40
1쪽40 원원원 원원원 쪽 쪽 A.C A/B A/E A/E A/E : Architectural Engineering A/E ABB ABB ABC Activity Base Cost ABWR AC ACB ACB ACC Advanced Control complex ACCD Advanced Control Complex Design (ABB-CE’s NUPLEX80+) ACI American Concrete Institute ACI ACPA ACR ACRS ACSC Auxiliary Control and Safety Console (center) ACTL Activation Library ACTM Automatic CEDM Timing Module ACU ACU : Address Control Unit ACU ADF ADS ADSL Asymmetric Digital Subceriber Line ADV Atmospheric Dump Valve AEA AEC Atomic Energy Commission AEC AECL AEO AEO : Atomic Energy Office AEOD AET AF AFA Alternating Current 쪽쪽 Auxiliary Building 쪽쪽쪽쪽쪽쪽쪽(AB) Architect Engineer 쪽쪽쪽 쪽쪽쪽쪽(쪽)쪽쪽3,4쪽쪽쪽 A/E : KOPEC - S & l A/E : Architect Engineer 쪽쪽쪽쪽쪽쪽 Asea Brown Boveri Ltd. (Switserland)*.’89.11.13 CE쪽 쪽쪽 ABB : Auxliary Boiler Building 쪽쪽 쪽쪽쪽 쪽쪽 Advanced Boiling Water Reactor 쪽쪽쪽 쪽쪽쪽쪽*.쪽쪽 : ALWR, APWR AC : Approval Category 쪽쪽쪽쪽 Air Circuit Breacker 쪽쪽쪽쪽쪽쪽쪽 *.쪽쪽:OCB ACB : Access Control Building 쪽쪽쪽쪽쪽쪽 ACI : American Concrete Institute 쪽쪽쪽쪽쪽쪽 쪽쪽 ACPA : American Concrete Pipe Association 쪽쪽 쪽쪽쪽쪽 쪽쪽 쪽쪽 Advanced Control Room 쪽쪽쪽 쪽쪽쪽 Advisory Committee on Reactor Safeguards쪽쪽쪽쪽쪽쪽쪽쪽쪽쪽 ACU : Air Cleaning Unit 쪽쪽쪽쪽쪽 Advanced Design Feature 쪽쪽쪽쪽쪽쪽(쪽쪽쪽쪽쪽 쪽쪽 41쪽 쪽쪽쪽쪽) Automatic Depressurization System 쪽쪽쪽쪽쪽쪽Automatic Dispatch System AEA : Atomic Energy Act 쪽쪽쪽쪽 AEC : Atomic Energy Commission 쪽쪽쪽쪽쪽쪽 Atomic Energy Of Canada, Ltd. 쪽쪽쪽쪽쪽쪽쪽쪽(WOLSONG #2 NSSS쪽쪽쪽쪽) Analysis and Evaluation of Operation Data쪽쪽쪽쪽쪽쪽쪽쪽 Advanced Energy Technology, Inc. (AET쪽) Air Filter 쪽쪽쪽쪽쪽 Advanced Fuel Assembly 쪽쪽쪽쪽쪽쪽쪽쪽

›자력약어정… · XLS file · Web view · 2017-08-07원자력 약어집 Utility Requirements Document (EPRI의 ALWR관련, 설계요건서) U.S Council for Energy Awareness미국에너지개발협의회

  • Upload
    buidung

  • View
    217

  • Download
    0

Embed Size (px)

Citation preview

1쪽76

원자력 약어집약 어A.C

A/B

A/E

A/E

A/E

ABB

ABB

ABC

ABWR

AC

ACB

ACB

ACC

ACCD

ACI

ACI

ACPA

ACR

ACRS

ACSC

ACTL

ACTM

ACU

ACU

ADF

ADS

ADSL

ADV

AEA

AEC

AEC

AECL

AEO

AEOD

AET

AF

AFA

2쪽76

AFAS

AFNOR

AFP

AFR

AFTA

AFU

AFW(S)

AGR

AHR

AHU

AIA

AIA

AICE

AID

AIF

AISC

AISC

AISI

AISI

ALAP

ALARA

ALI

ALMS

ALR

ALWR

AMI

AMIS

AMS

AMSAC

ANI

ANI

ANO(-2)

ANPP

ANS

ANS

ANSI

ANSI

AOO

APC

3쪽76

APD(S)

APM

APS

APSD

APWR

ARTS

ASA

As-built drawing

As-built DWG.

ASCE

ASCS

ASD

ASDV

ASEM

ASEP

ASGT

ASI

ASL

ASME

ASNT

ASNT

ASP

ASTM

ASTM

ASTPO

ATL

ATP

ATP

ATS

ATWS

ATWT

AVC

AVL

AVL

AVT

AWG

AWP

AWS

AWS

AWWA

4쪽76

AWWA

AXECOSG

B & PV

B/L

B/S

BABE

BAC

BACIX

BAMP

BASIC

BAST

BBO

BCD

BCMS

BDAS

BDPS

BEP

BHEP

BISC

BIT

BITE

BLPB

BOD

BOM

BOO

BOOT

BOP

BOP

BOS

BOT

BRS

BRT

BSD

BSI

BTP

BTRS

BTU

BWORG

BWR

BWR

5쪽76

C of C

C&F

C.V

C/O

CAD

CAD

CAI

CALS

CALS

CAMAC

CANDU

CAPS

CAR

CARES

CAS

CAT

CCDF

CCF

CCG

CCG

CCIP

CCLM

CCMD

CCN

CCP

CCS

CCS

CCS

CCTV

CCW(IS)

CCW(S)

CCWP

CD

CDA

CDF

CDMA

CDS

CE

CEA

6쪽76

CEA

CEAC

CEAS

CEDM

CEDM

CEDMCS

CENPD

CEO

CESSAR

CET(C)

CFF

CFM

CFM

CFMS

CFMS

CFR

CFR

CFR

CFR

CFS

CFT

CFT

CH

CHB

CHEP

CHF(R)

CHLR

CHRS

CHT

CHT

CI

CI

CI

CIAS

CICS

CICS

CIF

CIF

CIP

7쪽76

CIP

CIR

CIS

CLCS

CLMS

CLP

CLP

CMAA

CMEA

CMF

CMI

CMM

CMS

CMT

CMTR

CMTR

CO

CO

COC

COC

COC

COC

COD

COD

COL

COLSS

COMP-DWG

COPQ

COPQ

COS

CP

CP

CP

CP

CP-A1

CP-A2

CP-A3

CPC

CPC

CPC

8쪽76

CP-C1

CP-C2

CP-C3

CP-C4

CPCS

CP-E1

CP-E2

CP-E3

CP-E4

CP-E5

CPI

CPM

CPM

CP-M1

CP-M2

CP-M3

CP-M4

CP-M5

CP-M6

CP-M7

CP-P1

CP-P2

CP-S1

CP-S2

CPSD

CP-T1

CP-T2

CPTS

CPU

CR

CRA

CRD

CRDM

CRDR

Creek

CRGR

CRM

CRT

CRUD

9쪽76

CRW

CS No.

CS(S)

CSAE

CSAS

CSB

CSB

CSI

CSNI

CST

CST

CTCS

CTQ

CTQ

CU

CV

CV

CVAP

CVCS

CW

CW

CW(S)

CWIS

CWP

D.C

DAS

DAS

DB

DBA

DBA

DBE

DBE

DBMS

DBMS

DC

DC1ECS

DCM

DCM

DCN

DCN

10쪽76

DCP

DCR

DCR

DD

DDC

DDCC

DDCC

DDCL

DDN

DDN

DDS

DDS

DEGB

DEISS

DEL'Y

DEP

DEPT

DET

DFC

DFMS

DFT

DFT

DGB

DGC

DHR

DIAS

DIP

DIR

DL

DM

DMA

DMIMS

DNB(R)

DNFD

DOE

DOE

DOR

DOR

DOS

DOT

11쪽76

DPC(S)

DPDT

DPPS

DPS

DPT

DR

DRA

DRC

DRMS

DRN

DRPI

DRS

DRS

DSA

DSN-SPEC

DSS

DTR

DTS

DTS

DVI

DVM

E/P

EA

EAB

EAB

EAN

EBWR

ECCS

ECCS

ECN

ECN

ECT

ECW(S)

EDB

EDF

EDG

EDPS

EDPS

EDT

EDT

12쪽76

EEI

EEI

EF

EFAS

EFPD/Y

EFS

EGCB

EGL

EGS

EHC

EIS

EIS

E-M

EMI

EMS

ENDF

ENDL

ENFMS

ENG'G

EOF

EOF

EOP

EP

EP

EPB

EPC

EPC

EPD

EPG

EPM

EPMS

EPRI

EPZ

EQ

EQ

EQA

EQUIP-SPEC

13쪽76

ER

ER

ER

ER

ERF

ERP

ERP

ES

ES

ES

ESA

ESDE

ESF

ESF

ESFAMS

ESFAS

ESS

ESW

ESW

ETR

EU

EU

EU

EVMS

EWD

EWS

EX

EXCH

F(P)SK

FAI

FAR

FAS

FBR

FBS

FBS

FBTA

FC

FC

14쪽76

FCAW

FCN

FCR

FDA

FECN

FEMA

FES

FF

FFD

FFTF

FHA

FHB

FI

FIDAS

FIV

FLA

FLECHT

FMEA

FMEA

FMR

FMT

FOAKE

FOB

FOD

FP

FPDIL

FR

FR&P

FRP

FRTS

FS

FSAR

FSAR

FSP

FUSE

FWCS

FWLB

GA

GA(D)

15쪽76

GCB

GCS

GDC

GDC

GDS

GE

GE

GEC

GEN

GENESIS

GEO

GIB

GIS

GITS

GL

GMAW

GQA

GSAW

GSERMS

GSI

GSI

GTAW

GTAW

GTC

GTC

GUI

GW(M)S

HACT(S)

HCI

HDMS

HDSR(S)

HED

HEP

HEPA

HESS

HEU

HFE

HFT

HFT

HHWL

16쪽76

HJTC(S)

HOLD POINT

HP

HP TBN

HPCS(S)

HPSI

HRA

HRA

HRSG

HSP

HV

HVAC

HVAC(S)

HWL

HWR

HX

I & C

I&C

I/O MUX

I/S

IA(S)

IAEA

IAEA

IASCC

IATI

IBM

IBS

ICC(M)S

ICD

ICI

ICI(S)

ICRP

ICS

ICS

IDCOR

IDMS

IE

17쪽76

IEEE

IFR

IGA

ILRT

ILRT

ILS

IMQP

IMQP

IMS

INEL

INIS

INOP

INPO

INSAG

IP

IP

IPE

IPICS

IPP

IPPM

IPPM

IPS

IPS

IPSO

IR

IRD

IRD

IREP

IRR

IRS

IRWST

ISA

ISAP

ISI

ISI

ISO

IST

18쪽76

ISTS

ITB

ITB

ITB

ITC

ITER

ITP

IV

IVMS

IWD

JHEP

JIS

JIS

JIT

JNCC

JSD

JSD

KAERI

KAERI

KAIF

KAIST

KAIST

KARP

KB

KDI

KEA

KEDO

KEEI

KEPCO

KEPCO

KEPIC

KEPOS

KHIC

KHIC

KIER

KIMM

KIMM

KINS

KINS

KIST

19쪽76

K-M-G-T

KMRR

KMS

KNFC

KNFC

KNGR

KNS

KNSC

KNSC

KNU

KOPEC

KOPEC

KRIA

KS

KSNM

KSNP

KSNPP

KSNSSS

KSNT

KSP

KSP(P)

K-SRED

K-SSAR

L/C

L/C

L/I

L/I

LAN

LAN

LASER

LB

LBB

LC

LCO

LCO

LCP

LCR

LCS

LD

LDO

20쪽76

LDS

LED

LEF

LER

LERTS

LF

LHR

LIC

LIS

LLNL

LLRT

LLWL

LMS

LNG

LOC

LOCA

LOCA

LOCV

LOE

LOFT

LOOP

LP TBN

LPD

LPG

LPMS

LPPT

LPSI(P)

LPZ

LRA

LRB

LRM

LRS

LRS

LS

LSSS

LSSS

LSU

LTA

LTC

LTOP

21쪽76

LW(M)S

LWA

LWA

LWBR

LWD

LWL

LWMS

LWR

LWR

M/O

M/O

MAC

MAP

MAS

MAS

MBA

MC/H

MCA

MCB

MCB

MCBD

MCC

MCC

MCC

MCL

MCNP

MCP

MCR

MCR

MCS

MDL

MDS(OM)

MEI

MEI

MER

MF(C)S

MFG

MFIV

MG

MGP

22쪽76

MH

MI

MIP

MIS

MIS

MISC.

MIT

ML

ML

MMI

M-MIS

MMSA

MOC

MOST

MOST

MOT

MOU

MOU

MOV

MP

MP

MPR

MPR

MPR

MPS

MPS

MRI

MRP

MRR

MRR

MRS

MS

MSIS

MSIV

MSL

MSLB

MSP

MSR

MSR

MSS

23쪽76

MSS

MST

MST

MSTS

MSV

MSV

MT

MT

MTBF

MTC

MTO

MTS

MTS

MTTF

MWO

MWT

N/A

N/A

NACE

NASA

NBS

NCND

NCR

NCR

NCW(S)

NDCS

NDE

NDE

NEA

NEDS

NELPIA

NEMA

NEQ

NFC

NFMS

NFO

NFPA

NHR

NIMBY

NIMS

24쪽76

NIS

NMA

NNI

NNS

NNS

NPCS

NPI

NPM

NPP

NPP

NPRDS

NPS

NPS

NPSH

NPT

NPT

NQA

NQA

NRC

NRC

NRR

NSAC

NSIC

NSR

NSR

NSSS

NSSS

NSW(S)

NTP

NTP

NUPLEX

NUREG

NUS

NUSS

NWS

O & M

O & MR

OA

OA

OAT

25쪽76

OBA

OBE

OBE

OBS

OBS

OCB

OCI

ODAR

ODAR

ODC

OECD

OECD

OEM

OERTS

OJP

OJT

OJT

OL

OL

OM

OMB

OMC

OMS

OR

ORAB

ORI

OSART

OSC

OSIP

OSR

OST

OTL

OTSG

P & ID

P&ID

P(L)WR

P/O

P/O

PA

PAB

26쪽76

PAB

PAG

PAL

PAL

PAMI

PAMS

PAMS

PASS

PASS

PAT

PAW

PBM

PBNC

PBNCC

PBS

PBS

PC

PC

PC NO.

PCC

PCC

PCF

PCI

PCM

PCN

PCPS

PCPV

PCS

PCT

PD

PDA

PDAS

PDAS

PDCS

PDF

PDIL

PDL

PDL

PDM

PDM

27쪽76

PDP

PDR

PDS

PDU

PE

PE

PED

PEM

PERT

PERT

PGSV(S)

PH

PHWR

PHWR

PI

PI

PICS

PID

PIOS

PIR

PJT

PKG

PL

PLC

PLCEA

PLCS

PLHGR

PLI

PLI

PLR

PLU

PM

PM

PMC(S)

PMDS

PMF

PMO

PMS

PMS

PMS

28쪽76

PNC

PNC

PNS

PNS

POR

PORV

POT

PPCS

PPCU

PPDIL

PPL

PPM

PPM

PPM

PPS

PPS

PQR

PRA

PRDBE

PRINS

PRM

PRM

PRMS

PRN

PRP

PS

PS NO.

PSA

PSA

PSAR

PSAR

PSC

PSCEA

PSCS

PSF

PSG

PSI

PSI

PSM

PSR

29쪽76

PSS

PSV

PT

PT

PTC

PTE

PTS

PUNE

PV(-2)

PVC

PVC

PVNGS

PVRC

PWBS

PWC

PWHT

PWHT

PWR

PWR

PWSCC

PZR

PZR

QA

QA

QADM

QADM

QAP

QC

QC

QCI

QCR

QDU

QP

QP

QR

QR

QTAR

QTS

30쪽76

QTY

QVDL

QVDR

R & D

R/V

RAM

RAR

RAR

RAS

RAT

RAW

RC(S)

RCA

RCB

RCCA

RCDT

RCFC

RCFS

RCGV(S)

RCM

RCMS

RCP

RCP

RCPSSSS

RCS

RDP

RDT

RDT

REM

RERC

RFI

RFP

RFQ

RG

RGS

RH

RHRS

RI

31쪽76

RIC

RIM

RM

RMIEP

RMQC

RMS

RMS

RMWP

RMWT

ROM

RPCCP

RPCS/M

RPE

RPF

RPM

RPS

RPS

RPV

RPV

RRDADS

RRS

RRW

RSB

RSCR

RSI

RSP

RSPT

RSS

RSSH

RSSMAP

RT

RT

RT

RTB

RTD

RTD

32쪽76

RTM

RTM

RT-NDT

RTO

RTO

RTP

RTP

RTSG

RTSR

RTSS

RTU

RV

RVI

RVLMS

RW(S)T

RWB

RWLP

S & L

S&L

S/G

SA

SAA

SAB

SAFDL

SAP(S)

SAR

SAR

SAR

SAROS

SARP

SARRP

SAS

SAT

SAW

SAW

SB

SBCS

SBLOCA

SBM

33쪽76

SBO

SC

SC(S)

SCA

SCADA

SCC

SCCS

SCD

SCH

SCM

SCN

SCP

SCR

SCR

SCS

SCSS

SCU

SD

SD

SD

SD

SDC

SDC(HX)

SDCR

SDDR

SDDR

SDIV

SDR

SDR

SDR

SDS

SDT

SDV

SDV(S)

SE

SEC.NO.

SEE-IN

SEM

34쪽76

SER

SER

SF

SFC

SFG

SFG

SFH

SFP

SFR

SFR

SGBS

SGFS

SGTR

SI

SI

SIAS

SIAS

SID

SIL

SIP

SIR

SIS

SIS

SIT

SIT

SIW

SJAE

SL

SLB

SLI

SLI

SLP

SM

SMAW

SMAW

SMC

SMRS

SND

SNT

35쪽76

SOE

SOER

SOER

SOS

SOV

SPD(S)

SPDT

SPI

SPM

SPT

SPTA

SQCL

SQR

SRA

SRDBE

SRED

SRM

SRM

SRO

SRP

SRP

SRSS

SRU

SS

SSAR

SSCCS

SSE

SSM

SSPC

SSPC

SSPPS

SSS

SST

SSW

STA

STP/OS

SW

SW(M)S

SWCB

36쪽76

SWN

SWYD

SYS 80

SYS 80+

T/G

T/O

T/R

TAA

TB

TBN

TCH

TCHR

TCP/IP

TCR

TCR

TCS

TDAS

TEFC

TEM

TEMA

TF

TFLD

TFT

TGB

THERP

T-hot

TID

TKC

TLD

TLOFW

TMI

TMS

TORC

TPC

TPD

TQM

TS

TSC

TSC

TSP

37쪽76

TT

TTA

TWDS

UBC

UCB

UCN

UCS

UCT

UGS

UIC

UPS

URD

USCEA

USI

USNRC

UT

UT

UTDV

V/O

V/O

VAT

VBPSS

VCT

VDUs

VFC

VLP(M)S

VM

VOPT

VT

W(M)S

W/C

W/H Point

WANO

WBS

WBS

WDN

WEC

WELCO

WFT

WHO

38쪽76

WIR

WITNESS POINT

WPP

WPP

WPS

WPS

WTB

WTO

WVC

WWF

XFMR

XMFR

XPA

YCNP

ZA

ZD

ZPDIL

COFC

39쪽76

원자력 약어집

A/E : Architectural Engineering

Activity Base Cost

Advanced Control complex

Advanced Control Complex Design (ABB-CE’s NUPLEX80+)

American Concrete Institute

Auxiliary Control and Safety Console (center)

Activation Library

Automatic CEDM Timing Module

ACU : Address Control Unit

Asymmetric Digital Subceriber Line

Atmospheric Dump Valve

Atomic Energy Commission

AEO : Atomic Energy Office

내 용Alternating Current 교류Auxiliary Building 원자로보조건물(AB)

Architect Engineer 발전소 종합설계(사)울진3,4호기의 A/E : KOPEC - S & l

A/E : Architect Engineer 종합설계회사Asea Brown Boveri Ltd. (Switserland)*.’89.11.13 CE사 인수ABB : Auxliary Boiler Building 보조 보일러 건물

Advanced Boiling Water Reactor 개량형 비등수로*.비교 : ALWR, APWR

AC : Approval Category 승인등급Air Circuit Breacker 공기회로차단기 *.비교:OCB

ACB : Access Control Building 출입통제건물

ACI : American Concrete Institute 미국콘크리트 협회ACPA : American Concrete Pipe Association 미국 콘크리트 배관 연합Advanced Control Room 개량형 제어실Advisory Committee on Reactor Safeguards원자로안전자문위원회

ACU : Air Cleaning Unit 공기정화기Advanced Design Feature 설계개선사항(표준화관련 검토 41개 개선항목)

Automatic Depressurization System 자동감압계통Automatic Dispatch System

AEA : Atomic Energy Act 원자력법

AEC : Atomic Energy Commission 원자력위원회Atomic Energy Of Canada, Ltd. 카나다원자력공사(WOLSONG #2 NSSS주계약자)

Analysis and Evaluation of Operation Data운전자료분석평가Advanced Energy Technology, Inc. (AET사)

Air Filter 공기여과기Advanced Fuel Assembly 개량형연료집합체

40쪽76

Advanced Instrumentation Design

American Iron and Steel Institute

As Low As Practicable

ALR : Activity Listing Report

Automatic (CEA) Motion Inhibit

ATWS Mitigation System Actuation Circuity

Auxiliary Protective Cabinet

Auxiliary Feedwater Actuation Signal 보조급수작동신호Association Francaise des Normes (프랑스 Code명)

AFP : Auxiliary Feedwater Pumps 보조급수펌프AFR : Audit Finding Report 감사지적사항 보고서AFTA : Asian Free Trade Area 아시아 자유무역 지역AFU : Air Filtration Unit 공기여과장치Auxiliary Feed Water (System) 보조급수(계통)

Advanced Gas-cooled Reactor 개량형가스냉각로Aqueous Homogeneous Reactor 수용액균질로AHU : Air Handling Unit 공기조절장치AIA : American Institute of Architects 미 건축기구AIA : Authorized Inspection Agency 공인검사기관American Institute of Chemical Engineers미국화공연구소

Atomic Industry Forum 원자력산업회의American Institute of Steel Construction미국철강연구소AISC : American Institute of Steel Construction 미국철강연구소

AISI : American Iron and Steel Institute 미국철강협회

As Low as Reasonably Achievable방사성피폭저감설계개념ALI : Annual Limit of Intaked 연간섭취한도Acoustic Leak Monitoring System 음향누설탐지계통(TMI후속조치로 PSV,RCP Seal,ICI Seal, Hot/Cold Leg및 R/V Head등에서의 누설탐지계통)

Advanced Light Water Reactor 개량형경수로(EPRI개발중 : APWR 및 ABWR)

Automatic Motion Inhibit Signal CEA 자동운전금지신호Accident Monitoring System 사고감시계통

Authorized Nuclear Inspector 원자력공인검사관ANI : Authorized Nuclear Inspector 공인원자력검사자(기관)Arkansas Nuclear One(-Unit 2) *.비교 : PV-(2)*.YGN 3&4의 ReferenceDesign(R/V,RI,RCS,I&C기능, RCP설계/시험 등)Arizona Nuclear Power Project(미)아리조나원자력프로젝트American Nuclear Society 미국원자력협회ANS : Amenrican Nuclear Society 미국원자력학회American National Standards Institute미국국립표준연구소ANSI : American National Standard Institute 미국국립표준학회Anticipated Operational Occurrence 예상운전사고

41쪽76

Auto Power Spectral Density

Alternate Reactor Trip System

American Safety and Civil Engineers

Alternate Shutdown Control System

Accident Sequence Evaluation Program

Asymmetric Steam Generator Transient(Trip)

Axial Shape Index

Approved Supplier List

Accident Sequence Precursor

Accident Source Term Program Office

Acceleration Thermal Limit

Anticipated Transient Without Scram

Anticipated Transient Without Trip

Approved Vendor List

American Wire Gage

Automatic (CEA) Withdrawal Prohibit

American Water Works Association

Axial Power Distribution (Synthesis)축방향출력분포(합성) *.CPC기능APM : Assistance Project Manager 사업관리 부책임자American Physical Society 미국물리학회Alternate Protection System

Advanced Pressurized Water Reactor 개량형PWR*.비교 : ALWR, ABWR

American Standard Association 미국표준협회As-built drawing : 준공도면As-built DWG. : 실측도면

ASD : Allowable Stress Design 허용응력 설계법Atmospheric Steam Dump valve 대기증기방출밸브American Society of Mechanical Engineers 미국기계학회

ASME : American Society of Mechanical Engineers 미국기계학회American Society of Non- destructive Testing미국비파괴시험협회ASNT : American Society of Nondestructive Testing 미국비파괴검사학회

American Society for Testing and Materials미국재료시험협회ASTM : American Society for Testing & Materials 미국재료시험학회

Authorization to Proceed (사전)작업착수지시서*.Scope, Payment, Validity명시 – “준계약”ATP : Authorization To Proceed 작업착수 지시서Automatic Test System 자동시험계통

AVC : Automatic Volume Control 자동체적제어

AVL : Approved Vendor List 승인업체목록AVT : All Volatile Treatment 전휘발성처리

American Welding Society 미국용접학회AWS : American Welding Society 미국용접학회

42쪽76

Boiler and Pressure Vessel (ASME Code)

Boric Acid Batch Educator

Boric Acid Condenser Ion Exchanger

Boric Acid Make- Up Pump

Buy Back Order

Boron Dilution Alarm System / BOP Data Acquisition System

Basic Human Error Probability

Bank Insertion with a Stuck CEA

Built In Test Equipment

Brach Line Pipe Break

Build Own Operation

Build Own Operate Transfer

Build Operation & Transfer

Backup Reactor Trip

BTP : Branch Technical Position

AWWA : American Water Works Associations 미 수공사 연합Axial Economizer Steam Generator Thermal Analysis(Code명)

Bill Of Lading 선하증권B/S : Balance Sheet 대차대조표-특정시점의 재무상태를 나타내는 표

Boric Acid Concentrator 붕산농도측정기

Beginners All-purpose Symboric Instruction Code (전산용어)

Boric Acid Storage Tank 붕산수저장탱크

Burst Cartridge Detector 파손연료봉검출장치*.비교 : BSD, FFD Binary Coded Decimal

Boron Concentration Measurement System붕산농도측정계통(“Boronometer”)

Boron Dilution Protection System 붕산농도희석방지계통BEP : Break Even Point 손익분기점

Boron Injection Tank 붕산수주입탱크

BOD : Biochemical Oxygen Deamand 생화학적 산소요구량BOM : Bill of Material 자재명세표

Balance of Plant 보조기기BOP : Balance of Plant 보조설비BOS : Bottom Of Slab 슬래브 바닥

Boron Recycle System 붕산수회수계통(*CE사 Design : “CVDS”에 포함)

Burst Slug Detector 파손연료봉검출장치*.비교 : BCD, FFD

Basic Subject Index (월성#2 : CANDU 기본기기목록)

Boron Thermal Regeneration System 붕소열재생계통BTU : British Thermal Unit 영국열량단위Boiling Water Reactor Owner’s Group비등수로 발주자그룹Boiling Water Reactor 비등수로(비등수형 원자로)

BWS : Boiling Water Reactor 비등경수로

43쪽76

Certificate of Compliance

Computer Aided Drawing(Drafting)

Commerce At Light Speed

Computer Automated Measurement and Control

CAPS : Construction Activity Package System

Customer Aid for Remote Evaluation and Support

Complementary Cumulative Distribution Function

Construction Complete Group

CCG : Construction Complete Group

COLSS/CPC Improvement Program

Component Control Logic Module

CEA Core Mimic Display

Component Cooling Water Pump

Code Division Multiple Access

Cost and Freight 운임포함가격(해상운임조건)

Curriculum Vitae 이력(서) *. Resume

Certificate of Origin (무역물품) 원산지증명서

CAD : Computer Aided Design 컴퓨터설계Computer-Assisted Instruction컴퓨터원용수업(교육용Program)

CALS : Commerce At Light Speed 광속거래

Canadian Deuterium Uranium 카나다 증수로*.비교 : AECL, OCI

CAR : Corrective Action Request 시정조치 요구서

Committee on Assurance of Supply 핵공급보장위원회Chemical Additive Tank 화학첨가탱크Computer Assisted TrainingConstruction Acceptance Test

Common Cause Failure 공통원인실패(소내비상전력신뢰도)

CCN : Contract Change Notice 계약변경보고서Centrifugal Charging Pump 원심구동품프*.비교 : PDP

Component Control System (ESF) 기계제어계통Core Calculation System 노심연산계통Component Cooling System

CCS : Component Cooling System 기기냉각수 계통CCS : Construction Contract Schedule 건설계약일정CCTV : Closed Circuit Television 폐쇄회로TV

CCW(IS) : Component Cooling Water(Intake Structure) 기기냉각수(건물)

Component Cooling Water(System) 기기냉각수(게통)

Component Design 기기설계Conceptional Design 기본설계(월성#2)

Core Disruptive Accident 노심파열사고Core Damage Frequency 노심손상빈도(노심용융발생빈도)Cumulative Distribution Function

CDS : Construction Detail Schedule 건설상세일정Combustion Engineering, Inc. (CE사)*.’89.11.13, ABB사에서 인수 (Acquisition)

Control Element Assembly 제어봉집합체

44쪽76

CEA : Concrete Expansion Anchor

Combustion Engineering Standard Safety Analysis Report(SYSTEM 80)

Core Exit Thermocouple

Cavity Flooding System

CH : Channel

Conditional Human Error Probability

Closure Head Lift Rig

Containment Isolation

Contact Input

CI : Construction Issue

CIF : Cost, Insurance and Freight

CIP : Cast-in-place Pile

Control Element Assembly Calculator 제어봉집합체계산기CEAS : Control Element Assembly System 제어봉집합체계통Control Element Drive Mechanism 제어봉구동장치*비교 : CRDM

CEDM : Control Element Drive Mechanism 제어봉 구동장치Control Element Drive Mechanism Control System제어봉구동장치제어계통Combustion Engineering Nuclear Power DivisionCE사 원자력본부CEO : Chief Executive Officer 최고경영자

CFF : Cash Flow Forecast 공사비소요계획서Critical Function Monitor 주요기능감시기기CFM : Contractor Furnished Material 공급자제공재료Critical Functions Monitoring System주요기능감시계통CFMS : Critical Function Monitoring System 필수안전기능감시계통Code of Federal Regulations (미)연방규제법Cost and Freight (수입항까지 운입조건, Insurance 제외)

CFR : Claim Feed-Back Report 클레임처리 보고서CFR : Code of Federal Regulation 미국 연방 규제법

Cold Functional Test 상온기능시험 *.비교 : HFT

CFT : Cold Functional Test 상온기능시험

CHB : Chlorination Building 염소 주입(생산) 건물

Critical Heat Flux (Ratio)한계열유동(비)-GE사의 안전해석방법 *.비교 : DNB(R)

Containment Heat Removal System 격납용기열제거계통Cold Hydraulic Test 상온수압시험CHT : Cold Hydro Test 상온수압시험

Containment Isolation Actuation Signal격납용기격리신호(방사능 물질이 함유된 유체계통을 격리시켜 외부 누출을 방지 – SIAS에 관련된 안전변수(수동)

Construction Information Control System시공정보관리계통CICS : Construction Information Control System 건설정보관리시스템Cost, Insurance & Freight운임보험료포함가격(해상운임조건)

45쪽76

CIP : Construction Inspection Plan

CIS : Construction Intermediate Schedule

Consequence Limiting Control System

Containment Liner Plate

Crane Manufacturers Association of American

Council for Mutual Economic Assistance

Common Mode Failure

CEA Motion Inhibit

Composite Memory Module

CMS : Cable Management System

COC : Computer Operation Center

COC : Construction of Code

Cost of Poor Quality

Content Provider

Cost and / or Price of Component

CIR : Critical Items Report 중요문제점보고서

Core Limit Monitoring System 노심한계감시계통

CLP : Containment Liner Plate *원자로내부벽체, SLP(외부벽체)

Control– Room Mutiplexer Terminal *.비교:FMT

Certified Material Test Report 재료검사성적서CMTR : Certified Material Test Report 자재시험 성적서CO :Construction Order 건설작업지시서CO : Commercial Operation 상업운전COC : Certificate of Compliance 자재보증서COC : Certificate of Conformance 품질보증확인서

Commercial Operation Date 상업운전일COD : Construction Operation Date 상업운전일COL : Combined Licence (원전건설,운영)통합허가Core Operation Limit Supervisory System노심운전제한조건감시계통COMP-DWG : Component drawing 기기도면

COPQ : Cost Of Poor Quality 품질손실비용COS : Change Of Scope 역무변경Construction Permit 건설허가 *비교 : OLCathodic Protection

CP : Construction Permit 건설허가CP : Construction Package 시공 페키지CP-A1 : Major Buildings and related Structures(본관구조물 신축공사)

CP-A2 : Architectural Finishes,Equipment,and Materials(마감공사)

CP-A3 : Field Finish Coating/Painting(도장공사)

Core Protection Calculator 노심보호연산기CPC : Cost Price Component 원가요소

46쪽76

Cross Power Spectral Density

Containment Post Tensioning System

CRD : Concrete Research Division

Control Room Design Reviews

Nuclear Plants

Committee for Review of Generic Requirements

Customer Relationship Management

CP-C1 : Excavation / Backfill(기초굴착 및 되메우기)

CP-C2 : Concrete Production(콘크리트 생산공사)

CP-C3 : Yard and Underground Work(옥외매설물 설치공사)

CP-C4 : Cooling Water System Structures(냉각수계통 구조물공사)

Core Protection Calculator System노심보호연산기계통 : DNBR/LPD 및 CEA운전중 예상 사고시 DNBR 및 LPD가 허용된 핵연료설계기준을 초과시 원자로를 자동정지CP-E1 : Electrical Equipment Installation(전기기기 설치공사)

CP-E2 : Cabling & Termination(전선포설 및 결선공사)

CP-E3 : Switchyard(옥외 개폐소 기기 설치공사)

CP-E4 : Instrumentation & Control(계측제어설비 설치공사)

CP-E5 : Security / Communication System(통신 및 보안설비 공사)

Computer Products Inc. (CPI사)

Critical Path Method 주공정관리 *.비교 : PERT/CPM

CPM : Critical Path Method 주공정관리방법CP-M1 : Mechanical Equipment Installation(보조기기 설치공사)

CP-M2 : Condenser Installation & Erection (복수기 설치공사)

CP-M3 : Turbine-Generator Installation & Erection(터빈/발전기 설치공사)

CP-M4 : HVAC System Installation(공기조화설비 설치공사)

CP-M5 : NSSS Equipment Installation(원자로 설비 설치공사)

CP-M6 : Field Erected Tanks(현장조립탱크 설치공사)

CP-M7 : Equipment Finish Coating/Painting(기기 도장 공사)

CP-P1 : Piping(배관 설치공사)

CP-P2 : Insulation(보온공사)

CP-S1 : Start up Support during Component&System Function Test(시운전공사)

CP-S2 : Start up Support during Fuel Load&Power Ascension Test(핵연료장전시험)

CP-T1 : Nondestructive Examination Services(비파괴 공사)

CP-T2 : Preservice Inspection(사용전 검사)

Central Processing Unit 중앙처리장치CR : Cause of Revision 수정사유Call Recording Analyzer *.비교 : XPA

Control Rod Drive Mechanism (CE사 “CEDM”)

Classroom Training 강의실교육 *.비교 : OJTCathode- Ray Tube 음극선관(브라운관)

핵연료부식생성물(침전물)

47쪽76

Clean Radwaste

Condensate Steam Air Ejector

CSB : Core Support Steel

CSB : Current Schedule Barchart

Committee on the Safety of Nuclear Installation

Condensar Tube Cleaning System

Critical To Quality

Control Valve

Chilled Water (System)

CEA Withdrawal Prohibit

Data Base Management System

Dose Calculational Methodology

CS No. : Contract Serial Number 계약일련번호Containment Spray (System) 격납건물 살수(계통)

Containment Spray Actuation Signal 격납용기살수작동신호*.LOCA 또는 MSLB등 격납용기 고압력시 격납용기 내부대기의 열을 제거

CSI : Customer Satisfaction Index 고객만족지표

CST : Condensate Storage Tank 복수저장탱크CST : Critical Success Theme 중점실천계획

CTQ : Critical To Quality 중요품질특성CU : Currency Unit 통화단위

CV : Containment Vessel 격납용기Comprehensive Vibration Assessment Program원자로내부구조물진동시험Chemical & Volume Control System화학 및 체적제어계통Cooling Water 또는 Circulating Water냉각수 또는 순환수CW : Circulation Water 순환수

CWIS : Cooling Water Intake Structure 순환수건물

Direct Current 직류Data Acquisition System 자료수집계통Disturbance Analysis System

DAS : Data Acquisition System 자료DB : Data Base 데이터베이스Design Basis Accidents 설계기준사고*.10CFR, RG, SRP + ESF설계(노심용융방지)

DBA : Design Basis Accident 설계기준사고Design Basis Event 설계기준사고Design Basis Earthquake 설계기준지진강도*.비교 : OBE, SSEDBE : Design Basis Earthquake 설계기준지진

DBMS : Data Base Management System DB관리체계Design Certificate (by NRC for Specific Plant)설계인증 *.비교 : PDA, FDA

Digital Class 1E Control System디지털등급1E제어계통

DCM : Design Change Manual 설계변경메뉴얼DCN : Design Change Notice 설계변경지시서DCN : Design Criteria Notice 설계기준보고서

48쪽76

Design and Engineering Interface Support Services

DET : Detector

Digital Flux Mapping System

Decade Heat Removal

DIR : Design Interference Report

Data Link

Direct Memory Access

Digital Metal Impact Monitoring System

Design Network Flow Diagram

Discrete Ordinate Transport

DCP : Design Change Package 설계변경패키지Deviation of Contract Requirements 계약변경요구서DCR : Deviation of Contract Requirement 계약변경요구서Detailed Design 상세설계(월성#2)

Direct Digital Control 직접디지탈제어기술 *.비교 : RMS

Drawing and Document Control Center 자료관리실DDCC : Document and Drawing Contorol Center 자료관리실Drawing and Document Control Log 자료관리대장Document Deficiency Notice 자료상이통보서DDN : Document Deficiency Notice 자료상이 통보서Document Delivery Schedule 자료제출일정Design Data Status

DDS : Document Delivery Schedule 자료제출 일정Double Ended Guillotine Break양단 기요딘(절단)파열(사고) *.비교 : LBB

DEL'Y : Delivery 납기DEP : Design External Pressure 설계외부압력DEPT : Department 부서

DFC : Design Field Change 현장설계변경

Dry- film Thickness (of Coatings)건조후 도막두께 *.비교 : WFT

DFT : Dry Film Thickness 건조도막두께DGB : Diesel Generator Building 디젤제네레이터 빌딩Diesel Generator Controls 디젤발전기제어

Discrete Indication and Alarm System이산지시 및 경보계통DIP : Design Internal Pressure 설계내부압력

DM : Design Margin 설계여유도

Departure from Nucleate Boiling (Ratio)핵비등이탈(비) *.비교 : CHF(R)

(U.S) Department of Energy (미국)에너지성DOE : Department of Energy 미국 에너지성Division of Responsibility 책임구분DOR : Division Of Responsibility 책임(업무)분장Disk Operation System 소프트웨어운영체제(전산용어)

49쪽76

Digital Process Control (System)

Double Pole Double Throw

Dropped Rod Contact

Digital Rod Position Indicator

Dynamic Strain Aging

Diverse Shutdown System

Electro- Pneumatic (Converter on Turbine Bypass Valve)

Event Analysis Branch

ECCS : Emergency Core Cooling System

Engineering Change Notice

EDB : Electric Duct Bank

Digital Plant Protection System 디지털발전소보호계통Data Processing System 정보처리계통Diverse Protection System

DPT : Dew Point Temperature 이슬점온도DR : Design Requirement 설계요구서Deterministic Risk Assessment결정론적 위험도 평가 *.비교 : PRA,SRA

Digital Radiation Monitoring System디지털방사선감시계통DRN : Design Drawing/Document Review Notice 설계검토지시서

Document Review Sheet 자료검토결과서DRS : Document Revier Sheet 자료검토 결과서

DSN-SPEC : Design Specification 설계사양서

DTR : Document Transmittal Record 문서전송기록Document Transmittal Sheet 문서배포전DTS : Document Transmittal Sheet 자료배포전Direct Vessel Injection 원자로직접주입(방식)

Digital Voltage Meter 계수식 전압측정기

EA : Environmental Assessment 환경평가

EAB : Exclusion Area Boundary 비거주지역 경계EAN : Event Analysis Notification 사고분석보고Experimental Boiling Water Reactor 비등수로실험로Emergency Core Cooling System 비상(용)노심냉각계통*.Crud유출 최소화, 노심손상억제, 연료봉/경수(Zr + H2O)반응억제(관련계통 : Active SIS, Passive SIS 및 재순환계통)

ECN : Engineering Change Notice 기술변경보고서Eddy Current Test 와(전)류탐상시험Emergency Cooling Water (System) 비상냉각수(계통)

Electricite de France 프랑스전력청EDG : Emergency Diesel Generator 비상용 디젤 발전기Electronic Data Processing System 컴퓨터정보처리조직EDPS : Electronic Data Processing System 전자정보처리장치Equipment Drain Tank 기기배수탱크EDT : Equipment Drain Tank 기기배수탱크

50쪽76

EEI : Electrical Equipment Index

Engineering and Generic Communications Branch

EGL : Engineering Group Leader

Electro Hydraulic Control

Electro Magnetic Interface

Evaluated Nuclear Data File

Evaluated Nuclear Data Library

Engineering Procurement Construction

EPC : Engineering Procurement Construction

Electrical Power Distribution

Emergency Procedure Guidelines

EPM : Engineering Procedure Manual

EPMS : Engineering Progress Measurement System

EQ : Equipment Qualification

EQA : Engineering Quality Assurance

Electrical Equipment Index 전기설비지수 *.비교 : MEI

Emergency Feedwater 비상급수Emergency Feedwater Actuation Signal 비상급수작동신호Effective Full Power Days/Years 총유효가동일/년Emergency Feedwater System 비상급수계통(또는 EFWS)

EGS : Engineering Group Supervisor A/E 기술분야 책임자

EIS : Engineering Information System 기술정보체계EIS : Environmental Impact Statement 환경영향 평가 보고서Electro- Mechanics (CE계열사)

EMS : Energy Management System 에너지관리시스템

Ex-core Neutron Flux Monitoring System노외중성자속감시계통 – R/V밖으로 새어나오는 중성자수를측정하여 연쇄반응 및 열에너지의 정도를 간접 측정/감시ENG'G : Engineering 기술Emergency Offsite Facility 소외비상대책운영실Emergency Operations Facility(원전현장)비상운전본부 *.비교 : TSC, OSC

EOF : Emergency Offsite Facilities 발전소 비상대책본부EOP : Emergency Operating Procedures 비상운전절차서Electrostatic Precipitator 전기집진기EP : Engineering Procedure 기술절차서Economic Planning Board 경제기획원

Electric Power Research Institute (미)전력연구소Emergency Planning ZoneExclusion Population Zone *.비교 : LPZ

Equipment Qualification 기기검증*안전성관련 기기의 설계/제작시 이들 기기에 미칠수있는 환경조건과 지진등 자연현상에 의한 영향을 평가반영(내환경, 내진)

EQUIP-SPEC : Equipment specification 기기사양

51쪽76

ER : Engineering Release

Enterprise Resource Plan

ES : Early Start

Extension Shaft Assembly

Excess Steam Demand Exent

Emergency Safety Features Availability Monitoring System

ESS : Engineering Summary Schedule

ESW : Electro Slag Welding

EU : Engineering Unit

EWS : Engineering Working Schedule

Frequency (Phase) Shift Keying

Fail As Is

FAS : Free Alongside Ship

Fuctinal Breakdown Structure

FBS : Functional Break-Down Structure

Fail Closed

Environmental Report 환경영향평가보고서Engineering Review 기술검토

ER : Environmental Report 환경영향평가서Emergency Response Facility 비상대응설비*.YGN 3&4 : EOF, TSC, OSC

ERP : Enterprise Resource Planning 전사자원관리시스템Equipment Supply 기기공급ES : Equipment Supply 장비공급

Engineered Safety Features 공학적안전설비*.DBA시 발전소 종사자 및 대중의 재산과 생명을방사능으로부터 보호하는 설비*.관련계통 : ECCS, Habitability System(제어실근무환경),격납계통(열제거, 공기정화), AFWS

ESF : Engineered Safety Features 공학적 안전설비

Engineered Safety Features Actuation System공학적안전설비작동(구동)계통*.RCPB파단시 일정량이상의 방사능물질이 대기로 누출되는 것을 방지하는 기능(SIAS,CIAS,CSAS,MSIS,EFAS,RAS)

ESW : Essential Service Water 필수냉각수Engineered Test Reactor 공학실험로(일)

Engineering Unit (Operator Monitoring Function)Enriched Uranium 농축우라늄

EU : Enriched Uranium 농축우라늄EVMS : Earned Value Management System 건설PJT 계획대비 성과측정기법Elementary Wiring Diagram 제어회로도면(전기관련집약)

EX : Exchanger 교환기EXCH : Exchange 환율

FAR : Field Action Request 현장조치요구서

Fast Breeder Reactor 고속(중성자)증식로

Function- Bases Task Analysis 기능기준임무분석

FC : First Concrete 최초콘크리트

52쪽76

Flux Cored Arc Welding

FECN : Field Engineering Change Notice

Failure Effect Mode Analysis

FES : Front End Schedule

FF : Finish to Finish

FI : Final Issue

Flow Induced Vibration

Full Load Ampere

Failure Mode of Effect Analysis

FMEA : Failure Modes and Effects Analysis

FMR : Field Material Requisition

FOD : Forecast on Site Date

Full Power Dependent Insertion Limit

Federal Register

FR&P : Form, Rebar & Pouring

Failure Reports Tracking System

FS : Finish to Start

Floridians United for Safety Energy, Inc.

Feed Water Line Break

FCN : Field Change Notice 현장설계변경통보서FCR : Field Change Request 현장설계변경요구서Final Design Approval (by NRC) 최종설계승인*.비교 : PDA, DC

Failed Fuel Detector 파손연료봉검출장소*.비교 : BCD, BSD

Fast Flux Test Facilities 고속중성자 동시험설비FHA : Fuel Handling Accident 핵연료취급사고FHB : Fuel Handling Building 핵연료건물

Fixed In- core Detector Amplifier System고정식 노래 중성자속 검출기 증폭 계통

Full Length Emergency Cooling Heat Transfer전길이LOCA시 열전달시험기

Field Multiplexing Terminal *.비교 : CMT

First of A Kind Engineering(전체설계 공정중 50~60% 진행된 상태일)

Free on Board 본선인도(해상운임조건)

Fission Products 핵분열생성물

Fiberglass Reinforced Plastic 유리섬유강화 플라스틱

Final Safety Analysis Report 최종안전성분석보고서*.비교 : (P) SAR

FSAR : Final Safety Analysis Report 최종안전성 분석보고서FSP : Fuel Storage Pool 핵연료 저장조

Feedwater Control System (주)급수제어계통*.정상운전시 S/G Blowdown 수위를 유지하고, 과도상태시에도(Rx Trip, S/G고수위, 1대의 급수펌프기능상실등) 자동운전제공*.S/G수위제어 : Downcomer V/V Economizer V/V

GA : General Arrangement 일반배열(도면)

General Arrangement (Drawing) 일반배열(도면)

53쪽76

GCS : Gate Control System

Graphics Display System

GE : General Electric, Co

(CE’S) Generator Services and Inspection System

GIB : Gas Insulated Bus

GIS : Gas Insulated Switchgear

Generic Issues Tracking System (Distributed by NRC)

Gas Metal Arc Welding

GQA : Group Quality Assurance

Gas Stripper Effluent Radiation Monitoring System

GSI : General Safety Issue

Gas Tungsten Arc Welding

GTAW : Gas Tungsten Arc Welding

Graphic User Interface

Head Area Cable Tray (System) : for R/V

Human Computer Interaction

HDMS :

Historical Data Storage and Retrieval (System)

Human Engineering Discrepancy

Human Error Probability

Head Equipment Support Structure

Human Factor Engineering

Generator Current Breaker 발전기 차단기

General Design Criterion(Criteria) 일반(핵) 설계기준(요건)

GDC : General Design Criteria 일반설계기준

General Electric Co. (GE사)

The General Electric Co., Ltd. (영국 GEC사)

Generator 발전기

Gross Electrical Output 총전기출력

Generic Letter (NRC의 일반규제공문)

GSAW : Gas Shield Arc Welding 가스피복아크 용접

Generic Safety Issue 일반안전성문제(NRC지정)*.비교 : USI

General Terms & Conditions 계약일반조건(또는GT&C)

GTC : General Terms and Condition 일반조건

Gaseous Waste(Management) System기체페기물(처리)계통

HEPA : Hign Efficiency Particulate Air Fillter 고영향 부유 미립자

HEU : Hign Enriched Uranium 고농축 우라늄

Hot Functional Test 고온기능시험 *.비교 : CFT

HFT : Hot Fuction Test 고온기능시험Highest High Water Level 최고(설계)수위

54쪽76

High Pressure Core Spray (System) (for BWR Plant)

Human Reliability Analysis

Heat Recovery Steam Generator

Human Success Probability

HV : High Voltage

Irradiation- Assisted Stress Corrosion Cracking

Integrated Assessment Team Inspection

IBS : Intelligent Building System

ICI : In Core Instrument

International Commission of Radiological Protection

Integrated Control System

Integrated Data- base Management System

IE : Industrial Engineer

Heated Junction Thermocouple (System)노심내 수위감시 열전대(계통)

HOLD POINT : 필수확인점HP : High Pressure 고압High Pressure Turbine 고압터빈

High Pressure Safety Injection 고압안전주입

HRA : Human Reability Analysis 인간신뢰도 분석

HVAC : Heating Ventilation & Air Conditioning 공기조화계통Heating, Ventilation and Air Conditioning (System)공기조합설비(계통)

High Water Level 고(설계)수위HWR : Heavy Water Reactor 중수로HX : Heat Exchanger 열교환기Instrumentation and Control 전기계장설비I&C : Instruments & Controls 계측제어Input / Output Multiplexer 입.출력 다중송신기I/S : Income Statement 손익계산서-일정기간의 경영성과를 나타Instrument Air (System) 계장용공기(계통)

International Atomic Energy Agency 국제원자력기구IAEA : International Atomic Energy Agency 국제원자력에너지기구

Intercontinental Ballistic Missile 대륙간 탄도탄International Business Machines (IBN사)

Inadequate Core Cooling (Monitoring) System부적정노심냉각(감시)계통*.TMI후속조치로, 사고시 정확한 노심상태 진단을 위해,노심출구온도, R/V수위, 노심RC의 Sub-cooling Margin계산을 위한 자료를 MCR에 지시Initial Core Design 초기노심설계(KNFC-KAERI)

In- Core Instrumentation (System) 노내계축(계통)*.노심내 핵연료집합체의 실제 출력분포도를 측정하는설비(Detectors : 45 Ass’y X 5)

ICS : Integrated Control System 종합제어계통Industry Degraded Core Rulemaking (Program)1) Hydrogen Generation/Control 2) Core Debris Coolability 3) Direct Containment Heating 4) Containment Venting

55쪽76

Integral Fast Reactor

Integrated Leak Rate Test

Integrated Logic Support

Information Management System

In- Operable

Institute of Nuclear Power Operations

Information Provider

Industrial Process Information and Control System

IPP : Independent Project Producer

Independent Reviewer

Interim Reliability Evaluation Program

IRR : Interface Review Report

In- Containment Refueling Water Storage Tank(RWST + Recircul. Sump)

Integrated Safety Assessment Program

ISI : In Service Inspection

Institute of Electrical and Electronic Engineers전기, 전자학회

Intergranular Attack (S/G Tube재료의 입자경계부분에서의화학작용으로 Tube표면이 점상으로 인한 손상)*.비교 : SCC

ILRT : Intergrated Leak Rate Test 총누설율 시험

Integrated Manufacturing Quality Plan종합제조품질계획서IMQP : Intergrated Manufacturing Quality Plan 종합제조 품질계획서

Idaho National Engineering Laboratory아이다호국립연구소International Nuclear Information System국제원자력정보체계(IAEA)

International Nuclear Safety Advisory Group국제원자력안전자문단(‘84-, IAEA구성 지원)

IP : Internal Procedure 내부절차서Individual Plant Examination(Evaluation)발전소별 안전성 점검

Internal Project Procedures Manual(내부)사업관리절차서IPPM : Internal Project Procedure Manual 사업관리절차서Integrated Project Schedule 종합사업계획International Plutonium Storage 국제플루토늄저장(회의)Integrated Plant Assessment 발전소 종합평가IPS : Intergrated Project Schedule 시공관리기준공정표Integrated Process Status Overview전공정 현황조사(종합정보화면)

Interface Requirements Documents 연계관련자료IRD : Interface Requirements Documents 연계관련자료

Incident Reporting System 사고보고체계*. IAEA의 운전경험교류SYSTEM으로 ‘83- 운영

Instrument Society of American 미국기계협회

In- Service Inspection 가동중 검사 *.비교 : PSI

ISO : International Standardization Organization 국제표준기구In- Service Testing 가동중 시험

56쪽76

Improved Standard Technical Specification

ITB : Intermidate Block

Isothermal Temperature CoefficientIntegrated Transaction Controller

Intercept Valve

Internal Vibration and Monitoring System

Interconnection Wire Diagram

Joint Human Error Probability

KAIST : Korea Advanced Institute of Science & Technolgy

Korean Association for Radiation Protection

Keyboard

Korea Electric Association

Korea Energy Economics Institute

Korea Institute of Energy & Resources

Invitation To Bid 입찰안내서

ITB : Invitation To Bid 입찰안내서

International Thermonuclear Experimental Reactor국제열핵융합실험로ITP : Inspection & Test Plan 검사 및 시험계획서

Japanese Industrial Standards 일번공업규격JIS : Japanese Industrial Standard 일본공업규격JIT : Just In Time 적기(適期)

JNCC : Joint Nuclear Control Commission 핵통제공동위원회Joint System Design 공동설계(KAERI-CE)

JSD : Joint System Design 조인Korea Atomic Energy Research Institute한국원자력연구소KAERI : Korea Automic Energy Research Institute 한국원자력연구소Korea Atomic Industrial Forum, Inc. 한국원자력산업회의Korea Advanced Institute of Science & Technology 기술원

Korea Development Institute 한국개발원

KEDO : Korean Peninsula Energy Development Organization 한반도에너지개발기구

Korea Electric Power Corporation 한국전력공사KEPCO : Korea Electrical Power Corporation 한국전력공사㈜KEPIC : Korea Electric Power Industry Code 전력산업기술기준Korea Electric Power Operation Services Co., Ltd.한국전력보수(주)

Korea Heavy Industries & Construction Co., Ltd.한국중공업(주)

KHIC : Korea Heavy Industries & Construction Co., Ltd 한국중공업㈜

Korea Institute of Machinery & Metal 한국기계연구소KIMM : Korea Institute of Machinery and Metals 한국기계연구원Korea Institute for Nuclear Safety한국원자력안전기술원(기존의 KNSC)

KINS : Korea Institute Nuclear Safety 한국원자력안전기술원Korea Institute of Science & Technology한국과학기술연구소

57쪽76

Kilo(10*3)- Mega(10*6)- Giga(10*9)- Tera(10*12)

Korea Nuclear Units

Korea Radioisotope Association

Korean Industrial Standard

Korean Society of Nuclear Medicine

Korean Standard Nuclear Steam Supply System

Korean Society for Nondestructive Testing

Load Center

Local Area Network

Locked Closed

Load Dispatch Office

Korean Multi- purpose Research Reactor*.’89.03 ~ ’92말 가동KMS : Knoweldge Management System 지식관리시스템Korea Nuclear Fuel Company 한국핵연료(주)

KNFC : Korea Nuclear Fuel Co.,Ltd 한국원전연료㈜KNGR : Korea Next Generation Rector 한국차세대원자로 Korean Nuclear Society 한국원자력학회Korean Nuclear Society Center한국원자력안전센타 (KINS로 변경)

KNSC : Korea Nuclear Safety Committee 한국원자력안전위원회

Korea Power Engineering Company, Inc.한국전력기술(주)

KOPEC : Korea Power Engineering Company, Inc. 한국전력기술㈜

KSNP : Korean Standard Nuclear Power Plant 한국표준형 원자력발전소Korean Standard Nuclear Power Plant 표준원전

Korea Standardization Plan 표준화계획Korea Standardization Project (Phase) 표준화1-5단계Korea PWR Standard Requirements Document표준원전설계요건(케이 스레드)

Korea PWR Standard Safety Analysis Report표준원전안전성분석보고서(케이 싸르)

Letter of Credit 신용장

Letter of Intent 발주의향서L/I : Letter of Intent 발주의향서

LAN : Local Area Network 지역네트워크Light Amplification by Stimulated Emission of Radiation(빛의 증폭장치)

LB : Large Bore 대구경Leak Before Break 파단전 누설(개념) *.비교 : DEGB*.고에너지배관의 경우, DEGB발생확율보다는 파단전에내부고에너지유체가 누출되면서 감압될 확률이 훨씬크고,신속한 감압감지/후속조치등으로 DEGB를 방지개념Limiting Condition for Operation정상운전제한조건(COLSS)

LCO : Limiting Conditions for Operation 운전제한조건Local Control Panel 현장제어반Logarthmic Count Rate 대수적 계수율 *.비교 : MSV

Local Control Switch 현장제어스위치Lethal Dose 치사선량

58쪽76

Light Emitting Diode

Lower End Fitting

Licensing Event Report

Licensee Event Report Tracking System

LF : Late Finish

Linear Heat Rate

Level Indication and Control

Licensing Information Service

Lawrence Livermore National Laboratories

LOE : Level Of Effort

LOOP : Loss Of Offsite Power

Low Power Physics Test

Low Pressure Safety Injection (Pump)

Locked Rotor Ampere

Licensing Review Basis

Load Reference Motor

Liquid Radwaste System

LS : Late Start

Limiting Safety System Setting

Loader Storage Unit

Less Than Adequate

Low Temperature Over Pressuration/Overpressure Protection

Leak Detection System 누설감지설비

LLRT : Local Leak Rate Test 국부누수율시험Lowest Low Water Level 최저(설계)수위Leak Monitoring System 누설감지계통LNG : Liquefied Natural Gas 액화천연가스Limited Operating Condition 운전제한조건Loss of Coolant Accidents 냉각재상실사고LOCA : Loss of Coolant Accident 냉각재상실사고Loss of Condenser Vacuum 응축기진공상실

Loss of Fluid Test 냉각재상실사고실험

Low Pressure Turbine 저압터빈Local Power Density 국부출력밀도LPG : Liquefied Petroleum Gas 액화석유가스Losses Parts Monitoring System 고장부위감시계통

Low Population Zone 저 인구(밀도)지역 *.비교 : EPZ

LRS : Liquid Radwaste System 액체 폐기물 계통

LSSS : Limiting Safety System Settings 제한안전계통설정

Long Term Cooling (Computer Code명)

59쪽76

MAC : Maintenance Action Card

MAP : Management Action Plan

Material Assignment Schedule

MAS : Material Assignment Schedule

Maximum Credible Accident

Main Control Board *.Board Panel Console

Measurement Channel Block Diagram

Master Control Console

Motor Control Center

Main Coolant Loop

A General Monte Carlo Code for Neutron andPhoton Transport

MDL : Master Distribution List

MEI : Mechanical Equipment Index

MGP : Main Steam Generator Platform

Liquid Waste (Management) System액체폐기물(처리)계통Limited Work Authorization 제한공사(작업)승인LWA : Limited Work Authorizaton 제한공사승인 Liquid Waste Breeder Reactor 경수증식로Loop Wiring Diagram 측정회로도면(계측관련집약)

Low Water Level 저(설계)수위Liguid Waste Management System 액체 폐기물 처리계통Light Water(-cooled) Reactor 경수로LWR : Light Water Reactor 경수로Manufacturing Order 제조지시서M/O : Manufacturing Order 제조지시서

MBA : Material Blance Area 핵물질수지구역MC/H : Machine hour 시간당 기계작업량

MCB : Main Control Board 주제어판

MCC : Motor Control Center 모터제어반

Main Control Panel 주제어반Main Control Room 주제어실MCR : Main Control Room 주제어실MCS : Material Control System 자재관리시스템Megawatt Demand Setter (Operator’s Module)부하제한장치*.관련 계통 : ADS, CPC, DIAS, DPS(CRT), PPS, TCSMechanlcal Equipment Index 기계설비지수*.비교 : EEL

Ministry of Energy Resources 동력자원부Main Feedwater (Control) System 주급수(제어)계통MFG : Manufacuring 제조Main Feedwater Isolation Valve 주급수차단밸브Motor Generator 전동발전기(“CEDM”)

60쪽76

Mineral Insulation (Cable)

MIP : Material Index Procedure

Massachusetts Institute of Technology

Manufacturing License

Man- Machine Interface

Man- Machine Interface Systems

Man- Machine Systems Analysis

Middle of Cycle

Motor Operated Valve

Motion Pulse

MSP : Motor Suction Pump

MSR : Moisture Separator Reheater

MH : Man Hour 시간당 1인작업량

Management Information System 경영정보시스템MIS : Material Issue Slip 자재불출전표MISC. : Miscellaneous 잡(雜)∼

ML : Manufacturing License 제조면허

Ministry of Science and Technology 과학기술처MOST : Ministry of Science & Technology 과학기술처Ministry of Trading 상공부Memorandum of Understanding 양해각서MOU : Memorandum Of Understanding 양해각서

MP : Material Procurement 자재절차서Material Purchase Requisition 자재구매요구서Multi Point Recorder

MPR : Material Purchase Requisition 자재구매요구서MPR : Monthly Progress Report 월간진도보고서Material Purchase Specification 자재구매사양서MPS : Material Purchase Specification 자재구매사양서MRI : Magnetic Resonance Image 핵자기공명 영상장치MRP : Material Requirement Planning 자재소요계획Multi- Purpose Research Reactor 다목적연구로MRR : Material Receiving Report 자재인수보고서MRS : Material Return Slip 자재환입의뢰서Main Steam 주증기Main Steam Isolation System(Signal)주증기관격리계통(신호)*.격납용기 고압력, 각 S/G의 저압력/고수위시 수동작용하여 S/G와 격리, 2차 계통을 보호Main Steam Isolation Valve 주증기격리밸브Mean Seawater Level 평균(설계)수위Main Steamline Break 주증기관파열(사고)

Moisture Seperator / Reheater 습분분리재열기Materials Status Report 자재현황보고서Manufacturers Standardization Society of Valve & FittingsMain Steam System 주증기계통Manufacturing Standards Society

61쪽76

Multi- Stud Tensioner

MST : Multiple Stud Tensioner

Multi- Stud Tensioning System

Mean Time Between Failure

Mean Temperature Coefficient

Master Transfer Switch

Mean- Time- To- Failure

Not Applicable

National Association of Corrosion Engineers

Notional Breau of Standard

Nuclear Cooling Rater (System)

NSSS Digital Control System

NSSS Engineering Documentation System (Manual)

Nuclear Energy Liability and Property Insurance Association

National Electrical Manufacturers Association

Nuclear Environmental Qualified

“Not Full Closed” Position Signal on FCLD

Neutron Flux Monitoring System

“Not Full Open” Position Signal on FLCD

National Fire Protection Association

MSS : Main Steam System 주증기계통

Mean Square Valve 실효치*.원자로 고출력범위(10E-3 – 200%)에서 입사중성자에 대한 검출기의 출력 특성 *.비교 : LCRMSV : Main Stop Valve 주정지밸브Magnetic Particle Testing 자분탐상시험MT : Magnetic Particle Test 자분탐상시험

MTO : Material Take Off 자재물량산출

MTS : Material Tracking System 자재추적체계

MWO : Maintenance Work Order 보수작업지시서MWT : Minimum Wall Thickness 최소벽두께

N/A : Not Applicable 해당없음

National Aeronautics & Space Administration(미)항공우주국

Neither Confirm Nor Deny (확인도 부정도 않음)

Non- Confirm Report 불일치보고서NCR : Non-Conformance Report 불일치 보고서

Non- Destructive Examination 비파괴시험(검사)

NDE : Non Destructive Examination 비파괴검사Nuclear Energy Agency 국제에너지기관

Net Heat Rate 순열소비율Not In My Back Yard 님비(족)*.쓰레기를 자기 집앞(마을)에 가져오기를 바라지 않음NSSS Integrity Monitoring System원자로계통건전성감시계통

62쪽76

NIS : Nuclear Instrumentation System

National Micrographics Association

Non- Nuclear Instrumentation

Non- Nuclear Safety

NNS : Non-Nuclear Safety

Nuclear Power International (Framatome- Siemens)

Nuclear Power Module

Nuclear Power Plant

Normal Pipe Size

NPS : Normal Pipe Size

Net Positive Suction Head

Nuclear Reactor Regulation

NSR : Non-Safety Related

Notification To Proceed

Nuclear Regulatory Guide

Nuclear Utility Service

National Weather Service

Operations and Maintenance Reminder

Operator Aid

Operator Action Tree

NPCS : Nuclear Project Control System 원전건설관리 시스템

NPP : Nuclear Power Plant 원자력발전소Nuclear Plant Reliability Data System (INPO연)

Treaty on the Non- Proliferation of Nuclear Weapons핵무기확산금지조약NPT : Non-Proliferation Treaty 핵확산방지조약Nuclear Quality Assurance 원자력품질보증NQA : Nuclear Quality Assurance 원자력품질보증Nuclear Regulatory Commission 원자력규제위원회NRC : Nuclear Regulatory Commision 원자력규제위원회(미)

Nuclear Safety Analysis Center 원자력안전분석센타Nuclear Safety Information Center원자력안전정보센타Neutron Source Reactor 중성자원로

Nuclear Steam Supply System핵(원자력)중기공급(원자로)계통NSSS : Nuclear Steam Supply System 핵증기공급계통Nuclear Service Water (System) 기기냉각해수(계통)

NTP : Notice To Proceed 작업착수통보서I & C분야 Brand Name(상호) : Plant Control 장치

Nuclear Safety Standards원자력 안진기준 프로그램(IAEA 작성)

Operations and Maintenance 운전 및 보수유지

OA : Outside Air 외부공기

63쪽76

Offsite Dose Calculation

Organization for Economic Cooperation and Development

OECD : Organization for Economic Cooperation & Development

Operational Event Report Tracking System

OM : Operation Maintenance

Office of Management & Budget

Overall Manufacturing Schedule

Operation Reactors Assessment Branch

OST : Over Speed Trip

Overload Thermal Limit

Once- Through Steam Generator

Purchase Order

Primary Auxiliary Building

OBA : Operating Basis Accident 운전기준사고Operational Basis Earthquake 운전가능기준지진강도*.비교 : DEB, SSE*.발전소 운전 중 수시로 발생할 수 있는 약한 지진으로,공공의 안전이나 건강을 보장하기 위한 특정 설비들이지속적으로 운전이 가능한 정도의 지진OBE : Operating Basis Earthquake 운전기준지진Organization Brakdown Structure 조직분석체계OBS : Organization Breakdown Structure 조직분류구조Oil Circuit Breaker 기름회로차단기 *.비교 : ACB

Organization of CANDU Industries(’79년 설립)*.비교 : AECL

Outstanding Documents Analysis Report미해결자료분석보고서ODAR : Outstanding Documents Analysis Report 미해결자료분석 보고서

OEM : Original Equipment Manufacturing 주문자상표 부착방식

On the Job Participation 현장실무참여On the Job Training 현장실무교육 *.비교 : CRT

OJT : On the Jop Training 현장실습훈련Operation Licence (발전소)운영허가 *.비교 : CP

OL : Operating Licence 운영허가

OMC : Optimum Moisture Concrete 최적함수비

Operating Reactor 운전중인 운자로

ORI : Owner Request Items 고객요구사항Operation Safety Review Team가동중 원자로 안전운전평가팀(‘82- IAEA지원사업)

Operation Support Center 운영지원실*.비교 : TSC, EOF

Operational Safety Indicator Program운전중 안전지도 프로그램(‘85- IAEA지원사업)

OSR : Overage & Shortage Report 과부족보고서

Piping and Instrument Diagram 배관계장선도P&ID : Piping and Instrument Diagram 배관 및 계장 계통도Pressurized (Light) Water Reactor 가압(경)수로

P/O : Purchase Order 발주서Public Acceptance 대중이해

64쪽76

Protective Action Guide

Post Accident Monitoring Instrumentation

PAMS : Post Accident Monitoring System

PASS : Post Accident Sample Structure

Power Ascension Test

PAW : Plasma Arc Welding

Physical Breakdown Structure

PBS : Physical Break-down Structure

Power Coefficient

PCC : Project Contract Control

PCC : Project Cost Control

Pellet- Clad- Interaction

Peak Cladding Temperature

PDAS : Plant Data Acquisition System

PDCS : Project Daily Construction Schedule

Program Definition Language

PDL : Program Definition Language

Product Data Management

PAB : Primary Auxiliary Building 1차보조건물

Programmed Project Action Item List요(要)조치사항PAL : Programed Project Action Item List 요조치사항

Post Accident Monitoring System 사고후감시계통

Post Accident Sampling System 사고후시료재취계통

PBM : Pipe Bedding Material 배관받침재료Pacific Basin Nuclear Conference태평양연안국원자력회의Pacific Basin Nuclear Cooperation Committee아시아태평양지역협력기구 *.비교 : PNC

PC : Percent Complete 단위작업달성도PC NO. : Project Control Number 사업관리번호

Project Control Field (복합PJT의 공통비용 : PM관리)

PCM : Procedure Control Manual 절차서관리매뉴얼PCN : Procedure Change Notification 절차서변경통보서Pool Cooling and Purification System수조냉각 및 정화계통Reactor Coolant Pressure Boundary원자로냉각재압력경계Plant Computer System 발전소컴퓨터계통Power Control System

PD : Plant Design 발전소 설계Preliminary Design Approval (by NRC) *.비교 : DC, FDA

Plant Data Acquisition System 소내자료취득계통

PDF : Plant Design Factor 발전소설계인자(요소)

Power Dependent Insertion Limit출력종속삽입(揷入)한계(치)Predetermined Insertion Limit

PDM : Product Data Management 기술생산자료관리시스템

65쪽76

Position Display System

Position Display Unit

PED : Primary Engineering Data

PEM : Project Engineering Manager

Program Evaluation & Review Technique *.PERT/CPM

PERT : Program Evaluation and Review Technique

Proportional and Integral (Controller)

PI : Preliminary Issue

Process Integration Control System

Proportional Plus Integral Plus Derivative (Controller)

Production and Inventory Optimization Systems

PIR : Piping Installation Request

PKG : Pakage

Phone Line

Programmable Logic Controller

Peak Linear Heat Generation Rate

PLI : Professional Labor Index

Power / Load Unbalance

PM : Project Manager

Plant Monitoring and Display System

Probable Maximum Flood

PMS : Project Monitoring System

Positive Displacement Pump *.비교 : CCP

PDR : Process Deficiency Report 공정수정 요구서

Project Engineering ( Engineer ) 사업기술(자)

PE : Project Engineer 사업기술담당자

Pressurizer Gas and Steam Vent (System)가압기가스 및 증기배출(계통)

수소이온농도지수(수소지수)

Pressurized Heavy Water Reactor 가압중수로PHWR : Pressurized Heavy Water Reactor 가압중수로형 원자로(월성)

PJT : Project 사업

Part- Length Control Element Assembly *.비교 : PSCEAPressurizer Level Control System가압기수위제어계통 *.비교 : PPCS*.CVCS충전펌프 및 Letdown 제어 밸브등을 이용하여 RCS냉각재 재고량(Inventory)을 최소화하고 고도상태발생시 Surge수용토록 PZR증기체적을 유지Professional Labor Index 전문직근로자지수 *.비교 : SLI

PLR : Punch List Report 펀치리스트 보고서

Project Management (또는 Manager)

Plant Monitoring Computer (System) 발전소감시컴퓨터

PMO : Project Master Order 사업종합지시서Probable Maximum System 발전소감시계통Project Master Schedule

PMS : Project Milestone Schedule 사업기본공정표

66쪽76

Power Operated Relief Valve

Proportional Power Control Unit

Pre- Power Depend Insertion Limit

Proportional Power Level

PPM : Parts Per Million

PPS : Plant Protection System

Process Information System

Process Radiation Monitoring System

PRN : Procedure Review Notice

Project Requirement Planning

PSC : Pre-Stressed Concrete

Performance Shaping Factor

Power Systems Group

Piping Seismic Reconciliation

Pacific Nuclear Council 태평양 원자력 협의회*.비교 : PBNCC (’88년 PBNCC를 공식기구로 발족)PNC : Projent Numbering Coordinator 사업번호조정자Project Numbering System 사업번호부여체계PNS : Project Numbering System 사업번호체계POR : Purchase Order Requisition 구매요구서

PQT : Procedure Qualification Test 절차서검증시험Pressurizer Pressure Control System가압기압력제어계통 *.비교 : PLCS*.가압기 및 살수밸브등을 이용하여 일정 압력을 유지함

Part(s) Per Million 백만분의 1Project Procedure Manual

PPM : Project Procedures Manual 사업추진 지침서Plant Protection System 발전소보호계통

PQR : Procedure Qualification Report 절차서검증보고서 Probabilistic Risk Assesment / Analysis확률론적위험도평가/분석Level 1(Core Melting), 2(1+Containment Break),3(1+2+Environmental Effect) *.비교 : DRA, SRAPerformance Related Design Basis Event*.비교 : DBE, SRDBE

Project Review Meeting 사업추진회의Process Sampling System

PRM : Project Review Meeting 사업추진(분석)회의

Pferde Starke 독일마력(미터마력)

PS NO. : Project Serial Number 사업일련번호Probabilistic Safety Analysis 확률론적 안전성평가PSA : Probabilistic Safety Assessment 확률론적 안전성평가 Preliminary Safety Analysis Report사전안전성분석보고서 *.비교 : (F)SAR

PSAR : Preliminary Safety Analsis Report 예비안전성분석보고서

Part Strength Control Element Assembly(부하추종능력 증진목적) *.비교 : PLCEA

PSCS : Project Schedule Control System 공정관리시스템

Pre- Service Inspection 가동전검사 *.비교 : ISI

PSI : Pre-Service Inspection 가동(사용)전검사Primary System Monitoring 1차계통감시

67쪽76

Pressurizer Safety Vale

Periodic Test Error

PVC : Poly Vinyl Chloride

Palo Verde Nuclear Generation Station

Quality Assurance of Design Manual

QADM : Quality Assurance of Design Manual

Quality Display Unit

QTS : Quality Tracking System

Primary Sampling System 1차측 시료채취계통

(Liquid) Penetrant Test (액체)침투탐상시험PT : Liquid Penetrant Test 액상침투시험Performance Test Code*.PTC 6.0(Full Scope Test) 및 PTC6.1(Simplification Test) 유량측정장치(PrimaryFlow Element)가 LP HTR – Deaerateor 및 HP HTR – S/G사이 위치(6.1은 계산용이, 경비시간계기등 절약)

Pressurized (Pressure) Thermal Shock 가압열충격*.UN Conference for the Promotion of InternationalCooperation in the Peaceful Use of Nuclear Energy

Palo Verde(- Unit 2) 팔로버데 원자력발전소(2호기)*.영광 3,4호기는 PV-2설계의 축소형(S/G, PZR, RCS,ECCS, RCP의 Proven, I & C의 인허가/운전 등)으로,ANO-2에서 입증된 노심크기 및 출력성능을 조화시킴Polyvinyl Chloride 폴리염화비닐

Pressure Vessel Research Committee압력용기연구위원회Project Work Breakdown Structure사업업무분류체계 *.비교 : WBS

PWC : Preliminary Works Contract 초기현장공사(북한경수로)

Post Weld Heat Treatment 후열처리PWHT : Post Weld Heat Treatment 후열처리Pressurized Water(-cooled) Reactor 가열(냉각)수로PWR : Pressurized Water Reactor 가압경수로형 원자로Primary Water Stress Corrosion Cracking1차냉각수응력부식균열Pressurizer 가압기PZR : Pressurizer 가압기Quality Assurance 품질보증QA : Quality Assurance 품질보증

QAP : Quality Assurance Procedure 품질보증절차서Quality Control 품질관리QC : Quality Control 품질관리QCI : Quality Control Instruction 품질관리지시서QCR : Quality Control Report 품질관리보고서

Quality Plan 품질계획서QP : Quality Plan 품질계획서Quality Release 출하지시서QR : Quality Release 출하지시서QTAR : Quality T Analysis Report 품질경향분석 보고서

68쪽76

Quality Verification Document List

Resin Additive Tank

Risk Achievement Worth

Rod Cluster Control Assembly

Remote Control Module

Reactor Coolant Pump Shaft Speed Sensing System

Reactor Drain Pump

RDT : Reactor Drain Tank

*. A unit of Dose equivalent

원자력비상대책상황실RFI : Reactor For Information

RG : Regulatory Guide

(U.S NRC) Regulatory Guides

Relative Humidity

QTY : Quantity 수량

Quality Verification Document Requirements품질확인자료목록Research and Development 연구개발Reactor Vessel 원자로(용기)

Random- Access Memory (전산)

Request for Approval or Review 승인 또는 검토요청서RAR : Request for Approval/Review 검토 및 승인요청서Recirculation Actuation Signal 재순환작동신호*.LOCA이후에 RWST의 수위가 비워지기전에 SIMODE에서 재순환MODE로 자동전환케하고 동시에SUMP VALVE를 개방시켜 RWST의 유량 종결(HPSI/CS PUMP의 SUCTION변경)

Reactor Coolant (System) 원자로냉각재(계통)

Regional Cooperation Agreement 지역협력협정*.원자력 과학 및 기술의 연구개발과 훈련(’74.10체결)

RCB : Reactor Containment Building 원자로격납건물

Reactor Coolant Drain Tank 원자로냉각재배수탱크Reactor Containment Fan Cooler(HVAC 보조 공기구) *.UCN Non-safety Grade

Reactor Cavity Filtration System 원자로캐비티여과계통Reactor Coolant Gas Vent (System)냉각재불용성기체방출(계통)

Reactor Coolant Monitoring System원자로냉각재감시계통Reactor Coolant Pump 또는 Piping원자로냉각재펌프 또는 배관RCP : Reactor Coolant Pump 원자로 냉각재 펌프

RCS : Reactor Coolant System 원자로 냉각재 계통

Reactor Drain Tank 원자로배수탱크

Request For Proposal 공급제의요청서Request For Quotation 견적요청서

Residual Heat Removal System 잔열제거계통*(CE사 Design : “SCS”로 부름)

Reactor Internals 노심구조물(연료,중성자원등 제외)

69쪽76

Required Input Motion

Risk Methods Integration and Evaluation Program

Rail Mounted Quay Crane

Reactor Water Make- up Pump

Reactor Power Cutback Control Panel

Radial Power Factor

Risk Reduction Worth

Reactor Systems Branch

Remote Shutdown Control Room

Remote Shutdown Panel

Reed Switch Position Transmitter (Transducer)

Resin Sluice Supply Header

Reactor Safety Study Methodology Applications Program

Reactor Trip Breacker

RTD : Resistance Temperature Detector

RIC : Receiving Inspection Check List 인수검서보고서

Radioactivity Monitoring 반응도감지

Radiation Monitoring System 방사선감시계통Rigging Management System

Remote Multiplexing System원격신호다중화기술 *.비교 : DDC

Reactor Make- up Water (Storage) Tank원자로보충수(저장)탱크Read- Only Memory (전산)

Reactor Power Cutback System / Module원자로출력감발계통(1대의 주급수펌프상실 또는부하감발시, 원자로 TRIP이나 증기관안전밸브 작동없이도 원자로 및 터빈출력을 신속히 감발함.(CEDMCS, CPC, DIAS,DPS,SBCS,TCS등)

Registered Professional Engineer 정부공인기술사

Revolutions Per Minute 분당회전수Reactor Protection System 원자로보호계통노심과 RCPB보호를 위해 원자로를 진정시키는 역할을 함(ESFAS + CPCS)

RPS : Reactor Protection System 원자로보호계통Reactor Pressure Vessel 원자력압력용기RPV : Reactor Pressure Vessel 원자로압력용기Radiological Release and Dose Assessment Display System방사선량표시기능*Reactor Refueling System 핵연료재장전계통 Reactor Regulating System 원자로조절계통 즉 반응도제어계통으로 원자로의 반응도는 CEA 또는 붕산수농도 조절로 신속 또는 완만하게 제어함(CESSAR)*Required Response spectra : seismic 분석자료

RSI : Requition for Stored Items 청구 및 불출증

Reactor Safety Study 원자로안전연구Resin Sluice SupplyRoot- Sum- Square Method

Reactor Trip 원자로(사고)정지Radiographic Test 방사선탐상시험RT : Radiographic Test 방사선 투과시험

Resistance Temperature Detector 저항온도감지기기

70쪽76

Release To Material

RTM : Release To Manufacture

Reference Temperature for Nil Ductility Transition

RTO : Rated Thermal Output

Real Time Products

RTP : Real Time Products

Reactor Trip Switch Gear

Reactor Trip Switchgear System

Remote Terminal Unit (ADS)

Reactor Vessel Internals

Reactor Water Level Probe

S&L : Sargent & Lundy

SA : Supply Air

Specified Acceptable Fuel Design Limit

Safety and Reliability Optimization Service

Spray Additive System

Systemic Approach to TrainingSecondary Auxiliary Transformer

Submerged Arc Welding

Small Break Loss Of Coolant Accident

Shared Memory Bus

Rated Thermal Output 정격열출렬Reactor Tripped Overide

Refueling Transient Safety Report핵연료 완전교체시 안전성 검토보고서

RV : Reactor Vessel 원자로용기

Reactor Vessel Level Monitoring System원자로수위감시계통Refueling Water (Storage) Tank 재장전수(저장)탱크RWB : Radwaste Building 방사성폐기물 건물

Sargent & Lundy (YGN 3 & 4 A/E 수행하청사)

Steam Generator 증기발생기

Systems Assurance Analysis 계통보증분석SAB : Secondary Auxlimary Building 2차보조건물Severe Accident Policy (Statement) 중대사고정책(공고)*.”중대사고”란? – DBA초과사고(현,인허가요건은 아님- NRC, 규제화 추진중)Safety Analysis Report 안전성분석보고서*.비교 : PSAR, FSAR

SAR : Safety Analysis Report 안전성분석보고서SAR : Schedule Analysis Report 공정분석보고서

Severe Accident Research Program (Plan)(NRC의 중대사고연구프로그램)

Severe Accident Risk Reduction Program중대사고위험도감소계획

SAW : Submerged Arc Welding 수중아크용접SB : Small Bore 소구경Steam Bypass Control System 증기우회제어계통*.증기유량을 터빈BYPASS VALVE로 제거하여 주증기관 압력제어(NSSS내 과도에너지 자동발산 CEA자동인출 금지신호 발생) 또 NSSS승온/감온시 RC온도수동제어 허용

71쪽76

Secondary Controls

Surveillance Capsule Assemblies

Supervision of Control And Data Acquisition

Sub-cooled Margin MonitorSupply Chain Management

SCN : Specification Change Notice

Silicon Controlled Rectifier

Shutdown Cooling System

Sequence Coding and Search System

Statistic Combined Uncertainty

SD : Senior Draftman

Shutdown Cooling (Heat Exchanger)

Supplier Deviation Disposition Request

Scram Dischrge Instrument Volume

Shop Deviation Report (GE)

SDR : Supplier Document Registration

SDT : Secondary Drain Tank

Scram Discharge Volume

SE : Senior Engineer

Significant Events Evaluation and Information Network

Scanning Microscope

Station Break- out 발전소 정전사고*.원전의 필수모선(Essential Bus) 및 비필수모선 전부에모든 교류전력이 완전히 상실된 사고

Shutdown Cooling (System) 정지냉각(계통)

Stress Corrosion Cracking- S/G Tube내 잔류응력과 화학작용의 조합으로 인한 균열 *.비교 : IGA

Secondary Chemistry Control System2차측화학제어계통System Control Diagram 계통회로도면(계통관련집약)

SCH : Schedule 일정

SCP : Schedule Control Procedure 공정관리절차서

SCR : Schedule Change Request 일정변경요구서

System Design 계통설계Signal Distributor

SD : Standard Detail 표준상세SD : System Design 계통설계SDC : System Design Criteria 계통설계기준

SDCR : Shop Drawing Change Request 현장도면변경요구서

SDDR : Supplier Deviation Disposition Request 공급자 사양변경 요청서

SDR : Supplier Deviation Report 공급자 사양 보고서

Safety Depressurization System 안전감압계통

Safety Depressurization and Vent (System)안전감압 및 방출(계통)

SEC.NO. : Section number 절(節)번호

72쪽76

SF : Sand Fill

Single Failure Criterion

SFG : Structural Fill Granular

Spent Fuel Handling

Start- up Field Report

SFR : Start-up Field Change Request

SI : Safety Injection

System Installation Document

Service Information Letter

Seal Injection Water

Steam Jet Air Ejector

Significance Level

Steam Line Break

SLI : Shop Labor Index

Shielded Metal Arc Welding

Supervisory Monitoring Console

American Society of Non- DestructiveTesting Hydraulic Institute

Significant Event ReportSafety Evaluation Report 안전성심사(평가)보고서*.비교 : SRP

SER : Safety Evaluation Report 안전성 평가보고서

SFG : Sand Fill Grable 쇄석

SFP : Spent Fuel Pool 사용후 핵연료 저장조

Steam Generator Blowdown System증기발생기취출수계통Steam Generator Feedwater System 증기발생기급수계통Steam Generator Tube Rupture증기발생기 전열관파열사고Safety Injection 안전 주입(분사)Le Systems International D’ Unites(미터법)

Safety Injection Actuation Signal안전주입작동신호 – 격납용기 고압력, 가압기 저압력시RCS에 봉산수를 주입하여 노심을 냉각(수동 작동)SIAS : Safety Injection Actuation Signal 안전주입 기동신호

SIP : Site Internal Procedure 현장내부절차서Chemical Reagents Injection System (신형안전로 일종)Safe Integral Reactor(ABB-CE’s Design : NUPLEX80+관련)

Safety Injection System 안전주입계통SIS : Safety Injection System 안전주입 계통/설비Safety Injection Tank 안전주입탱크SIT : Structural Integrity Test 구조물시험

Shop Labor Index 공장근로자지수 *.비교 : PLI

SLP : Stainless Steel Liner Plate 스테인레스 격납판Safety Monitoring 안전감시

SMAW : Shield Metal Arc Welding 피복 아크 용접

SMRS : Six-Month Rolling Schedule 6개월단위공정표SND : Site Need Date 현장요구일

73쪽76

Sequence of Events

Significant Operating Experience Report

SOER : Society Operating Experience Report

Solenoid Operated V/v

Single Pole Double Throw

SPI : Schedule Performance Index

Success Path Monitoring

Standard Post Trip Action

Supplier Quality Classification List

SQR : Supplier Quality Representative

Senior Reactor Operators

SRP : Standard Review Plan

Square Root Sum of Squares

System Resource Unit

SS : Start to Start

Solid State Component Control System

Safety Status Monitoring

Steel Structures Painting Council

SSPC : Steel Structure Painting Council

Solid State Plant Protection System

Siting Source Terms

Standard Service Water

Shift Tachnical Advisor

Shielded Twisted Pair / Over All Shield Cable

Service Water

SWCB : Switchyard Control Building

Scope Of Supply 공급범위

Safety Parameter Display (System) 안전변수지수(계통)

SPT : Standard Penetration Test 표준관입시험

Systems Reliability Analysis 계통신뢰도분석Statistical Risk Assessment 통계적 위험도 평가*.비교 : PRA, DRASafety Related Design Basis Event*.비교 : DBE, PRDBE

Standard Requirements Document 표준설계요건Status Review Meeting 사업공정회의SRM : Status Review Meeting 사업공정회의

Standard Review Plan (NRC의 표준심사지침)*.비교 : SER

Standard Safety Analysis Report 표준안전성분석보고서

Safe Shutdown Earthquake 안전정지기준지진강도PBNC면의 건전성유지, 원자로정지와 안전정지상태보전등특정장비들만 제기능가능한 최대가상지진*.비교 : DBE, OBE

Safety Shutdown System 안전정지계통

Solid Waste (Management) System고체폐기물(처리)계통

74쪽76

SWYD : Switch Yard

Transport Container Handling

Terminal Communication Profile / Interconnect Profile

Test Data Acquisition System

Transmission Microscope

Tubular Exchanger Manufacturers Association

Temporary Fuel Load Detector

TFT : Task Force Team

Technique for Human Error Rate Prediction

Total Integrated Dose

TPC :

Thermal Production Division

TQM : Total Quality Management

TSC : Technical Safety Center

SWN : Stop Work Notice 작업중지통보서

CE사 표준원전설계 (Model)

CE사 개량형표준원전설계 (Model)

Turbine Generator 터빈발전기T/O : Table of Organization 인원편제표Transient (과도상태)

Technical Assistant Agreement 기술전수계약Turbine Bypass 터빈우회Turbine 터빈

Turbine Cycle Heat Rate 터빈Cycle 총열소비율

Technical Change Request 기술사양변경요청서TCR : Technical Change Request 기술사양변경 요청서Turbine Control System 터빈제어계통

Totally Enclosed Fan Cooled (옥내모타사양)

Task Force (Team) 특수임무(수행팀)

TGB : Turbine Generator Building 터빈제네레이터 빌딩

Hot Leg Coolant Temperature 원자로출구관내각수온도

TKC : Turn Key Contract 본공사(북한경수로)

Thermoluminescent Dosimeter 열발광방사량계Total Loss Of Feed Water 주급수상실사고Three Mile Island 드리마일원자력발전소(2호기사고)

Turbine Monitoring System 터빈감시계통CE사 노심열수력분석용 전산코드명

TS : Tensile Strength 인장강도Technical Support Center 기술(안전)지원실*.비교 : OSC, EOF

Tube Support Plate (for S/G) 튜브지지판

75쪽76

Telegraphic TransferTechnical TransferThermal Treated

Uniform Building Code

Uncertainly Bounds

Union of Concerned Scientist

Upper Guide Structure (R/V Internal)

Uncompensated Ionization Chamber

Uninterruptible Power Supply (=VBPSS)

Updating of System Time Dependent Variables

Visual Display Units

Valid for Construction

VM : Vibration Monitoring

Variable Overpower Trip

W/C : Wall & Column

Technical Transfer Agreement 기술이전계약TWDS : Three Week Daily Schedule 3주간 단위공정표

UCN : Ulchin Nuclear Power Plant 울진원자력발전소

UCT : Underground Common Tunnel 지하공동구

Utility Requirements Document (EPRI의 ALWR관련, 설계요건서)

U.S Council for Energy Awareness미국에너지개발협의회Unresolved Safety Issue 미해결안전성문제(NRC지정)*.비교 : GSI

United States Nuclear Regulatory Commission미국원자력규제위원회Ultrasonic Test 초음파탐상시험 UT : Ultrasonic Test 초음파 시험

Vendor Order 구매지시서V/O : Vendor Order 구매지시서VAT : Value Added Tax 부가가치세Vital Bus Power Supply System (=UPS)무정전전원공급장치Volume Control Tank 체적제어탱크(”CVCS”)

Vibration and Loose Parts (Monitoring) System진동 및 이완부분(감시) 계통

Visual Test / Vacuum (Box) Test 육안/진공(상자)검사Waste (Management) System 폐기물(처리)계통

W/H Point : Witness / Hold Point 입회/필수 확인점World Association of Nuclear Operators세계원자력발전사업자협회 (’89년 발족)

Work Breakdown Structure 업무분류체계*.비교 : PWBS

WBS : Work Breakdown Structure 직무분석구조WDN : Welding Defect Notice 용접결함 보고서WEC : World Energy Conference 세계에너지회의Westinghouse Electric Corporation 웨스팅하우스(사)

Wet- Film Thickness (of Coatings)(도장직후) 도막두께 *.비교 : DFT

World Health Organization 세계보건기구(UN)

76쪽76

Work Plan Procedure

WVC : Weight Value Construction

WWF : Welded Wire Fabric

XFMR : Transformer

XMFR : Transfer

Yellow Creek Nuclear Plants

Zero Power Dependent Insertion Limit

WIR : Welding Inspection Record 용접부검사기록서Witness point 입회점

WPP : Work Plan Procedure 작업시행절차서Welding Procedure Specification 용접절차시방서WPS : Welding Procedure Specification 용접절차시방서WTB : Water Treatment Building 수처리건물WTO : World Trade Organization 세계무역기구

Execution Program Profile Analyzer *.비교 : CRA

ZA : Zero Adjustment 영점조정ZD : Zeroo Defects 무결점운동

Certificate of conformance : 품질보증확인서