UNDERGROUND COAL GASIFICATION
PROJECT THAR
1. The project is based on an insitu technique to
recover the fuel or feedstock value of coal, that
is not economically available through conventional
technologies.
2. Lignite is a low rank coal and most suited to UCG
technique.
3. UCG promises lower capital/operating costs and also
has other advantages such as no human labourunderground.
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
4/36
4. We in Pakistan are blessed with this resource in
Thar Coal Field located in the eastern part of
Tharparkar Desert, Sindh.
5. Reasonably assured reserves of 175 billion tons of
Lignite Coal are available at Thar alone.
6. Coal reserves are known for the last twenty years
but unexploited, these lie 120 to 180 meters belowthe surface.
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
5/36
7. Now the energy security scenario in the country hasaroused interest in the utilization of this big coal
reserve.
8. How significant this fossil fuel is, can be adjudgedfrom the share of coal in the production of electricity
in the world.
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
6/36
No Source % No Source %
1 Coal Based 41.61 4 Nuclear 13.752 Oil Based 5.63 5 Hydro Power 15.57
3 Gas Based 20.87 6 Others 2.25
Total Power Generation of World
No Source % No Source %1 Coal Based 54.6 4 Hydro Power 22.8
2 Gas Based 13.0 5 Nuclear 2.9
3 Oil Based 0.9 6 Others 7.9
Total Generation capacity of IndiaTotal Generation capacity of India
No Source % No Source %
1 Coal Based 2.27 4 Hydro Power 32.54
2 Gas Based 4.50 5 Nuclear 2.23
3 Oil Based 58.37
Total Generation capacity of Pakistan
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
7/36
Cost of Electricity
Comparison of Investment & Cost
Item
Surface
gasification
Underground
coal
gasification
Construction
Investment
45006000
Rs. / m3
15002000
Rs. / m3
Gas cost5.08.0
Rs. / m3
2.03.5
Rs. / m3
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
8/36
Temperature 200-550oC Temperature 550-900oC Temperature more than 900oC
Drying & Pyrolysis Zone Reduction Zone Oxidation Zone
Coal CH4 + H2O
CO + CO2
H2 + C
Hydrocarbons
C + H2O CO + H2
CO2 + C 2CO
CO + H2O CO2 + H2
CO + 2H2 CH4
C + O2 CO2
C +1/2 O2 CO
CO +1/2O2 CO2
Coal + O2 CO2 + CO + H2O
Schematic of the processes involved in UCG
Air, Oxygen & Steam Product Gases ( CO, CO2, H2, CH4, N2 , Steam & Tar
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
9/36
Total Moisture (A R) 39.27%
Immane Water 11.09%
Ash Content (A R) 10.97%Volatile matter 47.64%
Fixed Carbon (AR) 30.14%
Total Sulphur 0.72%Heating Value 4937 BTU/Nm
COMPOSITION OF LIGNITE COAL
BLOCK-V
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
10/36
Syngas H2 O2 N2 CH4 CO CO2 HV
By Air
%
16 0.2 58 3.5 5 17.5 945Kcal/Nm
By 60%
Oxygen
30 0.0 30 4 15 21 1710Kcal/Nm
EXPECTED SYNGAS COMPOSITION
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
11/36
Generation of 100 M Watts through underground
coal gasification
Total project costUS $ = 115.6 million
( Rs. 9883.6 million)
Total funds received
US $ = 9.10million
( Rs. 789.0 million)
Funds allocated in PSDP
2011 2012
US $ = 12.51 million
( Rs. 1095.0 million)
First release of fund & commencement
of the project = 28 April, 2010
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
12/36
Project Milestone
b. Main Machinery ( All purchases under Sindh PPRA rules )
S. No. Description Date Status
1 Air compressor
( process)
15 8 2010
Expected delivery
(15 1 2011)
Not delivered
2 Air compressor
( Process) placed to thesecond lowest for
Hitachi Compressor
after negotiation at the
lowest cost. Expected
date of delivery -- Third
Week of April 2011..
18 2 2010
(Expected date ofDelivery Third Week of
April 2011..)
These machines have
been delayed by thesupplier. Now the
expected date of
delivery is Feb. 2012.
3. Air compressor(Startup)
15 12 - 2010Expected delivery
(15 4 2011 )
These machines weredelayed by the
manufacturers due to
modifications
necessitated by the hot
weather at Thar. They
have been delivered in
August.
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
13/36
Project Milestone
S.
No.Description Date Status
1 Land Acquisition 2 7 - 2010Acquired about 27
acres
2 Residential Colony 17 7 - 201090 % complete
( 39,312 sq. ft )
3
Technical Plant, workshop,
stores, laboratory, compressor
station, power station, control
room and admin block.
1 11 - 201060 % complete
( 27,756 sq. ft. )
a. CIVIL WORK
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
14/36
Civil Works done for surface pipingBrick Masonry = 6800 cftLean Concrete 1:4:8 = 1020 cftConcrete 1:2:4 = 512 cftSteel fixing = 1 Ton
Material used for Civil WorksBricks = 90,000 no.Cement = 700 bags
Sand = 5000 cftCrush = 2000 cftSteel = 01 Ton
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
15/36
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
16/36
Others worksInstallation of High Pressure compressor
Installation of 2 Nos. fuel Tanks 19000liter capacity each.
Installation of Cooling Towers.
Installation of 100 KVA Generator atresidential colony.
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
17/36
Installation R. O. Plant for residential
colony.
Installation of Saline water tube well.
Installation of Pumping wells.
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
18/36
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
19/36
SITE April, 2010
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
20/36
Drilling Rigs in Operation
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
21/36
Drilling and Casing of Gas Wells
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
22/36
Welding of Surface
Piping
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
23/36
Surface piping installation
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
24/36
Surface Piping
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
25/36
Surface Piping for
Gasifier
Well Head
Assembly
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
26/36
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
27/36
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
28/36
Well Head
Assembly
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
29/36
Diesel Generators
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
30/36
High Pressure Compressors
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
31/36
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
32/36
June, 2010COLONY
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
33/36
June, 2010COLONY
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem
34/36
COLONY April, 2011
8/12/2019 Xay Dung Nha May5-Dr Muhammad Saleem