: directional relay Directional relay Bus Bar-Generators -Transformer Over Current Relay Relay (Fault) (Fault) Relay Relay C.B directional relay -1 over current relay Instantaneous directional relay -2 bus bar

: Bus Bar Differential Relay : Voltage Supervision Relay

: HVHRC : High Voltage High Rupturing Capacity fuse .

: (Generator protection)1-Overcurrent protection2-Under/Over voltage3-Reverse power4-Loss of excitation5-Rotor Earth leack6-Differencial Protection 7-Negative sequence current8-Netral Point Voltage9-Out of Step10-over/under Frequency (speed)

: . :: ( Bus bars.. ) .: . : . . !!!

( - .... ) . ( ). ( ). . ( )

( ...) ( ). . . ( ) . ( ) . ( ). () . .

- . .

: 2 : 1 35 / 6 3 * 7070 / 12 3 * 150150/24 3 * 240

:

: soft starter .12.

: / / / /

: . ( 50)

: : ( ) *

:

: : :.1 : ( ) ( ) .2 .3 .4 () ( ).5 ..6 (Low Oil Level) .7 (Oil Pressure Relief) ..8 4 .

: (Tertiary Winding) : Tertiary Winding , .: .1 : .2 ( ) :

.1 .2.34.

: Armoury Armoury Is.c isolating

: (Crona Discharge): :1. .2 .3 .4

: ( ) : .

: 1. . 2. (Look Out) 3. .

: (fusible ) : :1- AM .2- GL AM

: Bus Bar Protection Current Injection .

ATS (AC) Alternator ac rectifier matching ac to dc alternator () .

.

: () (Y): .

Neutral Over Current Relay (Buck up Earth Fault ) (E/F Relay ) (KV 33 (11 KV - .

: over currentE / F

: - - : Short (Link ) ( ) (Link ) -

456 :1- 2- .3- .

: harmonics - :-1 0110 3 -2 C.B -3 (UNDER VOLTAGES)-4 5- (Q)6- 7- 8- (- - ..........)9-

.... 3-PHASE 3 =

.1 .2-.3 ( (DVD-AUDIO/VEDIO AMPLHFIER.4 - ( discharge gas lamps).5 - .6 ( (.7 ups system .8 detuned (VARLOGIC): . open delta 12 .. 2 open delta ( ) : ''Reclosing" Temporary ( 1)

: CLAMP METER 0 0: Knee Point Knee Point 10 % 50 %

Knee Point :

:

C.T.R = 300/5 , Is=5 A , 5 P 10 , 60 VA

Knee Point = 10*60 / Is = 10*60 / 5 = 120 Volt

5P10 10 [Accuracy Limit Factor ] Rated burdenVcallculated = ( ALF*Rated burden ) / In In = nominal secondary current

: ...1. . .2 / .3 / .4 _

: ... ( ( ... ( )

: pilot cable power cable pilot protection relay siemens relay 7SD600 as EMG. O/C with time delay pilot relay open delta DE/F interposing VT interposing VT DE/F STAR/DELTA CONVERTER

: - DC RESISTANCE- POLARITY TEST- SATURATION TEST - mugger test

: DIGITAL METER HOUR MTER MV DP 2 )V CONNICTION 3 WIRE PT) METERS 4 WIRE PHASE VOLTAGE : 7 THE POWER OF RESISTANCE 3 W. 28 - 3 STAR CONNECTION ( - ) - (STAR / DELTA CONVERTER)

:

my question is if I have current transformer has facility to change ratio from primary side and also from secondary side what is the better side for changethe answer is according to what I want where the advantage of primary side is maintaining ampere turnes so burden will be maintaned without change but the disadvantage is decreasing short circuit level. and the the opposite advantage and disadvantage for changing ratio from secondary side

DCDB 10A

: , . 16

: Icu Isc IEC 947-2 : Icu () ( ) , Isc () Icu :Isc = 100, 75 , 50 , 25 % Icu . Isc Icu . Isc = 100% Icu . SF6

(SF6) . , .

SF6 . . m^3 / 6.14 KG .1. 164.072. - 50.8 C3. C- 63.84. 45.46 C5. 73.193 bar 6. 0.725 g / m^37. -50.8C .........1.910g/m^3 .

.

(SF6) .

> 2SF6 + 524 Kcal-------- S2 + 6F2

, ( , , , ( , )) ( 500 C ) S2F, F.F2,F4 F10 . (SO2F2) (SOF2) . . ( SF6) . .

.

. ( - - ) Electrical arcing) ) . (SF6 ) . .1-Sulphured Hydrogen2-Sulfuric Anhydride 3-Hydroflouric Acid

SF6 . -----------------------------------------------------------

SF6. ----------------------------- (SF6) ( with stand voltage) . (Break down voltage ) . . ( withstand voltage) ,(partial pressure of moisture ) . ( Dew point of moisture) ( SF6) . . .

SF6.

. 1- ( withstand voltage) Dew point of moisture)) SF6)) .2- . .

* SF6 .------------------------------------------ 1- . 2- . 3- (Rubber sealing) . * SF6. ---------------------------------------------- : / ./ ( nitrogen purring ) . / ( ( O-ring ./ . (SF6) :-1- (sealing) .2- (SF6) . 3- .

. --------------------------------------------- (SF6) . 12 / 2 . . 400 KV 2 KW -22 C .

* . ----------------------------------------------- ( (SF6 ((O- ring ((O- ring ((O- ring (Silicon rubber) . ((O- ring (neoprene) .

(DEW POINT )

(DEW POINT ) (Hygrometer ) ( ppmw ) (15 ) }PPmw = PPmv x ( mw. water / mw.gas){PPmw = PPmv / 8.1 -----------PPmw ---------- PPmv ---------- mw water ---------- = 18mw gas ---------- = 146.05 SF6

. . (ON) (OFF) . (ON) (ON) .

a () . .

b (auxiliary switch) . 100 , , , . : DIN VDE 0100, part 410, section 6.1.2 :- ( PEN TN ) .- ( )- - - - . lighting current arresters

1.

1- 2- 3- 4- 5-

: : ( -) ( ) ( )

: : Economic efficiencyThermal efficiencyOperational efficiencyEnergy efficiency ( heat rate factor )Capacity factorLoad factor

: ( , ) : . . .

: : :-* * ( )* : : Generation of Electrical Energy

. :

:

. . . ( ) . .

: 1) 1.5

2) 2.5

3) 4

- 3-Phases X MW 3- Phase 1-phase 1 Phase X MW 3-Phase 1.5XMW

ac --dc

2- AC DC :- - DC 1000 V 1000 & A , 1 MW , Brushes Spark Short Circuit . AC ( 600 - 1000 ) MW . - DC .

:

:

220

1 - over speed ( n2 =n1* ( f2 / f1 2 - blocking ( I2=I1*(F2/F

-

-

:

:1- : () .

2- : ()

Surge Arrester

( ) . :

:

:

:

:

:

:

:

:

:

16 30

1. "" . .

2. ().

3. .

4. .

5. -- .

6. .

7. .

8. .

9. . 10 20 .

10. . .

11. .

12. .

13. . . = + + (10-20) .

14. .

15. . .

16. .

17. . .

18. .

19. . .

20. .

21. 120 .

22. .

23. " " .

24. " " .

25. " " . .

26. "" . ( / 100)

27. " " .

28. " ( )" . .

29. "" .

30. FCAN " ." .

31. FCBN " ." FCAN .

32. .

33. .

34. Telsa .

35. . . . 60 . .

36. .

37. 3 - . '.

38. .

39. . (120 2 60 ).

40. () .

41. .

42. .

43. .

44. .

45. .

46. .

47. .

48. busswork.

49. . .

50. " " . (1 = 1000 1000)

51. .

52. .

53. .

54. .

55. . I2R ( ) .

56. . ' . .

57. .

58.

59. .

60. ( ) . .

61. . .

62. . .

63. 2 - 3 3 4 .

64. .

65. () .

66. .

67. . ( )

68. .

69. () .

70. .

71. .

72. .

73. / .

74. .

75. .

76. RCBN -- .

77. .

78. .

79. .

80. . .

81. ( ) .

82. .

83. / (). .

84. .

85. . .

86. () () .

87. () () .

88. .

89. .

90. . : 105 150 180 220

91. .

92. ( ) ( ).

93. .

94. . .

95. : (1) (2) -- (3) (4) -- (5) -- . : () -- () -- () -- : ().

96. ( ) .

97.

98. . .

99. . ( ) .

100. - () . .

101. 3 - . .

102. . .

103. () ( " "). .

104. .

105. . .

106. . .

107. " " " " . .

108. "" " " .

109. . .

110. "" . .

111. () () 5-20 . 208 230 240 110 120 240 277 . . 120 240 480 12 16 24 32 48. 50 10000 . . .

112. . . . .

113. . .

114. - . . -- 10 .

115. 12 16 24 32 48 . .

116. 4 2 2 . . .

117. . . .

118. .

119. -- . 22 208 230 . : = ( ) / 1000= (230V 4167 ) / 1000 = 9.58

120. = ( 1000) / = ( 1000) / 173 = ( ) / 1000 = ( 1.73) / 1000

121. 3 -- . - 3 . 3 - 4 - . 3 - 3 - ( ) .

122. 3 - 4 3 3 -- "" 4 - . 4 - .

123. ' ' "" . .

124. . .

125. 60 - - 50 '' 60 - 60 50 . 50 - 60 .

126. 4 - . .

127. . . .

128. 208 240 . . 480 240 . 480 240 . .

129. . . 10KVA 35dB 75kVA 50dB.

130. 75 .

131. .

132. . ( ) . N.E.C. 450-4 " 600 " . () () .

133. 450-4 . : " 450-4 -- 600 () . 600 . 125 . . : 9 125 . 9 167 .() - . . " : 1kVA BKN4EA 120 240 12 24 . 208 230 . 958 9580. . = 9580 = 46 208 . 9 -- nonadjustable 125 .. = 46 125 = 575 . 450-4 () . 240-6 N.E.C.. = 60 .

134. . . 1000 . .

135. .

136. . .

137. . 10 20 .

138. . . .

139. . . . 30 . . " " . .

140. . . .

141. . . . .

142. / () . 10000 20000 . . . . . . . . / " ". 20 ' ' . 2100 600 . . . / .

143. / / / ( 20 ). . .

144. " " / / / . 3 . . 1200 480V 1600 600V . .

145. () ( " "). 600 .

146. : . . : . .

147. 600 . . 250VA 750kVA.

148. . . '' .

149. . .

150. 60 . . .

151. . . .

152. . . . .

153. . . .

154. . 25 . .

155. (TP1) . . 1-1996 " ". .

156. . 115 80 . 20 35 150 . .

157. . . : .

158. 5kV . .

159. . . 2 . 150 60 200 30 .

160. .

161. 750kVA 25 . . 46 25 .

162. . . . .

163. . . 2 1 / 2 5 . : 480V 504V. +5 .

164. 60Hz 50 60Hz 50Hz . 50Hz 60Hz.

165. 120/240V 120V 3 - . 120V . . .

166. . . . " ". . .

167. . . 6kVA 3kVA " " . . - . energization. .

168. . I2R .

169. . .

170. ( ) .

171. ( ) "" . . . .( : 500kVA .)

172. .

173. 60Hz . (3) C57 - 12-01.

174. 7200 60 .

175. . . . +20 . ( : 500kVA .)

176. . . () ( )

177. 1 . .

178. 1 - . .

179. 2 ( ) .

180. 2 - 2.

181. 3 . .

182. .

183. .

184. 3R 3 . . .

185. 3R 3R . .

186. 4 4 . . ( : )

187. 4X 4 . .

188. 12 . . ( : )

189. . . ' . . "" .

190. . '' '' . . .

191. . . ' . . . .

192. . . 600 2500 . .

193. .

194. . . . 20 . .

195. . . . . .

196. ( ) . 60hz . 60 2 120Hz (60 2) 3 180 . . . . . .

197. . . ( -- 3 9 15 phasors 21 ). .

198. 60Hz. . 4 7 20 13 30 . 4 50 . 13 100 .

199. . . . . .

+ / -5 nominal.These . . : . 20 . 10 100 . equipmento 600 6000 100 / 1000000 . () ( ). Misregistration '' .

200. . . . . $ 1500 -- . / 6000 $ 30000 $

1: 1: ( - )2- 3-

2: 2: . :-1. .2. 3. .

3: 3: () . .

4: : 125, 75 , 25, 20 , 12.5 ,10 ..4: (0.8) . ( ) (..)125-10075-6025-2020-1612.5-1010-8

5: 5: , :-- - - - - 66, 33. - .

6: 6: 50 / .

7: 7: : (8%) : (7%) : (7%) : (7%) : (9%) : (12%) : (10%)

8: 8: ( - ....) .

9: 9: 1- 2- 3-

10: 10: :-- - - ( ) 65% 1150. 620. 53% .

11: 11: 000 .

12: 12: .( 7000 . 10% )

1: 1: ( - )2- 3-

2: 2: . :-1. .2. 3. .

3: 3: () . .

4: : 125, 75 , 25, 20 , 12.5 ,10 ..4: (0.8) . ( ) (..)125-100

5: 5: , :-- - - - - 66, 33. - .

6: 6: 50 / .

7: 7: : (8%) : (7%) : (7%) : (7%) : (9%) : (12%) : (10%)

8: 8: ( - ....) .

9: 9: 1- 2- 3-

10: 10: :-- - - ( ) 65% 1150. 620. 53% .

11: 11: 000 .

12: 12: .( 7000 . 10% )

1-- ( ) ( )2 -- DIRECTIONAL RELAY . directional relay bus bar-generators -transformer over current relay relay (fault) (fault) relay relay C.B. directional relay :1 -- over current relay Instantaneous directional relay--2 bus bar3 -- BUSBAR DIFFRENTIAL RELAY. voltage supervision relay4 -- HVHRC : High Voltage High Rupturing Capacity fuse .5 -- ( ...) ( ). . . ( ) . ( ) . ( ). () . . - . .6 -- 7 -- 1-soft starter2- 8 -- . ( 50) .9 -- (Tertiary Winding) Tertiary Winding , .10 -- -- 1 .-- 2 ( look out)-- 3 . 11 -- ?1 -- .2 -- ( )3 -- ( )4 -- ( )12 -- .-- 1 2 -- open delta 12 3 -- .. 13 -- 456 :1 -- 2 -- .3 -- .14 -- ?? Open delta 15 -- () (Y) 16 -- ??ATS (ac) alternator ac rectifier matching ac to dc alternator () . .17 -- Armory Armory Is.c isolating 18 --What is the IP standard "Protection degrees of enclosures IP ex. IP 543 "5" dust "4" "water or "liquid "3" mechanical impact mechanical impact19 -- ANSI DEVICE NUMBERS :NO.2 MEANS TIME DELAYNO.21 MEANS DISTANCENO.25 MEANS SYNCHRONISM-CHECKNO.27 MEANS UNDERVOLTAGENO.30 MEANS ANNUNCIATORNO.32 MEANS DIRECTIONAL POWERNO.37 MEANS UNDERCURRENT OR UNDERPOWERNO.38 MEANS BEARINGNO.40 MEANS FIELDNO.46 MEANS REVERSE-PHASENO.47 MEANS PHASE-SEQUENCE VOLTAGENO.49 MEANS THERMALNO.50 MEANS INSTANTANEOUS OVERCURRENTNO.51 MEANS AC TIME OVER CURRENTNO.59 MEANS OVER VOLTAGENO.60 MEANS VOLTAGE BALANCEMEANS PRESSURE (MECHANICAL PROTECTION) NO.63NO.64 MEANS APPARATUS GROUNDNO.67 MEANS AC DIRECTIONAL OVER CURRENTNO.68 MEANS BLOCKINGNO.69 MEANS PERMISSIVENO.74 MEANS ALARMNO.76 MEANS DC OVER CURRENTNO.78 MEANS OUT-OF-STEPNO.79 MEANS AC RECLOSINGNO.81 MEANS FREQUENCYNO.85 MEANS CARRIER OR PILOT-WIRENO.86 MEANS LOCK OUTNO.87 MEANS DIFFERENTIALNO.94 MEANS TRIPPING20 -- .21 -- : 2000Hz 30mA 50-60 3-5 .- 50 60 .- 40 1000 30 13 500 .- .- : ( ) .- .- fibrillation .- .- - Let Go Current .- 50 65 110 30 60 .- .- .22 -- Ir - IL - Io.c - Ioff - Is.c -InL : Ioff , InL,IL,Ir,Io.c,IS.C23 -- : fire fitting : : ( ) 24 -- - () - () ( (25 -- - - - - 26 -- connected load ? demand loadconnect load connect load . demand load connect load factor diffarcity factor .27 -- recepticals bye 3 wire not 2wire as Egypt hot and neutral only short . . ground short ground . :Recovery voltage: .Resitriking voltage: .Transient over voltage: .First phase to clear the fault: (3Phase short circuit) . Resitriking voltage . 1.5 .Symmetrical fault: . :3phase fault3phase to ground faultAs Symmetrical fault: . :Single phase to ground faultTwo phase to ground faultPhase to phase faultZero sequence impedance: (Fault current If) (Fault) (Neutral point) (, ,...... ). Source impedance .Inductive type voltage impedance: , 110V .Out off phase switching: , , Short circuit 2phase .29 --- Over load ?? Over current 10 % 25 %. 1000 200 1200 40 240 . . . 10 - 25 % . . Over current 50 % . ( ) .30 --- .1 - Vacuum Circuit Breaker 1000000000 / 1 Torr 36 .2 - Oil Circuit Breaker .3 - SF6 Circuit Breaker 1100 . SF6 .

31 : 1 - single line diagram- 2 wiring diagram3 - --4 5 - - 6 - 7 - 8 - 9 - 10 - 11 32 - 1 2 - 3 - 4 - - 5 6- 33 - 1 : - 2 : - 3 : - 4 : 34 : :- 1 - 2 . 400 /1 400 /5 66000 /100 66000 /110 11000 /100 11000 /110 .35 : - 1 - 2 - 3 1 5 100 110 36 rated burden 37 5p20 , 30 VA Name plate p p 5 Accuracy class p ALF 20 30 . 5 % 20 30 VA 5P X 3p 6p CL KL class class 0.5 class 2 20 n .38 : - 1 (continuity)- 2 1000 10 20 - 3 - 4 - 5 10 % 50 % .6- = 39 S2 , S1 K , L In = ( ) 40 41 - 65 95 50 70 100 42 ( ) 2 43 44 : - 1 11 . - 2 - 3 ( )- 4 45 : 1 1 1 ,2 66 . 66 . .46 : 11 . : -- 1 - 2 - 3 ( )- 4 11 . - 5 11 . - 6 - 7 47 11 . - 1 -- 2 - 3 -4 - 5 - 6 - 7 -8 - 9 - 10 - 11 12 - 13 48 - 1 - 2 -3 4 - - 5 6 - 7 - 66 . 11 .8 - 11 . - 9 1 ,2 66 . 49 - 1 - 2 - 3 - 4 - 5 6 - 50 66 . 220 . 51 1 - 2 - 3 - - 4 - 5 - 6 - 7 -8 52 - ( 53 - ( , ) . . .54 -- Frequency load shedding When the load increase ------------------the frequency decreasewhen the load decrease ------------------the frequency Increase Frequency Governor speed governor / stability frailer : How the voltage affect by Reactive Power??55Answer: The voltage affects directly with the reactive power in the power systems so if the reactive power increased the voltage increase and vise versa when the reactive power decrease the voltage decrease.56 -- 3 = ()/ 3 . . phase . .--57 load bank resistor UPS ( LOAD BANK RESISTOR ) . STANDBY58 -- () . ( ) .59 -- governor under voltage n f . air superheated steam torque . .60 - zero sequence current .61 -- """" (()) . . ( 62 -- BURDEN BURDEN . BURDEN Volt Ampere Name Plate 15VA 30VA Accuracy 5P20 Cl 0.5 63 -- . ( ) , 1 -- 2 -- 64 --

64 -- . . . : . 600 : 18 1733 : 1800 . : 1831 20 ( ) : 1865 ..65 -- :1. .2. .3. .4. . " " ELCB . " " MCB . " " ELCB 66 -- electric field , magnetic field (electric field) (magnetic field) (magnetic field) electric field) 67 -- 90 V=Vmcos(wt) I(t)=imsin(wt) 90 I(t)=-imsin(wt)I(t)=imcos(wt+90)68 -- short (open circuit) 69 -- (KNEE POINT) . (KNEE POINT) .70 -- fuse&CB CB FUSE FUSE &CB ( PROTECTION COORDINATION)71 -- Faults Fault In Electrical Power System:1- Multi-phase Short Circuit "High Current will flowa- Balanced three phase Faultb- Single Phase - to - ground Faultc- Double phase to ground Faultd- Phase to phase Fault Single Phase - to - ground Fault 80 % .

\ 1