Vertical Dream

s

Solaris Passenger ElevatorEnglish

Deutsch

中文

Français

XJ SCHINDLER

Page 2: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving
Page 3: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

Safety\Energy-Saving \Environmental Protection\Performance

Page 4: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

Revoluntionary EngineVia CanBus backbone technology, Solaris is integrated into a high-speed network. All data can then be collected instanteously in real-time to simultaneously ensure the system's funtionality. The system enhances the shortest response time and provides the strongest robust structure, to compliment the most reliable operations.

Solaris control system is powered with self-adjustment and error contained functions. The digital system abstracts the complete running information, dynamically analyzes the performance of every individual components, and is able to accurately judge and predict the current elevator's operational status. In any events of abnormality, the system will carry out a series precautionary adjustments and instructions to avoid any possible break-down, easing subsequent services and to guarantee operation safety in the process.

Page 5: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

The main controller design follows MDS (Military Design Standard) standard, and constructed by ultra-powerful dual-core 32b CPUs with redundant CPU chip-sets and 64MB permanent storage. Overall calculation capability reaches 32 MIPS.

Dual core chip-set controller builds up a stable and efficient platform, every chip-set module works independently, all the I/O information is fully isolated. System also owns excellent EMC/EMI features and qualifies with EC255-22-1/2/3/4 standards.

The solaris's traction machine is operated by modern DTC (Digital Torque Control) technology. It is able to fully and automatically compensate start/stop jerks, to satisfy the stable and smooth operation.

The controller can conduct the distance control calculation from high grade sensors, and deliver the best speed curve and distance regulation with maximal error of 0.5mm.

Page 6: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

PM Synchronous DTC Traction Machine

125% single-side brake force 180KN shaft load 290% overloading capability 41°C temperature rise after 8 hrs running

Page 7: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

Traction Machine Safety Strong overloading capability( upto 290%) Outstanding shaft loading (upto180kN) Extremely low temperature rise afer long continous running Powerful brake, able to output 250% braking force Long life span,brake system guarantee 5,000,000 free service braking actions Over-heat protection (optional)

Integrated Door OperatorDoor operator seamlessly integrates door control and door drive to reduce the response time. With equipped self-invented car door safety lock mechanism, Solaris is able to prevent passengers from entering the hoistway as to avoid any human injury or property damage.

Perennial Control Panel

Control panel design and parts selection are strictly compliant with international IEC standard with completely humidity, temperature and aging tests. Galvanized cabinet and special coating guarantees the control panel is compatibility for most extreme environments.

Page 8: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

committed to provide a green environment.

Green Solaris

Page 9: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

Efficient Traction Machine Solaris introduces five invention patents to implement a completely new method to elaborate EM air-gap and EMF features. Driving efficiency is more than 95%.

Dynamic Power Consumption System real-timely analyzes loading information to allocate proper power usage, this technology cuts down the electricity consumption for non-full-load circumstances.

Re-Gen TechnologyUser can add an optional re-gen unit into Solaris built-in interface. Re-gen unit can transform kinetic energy into clean electricity, and feedback back to local/public grid.

Excellent EM FeaturesComplied with European standard EN12015 and EN12016. Solaris can guarantee the reliable operation even in extreme interference environment, while the very low EM radiation avoids any possible healthy damage.

SHL (Super ho is tway lubr ica t ion) StructureSolaris integrates with unique SHL structure, registered under invention patent. SLH achieves the best friction factors (moving frication factor: 0.03; still frication factor: 0.04) to reduce moving resistance and related noise and vibration.

Integrated Door OperatorHigh-efficient Siemens motor and vector control inverter constructs an accurate control loop, the driving torque is given based on the actual resistance to reduce the energy wastage.

Visual SatisfactionAdopts new manufacturing process, all panels are finely processed with anti-finger-print and anti-acid treatment. It is effortless to keep the cage tidy and clean.

Clean Lubrication DesignTraction machine uses seal type bearings to make motor lubrication unnecessary. Guide rail lubrication feeder are specially invented to dynamically regulate the oil-feeding on the actual situation to reduce oil leakage.

Low Operation Noise

Traction machine adopts new LTV technology to reduce overall torque vibration.

Compound car panel to isolate hoistway noise. SHL technology reduces the hoistway movement

frication and related noise. Cage, slung structure, cage platform are designed

with comprehensive vibration absorbing structure. Control panel uses selected silent components,

cabinet partitions are carefully designed to isolated component functioning sounds.

Overall running noise is only 43dB, far below regulation requirements.

43dB EMI/EMS

Page 10: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

Solaris, a brand-new alluring experience

With high-Integrated hall call chips and an intelligent dispatching system, the lift is able to provide intstant, convenient hall call and reduce waiting time.

Hall Call Entry

All-in-one operator shortens door response time, ensure l a n d i n g a c c u r a c y a n d levelness.

RunningSystem pre-designates multiple ergonomically designed speed curves, DTC’s high accuracy makes the elevator operate exactly on the given curve to bring the perfect riding experience. Furthermore, all start-stop jerks are fully compensated to ease any uncomfortable feeling.

Page 11: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

Accurate landing with max error of less than 0.5mm.

16-bit hall call chip-set to process landing requests independently and promptly.

Riding

With per fec t r id ing comfor t and lavish cabin surroundings, passengers will be enjoying every moment.

Exit

A d v a n c e d o o r o p e n functions, flawless stop and accurate levelness ensures no discomfort or delay to the passengers.

Se l f - i l luminated mic ro -movement (handicap) buttons give you a clear and comfort visual and touch feeling.

LCD/Monochrome Multimedia Display Colorful(Dual Color) display to show you multimedia information with built in USD interface for convenient content update.

VFD (Vacuum Fluorescent Display) to give you a colorful and fresh display and suitable for any environment at any sight angel.

Door wi th v is ion g lass, prov ides passenger with better safety and vision.

Page 12: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

d

Customer Services

With our service concept, UNLIMITED ASSURANCE, XJ brings a new prespective for elevator service standards.

XJ provides a complete series of services, we are glad to extend elevator personal service consultantcy to provide users with professional advice to ensure that your elevator is always in a safe, reliable and stable condition.

CAC (Customer Assistance Centre)

CAC provides a fully comprehensive consultancy and know-how services via CAC department, our professional engineers are trained to provide any of your enquiries and FAQs.

During preparation, CAC explains our products' specifications, answer your enquiries and arrange any nearby customer service centre to provide further assistance. During business negotiatons, CAC provides basic elevator knowledge and procuring information. Training service is made available between you and our experts; After sales, CAC provides all available information regarding to installation, maintenance or any other related topics. XJ will arrange the appropriate service schedule for our customers.

In order to provide better UNLIMITED ASSURANCE service, CAC hotline has been extended to 24 hours / 7 days a week.

Page 13: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

1. Actively scheduled visit to understand your need and difficulties.

Solaris promises you commitments

2. 1-to-1 expert consultation In Depth knowledge of your elevator

3. Scheduled maintenance ensure the elevator in tiptop condition.

4. Sufficient spare parts storageguarantee all storage problems to be solved completely.

6. Emergency assistance our qualified engineer will arrive in time as we promised.

5. Service enquiry and upgradingmaking sure that your elevator is of highest available standards.

CustomerFeedback

Business

Consultation

Production

Feelback productio

n

progress

customer req

uest

prop

ose solution

Delivery

Services

Inform the site progress

InstallationSupport

Confirm delivery time

informatio

n feedback

Comments & suggestions

Negotiationconfirmation

Installation

Commissioning

Qua

lity

chec

k &

ass

ista

nce

for

app

rova

l Schedule Service

Schedule customer visit

and elevator quality check

Service flow to fulfill your requests

Page 14: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

Available Coating Color

Aqua Blue 05Oyster Grey 01 Pistachio Green 02 White Solid 03 Silver Titanium 04

JX01Equipped with modern day technology, the simplicity and classical design of the car cage offers passengers a truly pleasurable experience.

Specification Ceiling Car walls Flooring Car door Front wall

COP Plate Indicator Button

X26C Powder coatingPowder coatingDM-A01 homogeneous vinyl tilesPowder coatingPowder coating

CZP-19FDS/S hairlineDot matrix LED displayAN19 braille button

Page 15: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

X22C

X20C

The exquisite combination of stainless steel and unique ceiling design achieves a high level of refinement and quality.

JX02

SpecificationCeiling Car walls Flooring Car door Front wall

COP Plate Indicator Button

X22C S/S hairline S/S hairlineDM-A02 homogeneous vinyl tilesS/S hairlineS/S hairline

CZP-19FDS/S hairlineDot matrix LED displayAN19 braille button

Page 16: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

X30C

X40C

Specification Ceiling Car walls Flooring Car door Front wall Handrail

COP Plate Indicator Button

JX03The graciously designed car cage enables a headroom space of 2.5m. By which, exhibiting distinctive spaciousness and elegance.

X30C S/S hairlineS/S hairline with half size S/S mirror in rearDM-A04 homogeneous vinyl tilesS/S hairlineS/S hairlineFS-11WJM S/S handrail for rear wall

CZP-19JDS/S mirror with hairline stripsDot matrix LED displayAN19 braille button

Page 17: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

X42C

X22C

Spectrums of mirror finishes within the car cage enable users to have a large visualization concept. The high ceiling design enhances the effect and displays the gent ly -shaped contours o f the surrounding.

Specification

Ceiling Car walls Flooring Car door Front wall Handrail COP Plate Indicator Button * Refer to etching pattern selection

JX07

X22C S/S hairline S/S hairline combined with S/S mirror etching panel DM-A05 homogeneous vinyl tilesS/S hairlineS/S mirror etchingFS-11WJM S/S handrail for 3 sides CZP-19JDS/S mirror with hairline stripsDot matrix LED horizontal displayAN19 braille button

For more cage and parts selection, please refer to Cage Selection Reference.

Page 18: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

Solaris Passenger Elevator Standard Layout Drawings

For details, please refer to XJ Elevator Standard Drawings.

R3 R4

Rai

l Bra

chet

Sp

acin

g 2

500m

m10

00

Gui

dra

il

500

0 R

ail

500

0 X

n=

50

500

300

2500

5000

2500

≥22

00

Pit

Dep

th (

pp

)S

tore

y H

eig

ht ≥

2600

Tota

l H

oist

way

Hei

ght

Hoisting Hook(by others)

Mot

or R

oom

Hei

ght

Rai

l Bra

cket

Sp

an

Rai

l S

pan

Ove

rhea

d H

eig

ht

Door Opening (JJ)

Structure Opening (SO)

Cage Size (AA)

(BB

)

Hoi

stw

ay D

epth

(B

H)

MR

Dep

th (

BM

)

MR Width (AM)

Lighting Outlet (by others)

Power Supply Pannel(by others)

B

R1

A A

R2

R5

A A

Cag

e D

epth

Hoisting Hook Above

Ventilation Aperture (by others)

Motor Room Plan

Hoistway Plan

Hoistway Width (AH)

Elevation Plan

Page 19: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

ModelSpeed

(m/s)

Load

(Kg)

Entrance

Opening

(JJ)

Door

Opening

(SO)

Cage Size

AA×BB

Hoistway

Size

AH×BH

M/C Size

AM×BM

Pit

Depth

(PP)

Min

Overhead

(OH)

Min Hook

Height

(HM)

9000-KT-06-10-F 1.0

630 800 9501400×

1100

1950×

1750

1950×

1750

1500 4400 2200

9000-KT-06-15-F 1.5 1600 4500 2200

9000-KT-06-17-F 1.75 1700 4800 2200

9000-KT-08-10-F 1.0

800 800 9501400×

1350

1950×

2000

1950×

2000

1500 4400 2200

9000-KT-08-15-F 1.5 1600 4500 2200

9000-KT-08-17-F 1.75 1700 4800 2200

9000-KT-08-20-F 2.0 1800 5000 2200

9000-KT-08-25-F 2.5 2000 5200 2200

9000-KT-10-10-F 1.0

1000 900 10501600×

1500

2200×

2200

2200×

2200

1500 4400 2200

9000-KT-10-15-F 1.5 1600 4500 2200

9000-KT-10-17-F 1.75 1700 4800 2200

9000-KT-10-20-F 2.0 1800 5000 2200

9000-KT-10-25-F 2.5 2000 5200 2200

9000-KT-11-10-F 1.0

1150 1100 12502000×

1350

2600×

2050

2600×

2050

1500 4400 2200

9000-KT-11-15-F 1.5 1600 4500 2200

9000-KT-11-17-F 1.75 1700 4800 2200

9000-KT-11-20-F 2.0 1800 5000 2200

9000-KT-11-25-F 2.5 2000 5200 2200

9000-KT-13-10-F 1.0

1350 1100 12502000×

1500

2600×

2200

2600×

2200

1500 4400 2200

9000-KT-13-15-F 1.5 1600 4500 2200

9000-KT-13-17-F 1.75 1700 4800 2200

9000-KT-13-20-F 2.0 1800 5000 2200

9000-KT-13-25-F 2.5 2000 5200 2200

9000-KT-16-10-F 1.0

1600 1100 12502000×

1750

2600×

2500

2600×

2500

1500 4400 2200

9000-KT-16-15-F 1.5 1600 4500 2200

9000-KT-16-17-F 1.75 1700 4800 2200

9000-KT-16-20-F 2.0 1800 5000 2200

9000-KT-16-25-F 2.5 2000 5200 2200

Work to be done by building contractors

Standard SpecificationH

oist

way

1 Prepare hoistway with proper framing and enclosure with either concrete, reinforced brick or steel structure to carry the sufficient loading

2 Provide and/or cut all necessary holes, chasing, and openings for landing doors, indicators, hall calls installation, and making good after installation

3 Reserve the reinforced steel bars for jamb and transom fixation4 Supply single phase electric power outlet in pit5 Supply and secure all supports, reinforced concrete slabs, separate beams, etc. for equipment installation

6 Provide all grouting works for entrance jamb frames, sills, hall buttons, indicators, brackets, bolts, machine beams, buffer stands, etc.

7 Provide suitable pit of proper depth with drains and water-proofing, and the pit ladder if necessary.8 Provide necessary conduits and wirings from machine room to guard house for supervisory panel or other monitoring system9 Pre-bury connecting plate for guide rail bracket installation in brick hoistway10 Supply hoistway service door if non-stop distance more than 11m

Mac

hine

Roo

m

1 Cut floor openings with proper measures to prevent water flowing in2 Provide hoisting hook for with proper loading requirements3 Construct the concrete machine bed platform with sufficient loading4 Supply and install three phase and single phase electrical power supply outlets and relevant controller/switch-board 5 Intercom cabling from machine room to guard house

6 Provide suitable machine room ambient temperature (10~40°C and humidity (<=85% at 25°C) and keep the machine room away from harmful gas, acid and dusts.

Oth

ers

1 Provide, free of charge, a suitable theft-proof and damage-proof storage area for materials and tools during installation work2 Prepare and erect suitable scaffolding and protective measures for the work in progress3 Construct the landing sill threshold projections on each landing floor

4Supply electric power for lighting of work area, installation work, elevator testing and spray painting; supply free-of-charge three phase electric power for testing and commissioning. Three phase and single phase electric supply should be isolated with each other at all time.

5 Power supply fluctuation should be less than 5%, the neutral and earth line must be completely separated (earthing resistance should be less than 4Ω)

Page 20: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

●- Standard function; ○ - Optional function; ◎# –Standard function but rely on an optional function numbered with #.

ID Function Description Spec

1 Selective Collective Control

System collects hall/car call signal from COP and hall calls, automatically arrange the responding sequence according to the current running position and direction, and respond on every individual registered call

2 Duplex Control

Fully automatic operation used for a two elevator system. Calls are responded to by whichever car that can serve the call faster. When there is no call, one of the cars will standby at the starting floor while the other car stops at the pre-designated floor.

3 Group Control

A group control system is used when there are more than two elevators operating in a group (up to 16 elevators). Using XJ group control dispatching algorithm, system reduces waiting time by computing forecasts of waiting time and distributing them evenly among all cars controlled.

4 Auto turn-off car light & fan

When the elevator is not in use for pre-designated period, the light and ventilation fan in the car are automatically turned off to conserve energy. ●

5 Car emergency lighting An emergency light will be activated automatically when power failure occurs. ●

6 Maintenance Operation Elevator operates at lower speed during maintenance ●

7 Overload protection This system will activate an audio/visual signal and prevent the elevator from moving when it is overload. ●

8 5-Way communication

An interphone system among car, machine room, car top, pit and guard house is provided for emergency communication. ●

9 Nearest landing operation

In the unlikely event of temporary trouble during operation, the elevator automatically goes to the nearest floor at low speed to prevent passengers from being trapped inside.

10 Fault recovery due to power failure

Once power supply recovered, elevator moves to the nearest floor and restore the normal operation. ●

11 Rescue operation When the elevator stops out of the door open zone, it will move to the nearest floor at slow speed to release passengers. ●

12 Attendant operation After activation, the stop floor is selected by an elevator operator, during attendant operation, hall call can be responded. ●

13 Independent operation

After activation, the elevator can only respond to car call selection but ignor hall call commands.. ●

14 VIP operation

When VIP switch turned on, elevator can only move to designated VIP floor and ignore any car call and hall call request. Once completion, VIP switch automatically resets and elevator restores back to normal operation. (VIP switch can be either key-lock switch or card reader)

15 Car roof escape hatch

In the event of emergency, passengers can be rescued and escaped through the hatch which can only open outside. ○

16 Operating handsetFor security reason, main board does not come with display screen and operation keypad, which are integrated into a operating handset and provided separately

17 Floor no. display char-set

System supports rich of signals, letters and numbers for various floor number indication ●

18 Micro-leveling operation Automatic correct of elevator landing level when subjected to varying car load ●

19 Standby floor setting A floor can be specified as standby floor, which used in automatic returning function ●

20 Automatic Returning Function

After all the calls have been served, the elevator returns to the pre-designated standby floor. ●

Functions

Page 21: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

ID Function Description Spec

21 Automatic door time adjustment

The duration for the doors to remain open is automatically tailored to current situation, substantially improving operational efficiency. ●

22 Door vision panel Car/landing door can be equipment with transparent vision panel to gain better security and vision. ○

23 Door holding time adjustment

Door open holding time can be manually adjusted to prolong or shorten door open time ●

24 Door open at next landing

When door fail to open at certain landing, elevator moves to the next landing to release passengers. ●

25 Faulty record Main board can store faulty records for last 20 break-downs with error codes and trouble-shooting information. ●

26 Hall call self-diagnose

When a hall call button signal keeps ON for more than 20 seconds, the elevator determines this button is faulty and isolated it from system and twinkle the button lamination till the button signal is OFF.

27 Door operator protection

Includes overvoltage protection, overheat protection, short circuit protection, earth protection, overload protection, PTC protection, overspeed protection, door inter-lock protection, a2t temperature protection, etc.

28 Door Close Protection

When the door cannot be fully closed within pre-designated period, elevator tries to close the door again. If fail to close for more than 6 times, activate the alarm signal and set to faulty mode

29 Door status scanning function

If landing error occurs, system can automatically scan all the landing door status and locate the fault immediately. ○

30Traction machine overheating protection

When the traction machine's operation temperature is higher than designated value, system alarms and stops operation. ●

31 Braking protection System can monitor brake actions via brake-arm switches, shutdown the system if error detected. ●

32 Encoder signaling checking

Controller is enable to detect encoder signal error or pulse loss, and activates alarms and stops running in the event of fault. ●

33 Electrical overspeed protection

By analyzing encoder's feed-back, controller determines whether the motor runs under overspeed and take the necessary protection measures to make safe

34 Fireman Operation When the fireman switch is turned on, the elevator returns to the designated floor and ready for fireman use. ○

35 Fire emergency operation

In the event of fire, the elevator is automatically brought to the designated floor where it remains inoperative for passenger safety. ◎34

36 Fire Rated Landing Doors

Special designed landing door is able to isolate the flame into hoistway or car for one or two hours ○

37 Advance Opening With advance door opening function, the elevator can open the car/landing door before stop and during landing zone low speed movement. ○

38 Door Nudging If the door is not close after one minute due to door safety signal or other reasons, elevator force to close the door in very slow speed ○

39 Door open prolong button

When this button on the car operating panel is pressed, the elevator doors stay open for a pre-set period of time. ○

40 Car call cancellation This function allows passenger to cancel the car call that is registered wrongly, by pressing the same button again. It thus eliminates unnecessary stops. ○

41 Mischievous call cancellation

When a large number of car calls have been registered for a small number of passengers, the calls are determined to be mischievous and are automatically cancelled upon responding to the next car call.

42 Overload bypass When car is fully loaded, it will only responds to car calls and bypass all hall calls ○

Page 22: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

ID Function Description Spec

43 Dual light hall call button

Hall call button can illuminate in full and drizzle light. Before pressing, button illuminate drizzly; once pressed, button fully light up. Useful for dark environment.

44 Door safety edgeMechanical safety unit can be provided an installed to both sides of the car doors. If a passenger makes contact with the safety edge of the closing doors, the doors immediately re-open.

45 Multi-beam door sensor

The multi-beam sensors installed at the edge of the door will kept doors open when the sensor path is obstructed. ●

46 2-In-1 Safety Edge This safety device integrates the multi-beam and safety edge into one piece, provide double door protection ○

47 3D Multi-beam This device detects passenger getting on or off the elevator, keeping the door open as long as passenger are in the area of detection. ○

48 Car door lockWith car door lock, the riding passengers cannot force to open the car door if car is not in landing area, prevent passenger from dropping into hoistway or any other injuries.

49 Arrival Gong An electronic chime located on car top sounds just before the arrival of the elevator. ●

50 Voice Synthesizer Present standard message information is announced to passengers through a voice synthesizer. (Available in multiple languages) ○

51 BGM speaker A speaker for background music and public announcements for building ○

52 Hall lantern Hall lanterns can be provided instead of hall indicators. (for group control, hall lanterns will be provided as basic feature) ◎3

53 VFD indicator Vacuum fluorescent display (VFD) indicator to show the elevator status with maximally visual satisfaction. ○

54 Monochrome indicator

Dual color LCD indicator to show elevator status and other information in graphics. ○

55 Horizontal Indicator Indicator with face plate is separately and horizontally placed at the top of entrance or transom instead of incorporated into hall call or COP. ○

56 LED information display

High density dot matrix LED display to show elevator running information and other customer specified information. ○

57 True color LCD multimedia display

True colored display elevator running information, date/time, whether, advertisements and other customer specified information in video, audio and other multimedia formats. Build in USB interface to update display contents conveniently.

58 Handicap COP arrangement

For handicap elevator, all the COP buttons are grooved with Braille points, every button should be located within the certain range (normally from 0.9~1.1m according to local handicap requirements) or sub COP with Braille buttons should be presented.

59 Sub COP Additional floor selection and door open/close buttons are located on the car left hand panel or left entrance panel. ○

60 Through type entrance There are two doors inside the car, make the landing at different direction. ○

61 Compulsory stop floor

When elevator moving by, it stops at the compulsory-stop-floor and open door even without call registered for this floor. ○

62 Floor lock out operation

Specific service floors can be locked out as non-stop floor through system configuration. ○

63 Power supply converter

Convert the 3 phase power supply to the system acceptable range (AC380V-415V/50Hz), ○

64 Automatic voltage regulator

Steadize the power supply voltage fluctuation if the local voltage fluctuation greater than required value. ○

Page 23: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

ID Function Description Spec

65 Scheduled non-serving floor

A floor can be accessed within pre-set time period; if other than the period, the floor cannot be selected from car neither made any hall call. ○

66 Parking Operation The elevator can be parked at the designated floor with a key switch ○

67 Dual parking switches

There are two parking switches at different floor, each switch can be used to excise parking operation ○

68 Scheduled startup / shutdown service Elevator automatically starts up and shuts down on the preset scheduled time. ○

69 Standby position scheme

For group control system, two standby position schemes can be set. Once activated, elevators will be dispatched to the landing specified in the standby scheme.

◎3

70 Upward rush hour schedule operation

While in the pre-designated up-direction rush hour, every individual elevator in a group system can enter schedule operation mode once there are more than 3 car calls registered, such elevators automatically return to home floor after call-responses to reduce the up direction waiting time

◎3

71 Downward rush hour schedule operation

While in the pre-designated down direction rush hour, every individual elevator in a group system can enter schedule operation mode once full load, such elevators automatically return to the highest floor after all call-responses to reduce the down direction waiting time

◎3

72Emergency operation for power failure by generator

In the event of building power failure, the elevator can be operated by building standby generator to move it to the designated floor. ○

73Automatic rescue device for power failure

In the event of power failure, the system automatically changes over to battery power to bring the elevator to the nearest floor. ○

74 Earthquake emergency operation When an earthquake is detected, the elevator will stop at the nearest floor. ○

75 CWT safety protection The elevator equips with CWT overspeed protection components ○

76 Cipher code operation

By activating cipher, using car operating panel floor buttons, only restricted passengers can gain access to certain floors. ○

77 Smart card access system

Controlled access to certain floors by means of smart cards. (Card reader system is provided and installed by third party, interfacing shall be by means of dry contacts)

78 Closed-circuit TV For monitoring of movement inside the car by the security personnel. (camera, recorder cabling by others) ○

79 Supervisory Panel Various supervisory operations, communication, and status monitoring can be provided through either the conventional LED. (Cabling done by others) ○

80 PC Monitoring System

Computer is used to monitor various supervisory operations, communication, and status information with comprehensive and handy operations. (Computer supplied by others; cabling done by others)

81 Wireless Communication

Monitoring centre can collect all elevators’ running information via wireless method, carry out real time healthy analysis and arrange the necessary service.

82 Elevator air-con Air-conditioner can be equipped into car cage ○

83 Air cleaning devicesThe elevator is able to equip with UV anti-bacteria device, air purifier device and oxygen generator device to create a clean and pleased riding environment.

Page 24: XJ SCHINDLER - Weeblychekad.weebly.com/uploads/2/5/1/2/25129578/xj-schindler_solaris.pdf · Solaris Passenger Elevator English Deutsch 中文 Français XJ SCHINDLER. Safety\Energy-Saving

SCAAI V1

Local Representative

Pictures in this brochure are computer generated; real product may differSpecification and designs are subject to change without prior notice.

XJ SCHINDLER CO., LTD.