33
s TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 1 SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS R TSG_CN Status Report to SMG#31 Harald Dettner ([email protected]) Chairman TSG_CN Brussels, Belgium, 14-16 Feb. 2000 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS R

TSG CN Status Report to SMG#31 - 株式会社QT · Hannu Hietalahti, Nokia Mark Fenton, Ericsson-N2A Steffen Habermann CAMEL N2B Yun-Chao Hu MAP, etc.. N2 Ian Park, Vodafone …

Embed Size (px)

Citation preview

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 1

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

TSG_CN Status Report to SMG#31

Harald Dettner

([email protected])Chairman TSG_CN

Brussels, Belgium, 14-16 Feb. 2000GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 2

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Relevant SMG#31 documents

Reporting• P-00-116 Status report slides• P-00-117 Draft Report TSG_CN#6• P-00-118 Draft Report TSG_CN R’00 all IPbMN

• P-00-119 Summary of SMG3 Specifications for R99

• P-00-120 Summary of SMG3 CRs for R99

• P-00-121 Summary of TSG_CN Specifications for R99

• P-00-122 Summary of TSG_CN CRs for R99

Decisions / Guidance / Discussion

• P-00-123 CRs for approval (GSM only)

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 3

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

TSG_CN Meeting Schedule

• High density of working group meetings;– intend to go for less planned meetings to allow for

more e-mailing & ad-hoc “itemised” meetings.

• Various meetings are scheduled(see “yellow pages” or MCC web)

• 3 ad-hoc meetings on OSA CN-aspects took placemore are scheduled until CN#7

• ITU-T ad-hoc activity works by electronic means;little activity here

• IP-Kick-off 31st Jan-02nd Feb 2000

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 4

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Structure of TSG_CN

Mark FentonGPRS drafting groupad-hoc activity

N1Hannu Hietalahti, Nokia Mark Fenton, Ericsson -

N2ASteffen Habermann CAMEL

N2BYun-Chao Hu MAP, etc..

N2Ian Park, Vodafone Yun-Chao Hu, Ericsson Steffen Habermann, T-Mobil

N3Norbert Klehn, Siemens Achim Brand, Alcatel -

SS Ad-hocSteffen Habermann,T-Mobil -acting on interim base

Nitu-t ITU-T ad-hocMasami Yabusaki, DoCoMoad-hocalmost virtual

OSA ad-hocYun-Chao Hu

ad-hoc until CN#7

CNHarald Dettner, Siemens Masami Yabusaki, NTTDoCoMo Stephen Hayes, Ericsson

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 5

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Structure of TSG_CN

Mark FentonGPRS drafting groupad-hoc activity

N1Hannu Hietalahti, Nokia Mark Fenton, Ericsson -

N2ASteffen Habermann CAMEL

N2BYun-Chao Hu MAP, etc..

N2Ian Park, Vodafone Yun-Chao Hu, Ericsson Steffen Habermann, T-Mobil

N3Norbert Klehn, Siemens Achim Brand, Alcatel -

SS Ad-hocSteffen Habermann,T-Mobil -acting on interim base

Nitu-t ITU-T ad-hocMasami Yabusaki, DoCoMoad-hocalmost virtual

OSA ad-hocYun-Chao Hu

ad-hoc until CN#7

CNHarald Dettner, Siemens Masami Yabusaki, NTTDoCoMo Stephen Hayes, Ericsson

/ SMG3SMG3: Vice-ChairIan Park, Vodafone

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 6

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Support Arrangements

• CN Plenary David Boswarthick [email protected]

• N1 (Iu-If) Ban Al Bakri [email protected]

• N2 Franco Settimo [email protected]

• N2A (CAMEL) Monica Hellman [email protected]

• N2B (MAP, etc) Franco Settimo

• N3 (IW) David Boswarthick

• SS_ad-hoc Monica Hellman

• OSA-ad-hoc tbd

• ITU-T ad-hoc -none intended-

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 7

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Activities/Highlights of TSG_CN1 (1)

Pre-R’99

• GPRS Decreasing amount of corrective CRs

• LCS review/refinement work

• TEI few CRs

Release’99

• Multicall: large work share CRs on hold at CN#6

• Multimedia

• GSM-UMTS interworking and UMTS MM

• MS-Classmark split

• EDGE

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 8

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Activities/Highlights of TSG_CN1 (2)

Release’99 con’t

• Security R99• Data integrity

• EUIC (Start Jan.’00)

• Paging response as MM– reference to GSM 04.18

• Out-of-Band Transcoder Control– open issues list

• QoS

• 03.22 / 23.022 split

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 9

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Activities/Highlights of TSG_CN1 (3)

R’00

• Security R00 not started/outstanding issues

• L3 segmentation postponed from R’99

• Turbocharger– critical

latest with CN#8 principle decision R’00 or never

• “All-IP” Work to be started 04/00

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 10

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Activities/Highlights of TSG_CN2 (1)

• Completed WI‘s: Pre-paging,non-CAMEL IST

• CAMEL Phase3 scope reduced– MSP Ph2

• GLR

• Super-charger

• White-book SCCP mandatory for MAP&CAP

• GTP improvements for 29.060

• CFE/Longer-FTN

• Security– Transport of new authentication vector (quintuple) complete

– work on other areas recently started (MAP ciphering, encryptedIMSI EUIC, Authentication Failure Message)

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 11

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Activities/Highlights of TSG_CN2 (2)

• Out-of-Band Transcoder -Controlcontinued work according FS report:based on ITU-T to be specified BICC protocol.N2 has leadN1 contacted---> open issues listS2/S4 communication --> expressed concerns /questionsanswered? ---> Status assessment by S2/S4

• LCS

• Multicall– Subcriber data management solved

– basic call handling (23.018) work needed

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 12

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Activities/Highlights of TSG_CN2 (3)

R’00

• Combined MMas proposed by S2

• CAMEL Phase4

• “CAMEL control of VoIP services” (FS completed)

• All-IP activities

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 13

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Activities/Highlights of TSG_CN3 (1)

R’99

• Circuit switched bearers in UMTS

• Facsimile non-transparent– “Compromise”: GSM 03.46 & UMTS 23.146

• Frame Tunnelling Mode (FTM)

• PIAFS

• service clean up

• GSM/GPRS Maintenance

• Access to ISPs & Intranets / Mobile IP

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 14

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Activities/Highlights of TSG_CN3 (2)

R’99

• Multimedia– step 1 --- basic Multimedia call

– step 2 --- sophisticated call-setup with fall-back mechanismon terminal capabilities

R’00

• Multimedia– step 3 --- “swap function” media change during call

– --> new WI

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 15

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Activities/Highlights of TSG_CNss

R99

• MSP Ph1 & Ph2; CAMEL3 dependency

• Follow Me

• USSD enhancements

• Call Fwd Enhancements

• LCS

• Multi-Call

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 16

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Activities/Highlights of VHE OSA ad-hoc (1)

R’99? tbd

• Basis 23.127 stage2

• Service Capability Features SCF• Framework SCF

• Call Control SCF

• Charging SCF

• User Interaction SCF (currently included into message transfer SCF)

• Terminal Capability SCF

• User Location SCF

• User Status SCF

• Message Transfer SCF

• Data Download SCF

• User Profile Management SCF

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 17

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Activities/Highlights of VHE OSA ad-hoc (2)

R’99? tbd

• Restricted to Service Capability Servers (SCS)• ”Framework SCS” (including authentication, registration, discovery)

• CAMEL SCS (including charging, user interaction, call control, userlocation and user status SCFs)

• WAP GW SCS (including terminal capabilities SCFs)

• SAT SCS (including Data Download SCF)

R’00

• “overflow from R’99”

• Co-Operation with ETSI SPAN3

• Parallel stage2/stage3 elaboration

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 18

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Others (1)

• Little activity within “ITU-T coordination area”

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 19

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

R‘99 / R‘00 General Treatment until CN#7

• Priority to R‘99 work-areas– open issues resolution

– debugging

– „negotiation of feasible content for R‘99“

– consideration of compatibility aspects

• Special attention to OSA, Multicall, Security

• Start of R‘00 with CN#7Exception: All IP-CN „Take-off“ meeting end Jan

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 20

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

R’00 All IP Core-network

• Kick-off meeting 31. January -- 02. February 2000

• P-00-118 Draft Report– Tutorial by S2

– Assessment by CN• architecture / services

• others (security,...)

– goal: prepare for decisions on what?, when?, who? at TSG#7

• Results– Joint Meeting with S2 agreed for April ‘00

Potentially some work transfer S2 --> CN working groups

– Tentatively some working group reorganisations

– Tentative allocation of work packages (interfaces) to workinggroups

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 21

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

R’99 Completion

• For R’99 completion the CN#6 established principles are:1) Exception from function freezing only allowed if stated in WI-

status sheets (SP-99602 (CN-view) and SP-99639 (SA#6 view))

2) Compatibility aspects for WI’s to be solved with R’99 (“Hooks”)

3) Specification of a restricted WI-subset for R’99

4) IF at CN#7• sufficient stability (incl. agreed documents) in work-area /sub-area

• no contentious issues

THEN R’99

ELSE R’00

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 22

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Status on Multicall:

• Unclear requirements (stage1)

• No defined/approved basic assumptions(lack of „stage 1½ specification“ )– Supplementary Service CN working assumption now!!!!! or

– Network Feature or

– ????

• Interactions with other Supplementary Services (CW, CH)unspecified

• Prevention of incompatibilities eg/esp. in SCI area

• Workshop this week in Sophia Antipolis linked to SS-adhoc

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 23

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Status on Multicall:

• Goal:– Stable documented principles end January

– identification of „viable Multicall phase1 R‘99“

– approval of resp. Material at CN#7

– Postponement of “add-on’s” to R’00 e.g. SCI

– CN not disputed WI to postpone to R‘00

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 24

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Status on OSA

• Spirit: Give it a chance for R‘99

• Stabilise a first small release

• Refine on Scope for R‘99

• final decision CN#7

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 25

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

Status on security

• Spirit: Give parts of it a chance for R‘99

• Status– Parts stable in CN since long (Quintuple download, Data Integrity)

– Requirement for EUIC, MAP Security (GSM Benefit!!),Authentication Failure in 12/99 for R’99

• Unbundle security package and identify the essentials (--> S3)

• Joined meeting begin Jan analysed MAP requirements

• Review of situation at CN#7

• To Learn:– Earlier involvement of affected groups

joined CN-S3 meeting May 2000 on R’00 requirements

– Better WI management within CN (work task identification)

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 26

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

TSG_CN / SMG3 Relation

• SMG3 almost virtual no real work in SMG3 any more

• almost all specifications are shared/common specifications

• From SMG3/TSG_CN perspective separation inSMG(3) and TSG_(CN) is artificial and disturbing

• Maintenance work for SMG only specs acceptable under someconditions (own agenda item, no disturbance of common workflow)

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 27

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

TSG_CNFuture Modifications

• Step down of SMG3/WP-B and CAMEL group ChairmanSteffen Habermann (T-Mobil)– Successor election after clarification on

CN working groups reorganisation

– Attention for SS-maintenance!!

• Step down of SMG3 / TSG_CN Chairman (Harald Dettner)with SMG#31 resp. TSG_CN#7– For SMG3 no new elections are proposed

Mr. Ian Park (vodafone/airtouch) SMG3 vice chairman volunteeredto act as SMG3 interim chairman until ... tbd

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 28

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

TSG_CNFuture Modifications

Mark FentonGPRS drafting groupad-hoc activity

N1Hannu Hietalahti, Nokia Mark Fenton, Ericsson -

N2ASteffen Habermann CAMEL

N2BYun-Chao Hu MAP, etc..

N2Ian Park, Vodafone Yun-Chao Hu, Ericsson Steffen Habermann, T-Mobil

N3Norbert Klehn, Siemens Achim Brand, Alcatel -

SS Ad-hocSteffen Habermann,T-Mobil -acting on interim base

Nitu-t ITU-T ad-hocMasami Yabusaki, DoCoMoad-hocalmost virtual

OSA ad-hocYun-Chao Hu

ad-hoc until CN#7

CN&SMG3Harald Dettner, Siemens Masami Yabusaki, NTTDoCoMo Stephen Hayes, Ericsson

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 29

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

General Information

• WI-Status see3GPP SP-99602 (CN-view) and SP-99639 (SA-view)

• Specification Lists– P-00-119 Summary of SMG3 Specifications for R99

– P-00-120 Summary of SMG3 CRs for R99

– P-00-121 Summary of TSG_CN Specifications for R99

– P-00-122 Summary of TSG_CN CRs for R99

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 30

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

SMG ApprovalSMG3 WP-A CRs P-00-123 Part1

T d o c C N 1/S M G 3#WP A T d o c

S p ec C R R ev C A T R el. O ldV er

N ew V er S u b ject

0464A 12 5 N 1-000128 04 .64 A 125 F R 97 6 .6 .0 6 .7 .0 X ID negotia tion w hile M S suspended , andco llision w ith X ID R eset

0464A 12 6 N 1-000129 04 .64 A 126 A R 98 7 .2 .0 7 .3 .0 X ID negotia tion w hile M S suspended , andco llision w ith X ID R eset

0464A 12 7 N 1-000130 04 .64 A 127 A R 99 8 .2 .0 8 .3 .0 X ID negotia tion w hile M S suspended , andco llision w ith X ID R eset

0464A 12 8 N 1-000219 04 .64 A 128 F R 97 6 .6 .0 6 .7 .0 U nso lic ited U A o r X ID response0464A 12 9 N 1-000220 04 .64 A 129 A R 98 7 .2 .0 7 .3 .0 U nso lic ited U A o r X ID response0464A 13 0 N 1-000221 04 .64 A 130 A R 99 8 .2 .0 8 .3 .0 U nso lic ited U A o r X ID response0464A 13 1R 1

N 1-000222 04 .64 A 131 1 F R 97 6 .6 .0 6 .7 .0 X ID param eter leng th value

0464A 13 2 N 1-000223 04 .64 A 132 A R 98 7 .2 .0 7 .3 .0 X ID param eter leng th value0464A 13 3 N 1-000224 04 .64 A 133 A R 99 8 .2 .0 8 .3 .0 X ID param eter leng th value0464A 13 4R 1

N 1-000225 04 .64 A 134 1 F R 97 6 .6 .0 6 .7 .0 Igno re co m m and fram es w ith po ll b it se t to0

0464A 13 5 N 1-000226 04 .64 A 135 A R 98 7 .2 .0 7 .3 .0 Igno re co m m and fram es w ith po ll b it se t to0

0464A 13 6 N 1-000227 04 .64 A 136 A R 99 8 .2 .0 8 .3 .0 Igno re co m m and fram es w ith po ll b it se t to0

0464A 13 7R 2

N 1-000245 04 .64 A 137 2 F R 97 6 .6 .0 6 .7 .0 X ID negotia tion fa ilu re a fter N 200re transm issions

0464A 13 8 N 1-000229 04 .64 A 138 A R 98 7 .2 .0 7 .3 .0 X ID negotia tion fa ilu re a fter N 200re transm issions

0464A 13 9 N 1-000230 04 .64 A 139 A R 99 8 .2 .0 8 .3 .0 X ID negotia tion fa ilu re a fter N 200re transm issions

04.64 GPRS -- LLC

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 31

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

SMG ApprovalSMG3 WP-A CRs P-00-123 Part2

Tdoc CN1/SMG3#WPA Tdoc

Spec CR Rev CAT Rel. OldVer

New Ver Subject

0465A066R1

N1-000231 04.65 A066 1 F R97 6.6.0 6.7.0 SNCPC behaviour after N200 LLCretransmissions

0465A067 N1-000232 04.65 A067 A R98 7.2.0 7.3.0 SNCPC behaviour after N200 LLCretransmissions

0465A068R1

N1-000246 04.65 A068 1 F R97 6.6.0 6.7.0 Re-establishment after LL-Reset.ind

0465A069R2

N1-000247 04.65 A069 2 A R98 7.2.0 7.3.0 Re-establishment after LL-Reset.ind

04.65 GPRS -- SNDCPSubnetwork Dependent Convergence Protocol

• Note:GSM only CRs in timeframe SMG#30 --- CN#6approved by electronic means

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 32

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

TSG_CNSummary

• All delegates in CN WGs as well as support team work veryhard

• Not everything is complete

• For some WI’s a scope-reduction is already communicated

• Some WI’s dropped out– (L3 segmentation, Turbo-charger,...)

• Outstanding issues identified

• Refinement/Clarification for Multicall, OSA, Security R’99 withCN#7

s

TSG_CN / SMG3 report to SMG#31 14-16.Feb. 2000 [email protected] 14.Feb.2000, slide 33

SMG#31 P-00-116 GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

R

TSG_CNSummary (2) / Outlook / Miscellaneous

• Improve Information Paths from CN to others• S3

• S2

• Limited time until & for CN#7 (2,5 Days)– Refinement scope / content R‘99

seek compromises in advance of CN#7

• Chairman Election at CN#7

• Joint work style in practice for all Y1999 with good experiences

EOP (End of Presentation)