    1. The project is based on an insitu technique to

    recover the fuel or feedstock value of coal, that

    is not economically available through conventional

    technologies.

    2. Lignite is a low rank coal and most suited to UCG

    technique.

    3. UCG promises lower capital/operating costs and also

    has other advantages such as no human labourunderground.

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    4/36

    4. We in Pakistan are blessed with this resource in

    Thar Coal Field located in the eastern part of

    Tharparkar Desert, Sindh.

    5. Reasonably assured reserves of 175 billion tons of

    Lignite Coal are available at Thar alone.

    6. Coal reserves are known for the last twenty years

    but unexploited, these lie 120 to 180 meters belowthe surface.

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    5/36

    7. Now the energy security scenario in the country hasaroused interest in the utilization of this big coal

    reserve.

    8. How significant this fossil fuel is, can be adjudgedfrom the share of coal in the production of electricity

    in the world.

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    6/36

    No Source % No Source %

    1 Coal Based 41.61 4 Nuclear 13.752 Oil Based 5.63 5 Hydro Power 15.57

    3 Gas Based 20.87 6 Others 2.25

    Total Power Generation of World

    No Source % No Source %1 Coal Based 54.6 4 Hydro Power 22.8

    2 Gas Based 13.0 5 Nuclear 2.9

    3 Oil Based 0.9 6 Others 7.9

    Total Generation capacity of IndiaTotal Generation capacity of India

    No Source % No Source %

    1 Coal Based 2.27 4 Hydro Power 32.54

    2 Gas Based 4.50 5 Nuclear 2.23

    3 Oil Based 58.37

    Total Generation capacity of Pakistan

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    7/36

    Cost of Electricity

    Comparison of Investment & Cost

    Item

    Surface

    gasification

    Underground

    coal

    gasification

    Construction

    Investment

    45006000

    Rs. / m3

    15002000

    Rs. / m3

    Gas cost5.08.0

    Rs. / m3

    2.03.5

    Rs. / m3

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    8/36

    Temperature 200-550oC Temperature 550-900oC Temperature more than 900oC

    Drying & Pyrolysis Zone Reduction Zone Oxidation Zone

    Coal CH4 + H2O

    CO + CO2

    H2 + C

    Hydrocarbons

    C + H2O CO + H2

    CO2 + C 2CO

    CO + H2O CO2 + H2

    CO + 2H2 CH4

    C + O2 CO2

    C +1/2 O2 CO

    CO +1/2O2 CO2

    Coal + O2 CO2 + CO + H2O

    Schematic of the processes involved in UCG

    Air, Oxygen & Steam Product Gases ( CO, CO2, H2, CH4, N2 , Steam & Tar

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    9/36

    Total Moisture (A R) 39.27%

    Immane Water 11.09%

    Ash Content (A R) 10.97%Volatile matter 47.64%

    Fixed Carbon (AR) 30.14%

    Total Sulphur 0.72%Heating Value 4937 BTU/Nm

    COMPOSITION OF LIGNITE COAL

    BLOCK-V

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    10/36

    Syngas H2 O2 N2 CH4 CO CO2 HV

    By Air

    %

    16 0.2 58 3.5 5 17.5 945Kcal/Nm

    By 60%

    Oxygen

    30 0.0 30 4 15 21 1710Kcal/Nm

    EXPECTED SYNGAS COMPOSITION

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    11/36

    Generation of 100 M Watts through underground

    coal gasification

    Total project costUS $ = 115.6 million

    ( Rs. 9883.6 million)

    Total funds received

    US $ = 9.10million

    ( Rs. 789.0 million)

    Funds allocated in PSDP

    2011 2012

    US $ = 12.51 million

    ( Rs. 1095.0 million)

    First release of fund & commencement

    of the project = 28 April, 2010

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    12/36

    Project Milestone

    b. Main Machinery ( All purchases under Sindh PPRA rules )

    S. No. Description Date Status

    1 Air compressor

    ( process)

    15 8 2010

    Expected delivery

    (15 1 2011)

    Not delivered

    2 Air compressor

    ( Process) placed to thesecond lowest for

    Hitachi Compressor

    after negotiation at the

    lowest cost. Expected

    date of delivery -- Third

    Week of April 2011..

    18 2 2010

    (Expected date ofDelivery Third Week of

    April 2011..)

    These machines have

    been delayed by thesupplier. Now the

    expected date of

    delivery is Feb. 2012.

    3. Air compressor(Startup)

    15 12 - 2010Expected delivery

    (15 4 2011 )

    These machines weredelayed by the

    manufacturers due to

    modifications

    necessitated by the hot

    weather at Thar. They

    have been delivered in

    August.

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    13/36

    Project Milestone

    S.

    No.Description Date Status

    1 Land Acquisition 2 7 - 2010Acquired about 27

    acres

    2 Residential Colony 17 7 - 201090 % complete

    ( 39,312 sq. ft )

    3

    Technical Plant, workshop,

    stores, laboratory, compressor

    station, power station, control

    room and admin block.

    1 11 - 201060 % complete

    ( 27,756 sq. ft. )

    a. CIVIL WORK

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    14/36

    Civil Works done for surface pipingBrick Masonry = 6800 cftLean Concrete 1:4:8 = 1020 cftConcrete 1:2:4 = 512 cftSteel fixing = 1 Ton

    Material used for Civil WorksBricks = 90,000 no.Cement = 700 bags

    Sand = 5000 cftCrush = 2000 cftSteel = 01 Ton

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    15/36

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    16/36

    Others worksInstallation of High Pressure compressor

    Installation of 2 Nos. fuel Tanks 19000liter capacity each.

    Installation of Cooling Towers.

    Installation of 100 KVA Generator atresidential colony.

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    17/36

    Installation R. O. Plant for residential

    colony.

    Installation of Saline water tube well.

    Installation of Pumping wells.

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    18/36

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    19/36

    SITE April, 2010

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    20/36

    Drilling Rigs in Operation

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    21/36

    Drilling and Casing of Gas Wells

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    22/36

    Welding of Surface

    Piping

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    23/36

    Surface piping installation

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    24/36

    Surface Piping

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    25/36

    Surface Piping for

    Gasifier

    Well Head

    Assembly

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    26/36

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    27/36

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    28/36

    Well Head

    Assembly

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    29/36

    Diesel Generators

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    30/36

    High Pressure Compressors

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    31/36

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    32/36

    June, 2010COLONY

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    33/36

    June, 2010COLONY

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    34/36

    COLONY April, 2011

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    35/36

  • 8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem

    36/36