 $137.99 $137.99 $150.46 $138.22 $138.22 $138.22 $138.22 $138.22 $138.22 $138.22

1129000833 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TUERCA UNION DE Fo.Go. DE 10MM (3/8")DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $32.55 $32.55 $32.55 $32.55 $32.55 $32.55 $32.55 $33.55 $32.56 $32.56 $32.56 $32.56 $32.56 $32.56 $32.56

1129000843 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TUERCA UNION DE Fo.Go. DE 13MM (1/2")DE DIAMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $46.58 $46.58 $46.58 $46.58 $46.58 $46.58 $46.58 $47.59 $46.59 $46.59 $46.59 $46.59 $46.59 $46.59 $46.59

1129000853 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TUERCA UNION DE Fo.Go. DE 19MM (3/4")DE DIAMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $59.49 $59.49 $59.49 $59.49 $59.49 $59.49 $59.49 $61.01 $59.51 $59.51 $59.51 $59.51 $59.51 $59.51 $59.51

:

Page 123: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 123 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000863 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TUERCA UNION DE Fo. Go. DE25MM (1")DE DIAMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $84.00 $84.00 $84.00 $84.00 $84.00 $84.00 $84.00 $86.36 $84.04 $84.04 $84.04 $84.04 $84.04 $84.04 $84.04

1129000873 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TUERCA UNION DE Fo. Go. DE 32MM (11/4") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $129.80 $129.80 $129.80 $129.80 $129.80 $129.80 $129.80 $134.00 $129.85 $129.85 $129.85 $129.85 $129.85 $129.85 $129.85

1129000883 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TUERCA UNION DE Fo. Go. DE 38MM (11/2") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $168.95 $168.95 $168.95 $168.95 $168.95 $168.95 $168.95 $174.20 $169.05 $169.05 $169.05 $169.05 $169.05 $169.05 $169.05

1129000893 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TUERCA UNION DE Fo.Go. DE 51 MM (2")DE DIAMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $217.30 $217.30 $217.30 $217.30 $217.30 $217.30 $217.30 $226.36 $217.47 $217.47 $217.47 $217.47 $217.47 $217.47 $217.47

1129000903 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TUERCA UNION DE Fo. Go. DE 63MM (21/2") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $457.00 $457.00 $457.00 $457.00 $457.00 $457.00 $457.00 $473.38 $457.29 $457.29 $457.29 $457.29 $457.29 $457.29 $457.29

1129000913 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TUERCA UNION DE Fo.Go. DE 75 MM (3")DE DIAMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $972.04 $972.04 $972.04 $972.04 $972.04 $972.04 $972.04 $996.09 $972.47 $972.47 $972.47 $972.47 $972.47 $972.47 $972.47

:

Page 124: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 124 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000923 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. TUERCA UNION DE Fo.Go. DE 102MM (4")DE DIAMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $1,110.47 $1,110.47 $1,110.47 $1,110.47 $1,110.47 $1,110.47 $1,110.47 $1,138.52 $1,110.96 $1,110.96 $1,110.96 $1,110.96 $1,110.96 $1,110.96 $1,110.96

1129000933 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CRUZ REFORZADA DE Fo.Go. DE 13MM(1/2") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $35.28 $35.28 $35.28 $35.28 $35.28 $35.28 $35.28 $36.48 $35.31 $35.31 $35.31 $35.31 $35.31 $35.31 $35.31

1129000943 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CRUZ REFORZADA DE Fo.Go. DE 19MM(3/4") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $169.14 $169.14 $169.14 $169.14 $169.14 $169.14 $169.14 $170.92 $169.18 $169.18 $169.18 $169.18 $169.18 $169.18 $169.18

1129000953 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CRUZ REFORZADA DE Fo.Go. DE 25 MM(1") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $82.92 $82.92 $82.92 $82.92 $82.92 $82.92 $82.92 $85.58 $82.95 $82.95 $82.95 $82.95 $82.95 $82.95 $82.95

1129000963 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CRUZ REFORZADA DE Fo.Go. DE 32 MM(1 1/4") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $73.40 $73.40 $73.40 $73.40 $73.40 $73.40 $73.40 $77.62 $73.49 $73.49 $73.49 $73.49 $73.49 $73.49 $73.49

1129000973 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CRUZ REFORZADA DE Fo.Go. DE 38 MM(1 1/2") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $178.13 $178.13 $178.13 $178.13 $178.13 $178.13 $178.13 $183.51 $178.23 $178.23 $178.23 $178.23 $178.23 $178.23 $178.23

:

Page 125: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 125 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129000983 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CRUZ REFORZADA DE Fo.Go. DE 51 MM(2") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $278.32 $278.32 $278.32 $278.32 $278.32 $278.32 $278.32 $286.72 $278.47 $278.47 $278.47 $278.47 $278.47 $278.47 $278.47

1129000993 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CRUZ REFORZADA DE Fo.Go. DE 63 MM(2 1/2") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $459.87 $459.87 $459.87 $459.87 $459.87 $459.87 $459.87 $477.38 $460.18 $460.18 $460.18 $460.18 $460.18 $460.18 $460.18

1129001003 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CRUZ REFORZADA DE Fo.Go. DE 75MM(3") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $916.97 $916.97 $916.97 $916.97 $916.97 $916.97 $916.97 $940.66 $917.39 $917.39 $917.39 $917.39 $917.39 $917.39 $917.39

1129001013 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. CRUZ REFORZADA DE Fo.Go. DE 102MM(4") DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $574.78 $574.78 $574.78 $574.78 $574.78 $574.78 $574.78 $618.37 $575.55 $575.55 $575.55 $575.55 $575.55 $575.55 $575.55

1129001023 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. YEE GRIEGA REFORZADA DE Fo.Go. DE13MM (1/2") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $63.05 $63.05 $63.05 $63.05 $63.05 $63.05 $63.05 $64.12 $63.06 $63.06 $63.06 $63.06 $63.06 $63.06 $63.06

1129001033 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. YEE GRIEGA REFORZADA DE Fo.Go. DE19MM (3/4") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $31.26 $31.26 $31.26 $31.26 $31.26 $31.26 $31.26 $32.98 $31.28 $31.28 $31.28 $31.28 $31.28 $31.28 $31.28

:

Page 126: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 126 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129001043 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. YEE GRIEGA REFORZADA DE Fo.Go. DE25MM (1") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $142.92 $142.92 $142.92 $142.92 $142.92 $142.92 $142.92 $145.84 $142.96 $142.96 $142.96 $142.96 $142.96 $142.96 $142.96

1129001053 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. YEE GRIEGA REFORZADA DE Fo.Go. DE32MM (1 1/4") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $82.91 $82.91 $82.91 $82.91 $82.91 $82.91 $82.91 $87.25 $82.98 $82.98 $82.98 $82.98 $82.98 $82.98 $82.98

1129001063 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. YEE GRIEGA REFORZADA DE Fo.Go. DE38 MM (1 1/2") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $341.88 $341.88 $341.88 $341.88 $341.88 $341.88 $341.88 $347.79 $341.98 $341.98 $341.98 $341.98 $341.98 $341.98 $341.98

1129001073 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. YEE GRIEGA REFORZADA DE Fo.Go. DE51 MM (2") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $500.76 $500.76 $500.76 $500.76 $500.76 $500.76 $500.76 $509.67 $500.92 $500.92 $500.92 $500.92 $500.92 $500.92 $500.92

1129001083 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. YEE GRIEGA REFORZADA DE Fo.Go. DE63 MM (2 1/2") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,269.59 $1,269.59 $1,269.59 $1,269.59 $1,269.59 $1,269.59 $1,269.59 $1,287.12 $1,269.90 $1,269.90 $1,269.90 $1,269.90 $1,269.90 $1,269.90 $1,269.90

1129001093 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. YEE GRIEGA REFORZADA DE Fo.Go. DE75 MM (3") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $2,075.64 $2,075.64 $2,075.64 $2,075.64 $2,075.64 $2,075.64 $2,075.64 $2,099.98 $2,076.08 $2,076.08 $2,076.08 $2,076.08 $2,076.08 $2,076.08 $2,076.08

:

Page 127: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 127 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129001103 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. YEE GRIEGA REFORZADA DE Fo.Go. DE102 MM (4") DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $3,517.46 $3,517.46 $3,517.46 $3,517.46 $3,517.46 $3,517.46 $3,517.46 $3,565.35 $3,518.30 $3,518.30 $3,518.30 $3,518.30 $3,518.30 $3,518.30 $3,518.30

1129001113 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. NIPLE DE Fo.Go. DE 13MM (1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $69.18 $69.18 $69.18 $69.18 $69.18 $69.18 $69.18 $77.30 $69.32 $69.32 $69.32 $69.32 $69.32 $69.32 $69.32

1129001123 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. NIPLE DE Fo.Go. DE 19 MM (3/4") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $86.51 $86.51 $86.51 $86.51 $86.51 $86.51 $86.51 $96.96 $86.70 $86.70 $86.70 $86.70 $86.70 $86.70 $86.70

1129001133 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. NIPLE DE Fo.Go. 25MM (1") DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $150.18 $150.18 $150.18 $150.18 $150.18 $150.18 $150.18 $165.07 $150.44 $150.44 $150.44 $150.44 $150.44 $150.44 $150.44

1129001143 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. NIPLE DE Fo.Go. DE 32 MM (1 1/4") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $169.14 $169.14 $169.14 $169.14 $169.14 $169.14 $169.14 $188.86 $169.48 $169.48 $169.48 $169.48 $169.48 $169.48 $169.48

1129001153 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. NIPLE DE Fo.Go. DE 38 MM (1 1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $197.95 $197.95 $197.95 $197.95 $197.95 $197.95 $197.95 $221.58 $198.38 $198.38 $198.38 $198.38 $198.38 $198.38 $198.38

:

Page 128: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 128 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1129001163 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. NIPLE DE Fo.Go. DE 51 MM (2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $255.49 $255.49 $255.49 $255.49 $255.49 $255.49 $255.49 $288.10 $256.06 $256.06 $256.06 $256.06 $256.06 $256.06 $256.06

1129001173 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. NIPLE DE Fo.Go. DE 63 MM (2 1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $405.64 $405.64 $405.64 $405.64 $405.64 $405.64 $405.64 $455.94 $406.53 $406.53 $406.53 $406.53 $406.53 $406.53 $406.53

1129001183 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. NIPLE DE Fo.Go. DE 75MM (3") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $480.77 $480.77 $480.77 $480.77 $480.77 $480.77 $480.77 $551.17 $482.01 $482.01 $482.01 $482.01 $482.01 $482.01 $482.01

1129001193 SUMINISTRO Y COLOCACION DE PIEZASESPECIALES DE FIERRO GALVANIZADO, INCLUYE:MANO DE OBRA, FLETES, MANIOBRAS LOCALES YPRUEBAS. NIPLE DE Fo.Go. DE 102MM (4") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $726.16 $726.16 $726.16 $726.16 $726.16 $726.16 $726.16 $819.88 $727.79 $727.79 $727.79 $727.79 $727.79 $727.79 $727.79

Total Sum. e Inst. de Piezas Especiales de FoG

A1130 Instalacion de Valvulas Especiales1130000013 INSTALACION DE VALVULA DE COMPUERTA DE

13MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA,CIERRE DE BRONCE A BRONCE Y EXTREMOSSOLDADOS MARCA URREA FIG. 783 INCLUYE:PRUEBA HIDROSTATICA CON TUBERIA,MATERIALES PARA INSTALACION, MANO DE OBRA YHERRAMIENTA,

PZA $41.02 $41.02 $41.02 $41.02 $41.02 $41.02 $41.02 $57.37 $41.25 $41.25 $41.25 $41.25 $41.25 $41.25 $41.25

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

:

Page 129: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 129 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1130000023 INSTALACION DE VALVULA DE COMPUERTA DE19MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA,CIERRE DE BRONCE A BRONCE Y EXTREMOSSOLDADOS MARCA URREA FIG. 783 INCLUYE:PRUEBA HIDROSTATICA CON TUBERIA,MATERIALES PARA INSTALACION, MANO DE OBRA YHERRAMIENTA,

PZA $47.85 $47.85 $47.85 $47.85 $47.85 $47.85 $47.85 $66.93 $48.11 $48.11 $48.11 $48.11 $48.11 $48.11 $48.11

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1130000033 INSTALACION DE VALVULA DE COMPUERTA DE25MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA,CIERRE DE BRONCE A BRONCE Y EXTREMOSSOLDADOS MARCA URREA FIG. 783 INCLUYE:PRUEBA HIDROSTATICA CON TUBERIA,MATERIALES PARA INSTALACION, MANO DE OBRA YHERRAMIENTA,

PZA $75.19 $75.19 $75.19 $75.19 $75.19 $75.19 $75.19 $105.17 $75.61 $75.61 $75.61 $75.61 $75.61 $75.61 $75.61

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1130000042 INSTALACION DE VALVULA DE COMPUERTA DE32MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA,CIERRE DE BRONCE A BRONCE Y EXTREMOSSOLDADOS MARCA URREA FIG. 783 INCLUYE:PRUEBA HIDROSTATICA CON TUBERIA,MATERIALES PARA INSTALACION, MANO DE OBRA YHERRAMIENTA,

PZA $136.71 $136.71 $136.71 $136.71 $136.71 $136.71 $136.71 $191.23 $137.47 $137.47 $137.47 $137.47 $137.47 $137.47 $137.47

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1130000043 INSTALACION DE VALVULA DE COMPUERTA DE38MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA,CIERRE DE BRONCE A BRONCE Y EXTREMOSSOLDADOS MARCA URREA FIG. 783 INCLUYE:PRUEBA HIDROSTATICA CON TUBERIA,MATERIALES PARA INSTALACION, MANO DE OBRA YHERRAMIENTA,

PZA $136.71 $136.71 $136.71 $136.71 $136.71 $136.71 $136.71 $191.23 $137.47 $137.47 $137.47 $137.47 $137.47 $137.47 $137.47

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

:

Page 130: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 130 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1130000053 INSTALACION DE VALVULA DE COMPUERTA DE51MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA,CIERRE DE BRONCE A BRONCE Y EXTREMOSSOLDADOS MARCA URREA FIG. 783 INCLUYE:PRUEBA HIDROSTATICA CON TUBERIA,MATERIALES PARA INSTALACION, MANO DE OBRA YHERRAMIENTA,

PZA $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $239.04 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1130000063 INSTALACION DE VALVULA DE COMPUERTA DE64MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA,CIERRE DE BRONCE A BRONCE Y EXTREMOSSOLDADOS MARCA URREA FIG. 783 INCLUYE:PRUEBA HIDROSTATICA CON TUBERIA,MATERIALES PARA INSTALACION, MANO DE OBRA YHERRAMIENTA,

PZA $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $239.04 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1130000073 INSTALACION DE VALVULA DE COMPUERTA DE75MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA,CIERRE DE BRONCE A BRONCE Y EXTREMOSSOLDADOS MARCA URREA FIG. 783 INCLUYE:PRUEBA HIDROSTATICA CON TUBERIA,MATERIALES PARA INSTALACION, MANO DE OBRA YHERRAMIENTA,

PZA $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $239.04 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1131000013 INSTALACION DE VALVULA DE EXPULSION DE AIREROSCABLE DE 125 LBS. DE 13 MM. (1/2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1131000023 INSTALACION DE VALVULA DE EXPULSION DE AIREROSCABLE DE 125 LBS. DE 19 MM. (3/4") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

:

Page 131: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 131 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1131000033 INSTALACION DE VALVULA DE EXPULSION DE AIREROSCABLE DE 125 LBS. DE 25 MM. (1") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1132000013 INSTALACION DE VALVULA DE EXPULSION DE AIREROSCABLE DE 250 LBS. DE 13 MM. (1/2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1132000023 INSTALACION DE VALVULA DE EXPULSION DE AIREROSCABLE DE 250 LBS. DE 19 MM. (3/4") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1132000033 INSTALACION DE VALVULA DE EXPULSION DE AIREROSCABLE DE 250 LBS. DE 25 MM. (1") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1133000013 INSTALACION DE VALVULA DE ADMISION YEXPULSION DE AIRE DE 125 LBS. DE 13 MM. (1/2")DE DIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1133000023 INSTALACION DE VALVULA DE ADMISION YEXPULSION DE AIRE DE 125 LBS. DE 19 MM. (3/4")DE DIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1133000033 INSTALACION DE VALVULA DE ADMISION YEXPULSION DE AIRE DE 125 LBS. DE 25 MM. (1") DEDIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1134000013 INSTALACION DE VALVULA DE ADMISION YEXPULSION DE AIRE DE 250 LBS. DE 13 MM. (1/2")DE DIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1134000023 INSTALACION DE VALVULA DE ADMISION YEXPULSION DE AIRE DE 250 LBS. DE 19 MM. (3/4")DE DIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

:

Page 132: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 132 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1134000033 INSTALACION DE VALVULA DE ADMISION YEXPULSION DE AIRE DE 250 LBS. DE 25 MM. (1") DEDIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1135000013 INSTALACION DE VALVULA COMBINADA DE 125 LBS.DE 13 MM. (1/2") DE DIAM. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1135000023 INSTALACION DE VALVULA COMBINADA DE 125 LBS.DE 25 MM. (1") DE DIAM. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1136000013 INSTALACION DE VALVULA COMBINADA DE 250 LBS.DE 13 MM. (1/2") DE DIAM. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1136000023 INSTALACION DE VALVULA COMBINADA DE 250 LBS.DE 25 MM. (1") DE DIAM. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $13.67 $19.12 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74 $13.74

1137000013 INSTALACION DE VALVULA DE FLOTADORROSCABLE DE 125 LBS. DE 1 1/2" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $54.69 $54.69 $54.69 $54.69 $54.69 $54.69 $54.69 $76.50 $54.99 $54.99 $54.99 $54.99 $54.99 $54.99 $54.99

1137000023 INSTALACION DE VALVULA DE FLOTADORROSCABLE DE 125 LBS. DE 50 MM. (2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $54.69 $54.69 $54.69 $54.69 $54.69 $54.69 $54.69 $76.50 $54.99 $54.99 $54.99 $54.99 $54.99 $54.99 $54.99

1137000033 INSTALACION DE VALVULA DE FLOTADORROSCABLE DE 125 LBS. DE 63 MM. (2 1/2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $54.69 $54.69 $54.69 $54.69 $54.69 $54.69 $54.69 $76.50 $54.99 $54.99 $54.99 $54.99 $54.99 $54.99 $54.99

1137000043 INSTALACION DE VALVULA DE FLOTADORROSCABLE DE 125 LBS. DE 75 MM. (3") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $54.69 $54.69 $54.69 $54.69 $54.69 $54.69 $54.69 $76.50 $54.99 $54.99 $54.99 $54.99 $54.99 $54.99 $54.99

:

Page 133: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 133 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1138000013 INSTALACION DE VALVULA DE FLOTADOR BRIDADADE 125 LBS. DE 100 MM. (4") DE DIAM. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $116.54 $116.54 $116.54 $116.54 $116.54 $116.54 $116.54 $159.17 $117.31 $117.31 $117.31 $117.31 $117.31 $117.31 $117.31

1138000023 INSTALACION DE VALVULA DE FLOTADOR BRIDADADE 125 LBS. DE 150 MM. (6") DE DIAM. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $116.54 $116.54 $116.54 $116.54 $116.54 $116.54 $116.54 $159.17 $117.31 $117.31 $117.31 $117.31 $117.31 $117.31 $117.31

1139000013 INSTALACION DE VALVULA CONTRA GOLPE DEARIETE DE 125 LBS. DE 25 MM. (1") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $239.04 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84

1139000023 INSTALACION DE VALVULA CONTRA GOLPE DEARIETE DE 125 LBS. DE 38 MM. (1 1/2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $239.04 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84

1139000033 INSTALACION DE VALVULA CONTRA GOLPE DEARIETE 125 LBS. DE 50 MM. (2") DE DIAM. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $239.04 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84

1140000013 INSTALACION DE VALVULA CONTRA GOLPE DEARIETE DE 250 LBS. DE 25 MM. (1") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $239.04 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84

1140000023 INSTALACION DE VALVULA CONTRA GOLPE DEARIETE DE 250 LBS. DE 38 MM. (1 1/2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $239.04 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84

1140000033 INSTALACION DE VALVULA CONTRA GOLPE DEARIETE DE 250 LBS. DE 50 MM. (2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $170.88 $239.04 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84 $171.84

Total Instalacion de Valvulas Especiales

A1141 Sum. e Inst. de Valvulas Comp Fig 783 200LBS

:

Page 134: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 134 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1141000013 SUMINISTRO Y COLOCACION DE VALVULA DECOMPUERTA DE 13MM 200LBS CABEZA ROSCADA,CUÑA SOLIDA, CIERRE DE BRONCE A BRONCE YEXTREMOS SOLDADOS MARCA URREA Fig. 83, FIG.783, (SOLDABLE O ROSCABLE) INCLUYE: PRUEBAHIDROSTATICA CON TUBERIA, MATERIALES, MANODE

PZA $205.39 $205.39 $205.39 $205.39 $205.39 $205.39 $205.39 $221.75 $205.62 $205.62 $205.62 $205.62 $205.62 $205.62 $205.62

OBRA Y HERRAMIENTA, INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1141000023 SUMINISTRO Y COLOCACION DE VALVULA DECOMPUERTA DE 19MM 200LBS CABEZA ROSCADA,CUÑA SOLIDA, CIERRE DE BRONCE A BRONCE YEXTREMOS SOLDADOS MARCA URREA Fig. 83, FIG.783, (SOLDABLE O ROSCABLE) INCLUYE: PRUEBAHIDROSTATICA CON TUBERIA, MATERIALES, MANODE

PZA $258.05 $258.05 $258.05 $258.05 $258.05 $258.05 $258.05 $277.13 $258.32 $258.32 $258.32 $258.32 $258.32 $258.32 $258.32

OBRA Y HERRAMIENTA, INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1141000033 SUMINISTRO Y COLOCACION DE VALVULA DECOMPUERTA DE 25MM 200LBS CABEZA ROSCADA,CUÑA SOLIDA, CIERRE DE BRONCE A BRONCE YEXTREMOS SOLDADOS MARCA URREA Fig. 83, FIG.783, (SOLDABLE O ROSCABLE) INCLUYE: PRUEBAHIDROSTATICA CON TUBERIA, MATERIALES, MANODE

PZA $373.53 $373.53 $373.53 $373.53 $373.53 $373.53 $373.53 $403.52 $373.96 $373.96 $373.96 $373.96 $373.96 $373.96 $373.96

OBRA Y HERRAMIENTA, INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1141000042 SUMINISTRO Y COLOCACION DE VALVULA DECOMPUERTA DE 32MM 200LBS CABEZA ROSCADA,CUÑA SOLIDA, CIERRE DE BRONCE A BRONCE YEXTREMOS SOLDADOS MARCA URREA Fig. 83, FIG.783, (SOLDABLE O ROSCABLE) INCLUYE: PRUEBAHIDROSTATICA CON TUBERIA, MATERIALES, MANODE

PZA $741.17 $741.17 $741.17 $741.17 $741.17 $741.17 $741.17 $795.70 $741.94 $741.94 $741.94 $741.94 $741.94 $741.94 $741.94

OBRA Y HERRAMIENTA, INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

:

Page 135: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 135 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1141000043 SUMINISTRO Y COLOCACION DE VALVULA DECOMPUERTA DE 38MM 200LBS CABEZA ROSCADA,CUÑA SOLIDA, CIERRE DE BRONCE A BRONCE YEXTREMOS SOLDADOS MARCA URREA Fig. 83, FIG.783, (SOLDABLE O ROSCABLE) INCLUYE: PRUEBAHIDROSTATICA CON TUBERIA, MATERIALES, MANO

PZA $868.00 $868.00 $868.00 $868.00 $868.00 $868.00 $868.00 $922.53 $868.77 $868.77 $868.77 $868.77 $868.77 $868.77 $868.77

DE OBRA Y HERRAMIENTA, INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1141000053 SUMINISTRO Y COLOCACION DE VALVULA DECOMPUERTA DE 51MM 200LBS CABEZA ROSCADA,CUÑA SOLIDA, CIERRE DE BRONCE A BRONCE YEXTREMOS SOLDADOS MARCA URREA Fig. 83, FIG.783, (SOLDABLE O ROSCABLE) INCLUYE: PRUEBAHIDROSTATICA CON TUBERIA, MATERIALES, MANODE

PZA $1,284.48 $1,284.48 $1,284.48 $1,284.48 $1,284.48 $1,284.48 $1,284.48 $1,352.64 $1,285.44 $1,285.44 $1,285.44 $1,285.44 $1,285.44 $1,285.44 $1,285.44

OBRA Y HERRAMIENTA, INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1141000063 SUMINISTRO Y COLOCACION DE VALVULA DECOMPUERTA DE 64MM 200LBS CABEZA ROSCADA,CUÑA SOLIDA, CIERRE DE BRONCE A BRONCE YEXTREMOS SOLDADOS MARCA URREA Fig. 83, FIG.783, (SOLDABLE O ROSCABLE) INCLUYE: PRUEBAHIDROSTATICA CON TUBERIA, MATERIALES, MANODE

PZA $2,339.70 $2,339.70 $2,339.70 $2,339.70 $2,339.70 $2,339.70 $2,339.70 $2,407.85 $2,340.66 $2,340.66 $2,340.66 $2,340.66 $2,340.66 $2,340.66 $2,340.66

OBRA Y HERRAMIENTA, INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1141000073 SUMINISTRO Y COLOCACION DE VALVULA DECOMPUERTA DE 75MM 200LBS CABEZA ROSCADA,CUÑA SOLIDA, CIERRE DE BRONCE A BRONCE YEXTREMOS SOLDADOS MARCA URREA Fig. 83, FIG.783, (SOLDABLE O ROSCABLE) INCLUYE: PRUEBAHIDROSTATICA CON TUBERIA, MATERIALES, MANODE

PZA $3,625.50 $3,625.50 $3,625.50 $3,625.50 $3,625.50 $3,625.50 $3,625.50 $3,693.66 $3,626.46 $3,626.46 $3,626.46 $3,626.46 $3,626.46 $3,626.46 $3,626.46

OBRA Y HERRAMIENTA, INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

Total Sum. e Inst. de Valvulas Comp Fig 783

A1142 Sum. e Inst. de Valvulas Exp. de Aire 125 lbs

:

Page 136: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 136 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1142000013 SUMINISTRO E INSTALACION DE VALVULA DEEXPULSION DE AIRE ROSCABLE DE 125 LBS. DE 13MM. (1/2") DE DIAM. INCL.: LIMPIEZA EINSTALACION DE LA PIEZA; ASI CO MO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTA

PZA $892.60 $892.60 $892.60 $892.60 $892.60 $892.60 $892.60 $898.06 $892.68 $892.68 $892.68 $892.68 $892.68 $892.68 $892.68

EJECUCION.

1142000023 SUMINISTRO E INSTALACION DE VALVULA DEEXPULSION DE AIRE ROSCABLE DE 125 LBS. DE 19MM. (3/4") DE DIAM., INCL.: LIMPIEZA E INSTALACION DE LA PIEZA; ASI CO MO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $892.60 $892.60 $892.60 $892.60 $892.60 $892.60 $892.60 $898.06 $892.68 $892.68 $892.68 $892.68 $892.68 $892.68 $892.68

1142000033 SUMINISTRO E INSTALACION DE VALVULA DEEXPULSION DE AIRE ROSCABLE DE 125 LBS. DE 25MM. (1") DE DIAM., INCLUYE: LIMPIEZA EINSTALACION DE LA PIEZA; ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $892.60 $892.60 $892.60 $892.60 $892.60 $892.60 $892.60 $898.06 $892.68 $892.68 $892.68 $892.68 $892.68 $892.68 $892.68

Total Sum. e Inst. de Valvula Exp. Aire 125 lb

A1143 Sum. e Inst. de Valvulas Exp. de Aire 250 lbs1143000013 SUMINISTRO E INSTALACION DE VALVULA DE

EXPULSION DE AIRE ROSCABLE DE 250 LBS. DE 13MM. (1/2") DE DIAM., INCLUYE: LIMPIEZA EINSTALACION DE LA PIEZA; ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTA

PZA $1,165.67 $1,165.67 $1,165.67 $1,165.67 $1,165.67 $1,165.67 $1,165.67 $1,171.12 $1,165.74 $1,165.74 $1,165.74 $1,165.74 $1,165.74 $1,165.74 $1,165.74

EJECUCION.

1143000023 SUMINISTRO E INSTALACION DE VALVULA DEEXPULSION DE AIRE ROSCABLE DE 250 LBS. DE 19MM. (3/4") DE DIAM., INCL.: LIMPIEZA EINSTALACION DE LA PIEZA; ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTA

PZA $1,165.67 $1,165.67 $1,165.67 $1,165.67 $1,165.67 $1,165.67 $1,165.67 $1,171.12 $1,165.74 $1,165.74 $1,165.74 $1,165.74 $1,165.74 $1,165.74 $1,165.74

EJECUCION.

:

Page 137: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 137 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1143000033 SUMINISTRO E INSTALACION DE VALVULA DEEXPULSION DE AIRE ROSCABLE DE 250 LBS. DE 25MM. (1") DE DIAM. INCLUYE: LIMPIEZA EINSTALACION DE LA PIEZA; ASI COMO PRUEBAHIDROSTATICA (JUNTO CON TUBERIA). INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $1,304.22 $1,304.22 $1,304.22 $1,304.22 $1,304.22 $1,304.22 $1,304.22 $1,309.67 $1,304.29 $1,304.29 $1,304.29 $1,304.29 $1,304.29 $1,304.29 $1,304.29

Total Sum. e Inst. de Valvula Exp. Aire 25o lb

A1144 Sum. e Inst. de Valv. adm/exp aire 125lb1144000013 SUMINISTRO E INSTALACION DE VALVULA DE

ADMISION Y EXPULSION DE AIRE DE 125 LBS. DE 13MM. (1/2") DE DIAM. INCL.: LIMPIEZA E INSTALACIONDE LA PIEZA; ASI CO MO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,353.59 $1,353.59 $1,353.59 $1,353.59 $1,353.59 $1,353.59 $1,353.59 $1,359.06 $1,353.67 $1,353.67 $1,353.67 $1,353.67 $1,353.67 $1,353.67 $1,353.67

1144000023 SUMINISTRO E INSTALACION DE VALVULA DEADMISION Y EXPULSION DE AIRE DE 125 LBS. DE 19MM. (3/4") DE DIAM. INCL.: LIMPIEZA E INSTALACIONDE LA PIEZA; ASI CO MO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA) INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,353.59 $1,353.59 $1,353.59 $1,353.59 $1,353.59 $1,353.59 $1,353.59 $1,359.06 $1,353.67 $1,353.67 $1,353.67 $1,353.67 $1,353.67 $1,353.67 $1,353.67

1144000033 SUMINISTRO E INSTALACION DE VALVULA DEADMISION Y EXPULSION DE AIRE DE 125 LBS. DE 25MM. (1") DE DIAM. INCL.: LIMPIEZA E INSTALACIONDE LA PIEZA; ASI CO MO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,353.59 $1,353.59 $1,353.59 $1,353.59 $1,353.59 $1,353.59 $1,353.59 $1,359.06 $1,353.67 $1,353.67 $1,353.67 $1,353.67 $1,353.67 $1,353.67 $1,353.67

Total Sum. e Inst. de Valv. adm/exp aire 125lb

A1145 Sum. e Inst. de Valv. adm/exp aire 2501145000013 SUMINISTRO E INSTALACION DE VALVULA DE

ADMISION Y EXPULSION DE AIRE DE 250 LBS. DE 13MM. (1/2") DE DIAM. INCL.: LIMPIEZA E INSTALACIONDE LA PIEZA; ASI CO MO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,476.52 $1,476.52 $1,476.52 $1,476.52 $1,476.52 $1,476.52 $1,476.52 $1,481.97 $1,476.60 $1,476.60 $1,476.60 $1,476.60 $1,476.60 $1,476.60 $1,476.60

:

Page 138: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 138 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1145000023 SUMINISTRO E INSTALACION DE VALVULA DEADMISION Y EXPULSION DE AIRE DE 250 LBS. DE 19MM. (3/4") DE DIAM. INCL.: LIMPIEZA E INSTALACIONDE LA PIEZA; ASI CO MO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,476.52 $1,476.52 $1,476.52 $1,476.52 $1,476.52 $1,476.52 $1,476.52 $1,481.97 $1,476.60 $1,476.60 $1,476.60 $1,476.60 $1,476.60 $1,476.60 $1,476.60

1145000033 SUMINISTRO E INSTALACION DE VALVULA DEADMISION Y EXPULSION DE AIRE DE 250 LBS. DE 25MM. (1") DE DIAM. INCL.: LIMPIEZA E INSTALACIONDE LA PIEZA; ASI CO MO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,476.52 $1,476.52 $1,476.52 $1,476.52 $1,476.52 $1,476.52 $1,476.52 $1,481.97 $1,476.60 $1,476.60 $1,476.60 $1,476.60 $1,476.60 $1,476.60 $1,476.60

Total Sum. e Inst. de Valv. adm/exp aire 250

A1146 Sum. e Inst. de Valv. combinada 125 lb1146000013 SUMINISTRO E INSTALACION DE VALVULA

COMBINADA DE 125 LBS DE 13 MM. (1/2") DE DIAM.INCL.: LIMPIEZA E INSTA LACION DE LA PIEZA; ASICOMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,300.14 $2,300.14 $2,300.14 $2,300.14 $2,300.14 $2,300.14 $2,300.14 $2,305.59 $2,300.22 $2,300.22 $2,300.22 $2,300.22 $2,300.22 $2,300.22 $2,300.22

1146000023 SUMINISTRO E INSTALACION DE VALVULACOMBINADA DE 125 LBS DE 25 MM. (1") DE DIAM.INCL.: LIMPIEZA E INSTALA CION DE LA PIEZA; ASICOMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,300.14 $2,300.14 $2,300.14 $2,300.14 $2,300.14 $2,300.14 $2,300.14 $2,305.59 $2,300.22 $2,300.22 $2,300.22 $2,300.22 $2,300.22 $2,300.22 $2,300.22

Total Sum. e Inst. de Valv. combinada 125 lb

A1147 Sum. e Inst. de Valv. combinada 250 lb1147000013 SUMINISTRO E INSTALACION DE VALVULA

COMBINADA DE 250 LBS DE 13 MM. (1/2") DE DIAM.INCL.: LIMPIEZA E INSTA LACION DE LA PIEZA; ASICOMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,300.14 $2,300.14 $2,300.14 $2,300.14 $2,300.14 $2,300.14 $2,300.14 $2,305.59 $2,300.22 $2,300.22 $2,300.22 $2,300.22 $2,300.22 $2,300.22 $2,300.22

:

Page 139: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 139 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1147000023 SUMINISTRO E INSTALACION DE VALVULACOMBINADA DE 250 LBS DE 25 MM. (1") DE DIAM.INCL.: LIMPIEZA E INSTALA CION DE LA PIEZA; ASICOMO PRUEBA HIDROSTATICA INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,882.19 $1,882.19 $1,882.19 $1,882.19 $1,882.19 $1,882.19 $1,882.19 $1,887.64 $1,882.27 $1,882.27 $1,882.27 $1,882.27 $1,882.27 $1,882.27 $1,882.27

Total Sum. e Inst. de Valv. combinada 250 lb

A1148 Sum. e Inst valv. Flotador Rosc 125 lb1148000013 SUMINISTRO E INSTALACION DE VALVULA DE

FLOTADOR ROSCABLE DE 125 LBS. DE 38 MM. (11/2") DE DIAM. INCL.: LIMPIEZA E INSTALACION DELA PIEZA; ASI COMO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $5,402.52 $5,402.52 $5,402.52 $5,402.52 $5,402.52 $5,402.52 $5,402.52 $5,424.32 $5,402.82 $5,402.82 $5,402.82 $5,402.82 $5,402.82 $5,402.82 $5,402.82

1148000023 SUMINISTRO E INSTALACION DE VALVULA DEFLOTADOR ROSCABLE DE 125 LBS. DE 51 MM. (2")DE DIAM. INCL.: LIMPIEZA E INSTALACION DE LAPIEZA; ASI COMO PRUEBA HI DROSTATICA (JUNTOCON TUBERIA). INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $10,769.72 $10,769.72 $10,769.72 $10,769.72 $10,769.72 $10,769.72 $10,769.72 $10,791.53 $10,770.03 $10,770.03 $10,770.03 $10,770.03 $10,770.03 $10,770.03 $10,770.03

1148000033 SUMINISTRO E INSTALACION DE VALVULA DEFLOTADOR ROSCABLE DE 125 LBS. DE 63 MM. (21/2") DE DIAM. INCL.: LIM PIEZA E INSTALACION DELA PIEZA; ASI COMO PRUEBA HIDROSTATICA(JUNTO CON TUBERIA). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $11,436.65 $11,436.65 $11,436.65 $11,436.65 $11,436.65 $11,436.65 $11,436.65 $11,458.46 $11,436.96 $11,436.96 $11,436.96 $11,436.96 $11,436.96 $11,436.96 $11,436.96

1148000043 SUMINISTRO E INSTALACION DE VALVULA DEFLOTADOR ROSCABLE DE 125 LBS. DE 75 MM. (3")DE DIAM. INCL.: LIMPIE ZA E INSTALACION DE LAPIEZA; ASI COMO PRUEBA HI DROSTATICA (JUNTOCON TUBERIA). INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $11,883.44 $11,883.44 $11,883.44 $11,883.44 $11,883.44 $11,883.44 $11,883.44 $11,905.26 $11,883.75 $11,883.75 $11,883.75 $11,883.75 $11,883.75 $11,883.75 $11,883.75

Total Sum. e Inst valv. Flotador Rosc 125 lb

A1149 Sum. e Inst valv. Flotador Bridado 125 lb

:

Page 140: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 140 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1149000013 SUMINISTRO E INSTALACION DE VALVULA DEFLOTADOR BRIDADA DE 125 LBS. DE 100 MM. (4")DE DIAM. INCL.: LIMPIE ZA E INSTALACION DE LAPIEZA; ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA). INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $15,642.39 $15,642.39 $15,642.39 $15,642.39 $15,642.39 $15,642.39 $15,642.39 $15,685.02 $15,643.17 $15,643.17 $15,643.17 $15,643.17 $15,643.17 $15,643.17 $15,643.17

1149000023 SUMINISTRO E INSTALACION DE VALVULA DEFLOTADOR BRIDADA DE 125 LBS. DE 150 MM. (6")DE DIAM. INCL.: LIMPIE ZA E INSTALACION DE LAPIEZA; ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA) INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $26,742.84 $26,742.84 $26,742.84 $26,742.84 $26,742.84 $26,742.84 $26,742.84 $26,785.47 $26,743.62 $26,743.62 $26,743.62 $26,743.62 $26,743.62 $26,743.62 $26,743.62

Total Sum. e Inst valv. Flotador Bridado 125 l

A1150 Sum. e Inst. de valv. contra Golpe de Ariete 125 lb1150000013 SUMINISTRO E INSTALACION DE VALVULA CONTRA

GOLPE DE ARIE TE DE 125 LBS. DE 25 MM. (1") DEDIAM. INCL.: LIM PIEZA E INSTALACION DE LA PIEZA;ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13,104.76 $13,104.76 $13,104.76 $13,104.76 $13,104.76 $13,104.76 $13,104.76 $13,172.92 $13,105.73 $13,105.73 $13,105.73 $13,105.73 $13,105.73 $13,105.73 $13,105.73

1150000023 SUMINISTRO E INSTALACION DE VALVULA CONTRAGOLPE DE ARIE TE DE 125 LBS. DE 38 MM. (1 1/2")DE DIAM. INCL.: LIMPIEZA E INSTALACION DE LAPIEZA; ASI COMO PRUEBA HIDROSTATICA (JUNTOCON TUBERIA). INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $13,104.74 $13,104.74 $13,104.74 $13,104.74 $13,104.74 $13,104.74 $13,104.74 $13,172.90 $13,105.70 $13,105.70 $13,105.70 $13,105.70 $13,105.70 $13,105.70 $13,105.70

1150000033 SUMINISTRO E INSTALACION DE VALVULA CONTRAGOLPE DE ARIE TE DE 125 LBS. DE 51 MM. (2") DEDIAM. INCL.: LIM PIEZA E INSTALACION DE LA PIEZA;ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $14,676.44 $14,676.44 $14,676.44 $14,676.44 $14,676.44 $14,676.44 $14,676.44 $14,744.60 $14,677.41 $14,677.41 $14,677.41 $14,677.41 $14,677.41 $14,677.41 $14,677.41

Total Sum. e Inst. de valv. contra Ariete 125l

A1151 Sum. e Inst. de valv. contra Golpe de Ariete 250lb

:

Page 141: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 141 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1151000013 SUMINISTRO E INSTALACION DE VALVULA CONTRAGOLPE DE ARIE TE DE 250 LBS. DE 25 MM. (1") DEDIAM. INCL.: LIM PIEZA E INSTALACION DE LA PIEZA;ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $16,554.90 $16,554.90 $16,554.90 $16,554.90 $16,554.90 $16,554.90 $16,554.90 $16,623.06 $16,555.86 $16,555.86 $16,555.86 $16,555.86 $16,555.86 $16,555.86 $16,555.86

1151000023 SUMINISTRO E INSTALACION DE VALVULA CONTRAGOLPE DE ARIETE 250 LBS. DE 38MM (1 1/2") DEDIAM INCL: LIMPIEZA E INSTALACION DE LA PIEZA;ASI COMO PRUE BA HIDROSTATICA (JUNTO CONTUBERIA). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $16,554.90 $16,554.90 $16,554.90 $16,554.90 $16,554.90 $16,554.90 $16,554.90 $16,623.06 $16,555.86 $16,555.86 $16,555.86 $16,555.86 $16,555.86 $16,555.86 $16,555.86

1151000033 SUMINISTRO E INSTALACION DE VALVULA CONTRAGOLPE DE ARIE TE DE 250 LBS. DE 51 MM. (2") DEDIAM. INCL.: LIM PIEZA E INSTALACION DE LA PIEZA;ASI COMO PRUEBA HIDROSTATICA (JUNTO CONTUBERIA). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $16,554.90 $16,554.90 $16,554.90 $16,554.90 $16,554.90 $16,554.90 $16,554.90 $16,623.06 $16,555.86 $16,555.86 $16,555.86 $16,555.86 $16,555.86 $16,555.86 $16,555.86

Total Sum. e Inst. de valv. contra Ariete 250l

A1152 Manometros Equipos de Cloracion

A115201 Sum. e Inst. de Manometros1152000013 SUMINISTRO E INSTALACION DE MANOMETRO TIPO

BOURDON DE 13 MM. (1/2") DE DIAMETRO,CARATULA DE 3" o 4" CON RANGO DE 0.00 A 7.00KG/CM2; INCLUYE: ACARREOS, FLETES,MANIOBRAS, HERRAMIENTA MENOR Y MANO DEOBRA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA

PZA $529.87 $529.87 $529.87 $529.87 $529.87 $529.87 $529.87 $562.64 $530.44 $530.44 $530.44 $530.44 $530.44 $530.44 $530.44

EJECUCION.

1152000023 SUMINISTRO E INSTALACION DE MANOMETRO TIPOBOURDON DE 13 MM. (1/2") DE DIAM., CARATULA 3"o 4" CON RANGO DE 0.00-14.00 KG/CM2; INCLUYE:ACARREOS, FLETES, MANIOBRAS, HERRAMIENTAMENOR Y MANO DE OBRA. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $550.34 $550.34 $550.34 $550.34 $550.34 $550.34 $550.34 $591.29 $551.05 $551.05 $551.05 $551.05 $551.05 $551.05 $551.05

Total Sum. e Inst. de Manometros

A115202 Equipo de Cloracion

:

Page 142: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 142 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1152000033 SUMINISTRO, INSTALACION DE EQUIPO DECLORACION MARCA RAINBOW MODELO 300-29XCON ENTRADA DE AGUA LIMPIA DE 1/2" Y SALIDADE SOLUCION DE 1/2" INCL.: ACCESORIOS, PARAINSTALARSE EN TANQUE DE ALMACENAMIENTO DEAGUA, NO INCLUYE LA CASETA DE PROTECCION.

PZA $5,682.76 $5,682.76 $5,682.76 $5,682.76 $5,682.76 $5,682.76 $5,682.76 $6,010.38 $5,688.35 $5,688.35 $5,688.35 $5,688.35 $5,688.35 $5,688.35 $5,688.35

INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1152000043 SUMINISTRO DE HIPOCLORITO DE CALCIO AL 65%(EN TABLETAS),INCLUYE:ACARREOS,FLETES,ALMACENAJES Y MANIOBRAS INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

Kg $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08

Total Equipo de Cloracion

A115203 Sum. materiales para Toma Domiciliaria1152000053 SUMINISTRO Y COLOCACION DE MATERIALES

PARA TOMA DOMICILIARIA TIPO RURAL INCLUYE:SUJETADOR PVC, 1.2M NIPLE FoGo, COPLE REFORZFoGo LLAVE DE NARIZ DE TODO LAS PIEZAS DE13mm DE DIAMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

Toma $357.24 $357.24 $357.24 $357.24 $357.24 $357.24 $357.24 $439.13 $358.63 $358.63 $358.63 $358.63 $358.63 $358.63 $358.63

Total Sum. materiales para Toma Domiciliaria

A115204 Tapa lamina, Escalera, Codos Forjados y Abrazaderas1152000063 SUMINISTRO E INSTALACION DE TAPA DE LAMINA

CAL. 10 CON MARCO Y CONTRAMARCO DE ANGULODE 2"X 1/4" DE ESPESOR, DIMENSIONES DE 60X60CMS. INCLUYE: BISAGRAS PORTACANDADO,SOLDADURA Y PINTURA ANTICORROSIVA. INCLUYETODO LO NECESARIO PARA SU CORRECTA

PZA $1,034.84 $1,034.84 $1,034.84 $1,034.84 $1,034.84 $1,034.84 $1,034.84 $1,209.54 $1,037.79 $1,037.79 $1,037.79 $1,037.79 $1,037.79 $1,037.79 $1,037.79

EJECUCION.

1152000073 SUMINISTRO E INSTALACION DE ESCALERA MARINACON VARILLA DE 5/8" DE DIAMETRO, ESCALONESCON DESARRO LLO DE 135.00 CMS. EMPOTRADASAL MURO Y CON SEPARA CION DE 35.00 CMS.,INCL.: PINTURA ANTICORROSIVA. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $509.36 $509.36 $509.36 $509.36 $509.36 $509.36 $509.36 $656.79 $511.86 $511.86 $511.86 $511.86 $511.86 $511.86 $511.86

:

Page 143: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 143 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1152000083 SUMINISTRO Y COLOCACION DE MALLA TIPOMOSQUITERO GALVANIZADA. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M2 $65.27 $65.27 $65.27 $65.27 $65.27 $65.27 $65.27 $81.65 $65.55 $65.55 $65.55 $65.55 $65.55 $65.55 $65.55

1152000093 RELLENO ASFALTICO EN JUNTA DE DILATACIONCON UNA SECCION DE 2X6 CMS. INCL.: MATERIALASFALTICO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

M $19.71 $19.71 $19.71 $19.71 $19.71 $19.71 $19.71 $24.63 $19.83 $19.83 $19.83 $19.83 $19.83 $19.83 $19.83

1152000103 CODO FORJADO EN OBRA DE FO.GO. MENORES DE45G. INCLUYE MATERIAL PARA CALENTAR LATUBERIA Y ARENA PARA EL LLENADO DE LA MISMADE 1 1/2" DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $97.63 $97.63 $97.63 $97.63 $97.63 $97.63 $97.63 $108.55 $97.81 $97.81 $97.81 $97.81 $97.81 $97.81 $97.81

1152000113 CODO FORJADO EN OBRA DE FO.GO. MENORES DE45G. INCLUYE MATERIAL PARA CALENTAR LATUBERIA Y ARENA PARA EL LLENADO DE LA MISMADE 2" DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $109.96 $109.96 $109.96 $109.96 $109.96 $109.96 $109.96 $120.88 $110.14 $110.14 $110.14 $110.14 $110.14 $110.14 $110.14

1152000123 CODO FORJADO EN OBRA DE FO.GO. MENORES DE45G. INCLUYE MATERIAL PARA CALENTAR LATUBERIA Y ARENA PARA EL LLENADO DE LA MISMADE 2 1/2" DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $133.70 $133.70 $133.70 $133.70 $133.70 $133.70 $133.70 $144.61 $133.87 $133.87 $133.87 $133.87 $133.87 $133.87 $133.87

1152000133 CODO FORJADO EN OBRA DE FO.GO. MENORES DE45G. INCLUYE MATERIAL PARA CALENTAR LATUBERIA Y ARENA PA RA EL LLENADO DE LA MISMADE 3" DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $157.73 $157.73 $157.73 $157.73 $157.73 $157.73 $157.73 $168.66 $157.91 $157.91 $157.91 $157.91 $157.91 $157.91 $157.91

1152000143 CODO FORJADO EN OBRA DE FO.GO. MENORES DE45G. INCLUYE MATERIAL PARA CALENTAR LATUBERIA Y ARENA PA RA EL LLENADO DE LA MISMADE 4" DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $200.44 $200.44 $200.44 $200.44 $200.44 $200.44 $200.44 $211.36 $200.61 $200.61 $200.61 $200.61 $200.61 $200.61 $200.61

:

Page 144: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 144 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1152000153 SUM. E INSTALACION DE ABRAZADERA TIPO,OMEGA DE 2" X1/4" DE ESPESOR Y 60 CMS. DEDESARROLLO EN APOYO DE CONCRETO, INCLUYE:2 BIRLOS DE ACERO DE 3/4"X6". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $160.99 $160.99 $160.99 $160.99 $160.99 $160.99 $160.99 $204.69 $161.75 $161.75 $161.75 $161.75 $161.75 $161.75 $161.75

1152000173 SUM. Y COLOCACION DE ABRAZADERA FORJADATIPO OMEGA CON SOLERA DE 2"X3/16" DEESPESOR Y CON DESARROLLO DE 50 CMS. ENAPOYO DE CONCRETO, INCLUYE: 2 BIRLOS DEACERO CON TUERCA DE 3/8"X6" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $140.88 $140.88 $140.88 $140.88 $140.88 $140.88 $140.88 $184.58 $141.63 $141.63 $141.63 $141.63 $141.63 $141.63 $141.63

Total Tapa lamina, Escalera, Codos Forjados y

Total Manometros Equipos de Cloracion

Total Agua Potable

A12 Alcantarillado

A1201 Sum. de Tuberia de Concreto Simple1201000013 SUMINISTRO DE TUBERIA DE CONCRETO SIMPLE 15

CMS DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $57.11 $57.11 $57.11 $57.11 $57.11 $57.11 $57.11 $57.11 $57.11 $57.11 $57.11 $57.11 $57.11 $57.11 $57.11

1201000023 SUMINISTRO DE TUBERIA DE CONCRETO SIMPLE 20CMS DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $66.61 $66.61 $66.61 $66.61 $66.61 $66.61 $66.61 $66.61 $66.61 $66.61 $66.61 $66.61 $66.61 $66.61 $66.61

1201000033 SUMINISTRO DE TUBERIA DE CONCRETO SIMPLE 25CMS DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $82.48 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48 $82.48

1201000043 SUMINISTRO DE TUBERIA DE CONCRETO SIMPLE 30CM DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $111.04 $111.04 $111.04 $111.04 $111.04 $111.04 $111.04 $111.04 $111.04 $111.04 $111.04 $111.04 $111.04 $111.04 $111.04

1201000053 SUMINISTRO DE TUBERIA DE CONCRETO SIMPLE 38CMS DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $158.63 $158.63 $158.63 $158.63 $158.63 $158.63 $158.63 $158.63 $158.63 $158.63 $158.63 $158.63 $158.63 $158.63 $158.63

1201000063 SUMINISTRO DE TUBERIA DE CONCRETO SIMPLE 45CMS DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $253.80 $253.80 $253.80 $253.80 $253.80 $253.80 $253.80 $253.80 $253.80 $253.80 $253.80 $253.80 $253.80 $253.80 $253.80

:

Page 145: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 145 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

Total Sum. de Tuberia de Concreto Simple

A1202 Sum. de Tuberia de Concreto Reforzado1202000013 SUMINISTRO DE TUBERIA DE CONCRETO

REFORZADO F'C= 280 KG/CM2. DE 61 CMS. DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $960.01 $960.01 $960.01 $960.01 $960.01 $960.01 $960.01 $960.01 $960.01 $960.01 $960.01 $960.01 $960.01 $960.01 $960.01

1202000023 SUMINISTRO DE TUBERIA DE CONCRETOREFORZADO F'C= 280 KG/CM2. DE 76 CMS. DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $1,280.00 $1,280.00 $1,280.00 $1,280.00 $1,280.00 $1,280.00 $1,280.00 $1,280.00 $1,280.00 $1,280.00 $1,280.00 $1,280.00 $1,280.00 $1,280.00 $1,280.00

1202000033 SUMINISTRO DE TUBERIA DE CONCRETOREFORZADO F'C= 280 KG/CM2. DE 90 CMS. DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $1,717.76 $1,717.76 $1,717.76 $1,717.76 $1,717.76 $1,717.76 $1,717.76 $1,717.76 $1,717.76 $1,717.76 $1,717.76 $1,717.76 $1,717.76 $1,717.76 $1,717.76

1202000043 SUMINISTRO DE TUBERIA DE CONCRETOREFORZADO F'C= 280 KG/CM2. DE 107 CMS. DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $2,186.23 $2,186.23 $2,186.23 $2,186.23 $2,186.23 $2,186.23 $2,186.23 $2,186.23 $2,186.23 $2,186.23 $2,186.23 $2,186.23 $2,186.23 $2,186.23 $2,186.23

1202000053 SUMINISTRO DE TUBERIA DE CONCRETOREFORZADO F'C= 280 KG/CM2. DE 122 CMS. DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $2,654.71 $2,654.71 $2,654.71 $2,654.71 $2,654.71 $2,654.71 $2,654.71 $2,654.71 $2,654.71 $2,654.71 $2,654.71 $2,654.71 $2,654.71 $2,654.71 $2,654.71

1202000063 SUMINISTRO DE TUBERIA DE CONCRETOREFORZADO F'C= 280 KG/CM2. DE 150CMS. DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $5,129.85 $5,129.85 $5,129.85 $5,129.85 $5,129.85 $5,129.85 $5,129.85 $5,129.85 $5,129.85 $5,129.85 $5,129.85 $5,129.85 $5,129.85 $5,129.85 $5,129.85

Total Sum. de Tuberia de Concreto Reforzado

A1203 Inst. de Tuberia de Concreto Simple1203000013 INSTALACION DE TUBERIAS DE CONCRETO SIMPLE

INCLUYE: MANIOBRAS LOCALES, BAJADO,INSTALACION, JUNTEO CON MORTERO CEMENTO-ARENA 1:3. DE 15 CM. DE DIAMETRO INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M $28.99 $28.99 $28.99 $28.99 $28.99 $28.99 $28.99 $39.90 $29.19 $29.19 $29.19 $29.19 $29.19 $29.19 $29.19

:

Page 146: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 146 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1203000023 INSTALACION DE TUBERIAS DE CONCRETO SIMPLEINCLUYE: MANIOBRAS LOCALES, BAJADO,INSTALACION, JUNTEO CON MORTERO CEMENTO-ARENA 1:3. DE 20 CM. DE DIAMETRO INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M $37.23 $37.23 $37.23 $37.23 $37.23 $37.23 $37.23 $50.33 $37.45 $37.45 $37.45 $37.45 $37.45 $37.45 $37.45

1203000033 INSTALACION DE TUBERIAS DE CONCRETO SIMPLEINCLUYE: MANIOBRAS LOCALES, BAJADO,INSTALACION, JUNTEO CON MORTERO CEMENTO-ARENA 1:3. DE 25 CM. DE DIAMETRO INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M $46.65 $46.65 $46.65 $46.65 $46.65 $46.65 $46.65 $63.05 $46.95 $46.95 $46.95 $46.95 $46.95 $46.95 $46.95

1203000043 INSTALACION DE TUBERIAS DE CONCRETO SIMPLEINCLUYE: MANIOBRAS LOCALES, BAJADO,INSTALACION, JUNTEO CON MORTERO CEMENTO-ARENA 1:3. DE 30 CM. DE DIAMETRO INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M $61.38 $61.38 $61.38 $61.38 $61.38 $61.38 $61.38 $83.22 $61.75 $61.75 $61.75 $61.75 $61.75 $61.75 $61.75

1203000053 INSTALACION DE TUBERIAS DE CONCRETO SIMPLEINCLUYE: MANIOBRAS LOCALES, BAJADO,INSTALACION, JUNTEO CON MORTERO CEMENTO-ARENA 1:3. DE 38 CM. DE DIAMETRO INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M $163.36 $163.36 $163.36 $163.36 $163.36 $163.36 $163.36 $221.00 $164.40 $164.40 $164.40 $164.40 $164.40 $164.40 $164.40

1203000063 INSTALACION DE TUBERIAS DE CONCRETO SIMPLEINCLUYE: MANIOBRAS LOCALES, BAJADO,INSTALACION, JUNTEO CON MORTERO CEMENTO-ARENA 1:3. DE 45 CM. DE DIAMETRO INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M $180.36 $180.36 $180.36 $180.36 $180.36 $180.36 $180.36 $243.79 $181.54 $181.54 $181.54 $181.54 $181.54 $181.54 $181.54

1203000073 INSTALACION DE TUBERIA DE CONCRETOREFORZADO, INCLUYE: MANIOBRAS LOCALESBAJADO, INSTALACION JUNTEO CON MORTEROCEMENTO-ARENA 1:3 DE: 61 CM. DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $223.60 $223.60 $223.60 $223.60 $223.60 $223.60 $223.60 $281.70 $224.77 $224.77 $224.77 $224.77 $224.77 $224.77 $224.77

1203000075 INSTALACION DE TUBERIA DE CONCRETOREFORZADO, INCLUYE: MANIOBRAS LOCALESBAJADO, INSTALACION JUNTEO CON MORTEROCEMENTO-ARENA 1:3 DE: 76 CM. DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $310.72 $310.72 $310.72 $310.72 $310.72 $310.72 $310.72 $394.12 $312.37 $312.37 $312.37 $312.37 $312.37 $312.37 $312.37

:

Page 147: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 147 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1203000093 INSTALACION DE TUBERIA DE CONCRETOREFORZADO, INCLUYE MANIOBRAS LOCALESBAJADO, INSTALACION JUNTEO CON MORTEROCEMENTO-ARENA 1:3 DE: 91 CM. DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $389.29 $389.29 $389.29 $389.29 $389.29 $389.29 $389.29 $494.32 $391.36 $391.36 $391.36 $391.36 $391.36 $391.36 $391.36

1203000103 INSTALACION DE TUBERIA DE CONCRETOREFORZADO, INCLUYE MANIOBRAS LOCALESBAJADO, INSTALACION JUNTEO CON MORTEROCEMENTO-ARENA 1:3 DE: 107 CM. DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $437.20 $437.20 $437.20 $437.20 $437.20 $437.20 $437.20 $550.33 $439.44 $439.44 $439.44 $439.44 $439.44 $439.44 $439.44

1203000113 INSTALACION DE TUBERIA DE CONCRETOREFORZADO, INCLUYE MANIOBRAS LOCALESBAJADO, INSTALACION JUNTEO CON MORTEROCEMENTO-ARENA 1:3 DE: 122 CM. DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $535.51 $535.51 $535.51 $535.51 $535.51 $535.51 $535.51 $668.39 $538.25 $538.25 $538.25 $538.25 $538.25 $538.25 $538.25

1203000123 INSTALACION DE TUBERIA DE CONCRETOREFORZADO, INCLUYE MANIOBRAS LOCALESBAJADO, INSTALACION JUNTEO CON MORTEROCEMENTO-ARENA 1:3 DE: 150 CM. DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $673.25 $673.25 $673.25 $673.25 $673.25 $673.25 $673.25 $840.75 $676.72 $676.72 $676.72 $676.72 $676.72 $676.72 $676.72

Total Inst. de Tuberia de Concreto Simple

A1205 Pozos de Visita1205000143 POZO DE VISITA DE: 1.25M. DE PROFUNDIDAD,

PARA TUBO DE 15-30CM DE DIÁMETRO, CON BASECIRCULAR DE 0.9 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $3,322.56 $3,322.56 $3,322.56 $3,322.56 $3,322.56 $3,322.56 $3,322.56 $3,811.03 $3,331.13 $3,331.13 $3,331.13 $3,331.13 $3,331.13 $3,331.13 $3,331.13

:

Page 148: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 148 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000153 POZO DE VISITA DE: 1.5M. DE PROFUNDIDAD,PARA TUBO DE 15-30CM DE DIÁMETRO, CON BASECIRCULAR DE 0.9 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $3,789.18 $3,789.18 $3,789.18 $3,789.18 $3,789.18 $3,789.18 $3,789.18 $4,350.72 $3,798.98 $3,798.98 $3,798.98 $3,798.98 $3,798.98 $3,798.98 $3,798.98

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 149: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 149 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1205000163 POZO DE VISITA DE: 2M. DE PROFUNDIDAD, PARATUBO DE 15-30CM DE DIÁMETRO, CON BASECIRCULAR DE 0.9 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $4,743.27 $4,743.27 $4,743.27 $4,743.27 $4,743.27 $4,743.27 $4,743.27 $5,454.97 $4,755.63 $4,755.63 $4,755.63 $4,755.63 $4,755.63 $4,755.63 $4,755.63

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000173 POZO DE VISITA DE: 2.5M. DE PROFUNDIDAD,PARA TUBO DE 15-30CM DE DIÁMETRO, CON BASECIRCULAR DE 1.2 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $7,458.22 $7,458.22 $7,458.22 $7,458.22 $7,458.22 $7,458.22 $7,458.22 $8,578.26 $7,477.63 $7,477.63 $7,477.63 $7,477.63 $7,477.63 $7,477.63 $7,477.63

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

:

Page 150: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 150 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000183 POZO DE VISITA DE: 3M. DE PROFUNDIDAD, PARATUBO DE 15-30CM DE DIÁMETRO, CON BASECIRCULAR DE 1.2 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $8,737.53 $8,737.53 $8,737.53 $8,737.53 $8,737.53 $8,737.53 $8,737.53 $10,058.26 $8,760.35 $8,760.35 $8,760.35 $8,760.35 $8,760.35 $8,760.35 $8,760.35

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 151: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 151 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1205000193 POZO DE VISITA DE: 3.5M. DE PROFUNDIDAD,PARA TUBO DE 15-30CM DE DIÁMETRO, CON BASECIRCULAR DE 1.2 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $10,242.48 $10,242.48 $10,242.48 $10,242.48 $10,242.48 $10,242.48 $10,242.48 $11,799.27 $10,269.30 $10,269.30 $10,269.30 $10,269.30 $10,269.30 $10,269.30 $10,269.30

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000203 POZO DE VISITA DE: 4M. DE PROFUNDIDAD, PARATUBO DE 15-30CM DE DIÁMETRO, CON BASECIRCULAR DE 1.2 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $11,747.52 $11,747.52 $11,747.52 $11,747.52 $11,747.52 $11,747.52 $11,747.52 $13,540.41 $11,778.34 $11,778.34 $11,778.34 $11,778.34 $11,778.34 $11,778.34 $11,778.34

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

:

Page 152: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 152 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000210 POZO DE VISITA DE: 1.25M. DE PROFUNDIDAD,PARA TUBO DE 38-45CM DE DIÁMETRO, CON BASECIRCULAR DE 0.9 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $3,184.36 $3,184.36 $3,184.36 $3,184.36 $3,184.36 $3,184.36 $3,184.36 $3,647.58 $3,192.50 $3,192.50 $3,192.50 $3,192.50 $3,192.50 $3,192.50 $3,192.50

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000213 POZO DE VISITA DE: 1.5M. DE PROFUNDIDAD,PARA TUBO DE 38-45CM DE DIÁMETRO, CON BASECIRCULAR DE 0.9 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $3,650.89 $3,650.89 $3,650.89 $3,650.89 $3,650.89 $3,650.89 $3,650.89 $4,187.14 $3,660.26 $3,660.26 $3,660.26 $3,660.26 $3,660.26 $3,660.26 $3,660.26

:

Page 153: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 153 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000223 POZO DE VISITA DE: 2M. DE PROFUNDIDAD, PARATUBO DE 38-45CM DE DIÁMETRO, CON BASECIRCULAR DE 0.9 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $4,602.71 $4,602.71 $4,602.71 $4,602.71 $4,602.71 $4,602.71 $4,602.71 $5,288.72 $4,614.66 $4,614.66 $4,614.66 $4,614.66 $4,614.66 $4,614.66 $4,614.66

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 154: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 154 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1205000233 POZO DE VISITA DE: 2.5M. DE PROFUNDIDAD,PARA TUBO DE 38-45CM DE DIÁMETRO, CON BASECIRCULAR DE 1.2 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $7,412.10 $7,412.10 $7,412.10 $7,412.10 $7,412.10 $7,412.10 $7,412.10 $8,517.48 $7,431.33 $7,431.33 $7,431.33 $7,431.33 $7,431.33 $7,431.33 $7,431.33

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000243 POZO DE VISITA DE: 3M. DE PROFUNDIDAD, PARATUBO DE 38-45CM DE DIÁMETRO, CON BASECIRCULAR DE 1.2 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $8,691.34 $8,691.34 $8,691.34 $8,691.34 $8,691.34 $8,691.34 $8,691.34 $9,997.39 $8,713.95 $8,713.95 $8,713.95 $8,713.95 $8,713.95 $8,713.95 $8,713.95

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

:

Page 155: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 155 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000253 POZO DE VISITA DE: 3.5M. DE PROFUNDIDAD,PARA TUBO DE 38-45CM DE DIÁMETRO, CON BASECIRCULAR DE 1.2 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $10,196.37 $10,196.37 $10,196.37 $10,196.37 $10,196.37 $10,196.37 $10,196.37 $11,738.52 $10,222.99 $10,222.99 $10,222.99 $10,222.99 $10,222.99 $10,222.99 $10,222.99

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 156: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 156 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1205000263 POZO DE VISITA DE: 4M. DE PROFUNDIDAD, PARATUBO DE 38-45CM DE DIÁMETRO, CON BASECIRCULAR DE 1.2 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $11,701.40 $11,701.40 $11,701.40 $11,701.40 $11,701.40 $11,701.40 $11,701.40 $13,479.65 $11,732.03 $11,732.03 $11,732.03 $11,732.03 $11,732.03 $11,732.03 $11,732.03

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000273 POZO DE VISITA DE: 2.5M. DE PROFUNDIDAD,PARA TUBO DE 61-76CM DE DIÁMETRO, CON BASECIRCULAR DE 1.5 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $9,160.61 $9,160.61 $9,160.61 $9,160.61 $9,160.61 $9,160.61 $9,160.61 $10,501.92 $9,184.01 $9,184.01 $9,184.01 $9,184.01 $9,184.01 $9,184.01 $9,184.01

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

:

Page 157: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 157 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000283 POZO DE VISITA DE: 3M. DE PROFUNDIDAD, PARATUBO DE 61-76CM DE DIÁMETRO, CON BASECIRCULAR DE 1.5 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $10,703.26 $10,703.26 $10,703.26 $10,703.26 $10,703.26 $10,703.26 $10,703.26 $12,286.55 $10,730.74 $10,730.74 $10,730.74 $10,730.74 $10,730.74 $10,730.74 $10,730.74

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 158: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 158 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1205000293 POZO DE VISITA DE: 3.5M. DE PROFUNDIDAD,PARA TUBO DE 61-76CM DE DIÁMETRO, CON BASECIRCULAR DE 1.5 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $12,584.41 $12,584.41 $12,584.41 $12,584.41 $12,584.41 $12,584.41 $12,584.41 $14,462.82 $12,616.91 $12,616.91 $12,616.91 $12,616.91 $12,616.91 $12,616.91 $12,616.91

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000303 POZO DE VISITA DE: 4M. DE PROFUNDIDAD, PARATUBO DE 61-76CM DE DIÁMETRO, CON BASECIRCULAR DE 1.5 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $14,465.66 $14,465.66 $14,465.66 $14,465.66 $14,465.66 $14,465.66 $14,465.66 $16,639.16 $14,503.17 $14,503.17 $14,503.17 $14,503.17 $14,503.17 $14,503.17 $14,503.17

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

:

Page 159: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 159 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000313 POZO DE VISITA DE: 2.5M. DE PROFUNDIDAD,PARA TUBO DE 91-105CM DE DIÁMETRO, CON BASECIRCULAR DE 2 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $13,088.80 $13,088.80 $13,088.80 $13,088.80 $13,088.80 $13,088.80 $13,088.80 $14,965.53 $13,121.70 $13,121.70 $13,121.70 $13,121.70 $13,121.70 $13,121.70 $13,121.70

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000323 POZO DE VISITA DE: 3M. DE PROFUNDIDAD, PARATUBO DE 91-105CM DE DIÁMETRO, CON BASECIRCULAR DE 2 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $15,070.39 $15,070.39 $15,070.39 $15,070.39 $15,070.39 $15,070.39 $15,070.39 $17,257.99 $15,108.60 $15,108.60 $15,108.60 $15,108.60 $15,108.60 $15,108.60 $15,108.60

:

Page 160: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 160 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000333 POZO DE VISITA DE: 3.5M. DE PROFUNDIDAD,PARA TUBO DE 91-105CM DE DIÁMETRO, CON BASECIRCULAR DE 2 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $17,578.74 $17,578.74 $17,578.74 $17,578.74 $17,578.74 $17,578.74 $17,578.74 $20,159.79 $17,623.60 $17,623.60 $17,623.60 $17,623.60 $17,623.60 $17,623.60 $17,623.60

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 161: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 161 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1205000343 POZO DE VISITA DE: 4M. DE PROFUNDIDAD, PARATUBO DE 91-105CM DE DIÁMETRO, CON BASECIRCULAR DE 2 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $20,087.07 $20,087.07 $20,087.07 $20,087.07 $20,087.07 $20,087.07 $20,087.07 $23,061.60 $20,138.60 $20,138.60 $20,138.60 $20,138.60 $20,138.60 $20,138.60 $20,138.60

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000353 POZO DE VISITA DE: 3M. DE PROFUNDIDAD, PARATUBO DE 1.22CM DE DIÁMETRO, CON BASECIRCULAR DE 2.3 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $18,226.55 $18,226.55 $18,226.55 $18,226.55 $18,226.55 $18,226.55 $18,226.55 $20,844.94 $18,272.33 $18,272.33 $18,272.33 $18,272.33 $18,272.33 $18,272.33 $18,272.33

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

:

Page 162: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 162 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000363 POZO DE VISITA DE: 3.5M. DE PROFUNDIDAD,PARA TUBO DE 1.22CM DE DIÁMETRO, CON BASECIRCULAR DE 2.3 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $21,111.17 $21,111.17 $21,111.17 $21,111.17 $21,111.17 $21,111.17 $21,111.17 $24,182.08 $21,164.65 $21,164.65 $21,164.65 $21,164.65 $21,164.65 $21,164.65 $21,164.65

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 163: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 163 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1205000373 POZO DE VISITA DE: 4M. DE PROFUNDIDAD, PARATUBO DE 1.22CM DE DIÁMETRO, CON BASECIRCULAR DE 2.3 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $23,995.72 $23,995.72 $23,995.72 $23,995.72 $23,995.72 $23,995.72 $23,995.72 $27,519.13 $24,056.87 $24,056.87 $24,056.87 $24,056.87 $24,056.87 $24,056.87 $24,056.87

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000383 POZO DE VISITA DE: 3.5M. DE PROFUNDIDAD,PARA TUBO DE 1.50CM DE DIÁMETRO, CON BASECIRCULAR DE 2.5 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN

PZA $22,737.05 $22,737.05 $22,737.05 $22,737.05 $22,737.05 $22,737.05 $22,737.05 $26,020.43 $22,794.35 $22,794.35 $22,794.35 $22,794.35 $22,794.35 $22,794.35 $22,794.35

DE 1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, ABASE DE PIEDRA BRAZA, ASENTADA CONMORTERO DE CEMENTO ARENA EN PROPORCIÓNDE 1:3. APLANADO ACABADO PULIDO EN ELINTERIOR A BASE DE MORTERO DE CEMENTOARENA EN PROPORCIÓN DE 1:5. ACOSTILLADOCON PIEDRA BRAZA Y

:

Page 164: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 164 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

CON TABIQUE ROJO RECOCIDO ASENTADOS CON MORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1205000393 POZO DE VISITA DE: 4M. DE PROFUNDIDAD, PARATUBO DE 1.50CM DE DIÁMETRO, CON BASECIRCULAR DE 2.5 M. DE DIÁMETRO INTERIOR.CONSTRUIDO A BASE DE TABIQUE ROJO RECOCIDO CON DIMENSIONES DE 5.5X13X28 CM. ASENTADOCON MEZCLA DE CEMENTO ARENA ENPROPORCIÓN DE

PZA $25,872.47 $25,872.47 $25,872.47 $25,872.47 $25,872.47 $25,872.47 $25,872.47 $29,647.67 $25,938.12 $25,938.12 $25,938.12 $25,938.12 $25,938.12 $25,938.12 $25,938.12

1:3, SOBRE CAMA DE 0.3 M. DE ESPESOR, A BASEDE PIEDRA BRAZA, ASENTADA CON MORTERO DECEMENTO ARENA EN PROPORCIÓN DE 1:3.APLANADO ACABADO PULIDO EN EL INTERIOR ABASE DE MORTERO DE CEMENTO ARENA ENPROPORCIÓN DE 1:5. ACOSTILLADO CON PIEDRABRAZA Y

CON TABIQUE ROJO RECOCIDO ASENTADOS CONMORTERO CEMENTO ARENA 1:3. INCLUYE: TRAZOEN EL AREA PARA EL DESPLANTE DE LA PLANTILLA.AFINE NIVELACION Y COMPACTACION CONCOMPACTADOR MANUAL DEL FONDO DEL POZO.PLANTILLA DE CONCRETO F'c=100 Kg/Cm2. DE 6cmDE

ESPESOR. MATERIALES, ACARREOS HASTA ELSITIO DE SU UTILIZACIÓN, MANO DE OBRA, EQUIPOY HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

Total Pozos de Visita

A1208 Brocales de Concreto

:

Page 165: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 165 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1208000013 BROCAL Y TAPA PARA POZO DE VISITA,FABRICADO A BASE DE CONCRETO ARMADO DE FC= 200 KG/ CM2; INCLUYE: HABILITADO DELACERO, CIMBRADO, DESCIMBRADO, ACARREOS,HERRAMIENTA MENOR Y TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $812.68 $812.68 $812.68 $812.68 $812.68 $812.68 $812.68 $988.29 $815.66 $815.66 $815.66 $815.66 $815.66 $815.66 $815.66

Total Brocales de Concreto

A1209 Cajas de Caida1209000013 CAJAS DE CAIDA ADOSADAS A LOS POZOS DE

VISITA INCLUYE: TAPA DE CONCRETO DE F'C=150KG/CM2, ARMADO CON ACERO DEL NO. 3 A CADA15 CMS, EN AMBOS LADOS, PLANTILLA DECONCRETO DE F'C=100 KG/CM2 DE 0.10 M. DEESPESOR, MURO DE TABIQUE DE 0.28 M. DEESPESOR

Caja $1,865.19 $1,865.19 $1,865.19 $1,865.19 $1,865.19 $1,865.19 $1,865.19 $2,225.58 $1,871.36 $1,871.36 $1,871.36 $1,871.36 $1,871.36 $1,871.36 $1,871.36

ASENTADO CON MORTERO CEMENTO ARENA 1:5,CONCRETO F'C=150 KG/CM2, TUBO DE PVCSANITARIO DE 0.25 CM. DE DIAM. E INSTALACION.CAJA DE CAIDA DE 0.80x0.80x0.80 Y 0.50 M. DEPROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1209000023 CAJAS DE CAIDA ADOSADAS A LOS POZOS DEVISITA INCLUYE: TAPA DE CONCRETO DE F'C=150KG/CM2, ARMADO CON ACERO DEL NO. 3 A CADA15 CMS, EN AMBOS LADOS, PLANTILLA DECONCRETO DE F'C=100 KG/CM2 DE 0.10 M. DEESPESOR, MURO DE TABIQUE DE 0.28 M. DEESPESOR

Caja $1,970.15 $1,970.15 $1,970.15 $1,970.15 $1,970.15 $1,970.15 $1,970.15 $2,330.55 $1,976.32 $1,976.32 $1,976.32 $1,976.32 $1,976.32 $1,976.32 $1,976.32

ASENTADO CON MORTERO CEMENTO ARENA 1:5,CONCRETO F'C=150 KG/CM2, TUBO DE PVCSANITARIO DE 0.25 CM. DE DIAM. E INSTALACION.CAJA DE CAIDA DE 0.80x0.80x0.80 Y 1.00 M. DEPROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 166: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 166 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1209000033 CAJAS DE CAIDA ADOSADAS A LOS POZOS DEVISITA INCLUYE: TAPA DE CONCRETO DE F'C=150KG/CM2, ARMADO CON ACERO DEL NO. 3 A CADA15 CMS, EN AMBOS LADOS, PLANTILLA DECONCRETO DE F'C=100 KG/CM2 DE 0.10 M. DEESPESOR, MURO DE TABIQUE DE 0.28 M. DEESPESOR

Caja $2,075.14 $2,075.14 $2,075.14 $2,075.14 $2,075.14 $2,075.14 $2,075.14 $2,435.54 $2,081.31 $2,081.31 $2,081.31 $2,081.31 $2,081.31 $2,081.31 $2,081.31

ASENTADO CON MORTERO CEMENTO ARENA 1:5,CONCRETO F'C=150 KG/CM2, TUBO DE PVCSANITARIO DE 0.25 CM. DE DIAM. E INSTALACION.CAJA DE CAIDA DE 0.80x0.80x0.80 Y 1.50 M. DEPROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1209000043 CAJAS DE CAIDA ADOSADAS A LOS POZOS DEVISITA INCLUYE: TAPA DE CONCRETO DE F'C=150KG/CM2, ARMADO CON ACERO DEL NO. 3 A CADA15 CMS, EN AMBOS LADOS, PLANTILLA DECONCRETO DE F'C=100 KG/CM2 DE 0.10 M. DEESPESOR, MURO DE TABIQUE DE 0.28 M. DEESPESOR

Caja $2,180.11 $2,180.11 $2,180.11 $2,180.11 $2,180.11 $2,180.11 $2,180.11 $2,540.51 $2,186.29 $2,186.29 $2,186.29 $2,186.29 $2,186.29 $2,186.29 $2,186.29

ASENTADO CON MORTERO CEMENTO ARENA 1:5,CONCRETO F'C=150 KG/CM2, TUBO DE PVCSANITARIO DE 0.25 CM. DE DIAM. E INSTALACION.CAJA DE CAIDA DE 0.80x0.80x0.80 Y 2.00 M. DEPROFUNDIDAD. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1209000053 INCREMENTO DE PRECIO POR CADA 50 CM. DEPROF. A LA CAJA DE CAIDA V.C. 1990. INCLUYETODO LO NECESARIO PARA SU CORRECTA

PZA $354.82 $354.82 $354.82 $354.82 $354.82 $354.82 $354.82 $387.58 $355.39 $355.39 $355.39 $355.39 $355.39 $355.39 $355.39

Total Cajas de Caida

A1210 Conexiones domiciliarias1210000013 CONEXIONES DOMICILIARIAS (SLANT Y CODO DE

CONCRETO SIMPLE) SEGUN PLANO V.C. 1983INCLUYE ALMACENAJE, INSTALACION CONMORTERO CEMENTO-ARENA 1:3. CONEXIONDOMICILIARIA DE 150 MM. DE DIAM. A TUBO DECONCRETO SIMPLE. INCLUYE TODO LO NECESARIOPARA SU

Juego $56.58 $56.58 $56.58 $56.58 $56.58 $56.58 $56.58 $74.63 $56.93 $56.93 $56.93 $56.93 $56.93 $56.93 $56.93

CORRECTA EJECUCION.

:

Page 167: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 167 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1210000023 CONEXION DOMICILIARIA DE 200 MM. DE DIAM. ATUBO DE CONCRETO SIMPLE. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

Juego $58.12 $58.12 $58.12 $58.12 $58.12 $58.12 $58.12 $76.17 $58.49 $58.49 $58.49 $58.49 $58.49 $58.49 $58.49

1210000033 CONEXION DOMICILIARIA DE 150 MM. DE DIAM. ATUBO DE CONCRETO REFORZADO. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

Juego $108.43 $108.43 $108.43 $108.43 $108.43 $108.43 $108.43 $144.47 $109.15 $109.15 $109.15 $109.15 $109.15 $109.15 $109.15

1210000043 CONEXION DOMICILIARIA DE 200 MM. DE DIAM. ATUBO DE CONCRETO REFORZADO. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

Juego $110.01 $110.01 $110.01 $110.01 $110.01 $110.01 $110.01 $146.07 $110.73 $110.73 $110.73 $110.73 $110.73 $110.73 $110.73

Total Conexiones domiciliarias

Total Alcantarillado

A14 Registros1401000013 REGISTRO DE 0.6 x 0.4 M. DE MEDIDAS

INTERIORES Y 0.6 M. DE PROFUNDIDAD, A BASEDE MUROS DE TABIQUE ROJO RECOCIDO DE 12CMS. DE ESPESOR, ASENTADO CON MEZCLA DECEMENTO ARENA EN PROPORCIÓN DE 1:5, DE 1CM. DE ESPESOR, APLANADO ACABADO PULIDO EN

PZA $1,921.42 $1,921.42 $1,921.42 $1,921.42 $1,921.42 $1,921.42 $1,921.42 $2,206.09 $1,926.39 $1,926.39 $1,926.39 $1,926.39 $1,926.39 $1,926.39 $1,926.39

INTERIOR, SOBRE FIRME DE 0.05 CMS. DEESPESOR DE CONCRETO HECHO EN OBRA DE F'C=150 KG/CM2 CON TAPA DE CONCRETO DE .05 M.DEESPESOR, CON MARCO Y CONTRAMARCO DEÁNGULO DE ACERO DE 1/4X3 PULGADAS, ARMADACON VARILLA DEL NO. 3 @ 15 EN AMBOS SENTIDOSSOBRE

CADENA DE 0.12X0.15 M. ARMADA CON 4VARILLAS DEL NO. 3 Y ESTRIBOS DEL NO. 2 A CADA20 CMS., INCLUYE: TRAZO, NIVELACIÓN,EXCAVACIÓN, TODOS LOS MATERIALESNECESARIOS, ACARREOS EN CARRETILLA A 20MTS., DESPERDICIOS, LIMPIEZA, MANO DE OBRA,EQUIPO Y

HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

:

Page 168: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 168 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1401000023 REGISTRO DE 0.6 x 0.4 M. DE MEDIDASINTERIORES Y 0.8 M. DE PROFUNDIDAD, A BASEDE MUROS DE TABIQUE ROJO RECOCIDO DE 12CMS. DE ESPESOR, ASENTADO CON MEZCLA DECEMENTO ARENA EN PROPORCIÓN DE 1:5, DE 1CM. DE ESPESOR, APLANADO ACABADO PULIDO EN

PZA $1,631.83 $1,631.83 $1,631.83 $1,631.83 $1,631.83 $1,631.83 $1,631.83 $1,927.24 $1,636.95 $1,636.95 $1,636.95 $1,636.95 $1,636.95 $1,636.95 $1,636.95

INTERIOR, SOBRE FIRME DE 0.05 CMS. DEESPESOR DE CONCRETO HECHO EN OBRA DE F'C=150 KG/CM2 CON TAPA DE CONCRETO DE .05 M.DEESPESOR, CON MARCO Y CONTRAMARCO DEÁNGULO DE ACERO DE 3/16X1 PULGADAS, ARMADACON VARILLA DEL NO. 3 @ 15 EN AMBOS SENTIDOS

SOBRE CADENA DE 0.12X0.15 M. ARMADA CON 4VARILLAS DEL NO. 3 Y ESTRIBOS DEL NO. 2 A CADA20 CMS., INCLUYE: TRAZO, NIVELACIÓN,EXCAVACIÓN, TODOS LOS MATERIALESNECESARIOS, ACARREOS EN CARRETILLA A 20MTS., DESPERDICIOS, LIMPIEZA, MANO DE OBRA,EQUIPO Y

HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1401000033 REGISTRO DE 0.6 x 0.4 M. DE MEDIDASINTERIORES Y 1 M. DE PROFUNDIDAD, A BASE DEMUROS DE TABIQUE ROJO RECOCIDO DE 12 CMS.DE ESPESOR, ASENTADO CON MEZCLA DECEMENTO ARENA EN PROPORCIÓN DE 1:5, DE 1CM. DE ESPESOR, APLANADO ACABADO PULIDO EN INTERIOR,

PZA $1,852.25 $1,852.25 $1,852.25 $1,852.25 $1,852.25 $1,852.25 $1,852.25 $2,190.81 $1,858.12 $1,858.12 $1,858.12 $1,858.12 $1,858.12 $1,858.12 $1,858.12

SOBRE FIRME DE 0.05 CMS. DE ESPESOR DECONCRETO HECHO EN OBRA DE F'C= 150 KG/CM2CON TAPA DE CONCRETO DE .05 M.DE ESPESOR,CON MARCO Y CONTRAMARCO DE ÁNGULO DEACERO DE 3/16X1 PULGADAS, ARMADA CONVARILLA DEL NO. 3 @ 15 EN AMBOS SENTIDOSSOBRE CADENA

DE 0.12X0.15 M. ARMADA CON 4 VARILLAS DEL NO.3 Y ESTRIBOS DEL NO. 2 A CADA 20 CMS.,INCLUYE: TRAZO, NIVELACIÓN, EXCAVACIÓN,TODOS LOS MATERIALES NECESARIOS,ACARREOS EN CARRETILLA A 20 MTS.,DESPERDICIOS, LIMPIEZA, MANO DE OBRA, EQUIPOY HERRAMIENTA.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

:

Page 169: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 169 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1401000043 REGISTRO DE 0.6 x 0.4 M. DE MEDIDASINTERIORES Y 0.6 M. DE PROFUNDIDAD, A BASE DEMUROS DE BLOCK DE CONCRETO DE 12X20X40CMS. DE ESPESOR, ASENTADO CON MEZCLA DECEMENTO ARENA EN PROPORCIÓN DE 1:5, DE 1CM. DE ESPESOR, APLANADO ACABADO PULIDO EN

PZA $1,842.60 $1,842.60 $1,842.60 $1,842.60 $1,842.60 $1,842.60 $1,842.60 $2,121.65 $1,847.48 $1,847.48 $1,847.48 $1,847.48 $1,847.48 $1,847.48 $1,847.48

INTERIOR, SOBRE FIRME DE 0.05 CMS. DEESPESOR DE CONCRETO HECHO EN OBRA DE F'C=150 KG/CM2 CON TAPA DE CONCRETO DE 0.05 M.DEESPESOR, CON MARCO Y CONTRAMARCO DEÁNGULO DE ACERO DE 1/4X3 PULGADAS, ARMADACON VARILLA DEL NO. 3 @ 15 EN AMBOS SENTIDOS

SOBRE CADENA DE 0.12X0.15 M. ARMADA CON 4VARILLAS DEL NO. 3 Y ESTRIBOS DEL NO. 2 A CADA20 CMS., INCLUYE: TRAZO, NIVELACIÓN,EXCAVACIÓN, TODOS LOS MATERIALESNECESARIOS, ACARREOS EN CARRETILLA A 20MTS., DESPERDICIOS, LIMPIEZA, MANO DE OBRA,EQUIPO Y

HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1401000063 REGISTRO DE 0.6 x 0.4 M. DE MEDIDASINTERIORES Y 1 M. DE PROFUNDIDAD, A BASE DEMUROS DE BLOCK DE CONCRETO DE 12X20X40CMS. DE ESPESOR, ASENTADO CON MEZCLA DECEMENTO ARENA EN PROPORCIÓN DE 1:5, DE 1CM. DE ESPESOR, APLANADO ACABADO PULIDO EN

PZA $1,684.70 $1,684.70 $1,684.70 $1,684.70 $1,684.70 $1,684.70 $1,684.70 $2,011.87 $1,690.38 $1,690.38 $1,690.38 $1,690.38 $1,690.38 $1,690.38 $1,690.38

INTERIOR, SOBRE FIRME DE 0.05 CMS. DEESPESOR DE CONCRETO HECHO EN OBRA DE F'C=150 KG/CM2 CON TAPA DE CONCRETO DE 0.05 M.DEESPESOR, CON MARCO Y CONTRAMARCO DEÁNGULO DE ACERO DE 3/16X1 PULGADAS, ARMADACON VARILLA DEL NO. 3 @ 15 EN AMBOS SENTIDOS

SOBRE CADENA DE 0.12X0.15 M. ARMADA CON 4VARILLAS DEL NO. 3 Y ESTRIBOS DEL NO. 2 A CADA20 CMS., INCLUYE: TRAZO, NIVELACIÓN,EXCAVACIÓN, TODOS LOS MATERIALESNECESARIOS, ACARREOS EN CARRETILLA A 20MTS., DESPERDICIOS, LIMPIEZA, MANO DE OBRA,EQUIPO Y

:

Page 170: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 170 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1401000045 REGISTRO DE 0.6 x 0.4 M. DE MEDIDASINTERIORES Y 0.8 M. DE PROFUNDIDAD, A BASE DEMUROS DE BLOCK DE CONCRETO DE 12X20X40CMS. DE ESPESOR, ASENTADO CON MEZCLA DECEMENTO ARENA EN PROPORCIÓN DE 1:5, DE 1CM. DE ESPESOR, APLANADO ACABADO PULIDO EN

PZA $1,461.79 $1,461.79 $1,461.79 $1,461.79 $1,461.79 $1,461.79 $1,461.79 $1,748.68 $1,466.77 $1,466.77 $1,466.77 $1,466.77 $1,466.77 $1,466.77 $1,466.77

INTERIOR, SOBRE FIRME DE 0.05 CMS. DEESPESOR DE CONCRETO HECHO EN OBRA DE F'C=150 KG/CM2 CON TAPA DE CONCRETO DE .05 M.DEESPESOR, CON MARCO Y CONTRAMARCO DEÁNGULO DE ACERO DE 3/16X1 PULGADAS, ARMADACON VARILLA DEL NO. 3 @ 15 EN AMBOS SENTIDOS

SOBRE CADENA DE 0.12X0.15 M. ARMADA CON 4VARILLAS DEL NO. 3 Y ESTRIBOS DEL NO. 2 A CADA20 CMS., INCLUYE: TRAZO, NIVELACIÓN,EXCAVACIÓN, TODOS LOS MATERIALESNECESARIOS, ACARREOS EN CARRETILLA A 20MTS., DESPERDICIOS, LIMPIEZA, MANO DE OBRA,EQUIPO Y

HERRAMIENTA. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

Total Registros

A20 Sum. de Materiales de Agua Potable

A2041 Sum. de Tuberia PVC Hidraulico2041000013 SUMINISTRO DE TUBERIA DE P.V.C. CON CAMPANA

DE 13 MM. (1/2") DE DIAMETRO. RD 26 INCLUYETODO LO NECESARIO PARA SU CORRECTA

M $6.61 $6.61 $6.61 $6.61 $6.61 $6.61 $6.61 $6.61 $6.61 $6.61 $6.61 $6.61 $6.61 $6.61 $6.61

2041000023 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 19 MM. (3/4") DE DIAMETRO. RD 26 INCLUYETODO LO NECESARIO PARA SU CORRECTA

M $7.13 $7.13 $7.13 $7.13 $7.13 $7.13 $7.13 $7.13 $7.13 $7.13 $7.13 $7.13 $7.13 $7.13 $7.13

2041000033 SUMINISTRO DE TUBERIA DE PVC DE 25 MM. (1") DEDIAMETRO. RD 26 INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M $8.45 $8.45 $8.45 $8.45 $8.45 $8.45 $8.45 $8.45 $8.45 $8.45 $8.45 $8.45 $8.45 $8.45 $8.45

2041000043 SUMINISTRO DE TUBERIA DE PVC DE 32 MM. (1 1/4")DE DIAMETRO. RD 26 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $10.32 $10.32 $10.32 $10.32 $10.32 $10.32 $10.32 $10.32 $10.32 $10.32 $10.32 $10.32 $10.32 $10.32 $10.32

:

Page 171: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 171 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2041000053 SUMINISTRO DE TUBERIA DE PVC DE 38 MM. (1 1/2")DE DIAMETRO. RD 26 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $14.79 $14.79 $14.79 $14.79 $14.79 $14.79 $14.79 $14.79 $14.79 $14.79 $14.79 $14.79 $14.79 $14.79 $14.79

2041000063 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 50 MM. (2") DE DIAMETRO. RD 26 INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M $21.06 $21.06 $21.06 $21.06 $21.06 $21.06 $21.06 $21.06 $21.06 $21.06 $21.06 $21.06 $21.06 $21.06 $21.06

2041000073 SUMINISTRO DE TUBERIA DE PVC DE 63 MM. (21/2") DE DIAMETRO. RD 26 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $31.05 $31.05 $31.05 $31.05 $31.05 $31.05 $31.05 $31.05 $31.05 $31.05 $31.05 $31.05 $31.05 $31.05 $31.05

2041000083 SUMINISTRO DE TUBERIA DE PVC DE 60 MM. (21/2") DE DIAMETRO. RD 32.5 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $22.99 $22.99 $22.99 $22.99 $22.99 $22.99 $22.99 $22.99 $22.99 $22.99 $22.99 $22.99 $22.99 $22.99 $22.99

2041000093 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 75 MM. (3") DE DIAMETRO. RD 26 INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M $52.76 $52.76 $52.76 $52.76 $52.76 $52.76 $52.76 $52.76 $52.76 $52.76 $52.76 $52.76 $52.76 $52.76 $52.76

2041000103 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 75 MM. (3") DE DIAMETRO. RD 32.5 INCLUYETODO LO NECESARIO PARA SU CORRECTA

M $34.32 $34.32 $34.32 $34.32 $34.32 $34.32 $34.32 $34.32 $34.32 $34.32 $34.32 $34.32 $34.32 $34.32 $34.32

2041000113 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 100 MM. (4") DE DIAMETRO. RD 26 INCLUYETODO LO NECESARIO PARA SU CORRECTA

M $83.23 $83.23 $83.23 $83.23 $83.23 $83.23 $83.23 $83.23 $83.23 $83.23 $83.23 $83.23 $83.23 $83.23 $83.23

2041000123 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 100 MM. (4") DE DIAMETRO.RD 32.5 INCLUYETODO LO NECESARIO PARA SU CORRECTA

M $56.07 $56.07 $56.07 $56.07 $56.07 $56.07 $56.07 $56.07 $56.07 $56.07 $56.07 $56.07 $56.07 $56.07 $56.07

2041000133 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 100 MM. (4") DE DIAMETRO RD 41 INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M $46.01 $46.01 $46.01 $46.01 $46.01 $46.01 $46.01 $46.01 $46.01 $46.01 $46.01 $46.01 $46.01 $46.01 $46.01

2041000143 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 150 MM. (6") DE DIAMETRO. RD 26 INCLUYETODO LO NECESARIO PARA SU CORRECTA

M $147.48 $147.48 $147.48 $147.48 $147.48 $147.48 $147.48 $147.48 $147.48 $147.48 $147.48 $147.48 $147.48 $147.48 $147.48

:

Page 172: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 172 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2041000153 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE150 MM. (6") DE DIAMETRO RD 32.5 INCLUYETODO LO NECESARIO PARA SU CORRECTA

M $119.10 $119.10 $119.10 $119.10 $119.10 $119.10 $119.10 $119.10 $119.10 $119.10 $119.10 $119.10 $119.10 $119.10 $119.10

2041000163 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 150 MM. (6") DE DIAMETRO RD 41 INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

M $97.27 $97.27 $97.27 $97.27 $97.27 $97.27 $97.27 $97.27 $97.27 $97.27 $97.27 $97.27 $97.27 $97.27 $97.27

2041000173 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 200 MM. (8") DE DIAMETRO. CLASE 5 INCLUYETODO LO NECESARIO PARA SU CORRECTA

M $103.56 $103.56 $103.56 $103.56 $103.56 $103.56 $103.56 $103.56 $103.56 $103.56 $103.56 $103.56 $103.56 $103.56 $103.56

2041000183 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 200 MM. (8") DE DIAMETRO. CLASE 7 INCLUYETODO LO NECESARIO PARA SU CORRECTA

M $141.02 $141.02 $141.02 $141.02 $141.02 $141.02 $141.02 $141.02 $141.02 $141.02 $141.02 $141.02 $141.02 $141.02 $141.02

2041000193 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 200 MM. (8") DE DIAMETRO CLASE 10 INCLUYETODO LO NECESARIO PARA SU CORRECTA

M $190.94 $190.94 $190.94 $190.94 $190.94 $190.94 $190.94 $190.94 $190.94 $190.94 $190.94 $190.94 $190.94 $190.94 $190.94

2041000203 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 250 MM. (10") DE DIAMETRO. CLASE 5 INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $162.68 $162.68 $162.68 $162.68 $162.68 $162.68 $162.68 $162.68 $162.68 $162.68 $162.68 $162.68 $162.68 $162.68 $162.68

2041000213 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 250 MM. (10") DE DIAMETRO. CLASE 7 INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $219.66 $219.66 $219.66 $219.66 $219.66 $219.66 $219.66 $219.66 $219.66 $219.66 $219.66 $219.66 $219.66 $219.66 $219.66

2041000223 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 250 MM. (10") DE DIAMETRO. CLASE 10 INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $297.79 $297.79 $297.79 $297.79 $297.79 $297.79 $297.79 $297.79 $297.79 $297.79 $297.79 $297.79 $297.79 $297.79 $297.79

2041000233 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 300 MM. (12") DE DIAMETRO. CLASE 5 INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $256.54 $256.54 $256.54 $256.54 $256.54 $256.54 $256.54 $256.54 $256.54 $256.54 $256.54 $256.54 $256.54 $256.54 $256.54

:

Page 173: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 173 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2041000243 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 300 MM. (12") DE DIAMETRO. CLASE 7 INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $349.38 $349.38 $349.38 $349.38 $349.38 $349.38 $349.38 $349.38 $349.38 $349.38 $349.38 $349.38 $349.38 $349.38 $349.38

2041000253 SUMINISTRO DE TUBERIA DE PVC CON CAMPANADE 300 MM. (12') DE DIAMETRO. CLASE 10 INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $475.37 $475.37 $475.37 $475.37 $475.37 $475.37 $475.37 $475.37 $475.37 $475.37 $475.37 $475.37 $475.37 $475.37 $475.37

2041000263 SUMINISTRO DE TUBERIA DE PVC DE 355 MM. (14")DE DIAMETRO. CLASE 5 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $344.61 $344.61 $344.61 $344.61 $344.61 $344.61 $344.61 $344.61 $344.61 $344.61 $344.61 $344.61 $344.61 $344.61 $344.61

2041000273 SUMINISTRO DE TUBERIA DE PVC DE 355 MM. (14")DE DIAMETRO. CLASE 7 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $480.23 $480.23 $480.23 $480.23 $480.23 $480.23 $480.23 $480.23 $480.23 $480.23 $480.23 $480.23 $480.23 $480.23 $480.23

2041000283 SUMINISTRO DE TUBERIA DE PVC DE 355 MM. (14")DE DIAMETRO CLASE 10 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $632.65 $632.65 $632.65 $632.65 $632.65 $632.65 $632.65 $632.65 $632.65 $632.65 $632.65 $632.65 $632.65 $632.65 $632.65

Total Sum. de Tuberia PVC Hidraulico

A2042 Sum. de Tuberia Polietileno Alta Densidad2042000013 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTA

DENSIDAD DE 13 MM. (1/2") DE DIAMETRO. RD 9INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $12.27 $12.27 $12.27 $12.27 $12.27 $12.27 $12.27 $12.27 $12.27 $12.27 $12.27 $12.27 $12.27 $12.27 $12.27

2042000023 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD DE 13 MM. (1/2") DE DIAMETRO. RD 11.5INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 $10.00 $10.00

2042000033 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD DE 19 MM. (3/4") DE DIAMETRO. RD 9INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $19.25 $19.25 $19.25 $19.25 $19.25 $19.25 $19.25 $19.25 $19.25 $19.25 $19.25 $19.25 $19.25 $19.25 $19.25

:

Page 174: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 174 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2042000043 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD DE 19 MM. (3/4") DE DIAMETRO RD 11.5INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $15.81 $15.81 $15.81 $15.81 $15.81 $15.81 $15.81 $15.81 $15.81 $15.81 $15.81 $15.81 $15.81 $15.81 $15.81

2042000053 SUMINISTRO DE TUBERIA DE POLIETILENO DEALTA DENSIDAD DE 25 MM. (1") DE DIAMETRO RD 9INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $27.56 $27.56 $27.56 $27.56 $27.56 $27.56 $27.56 $27.56 $27.56 $27.56 $27.56 $27.56 $27.56 $27.56 $27.56

2042000063 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD DE 25 MM. (1") DE DIAMETRO. RD 11.5INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $12.81 $12.81 $12.81 $12.81 $12.81 $12.81 $12.81 $12.81 $12.81 $12.81 $12.81 $12.81 $12.81 $12.81 $12.81

2042000073 SUMINISTRO DE TUBERIA DE POLIETILENO DEALTA DENSIDAD DE 25 MM. (1") DE DIAMETRO. RD15 INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54

2042000083 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD DE 32 MM. (1 1/4") DE DIAMETRO. RD 9INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $44.20 $44.20 $44.20 $44.20 $44.20 $44.20 $44.20 $44.20 $44.20 $44.20 $44.20 $44.20 $44.20 $44.20 $44.20

2042000093 SUMINISTRO DE TUBERIA DE POLIETILENO DEALTA DENSIDAD DE 32 MM. (1 1/4") DE DIAMETRO.RD 15 INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $15.03 $15.03 $15.03 $15.03 $15.03 $15.03 $15.03 $15.03 $15.03 $15.03 $15.03 $15.03 $15.03 $15.03 $15.03

2042000103 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD DE 38 MM. (1 1/2") DE DIAMETRO. RD 9INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $57.18 $57.18 $57.18 $57.18 $57.18 $57.18 $57.18 $57.18 $57.18 $57.18 $57.18 $57.18 $57.18 $57.18 $57.18

2042000113 SUMINISTRO DE TUBERIA DE POLIETILENO DEALTA DENSIDAD DE 38 MM. (1 1/2") DE DIAMETRO.RD 11.5 INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $47.74 $47.74 $47.74 $47.74 $47.74 $47.74 $47.74 $47.74 $47.74 $47.74 $47.74 $47.74 $47.74 $47.74 $47.74

:

Page 175: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 175 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2042000123 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD DE 38 MM. (1 1/2") DE DIAMETRO. RD 15INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $34.69 $34.69 $34.69 $34.69 $34.69 $34.69 $34.69 $34.69 $34.69 $34.69 $34.69 $34.69 $34.69 $34.69 $34.69

2042000133 SUMINISTRO DE TUBERIA DE POLIETILENO DEALTA DENSIDAD DE 50 MM. (2") DE DIAMETRO. RD 9INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $88.64 $88.64 $88.64 $88.64 $88.64 $88.64 $88.64 $88.64 $88.64 $88.64 $88.64 $88.64 $88.64 $88.64 $88.64

2042000143 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD DE 50 MM. (2") DE DIAMETRO. RD 11.5INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $74.50 $74.50 $74.50 $74.50 $74.50 $74.50 $74.50 $74.50 $74.50 $74.50 $74.50 $74.50 $74.50 $74.50 $74.50

2042000153 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD 50 MM. (2") DE DIAMETRO. RD 15INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $54.48 $54.48 $54.48 $54.48 $54.48 $54.48 $54.48 $54.48 $54.48 $54.48 $54.48 $54.48 $54.48 $54.48 $54.48

2042000163 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD 63 MM. (2 1/2") DE DIAMETRO. RD-26INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $23.46 $23.46 $23.46 $23.46 $23.46 $23.46 $23.46 $23.46 $23.46 $23.46 $23.46 $23.46 $23.46 $23.46 $23.46

2042000173 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD 63 MM. (2 1/2") DE DIAMETRO. RD-32.5INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $21.71 $21.71 $21.71 $21.71 $21.71 $21.71 $21.71 $21.71 $21.71 $21.71 $21.71 $21.71 $21.71 $21.71 $21.71

2042000183 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD 75 MM. (3") DE DIAMETRO. RD-26INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $30.42 $30.42 $30.42 $30.42 $30.42 $30.42 $30.42 $30.42 $30.42 $30.42 $30.42 $30.42 $30.42 $30.42 $30.42

2042000193 SUMINISTRO DE TUBERIA DE POLIETILENO DE ALTADENSIDAD 75 MM. (3") DE DIAMETRO. RD-32.5INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M $29.72 $29.72 $29.72 $29.72 $29.72 $29.72 $29.72 $29.72 $29.72 $29.72 $29.72 $29.72 $29.72 $29.72 $29.72

Total Sum. de Tuberia Polietileno Alta Densida

A2043 Sum. de Piezas Especiales de FoFo

A204301 Sum. de Tapa Ciega de FoFo

:

Page 176: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 176 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043000010 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Fo. de2" a 3" DE DIAMETRO (CARRETES, EXTREMIDADES,CODOS, TEES, CRUZ, REDUCCIONES, BRIDAS).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

KG $54.02 $54.02 $54.02 $54.02 $54.02 $54.02 $54.02 $54.02 $54.02 $54.02 $54.02 $54.02 $54.02 $54.02 $54.02

2043000013 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Fo. 4" A12" DE DIAMETRO (CARRETES, EXTREMIDADES,CODOS, TEES, CRUZ, REDUCCIONES, BRIDAS).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Kg $65.02 $65.02 $65.02 $65.02 $65.02 $65.02 $65.02 $65.02 $65.02 $65.02 $65.02 $65.02 $65.02 $65.02 $65.02

2043000015 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Fo. de14" A 24" DE DIAMETRO (CARRETES,EXTREMIDADES, CODOS, TEES, CRUZ,REDUCCIONES, BRIDAS). INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

KG $71.04 $71.04 $71.04 $71.04 $71.04 $71.04 $71.04 $71.04 $71.04 $71.04 $71.04 $71.04 $71.04 $71.04 $71.04

2043000023 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Fo. DE30" A 36" DE DIAMETRO (CARRETES, CODOS,EXTREMIDADES, TEES, CRUZ, REDUCCIONES,BRIDAS). INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Kg $80.00 $80.00 $80.00 $80.00 $80.00 $80.00 $80.00 $80.00 $80.00 $80.00 $80.00 $80.00 $80.00 $80.00 $80.00

2043000313 SUMINISTRO DE TAPA CIEGA DE 51 MM. ( 2" ) DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75

2043000323 SUMINISTRO DE TAPA CIEGA DE 63 MM. ( 2 1/2" ) DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $266.61 $266.61 $266.61 $266.61 $266.61 $266.61 $266.61 $266.61 $266.61 $266.61 $266.61 $266.61 $266.61 $266.61 $266.61

2043000333 SUMINISTRO DE TAPA CIEGA DE 76 MM. ( 3" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $361.34 $361.34 $361.34 $361.34 $361.34 $361.34 $361.34 $361.34 $361.34 $361.34 $361.34 $361.34 $361.34 $361.34 $361.34

2043000343 SUMINISTRO DE TAPA CIEGA DE 102 MM. ( 4" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75 $177.75

:

Page 177: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 177 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043000353 SUMINISTRO DE TAPA CIEGA DE 152 MM. ( 6" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $906.29 $906.29 $906.29 $906.29 $906.29 $906.29 $906.29 $906.29 $906.29 $906.29 $906.29 $906.29 $906.29 $906.29 $906.29

2043000363 SUMINISTRO DE TAPA CIEGA DE 203 MM. ( 8" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,455.13 $1,455.13 $1,455.13 $1,455.13 $1,455.13 $1,455.13 $1,455.13 $1,455.13 $1,455.13 $1,455.13 $1,455.13 $1,455.13 $1,455.13 $1,455.13 $1,455.13

2043000373 SUMINISTRO DE TAPA CIEGA DE 254 MM. ( 10" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,185.62 $2,185.62 $2,185.62 $2,185.62 $2,185.62 $2,185.62 $2,185.62 $2,185.62 $2,185.62 $2,185.62 $2,185.62 $2,185.62 $2,185.62 $2,185.62 $2,185.62

2043000383 SUMINISTRO DE TAPA CIEGA DE 305 MM. ( 12" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,908.32 $2,908.32 $2,908.32 $2,908.32 $2,908.32 $2,908.32 $2,908.32 $2,908.32 $2,908.32 $2,908.32 $2,908.32 $2,908.32 $2,908.32 $2,908.32 $2,908.32

2043000393 SUMINISTRO DE TAPA CIEGA DE 356 MM. ( 14" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $5,601.77 $5,601.77 $5,601.77 $5,601.77 $5,601.77 $5,601.77 $5,601.77 $5,601.77 $5,601.77 $5,601.77 $5,601.77 $5,601.77 $5,601.77 $5,601.77 $5,601.77

2043000403 SUMINISTRO DE TAPA CIEGA DE 406 MM. ( 16" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $7,390.90 $7,390.90 $7,390.90 $7,390.90 $7,390.90 $7,390.90 $7,390.90 $7,390.90 $7,390.90 $7,390.90 $7,390.90 $7,390.90 $7,390.90 $7,390.90 $7,390.90

2043000413 SUMINISTRO DE TAPA CIEGA DE 457 MM. ( 18" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $8,919.28 $8,919.28 $8,919.28 $8,919.28 $8,919.28 $8,919.28 $8,919.28 $8,919.28 $8,919.28 $8,919.28 $8,919.28 $8,919.28 $8,919.28 $8,919.28 $8,919.28

2043000423 SUMINISTRO DE TAPA CIEGA DE 508 MM. ( 20" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $11,463.31 $11,463.31 $11,463.31 $11,463.31 $11,463.31 $11,463.31 $11,463.31 $11,463.31 $11,463.31 $11,463.31 $11,463.31 $11,463.31 $11,463.31 $11,463.31 $11,463.31

2043000433 SUMINISTRO DE TAPA CIEGA DE 610 MM. ( 24" ) DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $11,192.81 $11,192.81 $11,192.81 $11,192.81 $11,192.81 $11,192.81 $11,192.81 $11,192.81 $11,192.81 $11,192.81 $11,192.81 $11,192.81 $11,192.81 $11,192.81 $11,192.81

2043000443 SUMINISTRO DE TAPA CIEGA DE 762 MM. ( 30" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $19,788.12 $19,788.12 $19,788.12 $19,788.12 $19,788.12 $19,788.12 $19,788.12 $19,788.12 $19,788.12 $19,788.12 $19,788.12 $19,788.12 $19,788.12 $19,788.12 $19,788.12

:

Page 178: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 178 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043000453 SUMINISTRO DE TAPA CIEGA DE 914MM. ( 36" ) DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $32,618.83 $32,618.83 $32,618.83 $32,618.83 $32,618.83 $32,618.83 $32,618.83 $32,618.83 $32,618.83 $32,618.83 $32,618.83 $32,618.83 $32,618.83 $32,618.83 $32,618.83

Total Sum. de Tapa Ciega de FoFo

A204302 Sum. de Tornillo Cabeza Hexagonal2043000463 SUMINISTRO DE TORNILLO CABEZA HEXAGONAL

CON TUERCA 7/16" X 2 1/2" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $9.36 $9.36 $9.36 $9.36 $9.36 $9.36 $9.36 $9.36 $9.36 $9.36 $9.36 $9.36 $9.36 $9.36 $9.36

2043000473 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA 7/16" X 3". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $12.83 $12.83 $12.83 $12.83 $12.83 $12.83 $12.83 $12.83 $12.83 $12.83 $12.83 $12.83 $12.83 $12.83 $12.83

2043000483 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA 7/16" X 3 1/2" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $12.54 $12.54 $12.54 $12.54 $12.54 $12.54 $12.54 $12.54 $12.54 $12.54 $12.54 $12.54 $12.54 $12.54 $12.54

2043000493 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA 7/16" X 4". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $13.68 $13.68 $13.68 $13.68 $13.68 $13.68 $13.68 $13.68 $13.68 $13.68 $13.68 $13.68 $13.68 $13.68 $13.68

2043000503 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 1/2" X 4 1/2". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $22.85 $22.85 $22.85 $22.85 $22.85 $22.85 $22.85 $22.85 $22.85 $22.85 $22.85 $22.85 $22.85 $22.85 $22.85

2043000513 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 1/2" X 5". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19

2043000523 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 1/2" X 5 1/2". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $29.30 $29.30 $29.30 $29.30 $29.30 $29.30 $29.30 $29.30 $29.30 $29.30 $29.30 $29.30 $29.30 $29.30 $29.30

2043000533 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA 5/8" X 2 1/2". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $15.35 $15.35 $15.35 $15.35 $15.35 $15.35 $15.35 $15.35 $15.35 $15.35 $15.35 $15.35 $15.35 $15.35 $15.35

2043000543 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 5/8" X 3". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19 $35.19

:

Page 179: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 179 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043000553 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 5/8" X 5 1/2" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24

2043000563 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 5/8" X 6". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $49.22 $49.22 $49.22 $49.22 $49.22 $49.22 $49.22 $49.22 $49.22 $49.22 $49.22 $49.22 $49.22 $49.22 $49.22

2043000573 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 5/8" X 7". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $47.34 $47.34 $47.34 $47.34 $47.34 $47.34 $47.34 $47.34 $47.34 $47.34 $47.34 $47.34 $47.34 $47.34 $47.34

2043000583 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 5/8" X 8". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $51.57 $51.57 $51.57 $51.57 $51.57 $51.57 $51.57 $51.57 $51.57 $51.57 $51.57 $51.57 $51.57 $51.57 $51.57

2043000593 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 3/4" X 3 1/2". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $38.67 $38.67 $38.67 $38.67 $38.67 $38.67 $38.67 $38.67 $38.67 $38.67 $38.67 $38.67 $38.67 $38.67 $38.67

2043000603 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 3/4" X 4". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24 $47.24

2043000613 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 3/4" X 4 1/2". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $51.64 $51.64 $51.64 $51.64 $51.64 $51.64 $51.64 $51.64 $51.64 $51.64 $51.64 $51.64 $51.64 $51.64 $51.64

2043000623 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 3/4" X 5". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $49.10 $49.10 $49.10 $49.10 $49.10 $49.10 $49.10 $49.10 $49.10 $49.10 $49.10 $49.10 $49.10 $49.10 $49.10

2043000633 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 3/4" X 6 1/2". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $39.77 $39.77 $39.77 $39.77 $39.77 $39.77 $39.77 $39.77 $39.77 $39.77 $39.77 $39.77 $39.77 $39.77 $39.77

2043000643 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 3/4" X 7". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $72.46 $72.46 $72.46 $72.46 $72.46 $72.46 $72.46 $72.46 $72.46 $72.46 $72.46 $72.46 $72.46 $72.46 $72.46

:

Page 180: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 180 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043000653 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA 3/4" X 7 1/2". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $62.72 $62.72 $62.72 $62.72 $62.72 $62.72 $62.72 $62.72 $62.72 $62.72 $62.72 $62.72 $62.72 $62.72 $62.72

2043000663 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 3/4" X 8". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $77.25 $77.25 $77.25 $77.25 $77.25 $77.25 $77.25 $77.25 $77.25 $77.25 $77.25 $77.25 $77.25 $77.25 $77.25

2043000673 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 3/4" X 9". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $86.16 $86.16 $86.16 $86.16 $86.16 $86.16 $86.16 $86.16 $86.16 $86.16 $86.16 $86.16 $86.16 $86.16 $86.16

2043000683 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 3/4" X 10". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $94.23 $94.23 $94.23 $94.23 $94.23 $94.23 $94.23 $94.23 $94.23 $94.23 $94.23 $94.23 $94.23 $94.23 $94.23

2043000693 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 7/8" X 4". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $78.04 $78.04 $78.04 $78.04 $78.04 $78.04 $78.04 $78.04 $78.04 $78.04 $78.04 $78.04 $78.04 $78.04 $78.04

2043000703 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 1" X 4". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $105.14 $105.14 $105.14 $105.14 $105.14 $105.14 $105.14 $105.14 $105.14 $105.14 $105.14 $105.14 $105.14 $105.14 $105.14

2043000713 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 1" X 4 1/2". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $111.32 $111.32 $111.32 $111.32 $111.32 $111.32 $111.32 $111.32 $111.32 $111.32 $111.32 $111.32 $111.32 $111.32 $111.32

2043000723 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 1" X 8". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $138.50 $138.50 $138.50 $138.50 $138.50 $138.50 $138.50 $138.50 $138.50 $138.50 $138.50 $138.50 $138.50 $138.50 $138.50

2043000733 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 1 1/8" X 5". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $129.60 $129.60 $129.60 $129.60 $129.60 $129.60 $129.60 $129.60 $129.60 $129.60 $129.60 $129.60 $129.60 $129.60 $129.60

2043000743 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 1 1/8" X 8". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $182.79 $182.79 $182.79 $182.79 $182.79 $182.79 $182.79 $182.79 $182.79 $182.79 $182.79 $182.79 $182.79 $182.79 $182.79

:

Page 181: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 181 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043000753 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 1 1/4" X5 1/2" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $296.39 $296.39 $296.39 $296.39 $296.39 $296.39 $296.39 $296.39 $296.39 $296.39 $296.39 $296.39 $296.39 $296.39 $296.39

2043000763 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 1 1/4" X6 1/2" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $303.77 $303.77 $303.77 $303.77 $303.77 $303.77 $303.77 $303.77 $303.77 $303.77 $303.77 $303.77 $303.77 $303.77 $303.77

2043000773 SUMINISTRO DE TORNILLO CABEZA HEXAGONALCON TUERCA DE 1 1/2" X 7". INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $471.40 $471.40 $471.40 $471.40 $471.40 $471.40 $471.40 $471.40 $471.40 $471.40 $471.40 $471.40 $471.40 $471.40 $471.40

Total Sum. de Tornillo Cabeza Hexagonal

A204303 Sum. de Junta Gibault Completa y Junta Dresser2043001383 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 51

MM (2") DE DIAMETRO A5-A7 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29

2043001393 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 63MM (2 1/2") DE DIAMETRO A5-A7 O SIMILAR ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29 $159.29

2043001403 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 76MM (3") DE DIAMETRO A5-A7 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $201.08 $201.08 $201.08 $201.08 $201.08 $201.08 $201.08 $201.08 $201.08 $201.08 $201.08 $201.08 $201.08 $201.08 $201.08

2043001413 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 102MM (4") DE DIAMETRO A5-A7 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $275.66 $275.66 $275.66 $275.66 $275.66 $275.66 $275.66 $275.66 $275.66 $275.66 $275.66 $275.66 $275.66 $275.66 $275.66

2043001423 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 152MM (6") DE DIAMETRO A5-A7 O SIMILAR, ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $389.76 $389.76 $389.76 $389.76 $389.76 $389.76 $389.76 $389.76 $389.76 $389.76 $389.76 $389.76 $389.76 $389.76 $389.76

2043001433 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 203MM (8") DE DIAMETRO A5-A7 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $589.71 $589.71 $589.71 $589.71 $589.71 $589.71 $589.71 $589.71 $589.71 $589.71 $589.71 $589.71 $589.71 $589.71 $589.71

:

Page 182: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 182 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043001443 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 254MM (10") DE DIAMETRO A5-A7 O SIMILAR ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $765.96 $765.96 $765.96 $765.96 $765.96 $765.96 $765.96 $765.96 $765.96 $765.96 $765.96 $765.96 $765.96 $765.96 $765.96

2043001453 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 305MM (12") DE DIAMETRO A5-A7 O SIMILAR ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80

2043001463 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 356MM (14") DE DIAMETRO A5-A7 O SIMILAR, ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $1,658.46 $1,658.46 $1,658.46 $1,658.46 $1,658.46 $1,658.46 $1,658.46 $1,658.46 $1,658.46 $1,658.46 $1,658.46 $1,658.46 $1,658.46 $1,658.46 $1,658.46

2043001473 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 406MM (16") DE DIAMETRO A5-A7 O SIMILAR ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $2,566.76 $2,566.76 $2,566.76 $2,566.76 $2,566.76 $2,566.76 $2,566.76 $2,566.76 $2,566.76 $2,566.76 $2,566.76 $2,566.76 $2,566.76 $2,566.76 $2,566.76

2043001483 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 457MM (18") DE DIAMETRO A5-A7 O SIMILAR, ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $3,364.35 $3,364.35 $3,364.35 $3,364.35 $3,364.35 $3,364.35 $3,364.35 $3,364.35 $3,364.35 $3,364.35 $3,364.35 $3,364.35 $3,364.35 $3,364.35 $3,364.35

2043001493 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 508MM (20") DE DIAMETRO A5-A7 O SIMILAR ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $4,062.53 $4,062.53 $4,062.53 $4,062.53 $4,062.53 $4,062.53 $4,062.53 $4,062.53 $4,062.53 $4,062.53 $4,062.53 $4,062.53 $4,062.53 $4,062.53 $4,062.53

2043001503 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 610MM (24") DE DIAMETRO A5-A7 O SIMILAR ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $4,574.97 $4,574.97 $4,574.97 $4,574.97 $4,574.97 $4,574.97 $4,574.97 $4,574.97 $4,574.97 $4,574.97 $4,574.97 $4,574.97 $4,574.97 $4,574.97 $4,574.97

2043001513 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 762MM (30") DE DIAMETRO A5-A7 O SIMILAR ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $8,549.85 $8,549.85 $8,549.85 $8,549.85 $8,549.85 $8,549.85 $8,549.85 $8,549.85 $8,549.85 $8,549.85 $8,549.85 $8,549.85 $8,549.85 $8,549.85 $8,549.85

:

Page 183: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 183 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043001523 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 914MM (36") DE DIAMETRO A5-A7 O SIMILAR ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $9,080.83 $9,080.83 $9,080.83 $9,080.83 $9,080.83 $9,080.83 $9,080.83 $9,080.83 $9,080.83 $9,080.83 $9,080.83 $9,080.83 $9,080.83 $9,080.83 $9,080.83

2043001533 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 51MM (2") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09

2043001543 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 63MM (2 1/2") DE DIAMETRO A-10 O SIMILAR ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09

2043001553 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 76MM (3") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84

2043001563 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 102MM (4") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82

2043001573 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 152MM (6") DE DAMETRO A-10 O SIMILAR EN CALIDAD YCOSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00

2043001583 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 203MM (8") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88

2043001593 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 254MM (10") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36

:

Page 184: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 184 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043001603 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 305MM (12") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80

2043001613 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 356MM (14") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47

2043001623 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 406MM (16") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,480.98 $2,480.98 $2,480.98 $2,480.98 $2,480.98 $2,480.98 $2,480.98 $2,480.98 $2,480.98 $2,480.98 $2,480.98 $2,480.98 $2,480.98 $2,480.98 $2,480.98

2043001633 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 457MM (18") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,491.83 $3,491.83 $3,491.83 $3,491.83 $3,491.83 $3,491.83 $3,491.83 $3,491.83 $3,491.83 $3,491.83 $3,491.83 $3,491.83 $3,491.83 $3,491.83 $3,491.83

2043001643 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 508MM (20") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,624.87 $3,624.87 $3,624.87 $3,624.87 $3,624.87 $3,624.87 $3,624.87 $3,624.87 $3,624.87 $3,624.87 $3,624.87 $3,624.87 $3,624.87 $3,624.87 $3,624.87

2043001653 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 610MM (24") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01

2043001663 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 762MM (30") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $7,322.99 $7,322.99 $7,322.99 $7,322.99 $7,322.99 $7,322.99 $7,322.99 $7,322.99 $7,322.99 $7,322.99 $7,322.99 $7,322.99 $7,322.99 $7,322.99 $7,322.99

2043001673 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 914MM (36") DE DIAMETRO A-10 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $9,642.35 $9,642.35 $9,642.35 $9,642.35 $9,642.35 $9,642.35 $9,642.35 $9,642.35 $9,642.35 $9,642.35 $9,642.35 $9,642.35 $9,642.35 $9,642.35 $9,642.35

:

Page 185: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 185 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043001683 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 51MM (2") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09

2043001693 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 63MM (2 1/2") DE DIAMETRO A-14 O SIMILAR ENCALIDAD Y COSTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09 $137.09

2043001703 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 76MM (3") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84 $172.84

2043001713 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 102MM (4") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82 $236.82

2043001723 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 152MM (6") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00 $335.00

2043001733 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 203MM (8") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88 $506.88

2043001743 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 254MM (10") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36 $658.36

2043001753 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 305MM (12") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80 $877.80

:

Page 186: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 186 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043001763 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 356MM (14") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47 $1,425.47

2043001773 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 406MM (16") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,573.23 $2,573.23 $2,573.23 $2,573.23 $2,573.23 $2,573.23 $2,573.23 $2,573.23 $2,573.23 $2,573.23 $2,573.23 $2,573.23 $2,573.23 $2,573.23 $2,573.23

2043001783 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 457MM (18") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,611.77 $3,611.77 $3,611.77 $3,611.77 $3,611.77 $3,611.77 $3,611.77 $3,611.77 $3,611.77 $3,611.77 $3,611.77 $3,611.77 $3,611.77 $3,611.77 $3,611.77

2043001793 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 508MM (20") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4,211.19 $4,211.19 $4,211.19 $4,211.19 $4,211.19 $4,211.19 $4,211.19 $4,211.19 $4,211.19 $4,211.19 $4,211.19 $4,211.19 $4,211.19 $4,211.19 $4,211.19

2043001803 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 610MM (24") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01 $5,953.01

2043001813 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 762MM (30") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $7,805.15 $7,805.15 $7,805.15 $7,805.15 $7,805.15 $7,805.15 $7,805.15 $7,805.15 $7,805.15 $7,805.15 $7,805.15 $7,805.15 $7,805.15 $7,805.15 $7,805.15

2043001823 SUMINISTRO DE JUNTA GIBAULT COMPLETA DE 914MM (36") DE DIAMETRO A-14 O SIMILAR EN CALIDADY COSTO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $10,526.18 $10,526.18 $10,526.18 $10,526.18 $10,526.18 $10,526.18 $10,526.18 $10,526.18 $10,526.18 $10,526.18 $10,526.18 $10,526.18 $10,526.18 $10,526.18 $10,526.18

2043004873 SUMINISTRO DE JUNTA MECANICA (UNIVERSAL) DE51 MM (2") DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $219.06 $219.06 $219.06 $219.06 $219.06 $219.06 $219.06 $219.06 $219.06 $219.06 $219.06 $219.06 $219.06 $219.06 $219.06

2043004883 SUMINISTRO DE JUNTA MECANICA (UNIVERSAL) DE63MM (2 1/2") DE DIAMETRO . INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $369.15 $369.15 $369.15 $369.15 $369.15 $369.15 $369.15 $369.15 $369.15 $369.15 $369.15 $369.15 $369.15 $369.15 $369.15

:

Page 187: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 187 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043004893 SUMINISTRO DE JUNTA MECANICA (UNIVERSAL) DE76MM (3") DE DIAMETRO . INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $402.36 $402.36 $402.36 $402.36 $402.36 $402.36 $402.36 $402.36 $402.36 $402.36 $402.36 $402.36 $402.36 $402.36 $402.36

2043004903 SUMINISTRO DE JUNTA UNIVERSAL DE 102 MM (4")DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $571.31 $571.31 $571.31 $571.31 $571.31 $571.31 $571.31 $571.31 $571.31 $571.31 $571.31 $571.31 $571.31 $571.31 $571.31

2043004913 SUMINISTRO DE JUNTA MECANICA (UNIVERSAL) DE152 MM (6") DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $862.33 $862.33 $862.33 $862.33 $862.33 $862.33 $862.33 $862.33 $862.33 $862.33 $862.33 $862.33 $862.33 $862.33 $862.33

2043004923 SUMINISTRO DE JUNTA MECANICA (UNIVERSAL) DE203 MM (8") DE DIAMETRO . INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,458.06 $1,458.06 $1,458.06 $1,458.06 $1,458.06 $1,458.06 $1,458.06 $1,458.06 $1,458.06 $1,458.06 $1,458.06 $1,458.06 $1,458.06 $1,458.06 $1,458.06

2043004933 SUMINISTRO DE JUNTA MECANICA (UNIVERSAL) DE254 MM (10") DE DIAMETRO . INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,970.77 $1,970.77 $1,970.77 $1,970.77 $1,970.77 $1,970.77 $1,970.77 $1,970.77 $1,970.77 $1,970.77 $1,970.77 $1,970.77 $1,970.77 $1,970.77 $1,970.77

2043004943 SUMINISTRO DE JUNTA MECANICA (UNIVERSAL) DE305 MM (12") DE DIAMETRO . INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $2,492.26 $2,492.26 $2,492.26 $2,492.26 $2,492.26 $2,492.26 $2,492.26 $2,492.26 $2,492.26 $2,492.26 $2,492.26 $2,492.26 $2,492.26 $2,492.26 $2,492.26

2043004953 SUMINISTRO DE JUNTA MECANICA (UNIVERSAL) DE356 MM (14") DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $4,852.71 $4,852.71 $4,852.71 $4,852.71 $4,852.71 $4,852.71 $4,852.71 $4,852.71 $4,852.71 $4,852.71 $4,852.71 $4,852.71 $4,852.71 $4,852.71 $4,852.71

2043004963 SUMINISTRO DE JUNTA MECANICA (UNIVERSAL) DE406 MM (16") DE DIAMETRO . INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $3,512.31 $3,512.31 $3,512.31 $3,512.31 $3,512.31 $3,512.31 $3,512.31 $3,512.31 $3,512.31 $3,512.31 $3,512.31 $3,512.31 $3,512.31 $3,512.31 $3,512.31

2043004973 SUMINISTRO DE JUNTA MECANICA (UNIVERSAL) DE457 MM (18") DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $4,977.27 $4,977.27 $4,977.27 $4,977.27 $4,977.27 $4,977.27 $4,977.27 $4,977.27 $4,977.27 $4,977.27 $4,977.27 $4,977.27 $4,977.27 $4,977.27 $4,977.27

2043004983 SUMINISTRO DE JUNTA MECANICA (UNIVERSAL) DE508 MM (20") DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $6,103.54 $6,103.54 $6,103.54 $6,103.54 $6,103.54 $6,103.54 $6,103.54 $6,103.54 $6,103.54 $6,103.54 $6,103.54 $6,103.54 $6,103.54 $6,103.54 $6,103.54

:

Page 188: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 188 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043004993 SUMINISTRO DE JUNTA MECANICA (UNIVERSAL) DE610 MM (24") DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $8,137.45 $8,137.45 $8,137.45 $8,137.45 $8,137.45 $8,137.45 $8,137.45 $8,137.45 $8,137.45 $8,137.45 $8,137.45 $8,137.45 $8,137.45 $8,137.45 $8,137.45

Total Sum. Junta Gibault Completa

A204304 Sum. de Empaque de Plomo2043005003 SUMINISTRO DE EMPAQUE DE PLOMO DE 51 MM (2")

DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $33.21 $33.21 $33.21 $33.21 $33.21 $33.21 $33.21 $33.21 $33.21 $33.21 $33.21 $33.21 $33.21 $33.21 $33.21

2043005013 SUMINISTRO DE EMPAQUE DE PLOMO DE 63 MM (21/2") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $49.09 $49.09 $49.09 $49.09 $49.09 $49.09 $49.09 $49.09 $49.09 $49.09 $49.09 $49.09 $49.09 $49.09 $49.09

2043005023 SUMINISTRO DE EMPAQUE DE PLOMO DE 76 MM (3")DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $60.92 $60.92 $60.92 $60.92 $60.92 $60.92 $60.92 $60.92 $60.92 $60.92 $60.92 $60.92 $60.92 $60.92 $60.92

2043005033 SUMINISTRO DE EMPAQUE DE PLOMO DE 102 MM(4") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $74.87 $74.87 $74.87 $74.87 $74.87 $74.87 $74.87 $74.87 $74.87 $74.87 $74.87 $74.87 $74.87 $74.87 $74.87

2043005043 SUMINISTRO DE EMPAQUE DE PLOMO DE 152 MM(6") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $103.51 $103.51 $103.51 $103.51 $103.51 $103.51 $103.51 $103.51 $103.51 $103.51 $103.51 $103.51 $103.51 $103.51 $103.51

2043005053 SUMINISTRO DE EMPAQUE DE PLOMO DE 203 MM(8") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $185.52 $185.52 $185.52 $185.52 $185.52 $185.52 $185.52 $185.52 $185.52 $185.52 $185.52 $185.52 $185.52 $185.52 $185.52

2043005063 SUMINISTRO DE EMPAQUE DE PLOMO DE 254 MM(10") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $337.89 $337.89 $337.89 $337.89 $337.89 $337.89 $337.89 $337.89 $337.89 $337.89 $337.89 $337.89 $337.89 $337.89 $337.89

2043005073 SUMINISTRO DE EMPAQUE DE PLOMO DE 305 MM(12") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $446.31 $446.31 $446.31 $446.31 $446.31 $446.31 $446.31 $446.31 $446.31 $446.31 $446.31 $446.31 $446.31 $446.31 $446.31

2043005083 SUMINISTRO DE EMPAQUE DE PLOMO DE 356 MM(14") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $641.62 $641.62 $641.62 $641.62 $641.62 $641.62 $641.62 $641.62 $641.62 $641.62 $641.62 $641.62 $641.62 $641.62 $641.62

:

Page 189: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 189 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043005093 SUMINISTRO DE EMPAQUE DE PLOMO DE 406 MM(16") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $854.53 $854.53 $854.53 $854.53 $854.53 $854.53 $854.53 $854.53 $854.53 $854.53 $854.53 $854.53 $854.53 $854.53 $854.53

2043005103 SUMINISTRO DE EMPAQUE DE PLOMO DE 457 MM(18") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $728.02 $728.02 $728.02 $728.02 $728.02 $728.02 $728.02 $728.02 $728.02 $728.02 $728.02 $728.02 $728.02 $728.02 $728.02

2043005113 SUMINISTRO DE EMPAQUE DE PLOMO DE 508 MM(20") E DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $899.89 $899.89 $899.89 $899.89 $899.89 $899.89 $899.89 $899.89 $899.89 $899.89 $899.89 $899.89 $899.89 $899.89 $899.89

2043005123 SUMINISTRO DE EMPAQUE DE PLOMO DE 610 MM(24") DE DIAMETRO . INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $1,122.27 $1,122.27 $1,122.27 $1,122.27 $1,122.27 $1,122.27 $1,122.27 $1,122.27 $1,122.27 $1,122.27 $1,122.27 $1,122.27 $1,122.27 $1,122.27 $1,122.27

2043005133 SUMINISTRO DE EMPAQUE DE PLOMO DE 762 MM(30") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $1,631.47 $1,631.47 $1,631.47 $1,631.47 $1,631.47 $1,631.47 $1,631.47 $1,631.47 $1,631.47 $1,631.47 $1,631.47 $1,631.47 $1,631.47 $1,631.47 $1,631.47

2043005143 SUMINISTRO DE EMPAQUE DE PLOMO DE 914 MM(36") DE DIAMETRO . INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $1,631.33 $1,631.33 $1,631.33 $1,631.33 $1,631.33 $1,631.33 $1,631.33 $1,631.33 $1,631.33 $1,631.33 $1,631.33 $1,631.33 $1,631.33 $1,631.33 $1,631.33

Total Sum. de Empaque de Plomo

A204305 Sum. de Abrazadera completa de 1/2" y 3/4"2043005153 SUMINISTRO DE ABRAZADERA DE INSERCION

COMPLETA Fo.Fo. DE: 2"-1/2" Y 3/4" INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $134.14 $134.14 $134.14 $134.14 $134.14 $134.14 $134.14 $134.14 $134.14 $134.14 $134.14 $134.14 $134.14 $134.14 $134.14

2043005163 SUMINISTRO DE ABRAZADERA DE INSERCIONCOMPLETA Fo.Fo. DE: 2 1/2" - 1/2" Y 3/4" INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $169.52 $169.52 $169.52 $169.52 $169.52 $169.52 $169.52 $169.52 $169.52 $169.52 $169.52 $169.52 $169.52 $169.52 $169.52

2043005173 SUMINISTRO DE ABRAZADERA DE INSERCIONCOMPLETA Fo.Fo. DE: 3" - 1/2" Y 3/4" INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $175.21 $175.21 $175.21 $175.21 $175.21 $175.21 $175.21 $175.21 $175.21 $175.21 $175.21 $175.21 $175.21 $175.21 $175.21

2043005183 SUMINISTRO DE ABRAZADERA DE INSERCIONCOMPLETA Fo.Fo. DE: 4" - 1/2" Y 3/4" INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $199.27 $199.27 $199.27 $199.27 $199.27 $199.27 $199.27 $199.27 $199.27 $199.27 $199.27 $199.27 $199.27 $199.27 $199.27

:

Page 190: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 190 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043005193 SUMINISTRO DE ABRAZADERA DE INSERCIONCOMPLETA Fo.Fo. DE: 6" - 1/2" Y 3/4" INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $239.92 $239.92 $239.92 $239.92 $239.92 $239.92 $239.92 $239.92 $239.92 $239.92 $239.92 $239.92 $239.92 $239.92 $239.92

2043005203 SUMINISTRO DE ABRAZADERA DE INSERCIONCOMPLETA Fo.Fo. DE: 8" - 1/2" Y 3/4" INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $349.48 $349.48 $349.48 $349.48 $349.48 $349.48 $349.48 $349.48 $349.48 $349.48 $349.48 $349.48 $349.48 $349.48 $349.48

2043005213 SUMINISTRO DE ABRAZADERA DE INSERCIONCOMPLETA Fo.Fo. DE: 10" - 1/2" Y 3/4" INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $452.87 $452.87 $452.87 $452.87 $452.87 $452.87 $452.87 $452.87 $452.87 $452.87 $452.87 $452.87 $452.87 $452.87 $452.87

2043005223 SUMINISTRO DE ABRAZADERA DE INSERCIONCOMPLETA Fo.Fo. DE: 12" - 1/2" Y 3/4" INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $685.24 $685.24 $685.24 $685.24 $685.24 $685.24 $685.24 $685.24 $685.24 $685.24 $685.24 $685.24 $685.24 $685.24 $685.24

2043005233 SUMINISTRO DE ABRAZADERA DE INSERCION Fo.Fo. COMPLETA DE 14" - 1/2" Y 3/4" DE 356 MM (14")DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $937.96 $937.96 $937.96 $937.96 $937.96 $937.96 $937.96 $937.96 $937.96 $937.96 $937.96 $937.96 $937.96 $937.96 $937.96

Total Sum. de Abrazadera completa de 1/2" y 3/

A204306 Sum. de Contramarcos2043005243 SUMINISTRO DE CONTRA MARCO TIPO SENCILLO

CENTRADO O DESCENTRADO DE 4" X 90 CMINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,555.20 $1,555.20 $1,555.20 $1,555.20 $1,555.20 $1,555.20 $1,555.20 $1,555.20 $1,555.20 $1,555.20 $1,555.20 $1,555.20 $1,555.20 $1,555.20 $1,555.20

2043005263 SUMINISTRO DE CONTRA MARCO TIPO SENCILLOCENTRADO O DESCENTRADO DE 4" X 110 CM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,841.91 $1,841.91 $1,841.91 $1,841.91 $1,841.91 $1,841.91 $1,841.91 $1,841.91 $1,841.91 $1,841.91 $1,841.91 $1,841.91 $1,841.91 $1,841.91 $1,841.91

2043005273 SUMINISTRO DE CONTRA MARCO TIPO SENCILLOCENTRADO O DESCENTRADO DE 4" X 130 CM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,985.27 $1,985.27 $1,985.27 $1,985.27 $1,985.27 $1,985.27 $1,985.27 $1,985.27 $1,985.27 $1,985.27 $1,985.27 $1,985.27 $1,985.27 $1,985.27 $1,985.27

:

Page 191: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 191 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043005283 SUMINISTRO DE CONTRA MARCO TIPO SENCILLOCENTRADO O DESCENTRADO DE 4" X 140 CM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,082.55 $2,082.55 $2,082.55 $2,082.55 $2,082.55 $2,082.55 $2,082.55 $2,082.55 $2,082.55 $2,082.55 $2,082.55 $2,082.55 $2,082.55 $2,082.55 $2,082.55

2043005293 SUMINISTRO DE CONTRA MARCO TIPO SENCILLOCENTRADO O DESCENTRADO DE 4" X 180 CM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08

2043005303 SUMINISTRO DE CONTRA MARCO TIPO SENCILLOCENTRADO O DESCENTRADO DE 4" X 210 CM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55

2043005313 SUMINISTRO DE CONTRA MARCO TIPO SENCILLOCENTRADO O DESCENTRADO DE 6" X 140 CM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,358.72 $3,358.72 $3,358.72 $3,358.72 $3,358.72 $3,358.72 $3,358.72 $3,358.72 $3,358.72 $3,358.72 $3,358.72 $3,358.72 $3,358.72 $3,358.72 $3,358.72

2043005323 SUMINISTRO DE CONTRA MARCO TIPO SENCILLOCENTRADO O DESCENTRADO DE 6" X 180 CM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4,121.58 $4,121.58 $4,121.58 $4,121.58 $4,121.58 $4,121.58 $4,121.58 $4,121.58 $4,121.58 $4,121.58 $4,121.58 $4,121.58 $4,121.58 $4,121.58 $4,121.58

2043005333 SUMINISTRO DE CONTRA MARCO TIPO SENCILLOCENTRADO O DESCENTRADO DE 6" X 210 CM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4,625.91 $4,625.91 $4,625.91 $4,625.91 $4,625.91 $4,625.91 $4,625.91 $4,625.91 $4,625.91 $4,625.91 $4,625.91 $4,625.91 $4,625.91 $4,625.91 $4,625.91

2043005343 SUMINISTRO DE CONTRA MARCO TIPO DOBLE DE 4"X 140 CM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08 $2,702.08

2043005353 SUMINISTRO DE CONTRA MARCO TIPO DOBLE DE 4"X 180 CM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,159.03 $3,159.03 $3,159.03 $3,159.03 $3,159.03 $3,159.03 $3,159.03 $3,159.03 $3,159.03 $3,159.03 $3,159.03 $3,159.03 $3,159.03 $3,159.03 $3,159.03

2043005363 SUMINISTRO DE CONTRA MARCO TIPO DOBLE DE 4"X 210 CM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55 $2,882.55

:

Page 192: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 192 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043005373 SUMINISTRO DE CONTRA MARCO TIPO DOBLE DE 6"X 150 CM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4,183.03 $4,183.03 $4,183.03 $4,183.03 $4,183.03 $4,183.03 $4,183.03 $4,183.03 $4,183.03 $4,183.03 $4,183.03 $4,183.03 $4,183.03 $4,183.03 $4,183.03

2043005383 SUMINISTRO DE CONTRA MARCO TIPO DOBLE DE 6"X 180 CM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $5,550.06 $5,550.06 $5,550.06 $5,550.06 $5,550.06 $5,550.06 $5,550.06 $5,550.06 $5,550.06 $5,550.06 $5,550.06 $5,550.06 $5,550.06 $5,550.06 $5,550.06

2043005393 SUMINISTRO DE CONTRA MARCO TIPO DOBLE DE 6"X 210 CM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $6,567.66 $6,567.66 $6,567.66 $6,567.66 $6,567.66 $6,567.66 $6,567.66 $6,567.66 $6,567.66 $6,567.66 $6,567.66 $6,567.66 $6,567.66 $6,567.66 $6,567.66

2043005403 SUMINISTRO DE ESCALONES PARA POZO DE VISITATIPO D.D.F DE165x265 MM. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $145.41 $145.41 $145.41 $145.41 $145.41 $145.41 $145.41 $145.41 $145.41 $145.41 $145.41 $145.41 $145.41 $145.41 $145.41

2043005404 SUMINISTRO DE CONTRA MARCO TIPO DOBLE DE 6"X 240 CM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $7,823.34 $7,823.34 $7,823.34 $7,823.34 $7,823.34 $7,823.34 $7,823.34 $7,823.34 $7,823.34 $7,823.34 $7,823.34 $7,823.34 $7,823.34 $7,823.34 $7,823.34

2043005413 SUMINISTRO DE ESCALONES PARA POZO DE VISITANORMAL DE 150x250 MM INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $101.37 $101.37 $101.37 $101.37 $101.37 $101.37 $101.37 $101.37 $101.37 $101.37 $101.37 $101.37 $101.37 $101.37 $101.37

Total Sum. de Contramarcos

A204307 Sum. de Coladeras, Campanas y Rejillas2043005423 SUMINISTRO DE COLADERA PLUVIAL DE

BANQUETA. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $1,948.80 $1,948.80 $1,948.80 $1,948.80 $1,948.80 $1,948.80 $1,948.80 $1,948.80 $1,948.80 $1,948.80 $1,948.80 $1,948.80 $1,948.80 $1,948.80 $1,948.80

2043005533 SUMINISTRO DE BOMBA PARA PRUEBA DE TUBERIADE PISTON DE 59 MM ( 2 5/16") INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $7,866.22 $7,866.22 $7,866.22 $7,866.22 $7,866.22 $7,866.22 $7,866.22 $7,866.22 $7,866.22 $7,866.22 $7,866.22 $7,866.22 $7,866.22 $7,866.22 $7,866.22

2043005543 SUMINISTRO DE CAMPANA DE OPERACION DEVALVULAS DE 76 MM A 152 MM (3" A 6") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $1,841.99 $1,841.99 $1,841.99 $1,841.99 $1,841.99 $1,841.99 $1,841.99 $1,841.99 $1,841.99 $1,841.99 $1,841.99 $1,841.99 $1,841.99 $1,841.99 $1,841.99

:

Page 193: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 193 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043005553 SUMINISTRO DE CAMPANA DE OPERACION DEVALVULAS DE 203 MM A 254 MM (8" A 10") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $2,635.89 $2,635.89 $2,635.89 $2,635.89 $2,635.89 $2,635.89 $2,635.89 $2,635.89 $2,635.89 $2,635.89 $2,635.89 $2,635.89 $2,635.89 $2,635.89 $2,635.89

2043005563 SUMINISTRO DE CAMPANA DE OPERACION DEVALVULAS DE 305 MM A 356 MM (12" A 14") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $3,910.68 $3,910.68 $3,910.68 $3,910.68 $3,910.68 $3,910.68 $3,910.68 $3,910.68 $3,910.68 $3,910.68 $3,910.68 $3,910.68 $3,910.68 $3,910.68 $3,910.68

2043005573 SUMINISTRO DE PLATOS QUIEBRA CHORRO(COMPLETO CODO, BOLA Y PLATO) INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,585.39 $1,585.39 $1,585.39 $1,585.39 $1,585.39 $1,585.39 $1,585.39 $1,585.39 $1,585.39 $1,585.39 $1,585.39 $1,585.39 $1,585.39 $1,585.39 $1,585.39

2043005583 SUMINISTRO DE CAJAS Y TAPAS PARA LLAVE DEBANQUETA (BOTA). INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $207.98 $207.98 $207.98 $207.98 $207.98 $207.98 $207.98 $207.98 $207.98 $207.98 $207.98 $207.98 $207.98 $207.98 $207.98

2043005593 SUMINISTRO DE REJILLAS DE PISO FIJAS DE 45 X 45CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,235.45 $1,235.45 $1,235.45 $1,235.45 $1,235.45 $1,235.45 $1,235.45 $1,235.45 $1,235.45 $1,235.45 $1,235.45 $1,235.45 $1,235.45 $1,235.45 $1,235.45

2043005603 SUMINISTRO DE REJILLAS DE PISO FIJAS DE 40 X 60CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,621.54 $1,621.54 $1,621.54 $1,621.54 $1,621.54 $1,621.54 $1,621.54 $1,621.54 $1,621.54 $1,621.54 $1,621.54 $1,621.54 $1,621.54 $1,621.54 $1,621.54

2043005613 SUMINISTRO DE REJILLAS DE PISO FIJAS DE 60 X 70CMS. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,698.74 $1,698.74 $1,698.74 $1,698.74 $1,698.74 $1,698.74 $1,698.74 $1,698.74 $1,698.74 $1,698.74 $1,698.74 $1,698.74 $1,698.74 $1,698.74 $1,698.74

2043005703 SUMINISTRO DE REJILLAS DE PISO C/BISAGRA OPARRILLAS PLUVIALES DE 45 X 45 CMS. STANDARD.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $960.13 $960.13 $960.13 $960.13 $960.13 $960.13 $960.13 $960.13 $960.13 $960.13 $960.13 $960.13 $960.13 $960.13 $960.13

2043005713 SUMINISTRO DE REJILLAS DE PISO C/BISAGRA OPARRILLAS PLUVIALES DE 50 X 50 CMS. STANDARD.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,663.61 $2,663.61 $2,663.61 $2,663.61 $2,663.61 $2,663.61 $2,663.61 $2,663.61 $2,663.61 $2,663.61 $2,663.61 $2,663.61 $2,663.61 $2,663.61 $2,663.61

:

Page 194: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 194 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043005723 SUMINISTRO DE REJILLAS DE PISO C/BISAGRA OPARRILLAS PLUVIALES DE 47 X 47 CMS.REFORZADAS TIPO D.D.F. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $3,339.65 $3,339.65 $3,339.65 $3,339.65 $3,339.65 $3,339.65 $3,339.65 $3,339.65 $3,339.65 $3,339.65 $3,339.65 $3,339.65 $3,339.65 $3,339.65 $3,339.65

2043005733 SUMINISTRO DE REJILLAS DE PISO C/BISAGRA OPARRILLAS PLUVIALES DE 40 X 40 CMS. STANDARD.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,279.62 $1,279.62 $1,279.62 $1,279.62 $1,279.62 $1,279.62 $1,279.62 $1,279.62 $1,279.62 $1,279.62 $1,279.62 $1,279.62 $1,279.62 $1,279.62 $1,279.62

2043005743 SUMINISTRO DE REJILLAS DE PISO C/BISAGRA OPARRILLAS PLUVIALES DE 60 X 70 CMS. TIPO D.D.F.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,206.65 $3,206.65 $3,206.65 $3,206.65 $3,206.65 $3,206.65 $3,206.65 $3,206.65 $3,206.65 $3,206.65 $3,206.65 $3,206.65 $3,206.65 $3,206.65 $3,206.65

2043005753 SUMINISTRO DE REJILLAS DE PISO C/BISAGRA OPARRILLAS PLUVIALES CURVA DE 40 X 60 CMS.PESADA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,387.76 $2,387.76 $2,387.76 $2,387.76 $2,387.76 $2,387.76 $2,387.76 $2,387.76 $2,387.76 $2,387.76 $2,387.76 $2,387.76 $2,387.76 $2,387.76 $2,387.76

Total Sum. Coladeras, Campanas y Rejillas

A204308 Sum. de Brocales y Tapas para Pozo de visita2043005623 SUMINISTRO DE TAPAS PARA CAJA DE VALVULA

(MARCO C/TAPA STANDARD DE 50 X 50 CMS.).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,292.48 $2,292.48 $2,292.48 $2,292.48 $2,292.48 $2,292.48 $2,292.48 $2,292.48 $2,292.48 $2,292.48 $2,292.48 $2,292.48 $2,292.48 $2,292.48 $2,292.48

2043005633 SUMINISTRO DE TAPAS PARA CAJA DE VALVULA(MARCO C/TAPA PESADO DE 50 X 50 CMS.).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,360.00 $3,360.00 $3,360.00 $3,360.00 $3,360.00 $3,360.00 $3,360.00 $3,360.00 $3,360.00 $3,360.00 $3,360.00 $3,360.00 $3,360.00 $3,360.00 $3,360.00

2043005643 SUMINISTRO DE TAPAS PARA CAJA DE VALVULA(MARCO C/TAPA REFORZADO DE 50 X 50 CMS.).INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,971.84 $3,971.84 $3,971.84 $3,971.84 $3,971.84 $3,971.84 $3,971.84 $3,971.84 $3,971.84 $3,971.84 $3,971.84 $3,971.84 $3,971.84 $3,971.84 $3,971.84

2043005653 SUMINISTRO Y COLOCACION DE BROCALES PARAPOZO DE VISITA LIGERO CIEGO DE 60 DE DIAM. Y80 KG INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,148.91 $2,148.91 $2,148.91 $2,148.91 $2,148.91 $2,148.91 $2,148.91 $2,148.91 $2,148.91 $2,148.91 $2,148.91 $2,148.91 $2,148.91 $2,148.91 $2,148.91

:

Page 195: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 195 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043005654 SUMINISTRO DE BROCALES PARA POZO DE VISITALIGERO CIEGO DE 60 CMS DE DIAM. 95 KG.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,185.18 $2,185.18 $2,185.18 $2,185.18 $2,185.18 $2,185.18 $2,185.18 $2,185.18 $2,185.18 $2,185.18 $2,185.18 $2,185.18 $2,185.18 $2,185.18 $2,185.18

2043005663 SUMINISTRO DE BROCALES PARA POZO DE VISITAMEDIANO CIEGO DE 60 CMS DE DIAM. DE 115 KG.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,999.41 $2,999.41 $2,999.41 $2,999.41 $2,999.41 $2,999.41 $2,999.41 $2,999.41 $2,999.41 $2,999.41 $2,999.41 $2,999.41 $2,999.41 $2,999.41 $2,999.41

2043005664 SUMINISTRO DE BROCALES PARA POZO DE VISITAMEDIANO CON REJILLA DE 60 CMS. DE DIAM. 110KG INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,253.78 $3,253.78 $3,253.78 $3,253.78 $3,253.78 $3,253.78 $3,253.78 $3,253.78 $3,253.78 $3,253.78 $3,253.78 $3,253.78 $3,253.78 $3,253.78 $3,253.78

2043005665 SUMINISTRO DE BROCALES PARA POZO DE VISITAMEDIANO CIEGO DE 60 CMS DE 135 KG. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14

2043005673 SUMINISTRO DE BROCALES PARA POZO DE VISITAPESADO CIEGO DE 60 CMS. DIAM. DE 165 KGINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4,852.92 $4,852.92 $4,852.92 $4,852.92 $4,852.92 $4,852.92 $4,852.92 $4,852.92 $4,852.92 $4,852.92 $4,852.92 $4,852.92 $4,852.92 $4,852.92 $4,852.92

2043005674 SUMINISTRO DE BROCALES PARA POZO DE VISITAPESADO CON REJILLA (ABIERTO) DE 60 CMS. DIAM.Y 130 KG. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14 $3,843.14

2043005683 SUMINISTRO DE BROCALES PARA POZO DE VISITANo. 84 C.F.E. ARO Y TAPA. 135 KG INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $3,314.69 $3,314.69 $3,314.69 $3,314.69 $3,314.69 $3,314.69 $3,314.69 $3,314.69 $3,314.69 $3,314.69 $3,314.69 $3,314.69 $3,314.69 $3,314.69 $3,314.69

2043005693 SUMINISTRO DE BROCALES PARA POZO DE VISITANo. 84 C.F.E MARCO Y TAPA DE 181 KG INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $3,598.08 $3,598.08 $3,598.08 $3,598.08 $3,598.08 $3,598.08 $3,598.08 $3,598.08 $3,598.08 $3,598.08 $3,598.08 $3,598.08 $3,598.08 $3,598.08 $3,598.08

:

Page 196: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 196 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2043005694 SUMINISTRO DE BROCALES PARA POZO DE VISITADE H. DUCTIL CIEGO 60 CMS. DIAM. 70 KG INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $2,342.70 $2,342.70 $2,342.70 $2,342.70 $2,342.70 $2,342.70 $2,342.70 $2,342.70 $2,342.70 $2,342.70 $2,342.70 $2,342.70 $2,342.70 $2,342.70 $2,342.70

2043005695 SUMINISTRO DE BROCALES PARA POZO DE VISITADE H. DUCTIL CON REJILLA DE 60 CM Y 65 KGINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,416.64 $2,416.64 $2,416.64 $2,416.64 $2,416.64 $2,416.64 $2,416.64 $2,416.64 $2,416.64 $2,416.64 $2,416.64 $2,416.64 $2,416.64 $2,416.64 $2,416.64

2043005696 SUMINISTRO DE BROCALES PARA POZO DE VISITADE POLIETILENO DE 40 KG. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,710.07 $1,710.07 $1,710.07 $1,710.07 $1,710.07 $1,710.07 $1,710.07 $1,710.07 $1,710.07 $1,710.07 $1,710.07 $1,710.07 $1,710.07 $1,710.07 $1,710.07

Total Sum. de Brocales y Tapas para Pozo de vi

A204310 Inst. de Brocales y tapas para Pozo de Visita1208000023 INSTALACION DE BROCALES Y TAPAS DE FIERRO

FUNDIDO TIPO LIGERO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $204.70 $204.70 $204.70 $204.70 $204.70 $204.70 $204.70 $286.59 $206.09 $206.09 $206.09 $206.09 $206.09 $206.09 $206.09

1208000033 INSTALACION DE BROCALES Y TAPAS DE FIERROFUNDIDO TIPO MEDIANO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $272.93 $272.93 $272.93 $272.93 $272.93 $272.93 $272.93 $382.12 $274.77 $274.77 $274.77 $274.77 $274.77 $274.77 $274.77

1208000043 INSTALACION DE BROCALES Y TAPAS DE FIERROFUNDIDO TIPO PESADO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $409.39 $409.39 $409.39 $409.39 $409.39 $409.39 $409.39 $573.20 $412.18 $412.18 $412.18 $412.18 $412.18 $412.18 $412.18

1113000113 INSTALACION DE MARCO CON TAPA PARA CAJA DEVALVULA TIPO REFORZADO, INCLUYE: MANO DEOBRA Y HERRAMIENTA MENOR. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $409.39 $409.39 $409.39 $409.39 $409.39 $409.39 $409.39 $573.20 $412.18 $412.18 $412.18 $412.18 $412.18 $412.18 $412.18

Total Inst. de Brocales y tapas para Pozo de V

Total Sum. de Piezas Especiales de FoFo

A2044 Sum. de Piezas Especiales de PVC2044000013 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:

CRUZ 38 X 38 MM. (1 1/2" X 1 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18

:

Page 197: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 197 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044000023 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ 50 X 50 MM. (2"X 2") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTA

PZA $131.46 $131.46 $131.46 $131.46 $131.46 $131.46 $131.46 $131.46 $131.46 $131.46 $131.46 $131.46 $131.46 $131.46 $131.46

2044000033 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ DE 50 X 38 MM. (2" X 1 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $130.34 $130.34 $130.34 $130.34 $130.34 $130.34 $130.34 $130.34 $130.34 $130.34 $130.34 $130.34 $130.34 $130.34 $130.34

2044000043 SUMINISTRO DE PIEZAS ESPECIALES DE P.C.V.:CRUZ DE 60 X 60 (2 1/2" X 2 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $224.26 $224.26 $224.26 $224.26 $224.26 $224.26 $224.26 $224.26 $224.26 $224.26 $224.26 $224.26 $224.26 $224.26 $224.26

2044000053 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ DE 60 X 50 MM. (2 1/2" X 2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $180.80 $180.80 $180.80 $180.80 $180.80 $180.80 $180.80 $180.80 $180.80 $180.80 $180.80 $180.80 $180.80 $180.80 $180.80

2044000063 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ DE 75 X 75 MM. (3" X 3") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $335.28 $335.28 $335.28 $335.28 $335.28 $335.28 $335.28 $335.28 $335.28 $335.28 $335.28 $335.28 $335.28 $335.28 $335.28

2044000073 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ DE 75 X 60 MM. (3" X 2 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $261.76 $261.76 $261.76 $261.76 $261.76 $261.76 $261.76 $261.76 $261.76 $261.76 $261.76 $261.76 $261.76 $261.76 $261.76

2044000083 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ DE 75 X 50 MM. (3" X 2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $249.22 $249.22 $249.22 $249.22 $249.22 $249.22 $249.22 $249.22 $249.22 $249.22 $249.22 $249.22 $249.22 $249.22 $249.22

2044000093 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ DE 100 X 100 MM. (4" X 4") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $533.95 $533.95 $533.95 $533.95 $533.95 $533.95 $533.95 $533.95 $533.95 $533.95 $533.95 $533.95 $533.95 $533.95 $533.95

:

Page 198: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 198 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044000103 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ DE 100 X 75 MM. (4" X 3") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $253.02 $253.02 $253.02 $253.02 $253.02 $253.02 $253.02 $253.02 $253.02 $253.02 $253.02 $253.02 $253.02 $253.02 $253.02

2044000113 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ DE 100 X 60 MM (4" X 2 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $222.34 $222.34 $222.34 $222.34 $222.34 $222.34 $222.34 $222.34 $222.34 $222.34 $222.34 $222.34 $222.34 $222.34 $222.34

2044000123 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ DE 160 X 160 MM. (6" X 6") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $655.75 $655.75 $655.75 $655.75 $655.75 $655.75 $655.75 $655.75 $655.75 $655.75 $655.75 $655.75 $655.75 $655.75 $655.75

2044000133 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ DE 160 X 100 (6" X 4") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTA

PZA $594.61 $594.61 $594.61 $594.61 $594.61 $594.61 $594.61 $594.61 $594.61 $594.61 $594.61 $594.61 $594.61 $594.61 $594.61

2044000143 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ DE 200 X 200 MM. (8" X 8") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,213.50 $2,213.50 $2,213.50 $2,213.50 $2,213.50 $2,213.50 $2,213.50 $2,213.50 $2,213.50 $2,213.50 $2,213.50 $2,213.50 $2,213.50 $2,213.50 $2,213.50

2044000153 SUMINISTRO DEPIEZAS ESPECIALES DE P.V.C.:CRUZ DE 200 X 160 MM. (8" X 6") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,109.30 $2,109.30 $2,109.30 $2,109.30 $2,109.30 $2,109.30 $2,109.30 $2,109.30 $2,109.30 $2,109.30 $2,109.30 $2,109.30 $2,109.30 $2,109.30 $2,109.30

2044000163 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CRUZ DE 200 X 100 MM. ( 8" x 4") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $703.05 $703.05 $703.05 $703.05 $703.05 $703.05 $703.05 $703.05 $703.05 $703.05 $703.05 $703.05 $703.05 $703.05 $703.05

2044000183 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:CRUZ DE 250 X 200 MM. (10" X 8") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,549.31 $3,549.31 $3,549.31 $3,549.31 $3,549.31 $3,549.31 $3,549.31 $3,549.31 $3,549.31 $3,549.31 $3,549.31 $3,549.31 $3,549.31 $3,549.31 $3,549.31

2044000203 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:CRUZ DE 250 X 250 MM. (10" X 10") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,283.75 $2,283.75 $2,283.75 $2,283.75 $2,283.75 $2,283.75 $2,283.75 $2,283.75 $2,283.75 $2,283.75 $2,283.75 $2,283.75 $2,283.75 $2,283.75 $2,283.75

:

Page 199: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 199 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044000205 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:CRUZ DE 250 X 150 MM. (10" X 6") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,371.07 $1,371.07 $1,371.07 $1,371.07 $1,371.07 $1,371.07 $1,371.07 $1,371.07 $1,371.07 $1,371.07 $1,371.07 $1,371.07 $1,371.07 $1,371.07 $1,371.07

2044000213 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:CRUZ DE 315 X 315 MM. (12" X 12") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,393.30 $2,393.30 $2,393.30 $2,393.30 $2,393.30 $2,393.30 $2,393.30 $2,393.30 $2,393.30 $2,393.30 $2,393.30 $2,393.30 $2,393.30 $2,393.30 $2,393.30

2044000263 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 38 X 38 MM. (1 1/2" X 1 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18 $77.18

2044000273 SUMINISTRO DEPIEZAS ESPECIALES DE P.V.C.: TEEDE 38 X 50 MM. (1 1/2" X 2") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19

2044000283 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEE50 X 50 MM. (2" X 2") DE DIAMETRO. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19

2044000293 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 50 X 38 MM. (2" X 1 1/2") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19 $92.19

2044000303 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 60 X 60 MM. (2 1/2" X 2 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $173.55 $173.55 $173.55 $173.55 $173.55 $173.55 $173.55 $173.55 $173.55 $173.55 $173.55 $173.55 $173.55 $173.55 $173.55

2044000313 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 60 X 50 MM. (2 1/2" X 2") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $125.37 $125.37 $125.37 $125.37 $125.37 $125.37 $125.37 $125.37 $125.37 $125.37 $125.37 $125.37 $125.37 $125.37 $125.37

:

Page 200: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 200 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044000323 SUMINISTRO DEPIEZAS ESPECIALES DE P.V.C.: TEEDE 75 X 75 MM. (3" X 3") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $243.40 $243.40 $243.40 $243.40 $243.40 $243.40 $243.40 $243.40 $243.40 $243.40 $243.40 $243.40 $243.40 $243.40 $243.40

2044000333 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 75 X 50 MM. (3" X 2") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $110.84 $110.84 $110.84 $110.84 $110.84 $110.84 $110.84 $110.84 $110.84 $110.84 $110.84 $110.84 $110.84 $110.84 $110.84

2044000343 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 100 X 100 MM. (4" X 4") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $399.47 $399.47 $399.47 $399.47 $399.47 $399.47 $399.47 $399.47 $399.47 $399.47 $399.47 $399.47 $399.47 $399.47 $399.47

2044000353 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 100 MM X 75 MM. (4"X 3") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $168.37 $168.37 $168.37 $168.37 $168.37 $168.37 $168.37 $168.37 $168.37 $168.37 $168.37 $168.37 $168.37 $168.37 $168.37

2044000363 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 100MM X 50 MM. (4" X 2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $157.51 $157.51 $157.51 $157.51 $157.51 $157.51 $157.51 $157.51 $157.51 $157.51 $157.51 $157.51 $157.51 $157.51 $157.51

2044000373 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 160 X 160 MM. (6" X 6") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $479.13 $479.13 $479.13 $479.13 $479.13 $479.13 $479.13 $479.13 $479.13 $479.13 $479.13 $479.13 $479.13 $479.13 $479.13

2044000383 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 160 X 100 MM. (6" X 4") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $396.23 $396.23 $396.23 $396.23 $396.23 $396.23 $396.23 $396.23 $396.23 $396.23 $396.23 $396.23 $396.23 $396.23 $396.23

2044000393 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 200 X 200 MM. (8" X 8" ) DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $780.92 $780.92 $780.92 $780.92 $780.92 $780.92 $780.92 $780.92 $780.92 $780.92 $780.92 $780.92 $780.92 $780.92 $780.92

:

Page 201: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 201 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044000403 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 200 X 160 MM. (8" X 6") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $682.57 $682.57 $682.57 $682.57 $682.57 $682.57 $682.57 $682.57 $682.57 $682.57 $682.57 $682.57 $682.57 $682.57 $682.57

2044000423 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 250 X 250 MM. (10" X 10") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,127.33 $1,127.33 $1,127.33 $1,127.33 $1,127.33 $1,127.33 $1,127.33 $1,127.33 $1,127.33 $1,127.33 $1,127.33 $1,127.33 $1,127.33 $1,127.33 $1,127.33

2044000433 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 250 X 200 MM. (10" X 8") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $993.74 $993.74 $993.74 $993.74 $993.74 $993.74 $993.74 $993.74 $993.74 $993.74 $993.74 $993.74 $993.74 $993.74 $993.74

2044000443 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 250 X 150 MM. (10" X 6") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $1,143.20 $1,143.20 $1,143.20 $1,143.20 $1,143.20 $1,143.20 $1,143.20 $1,143.20 $1,143.20 $1,143.20 $1,143.20 $1,143.20 $1,143.20 $1,143.20 $1,143.20

2044000453 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 315 X 315 MM. (12" X 12") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4,695.16 $4,695.16 $4,695.16 $4,695.16 $4,695.16 $4,695.16 $4,695.16 $4,695.16 $4,695.16 $4,695.16 $4,695.16 $4,695.16 $4,695.16 $4,695.16 $4,695.16

2044000463 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.: TEEDE 315 X 200 MM. (12" X 8") DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $1,977.74 $1,977.74 $1,977.74 $1,977.74 $1,977.74 $1,977.74 $1,977.74 $1,977.74 $1,977.74 $1,977.74 $1,977.74 $1,977.74 $1,977.74 $1,977.74 $1,977.74

2044000533 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 90G. DE 38 MM. (1 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $53.77 $53.77 $53.77 $53.77 $53.77 $53.77 $53.77 $53.77 $53.77 $53.77 $53.77 $53.77 $53.77 $53.77 $53.77

2044000543 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 90G. DE 50 MM. (2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $76.26 $76.26 $76.26 $76.26 $76.26 $76.26 $76.26 $76.26 $76.26 $76.26 $76.26 $76.26 $76.26 $76.26 $76.26

:

Page 202: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 202 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044000553 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 90G. DE 60 MM. (2 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $131.56 $131.56 $131.56 $131.56 $131.56 $131.56 $131.56 $131.56 $131.56 $131.56 $131.56 $131.56 $131.56 $131.56 $131.56

2044000563 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 90G. DE 75MM. (3") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $177.62 $177.62 $177.62 $177.62 $177.62 $177.62 $177.62 $177.62 $177.62 $177.62 $177.62 $177.62 $177.62 $177.62 $177.62

2044000573 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 90G. DE 100 MM. (4") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $205.82 $205.82 $205.82 $205.82 $205.82 $205.82 $205.82 $205.82 $205.82 $205.82 $205.82 $205.82 $205.82 $205.82 $205.82

2044000583 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 90G. DE 150 MM. (6") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $473.84 $473.84 $473.84 $473.84 $473.84 $473.84 $473.84 $473.84 $473.84 $473.84 $473.84 $473.84 $473.84 $473.84 $473.84

2044000593 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 90G. DE 200 MM. (8") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $773.53 $773.53 $773.53 $773.53 $773.53 $773.53 $773.53 $773.53 $773.53 $773.53 $773.53 $773.53 $773.53 $773.53 $773.53

2044000643 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 45G. DE 38 MM. (1 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $51.46 $51.46 $51.46 $51.46 $51.46 $51.46 $51.46 $51.46 $51.46 $51.46 $51.46 $51.46 $51.46 $51.46 $51.46

2044000653 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 45G. DE 50 MM. (2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $65.73 $65.73 $65.73 $65.73 $65.73 $65.73 $65.73 $65.73 $65.73 $65.73 $65.73 $65.73 $65.73 $65.73 $65.73

2044000663 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 45G. DE 60 MM. (2 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $105.48 $105.48 $105.48 $105.48 $105.48 $105.48 $105.48 $105.48 $105.48 $105.48 $105.48 $105.48 $105.48 $105.48 $105.48

2044000673 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 45G. DE 75 MM. (3") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79

:

Page 203: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 203 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044000683 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 45G. DE 100 MM. (4") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $181.37 $181.37 $181.37 $181.37 $181.37 $181.37 $181.37 $181.37 $181.37 $181.37 $181.37 $181.37 $181.37 $181.37 $181.37

2044000693 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 45G. DE 150 MM. (6") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $458.06 $458.06 $458.06 $458.06 $458.06 $458.06 $458.06 $458.06 $458.06 $458.06 $458.06 $458.06 $458.06 $458.06 $458.06

2044000703 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 45G. DE 200 MM. (8") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $660.42 $660.42 $660.42 $660.42 $660.42 $660.42 $660.42 $660.42 $660.42 $660.42 $660.42 $660.42 $660.42 $660.42 $660.42

2044000713 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:CODO DE 45G. DE 250 MM. (10") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,082.51 $1,082.51 $1,082.51 $1,082.51 $1,082.51 $1,082.51 $1,082.51 $1,082.51 $1,082.51 $1,082.51 $1,082.51 $1,082.51 $1,082.51 $1,082.51 $1,082.51

2044000723 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:CODO DE 45G. DE 315 MM. (12") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,503.43 $1,503.43 $1,503.43 $1,503.43 $1,503.43 $1,503.43 $1,503.43 $1,503.43 $1,503.43 $1,503.43 $1,503.43 $1,503.43 $1,503.43 $1,503.43 $1,503.43

2044000753 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 22G. DE 38 MM. (1 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $37.25 $37.25 $37.25 $37.25 $37.25 $37.25 $37.25 $37.25 $37.25 $37.25 $37.25 $37.25 $37.25 $37.25 $37.25

2044000763 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 22G. DE 50 MM. (2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $55.84 $55.84 $55.84 $55.84 $55.84 $55.84 $55.84 $55.84 $55.84 $55.84 $55.84 $55.84 $55.84 $55.84 $55.84

2044000773 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 22G. DE 60 MM. (2 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $79.61 $79.61 $79.61 $79.61 $79.61 $79.61 $79.61 $79.61 $79.61 $79.61 $79.61 $79.61 $79.61 $79.61 $79.61

:

Page 204: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 204 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044000783 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 22G. DE 75 MM. (3") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79 $146.79

2044000793 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 22G. DE 100 MM. (4") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $229.95 $229.95 $229.95 $229.95 $229.95 $229.95 $229.95 $229.95 $229.95 $229.95 $229.95 $229.95 $229.95 $229.95 $229.95

2044000803 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:CODO DE 22G. DE 150 MM. (6") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $322.88 $322.88 $322.88 $322.88 $322.88 $322.88 $322.88 $322.88 $322.88 $322.88 $322.88 $322.88 $322.88 $322.88 $322.88

2044000813 SUMINISTRO DEPIEZAS ESPECIALES DE P.V.C:CODO DE 22G. DE 250 MM. (10") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $897.89 $897.89 $897.89 $897.89 $897.89 $897.89 $897.89 $897.89 $897.89 $897.89 $897.89 $897.89 $897.89 $897.89 $897.89

2044000823 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:CODO DE 22G. DE 315 MM. (12") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,479.85 $1,479.85 $1,479.85 $1,479.85 $1,479.85 $1,479.85 $1,479.85 $1,479.85 $1,479.85 $1,479.85 $1,479.85 $1,479.85 $1,479.85 $1,479.85 $1,479.85

2044000853 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:COPLE DE REPARACION DE 38 MM. (1 1/2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $24.30 $24.30 $24.30 $24.30 $24.30 $24.30 $24.30 $24.30 $24.30 $24.30 $24.30 $24.30 $24.30 $24.30 $24.30

2044000863 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:COPLE DE REPARACION DE 50 MM. (2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $27.98 $27.98 $27.98 $27.98 $27.98 $27.98 $27.98 $27.98 $27.98 $27.98 $27.98 $27.98 $27.98 $27.98 $27.98

2044000873 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:COPLE DE REPARACION DE 63 MM. (2 1/2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $42.25 $42.25 $42.25 $42.25 $42.25 $42.25 $42.25 $42.25 $42.25 $42.25 $42.25 $42.25 $42.25 $42.25 $42.25

:

Page 205: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 205 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044000883 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:COPLE DE REPARACION DE 75 MM. (3") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $64.32 $64.32 $64.32 $64.32 $64.32 $64.32 $64.32 $64.32 $64.32 $64.32 $64.32 $64.32 $64.32 $64.32 $64.32

2044000893 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:COPLE DE REPARACION DE 100 MM. (4") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $139.05 $139.05 $139.05 $139.05 $139.05 $139.05 $139.05 $139.05 $139.05 $139.05 $139.05 $139.05 $139.05 $139.05 $139.05

2044000903 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:COPLE DE REPARACION DE 150 MM. (6") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $265.46 $265.46 $265.46 $265.46 $265.46 $265.46 $265.46 $265.46 $265.46 $265.46 $265.46 $265.46 $265.46 $265.46 $265.46

2044000913 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:COPLE DE REPARACION DE 200 MM. (8") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $454.32 $454.32 $454.32 $454.32 $454.32 $454.32 $454.32 $454.32 $454.32 $454.32 $454.32 $454.32 $454.32 $454.32 $454.32

2044000923 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:COPLE REPARAC. DE 250 MM. (10") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $633.01 $633.01 $633.01 $633.01 $633.01 $633.01 $633.01 $633.01 $633.01 $633.01 $633.01 $633.01 $633.01 $633.01 $633.01

2044000933 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:COPLE REPARAC. DE 315 MM. (12") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $999.89 $999.89 $999.89 $999.89 $999.89 $999.89 $999.89 $999.89 $999.89 $999.89 $999.89 $999.89 $999.89 $999.89 $999.89

2044000973 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:REDUCCION ESPIGA DE 50 X 38 MM. (2" X 1 1\2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $54.34 $54.34 $54.34 $54.34 $54.34 $54.34 $54.34 $54.34 $54.34 $54.34 $54.34 $54.34 $54.34 $54.34 $54.34

2044000983 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:REDUCCION ESPIGA DE 63 X 50 MM. (2 1/2" X 2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $60.38 $60.38 $60.38 $60.38 $60.38 $60.38 $60.38 $60.38 $60.38 $60.38 $60.38 $60.38 $60.38 $60.38 $60.38

:

Page 206: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 206 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044001003 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:REDUCCION ESPIGA DE 75 X 50 MM. (3" X 2") DE DIAMETRO. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $66.08 $66.08 $66.08 $66.08 $66.08 $66.08 $66.08 $66.08 $66.08 $66.08 $66.08 $66.08 $66.08 $66.08 $66.08

2044001013 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:REDUCCION ESPIGA DE 100 X 75 MM. (4" X 3") DEDIA METRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $235.77 $235.77 $235.77 $235.77 $235.77 $235.77 $235.77 $235.77 $235.77 $235.77 $235.77 $235.77 $235.77 $235.77 $235.77

2044001033 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:REDUCCION ESPIGA DE 100 X 50 MM. (4" X 2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $87.97 $87.97 $87.97 $87.97 $87.97 $87.97 $87.97 $87.97 $87.97 $87.97 $87.97 $87.97 $87.97 $87.97 $87.97

2044001043 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:REDUCCION ESPIGA DE 150 X 100 MM. (6" X 4") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

Pza $278.28 $278.28 $278.28 $278.28 $278.28 $278.28 $278.28 $278.28 $278.28 $278.28 $278.28 $278.28 $278.28 $278.28 $278.28

2044001063 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:REDUCCION ESPIGA DE 200 X 150 MM. (8"X 6") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $451.85 $451.85 $451.85 $451.85 $451.85 $451.85 $451.85 $451.85 $451.85 $451.85 $451.85 $451.85 $451.85 $451.85 $451.85

2044001143 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:REDUCCION CAMPANA DE 50 X 38 MM. (2" X 1 1/2")DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $55.10 $55.10 $55.10 $55.10 $55.10 $55.10 $55.10 $55.10 $55.10 $55.10 $55.10 $55.10 $55.10 $55.10 $55.10

2044001153 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:REDUCCION CAMPANA DE 60MM X 50 MM. (2 1/2" X2") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $91.75 $91.75 $91.75 $91.75 $91.75 $91.75 $91.75 $91.75 $91.75 $91.75 $91.75 $91.75 $91.75 $91.75 $91.75

2044001163 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:REDUCCION CAMPANA DE 75MM X 50 MM. (3" X 2")DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $63.41 $63.41 $63.41 $63.41 $63.41 $63.41 $63.41 $63.41 $63.41 $63.41 $63.41 $63.41 $63.41 $63.41 $63.41

:

Page 207: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 207 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044001173 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:REDUCCION CAMPANA DE 75MM X 63 MM. (3" X 21/2") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $126.89 $126.89 $126.89 $126.89 $126.89 $126.89 $126.89 $126.89 $126.89 $126.89 $126.89 $126.89 $126.89 $126.89 $126.89

2044001183 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:REDUCCION CAMPANA DE 100MM X 75 MM. (4" X 3")DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $117.36 $117.36 $117.36 $117.36 $117.36 $117.36 $117.36 $117.36 $117.36 $117.36 $117.36 $117.36 $117.36 $117.36 $117.36

2044001193 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:REDUCCION CAMPANA DE 100MMX 60 MM. (4" X 21/2") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86

2044001203 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:REDUCCION CAMPANA DE 100 X 50 MM. (4" X 2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86 $89.86

2044001213 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:REDUCCION CAMPANA DE 150 MM X 100 MM. (6" X4") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $270.53 $270.53 $270.53 $270.53 $270.53 $270.53 $270.53 $270.53 $270.53 $270.53 $270.53 $270.53 $270.53 $270.53 $270.53

2044001223 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:REDUCCION CAMPANA DE 200MM X 150 MM. (8" X6") DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $452.74 $452.74 $452.74 $452.74 $452.74 $452.74 $452.74 $452.74 $452.74 $452.74 $452.74 $452.74 $452.74 $452.74 $452.74

2044001303 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD ESPIGA DE 38 MM. (1 1/2") DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27

2044001313 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD ESPIGA DE 50 MM. (2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27 $121.27

2044001323 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD ESPIGA DE 60 MM. (2 1/2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $272.29 $272.29 $272.29 $272.29 $272.29 $272.29 $272.29 $272.29 $272.29 $272.29 $272.29 $272.29 $272.29 $272.29 $272.29

:

Page 208: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 208 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044001333 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD ESPIGA DE 75 MM. (3") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $170.21 $170.21 $170.21 $170.21 $170.21 $170.21 $170.21 $170.21 $170.21 $170.21 $170.21 $170.21 $170.21 $170.21 $170.21

2044001343 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD ESPIGA DE 100 MM. (4") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $253.56 $253.56 $253.56 $253.56 $253.56 $253.56 $253.56 $253.56 $253.56 $253.56 $253.56 $253.56 $253.56 $253.56 $253.56

2044001353 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD ESPIGA DE 150 MM. (6") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $654.28 $654.28 $654.28 $654.28 $654.28 $654.28 $654.28 $654.28 $654.28 $654.28 $654.28 $654.28 $654.28 $654.28 $654.28

2044001363 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD ESPIGA DE 200 MM. (8") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $1,772.51 $1,772.51 $1,772.51 $1,772.51 $1,772.51 $1,772.51 $1,772.51 $1,772.51 $1,772.51 $1,772.51 $1,772.51 $1,772.51 $1,772.51 $1,772.51 $1,772.51

2044001373 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:EXTREMIDAD ESPIGA DE 250 MM. (10") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $2,124.75 $2,124.75 $2,124.75 $2,124.75 $2,124.75 $2,124.75 $2,124.75 $2,124.75 $2,124.75 $2,124.75 $2,124.75 $2,124.75 $2,124.75 $2,124.75 $2,124.75

2044001383 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:EXTREMIDAD ESPIGA DE 315 MM. (12") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $2,445.15 $2,445.15 $2,445.15 $2,445.15 $2,445.15 $2,445.15 $2,445.15 $2,445.15 $2,445.15 $2,445.15 $2,445.15 $2,445.15 $2,445.15 $2,445.15 $2,445.15

2044001413 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD CAMPANA DE 38 MM. (1 1/2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $80.93 $80.93 $80.93 $80.93 $80.93 $80.93 $80.93 $80.93 $80.93 $80.93 $80.93 $80.93 $80.93 $80.93 $80.93

2044001423 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD CAMPANA DE 50 MM. (2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $131.31 $131.31 $131.31 $131.31 $131.31 $131.31 $131.31 $131.31 $131.31 $131.31 $131.31 $131.31 $131.31 $131.31 $131.31

:

Page 209: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 209 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044001433 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD CAMPANA DE 63 MM. (2 1/2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $157.24 $157.24 $157.24 $157.24 $157.24 $157.24 $157.24 $157.24 $157.24 $157.24 $157.24 $157.24 $157.24 $157.24 $157.24

2044001443 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD CAMPANA DE 75 MM. (3") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $187.70 $187.70 $187.70 $187.70 $187.70 $187.70 $187.70 $187.70 $187.70 $187.70 $187.70 $187.70 $187.70 $187.70 $187.70

2044001453 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD CAMPANA DE 100 MM. (4") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $279.97 $279.97 $279.97 $279.97 $279.97 $279.97 $279.97 $279.97 $279.97 $279.97 $279.97 $279.97 $279.97 $279.97 $279.97

2044001463 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD CAMPANA DE 150 MM. (6") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $697.70 $697.70 $697.70 $697.70 $697.70 $697.70 $697.70 $697.70 $697.70 $697.70 $697.70 $697.70 $697.70 $697.70 $697.70

2044001473 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:EXTREMIDAD CAMPANA DE 200 MM. (8") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $1,131.13 $1,131.13 $1,131.13 $1,131.13 $1,131.13 $1,131.13 $1,131.13 $1,131.13 $1,131.13 $1,131.13 $1,131.13 $1,131.13 $1,131.13 $1,131.13 $1,131.13

2044001483 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:EXTREMIDAD CAMPANA DE 250 MM. (10") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $2,249.37 $2,249.37 $2,249.37 $2,249.37 $2,249.37 $2,249.37 $2,249.37 $2,249.37 $2,249.37 $2,249.37 $2,249.37 $2,249.37 $2,249.37 $2,249.37 $2,249.37

2044001493 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:EXTREMIDAD CAMPANA DE 315 MM. (12") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $2,647.04 $2,647.04 $2,647.04 $2,647.04 $2,647.04 $2,647.04 $2,647.04 $2,647.04 $2,647.04 $2,647.04 $2,647.04 $2,647.04 $2,647.04 $2,647.04 $2,647.04

2044001523 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:ADAPTADOR ESPIGA DE 38 MM. (1 1/2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $23.61 $23.61 $23.61 $23.61 $23.61 $23.61 $23.61 $23.61 $23.61 $23.61 $23.61 $23.61 $23.61 $23.61 $23.61

:

Page 210: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 210 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044001533 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:ADAPTADOR ESPIGA DE 50 MM. (2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99

2044001543 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:ADAPTADOR ESPIGA DE 60 MM. (2 1/2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $69.50 $69.50 $69.50 $69.50 $69.50 $69.50 $69.50 $69.50 $69.50 $69.50 $69.50 $69.50 $69.50 $69.50 $69.50

2044001553 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:ADAPTADOR ESPIGA DE 75 MM. (3") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $92.09 $92.09 $92.09 $92.09 $92.09 $92.09 $92.09 $92.09 $92.09 $92.09 $92.09 $92.09 $92.09 $92.09 $92.09

2044001563 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:ADAPTADOR ESPIGA DE 100 MM. (4") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $143.83 $143.83 $143.83 $143.83 $143.83 $143.83 $143.83 $143.83 $143.83 $143.83 $143.83 $143.83 $143.83 $143.83 $143.83

2044001573 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:ADAPTADOR ESPIGA DE 150 MM. (6") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $290.62 $290.62 $290.62 $290.62 $290.62 $290.62 $290.62 $290.62 $290.62 $290.62 $290.62 $290.62 $290.62 $290.62 $290.62

2044001583 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:ADAPTADOR ESPIGA DE 200 MM. (8") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $603.72 $603.72 $603.72 $603.72 $603.72 $603.72 $603.72 $603.72 $603.72 $603.72 $603.72 $603.72 $603.72 $603.72 $603.72

2044001603 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:ADAPTADOR CAMPANA DE 38 MM. (1 1/2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $23.81 $23.81 $23.81 $23.81 $23.81 $23.81 $23.81 $23.81 $23.81 $23.81 $23.81 $23.81 $23.81 $23.81 $23.81

2044001613 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:ADAPTADOR CAMPANA DE 50 MM. (2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $37.11 $37.11 $37.11 $37.11 $37.11 $37.11 $37.11 $37.11 $37.11 $37.11 $37.11 $37.11 $37.11 $37.11 $37.11

:

Page 211: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 211 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044001623 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:ADAPTADOR CAMPANA DE 60 MM. (2 1/2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $69.64 $69.64 $69.64 $69.64 $69.64 $69.64 $69.64 $69.64 $69.64 $69.64 $69.64 $69.64 $69.64 $69.64 $69.64

2044001633 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:ADAPTADOR CAMPANA DE 75 MM. (3") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84

2044001643 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:ADAPTADOR CAMPANA DE 100 MM. (4") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $170.20 $170.20 $170.20 $170.20 $170.20 $170.20 $170.20 $170.20 $170.20 $170.20 $170.20 $170.20 $170.20 $170.20 $170.20

2044001653 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:ADAPTADOR CAMPANA DE 150 MM. (6") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $250.49 $250.49 $250.49 $250.49 $250.49 $250.49 $250.49 $250.49 $250.49 $250.49 $250.49 $250.49 $250.49 $250.49 $250.49

2044001703 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:TAPON ESPIGA DE 38 MM. (1 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Pza $25.92 $25.92 $25.92 $25.92 $25.92 $25.92 $25.92 $25.92 $25.92 $25.92 $25.92 $25.92 $25.92 $25.92 $25.92

2044001713 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:TAPON ESPIGA DE 50 MM. (2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Pza $39.94 $39.94 $39.94 $39.94 $39.94 $39.94 $39.94 $39.94 $39.94 $39.94 $39.94 $39.94 $39.94 $39.94 $39.94

2044001723 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:TAPON ESPIGA DE 63 MM. (2 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Pza $73.08 $73.08 $73.08 $73.08 $73.08 $73.08 $73.08 $73.08 $73.08 $73.08 $73.08 $73.08 $73.08 $73.08 $73.08

2044001733 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:TAPON ESPIGA DE 75 MM. (3") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Pza $88.24 $88.24 $88.24 $88.24 $88.24 $88.24 $88.24 $88.24 $88.24 $88.24 $88.24 $88.24 $88.24 $88.24 $88.24

:

Page 212: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 212 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044001743 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:TAPON ESPIGA DE 100 MM. (4") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Pza $164.35 $164.35 $164.35 $164.35 $164.35 $164.35 $164.35 $164.35 $164.35 $164.35 $164.35 $164.35 $164.35 $164.35 $164.35

2044001753 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:TAPON ESPIGA DE 150 MM. (6") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Pza $187.35 $187.35 $187.35 $187.35 $187.35 $187.35 $187.35 $187.35 $187.35 $187.35 $187.35 $187.35 $187.35 $187.35 $187.35

2044001763 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:TAPON ESPIGA DE 200 MM. (8") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

Pza $295.67 $295.67 $295.67 $295.67 $295.67 $295.67 $295.67 $295.67 $295.67 $295.67 $295.67 $295.67 $295.67 $295.67 $295.67

2044001813 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:TAPON CAMPANA DE 38 MM. (1 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $26.11 $26.11 $26.11 $26.11 $26.11 $26.11 $26.11 $26.11 $26.11 $26.11 $26.11 $26.11 $26.11 $26.11 $26.11

2044001823 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:TAPON CAMPANA DE 50 MM. (2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $40.13 $40.13 $40.13 $40.13 $40.13 $40.13 $40.13 $40.13 $40.13 $40.13 $40.13 $40.13 $40.13 $40.13 $40.13

2044001833 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:TAPON CAMPANA DE 60 MM. (2 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $70.47 $70.47 $70.47 $70.47 $70.47 $70.47 $70.47 $70.47 $70.47 $70.47 $70.47 $70.47 $70.47 $70.47 $70.47

2044001843 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:TAPON CAMPANA DE 75 MM. (3") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $104.45 $104.45 $104.45 $104.45 $104.45 $104.45 $104.45 $104.45 $104.45 $104.45 $104.45 $104.45 $104.45 $104.45 $104.45

2044001853 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:TAPON CAMPANA DE 100 MM. (4") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $190.77 $190.77 $190.77 $190.77 $190.77 $190.77 $190.77 $190.77 $190.77 $190.77 $190.77 $190.77 $190.77 $190.77 $190.77

2044001863 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:TAPON CAMPANA DE 150 M. (6") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $230.76 $230.76 $230.76 $230.76 $230.76 $230.76 $230.76 $230.76 $230.76 $230.76 $230.76 $230.76 $230.76 $230.76 $230.76

:

Page 213: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 213 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044001873 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C.:TAPON CAMPANA DE 200 MM. (8") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $366.52 $366.52 $366.52 $366.52 $366.52 $366.52 $366.52 $366.52 $366.52 $366.52 $366.52 $366.52 $366.52 $366.52 $366.52

2044001923 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:EMPAQUE BRIDA DE 38 MM. (1 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $38.02 $38.02 $38.02 $38.02 $38.02 $38.02 $38.02 $38.02 $38.02 $38.02 $38.02 $38.02 $38.02 $38.02 $38.02

2044001933 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:EMPAQUE BRIDA DE 50 MM. (2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $38.65 $38.65 $38.65 $38.65 $38.65 $38.65 $38.65 $38.65 $38.65 $38.65 $38.65 $38.65 $38.65 $38.65 $38.65

2044001943 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:EMPAQUE BRIDA DE 60 MM. ( 2 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $40.83 $40.83 $40.83 $40.83 $40.83 $40.83 $40.83 $40.83 $40.83 $40.83 $40.83 $40.83 $40.83 $40.83 $40.83

2044001953 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:EMPAQUE BRIDA DE 75 MM. (3") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $41.73 $41.73 $41.73 $41.73 $41.73 $41.73 $41.73 $41.73 $41.73 $41.73 $41.73 $41.73 $41.73 $41.73 $41.73

2044001963 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:EMPAQUE BRIDA DE 100 MM. (4") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $47.81 $47.81 $47.81 $47.81 $47.81 $47.81 $47.81 $47.81 $47.81 $47.81 $47.81 $47.81 $47.81 $47.81 $47.81

2044001973 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:EMPAQUE BRIDA DE 150 MM. (6") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $59.78 $59.78 $59.78 $59.78 $59.78 $59.78 $59.78 $59.78 $59.78 $59.78 $59.78 $59.78 $59.78 $59.78 $59.78

2044001975 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:EMPAQUE BRIDA DE 200 MM. (8") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $74.04 $74.04 $74.04 $74.04 $74.04 $74.04 $74.04 $74.04 $74.04 $74.04 $74.04 $74.04 $74.04 $74.04 $74.04

:

Page 214: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 214 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044001983 SUMINISTRO DE PIEZAS ESPECIALES DE P.V.C:EMPAQUE BRIDA DE 250 MM. ( 10") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $87.55 $87.55 $87.55 $87.55 $87.55 $87.55 $87.55 $87.55 $87.55 $87.55 $87.55 $87.55 $87.55 $87.55 $87.55

2044002023 SUMINISTRO DE ANILLO DE 38 MM. ( 1 1/2") DEDIAMETRO DE P.V.C. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $7.80 $7.80 $7.80 $7.80 $7.80 $7.80 $7.80 $7.80 $7.80 $7.80 $7.80 $7.80 $7.80 $7.80 $7.80

2044002033 SUMINISTRO DE ANILLO DE 50 MM. ( 2" ) DEDIAMETRO DE P.V.C. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $10.43 $10.43 $10.43 $10.43 $10.43 $10.43 $10.43 $10.43 $10.43 $10.43 $10.43 $10.43 $10.43 $10.43 $10.43

2044002043 SUMINISTRO DE ANILLO DE 60 MM. ( 2 1/2") DEDIAMETRO DE P.V.C. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $13.37 $13.37 $13.37 $13.37 $13.37 $13.37 $13.37 $13.37 $13.37 $13.37 $13.37 $13.37 $13.37 $13.37 $13.37

2044002053 SUMINISTRO DE ANILLO DE 75 MM. ( 3" ) DEDIAMETRO DE P.V.C. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54 $16.54

2044002063 SUMINISTRO DE ANILLO DE 100 MM. ( 4" ) DEDIAMETRO DE P.V.C. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $23.74 $23.74 $23.74 $23.74 $23.74 $23.74 $23.74 $23.74 $23.74 $23.74 $23.74 $23.74 $23.74 $23.74 $23.74

2044002073 SUMINISTRO DE ANILLO DE 150 MM. ( 6" ) DEDIAMETRO DE P.V.C. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $50.21 $50.21 $50.21 $50.21 $50.21 $50.21 $50.21 $50.21 $50.21 $50.21 $50.21 $50.21 $50.21 $50.21 $50.21

2044002083 SUMINISTRO DE: ANILLO DE 200 MM. ( 8" ) DEDIAMETRO DE P.V.C. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $71.17 $71.17 $71.17 $71.17 $71.17 $71.17 $71.17 $71.17 $71.17 $71.17 $71.17 $71.17 $71.17 $71.17 $71.17

2044002093 SUMINISTRO DE: ANILLO DE 250 MM. ( 10" ) DEDIAMETRO DE P.V.C. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $100.62 $100.62 $100.62 $100.62 $100.62 $100.62 $100.62 $100.62 $100.62 $100.62 $100.62 $100.62 $100.62 $100.62 $100.62

2044002103 SUMINISTRO DE: ANILLO DE 305 MM. ( 12" ) DEDIAMETRO DE P.V.C. INCLUYE TODO LO NECESARIO PARA SU CORRECTA EJECUCION.

PZA $213.42 $213.42 $213.42 $213.42 $213.42 $213.42 $213.42 $213.42 $213.42 $213.42 $213.42 $213.42 $213.42 $213.42 $213.42

:

Page 215: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 215 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044002123 SUMINISTRO DE ABRAZADERA TOMA DOMICILIARIADE: 38x13mm 1 1/2"x1/2" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43

2044002133 SUMINISTRO DE ABRAZADERA TOMA DOMICILIARIADE: 38x19mm 1 1/2"x3/4" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43 $34.43

2044002143 SUMINISTRO DE ABRAZADERA TOMA DOMICILIARIADE: 50x13mm 2"x1/2" INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75

2044002153 SUMINISTRO DE ABRAZADERA TOMA DOMICILIARIADE: 50x19mm 2"x3/4" INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75 $42.75

2044002163 SUMINISTRO DE ABRAZADERA TOMA DOMICILIARIADE: 63x13mm 2 1/2"x1/2" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87

2044002173 SUMINISTRO DE ABRAZADERA TOMA DOMICILIARIADE: 63x19mm 2 1/2"x3/4" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87 $49.87

2044002183 SUMINISTRO DE ABRAZADERA TOMA DOMICILIARIADE: 75x13mm 3"x1/2" INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10

2044002193 SUMINISTRO DE ABRAZADERA TOMA DOMICILIARIADE: 75x19mm 3"x3/4" INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10 $64.10

2044002203 SUMINISTRO DE ABRAZADERA TOMA DOMICILIARIADE: 100x13mm 4"x1/2" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80

2044002213 SUMINISTRO DE ABRAZADERA TOMA DOMICILIARIADE: 100x19mm 4"x3/4" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80 $87.80

:

Page 216: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 216 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2044002223 SUMINISTRO DE ABRAZADERA TOMA DOMICILIARIADE: 150x13mm 6"x1/2" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35

2044002233 SUMINISTRO DE ABRAZADERA TOMA DOMICILIARIADE: 150x19mm 6"x3/4" INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35 $129.35

2044002243 SUMINISTRO DE LUBRICANTE DE 1 LTO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84 $99.84

Total Sum. de Piezas Especiales de PVC

A2045 Sum. de Valvulas

A204501 Sum. de Valvulas de Seccionamiento V/F2045000013 SUMINISTRO DE VALVULA DE SECCIONAMIENTO

TIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 50MM. (2") DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $3,052.86 $3,052.86 $3,052.86 $3,052.86 $3,052.86 $3,052.86 $3,052.86 $3,052.86 $3,052.86 $3,052.86 $3,052.86 $3,052.86 $3,052.86 $3,052.86 $3,052.86

2045000023 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 63MM. (2 1/2") DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $3,206.19 $3,206.19 $3,206.19 $3,206.19 $3,206.19 $3,206.19 $3,206.19 $3,206.19 $3,206.19 $3,206.19 $3,206.19 $3,206.19 $3,206.19 $3,206.19 $3,206.19

2045000033 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 75MM. ( 3" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $3,918.39 $3,918.39 $3,918.39 $3,918.39 $3,918.39 $3,918.39 $3,918.39 $3,918.39 $3,918.39 $3,918.39 $3,918.39 $3,918.39 $3,918.39 $3,918.39 $3,918.39

2045000043 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 100MM. ( 4" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $5,361.37 $5,361.37 $5,361.37 $5,361.37 $5,361.37 $5,361.37 $5,361.37 $5,361.37 $5,361.37 $5,361.37 $5,361.37 $5,361.37 $5,361.37 $5,361.37 $5,361.37

2045000053 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 150MM. ( 6" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $8,531.69 $8,531.69 $8,531.69 $8,531.69 $8,531.69 $8,531.69 $8,531.69 $8,531.69 $8,531.69 $8,531.69 $8,531.69 $8,531.69 $8,531.69 $8,531.69 $8,531.69

:

Page 217: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 217 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2045000063 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 203MM. ( 8" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $14,782.93 $14,782.93 $14,782.93 $14,782.93 $14,782.93 $14,782.93 $14,782.93 $14,782.93 $14,782.93 $14,782.93 $14,782.93 $14,782.93 $14,782.93 $14,782.93 $14,782.93

2045000073 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 254MM. ( 10" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $23,064.02 $23,064.02 $23,064.02 $23,064.02 $23,064.02 $23,064.02 $23,064.02 $23,064.02 $23,064.02 $23,064.02 $23,064.02 $23,064.02 $23,064.02 $23,064.02 $23,064.02

2045000083 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 305MM. ( 12" ) DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $33,033.74 $33,033.74 $33,033.74 $33,033.74 $33,033.74 $33,033.74 $33,033.74 $33,033.74 $33,033.74 $33,033.74 $33,033.74 $33,033.74 $33,033.74 $33,033.74 $33,033.74

2045000093 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 350MM. ( 14" ) DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $68,462.53 $68,462.53 $68,462.53 $68,462.53 $68,462.53 $68,462.53 $68,462.53 $68,462.53 $68,462.53 $68,462.53 $68,462.53 $68,462.53 $68,462.53 $68,462.53 $68,462.53

2045000103 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 400MM. ( 16" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $95,312.64 $95,312.64 $95,312.64 $95,312.64 $95,312.64 $95,312.64 $95,312.64 $95,312.64 $95,312.64 $95,312.64 $95,312.64 $95,312.64 $95,312.64 $95,312.64 $95,312.64

2045000113 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 450MM. ( 18" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $130,951.64 $130,951.64 $130,951.64 $130,951.64 $130,951.64 $130,951.64 $130,951.64 $130,951.64 $130,951.64 $130,951.64 $130,951.64 $130,951.64 $130,951.64 $130,951.64 $130,951.64

2045000123 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 500MM. ( 20" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $164,935.01 $164,935.01 $164,935.01 $164,935.01 $164,935.01 $164,935.01 $164,935.01 $164,935.01 $164,935.01 $164,935.01 $164,935.01 $164,935.01 $164,935.01 $164,935.01 $164,935.01

2045000133 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA VAL.DE 600 MM. ( 24" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $293,910.75 $293,910.75 $293,910.75 $293,910.75 $293,910.75 $293,910.75 $293,910.75 $293,910.75 $293,910.75 $293,910.75 $293,910.75 $293,910.75 $293,910.75 $293,910.75 $293,910.75

:

Page 218: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 218 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2045000143 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/F CON BRIDA DE 750MM. ( 30 ") DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $471,033.72 $471,033.72 $471,033.72 $471,033.72 $471,033.72 $471,033.72 $471,033.72 $471,033.72 $471,033.72 $471,033.72 $471,033.72 $471,033.72 $471,033.72 $471,033.72 $471,033.72

Total Sum. de Valvulas de Seccionamiento V/F

A204502 Sum. de Valvulas de Seccionamiento V/S2046000013 SUMINISTRO DE VALVULA DE SECCIONAMIENTO

TIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE 51MM. ( 2" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $4,153.59 $4,153.59 $4,153.59 $4,153.59 $4,153.59 $4,153.59 $4,153.59 $4,153.59 $4,153.59 $4,153.59 $4,153.59 $4,153.59 $4,153.59 $4,153.59 $4,153.59

2046000023 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE 63MM. ( 2 1/2" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $5,092.80 $5,092.80 $5,092.80 $5,092.80 $5,092.80 $5,092.80 $5,092.80 $5,092.80 $5,092.80 $5,092.80 $5,092.80 $5,092.80 $5,092.80 $5,092.80 $5,092.80

2046000033 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE 76MM. ( 3" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $5,964.79 $5,964.79 $5,964.79 $5,964.79 $5,964.79 $5,964.79 $5,964.79 $5,964.79 $5,964.79 $5,964.79 $5,964.79 $5,964.79 $5,964.79 $5,964.79 $5,964.79

2046000043 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE102 MM. ( 4" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $8,075.50 $8,075.50 $8,075.50 $8,075.50 $8,075.50 $8,075.50 $8,075.50 $8,075.50 $8,075.50 $8,075.50 $8,075.50 $8,075.50 $8,075.50 $8,075.50 $8,075.50

2046000053 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE152 MM. ( 6" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $14,028.77 $14,028.77 $14,028.77 $14,028.77 $14,028.77 $14,028.77 $14,028.77 $14,028.77 $14,028.77 $14,028.77 $14,028.77 $14,028.77 $14,028.77 $14,028.77 $14,028.77

2046000063 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE203 MM. ( 8" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $27,826.25 $27,826.25 $27,826.25 $27,826.25 $27,826.25 $27,826.25 $27,826.25 $27,826.25 $27,826.25 $27,826.25 $27,826.25 $27,826.25 $27,826.25 $27,826.25 $27,826.25

2046000073 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE254 MM. ( 10" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $40,235.45 $40,235.45 $40,235.45 $40,235.45 $40,235.45 $40,235.45 $40,235.45 $40,235.45 $40,235.45 $40,235.45 $40,235.45 $40,235.45 $40,235.45 $40,235.45 $40,235.45

:

Page 219: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 219 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2046000083 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE305 MM. ( 12" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $58,640.53 $58,640.53 $58,640.53 $58,640.53 $58,640.53 $58,640.53 $58,640.53 $58,640.53 $58,640.53 $58,640.53 $58,640.53 $58,640.53 $58,640.53 $58,640.53 $58,640.53

2046000093 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE356 MM. ( 14" ) DE DIAM. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $95,615.82 $95,615.82 $95,615.82 $95,615.82 $95,615.82 $95,615.82 $95,615.82 $95,615.82 $95,615.82 $95,615.82 $95,615.82 $95,615.82 $95,615.82 $95,615.82 $95,615.82

2046000103 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE400 MM. ( 16" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $153,205.47 $153,205.47 $153,205.47 $153,205.47 $153,205.47 $153,205.47 $153,205.47 $153,205.47 $153,205.47 $153,205.47 $153,205.47 $153,205.47 $153,205.47 $153,205.47 $153,205.47

2046000113 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE450 MM. ( 18" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $230,334.30 $230,334.30 $230,334.30 $230,334.30 $230,334.30 $230,334.30 $230,334.30 $230,334.30 $230,334.30 $230,334.30 $230,334.30 $230,334.30 $230,334.30 $230,334.30 $230,334.30

2046000123 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE500 MM. ( 20" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $300,035.29 $300,035.29 $300,035.29 $300,035.29 $300,035.29 $300,035.29 $300,035.29 $300,035.29 $300,035.29 $300,035.29 $300,035.29 $300,035.29 $300,035.29 $300,035.29 $300,035.29

2046000133 SUMINISTRO DE VALVULA DE SECCIONAMIENTOTIPO COMPUERTA DE Fo. Fo. V/S CON BRIDA DE600 MM. ( 24" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $460,024.76 $460,024.76 $460,024.76 $460,024.76 $460,024.76 $460,024.76 $460,024.76 $460,024.76 $460,024.76 $460,024.76 $460,024.76 $460,024.76 $460,024.76 $460,024.76 $460,024.76

Total Sum. de Valvulas de Seccionamiento V/S

A204503 Sum. de Valvulas Check2047000013 SUMINISTRO DE VALVULA CHECK O SIMILAR DE

Fo.Fo. CON BRIDA DE 51 MM. (2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74

2047000023 SUMINISTRO DE VALVULA CHECK O SIMILAR DEFo.Fo. CON BRIDA DE 63 MM. ( 2 1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74 $3,567.74

:

Page 220: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 220 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2047000033 SUMINISTRO DE VALVULA CHECK O SIMILAR DEFo.Fo. CON BRIDA DE 76 MM. ( 3" ) DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4,427.27 $4,427.27 $4,427.27 $4,427.27 $4,427.27 $4,427.27 $4,427.27 $4,427.27 $4,427.27 $4,427.27 $4,427.27 $4,427.27 $4,427.27 $4,427.27 $4,427.27

2047000043 SUMINISTRO DE VALVULA CHECK O SIMILAR DEFo.Fo. CON BRIDA DE 102 MM. ( 4" ) DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $6,263.24 $6,263.24 $6,263.24 $6,263.24 $6,263.24 $6,263.24 $6,263.24 $6,263.24 $6,263.24 $6,263.24 $6,263.24 $6,263.24 $6,263.24 $6,263.24 $6,263.24

2047000053 SUMINISTRO DE VALVULA CHECK O SIMILAR DEFo.Fo. CON BRIDA DE 152 MM. ( 6" ) DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $10,923.39 $10,923.39 $10,923.39 $10,923.39 $10,923.39 $10,923.39 $10,923.39 $10,923.39 $10,923.39 $10,923.39 $10,923.39 $10,923.39 $10,923.39 $10,923.39 $10,923.39

2047000063 SUMINISTRO DE VALVULA CHECK O SIMILAR DEFo.Fo. CON BRIDA DE 203 MM. ( 8" ) DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $20,536.71 $20,536.71 $20,536.71 $20,536.71 $20,536.71 $20,536.71 $20,536.71 $20,536.71 $20,536.71 $20,536.71 $20,536.71 $20,536.71 $20,536.71 $20,536.71 $20,536.71

2047000073 SUMINISTRO DE VALVULA CHECK O SIMILAR DEFo.Fo. CON BRIDA DE 254 MM. ( 10" ) DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $33,803.32 $33,803.32 $33,803.32 $33,803.32 $33,803.32 $33,803.32 $33,803.32 $33,803.32 $33,803.32 $33,803.32 $33,803.32 $33,803.32 $33,803.32 $33,803.32 $33,803.32

2047000083 SUMINISTRO DE VALVULA CHECK O SIMILAR DEFo.Fo. CON BRIDA DE 305 MM. ( 12" ) DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $50,919.66 $50,919.66 $50,919.66 $50,919.66 $50,919.66 $50,919.66 $50,919.66 $50,919.66 $50,919.66 $50,919.66 $50,919.66 $50,919.66 $50,919.66 $50,919.66 $50,919.66

Total Sum. de Valvulas Check

A204504 Sum. de Valvula Comp. 200lbs FG.7832047000213 SUMINISTRO DE VALVULA DE COMPUERTA DE 13MM

200LBS CABEZA ROSCADA, CUÑA SOLIDA, CIERREDE BRONCE A BRONCE Y EXTREMOS SOLDADOSMARCA URREA FIG. 783 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $164.37 $164.37 $164.37 $164.37 $164.37 $164.37 $164.37 $164.37 $164.37 $164.37 $164.37 $164.37 $164.37 $164.37 $164.37

:

Page 221: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 221 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2047000223 SUMINISTRO DE VALVULA DE COMPUERTA DE 19MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA, CIERREDE BRONCE A BRONCE Y EXTREMOS SOLDADOSMARCA URREA FIG. 783 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $210.20 $210.20 $210.20 $210.20 $210.20 $210.20 $210.20 $210.20 $210.20 $210.20 $210.20 $210.20 $210.20 $210.20 $210.20

2047000233 SUMINISTRO DE VALVULA DE COMPUERTA DE 25MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA, CIERREDE BRONCE A BRONCE Y EXTREMOS SOLDADOSMARCA URREA FIG. 783 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $298.34 $298.34 $298.34 $298.34 $298.34 $298.34 $298.34 $298.34 $298.34 $298.34 $298.34 $298.34 $298.34 $298.34 $298.34

2047000243 SUMINISTRO DE VALVULA DE COMPUERTA DE 32MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA, CIERREDE BRONCE A BRONCE Y EXTREMOS SOLDADOSMARCA URREA FIG. 783 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $604.47 $604.47 $604.47 $604.47 $604.47 $604.47 $604.47 $604.47 $604.47 $604.47 $604.47 $604.47 $604.47 $604.47 $604.47

2047000253 SUMINISTRO DE VALVULA DE COMPUERTA DE 38MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA, CIERREDE BRONCE A BRONCE Y EXTREMOS SOLDADOSMARCA URREA FIG. 783 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $731.30 $731.30 $731.30 $731.30 $731.30 $731.30 $731.30 $731.30 $731.30 $731.30 $731.30 $731.30 $731.30 $731.30 $731.30

2047000263 SUMINISTRO DE VALVULA DE COMPUERTA DE 51MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA, CIERREDE BRONCE A BRONCE Y EXTREMOS SOLDADOSMARCA URREA FIG. 783 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,113.60 $1,113.60 $1,113.60 $1,113.60 $1,113.60 $1,113.60 $1,113.60 $1,113.60 $1,113.60 $1,113.60 $1,113.60 $1,113.60 $1,113.60 $1,113.60 $1,113.60

2047000273 SUMINISTRO DE VALVULA DE COMPUERTA DE 64MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA, CIERREDE BRONCE A BRONCE Y EXTREMOS SOLDADOSMARCA URREA FIG. 783 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $2,168.82 $2,168.82 $2,168.82 $2,168.82 $2,168.82 $2,168.82 $2,168.82 $2,168.82 $2,168.82 $2,168.82 $2,168.82 $2,168.82 $2,168.82 $2,168.82 $2,168.82

2047000283 SUMINISTRO DE VALVULA DE COMPUERTA DE 75MM 200LBS CABEZA ROSCADA, CUÑA SOLIDA, CIERREDE BRONCE A BRONCE Y EXTREMOS SOLDADOSMARCA URREA FIG. 783 INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $3,454.62 $3,454.62 $3,454.62 $3,454.62 $3,454.62 $3,454.62 $3,454.62 $3,454.62 $3,454.62 $3,454.62 $3,454.62 $3,454.62 $3,454.62 $3,454.62 $3,454.62

:

Page 222: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 222 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

Total Sum. de Valvula Comp. 200lbs FG.783

A204505 Sum. de Valvula de Expulsion de Aire2047000313 SUMINISTRO DE VALVULA DE EXPULSION DE AIRE

ROSCABLE DE 125 LBS. DE 13 MM. (1/2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93

2047000323 SUMINISTRO DE VALVULA DE EXPULSION DE AIREROSCABLE DE 125 LBS. DE 19 MM. (3/4") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93

2047000333 SUMINISTRO DE VALVULA DE EXPULSION DE AIREROSCABLE DE 125 LBS. DE 25 MM. (1") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93 $878.93

2047000343 SUMINISTRO DE VALVULA DE EXPULSION DE AIREROSCABLE DE 250 LBS. DE 13 MM. (1/2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00

2047000353 SUMINISTRO DE VALVULA DE EXPULSION DE AIREROSCABLE DE 250 LBS. DE 19 MM. (3/4") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00 $1,152.00

2047000363 SUMINISTRO DE VALVULA DE EXPULSION DE AIREROSCABLE DE 250 LBS. DE 25 MM. (1") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,290.55 $1,290.55 $1,290.55 $1,290.55 $1,290.55 $1,290.55 $1,290.55 $1,290.55 $1,290.55 $1,290.55 $1,290.55 $1,290.55 $1,290.55 $1,290.55 $1,290.55

Total Sum. de Valvula de Expulsion de Aire

A204506 Sum. de Valvula de adm/expulsion de Aire2047000373 SUMINISTRO DE VALVULA DE ADMISION Y

EXPULSION DE AIRE DE 125 LBS. DE 13 MM. (1/2")DE DIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93

:

Page 223: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 223 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2047000383 SUMINISTRO DE VALVULA DE ADMISION YEXPULSION DE AIRE DE 125 LBS. DE 19 MM. (3/4")DE DIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93

2047000393 SUMINISTRO DE VALVULA DE ADMISION YEXPULSION DE AIRE DE 125 LBS. DE 25 MM. (1") DEDIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93 $1,339.93

2047000403 SUMINISTRO DE VALVULA DE ADMISION YEXPULSION DE AIRE DE 250 LBS. DE 13 MM. (1/2")DE DIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86

2047000413 SUMINISTRO DE VALVULA DE ADMISION YEXPULSION DE AIRE DE 250 LBS. DE 19 MM. (3/4")DE DIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86

2047000423 SUMINISTRO DE VALVULA DE ADMISION YEXPULSION DE AIRE DE 250 LBS. DE 25 MM. (1") DEDIAM. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86 $1,462.86

Total Sum. de Valvula de adm/expulsion de Aire

A204507 Sum. de Valvula Combinada2047000433 SUMINISTRO DE VALVULA COMBINADA DE 125 LBS

DE 13 MM. (1/2") DE DIAM. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47

2047000443 SUMINISTRO DE VALVULA COMBINADA DE 125 LBSDE 25 MM. (1") DE DIAM. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47

2047000453 SUMINISTRO DE VALVULA COMBINADA DE 250 LBSDE 13 MM. (1/2") DE DIAM. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47 $2,286.47

2047000463 SUMINISTRO DE VALVULA COMBINADA DE 250 LBSDE 25 MM. (1") DE DIAM. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

PZA $1,868.51 $1,868.51 $1,868.51 $1,868.51 $1,868.51 $1,868.51 $1,868.51 $1,868.51 $1,868.51 $1,868.51 $1,868.51 $1,868.51 $1,868.51 $1,868.51 $1,868.51

:

Page 224: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 224 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

Total Sum. de Valvula Combinada

A204508 Sum. de Valvula de Flotador2047000473 SUMINISTRO DE VALVULA DE FLOTADOR

ROSCABLE DE 125 LBS. DE 38 MM. (1 1/2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $5,347.83 $5,347.83 $5,347.83 $5,347.83 $5,347.83 $5,347.83 $5,347.83 $5,347.83 $5,347.83 $5,347.83 $5,347.83 $5,347.83 $5,347.83 $5,347.83 $5,347.83

2047000483 SUMINISTRO DE VALVULA DE FLOTADORROSCABLE DE 125 LBS. DE 51 MM. (2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $10,715.04 $10,715.04 $10,715.04 $10,715.04 $10,715.04 $10,715.04 $10,715.04 $10,715.04 $10,715.04 $10,715.04 $10,715.04 $10,715.04 $10,715.04 $10,715.04 $10,715.04

2047000493 SUMINISTRO DE VALVULA DE FLOTADORROSCABLE DE 125 LBS. DE 63 MM. (2 1/2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $11,381.97 $11,381.97 $11,381.97 $11,381.97 $11,381.97 $11,381.97 $11,381.97 $11,381.97 $11,381.97 $11,381.97 $11,381.97 $11,381.97 $11,381.97 $11,381.97 $11,381.97

2047000503 SUMINISTRO DE VALVULA DE FLOTADORROSCABLE DE 125 LBS. DE 75 MM. (3") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $11,828.77 $11,828.77 $11,828.77 $11,828.77 $11,828.77 $11,828.77 $11,828.77 $11,828.77 $11,828.77 $11,828.77 $11,828.77 $11,828.77 $11,828.77 $11,828.77 $11,828.77

2047000513 SUMINISTRO DE VALVULA DE FLOTADOR BRIDADADE 125 LBS. DE 100 MM. (4") DE DIAM. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $15,525.85 $15,525.85 $15,525.85 $15,525.85 $15,525.85 $15,525.85 $15,525.85 $15,525.85 $15,525.85 $15,525.85 $15,525.85 $15,525.85 $15,525.85 $15,525.85 $15,525.85

2047000523 SUMINISTRO DE VALVULA DE FLOTADOR BRIDADADE 125 LBS. DE 150 MM. (6") DE DIAM. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $26,626.30 $26,626.30 $26,626.30 $26,626.30 $26,626.30 $26,626.30 $26,626.30 $26,626.30 $26,626.30 $26,626.30 $26,626.30 $26,626.30 $26,626.30 $26,626.30 $26,626.30

Total Sum. de Valvula de Flotador

A204509 Sum. de Valvula contra golpe de Ariete2047000533 SUMINISTRO DE VALVULA CONTRA GOLPE DE ARIE

TE DE 125 LBS. DE 25 MM. (1") DE DIAM. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $12,933.89 $12,933.89 $12,933.89 $12,933.89 $12,933.89 $12,933.89 $12,933.89 $12,933.89 $12,933.89 $12,933.89 $12,933.89 $12,933.89 $12,933.89 $12,933.89 $12,933.89

:

Page 225: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 225 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2047000543 SUMINISTRO DE VALVULA CONTRA GOLPE DE ARIETE DE 125 LBS. DE 38 MM. (1 1/2") DE DIAM. INCLUYE TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $12,933.86 $12,933.86 $12,933.86 $12,933.86 $12,933.86 $12,933.86 $12,933.86 $12,933.86 $12,933.86 $12,933.86 $12,933.86 $12,933.86 $12,933.86 $12,933.86 $12,933.86

2047000553 SUMINISTRO DE VALVULA CONTRA GOLPE DE ARIETE DE 125 LBS. DE 51 MM. (2") DE DIAM. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $14,505.56 $14,505.56 $14,505.56 $14,505.56 $14,505.56 $14,505.56 $14,505.56 $14,505.56 $14,505.56 $14,505.56 $14,505.56 $14,505.56 $14,505.56 $14,505.56 $14,505.56

2047000563 SUMINISTRO DE VALVULA CONTRA GOLPE DE ARIETE DE 250 LBS. DE 25 MM. (1") DE DIAM. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03

2047000573 SUMINISTRO DE VALVULA CONTRA GOLPE DEARIETE 250 LBS. DE 38MM (1 1/2") DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03

2047000583 SUMINISTRO DE VALVULA CONTRA GOLPE DE ARIETE DE 250 LBS. DE 51 MM. (2") DE DIAM. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03 $16,384.03

Total Sum. de Valvula contra golpe de Ariete

Total Sum. de Valvulas de Secc. V/F

A2048 Sum. de Tuberia de FoGo Ced. 402048000013 SUMINISTRO DE TUBERIA DE Fo.Go. CED-40 DE 13

MM. ( 1/2" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $37.53 $37.53 $37.53 $37.53 $37.53 $37.53 $37.53 $37.53 $37.53 $37.53 $37.53 $37.53 $37.53 $37.53 $37.53

2048000023 SUMINISTRO DE TUBERIA DE Fo.Go. CED-40 DE 19MM. ( 3/4" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $56.52 $56.52 $56.52 $56.52 $56.52 $56.52 $56.52 $56.52 $56.52 $56.52 $56.52 $56.52 $56.52 $56.52 $56.52

2048000033 SUMINISTRO DE TUBERIA DE Fo.Go. CED-40 DE 25MM. ( 1" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $77.70 $77.70 $77.70 $77.70 $77.70 $77.70 $77.70 $77.70 $77.70 $77.70 $77.70 $77.70 $77.70 $77.70 $77.70

:

Page 226: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 226 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2048000043 SUMINISTRO DE TUBERIA DE Fo.Go. CED-40 DE 32MM. ( 1 1/4" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $105.49 $105.49 $105.49 $105.49 $105.49 $105.49 $105.49 $105.49 $105.49 $105.49 $105.49 $105.49 $105.49 $105.49 $105.49

2048000053 SUMINISTRO DE TUBERIA DE Fo.Go. CED-40 DE 38MM. ( 1 1/2" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $126.67 $126.67 $126.67 $126.67 $126.67 $126.67 $126.67 $126.67 $126.67 $126.67 $126.67 $126.67 $126.67 $126.67 $126.67

2048000063 SUMINISTRO DE TUBERIA DE Fo.Go. CED-40 DE 50MM. ( 2" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $166.53 $166.53 $166.53 $166.53 $166.53 $166.53 $166.53 $166.53 $166.53 $166.53 $166.53 $166.53 $166.53 $166.53 $166.53

2048000073 SUMINISTRO DE TUBERIA DE Fo.Go. CED-40 DE 64MM. ( 2 1/2 ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $265.18 $265.18 $265.18 $265.18 $265.18 $265.18 $265.18 $265.18 $265.18 $265.18 $265.18 $265.18 $265.18 $265.18 $265.18

2048000083 SUMINISTRO DE TUBERIA DE Fo.Go. CED-40 DE 76MM. ( 3" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $345.55 $345.55 $345.55 $345.55 $345.55 $345.55 $345.55 $345.55 $345.55 $345.55 $345.55 $345.55 $345.55 $345.55 $345.55

2048000093 SUMINISTRO DE TUBERIA DE Fo.Go. CED-40 DE 102MM. ( 4" ) DE DIAMETRO. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $486.95 $486.95 $486.95 $486.95 $486.95 $486.95 $486.95 $486.95 $486.95 $486.95 $486.95 $486.95 $486.95 $486.95 $486.95

Total Sum. de Tuberia de FoGo Ced. 40

A2049 Sum. de Piezas Especiales FoGo2049000013 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:

COPLE REFORZADO DE 13MM (1/2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4.45 $4.45 $4.45 $4.45 $4.45 $4.45 $4.45 $4.45 $4.45 $4.45 $4.45 $4.45 $4.45 $4.45 $4.45

2049000023 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:COPLE REFORZADO DE 19MM (3/4") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $6.42 $6.42 $6.42 $6.42 $6.42 $6.42 $6.42 $6.42 $6.42 $6.42 $6.42 $6.42 $6.42 $6.42 $6.42

2049000033 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:COPLE REFORZADO DE 25MM (1") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $13.97 $13.97 $13.97 $13.97 $13.97 $13.97 $13.97 $13.97 $13.97 $13.97 $13.97 $13.97 $13.97 $13.97 $13.97

:

Page 227: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 227 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049000043 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:COPLE REFORZADO DE 32MM (1 1/4") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $18.72 $18.72 $18.72 $18.72 $18.72 $18.72 $18.72 $18.72 $18.72 $18.72 $18.72 $18.72 $18.72 $18.72 $18.72

2049000053 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:COPLE REFORZADO DE 38MM (1 1/2") DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $23.39 $23.39 $23.39 $23.39 $23.39 $23.39 $23.39 $23.39 $23.39 $23.39 $23.39 $23.39 $23.39 $23.39 $23.39

2049000063 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:COPLE REFORZADO DE 51MM (2") DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $34.90 $34.90 $34.90 $34.90 $34.90 $34.90 $34.90 $34.90 $34.90 $34.90 $34.90 $34.90 $34.90 $34.90 $34.90

2049000073 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:COPLE REFORZADO DE 63MM 2 1/2" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $68.77 $68.77 $68.77 $68.77 $68.77 $68.77 $68.77 $68.77 $68.77 $68.77 $68.77 $68.77 $68.77 $68.77 $68.77

2049000083 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:COPLE REFORZADO DE 75MM 3" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $111.70 $111.70 $111.70 $111.70 $111.70 $111.70 $111.70 $111.70 $111.70 $111.70 $111.70 $111.70 $111.70 $111.70 $111.70

2049000093 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:COPLE REFORZADO DE 102MM 4" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $175.71 $175.71 $175.71 $175.71 $175.71 $175.71 $175.71 $175.71 $175.71 $175.71 $175.71 $175.71 $175.71 $175.71 $175.71

2049000103 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION CAMPANA DE 10MM 3/8" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82

2049000113 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION CAMPANA 13MM DE 1/2" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82 $19.82

:

Page 228: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 228 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049000123 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION CAMPANA DE 19MM 3/4" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $16.37 $16.37 $16.37 $16.37 $16.37 $16.37 $16.37 $16.37 $16.37 $16.37 $16.37 $16.37 $16.37 $16.37 $16.37

2049000133 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION CAMPANA DE 25MM 1" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $25.67 $25.67 $25.67 $25.67 $25.67 $25.67 $25.67 $25.67 $25.67 $25.67 $25.67 $25.67 $25.67 $25.67 $25.67

2049000143 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION CAMPANA DE 32MM 1 1/4" DE DIAM.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $55.01 $55.01 $55.01 $55.01 $55.01 $55.01 $55.01 $55.01 $55.01 $55.01 $55.01 $55.01 $55.01 $55.01 $55.01

2049000153 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION CAMPANA 38MM 1 1/2" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $69.90 $69.90 $69.90 $69.90 $69.90 $69.90 $69.90 $69.90 $69.90 $69.90 $69.90 $69.90 $69.90 $69.90 $69.90

2049000163 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION CAMPANA 51MM 2" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $84.21 $84.21 $84.21 $84.21 $84.21 $84.21 $84.21 $84.21 $84.21 $84.21 $84.21 $84.21 $84.21 $84.21 $84.21

2049000173 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION CAMPANA DE 63MM 2 1/2" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $92.74 $92.74 $92.74 $92.74 $92.74 $92.74 $92.74 $92.74 $92.74 $92.74 $92.74 $92.74 $92.74 $92.74 $92.74

2049000183 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION CAMPANA DE 75MM 3" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $133.63 $133.63 $133.63 $133.63 $133.63 $133.63 $133.63 $133.63 $133.63 $133.63 $133.63 $133.63 $133.63 $133.63 $133.63

2049000193 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION CAMPANA DE 102MM 4" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $254.40 $254.40 $254.40 $254.40 $254.40 $254.40 $254.40 $254.40 $254.40 $254.40 $254.40 $254.40 $254.40 $254.40 $254.40

2049000203 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION BUSHING DE 10MM 3/8" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $12.85 $12.85 $12.85 $12.85 $12.85 $12.85 $12.85 $12.85 $12.85 $12.85 $12.85 $12.85 $12.85 $12.85 $12.85

:

Page 229: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 229 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049000213 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION BUSHING DE 13MM 1/2" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $11.74 $11.74 $11.74 $11.74 $11.74 $11.74 $11.74 $11.74 $11.74 $11.74 $11.74 $11.74 $11.74 $11.74 $11.74

2049000223 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION BUSHING DE 19MM 3/4" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $12.87 $12.87 $12.87 $12.87 $12.87 $12.87 $12.87 $12.87 $12.87 $12.87 $12.87 $12.87 $12.87 $12.87 $12.87

2049000233 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION BUSHING DE 25MM 1" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $33.89 $33.89 $33.89 $33.89 $33.89 $33.89 $33.89 $33.89 $33.89 $33.89 $33.89 $33.89 $33.89 $33.89 $33.89

2049000243 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION BUSHING DE 32MM 1 1/4" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $33.07 $33.07 $33.07 $33.07 $33.07 $33.07 $33.07 $33.07 $33.07 $33.07 $33.07 $33.07 $33.07 $33.07 $33.07

2049000253 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION BUSHING DE 38MM 1 1/2" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $54.10 $54.10 $54.10 $54.10 $54.10 $54.10 $54.10 $54.10 $54.10 $54.10 $54.10 $54.10 $54.10 $54.10 $54.10

2049000263 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION BUSHING DE 51MM 2" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $53.78 $53.78 $53.78 $53.78 $53.78 $53.78 $53.78 $53.78 $53.78 $53.78 $53.78 $53.78 $53.78 $53.78 $53.78

2049000273 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION BUSHING DE 63MM 2 1/2" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $95.61 $95.61 $95.61 $95.61 $95.61 $95.61 $95.61 $95.61 $95.61 $95.61 $95.61 $95.61 $95.61 $95.61 $95.61

2049000283 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION BUSHING DE 75MM 3" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $131.97 $131.97 $131.97 $131.97 $131.97 $131.97 $131.97 $131.97 $131.97 $131.97 $131.97 $131.97 $131.97 $131.97 $131.97

:

Page 230: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 230 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049000293 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:REDUCCION BUSHING DE 102MM 4" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $256.66 $256.66 $256.66 $256.66 $256.66 $256.66 $256.66 $256.66 $256.66 $256.66 $256.66 $256.66 $256.66 $256.66 $256.66

2049000303 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO DE 45G. REFORZADO DE 10MM 3/8" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $4.11 $4.11 $4.11 $4.11 $4.11 $4.11 $4.11 $4.11 $4.11 $4.11 $4.11 $4.11 $4.11 $4.11 $4.11

2049000313 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO DE 45G. REFORZADO DE 13MM 1/2" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $15.86 $15.86 $15.86 $15.86 $15.86 $15.86 $15.86 $15.86 $15.86 $15.86 $15.86 $15.86 $15.86 $15.86 $15.86

2049000323 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO DE 45G. REFORZADO DE 19MM 3/4" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $21.14 $21.14 $21.14 $21.14 $21.14 $21.14 $21.14 $21.14 $21.14 $21.14 $21.14 $21.14 $21.14 $21.14 $21.14

2049000333 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO DE 45G. REFORZADO DE 25MM 1" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $26.40 $26.40 $26.40 $26.40 $26.40 $26.40 $26.40 $26.40 $26.40 $26.40 $26.40 $26.40 $26.40 $26.40 $26.40

2049000343 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO DE 45G. REFORZADO DE 32MM 1 1/4" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $23.67 $23.67 $23.67 $23.67 $23.67 $23.67 $23.67 $23.67 $23.67 $23.67 $23.67 $23.67 $23.67 $23.67 $23.67

2049000353 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO DE 45G. REFORZADO DE 38MM 1 1/2" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $61.37 $61.37 $61.37 $61.37 $61.37 $61.37 $61.37 $61.37 $61.37 $61.37 $61.37 $61.37 $61.37 $61.37 $61.37

2049000363 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO DE 45G. REFORZADO DE 51MM 2" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $87.63 $87.63 $87.63 $87.63 $87.63 $87.63 $87.63 $87.63 $87.63 $87.63 $87.63 $87.63 $87.63 $87.63 $87.63

:

Page 231: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 231 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049000373 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO DE 45G. REFORZADO DE 63MM 2 1/2" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $182.51 $182.51 $182.51 $182.51 $182.51 $182.51 $182.51 $182.51 $182.51 $182.51 $182.51 $182.51 $182.51 $182.51 $182.51

2049000383 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO DE 45G. REFORZADO DE 75MM 3" DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $304.26 $304.26 $304.26 $304.26 $304.26 $304.26 $304.26 $304.26 $304.26 $304.26 $304.26 $304.26 $304.26 $304.26 $304.26

2049000393 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CODO DE 45G. REFORZADO DE 102MM 4" DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $568.88 $568.88 $568.88 $568.88 $568.88 $568.88 $568.88 $568.88 $568.88 $568.88 $568.88 $568.88 $568.88 $568.88 $568.88

2049000403 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CODO DE 45G. REFORZADO DE 1/4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3.82 $3.82 $3.82 $3.82 $3.82 $3.82 $3.82 $3.82 $3.82 $3.82 $3.82 $3.82 $3.82 $3.82 $3.82

2049000413 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CODO DE 90G. REFORZADO DE 10MM 3/8" DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $4.10 $4.10 $4.10 $4.10 $4.10 $4.10 $4.10 $4.10 $4.10 $4.10 $4.10 $4.10 $4.10 $4.10 $4.10

2049000423 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CODO DE 90G. REFORZADO DE 13MM 1/2" DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $8.12 $8.12 $8.12 $8.12 $8.12 $8.12 $8.12 $8.12 $8.12 $8.12 $8.12 $8.12 $8.12 $8.12 $8.12

2049000433 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CODO DE 90G. REFORZADO DE 19MM 3/4" DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $14.25 $14.25 $14.25 $14.25 $14.25 $14.25 $14.25 $14.25 $14.25 $14.25 $14.25 $14.25 $14.25 $14.25 $14.25

2049000443 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CODO DE 90G. REFORZADO DE 25MM 1" DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $28.18 $28.18 $28.18 $28.18 $28.18 $28.18 $28.18 $28.18 $28.18 $28.18 $28.18 $28.18 $28.18 $28.18 $28.18

:

Page 232: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 232 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049000453 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CODO DE 90G. REFORZADO DE 32MM 1 1/4 " DEDIAMETRO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

PZA $21.45 $21.45 $21.45 $21.45 $21.45 $21.45 $21.45 $21.45 $21.45 $21.45 $21.45 $21.45 $21.45 $21.45 $21.45

2049000463 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CODO DE 90G. REFORZADO DE 38MM 1 1/2" DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $56.78 $56.78 $56.78 $56.78 $56.78 $56.78 $56.78 $56.78 $56.78 $56.78 $56.78 $56.78 $56.78 $56.78 $56.78

2049000473 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO DE 90G. REFORZADO DE 51MM 2" DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $82.14 $82.14 $82.14 $82.14 $82.14 $82.14 $82.14 $82.14 $82.14 $82.14 $82.14 $82.14 $82.14 $82.14 $82.14

2049000483 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO DE 90G. REFORZADO DE 63MM 2 1/2" DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $173.82 $173.82 $173.82 $173.82 $173.82 $173.82 $173.82 $173.82 $173.82 $173.82 $173.82 $173.82 $173.82 $173.82 $173.82

2049000493 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO REFORZADO DE 90G. DE 75MM 3" DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $318.73 $318.73 $318.73 $318.73 $318.73 $318.73 $318.73 $318.73 $318.73 $318.73 $318.73 $318.73 $318.73 $318.73 $318.73

2049000503 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CODO DE 90G. REFORZADO DE 102MM 4" DEDIAMETRO INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $579.51 $579.51 $579.51 $579.51 $579.51 $579.51 $579.51 $579.51 $579.51 $579.51 $579.51 $579.51 $579.51 $579.51 $579.51

2049000513 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TEE REFORZADA DE 1/4" DE DIAMETRO INCLUYETODO LO NECESARIO PARA SU CORRECTA

PZA $9.60 $9.60 $9.60 $9.60 $9.60 $9.60 $9.60 $9.60 $9.60 $9.60 $9.60 $9.60 $9.60 $9.60 $9.60

2049000523 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TEE REFORZADA DE 10MM 3/8" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $19.96 $19.96 $19.96 $19.96 $19.96 $19.96 $19.96 $19.96 $19.96 $19.96 $19.96 $19.96 $19.96 $19.96 $19.96

:

Page 233: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 233 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049000533 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TEE REFORZADA DE 13MM 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55

2049000543 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TEE REFORZADA DE 19MM 3/4" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $18.51 $18.51 $18.51 $18.51 $18.51 $18.51 $18.51 $18.51 $18.51 $18.51 $18.51 $18.51 $18.51 $18.51 $18.51

2049000553 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TEE REFORZADA DE 25MM 1" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99 $36.99

2049000563 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TEE REFORZADA DE 32MM 1 1/4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $77.06 $77.06 $77.06 $77.06 $77.06 $77.06 $77.06 $77.06 $77.06 $77.06 $77.06 $77.06 $77.06 $77.06 $77.06

2049000573 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TEE REFORZADA DE 38MM 1 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $85.17 $85.17 $85.17 $85.17 $85.17 $85.17 $85.17 $85.17 $85.17 $85.17 $85.17 $85.17 $85.17 $85.17 $85.17

2049000583 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TEE REFORZADA DE 51MM 2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $125.95 $125.95 $125.95 $125.95 $125.95 $125.95 $125.95 $125.95 $125.95 $125.95 $125.95 $125.95 $125.95 $125.95 $125.95

2049000593 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TEE REFORZADA DE 63MM 2 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $407.55 $407.55 $407.55 $407.55 $407.55 $407.55 $407.55 $407.55 $407.55 $407.55 $407.55 $407.55 $407.55 $407.55 $407.55

2049000603 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TEE REFORZADA DE 75MM 3" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $419.86 $419.86 $419.86 $419.86 $419.86 $419.86 $419.86 $419.86 $419.86 $419.86 $419.86 $419.86 $419.86 $419.86 $419.86

2049000613 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TEE REFORZADA DE 102MM 4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $973.52 $973.52 $973.52 $973.52 $973.52 $973.52 $973.52 $973.52 $973.52 $973.52 $973.52 $973.52 $973.52 $973.52 $973.52

:

Page 234: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 234 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049000623 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON MACHO DE 10MM 3/8" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $6.89 $6.89 $6.89 $6.89 $6.89 $6.89 $6.89 $6.89 $6.89 $6.89 $6.89 $6.89 $6.89 $6.89 $6.89

2049000633 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON MACHO DE 13MM 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2.51 $2.51 $2.51 $2.51 $2.51 $2.51 $2.51 $2.51 $2.51 $2.51 $2.51 $2.51 $2.51 $2.51 $2.51

2049000643 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON MACHO DE 19MM 3/4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3.24 $3.24 $3.24 $3.24 $3.24 $3.24 $3.24 $3.24 $3.24 $3.24 $3.24 $3.24 $3.24 $3.24 $3.24

2049000653 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON MACHO DE 25MM 1" DE DIAMETRO INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $5.16 $5.16 $5.16 $5.16 $5.16 $5.16 $5.16 $5.16 $5.16 $5.16 $5.16 $5.16 $5.16 $5.16 $5.16

2049000663 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON MACHO DE 32MM 1 1/4 DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $8.11 $8.11 $8.11 $8.11 $8.11 $8.11 $8.11 $8.11 $8.11 $8.11 $8.11 $8.11 $8.11 $8.11 $8.11

2049000673 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON MACHO DE 38MM 1 1/2" DE DIAMETRO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $9.79 $9.79 $9.79 $9.79 $9.79 $9.79 $9.79 $9.79 $9.79 $9.79 $9.79 $9.79 $9.79 $9.79 $9.79

2049000683 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON MACHO DE 51MM 2" DE DIAMETRO INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $14.94 $14.94 $14.94 $14.94 $14.94 $14.94 $14.94 $14.94 $14.94 $14.94 $14.94 $14.94 $14.94 $14.94 $14.94

2049000693 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON MACHO DE 63MM 2 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $29.81 $29.81 $29.81 $29.81 $29.81 $29.81 $29.81 $29.81 $29.81 $29.81 $29.81 $29.81 $29.81 $29.81 $29.81

:

Page 235: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 235 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049000703 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON MACHO DE 75MM 3" DE DIAMETRO INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $41.66 $41.66 $41.66 $41.66 $41.66 $41.66 $41.66 $41.66 $41.66 $41.66 $41.66 $41.66 $41.66 $41.66 $41.66

2049000713 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON MACHO DE 102MM 4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $74.35 $74.35 $74.35 $74.35 $74.35 $74.35 $74.35 $74.35 $74.35 $74.35 $74.35 $74.35 $74.35 $74.35 $74.35

2049000723 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON HEMBRA DE 10MM 3/8" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3.19 $3.19 $3.19 $3.19 $3.19 $3.19 $3.19 $3.19 $3.19 $3.19 $3.19 $3.19 $3.19 $3.19 $3.19

2049000733 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON HEMBRA DE 13MM 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3.62 $3.62 $3.62 $3.62 $3.62 $3.62 $3.62 $3.62 $3.62 $3.62 $3.62 $3.62 $3.62 $3.62 $3.62

2049000743 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TAPON HEMBRA DE 19MM 3/4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $6.26 $6.26 $6.26 $6.26 $6.26 $6.26 $6.26 $6.26 $6.26 $6.26 $6.26 $6.26 $6.26 $6.26 $6.26

2049000753 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON HEMBRA DE 25MM 1" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70 $8.70

2049000763 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:TAPON HEMBRA DE 32MM 1 1/4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $10.90 $10.90 $10.90 $10.90 $10.90 $10.90 $10.90 $10.90 $10.90 $10.90 $10.90 $10.90 $10.90 $10.90 $10.90

2049000773 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TAPON HEMBRA DE 38MM 1 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $15.24 $15.24 $15.24 $15.24 $15.24 $15.24 $15.24 $15.24 $15.24 $15.24 $15.24 $15.24 $15.24 $15.24 $15.24

:

Page 236: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 236 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049000783 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TAPON HEMBRA DE 51MM 2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $22.82 $22.82 $22.82 $22.82 $22.82 $22.82 $22.82 $22.82 $22.82 $22.82 $22.82 $22.82 $22.82 $22.82 $22.82

2049000793 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TAPON HEMBRA DE 63MM 2 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $46.37 $46.37 $46.37 $46.37 $46.37 $46.37 $46.37 $46.37 $46.37 $46.37 $46.37 $46.37 $46.37 $46.37 $46.37

2049000803 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TAPON HEMBRA DE 75MM 3" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $64.18 $64.18 $64.18 $64.18 $64.18 $64.18 $64.18 $64.18 $64.18 $64.18 $64.18 $64.18 $64.18 $64.18 $64.18

2049000813 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TAPON HEMBRA DE 102MM 4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $106.86 $106.86 $106.86 $106.86 $106.86 $106.86 $106.86 $106.86 $106.86 $106.86 $106.86 $106.86 $106.86 $106.86 $106.86

2049000843 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TUERCA UNION DE 13MM 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $44.04 $44.04 $44.04 $44.04 $44.04 $44.04 $44.04 $44.04 $44.04 $44.04 $44.04 $44.04 $44.04 $44.04 $44.04

2049000853 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TUERCA UNION DE 19MM 3/4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $55.70 $55.70 $55.70 $55.70 $55.70 $55.70 $55.70 $55.70 $55.70 $55.70 $55.70 $55.70 $55.70 $55.70 $55.70

2049000863 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TUERCA UNION DE 25MM 1" DE DIAMETRO INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08 $78.08

2049000873 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TUERCA UNION DE 32MM 1 1/4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $119.27 $119.27 $119.27 $119.27 $119.27 $119.27 $119.27 $119.27 $119.27 $119.27 $119.27 $119.27 $119.27 $119.27 $119.27

:

Page 237: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 237 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049000883 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TUERCA UNION DE 38MM 1 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $155.83 $155.83 $155.83 $155.83 $155.83 $155.83 $155.83 $155.83 $155.83 $155.83 $155.83 $155.83 $155.83 $155.83 $155.83

2049000893 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TUERCA UNION DE 51MM 2" DE DIAMETRO INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $194.70 $194.70 $194.70 $194.70 $194.70 $194.70 $194.70 $194.70 $194.70 $194.70 $194.70 $194.70 $194.70 $194.70 $194.70

2049000903 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TUERCA UNION DE 63MM 2 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16

2049000913 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TUERCA UNION DE 75MM 3" DE DIAMETRO INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

PZA $912.02 $912.02 $912.02 $912.02 $912.02 $912.02 $912.02 $912.02 $912.02 $912.02 $912.02 $912.02 $912.02 $912.02 $912.02

2049000923 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:TUERCA UNION DE 102MM 4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,040.45 $1,040.45 $1,040.45 $1,040.45 $1,040.45 $1,040.45 $1,040.45 $1,040.45 $1,040.45 $1,040.45 $1,040.45 $1,040.45 $1,040.45 $1,040.45 $1,040.45

2049000933 SUMINISTRO DE PIEZAS ESPECIALES DE Fo.Go.:CRUZ REFORZADA DE 13MM 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $32.32 $32.32 $32.32 $32.32 $32.32 $32.32 $32.32 $32.32 $32.32 $32.32 $32.32 $32.32 $32.32 $32.32 $32.32

2049000943 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CRUZ REFORZADA DE 19MM 3/4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70

2049000953 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CRUZ REFORZADA DE 25MM 1" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $76.30 $76.30 $76.30 $76.30 $76.30 $76.30 $76.30 $76.30 $76.30 $76.30 $76.30 $76.30 $76.30 $76.30 $76.30

:

Page 238: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 238 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049000963 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CRUZ REFORZADA DE 32MM 1 1/4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $62.93 $62.93 $62.93 $62.93 $62.93 $62.93 $62.93 $62.93 $62.93 $62.93 $62.93 $62.93 $62.93 $62.93 $62.93

2049000973 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CRUZ REFORZADA DE 38MM 1 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70 $164.70

2049000983 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CRUZ REFORZADA DE 51MM 2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $257.39 $257.39 $257.39 $257.39 $257.39 $257.39 $257.39 $257.39 $257.39 $257.39 $257.39 $257.39 $257.39 $257.39 $257.39

2049000993 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CRUZ REFORZADA DE 63MM 2 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16 $416.16

2049001003 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CRUZ REFORZADA DE 75MM 3" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $857.88 $857.88 $857.88 $857.88 $857.88 $857.88 $857.88 $857.88 $857.88 $857.88 $857.88 $857.88 $857.88 $857.88 $857.88

2049001013 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:CRUZ REFORZADA DE 102MM 4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $466.03 $466.03 $466.03 $466.03 $466.03 $466.03 $466.03 $466.03 $466.03 $466.03 $466.03 $466.03 $466.03 $466.03 $466.03

2049001023 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.: YGRIEGA REFORZADA DE 13MM 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $60.31 $60.31 $60.31 $60.31 $60.31 $60.31 $60.31 $60.31 $60.31 $60.31 $60.31 $60.31 $60.31 $60.31 $60.31

2049001033 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.: YGRIEGA REFORZADA DE 19MM 3/4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $26.94 $26.94 $26.94 $26.94 $26.94 $26.94 $26.94 $26.94 $26.94 $26.94 $26.94 $26.94 $26.94 $26.94 $26.94

2049001043 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.: YGRIEGA REFORZADA DE 25MM 1" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $135.60 $135.60 $135.60 $135.60 $135.60 $135.60 $135.60 $135.60 $135.60 $135.60 $135.60 $135.60 $135.60 $135.60 $135.60

:

Page 239: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 239 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049001053 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.: YGRIEGA REFORZADA DE 32MM 1 1/4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $72.06 $72.06 $72.06 $72.06 $72.06 $72.06 $72.06 $72.06 $72.06 $72.06 $72.06 $72.06 $72.06 $72.06 $72.06

2049001063 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.: YGRIEGA REFORZADA DE 38MM 1 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $327.11 $327.11 $327.11 $327.11 $327.11 $327.11 $327.11 $327.11 $327.11 $327.11 $327.11 $327.11 $327.11 $327.11 $327.11

2049001073 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.: YGRIEGA REFORZADA DE 51MM 2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $478.49 $478.49 $478.49 $478.49 $478.49 $478.49 $478.49 $478.49 $478.49 $478.49 $478.49 $478.49 $478.49 $478.49 $478.49

2049001083 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.: YGRIEGA REFORZADA DE 63MM 2 1/2" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $1,225.82 $1,225.82 $1,225.82 $1,225.82 $1,225.82 $1,225.82 $1,225.82 $1,225.82 $1,225.82 $1,225.82 $1,225.82 $1,225.82 $1,225.82 $1,225.82 $1,225.82

2049001093 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.: YGRIEGA REFORZADA DE 75MM 3" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $2,014.91 $2,014.91 $2,014.91 $2,014.91 $2,014.91 $2,014.91 $2,014.91 $2,014.91 $2,014.91 $2,014.91 $2,014.91 $2,014.91 $2,014.91 $2,014.91 $2,014.91

2049001103 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.: YGRIEGA REFORZADA DE 102MM 4" DE DIAMETROINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

PZA $3,397.96 $3,397.96 $3,397.96 $3,397.96 $3,397.96 $3,397.96 $3,397.96 $3,397.96 $3,397.96 $3,397.96 $3,397.96 $3,397.96 $3,397.96 $3,397.96 $3,397.96

2049001113 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:NIPLE DE 13MM 1/2" DE DIAMETRO INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M $48.92 $48.92 $48.92 $48.92 $48.92 $48.92 $48.92 $48.92 $48.92 $48.92 $48.92 $48.92 $48.92 $48.92 $48.92

2049001123 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:NIPLE DE 19MM 3/4" DE DIAMETRO INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M $60.44 $60.44 $60.44 $60.44 $60.44 $60.44 $60.44 $60.44 $60.44 $60.44 $60.44 $60.44 $60.44 $60.44 $60.44

2049001133 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:NIPLE DE 25MM 1" DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $113.04 $113.04 $113.04 $113.04 $113.04 $113.04 $113.04 $113.04 $113.04 $113.04 $113.04 $113.04 $113.04 $113.04 $113.04

:

Page 240: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 240 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2049001143 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:NIPLE DE 32MM 1 1/4" DE DIAMETRO INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M $119.94 $119.94 $119.94 $119.94 $119.94 $119.94 $119.94 $119.94 $119.94 $119.94 $119.94 $119.94 $119.94 $119.94 $119.94

2049001153 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:NIPLE DE 38MM 1 1/2" DE DIAMETRO INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M $139.01 $139.01 $139.01 $139.01 $139.01 $139.01 $139.01 $139.01 $139.01 $139.01 $139.01 $139.01 $139.01 $139.01 $139.01

2049001163 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:NIPLE DE 51MM 2" DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $174.11 $174.11 $174.11 $174.11 $174.11 $174.11 $174.11 $174.11 $174.11 $174.11 $174.11 $174.11 $174.11 $174.11 $174.11

2049001173 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:NIPLE DE 63MM 2 1/2" DE DIAMETRO INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M $280.14 $280.14 $280.14 $280.14 $280.14 $280.14 $280.14 $280.14 $280.14 $280.14 $280.14 $280.14 $280.14 $280.14 $280.14

2049001183 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:NIPLE DE 75MM 3" DE DIAMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M $305.09 $305.09 $305.09 $305.09 $305.09 $305.09 $305.09 $305.09 $305.09 $305.09 $305.09 $305.09 $305.09 $305.09 $305.09

2049001193 SUMINISTRO DE PIEZAS ESPECIALES DE Fo. Go.:NIPLE DE 102MM 4" DE DIAMETRO INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M $492.27 $492.27 $492.27 $492.27 $492.27 $492.27 $492.27 $492.27 $492.27 $492.27 $492.27 $492.27 $492.27 $492.27 $492.27

Total Sum. de Piezas Especiales FoGo

A2050 Sum. de Tuberia Soldable2050000013 SUMINISTRO DE TUBERIA DE ACERO SOLDABLE DE

1/4" DE ESPESOR Y 6" DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTA

M $899.24 $899.24 $899.24 $899.24 $899.24 $899.24 $899.24 $899.24 $899.24 $899.24 $899.24 $899.24 $899.24 $899.24 $899.24

2050000023 SUMINISTRO DE TUBERIA DE ACERO SOLDABLE DE1/4" DE ESPESOR Y DE 8" DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $1,074.09 $1,074.09 $1,074.09 $1,074.09 $1,074.09 $1,074.09 $1,074.09 $1,074.09 $1,074.09 $1,074.09 $1,074.09 $1,074.09 $1,074.09 $1,074.09 $1,074.09

2050000033 SUMINISTRO DE TUBERIA DE ACERO SOLDABLE DE1/4" DE ESPESOR Y 10" DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $1,617.64 $1,617.64 $1,617.64 $1,617.64 $1,617.64 $1,617.64 $1,617.64 $1,617.64 $1,617.64 $1,617.64 $1,617.64 $1,617.64 $1,617.64 $1,617.64 $1,617.64

:

Page 241: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 241 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2050000043 SUMINISTRO DE TUBERIA DE ACERO SOLDABLE DE1/4" DE ESPESOR Y 12" DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $1,921.44 $1,921.44 $1,921.44 $1,921.44 $1,921.44 $1,921.44 $1,921.44 $1,921.44 $1,921.44 $1,921.44 $1,921.44 $1,921.44 $1,921.44 $1,921.44 $1,921.44

2050000053 SUMINISTRO DE TUBERIA DE ACERO SOLDABLE DE1/4" DE ESPESOR Y 14" DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $2,106.64 $2,106.64 $2,106.64 $2,106.64 $2,106.64 $2,106.64 $2,106.64 $2,106.64 $2,106.64 $2,106.64 $2,106.64 $2,106.64 $2,106.64 $2,106.64 $2,106.64

2050000063 SUMINISTRO DE TUBERIA DE ACERO SOLDABLE DE1/4" DE ESPESOR Y 16" DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $2,415.36 $2,415.36 $2,415.36 $2,415.36 $2,415.36 $2,415.36 $2,415.36 $2,415.36 $2,415.36 $2,415.36 $2,415.36 $2,415.36 $2,415.36 $2,415.36 $2,415.36

2050000073 SUMINISTRO DE TUBERIA DE ACERO SOLDABLE DE1/4" DE ESPESOR Y 18" DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $2,679.18 $2,679.18 $2,679.18 $2,679.18 $2,679.18 $2,679.18 $2,679.18 $2,679.18 $2,679.18 $2,679.18 $2,679.18 $2,679.18 $2,679.18 $2,679.18 $2,679.18

2050000083 SUMINISTRO DE TUBERIA DE ACERO SOLDABLE DE1/4" DE ESPESOR Y 20" DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $3,002.72 $3,002.72 $3,002.72 $3,002.72 $3,002.72 $3,002.72 $3,002.72 $3,002.72 $3,002.72 $3,002.72 $3,002.72 $3,002.72 $3,002.72 $3,002.72 $3,002.72

2050000093 SUMINISTRO DE TUBERIA DE ACERO SOLDABLE DE1/4" DE ESPESOR Y 24" DE DIAMETRO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M $4,291.50 $4,291.50 $4,291.50 $4,291.50 $4,291.50 $4,291.50 $4,291.50 $4,291.50 $4,291.50 $4,291.50 $4,291.50 $4,291.50 $4,291.50 $4,291.50 $4,291.50

Total Sum. de Tuberia Soldable

A2051 Sum. de Bridas de Acero2051000023 SUMINISTRO DE BRIDA DE ACERO SOLDABLE DE 6"

DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $1,005.34 $1,005.34 $1,005.34 $1,005.34 $1,005.34 $1,005.34 $1,005.34 $1,005.34 $1,005.34 $1,005.34 $1,005.34 $1,005.34 $1,005.34 $1,005.34 $1,005.34

2051000033 SUMINISTRO DE BRIDA DE ACERO SOLDABLE DE 8"DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $1,420.66 $1,420.66 $1,420.66 $1,420.66 $1,420.66 $1,420.66 $1,420.66 $1,420.66 $1,420.66 $1,420.66 $1,420.66 $1,420.66 $1,420.66 $1,420.66 $1,420.66

:

Page 242: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 242 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2051000043 SUMINISTRO DE BRIDA DE ACERO SOLDABLE DE10" DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $2,184.22 $2,184.22 $2,184.22 $2,184.22 $2,184.22 $2,184.22 $2,184.22 $2,184.22 $2,184.22 $2,184.22 $2,184.22 $2,184.22 $2,184.22 $2,184.22 $2,184.22

2051000053 SUMINISTRO DE BRIDA DE ACERO SOLDABLE DE12" DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $3,378.14 $3,378.14 $3,378.14 $3,378.14 $3,378.14 $3,378.14 $3,378.14 $3,378.14 $3,378.14 $3,378.14 $3,378.14 $3,378.14 $3,378.14 $3,378.14 $3,378.14

2051000063 SUMINISTRO DE BRIDA DE ACERO SOLDABLE DE14" DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $5,112.32 $5,112.32 $5,112.32 $5,112.32 $5,112.32 $5,112.32 $5,112.32 $5,112.32 $5,112.32 $5,112.32 $5,112.32 $5,112.32 $5,112.32 $5,112.32 $5,112.32

2051000073 SUMINISTRO DE BRIDA DE ACERO SOLDABLE DE16" DE DIAMETRO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

PZA $6,567.68 $6,567.68 $6,567.68 $6,567.68 $6,567.68 $6,567.68 $6,567.68 $6,567.68 $6,567.68 $6,567.68 $6,567.68 $6,567.68 $6,567.68 $6,567.68 $6,567.68

Total Sum. de Bridas de Acero

Total Sum. de Materiales de Agua Potable

A22 Tuberia de polietileno alta densidad2201000070 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DE

ALTA DENSIDAD DE 18" N-12 SANITARIO CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

M $900.98 $900.98 $900.98 $900.98 $900.98 $900.98 $900.98 $903.72 $901.04 $901.04 $901.04 $901.04 $901.04 $901.04 $901.04

NECESARIO PARA SU CORRECTA EJECUCION.

2201000080 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 24" N-12 SANITARIO CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

M $1,569.11 $1,569.11 $1,569.11 $1,569.11 $1,569.11 $1,569.11 $1,569.11 $1,574.67 $1,569.24 $1,569.24 $1,569.24 $1,569.24 $1,569.24 $1,569.24 $1,569.24

NECESARIO PARA SU CORRECTA EJECUCION.

:

Page 243: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 243 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2201000090 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 30" N-12 SANITARIO CONCAMPANA Y EMPAQUE; INCLUYE, LUBRICANTE1100LU ADS (4 LITROS): ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

M $2,307.05 $2,307.05 $2,307.05 $2,307.05 $2,307.05 $2,307.05 $2,307.05 $2,314.71 $2,307.25 $2,307.25 $2,307.25 $2,307.25 $2,307.25 $2,307.25 $2,307.25

NECESARIO PARA SU CORRECTA EJECUCION.

2201000100 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 36" N-12 HC SANITARIO CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

M $3,076.84 $3,076.84 $3,076.84 $3,076.84 $3,076.84 $3,076.84 $3,076.84 $3,086.24 $3,077.08 $3,077.08 $3,077.08 $3,077.08 $3,077.08 $3,077.08 $3,077.08

NECESARIO PARA SU CORRECTA EJECUCION.

2201000110 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 42" N-12 HC SANITARIO CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

M $4,204.08 $4,204.08 $4,204.08 $4,204.08 $4,204.08 $4,204.08 $4,204.08 $4,216.05 $4,204.36 $4,204.36 $4,204.36 $4,204.36 $4,204.36 $4,204.36 $4,204.36

NECESARIO PARA SU CORRECTA EJECUCION.

2201000120 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 48" N-12 SANITARIO CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

M $5,017.04 $5,017.04 $5,017.04 $5,017.04 $5,017.04 $5,017.04 $5,017.04 $5,031.20 $5,017.38 $5,017.38 $5,017.38 $5,017.38 $5,017.38 $5,017.38 $5,017.38

NECESARIO PARA SU CORRECTA EJECUCION.

2201000062 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 4" N-12 SANITARIO CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

M $59.19 $59.19 $59.19 $59.19 $59.19 $59.19 $59.19 $60.27 $59.21 $59.21 $59.21 $59.21 $59.21 $59.21 $59.21

:

Page 244: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 244 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

NECESARIO PARA SU CORRECTA EJECUCION.

2201000064 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 6" N-12 SANITARIO CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

M $111.04 $111.04 $111.04 $111.04 $111.04 $111.04 $111.04 $112.41 $111.07 $111.07 $111.07 $111.07 $111.07 $111.07 $111.07

NECESARIO PARA SU CORRECTA EJECUCION.

2201000066 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 8" N-12 SANITARIO CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

M $191.30 $191.30 $191.30 $191.30 $191.30 $191.30 $191.30 $192.86 $191.33 $191.33 $191.33 $191.33 $191.33 $191.33 $191.33

NECESARIO PARA SU CORRECTA EJECUCION.

2201000067 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 10" N-12 SANITARIO CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADOM,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

M $295.53 $295.53 $295.53 $295.53 $295.53 $295.53 $295.53 $297.34 $295.56 $295.56 $295.56 $295.56 $295.56 $295.56 $295.56

NECESARIO PARA SU CORRECTA EJECUCION.

2201000068 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 12" N-12 SANITARIO CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

M $428.40 $428.40 $428.40 $428.40 $428.40 $428.40 $428.40 $430.58 $428.45 $428.45 $428.45 $428.45 $428.45 $428.45 $428.45

NECESARIO PARA SU CORRECTA EJECUCION.

:

Page 245: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 245 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

2201000069 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 15" N-12 SANITARIO CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYETODO LO

M $630.97 $630.97 $630.97 $630.97 $630.97 $630.97 $630.97 $633.43 $631.02 $631.02 $631.02 $631.02 $631.02 $631.02 $631.02

NECESARIO PARA SU CORRECTA EJECUCION.

2201000150 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 12" N-12 PLUVIAL SERIE 85 CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE

ML $408.76 $408.76 $408.76 $408.76 $408.76 $408.76 $408.76 $410.01 $408.79 $408.79 $408.79 $408.79 $408.79 $408.79 $408.79

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

2201000160 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 15" N-12 PLUVIAL SERIE 85 CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE

ML $605.81 $605.81 $605.81 $605.81 $605.81 $605.81 $605.81 $608.29 $605.87 $605.87 $605.87 $605.87 $605.87 $605.87 $605.87

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

2201000170 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 18" N-12 PLUVIAL SERIE 85 CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE

ML $849.76 $849.76 $849.76 $849.76 $849.76 $849.76 $849.76 $852.51 $849.82 $849.82 $849.82 $849.82 $849.82 $849.82 $849.82

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

2201000180 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 24" N-12 PLUVIAL SERIE 85 CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE

ML $1,482.26 $1,482.26 $1,482.26 $1,482.26 $1,482.26 $1,482.26 $1,482.26 $1,487.81 $1,482.38 $1,482.38 $1,482.38 $1,482.38 $1,482.38 $1,482.38 $1,482.38

:

Page 246: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 246 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

2201000190 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 30" N-12 PLUVIAL SERIE 85 CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE

ML $2,267.27 $2,267.27 $2,267.27 $2,267.27 $2,267.27 $2,267.27 $2,267.27 $2,274.93 $2,267.45 $2,267.45 $2,267.45 $2,267.45 $2,267.45 $2,267.45 $2,267.45

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

2201000200 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 36" N-12 PLUVIAL SERIE 85 CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE

ML $2,971.38 $2,971.38 $2,971.38 $2,971.38 $2,971.38 $2,971.38 $2,971.38 $2,979.41 $2,971.59 $2,971.59 $2,971.59 $2,971.59 $2,971.59 $2,971.59 $2,971.59

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

2201000210 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 42" N-12 PLUVIAL SERIE 85 CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE

ML $4,063.15 $4,063.15 $4,063.15 $4,063.15 $4,063.15 $4,063.15 $4,063.15 $4,075.13 $4,063.43 $4,063.43 $4,063.43 $4,063.43 $4,063.43 $4,063.43 $4,063.43

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

2201000220 SUMINISTRO Y COLOCACION DE TUBO TIPO ADS DEALTA DENSIDAD DE 48" N-12 PLUVIAL SERIE 85 CONCAMPANA Y EMPAQUE, LUBRICANTE 1100LU ADS (4LITROS); INCLUYE: ACARREO, MANIOBRA DECOLOCACION, CONEXIONES, NIVELADO,HERRAMIENTA MENOR Y MANO DE OBRA. INCLUYE

ML $4,851.39 $4,851.39 $4,851.39 $4,851.39 $4,851.39 $4,851.39 $4,851.39 $4,865.55 $4,851.72 $4,851.72 $4,851.72 $4,851.72 $4,851.72 $4,851.72 $4,851.72

TODO LO NECESARIO PARA SU CORRECTAEJECUCION.

Total Tuberia de polietileno alta densidad

A30 Acarreos

A3009 ACARREOS

:

Page 247: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 247 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1108000011 ACARREO EN CARRETILLA DE TIERRA Y MATERIALMIXTO PRODUCTO DE EXCAVACIONES Y/ODEMOLICIONES, INCLUYE: CARGA Y DESCARGA ENESTACIONES DE 20 MTS, MEDIDO SUELTO.PRIMERA ESTACIÓN. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M3 $57.62 $57.62 $57.62 $57.62 $57.62 $57.62 $57.62 $74.02 $58.01 $58.01 $58.01 $58.01 $58.01 $58.01 $58.01

1108000022 ACARREO EN CARRETILLA DE TIERRA Y MATERIALMIXTO PRODUCTO DE EXCAVACIONES Y/ODEMOLICIONES, INCLUYE: CARGA Y DESCARGA ENESTACIONES DE 20 MTS, MEDIDO SUELTO,ESTACIONES SUBSECUENTES A 20 MTS. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M3-EST $34.57 $34.57 $34.57 $34.57 $34.57 $34.57 $34.57 $44.41 $34.80 $34.80 $34.80 $34.80 $34.80 $34.80 $34.80

1108000023 ACARREO EN CARRETA TIRADA POR BESTIAS, DEMATERIALES PARA CONSTRUCCIÓN Y ACCESORIOSVARIOS. APLICABLE EXCLUSIVAMENTE EN LOSLUGARES EN QUE LAS CONDICIONES DELTERRENO NO PERMITEN OTRO MEDIO DETRANSPORTE, INCLUYE: CARGA Y DESCARGA,DISTANCIA MÁXIMA DE

TON $806.44 $806.44 $806.44 $806.44 $806.44 $806.44 $806.44 $839.26 $807.23 $807.23 $807.23 $807.23 $807.23 $807.23 $807.23

ACARREO 1ER. KILOMETRO. CON AUTORIZACIONDE LA DEPENDENCIA INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1108000024 ACARREO EN CARRETA TIRADA POR BESTIAS, DEMATERIALES PARA CONSTRUCCIÓN Y ACCESORIOSVARIOS. APLICABLE EXCLUSIVAMENTE EN LOSLUGARES EN QUE LAS CONDICIONES DELTERRENO NO PERMITEN OTRO MEDIO DETRANSPORTE, INCLUYE: CARGA Y DESCARGA, KMSUBSECUENTE. CON

TKM $230.40 $230.40 $230.40 $230.40 $230.40 $230.40 $230.40 $230.40 $230.40 $230.40 $230.40 $230.40 $230.40 $230.40 $230.40

AUTORIZACION DE LA DEPENDENCIA INCLUYETODO LO NECESARIO PARA SU CORRECTA

1108000031 ACARREOS EN CAMIÓN CON CARGA MANUAL DETIERRA Y MATERIAL MIXTO, PRODUCTO DE LASEXCAVACIONES QUE NO SEAN ROCA, MEDIDOSUELTO. PRIMER KILÓMETRO PAVIMENTO. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M3 $122.25 $122.25 $122.25 $122.25 $122.25 $122.25 $122.25 $138.65 $122.64 $122.64 $122.64 $122.64 $122.64 $122.64 $122.64

:

Page 248: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 248 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1108000032 ACARREOS EN CAMIÓN DE TIERRA Y MATERIALMIXTO, PRODUCTO DE LAS EXCAVACIONES, ROCASUELTA, CARPETAS, EMPEDRADOS, DEMOLICIONES DE MAMPOSTERIA, DEMOLICIONES DE CONCRETO,TALA DE ARBOLES. MEDIDO SUELTO. KM 2 AL KM 20EN PAVIMENTO INCLUYE TODO LO NECESARIO

M3-Km $8.52 $8.52 $8.52 $8.52 $8.52 $8.52 $8.52 $8.52 $8.52 $8.52 $8.52 $8.52 $8.52 $8.52 $8.52

PARA SU CORRECTA EJECUCION.

1108000033 ACARREOS EN CAMIÓN DE TIERRA Y MATERIALMIXTO, PRODUCTO DE LAS EXCAVACIONES, ROCASUELTA, CARPETAS, EMPEDRADOS, DEMOLICIONES DE MAMPOSTERIA, DEMOLICIONES DE CONCRETO,TALA DE ARBOLES. MEDIDO SUELTO. KM 21 ENADELANTE EN PAVIMENTO INCLUYE TODO LO

M3-Km $7.11 $7.11 $7.11 $7.11 $7.11 $7.11 $7.11 $7.11 $7.11 $7.11 $7.11 $7.11 $7.11 $7.11 $7.11

NECESARIO PARA SU CORRECTA EJECUCION.

1108000035 ACARREOS EN CAMIÓN CON CARGA MANUAL DETIERRA Y MATERIAL MIXTO, PRODUCTO DE LASEXCAVACIONES QUE NO SEAN ROCA, MEDIDOSUELTO. 1er KM EN REVESTIMIENTO, TERRACERIAY BRECHA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M3 $123.48 $123.48 $123.48 $123.48 $123.48 $123.48 $123.48 $139.88 $123.87 $123.87 $123.87 $123.87 $123.87 $123.87 $123.87

1108000036 ACARREOS EN CAMIÓN DE TIERRA Y MATERIALMIXTO, PRODUCTO DE LAS EXCAVACIONES, ROCASUELTA, CARPETAS, EMPEDRADOS, DEMOLICIONES DE MAMPOSTERIA, DEMOLICIONES DE CONCRETO,TALA DE ARBOLES. MEDIDO SUELTO. KM 2 AL KM 20EN REVESTIMIENTO. INCLUYE TODO LO

M3-Km $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35 $9.35

NECESARIO PARA SU CORRECTA EJECUCION.

1108000037 ACARREOS EN CAMIÓN DE TIERRA Y MATERIALMIXTO, PRODUCTO DE LAS EXCAVACIONES, ROCASUELTA, CARPETAS, EMPEDRADOS, DEMOLICIONES DE MAMPOSTERIA, DEMOLICIONES DE CONCRETO,TALA DE ARBOLES. MEDIDO SUELTO. KM 21 ENADELANTE EN REVESTIMIENTO, TERRACERIA Y

M3-Km $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73

BRECHA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

:

Page 249: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 249 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1108000061 ACARREOS EN CAMIÓN CON CARGA MANUAL, DELPRODUCTO DE LAS DEMOLICIONES DEMAMPOSTERÍA, ROCA SUELTA, CARPETAS,EMPEDRADOS Y SIMILARES. MEDIDO SUELTOPRIMER KILÓMETRO PAVIMENTO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M3 $151.06 $151.06 $151.06 $151.06 $151.06 $151.06 $151.06 $175.66 $151.65 $151.65 $151.65 $151.65 $151.65 $151.65 $151.65

1108000081 ACARREOS EN CAMIÓN CON CARGA MANUAL, DELPRODUCTO DE LAS DEMOLICIONES DEMAMPOSTERÍA, ROCA SUELTA, CARPETAS,EMPEDRADOS Y SIMILARES. MEDIDO SUELTO 1erKM EN REVESTIMIENTO, TERRACERIAS Y BRECHASINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M3-Km $135.00 $135.00 $135.00 $135.00 $135.00 $135.00 $135.00 $154.69 $135.45 $135.45 $135.45 $135.45 $135.45 $135.45 $135.45

1108000111 ACARREOS EN CAMIÓN CON CARGA MANUAL, DELPRODUCTO DE LAS DEMOLICIONES DE ELEMENTOSDE CONCRETO. MEDIDO SUELTO. PRIMERKILÓMETRO PAVIMENTO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M3 $133.78 $133.78 $133.78 $133.78 $133.78 $133.78 $133.78 $153.46 $134.23 $134.23 $134.23 $134.23 $134.23 $134.23 $134.23

1108000131 ACARREOS EN CAMIÓN CON CARGA MANUAL, DELPRODUCTO DE LAS DEMOLICIONES DE ELEMENTOSDE CONCRETO. MEDIDO SUELTO. 1er KM.REVESTIMIENTO, TERRACERIA Y BRECHASINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M3-Km $135.00 $135.00 $135.00 $135.00 $135.00 $135.00 $135.00 $154.69 $135.45 $135.45 $135.45 $135.45 $135.45 $135.45 $135.45

1108000161 ACARREOS EN CAMIÓN CON CARGA MANUAL, DELPRODUCTO DE TALAS DE ÁRBOLES Y EXTRACCIÓNDE TOCONES, MEDIDO SUELTO, 1er KM ENPAVIMENTO. INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

M3 $107.72 $107.72 $107.72 $107.72 $107.72 $107.72 $107.72 $121.79 $108.06 $108.06 $108.06 $108.06 $108.06 $108.06 $108.06

1108000181 ACARREOS EN CAMIÓN CON CARGA MANUAL, DELPRODUCTO DE LA TALA DE ÁRBOLES YEXTRACCIÓN DE TOCONES. MEDIDO SUELTO, 1erKM. REVESTIMIENTO, TERRACERIAS Y BRECHAS.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M3-Km $128.71 $128.71 $128.71 $128.71 $128.71 $128.71 $128.71 $148.40 $129.19 $129.19 $129.19 $129.19 $129.19 $129.19 $129.19

:

Page 250: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 250 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1108000201 ACARREOS EN CAMIÓN DE REDILAS DE 10-12TONELADAS DE CAPACIDAD, DE MATERIALES PARACONSTRUCCIÓN Y ACCESORIOS VARIOS, CUANDOEXISTA DIFICULTAD PARA ENTREGA DIRECTA POREL PROVEEDOR O NO SE DISPONGA DELPRODUCTO EN LA LOCALIDAD Y SIEMPRE QUE SEAAUTORIZADO

TON $213.53 $213.53 $213.53 $213.53 $213.53 $213.53 $213.53 $248.42 $214.37 $214.37 $214.37 $214.37 $214.37 $214.37 $214.37

POR LA DEPENDENCIA. INCLUYE: CARGA YDESCARGA. PRIMER KILÓMETRO PAVIMENTO.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1108000211 ACARREOS EN CAMIÓN DE REDILAS DE 10-12TONELADAS DE CAPACIDAD, DE MATERIALES PARACONSTRUCCIÓN Y ACCESORIOS VARIOS, CUANDOEXISTA DIFICULTAD PARA ENTREGA DIRECTA POREL PROVEEDOR O NO SE DISPONGA DELPRODUCTO EN LA LOCALIDAD Y SIEMPRE QUE SEAAUTORIZADO

TKM $8.38 $8.38 $8.38 $8.38 $8.38 $8.38 $8.38 $8.65 $8.38 $8.38 $8.38 $8.38 $8.38 $8.38 $8.38

POR LA DEPENDENCIA, INCLUYE: CARGA YDESCARGA. KILÓMETROS SUBSECUENTES, ENPAVIMENTO DEL KM2 EN ADELANTE INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

1108000221 ACARREOS EN CAMIÓN DE REDILAS DE 10-12TONELADAS DE CAPACIDAD, DE MATERIALES PARACONSTRUCCIÓN Y ACCESORIOS VARIOS, CUANDOEXISTA DIFICULTAD PARA ENTREGA DIRECTA POREL PROVEEDOR O NO SE DISPONGA DELPRODUCTO EN LA LOCALIDAD Y SIEMPRE QUE SEAAUTORIZADO

TKM $226.77 $226.77 $226.77 $226.77 $226.77 $226.77 $226.77 $265.18 $227.71 $227.71 $227.71 $227.71 $227.71 $227.71 $227.71

POR LA DEPENDENCIA, INCLUYE: CARGA YDESCARGA. 1er KM EN REVESTIMIENTO,TERRACERIAS Y BRECHAS. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1108000231 ACARREOS EN CAMIÓN DE REDILAS DE 10-12TONELADAS DE CAPACIDAD, DE MATERIALES PARACONSTRUCCIÓN Y ACCESORIOS VARIOS, CUANDOEXISTA DIFICULTAD PARA ENTREGA DIRECTA POREL PROVEEDOR O NO SE DISPONGA DELPRODUCTO EN LA LOCALIDAD Y SIEMPRE QUE SEAAUTORIZADO

TKM $8.38 $8.38 $8.38 $8.38 $8.38 $8.38 $8.38 $8.65 $8.38 $8.38 $8.38 $8.38 $8.38 $8.38 $8.38

:

Page 251: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 251 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

POR LA DEPENDENCIA, INCLUYE: CARGA YDESCARGA. KM2 EN ADELANTE .ENREVESTIMIENTOS, TERRACERIAS Y BRECHAS.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1108000241 ACARREOS EN CAMIÓN DE REDILAS DE 10TONELADAS DE CAPACIDAD, DE MATERIALES PARACONSTRUCCIÓN Y ACCESORIOS VARIOS, CUANDOEXISTA DIFICULTAD PARA ENTREGA DIRECTA POREL PROVEEDOR O NO SE DISPONGA DELPRODUCTO EN LA LOCALIDAD Y SIEMPRE QUE SEAAUTORIZADO

TKM $10.47 $10.47 $10.47 $10.47 $10.47 $10.47 $10.47 $10.82 $10.49 $10.49 $10.49 $10.49 $10.49 $10.49 $10.49

POR LA DEPENDENCIA, INCLUYE: CARGA YDESCARGA. KILÓMETROS SUBSECUENTES, SOBRETERRENOS CON PENDIENTES MAYORES AL 15%.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1108000281 ACARREOS EN CAMIÓN CON CARGA MECÁNICA,DEL PRODUCTO DE LAS DEMOLICIONES DEELEMENTOS DE CONCRETO. MEDIDO SUELTO.PRIMER KILÓMETRO EN PAVIMENTO INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M3 $32.11 $32.11 $32.11 $32.11 $32.11 $32.11 $32.11 $32.60 $32.14 $32.14 $32.14 $32.14 $32.14 $32.14 $32.14

1108000301 ACARREOS EN CAMIÓN CON CARGA MECÁNICA DEMATERIALES PETREOS, MATERIALES PRODUCTODE LAS EXCAVACIONES O DEMOLICIONES DEELEMENTOS DE CONCRETO MEDIDO SUELTO. 1erKM EN REVESTIMIENTO, TERRACERIAS Y BRECHA.INCLUYE TODO LO NECESARIO PARA SUCORRECTA

M3-Km $33.34 $33.34 $33.34 $33.34 $33.34 $33.34 $33.34 $33.83 $33.38 $33.38 $33.38 $33.38 $33.38 $33.38 $33.38

EJECUCION.

1108000331 ACARREOS EN CAMIÓN CON CARGA MECÁNICA, DEMATERIALES PRODUCTO DE LA DEMOLICIÓN DEMAMPOSTERÍA, ROCA SUELTA, CARPETAS,EMPEDRADOS Y SIMILARES. MEDIDO SUELTO. 1erKM. EN PAVIMENTO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

M3 $32.11 $32.11 $32.11 $32.11 $32.11 $32.11 $32.11 $32.60 $32.14 $32.14 $32.14 $32.14 $32.14 $32.14 $32.14

:

Page 252: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 252 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1108000351 ACARREOS EN CAMIÓN CON CARGA MECÁNICA, DEMATERIALES PRODUCTO DE LA DEMOLICIÓN DEMAMPOSTERÍA, ROCA SUELTA, CARPETAS,EMPEDRADOS Y SIMILARES. MEDIDO SUELTO. 1er.KM. REVESTIMIENTO, TERRACERIAS Y BRECHAINCLUYE TODO LO NECESARIO PARA SUCORRECTA

M3-Km $33.34 $33.34 $33.34 $33.34 $33.34 $33.34 $33.34 $33.83 $33.38 $33.38 $33.38 $33.38 $33.38 $33.38 $33.38

EJECUCION.

1108000431 ACARREOS EN CAMIÓN CON CARGA MECÁNICA,DEL PRODUCTO DE LA TALA DE ÁRBOLES YEXTRACCIÓN DE TOCONES. MEDIDO SUELTO.PRIMER KILÓMETRO EN PAVIMENTO INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

M3 $32.11 $32.11 $32.11 $32.11 $32.11 $32.11 $32.11 $32.60 $32.14 $32.14 $32.14 $32.14 $32.14 $32.14 $32.14

1108000451 ACARREOS EN CAMIÓN CON CARGA MECÁNICA,DEL PRODUCTO DE LA TALA DE ÁRBOLES YEXTRACCIÓN DE TOCONES. MEDIDO SUELTO. 1er.KM EN REVESTIMIENTO, TERRACERIA Y BRECHA.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M3-Km $33.34 $33.34 $33.34 $33.34 $33.34 $33.34 $33.34 $33.83 $33.38 $33.38 $33.38 $33.38 $33.38 $33.38 $33.38

1108000481 ACARREO DE AGUA EN PIPA DE 8000 LTS. DECAPACIDAD; INCLUYE: BOMBA AUTOCEBANTE DE4", PRIMER KILÓMETRO EN PAVIMENTO INCLUYETODO LO NECESARIO PARA SU CORRECTA

M3 $39.92 $39.92 $39.92 $39.92 $39.92 $39.92 $39.92 $42.71 $39.98 $39.98 $39.98 $39.98 $39.98 $39.98 $39.98

1108000491 ACARREO DE AGUA EN PIPA DE 8000 LTS. DECAPACIDAD. KM 2 EN ADELANTE EN PAVIMENTOINCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

M3-Km $4.13 $4.13 $4.13 $4.13 $4.13 $4.13 $4.13 $4.26 $4.13 $4.13 $4.13 $4.13 $4.13 $4.13 $4.13

1108000501 ACARREO DE AGUA EN PIPA DE 8000 LTS. DECAPACIDAD. 1er. KM. SOBRE REVESTIMIENTO,TERRACERIA Y BRECHA INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M3-Km $56.75 $56.75 $56.75 $56.75 $56.75 $56.75 $56.75 $59.86 $56.82 $56.82 $56.82 $56.82 $56.82 $56.82 $56.82

1108000511 ACARREO DE AGUA EN PIPA DE 8000 LTS DECAPACIDAD. KM 2 EN ADELANTE ENREVESTIMIENTO, TERRACERIAS Y BRECHAINCLUYE TODO LO NECESARIO PARA SU

M3-Km $6.20 $6.20 $6.20 $6.20 $6.20 $6.20 $6.20 $6.40 $6.21 $6.21 $6.21 $6.21 $6.21 $6.21 $6.21

:

Page 253: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 253 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1108000531 ACARREOS EN LANCHA MOTORIZADA, CON CARGAMANUAL, DE MATERIALES PARA CONSTRUCCIÓN YACCESORIOS VARIOS, INCLUYE: CARGA YDESCARGA. PRIMER KILÓMETRO. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

TON $141.58 $141.58 $141.58 $141.58 $141.58 $141.58 $141.58 $174.40 $142.36 $142.36 $142.36 $142.36 $142.36 $142.36 $142.36

1108000541 ACARREOS EN LANCHA MOTORIZADA, CON CARGAMANUAL, DE MATERIALES PARA CONSTRUCCIÓN YACCESORIOS VARIOS, INCLUYE: CARGA YDESCARGA. KILÓMETROS SUBSECUENTES.INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

TKM $19.90 $19.90 $19.90 $19.90 $19.90 $19.90 $19.90 $19.90 $19.90 $19.90 $19.90 $19.90 $19.90 $19.90 $19.90

1108000551 ACARREO EN CAMIÓN DE REDILAS DE 3TONELADAS DE CAPACIDAD, DE MATERIALES PARACONSTRUCCIÓN Y ACCESORIOS VARIOS, CUANDOEXISTA LA DIFICULTAD PARA ENTREGA DIRECTADEL PROVEEDOR, O NO SE DISPONGA DELPRODUCTO EN LA LOCALIDAD Y SIEMPRE QUE SEAAUTORIZADO POR

TON $119.74 $119.74 $119.74 $119.74 $119.74 $119.74 $119.74 $136.34 $120.13 $120.13 $120.13 $120.13 $120.13 $120.13 $120.13

LA DEPENDENCIA, INCLUYE: CARGA Y DESCARGA.PRIMER KILÓMETRO PAVIMENTO. INCLUYE TODOLO NECESARIO PARA SU CORRECTA EJECUCION.

1108000561 ACARREO EN CAMIÓN DE REDILAS DE 3TONELADAS DE CAPACIDAD, DE MATERIALES PARACONSTRUCCIÓN Y ACCESORIOS VARIOS, CUANDOEXISTA DIFICULTAD PARA ENTREGA DIRECTA POREL PROVEEDOR, O NO SE DISPONGA DELPRODUCTO EN LA LOCALIDAD Y SIEMPRE QUE SEAAUTORIZADO POR

TKM $3.50 $3.50 $3.50 $3.50 $3.50 $3.50 $3.50 $3.70 $3.50 $3.50 $3.50 $3.50 $3.50 $3.50 $3.50

LA DEPENDENCIA. KILÓMETROS KM 2 EN ADELANTEEN PAVIMENTO. INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

1108000571 ACARREO EN CAMIÓN DE REDILAS DE 3TONELADAS DE CAPACIDAD, DE MATERIALES PARACONSTRUCCIÓN Y ACCESORIOS VARIOS, CUANDOEXISTA DIFICULTAD PARA ENTREGA DIRECTA POREL PROVEEDOR, O NO SE DISPONGA DELPRODUCTO EN LA LOCALIDAD Y SIEMPRE QUE SEAAUTORIZADO POR

TKM $199.49 $199.49 $199.49 $199.49 $199.49 $199.49 $199.49 $232.65 $200.31 $200.31 $200.31 $200.31 $200.31 $200.31 $200.31

:

Page 254: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 254 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

LA DEPENDENCIA. 1er. KM. EN REVESTIMIENTO,TERRACERIA Y BRECHA. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

1108000581 ACARREO EN CAMIÓN DE REDILAS DE 3TONELADAS DE CAPACIDAD, DE MATERIALES PARACONSTRUCCIÓN Y ACCESORIOS VARIOS, CUANDOEXISTA DIFICULTAD PARA SU ENTREGA DIRECTAPOR EL PROVEEDOR EN LA LOCALIDAD Y SIEMPREQUE SEA AUTORIZADO POR LA DEPENDENCIA. KM2EN

TKM $5.85 $5.85 $5.85 $5.85 $5.85 $5.85 $5.85 $6.18 $5.86 $5.86 $5.86 $5.86 $5.86 $5.86 $5.86

ADELANTE EN REVESTIMIENTO, TERRACERIA YBRECHA. INCLUYE TODO LO NECESARIO PARA SUCORRECTA EJECUCION.

1108001713 ACARREO DE AGREGADOS , EN VEREDA CONBESTIA O A HOMBRO CON UNA PENDIENTE HASTAEL 15%, 1ER HECTOMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M3 $129.67 $129.67 $129.67 $129.67 $129.67 $129.67 $129.67 $159.50 $130.37 $130.37 $130.37 $130.37 $130.37 $130.37 $130.37

1108001723 ACARREO DE AGREGADOS , EN VEREDA CONBESTIA O A HOMBRO CON UNA PENDIENTE HASTAEL 15%, HECTOMETRO SUBSECUENTE INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

M3-HM $24.91 $24.91 $24.91 $24.91 $24.91 $24.91 $24.91 $24.91 $24.91 $24.91 $24.91 $24.91 $24.91 $24.91 $24.91

1108001733 ACARREO DE AGLUTINANTES EN VEREDA CONBESTIA O A HOMBRO CON UNA PENDIENTE HASTAEL 15%, 1ER HECTOMETRO INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

TON $171.70 $171.70 $171.70 $171.70 $171.70 $171.70 $171.70 $203.74 $172.47 $172.47 $172.47 $172.47 $172.47 $172.47 $172.47

1108001743 ACARREO DE AGLUTINANTES EN VEREDA CONBESTIA O A HOMBRO CON UNA PENDIENTE HASTAEL 15%, HECTOMETRO SUBSECUENTE. INCLUYETODO LO NECESARIO PARA SU CORRECTAEJECUCION.

TONHM $59.10 $59.10 $59.10 $59.10 $59.10 $59.10 $59.10 $59.10 $59.10 $59.10 $59.10 $59.10 $59.10 $59.10 $59.10

1108001753 ACARREO DE PIEDRA EN VEREDA CON BESTIA O AHOMBRO CON PENDIENTE HASTA EL 15% 1ERHECTOMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

M3 $151.00 $151.00 $151.00 $151.00 $151.00 $151.00 $151.00 $181.25 $151.73 $151.73 $151.73 $151.73 $151.73 $151.73 $151.73

:

Page 255: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 255 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1108001763 ACARREO DE PIEDRA EN VEREDA CON BESTIA O AHOMBRO CON PENDIENTE HASTA EL 15%HECTOMETRO SUBSECUENTE. INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

M3-HM $44.80 $44.80 $44.80 $44.80 $44.80 $44.80 $44.80 $44.80 $44.80 $44.80 $44.80 $44.80 $44.80 $44.80 $44.80

1108001773 ACARREO DE TUBERIA DE Fo.Go. 1 1/2" EN VEREDAA HOMBRO CON PENDIENTE HASTA EL 15% 1ERHECTOMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

TRAMO $2.52 $2.52 $2.52 $2.52 $2.52 $2.52 $2.52 $3.24 $2.53 $2.53 $2.53 $2.53 $2.53 $2.53 $2.53

1108001783 ACARREO DE TUBERIA DE Fo.Go. 1 1/2" EN VEREDAA HOMBRO CON PENDIENTE HASTA EL 15%HECTOMETRO SUBSECUENTE INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

TR-HM $2.61 $2.61 $2.61 $2.61 $2.61 $2.61 $2.61 $3.35 $2.63 $2.63 $2.63 $2.63 $2.63 $2.63 $2.63

1108001793 ACARREO DE TUBERIA DE Fo.Go. 2" EN VEREDA AHOMBRO CON PENDIENTE HASTA EL 15% 1ERHECTOMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

TRAMO $2.81 $2.81 $2.81 $2.81 $2.81 $2.81 $2.81 $3.62 $2.82 $2.82 $2.82 $2.82 $2.82 $2.82 $2.82

1108001803 ACARREO DE TUBERIA DE Fo.Go. 2" EN VEREDA AHOMBRO CON PENDIENTE HASTA EL 15%HECTOMETRO SUBSECUENTE INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

TR-HM $2.87 $2.87 $2.87 $2.87 $2.87 $2.87 $2.87 $3.70 $2.89 $2.89 $2.89 $2.89 $2.89 $2.89 $2.89

1108001813 ACARREO DE TUBERIA DE Fo.Go. 2 1/2" EN VEREDAA HOMBRO CON PENDIENTE HASTA EL 15% 1ERHECTOMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

TRAMO $3.65 $3.65 $3.65 $3.65 $3.65 $3.65 $3.65 $4.70 $3.67 $3.67 $3.67 $3.67 $3.67 $3.67 $3.67

1108001823 ACARREO DE TUBERIA DE Fo.Go. 2 1/2" EN VEREDAA HOMBRO CON PENDIENTE HASTA EL 15%HECTOMETRO SUBSECUENTE INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

TR-HM $3.74 $3.74 $3.74 $3.74 $3.74 $3.74 $3.74 $4.80 $3.77 $3.77 $3.77 $3.77 $3.77 $3.77 $3.77

1108001833 ACARREO DE TUBERIA DE Fo.Go. 3" EN VEREDA AHOMBRO CON PENDIENTE HASTA EL 15% 1ERHECTOMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

TRAMO $7.65 $7.65 $7.65 $7.65 $7.65 $7.65 $7.65 $9.83 $7.71 $7.71 $7.71 $7.71 $7.71 $7.71 $7.71

:

Page 256: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 256 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1108001843 ACARREO DE TUBERIA DE Fo.Go. 3" EN VEREDA AHOMBRO CON PENDIENTE HASTA EL 15%HECTOMETRO SUBSECUENTE INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

TR-HM $7.88 $7.88 $7.88 $7.88 $7.88 $7.88 $7.88 $10.14 $7.94 $7.94 $7.94 $7.94 $7.94 $7.94 $7.94

1108001853 ACARREO DE TUBERIA DE Fo.Go. 4" EN VEREDA AHOMBRO CON PENDIENTE HASTA EL 15% 1ERHECTOMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

TRAMO $11.48 $11.48 $11.48 $11.48 $11.48 $11.48 $11.48 $14.74 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55 $11.55

1108001863 ACARREO DE TUBERIA DE Fo.Go. 4" EN VEREDA AHOMBRO CON PENDIENTE HASTA EL 15%HECTOMETRO SUBSECUENTE INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

TR-HM $11.83 $11.83 $11.83 $11.83 $11.83 $11.83 $11.83 $15.19 $11.90 $11.90 $11.90 $11.90 $11.90 $11.90 $11.90

1108001873 ACARREO DE TUBERIA DE PVC 1 1/2" EN VEREDA AHOMBRO CON PENDIENTE HASTA EL 15% 1ERHECTOMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

TRAMO $0.61 $0.61 $0.61 $0.61 $0.61 $0.61 $0.61 $0.78 $0.61 $0.61 $0.61 $0.61 $0.61 $0.61 $0.61

1108001883 ACARREO DE TUBERIA DE PVC 1 1/2" EN VEREDA AHOMBRO CON PENDIENTE HASTA EL 15%HECTOMETRO SUBSECUENTE INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

TR-HM $0.43 $0.43 $0.43 $0.43 $0.43 $0.43 $0.43 $0.55 $0.44 $0.44 $0.44 $0.44 $0.44 $0.44 $0.44

1108001893 ACARREO DE TUBERIA DE PVC DE 2" EN VEREDA A HOMBRO CON PENDIENTE HASTA EL 15% 1ERHECTOMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

TRAMO $1.11 $1.11 $1.11 $1.11 $1.11 $1.11 $1.11 $1.44 $1.12 $1.12 $1.12 $1.12 $1.12 $1.12 $1.12

1108001903 ACARREO DE TUBERIA DE PVC DE 2" EN VEREDA A HOMBRO CON PENDIENTE HASTA EL 15%HECTOMETRO SUBSECUENTE INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

TR-HM $0.58 $0.58 $0.58 $0.58 $0.58 $0.58 $0.58 $0.74 $0.58 $0.58 $0.58 $0.58 $0.58 $0.58 $0.58

1108001913 ACARREO DE TUBERIA DE PVC DE 2 1/2" ENVEREDA A HOMBRO CON PENDIENTE HASTA EL 15%1ER HECTOMETRO INCLUYE TODO LO NECESARIOPARA SU CORRECTA EJECUCION.

TRAMO $1.35 $1.35 $1.35 $1.35 $1.35 $1.35 $1.35 $1.73 $1.36 $1.36 $1.36 $1.36 $1.36 $1.36 $1.36

1108001923 ACARREO DE TUBERIA DE PVC DE 2 1/2" ENVEREDA A HOMBRO CON PENDIENTE HASTA EL 15%HECTOMETRO SUBSECUENTE INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

TR-HM $0.78 $0.78 $0.78 $0.78 $0.78 $0.78 $0.78 $1.00 $0.78 $0.78 $0.78 $0.78 $0.78 $0.78 $0.78

:

Page 257: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 257 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1108001933 ACARREO DE TUBERIA DE PVC DE 3" EN VEREDA A HOMBRO CON PENDIENTE HASTA EL 15% 1ERHECTOMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

TRAMO $0.61 $0.61 $0.61 $0.61 $0.61 $0.61 $0.61 $0.78 $0.61 $0.61 $0.61 $0.61 $0.61 $0.61 $0.61

1108001943 ACARREO DE TUBERIA DE PVC DE 3" EN VEREDA A HOMBRO CON PENDIENTE HASTA EL 15%HECTOMETRO SUBSECUENTE INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

TR-HM $0.78 $0.78 $0.78 $0.78 $0.78 $0.78 $0.78 $1.00 $0.78 $0.78 $0.78 $0.78 $0.78 $0.78 $0.78

1108001953 ACARREO DE TUBERIA DE PVC DE 4" EN VEREDA A HOMBRO CON PENDIENTE HASTA EL 15% 1ERHECTOMETRO INCLUYE TODO LO NECESARIO PARASU CORRECTA EJECUCION.

TRAMO $2.64 $2.64 $2.64 $2.64 $2.64 $2.64 $2.64 $3.39 $2.66 $2.66 $2.66 $2.66 $2.66 $2.66 $2.66

1108001963 ACARREO DE TUBERIA DE PVC DE 4" EN VEREDA A HOMBRO CON PENDIENTE HASTA EL 15%HECTOMETRO SUBSECUENTE INCLUYE TODO LONECESARIO PARA SU CORRECTA EJECUCION.

TR-HM $1.32 $1.32 $1.32 $1.32 $1.32 $1.32 $1.32 $1.69 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34 $1.34

Total ACARREOS

A3010 ACARREOS VOLUMENES MAYORES A 3000M31108002013 ACARREO EN CAMION DE VOLTEO DE 7M3

CONSIDERANDO UNA VELOCIDAD PROMEDIO DERECORRIDO DE 36 KM/HR Y SIETE MINUTOS CONCATORCE SEGUNDOS EN ESPERA, ACOMODO,CARGA Y DESCARGA. ZONA IV. SOBRE PAVIMENTO1 ER KM (SEGUN SCT)

M3 $14.74 $14.74 $14.74 $14.74 $14.74 $14.74 $14.74 $14.74 $14.74 $14.74 $14.74 $14.74 $14.74 $14.74 $14.74

1108002014 ACARREO EN CAMION DE VOLTEO DE 7M3CONSIDERANDO UNA VELOCIDAD PROMEDIO DERECORRIDO DE 36 KM/HR Y SIETE MINUTOS CONCATORCE SEGUNDOS EN ESPERA, ACOMODO,CARGA Y DESCARGA. ZONA IV. SOBRE PAVIMENTOKM 2 AL KM 20 (SEGUN SCT)

M3/KM $6.25 $6.25 $6.25 $6.25 $6.25 $6.25 $6.25 $6.25 $6.25 $6.25 $6.25 $6.25 $6.25 $6.25 $6.25

:

Page 258: TABULADOR AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES.pdf

Página 258 de 258

SECRETARIA TECNICA DE INFRAESTRUCTURA Y PLANEACIONDIRECCION DE COSTOS

Fecha: 01-Jul-13

Obra: TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013

Lugar: CHIAPAS.

TABULADOR DE AGUA POTABLE Y ALCANTARILLADO 2013 POR REGIONES

Código Concepto Unidad REGION I REGION II REGION III REGION IV REGION V REGION VI REGION VII REGION VIII REGION IX REGION X REGION XI REGION XII REGION XIII REGION XIV REGION XV

1108002015 ACARREO EN CAMION DE VOLTEO DE 7M3CONSIDERANDO UNA VELOCIDAD PROMEDIO DERECORRIDO DE 36 KM/HR Y SIETE MINUTOS CONCATORCE SEGUNDOS EN ESPERA, ACOMODO,CARGA Y DESCARGA. ZONA IV. SOBRE PAVIMENTOKM 21 EN ADELANTE (SEGUN SCT)

M3/KM $5.79 $5.79 $5.79 $5.79 $5.79 $5.79 $5.79 $5.79 $5.79 $5.79 $5.79 $5.79 $5.79 $5.79 $5.79

1108002016 ACARREO EN CAMION DE VOLTEO DE 7M3CONSIDERANDO UNA VELOCIDAD PROMEDIO DERECORRIDO DE 28.8 KM/HR Y SIETE MINUTOS CONCATORCE SEGUNDOS EN ESPERA, ACOMODO,CARGA Y DESCARGA. ZONA IV. SOBREREVESTIMIENTO, TERRACERIA Y BRECHA: 1 ER KM(SEGUN SCT)

M3 $16.07 $16.07 $16.07 $16.07 $16.07 $16.07 $16.07 $16.07 $16.07 $16.07 $16.07 $16.07 $16.07 $16.07 $16.07

1108002017 ACARREO EN CAMION DE VOLTEO DE 7M3CONSIDERANDO UNA VELOCIDAD PROMEDIO DERECORRIDO DE 28.8 KM/HR Y SIETE MINUTOS CONCATORCE SEGUNDOS EN ESPERA, ACOMODO,CARGA Y DESCARGA. ZONA IV. SOBREREVESTIMIENTO, TERRACERIA Y BRECHA: KM 2 ALKM 20 (SEGUN SCT)

M3/KM $7.75 $7.75 $7.75 $7.75 $7.75 $7.75 $7.75 $7.75 $7.75 $7.75 $7.75 $7.75 $7.75 $7.75 $7.75

1108002018 ACARREO EN CAMION DE VOLTEO DE 7M3CONSIDERANDO UNA VELOCIDAD PROMEDIO DERECORRIDO DE 28.8 KM/HR Y SIETE MINUTOS CONCATORCE SEGUNDOS EN ESPERA, ACOMODO,CARGA Y DESCARGA. ZONA IV. SOBREREVESTIMIENTO, TERRACERIA Y BRECHA: KM 21EN ADELANTE (SEGUN

M3/KM $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73 $8.73

SCT)

Total ACARREOS VOLUMENES MAYORES A 3000M3

Total Acarreos

Total Agua Potable y Alcantarillado

Total del presupuesto

: