1
104°45’E 104°30’E 105°00’E 20 °45’N 20 °45’N Trung Son Hydro Project Site (for detail, see IBRD 37776) Trung Son Hydro Project Site (for detail, see IBRD 37776) XUAN NHA TAN XUAN TRUNG SON TAM CHUNG MUONG LY TRUNG LY TT. MUONG LAT TRUNG THANH PHU SON PHU XUAN THANH SON MAI HICH THANH XUAN HOI XUAN VAN MAI MAI HA CHIENG CHAU MAI CHAU TONG DAU THUNG KHA PHU DUONG DICH GIAO TUAN LO MAN DUC TU NE THANH HOI TEN TAN MUONG LAT QUAN HOA QUAN SON KY SON BAC THUAC MAI CHAU MOC CHAU TAN LAC SON LA HOA BINH THANH HOA LAO PEOPLE’S DEM. REP. LAO PEOPLE’S DEM. REP. Co Me Village Quan Hoa Muong Lat Co Luong Village Mai Chau Thanh Hoi Huoi Pa Nang 1 M a M a M a Q u a n h S o n g P u K il H o u e i O n Sa n L u Li p C ha L o c C a n Lal H o u a y He n N g h i a u 104°45’E 104°30’E 105°00’E 20 °45’N 20 °45’N 20°30’N 105°15’E 104°45’E 104°30’E 105°00’E 0 2 4 6 8 10 Kilometers 15A 15A 6 6 12b 15A 35kV line (Second Rural Energy Project, Cr. 4000 VN) 110/35kV Substation Hydrological gauging station 35kV line 35kV line (Second Rural Energy Project, Cr. 4000 VN) 110/35kV Substation Hydrological gauging station 35kV line Reservoir tail at 160m level is 9.5km from international boundary Ma HANOI Trung Son Hydro Project Site Area of map Trung Son Hydro Project Site Area of map CHINA THAILAND LAO PEOPLE'S DEM. REP. Gulf of Tonkin 18° 20° 22° 102° 104° 106° 108° 0 50 100 Kilometers This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other information shown on this map do not imply, on the part of The World Bank Group, any judgment on the legal status of any territory, or any endorsement or acceptance of such boundaries. IBRD 37775 DECEMBER 2010 VIETNAM TRUNG SON HYDROPOWER PROJECT Map 1: General Project Area PROJECT DAM SITE CORE RLDP PROJECT AREA OTHER PROJECT AREA 35 kV LINES APPROXIMATE ROUTE OF 220 kV LINE; DETAILED ALIGNMENT TO BE DETERMINED LATER PROJECT ROAD MAIN ROADS CULTURAL HERITAGE SITES COMMUNE BOUNDARIES DISTRICT BOUNDARIES PROVINCE BOUNDARIES INTERNATIONAL BOUNDARIES VILLAGES WHICH WILL BE RESETTLED LANDS BEING PURCHASED FOR RESETTLED VILLAGES EXISTING VILLAGES AFFECTED BY RESETTLEMENT: H’MONG THAI MUONG KHO MU NATIONAL CAPITAL PROVINCE BOUNDARIES INTERNATIONAL BOUNDARIES INSET: VIETNAM

Trung Son Hydropower Project: General Project Area (Map)€¦ · xuan nha tan xuan trung son tam chung muong ly trung ly tt. muong lat trung thanh phu son phu xuan thanh son mai hich

Embed Size (px)

Citation preview

104°45’E104°30’E 105°00’E

20 °45’N 20 °45’N

20°30’N

Trung Son HydroProject Site(for detail, seeIBRD 37776)

Trung Son HydroProject Site(for detail, seeIBRD 37776)

XUAN NHA

TAN XUANTRUNG SON

TAM CHUNG

MUONG LY

TRUNG LY

TT. MUONGLAT

TRUNG THANH

PHU SON

PHUXUAN

THANH SON

MAI HICH

THANH XUAN

HOI XUAN

VAN MAI

MAI HACHIENGCHAU

MAI CHAU

TONGDAU

THUNGKHA

PHUDUONG

DICHGIAO

TUANLO MAN

DUCTU NE THANH

HOI

TEN TAN

M U O N G L A T

Q U A N H O A

Q U A N S O N

K Y S O N

D A B A C

L A C S O N

B A C T H U A C

M A I C H A U

M O C C H A U

T A N L A C

S O N L A

H O A B I N H

T H A N H H O A

LAO PEOPLE’SDEM. REP.

LAO PEOPLE’SDEM. REP.

Co Me Village

Quan Hoa

Muong Lat

Co LuongVillage

Mai Chau

Thanh Hoi

Huoi Pa

Nang 1

Ma

M

a

M

a

Qu

anh

Song Pu

K

il

Houei O

n

San Lu

LipCha Loc

Can

Lal

Hou

ay H

en

Ngh

iau

104°45’E104°30’E 105°00’E

20 °45’N 20 °45’N

20°30’N20°30’N

105°15’E

104°45’E104°30’E 105°00’E 105°15’E

0 2 4 6 8 10 Kilometers

15A

15A

6

6

12b

15A

35kV line(Second Rural Energy Project,

Cr. 4000 VN)

110/35kVSubstation

Hydrologicalgauging station

35kV line35kV line

(Second Rural Energy Project,Cr. 4000 VN)

110/35kVSubstation

Hydrologicalgauging station

35kV line

Reservoir tail at 160m level is 9.5kmfrom international boundary

Ma

HANOI

Trung Son HydroProject Site

Area of map

Trung Son HydroProject Site

Area of map

CHINA

THAILAND

LAOPEOPLE'SDEM. REP.

Gulf of Tonkin

18°

20°

22°

102° 104° 106° 108°

0 50 100 Kilometers

This map was produced by the Map Design Unit of The World Bank. The boundaries, colors, denominations and any other informationshown on this map do not imply, on the part of The World BankGroup, any judgment on the legal status of any territory, or anyendorsement or acceptance of such boundaries.

IBRD 37775

DECEMBER 2010

VIETNAMTRUNG SON HYDROPOWER PROJECT

Map 1: General Project AreaPROJECT DAM SITE

CORE RLDP PROJECT AREA

OTHER PROJECT AREA

35 kV LINES

APPROXIMATE ROUTE OF 220 kV LINE;DETAILED ALIGNMENT TO BE DETERMINED LATER

PROJECT ROAD

MAIN ROADS

CULTURAL HERITAGE SITES

COMMUNE BOUNDARIES

DISTRICT BOUNDARIES

PROVINCE BOUNDARIES

INTERNATIONAL BOUNDARIES

VILLAGES WHICH WILL BE RESETTLED

LANDS BEING PURCHASED FOR RESETTLED VILLAGES

EXISTING VILLAGES AFFECTED BY RESETTLEMENT: H’MONG THAI MUONG KHO MU

NATIONAL CAPITAL

PROVINCE BOUNDARIES

INTERNATIONALBOUNDARIES

INSET:

VIETNAM