PROYEK BALLROOM AL MANAR UNISMUH MAKASSAR REKAPITULASI BILL OF QUANTITY (BOQ) BALLROOM NO URAIAN BETON (M3) Ø 25 1 LANTAI DASAR PONDASI 184.8 308 SLOEP 68.2632 455.088 PLAT 144.978 21.492 KOLOM 74.448 496.32 2 LANTAI 2 (DUA) BALOK 121.4199 805.68596 PLAT 177.6486 1544.9325 KOLOM 37.44 234.975 3 LANTAI ATAP BALOK 40.0575 286.125 TOTAL VOLUME BALLROOM 849.0552 4152.61846 BEKISTING (M2)

Volume Boq

Embed Size (px)

DESCRIPTION

ok

Citation preview

VOL AKTUALPROYEK BALLROOM AL MANAR UNISMUH MAKASSARREKAPITULASI BILL OF QUANTITY (BOQ) BALLROOM

NOURAIANBETON (M3)BEKISTING (M2)BESI (KG) 25 22 19 13 101LANTAI DASARPONDASI184.830823973.524784SLOEP68.2632455.08817543.3064841020.94311155552.784675PLAT144.97821.49215386.79195KOLOM74.448496.3213470.3375842231.1135

2LANTAI 2 (DUA)BALOK121.4199805.6859633438.3287049561.4723532186.6305597370.06844PLAT177.64861544.932528240.72242KOLOM37.44234.9755585.785921898.82

3LANTAI ATAPBALOK40.0575286.1254428.04824443.426256809.7111

TOTAL VOLUME BALLROOM849.05524152.6184698439.3317169561.4723533650.999926561490.012085

VOL PLUS 10%PROYEK BALLROOM AL MANAR UNISMUH MAKASSARREKAPITULASI BILL OF QUANTITY (BOQ) BALLROOM

NOURAIANBETON (M3)BEKISTING (M2)BESI (KG) 25 22 19 13 101LANTAI DASARPONDASI203.28338.826370.876784SLOEP75.0892500.59619297.6364841123.03711156108.062675PLAT159.47523.64116925.47095KOLOM81.892545.95214817.3705842454.2245

2LANTAI 2 (DUA)BALOK133.5609886.2539636782.16070410517.6193532405.2935598107.07444PLAT195.41261699.425531064.79442KOLOM41.184258.4726144.363922088.702

3LANTAI ATAPBALOK44.0625314.7374870.85224487.768256890.6821

TOTAL VOLUME BALLROOM933.95624567.87746108283.26071610517.6193534016.098926567639.011085