Upload
rebin1988
View
31
Download
5
Embed Size (px)
DESCRIPTION
WiMAX Installation 3
Citation preview
Wi-MAX BTS INSTALLATION-Indoor
BTS Rack Positioning
Battery Bank
Cable routing through tray
BSNL DCDB (-48 V DC) & DC power should be extended from DC Breaker to WiMAX BTS Rack DCDB Panel
Termination of DC Input for WiMAX Rack from Bsnl
- 48 V DC+48 v DC
Termination of Grounding Cable for WiMAX Rack from BSNL &WiMAX DCDB panel to be grounded with nearest electrical grounding bus-bar
& WiMAX BTS Rack to be grounded
GND
MCB LINK PLATE
IDU 1
IDU 2
RRHA
RRHB
RRHC
E1
CO
NV
ER
TE
R
Ring Type Lug Pin Type Lug
INP
UT
S - 48V DC+ ve
GND
- 48V OUTPUTS
Need to use Ring Type lugs
Need to use Pin Type lugs
+VE OUTPUTs
1- Dual Pole MCB 6- Single Pole MCBS
GROUND OUTPUTS
DCDB CONNECTIVITY DIAGRAM WITH MCB LINK PLATE
MCB Holding Plate
DCDB in Rack & WiMAX MCB(DC Breaker ) should be installed and tapped nearby BSNL DCDB
BSNL Input cable connected to DCDB
Input looping for all MCBs in DCDB
Input cable and Output cable connected to DCDB
Cable vent & RRH ground bus bar
Checking of Input Source (- 48 V) , Power level voltage to be verified for DCDB Panel and documented
Fixing of IDU in the Rack
Termination of Input cable for IDU from DCDB
Cable routing in tray
Cable routed & connected to our BTS
DC Connectors connected to WiMAX IDU
Power 1 - Primary
Power 2 - Secondary
Power 1 Primary Input
Power 2 Secondary Input
BTS Outdoor installation photographs
Fixing of Sectorial Antennas
TOP
BOTTOM
Remove the cover and check the conditons of the connectors
RRH Clamp Installations
Third BracketSecond Bracket
First Clamp
Double side Bolts & Nuts
Install the RRH Holding clamps as per below
RRH before installation
Holding clamps for RRH
Bottom side of RRH
RF Antenna Ports
DC Input
Fiber Input
Installation Tower
Free Space for Installing Antenna Mount
Use pulley to pull the RRH & Sectorial antenna
Mounting of Antenna Mount along with Antenna
Mounting of Antenna Mount along with Antenna
Installing the Antenna Mount along with Antenna
Fixing of RRH on the Antenna Mount
Fixing of RRH on the Antenna Mount
Tighten the RRH clamp bolts
Rechecking the antenna mounts, Antennas and RRH
Position of installed equipments in tower
RRH & Antenna position
Position of Antenna Mount along with Antennas & RRH for all 3 Sectors
Sector 3 - Gamma
Sector 1 - Alpha
Sector 2 - Beta
RRHDCCABLES
FIBERCABLES
RRH DC Cable & Fiber Cable
Cable Tray from Tower to BTS building/ Shelter Entry
Cable vent & RRH ground bus bar
Installation of GPS ANTENNA
GPS Antenna cable
Thread the bottom connector to the GPS Antenna
Installtion of the bottom connector of the GPS Antenna
Installation of the adjustment clamp of the GPS Antenna
Fixing of the adjustment clamp of the GPS Antenna
Bolts & Nuts for Installing GPS Antenna
Fixing of Bolts & Nuts
After fixing of Bolts & Nuts
Fixing of Wall Mount Clamp to GPS Antenna
Positioning of Wall Mount Clamp to GPS Antenna
Fixing of Wall Mount Clamp using bolts & nuts
Tighten the bolts & nuts
GPS Antenna installed on Tower
GPS Antenna fixed using U Clamps on Tower
Fixing of GPS Antenna on Wall
WiMAX GPS
Need to purchase the U clamp to fix the GPS Antenna
Fixing of GPS Antenna in GI Pipe using U Clamp
RRH Side Connector
Fiber Cable
IDU Side Connector
RRH Side Connector
Fiber Cable
Fixing of GPS Antenna in Wall
ZTE OCLAN SWITCH
WiMAX BH terminated in GE port and extended to BTS
UTSTAR OCLAN SWITCH
WiMAX BH terminated in GE port and extended to BTS
ASN Reachable check
BTS Reflecting in EMS
E1 Media converter @ BTS for NON OCLAN
ROSETTE or I/O BOX Top View
BSNL MDF
Backhaul extension to Atrie converter
E1 Media Converter installed & grounded
BETASEC
TOR
ALPHA
SECTO
R
GAM
MA
SECTO
R
GPS
Antenna FiberCables
R PERouter
INTERNET
RRH
WiMAXRACK
DCDB
16 E1 toEth
converter
WiMAXIDU
Network Schematic Diagram ofBSNL WiMAX BTS
Power Cables
OCLAN LOCATION
16 E1 to EthconverterE1 Lines/STM
OCLAN
RF Cables
CLOUD
GPS Antenna Cable
ASN
MCR
HA
EMS
12 3 4 5
GWN
ASN
CSN Connectivity Services Network
Mobile Subscriber
Metro Core RouterAccess Service NetworkHome AgentElement Management System
MCRASNHAEMS
802.16e Remote Radio HeadRRHProvider Edge
CSN
PE
Optimization & DT
BTS Optimization:-
Sectors azimuth and tilt to be done as per RF planning.If needed, azimuth and tilt to be changed as per DT report.
Drive Test:-
Ensure DT software loaded in to the laptop.Laptop to be connected to the GPS & USB dongle or CPEs as per coverage then open the Drive test tool.Required parameters to be selected in DT tool.Select the record mode in DT tool and start test and record the session for DT.Move in and around 15km from the BTS sectors wise and record the same.If needed, re-optimization to be done in BTS based on DT report.
Sample DT GUI report
Sample Excel report
Coverage& Mobility
Refer file name
Coverage & Mobility
Remove the Outer Sleeve of the cable upto 3 inch
Remove the Outer Sleeve of the cable upto 3 inch
Colour of the cable should be like this Blue-Green-Red
Remove the sleeve of the cable for 1/2 inch
Insert the cable into the Lugs
Insert the cable into the Lugs properly
Crimp the Lugs by crimping tool not with any other tool which is shown below
Check Whether the Lugs have crimped properly
Check Whether all the Lugs have crimped properly
Solder the lugs properly
Check wheather the all the lugs Soldered properly
Insert the bottom shell of the connector into the cables
Check the top shell connectors have numbering
2 1
3
BlueRed
Check the top shell connectors have numbering
Green
Insert the cables as per the numbering
Blue 1Red 2Green - 3
Insert the cables fully into the connectors
Check wheather the lugs inserted properly in top
Check wheather the lugs came out from the holes
Insulate the cables in the bottom of the connectors & use heat sink blower for proper connectivity
Insulation tape must be applied firmly
Tight packing of connetor
Insulate the cables in the bottom of the connectors
Thread the Top & Bottom connectors
Cable holder need to be screwed properly
Cable holder need to be screwed properly
Final connetorization