Upload
yehia-helmy
View
279
Download
2
Embed Size (px)
Citation preview
YEHIA HELMY HAFEZ : CADD Manager
Page 1
PERSONAL DETAILS
NAME : Yehia Helmy Hafez
NATIONALITY : Egyptian
PROFESSION : CADD Manager
DATE OF BIRTH : 21 March 1960
MARITAL STATUS : Married
ADDRESS : 35 ben Qutaiba Naser City Cairo
CONTACT NO : +966-540360425 +201114947773
E-MAIL : [email protected] Yehia.swilm @saudiparsons.com
CURRENT ROLE : CADD Manager - Saudi Arabia Parsons (SAPL) EDUCATION : Bachelor of Business Administration – 1986
Ain Shams University – Cairo Egypt Free Studies from Fine Arts Faculty Interior design & Sculpture 1986 – 1990. Without degree Diploma in PC Languages DATA BASE DOS 1990
EMPLOYMENT EXPERIENCE RECORD
From To Company 2012 Date Saudi Arabia Parsons Limited (SAPL)KSA, Makkah Position: CADD Manager
2009 2012 Zuhair Fayez Partnership (ZFP) Position: CADD Manager Zuhair Fayez Partnership
1989 2009 Dar AL-Handasah (Shair And Partners) Position: Last Position CADD Manager (Highways)
1986 1989 A.H.D Hotel Developer Position: Interior Designer
1986 2000 My Privet Work Y. H. Design
YEHIA HELMY HAFEZ : CADD Manager
Page 2
COMPUTER SKILLS
Microsoft Office (WinWord, Excel, PowerPoint)
AutoCAD
CIVIL 3D
Photoshop
3D MAX
SketchUp 8
Global Mapper & Google pro
POWERPOINT
ProjectWise Explorer
Introduction primary to MicroStation V8i
TRAINING COURSES AutoCAD 3D Training Course1992 - 1
Architecture Courses Computek Training Canter 5 - 1995
3D Max Course for Interior Design 2 - 1996
AUTODESK CIVIL 3D : INTERMEDIATE LEVEL 4 - 2010
Global Mapper & Google pro 10 - 2012
ProjectWise Explorer 8 - 2012
SketchUp 8 2 – 2015
EXPERIENCE PROFILE
More than thirty years of experience and participation in major civil engineering projects in the field of transport multi-disciplinary and highways Projects include local networks to the main roads and highways projects in various fields Such as road planning and preliminary studies, detailed design As well as the following Currently working with the leadership team of the company, "Parsons' body with the development of Mecca in Saudi Arabia Participate in the early stages of design through the preparation of workshops for the project with the design team during the start and end of the project Management as well as the design of some new road axis include major intersections and bridges and tunnels In one of the largest projects in the Kingdom of Saudi Arabia and the Middle East Project "King Abdullah bin Abdul Aziz for ages Mecca" (DCOMM).
YEHIA HELMY HAFEZ : CADD Manager
Page 3
Responsibility:
1. Set Standards for the Start of Each Project Followers CADD Standards to Manage and Organize the Necessary Construction Drawings for the Production of Digital Data. Addressed by These Standar Through three main components * The Structure of the Project Folder Label File Structure * * Drafting Agreements
2. Involved in the Preparation and Visions Preliminary Designs
Through to Show the Work of These Designs and Derceptions Through so Special Programs
3. Work and Supervise the Cad team ... for All Project Disciplines
of Roads And Lighting of Roads and Infrastructure Works and Landscaping and Corridors to The Project Site
Planning and Design Task :
1. Prepare Completely Full Design and Drawing Works of Signals and Traffic Signs and Road Marking and Traffic Signs Indicative of Roads 2. Completely Survey Quantities to Acts of Signals and Marking for the Project Other skills :
1- Review of Shop drawings in a several projects “check print for audit” 2- Strong leadership skills. 3- Leading and handling the team work. 4- Ability to work under pressure. 5- Able to collect very fast and match with new systems.
WORK EXPERIENCE From To Dec. 2012 Date Saudi Arabia Parsons Limited (SAPL)
KSA, Makkah Position: CADD Manager Project: Northern Branch Lines Project SAR SAUDI RAILWAY PRELEMINARY DESIGN ELEMENTS THAT REQUIRE FURTHER DESIGN EFFORT Preliminary
YEHIA HELMY HAFEZ : CADD Manager
Page 4
Project:
PMC - King Abdullah bin Abdul-Aziz Project For Makkah. Clint: Development
Commission of holly Makkah and Mashaer (DCOMM).
King Abdullah bin Abdul-Aziz Project for Makkah is one of the biggest Projects in Saudi Arabia. The Plan Covered Various elements including urban infrastructure and a multimodal Transportation network within a six years duration and SAR 22 billion preliminary budgets
Responsibility:
1. Set Standards for the Start of Each Project Followers CADD Standards to Manage and Organize the Necessary Construction Drawings for the Production of Digital Data. Addressed by These Standards Through three main components * The Structure of the Project Folder Label File Structure * * Drafting Agreements
2. Involved in the Preparation and Visions Preliminary Designs
Through to Show the Work of These Designs and Derceptions Through so Special Programs
3. Work and Supervise the Cad team ... for All Project Disciplines
of Roads And Lighting of Roads and Infrastructure Works and Landscaping and Corridors to The Project Site
Planning and Design Task:
1. Prepare Completely Full Design and Drawing Works of Signals and Traffic Signs and Road Marking and Traffic Signs Indicative of Roads 2. Completely Survey Quantities to Acts of Signals and Marking for the Project
From To
Dec. 2009 Date 2012
Zuhair Fayez Partnership (ZFP)
Position: CADD Manager
Project: J06-01900, J10-07600 : Improvement &Upgrade of Major Roads in
Riyadh : Development &Improvement of Streets and Pedestrian Bridge in
Riyadh
• Improvement and upgrade of 150Km with right of way ranging between
30m and 100m of The following roads; -AL-NAHDA Road -AL-AZIZYA
Road -FATAH MAKKA Road -Prince Salman Bin Abdulaziz Road -
PRINCE SUAD BIN MEQREN Road -Prince Saud Bin Faisal Road -
Prince Saud Bin Galawy Road -Prince Torky Bin Abdul-Aziz Road -Prince
YEHIA HELMY HAFEZ : CADD Manager
Page 5
Mesheel Bin Abdul-Aziz Road -Osman Bin Affan Road
• -King Abdul-Aziz Road -Shebh Aljazeera ALarabia Road
Proje J08-13500 : Preparation of Study and Final Design for Improvement
An Upgrade of Intersections in Eastern Province Cities (GROUP 4)
- The project located in eastern province cities (Dammam & AL-Khober),
the project consists of five Intersections, four of them is interchange and
one is at grade separation, These intersections between the following
roads;
• ALI BIN ABI-TALEB Road & PRINCE MOHAMED BIN FAHD Road
• OSMAN BIN AFFAN Road & ALI BIN ABI-TALEB Road
• KING ABDUL-AZIZ Road & 28th
Street
• PRINCE SALMAN Road & KING SUAD Road
• KING FAHD Road & PRINCE TORKY Road & 30th
Street
Projec J10-13400 : Study of Traffic Movement Important and Design of Tunnels and
Bridges on Main Access In Riyadh City
Improvement and Design of five Main Access corridors in north of Riyadh city to
improve the traffic Movement to Amira Nora University, -ANAS BIN MALEK
Corridor (15Km) -OMAR BIN KHATAB Corridor (10Km)
Project: J09-09400 : Study and Upgrade Of Makkah Al-Mukkaramah East /
West Corridor
Improvement and Design of Interchanges at this Axis like;
Projec J08-05800 : Study and Design the Highway axis to King Abdullah Civic Centre
(KACC) in Dammam City
This Project consists of: 1-Major Highway by 20Km with 20m High above the sea
to Link the around Scheme with the Civic Centre and this Link by more than
Interchanges Like {Direction Ramps, Underpasses, Trumpet} 2-Streets and
pedestrian Bridges or Tunnels at Gradual levels start from sea level inside the
Centre
My role in this projects is to cover the following tasks:
Responsibility:
1. Set Standards for the Start of Each Project Followers CADD Standards to Manage and Organize the Necessary Construction Drawings for the Production of Digital Data. Addressed by These Standards Through three main components * The Structure of the Project Folder Label File Structure * * Drafting Agreements
2. Involved in the Preparation and Visions Preliminary Designs
YEHIA HELMY HAFEZ : CADD Manager
Page 6
Through to Show the Work of These Designs and Derceptions Through so Special Programs
3. Work and Supervise the Cad team ... for All Project Disciplines
of Roads And Lighting of Roads and Infrastructure Works and Landscaping and Corridors to The Project Site
Planning and Design Task:
1. Prepare Completely Full Design and Drawing Works of Signals and Traffic Signs and Road Marking and Traffic Signs Indicative of Roads 2. Completely Survey Quantities to Acts of Signals and Marking for the Project
********
YEHIA HELMY HAFEZ : CADD Manager
Page 7
From 1989
To 2009
Dar AL-Handasah (Shair And Partners) Position: Last Position CADD Manager (Highways)
• Qassim-Madinah-Rabigh Expressway In Kingdom SaudiArabia
• Qassim-Madinah-Raghib Expressway Inside Madinah Kingdom Of Saudi Arabia
• Roads, Railway And Ifrastructure Around Luanda Port, Angola
• Pilgrims Accommodation Project In Mina,Kingdom Of Saudia Arabia
• Extension Of Pilgrims Accommodation In Mina, Kingdom Of Saudia Arabia
• Bridges, Slaughter House (Terraces)In Mina, Kingdom Of Saudia Arabia
• Tunnels, Bridges And Road Rehabilitation In Luanda, Angola
• Technical Assistance For Jazeerah Bank, Kingdom Of Saudia Arabia
• Design Of Roqah Terraces (Phase B) At Jamarat Area In Kingdom Of Saudia Arabia
• Airforce Medical Center, Cairo – Egypt
• Terminal And Services Building In New Doha International Airport, Qatar
• Roads, Infrastructure, Aprons, Taxiways And Runways In New Doha International Airport, Qatar
• Sana'a International Airport Development Project – Yemen
• New Terminal Building at Sharm El-Sheikh International Airport" – Egypt
• Luanda – Viana Expressway - Angola
• Viana – Cacuaco Expressway - Angola
• Urban Water and Sanitation Project – Yemen
Angola project Dubai airport - Horghada airport - Sinegal airport
********
YEHIA HELMY HAFEZ : CADD Manager
Page 8
From 1986 From 1986
To 1989 To 2000
• E.H.D Hotel Developer
• Position: Interior Designer
********
• My Privet Works
• Y. H. Design
Sample of Modelling works (Make-up’s)
Parking Kuwait airport
El Dekhilah Port
YEHIA HELMY HAFEZ : CADD Manager
Page 9
Model Airport
Model Mosque
YEHIA HELMY HAFEZ : CADD Manager
Page 10
North Cost Village
Design and Modelling Swimming Pool
YEHIA HELMY HAFEZ : CADD Manager
Page 11
Mall Talaat harb
Interchange in 3
YEHIA HELMY HAFEZ : CADD Manager
Page 12
REFERENCE:
Model Mosque
Dr. Ashraf Karakish (+966-053437104) STAKEHOLDER MGR Saudi Arabia Parsons Limited (SAPL) KSA, Makkah
Dr. Mahmoud Soliman (+ 966-562166493) Head of Department Highway Zuhair Fayez Partnership (ZFP) Eng. Ali Hamoud (+ 20 100 154 2905) Head of Department Highway Dar AL-Handasah (Shair And Partner