Upload
priscilla-andrews
View
21
Download
0
Embed Size (px)
DESCRIPTION
W E L C O M E. 热烈欢迎尊敬的中国代表团. SOUTHERN REGIONAL LOAD DESPATCH CENTRE Power Grid Corporation of India Limited ( A Government of India Enterprise ). YOU ARE HERE. NORTHERN REGION. NORTH-EASTERN REGION. EASTERN REGION. WESTERNREGION. SOUTHERN REGION. ‘ ELECTRICAL ’ REGIONS. 1. - PowerPoint PPT Presentation
Citation preview
W E L C O M E
SOUTHERN REGIONAL LOAD DESPATCH CENTREPower Grid Corporation of India Limited
(A Government of India Enterprise)
热烈欢迎尊敬的中国代表团
YOU ARE HERE
SOUTHERN REGION
WESTERNREGION
EASTERN REGION
NORTHERN REGION
NORTH-EASTERN REGION
SOUTHERN REGION
WESTERNREGION
EASTERN REGION
NORTHERN REGION
NORTH-EASTERN REGION
‘ELECTRICAL’
REGIONS1
2
3 SAME FREQUENCY FROM PANANDRO IN GUJARAT TO NIRJULI IN ARUNACHAL PRADESH
ABOUT 2800 KMS! APART
YOU ARE HERE
14336 (49%)
10538 (36%)780 (3%)2783 (9%)
28 (0.1%)
1043 (4%)
HYDRO THERMAL GAS WIND IPP NUCLEAR
INSTALLED CAPACITY OF SOUTHERN REGION IN MW
29508 MW
HYDRO
THERMAL
WIND
IPPNUCLEAR
GAS
T
A.P
KAR
T.N
KER
MAH
ORISSA
RAMAGUNDAM
NEYVELI
MAPS
GOA
PONDICHERRY
HVDC BIPOLAR STATION
HVDC B2B STATION
CENTRAL GEN.STATION
CHANDRAPUR
JEYPORE
GAZUWAKA
KOLHAPUR
BELGAUM
U.SILERU
L.SILERU
BALIMELA
BARSUR
220 kV LINE
400 kV LINE
M.P
110 kV HVDC LINE
AMBEWADI
INTER REGIONAL LINKS
KOLAR
TALCHAR
KAIGA
500 kV HVDC LINE
SOUTHERN REGION:QUICK SOUTHERN REGION:QUICK FACTSFACTSINSTALLED CAPACITY:29508 MW
MAX DEMAND MET:21928 MW MAX CONSUMPTION: 457 MUKARNATAKA
MAX DEMAND MET
5445 MWINSTALLED CAPACITY
5041 MWDAILY CONSUMPTION MAX
107 MU
ANDHRAPRADESHMAX DEMAND MET
7441 MW
9067 MWINSTALLED CAPACITY
DAILY CONSUMPTION MAX
166 MU
TAMILNADUMAX DEMAND MET
7228 MW
6990 MW
INSTALLED CAPACITY
DAILY CONSUMPTION MAX
146 MU
KERALAMAX DEMAND MET
2426 MW
2609 MWINSTALLED CAPACITY
DAILY CONSUMPTION MAX
39 MU3D SOUTHERN REGION
DEMAND
TRANSMISSION IN SOUTHERN TRANSMISSION IN SOUTHERN INDIAINDIA
IN CKT KMSIN CKT KMS
VOLTAGE LEVEL AP KAR KER TN CGS TOTAL
400 KV 1300 1460 6533 9293
220/230 KV 10050 7590 2650 6270 366 26926
132/110 KV 12360 6060 3720 10220 32360
TOTAL 23710 15110 6370 16490 6899 68579
SR 400 KV GRID MAPSR 400 KV GRID MAP
KHAMMAM
VIJAYAWADANAGARJUNASAGAR
VISAKHAPATNAM
(POWERGRID)HYDERABAD
RAICHUR
GOOTY
HOODY
SALEM
UDUMALPET
TRICHUR
MADURAI
TRICHY
MADRAS
NEYVELI
CUDDAPAHDAVANAGERE
KAIGA
115
317
RSTPP
BHADRAVATI
130x2
164x
218
2
151
181
173
302
308172
277
279
155
178x
2
PONDICHERY
BANGALORE
MUNIRABAD
PP
P
P
P
P
P
P
P
P
P
PP
P
P
N
KOLAR
PALLOM
KAYANKULAM EDAMON
TALCHER
JEYPORE
187
2x78
2x221
54
HOSUR
TLGPA
KODASAALY
Nagjhari
1
120
60
MAPS
P
SSLMM
MMDP
THIRUVANATHAPURAM
NELLORE400 KV LINE PRESENTLY
OPERATED AT 220 KVNELAMANGALA
KURNOOL
GAZUWAKA(AP)
SIMHADRI NTPC
HIRIYUR
189
195
267x
2
258
242
98
175
179
127
130x
2
221x2
146x2
52x2
197x2
301x2
8x4
15x2
300
28
330
3500 MW TRANSFER CAPABILITY ON HVDC
HVDC LINK BETWEEN ER AND SR
765 KV RING MAIN SYSTEM
ULDC SCHEMEULDC SCHEME
RLDC,Bangalore
KalamasseryHyderabad BangaloreChennai
Cuddapah
Warangal
Vijayawada
Kalam’erry
Kannur
Trivandrum
Chennai
Erode
Madurai
Bangalore
Davangere
Hubli
CPCC SCC, Pondy
Hyderabad
Hierarchy of The ULDC Scheme in Southern Region
Andhra Kerala Tamilnadu Karnataka
SUB-LDC
SLDC
Andhra Pradesh
Karnataka
Kerala
Tamilnadu
UT of Pondy
Vijayawada
Warangal
HYDERABADGhanapur
Chinkampalli
CHENNAI
Pondy
Madurai
Kannur-B
KALAMASSERY
Vydyuthi Bhavanam
Erode
MW LinkFO LinkState owneed Link
Sub-LDC
SLDC
RCLDC
Hubli
Davangeree
Bangalore
Information Flow to Control CentresInformation Flow to Control Centres
Satellite
Ramagundam
Inter-Regional Energy Transfer
≈5000MU (HVDC)
Transformation
Capacity ≈ 45000 MVA
Transformers (220kV and above)
476 nos.
Installed Capacity≈29508 MW
Integrated Opn of Ten Power
Utilities
Dynamic Grid Conditions
Southern Region Grid Complexities in Monitoring & Control
Generators –Hydro, Thermal,Gas/IPP
415 nos.
Transmission Network 400/220kV
≈ 37000 Ckm
40,000 POINTS Active Power, Reactive Power,
Voltage, Frequency, Transformer Tap Position, Circuit Breaker Position,
Isolator Position etc.
PROJECT COST:Rs 6840 MILLION(1230 MILLION YUAN)
COMPLETED SIX MONTHS AHEAD OF SCHEDULE
COMPLEXITIESCOMPLEXITIES 107,600 ANALOG POINTS107,600 ANALOG POINTS 14100 TELEMETERED ANALOG 14100 TELEMETERED ANALOG
POINTSPOINTS 23500 TELEMETERED STATUS 23500 TELEMETERED STATUS
POINTSPOINTS 700,000 BYTES TRANSACTED 700,000 BYTES TRANSACTED
EVERY EVERY 10 SECS10 SECS 302 RTU STATIONS302 RTU STATIONS 2300 KMS OPTIC FIBRE LINKS2300 KMS OPTIC FIBRE LINKS 35 MICROWAVE LINKS35 MICROWAVE LINKS 288 PLCC LINKS288 PLCC LINKS
CAPABILITIESCAPABILITIES 500,000 ANALOG POINTS500,000 ANALOG POINTS 500,000 STATUS POINTS500,000 STATUS POINTS MORE THAN 1800 VIDEO TRENDSMORE THAN 1800 VIDEO TRENDS CONTINOUS DATABASE RECORDINGCONTINOUS DATABASE RECORDING REAL TIME NETWORK ANALYSIS EVERY 5 REAL TIME NETWORK ANALYSIS EVERY 5
MINMIN REAL TIME CONTINGENCY ANALYSIS EVERY 5 REAL TIME CONTINGENCY ANALYSIS EVERY 5
MINMIN AUTOMATIC TRIGGER OF DISTURBANCE AUTOMATIC TRIGGER OF DISTURBANCE
CASESCASES REDUNDANCY AT COMMUNICATION, REDUNDANCY AT COMMUNICATION,
HARDWARE AND SOFTWARE LEVELSHARDWARE AND SOFTWARE LEVELS DESPATCHER TRAINING SIMULATOR-DESPATCHER TRAINING SIMULATOR-
INTERFACED WITH REAL-TIME SYSTEMINTERFACED WITH REAL-TIME SYSTEM
ULDC-THE ULDC-THE EYES AND EARSEYES AND EARS OF OF THE SYSTEM OPERATORTHE SYSTEM OPERATOR
ALL CONSTITUENTS GET THE SAME ALL CONSTITUENTS GET THE SAME DATA IN REAL TIME.DATA IN REAL TIME. TRANSPARENCY.TRANSPARENCY. SYNERGY IN OPERATION.SYNERGY IN OPERATION. NO “PASSING THE BUCK” APPROACH.NO “PASSING THE BUCK” APPROACH.
QUANTUM LEAP IN VISIBILITY TO QUANTUM LEAP IN VISIBILITY TO OPERATOR.OPERATOR. INCREASED CONFIDENCE.INCREASED CONFIDENCE. FOCUS ON SECURITY AND ECONOMY.FOCUS ON SECURITY AND ECONOMY. INCREASED SCOPE FOR TRANSACTIONS INCREASED SCOPE FOR TRANSACTIONS
WITH OTHER REGIONSWITH OTHER REGIONS
SOME ULDCPICTURES
ULDC-THE ULDC-THE EYES AND EARSEYES AND EARS OF OF THE SYSTEM OPERATORTHE SYSTEM OPERATOR
PREMPTIVE, DYNAMIC “EARLY PREMPTIVE, DYNAMIC “EARLY WARNING” SYSTEMS.WARNING” SYSTEMS. LOAD ANGLE.LOAD ANGLE. ALARMSALARMS CONTINGENCY ANALYSISCONTINGENCY ANALYSIS
GRID LESS VULNERABLE TO GRID LESS VULNERABLE TO DISTURBANCES.DISTURBANCES.
ANALYSIS OF GRID INCIDENTS – ANALYSIS OF GRID INCIDENTS – ACCURATE AND EASIERACCURATE AND EASIER
RESTORATION AFTER PERTURBATION RESTORATION AFTER PERTURBATION BECOMES MUCH FASTER.BECOMES MUCH FASTER.
OPGW STRINGINGOPGW STRINGING
AVAILABILTY AVAILABILTY BASED TARIFFBASED TARIFF
AVAILABILITY BASED AVAILABILITY BASED TARIFFTARIFF
A RATIONAL TARIFF A RATIONAL TARIFF STRUCTURESTRUCTURE
SCIENTIFIC SETTLEMENT SCIENTIFIC SETTLEMENT SYSTEMSYSTEM
WHAT IS AVAILABILITY WHAT IS AVAILABILITY TARIFF?TARIFF?
PAYMENT OF FIXED COST PAYMENT OF FIXED COST ααPLANT PLANT AVAILABILITY.AVAILABILITY.
VARIABLE COST VARIABLE COST αα SCHEDULED SCHEDULED GENERATIONGENERATION
DEVIATIONS ATTRACT A DEVIATIONS ATTRACT A FREQUENCY LINKED CHARGE.(UI-FREQUENCY LINKED CHARGE.(UI-UNSCHEDULED INTERCHANGE)UNSCHEDULED INTERCHANGE)
UI_PRICE Vs FREQUENCY:- THE CURVE IN USE PRESENTLY AND OLD CURVE
0
50
100
150
200
250
300
350
400
450
500
550
600
65048
.50
48.6
0
48.7
0
48.8
0
48.9
0
49.0
0
49.1
0
49.2
0
49.3
0
49.4
0
49.5
0
49.6
0
49.7
0
49.8
0
49.9
0
50.0
0
50.1
0
50.2
0
50.3
0
50.4
0
50.5
0
50.6
0
50.7
0
50.8
0
50.9
0
51.0
0
51.1
0
FREQUENCY IN HZ
UI P
RIC
E IN
PA
ISA
/UN
IT
OLD CURVE
CURVE ADOPTED FROM 1ST APRIL 2004
A FREQUENCY OF 49.50 HZ CORRESPONDS TO A PRICE OF Rs.4.00
Rs.6.00
谢谢谢谢
BACK TO SLIDE
BACK TO SLIDE
BACK TO SLIDE