TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 1
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
TSG_CN Status Report to SMG#31
Harald Dettner
([email protected])Chairman TSG_CN
Brussels, Belgium, 14-16 Feb. 2000GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 2
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Relevant SMG#31 documents
Reporting• P-00-116 Status report slides• P-00-117 Draft Report TSG_CN#6• P-00-118 Draft Report TSG_CN R’00 all IPbMN
• P-00-119 Summary of SMG3 Specifications for R99
• P-00-120 Summary of SMG3 CRs for R99
• P-00-121 Summary of TSG_CN Specifications for R99
• P-00-122 Summary of TSG_CN CRs for R99
Decisions / Guidance / Discussion
• P-00-123 CRs for approval (GSM only)
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 3
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
TSG_CN Meeting Schedule
• High density of working group meetings;– intend to go for less planned meetings to allow for
more e-mailing & ad-hoc “itemised” meetings.
• Various meetings are scheduled(see “yellow pages” or MCC web)
• 3 ad-hoc meetings on OSA CN-aspects took placemore are scheduled until CN#7
• ITU-T ad-hoc activity works by electronic means;little activity here
• IP-Kick-off 31st Jan-02nd Feb 2000
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 4
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Structure of TSG_CN
Mark FentonGPRS drafting groupad-hoc activity
N1Hannu Hietalahti, Nokia Mark Fenton, Ericsson -
N2ASteffen Habermann CAMEL
N2BYun-Chao Hu MAP, etc..
N2Ian Park, Vodafone Yun-Chao Hu, Ericsson Steffen Habermann, T-Mobil
N3Norbert Klehn, Siemens Achim Brand, Alcatel -
SS Ad-hocSteffen Habermann,T-Mobil -acting on interim base
Nitu-t ITU-T ad-hocMasami Yabusaki, DoCoMoad-hocalmost virtual
OSA ad-hocYun-Chao Hu
ad-hoc until CN#7
CNHarald Dettner, Siemens Masami Yabusaki, NTTDoCoMo Stephen Hayes, Ericsson
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 5
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Structure of TSG_CN
Mark FentonGPRS drafting groupad-hoc activity
N1Hannu Hietalahti, Nokia Mark Fenton, Ericsson -
N2ASteffen Habermann CAMEL
N2BYun-Chao Hu MAP, etc..
N2Ian Park, Vodafone Yun-Chao Hu, Ericsson Steffen Habermann, T-Mobil
N3Norbert Klehn, Siemens Achim Brand, Alcatel -
SS Ad-hocSteffen Habermann,T-Mobil -acting on interim base
Nitu-t ITU-T ad-hocMasami Yabusaki, DoCoMoad-hocalmost virtual
OSA ad-hocYun-Chao Hu
ad-hoc until CN#7
CNHarald Dettner, Siemens Masami Yabusaki, NTTDoCoMo Stephen Hayes, Ericsson
/ SMG3SMG3: Vice-ChairIan Park, Vodafone
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 6
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Support Arrangements
• CN Plenary David Boswarthick [email protected]
• N1 (Iu-If) Ban Al Bakri [email protected]
• N2 Franco Settimo [email protected]
• N2A (CAMEL) Monica Hellman [email protected]
• N2B (MAP, etc) Franco Settimo
• N3 (IW) David Boswarthick
• SS_ad-hoc Monica Hellman
• OSA-ad-hoc tbd
• ITU-T ad-hoc -none intended-
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 7
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Activities/Highlights of TSG_CN1 (1)
Pre-R’99
• GPRS Decreasing amount of corrective CRs
• LCS review/refinement work
• TEI few CRs
Release’99
• Multicall: large work share CRs on hold at CN#6
• Multimedia
• GSM-UMTS interworking and UMTS MM
• MS-Classmark split
• EDGE
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 8
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Activities/Highlights of TSG_CN1 (2)
Release’99 con’t
• Security R99• Data integrity
• EUIC (Start Jan.’00)
• Paging response as MM– reference to GSM 04.18
• Out-of-Band Transcoder Control– open issues list
• QoS
• 03.22 / 23.022 split
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 9
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Activities/Highlights of TSG_CN1 (3)
R’00
• Security R00 not started/outstanding issues
• L3 segmentation postponed from R’99
• Turbocharger– critical
latest with CN#8 principle decision R’00 or never
• “All-IP” Work to be started 04/00
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 10
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Activities/Highlights of TSG_CN2 (1)
• Completed WI‘s: Pre-paging,non-CAMEL IST
• CAMEL Phase3 scope reduced– MSP Ph2
• GLR
• Super-charger
• White-book SCCP mandatory for MAP&CAP
• GTP improvements for 29.060
• CFE/Longer-FTN
• Security– Transport of new authentication vector (quintuple) complete
– work on other areas recently started (MAP ciphering, encryptedIMSI EUIC, Authentication Failure Message)
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 11
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Activities/Highlights of TSG_CN2 (2)
• Out-of-Band Transcoder -Controlcontinued work according FS report:based on ITU-T to be specified BICC protocol.N2 has leadN1 contacted---> open issues listS2/S4 communication --> expressed concerns /questionsanswered? ---> Status assessment by S2/S4
• LCS
• Multicall– Subcriber data management solved
– basic call handling (23.018) work needed
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 12
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Activities/Highlights of TSG_CN2 (3)
R’00
• Combined MMas proposed by S2
• CAMEL Phase4
• “CAMEL control of VoIP services” (FS completed)
• All-IP activities
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 13
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Activities/Highlights of TSG_CN3 (1)
R’99
• Circuit switched bearers in UMTS
• Facsimile non-transparent– “Compromise”: GSM 03.46 & UMTS 23.146
• Frame Tunnelling Mode (FTM)
• PIAFS
• service clean up
• GSM/GPRS Maintenance
• Access to ISPs & Intranets / Mobile IP
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 14
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Activities/Highlights of TSG_CN3 (2)
R’99
• Multimedia– step 1 --- basic Multimedia call
– step 2 --- sophisticated call-setup with fall-back mechanismon terminal capabilities
R’00
• Multimedia– step 3 --- “swap function” media change during call
– --> new WI
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 15
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Activities/Highlights of TSG_CNss
R99
• MSP Ph1 & Ph2; CAMEL3 dependency
• Follow Me
• USSD enhancements
• Call Fwd Enhancements
• LCS
• Multi-Call
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 16
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Activities/Highlights of VHE OSA ad-hoc (1)
R’99? tbd
• Basis 23.127 stage2
• Service Capability Features SCF• Framework SCF
• Call Control SCF
• Charging SCF
• User Interaction SCF (currently included into message transfer SCF)
• Terminal Capability SCF
• User Location SCF
• User Status SCF
• Message Transfer SCF
• Data Download SCF
• User Profile Management SCF
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 17
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Activities/Highlights of VHE OSA ad-hoc (2)
R’99? tbd
• Restricted to Service Capability Servers (SCS)• ”Framework SCS” (including authentication, registration, discovery)
• CAMEL SCS (including charging, user interaction, call control, userlocation and user status SCFs)
• WAP GW SCS (including terminal capabilities SCFs)
• SAT SCS (including Data Download SCF)
R’00
• “overflow from R’99”
• Co-Operation with ETSI SPAN3
• Parallel stage2/stage3 elaboration
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 18
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Others (1)
• Little activity within “ITU-T coordination area”
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 19
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
R‘99 / R‘00 General Treatment until CN#7
• Priority to R‘99 work-areas– open issues resolution
– debugging
– „negotiation of feasible content for R‘99“
– consideration of compatibility aspects
• Special attention to OSA, Multicall, Security
• Start of R‘00 with CN#7Exception: All IP-CN „Take-off“ meeting end Jan
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 20
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
R’00 All IP Core-network
• Kick-off meeting 31. January -- 02. February 2000
• P-00-118 Draft Report– Tutorial by S2
– Assessment by CN• architecture / services
• others (security,...)
– goal: prepare for decisions on what?, when?, who? at TSG#7
• Results– Joint Meeting with S2 agreed for April ‘00
Potentially some work transfer S2 --> CN working groups
– Tentatively some working group reorganisations
– Tentative allocation of work packages (interfaces) to workinggroups
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 21
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
R’99 Completion
• For R’99 completion the CN#6 established principles are:1) Exception from function freezing only allowed if stated in WI-
status sheets (SP-99602 (CN-view) and SP-99639 (SA#6 view))
2) Compatibility aspects for WI’s to be solved with R’99 (“Hooks”)
3) Specification of a restricted WI-subset for R’99
4) IF at CN#7• sufficient stability (incl. agreed documents) in work-area /sub-area
• no contentious issues
THEN R’99
ELSE R’00
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 22
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Status on Multicall:
• Unclear requirements (stage1)
• No defined/approved basic assumptions(lack of „stage 1½ specification“ )– Supplementary Service CN working assumption now!!!!! or
– Network Feature or
– ????
• Interactions with other Supplementary Services (CW, CH)unspecified
• Prevention of incompatibilities eg/esp. in SCI area
• Workshop this week in Sophia Antipolis linked to SS-adhoc
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 23
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Status on Multicall:
• Goal:– Stable documented principles end January
– identification of „viable Multicall phase1 R‘99“
– approval of resp. Material at CN#7
– Postponement of “add-on’s” to R’00 e.g. SCI
– CN not disputed WI to postpone to R‘00
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 24
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Status on OSA
• Spirit: Give it a chance for R‘99
• Stabilise a first small release
• Refine on Scope for R‘99
• final decision CN#7
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 25
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
Status on security
• Spirit: Give parts of it a chance for R‘99
• Status– Parts stable in CN since long (Quintuple download, Data Integrity)
– Requirement for EUIC, MAP Security (GSM Benefit!!),Authentication Failure in 12/99 for R’99
• Unbundle security package and identify the essentials (--> S3)
• Joined meeting begin Jan analysed MAP requirements
• Review of situation at CN#7
• To Learn:– Earlier involvement of affected groups
joined CN-S3 meeting May 2000 on R’00 requirements
– Better WI management within CN (work task identification)
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 26
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
TSG_CN / SMG3 Relation
• SMG3 almost virtual no real work in SMG3 any more
• almost all specifications are shared/common specifications
• From SMG3/TSG_CN perspective separation inSMG(3) and TSG_(CN) is artificial and disturbing
• Maintenance work for SMG only specs acceptable under someconditions (own agenda item, no disturbance of common workflow)
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 27
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
TSG_CNFuture Modifications
• Step down of SMG3/WP-B and CAMEL group ChairmanSteffen Habermann (T-Mobil)– Successor election after clarification on
CN working groups reorganisation
– Attention for SS-maintenance!!
• Step down of SMG3 / TSG_CN Chairman (Harald Dettner)with SMG#31 resp. TSG_CN#7– For SMG3 no new elections are proposed
Mr. Ian Park (vodafone/airtouch) SMG3 vice chairman volunteeredto act as SMG3 interim chairman until ... tbd
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 28
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
TSG_CNFuture Modifications
Mark FentonGPRS drafting groupad-hoc activity
N1Hannu Hietalahti, Nokia Mark Fenton, Ericsson -
N2ASteffen Habermann CAMEL
N2BYun-Chao Hu MAP, etc..
N2Ian Park, Vodafone Yun-Chao Hu, Ericsson Steffen Habermann, T-Mobil
N3Norbert Klehn, Siemens Achim Brand, Alcatel -
SS Ad-hocSteffen Habermann,T-Mobil -acting on interim base
Nitu-t ITU-T ad-hocMasami Yabusaki, DoCoMoad-hocalmost virtual
OSA ad-hocYun-Chao Hu
ad-hoc until CN#7
CN&SMG3Harald Dettner, Siemens Masami Yabusaki, NTTDoCoMo Stephen Hayes, Ericsson
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 29
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
General Information
• WI-Status see3GPP SP-99602 (CN-view) and SP-99639 (SA-view)
• Specification Lists– P-00-119 Summary of SMG3 Specifications for R99
– P-00-120 Summary of SMG3 CRs for R99
– P-00-121 Summary of TSG_CN Specifications for R99
– P-00-122 Summary of TSG_CN CRs for R99
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 30
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
SMG ApprovalSMG3 WP-A CRs P-00-123 Part1
T d o c C N 1/S M G 3#WP A T d o c
S p ec C R R ev C A T R el. O ldV er
N ew V er S u b ject
0464A 12 5 N 1-000128 04 .64 A 125 F R 97 6 .6 .0 6 .7 .0 X ID negotia tion w hile M S suspended , andco llision w ith X ID R eset
0464A 12 6 N 1-000129 04 .64 A 126 A R 98 7 .2 .0 7 .3 .0 X ID negotia tion w hile M S suspended , andco llision w ith X ID R eset
0464A 12 7 N 1-000130 04 .64 A 127 A R 99 8 .2 .0 8 .3 .0 X ID negotia tion w hile M S suspended , andco llision w ith X ID R eset
0464A 12 8 N 1-000219 04 .64 A 128 F R 97 6 .6 .0 6 .7 .0 U nso lic ited U A o r X ID response0464A 12 9 N 1-000220 04 .64 A 129 A R 98 7 .2 .0 7 .3 .0 U nso lic ited U A o r X ID response0464A 13 0 N 1-000221 04 .64 A 130 A R 99 8 .2 .0 8 .3 .0 U nso lic ited U A o r X ID response0464A 13 1R 1
N 1-000222 04 .64 A 131 1 F R 97 6 .6 .0 6 .7 .0 X ID param eter leng th value
0464A 13 2 N 1-000223 04 .64 A 132 A R 98 7 .2 .0 7 .3 .0 X ID param eter leng th value0464A 13 3 N 1-000224 04 .64 A 133 A R 99 8 .2 .0 8 .3 .0 X ID param eter leng th value0464A 13 4R 1
N 1-000225 04 .64 A 134 1 F R 97 6 .6 .0 6 .7 .0 Igno re co m m and fram es w ith po ll b it se t to0
0464A 13 5 N 1-000226 04 .64 A 135 A R 98 7 .2 .0 7 .3 .0 Igno re co m m and fram es w ith po ll b it se t to0
0464A 13 6 N 1-000227 04 .64 A 136 A R 99 8 .2 .0 8 .3 .0 Igno re co m m and fram es w ith po ll b it se t to0
0464A 13 7R 2
N 1-000245 04 .64 A 137 2 F R 97 6 .6 .0 6 .7 .0 X ID negotia tion fa ilu re a fter N 200re transm issions
0464A 13 8 N 1-000229 04 .64 A 138 A R 98 7 .2 .0 7 .3 .0 X ID negotia tion fa ilu re a fter N 200re transm issions
0464A 13 9 N 1-000230 04 .64 A 139 A R 99 8 .2 .0 8 .3 .0 X ID negotia tion fa ilu re a fter N 200re transm issions
04.64 GPRS -- LLC
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 31
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
SMG ApprovalSMG3 WP-A CRs P-00-123 Part2
Tdoc CN1/SMG3#WPA Tdoc
Spec CR Rev CAT Rel. OldVer
New Ver Subject
0465A066R1
N1-000231 04.65 A066 1 F R97 6.6.0 6.7.0 SNCPC behaviour after N200 LLCretransmissions
0465A067 N1-000232 04.65 A067 A R98 7.2.0 7.3.0 SNCPC behaviour after N200 LLCretransmissions
0465A068R1
N1-000246 04.65 A068 1 F R97 6.6.0 6.7.0 Re-establishment after LL-Reset.ind
0465A069R2
N1-000247 04.65 A069 2 A R98 7.2.0 7.3.0 Re-establishment after LL-Reset.ind
04.65 GPRS -- SNDCPSubnetwork Dependent Convergence Protocol
• Note:GSM only CRs in timeframe SMG#30 --- CN#6approved by electronic means
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 32
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
TSG_CNSummary
• All delegates in CN WGs as well as support team work veryhard
• Not everything is complete
• For some WI’s a scope-reduction is already communicated
• Some WI’s dropped out– (L3 segmentation, Turbo-charger,...)
• Outstanding issues identified
• Refinement/Clarification for Multicall, OSA, Security R’99 withCN#7
s
TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 33
SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
R
TSG_CNSummary (2) / Outlook / Miscellaneous
• Improve Information Paths from CN to others• S3
• S2
• Limited time until & for CN#7 (2,5 Days)– Refinement scope / content R‘99
seek compromises in advance of CN#7
• Chairman Election at CN#7
• Joint work style in practice for all Y1999 with good experiences
EOP (End of Presentation)