Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Reclaiming the shipyardConceptual MasterplanNovember 2017
Young City
ConceptThree ways of reclaiming the shipyard
the dock
the park
the plaza
the dock
the park
the plaza
the dock
the park
the plaza
REMEMBER Reinforcing social and historical qualities of existing buildings,
RECONNECT Integrating the Young City with Gdansk
REIMAGINE Diversi�ed communities
The old shipyard holds a unique potential for developing new urban spaces. At the same time, it is crucial for masterplan development to introduce people and social activities to the site from the very beginning in order to support growth for future construction. In other words; to think of people before spaces and spaces before buildings.
In order to meet this knowledge, we propose to preserve and make use of key existing buildings and structures on-site and investigate profits for re-investment.
Using the shipyard buildings as the face of new public life is the key to feasibility and overall sucess of Young City.
In order to make Young City an accessible desitination for the citizens and tourists of Gdansk it is essential to plan for special activities that attract people to the area. Furthermore, it is crucial to create strong connections to Young City from Gdank’s city centre and central station. Finally, social inclusion must be maximised on the site.
In order to achieve these qualities we propse the Plaza, the Dock and the Park as key inclusive urban spaces. The three spatial programmes are connected by an urban spine connecting parts of Young City and integrating it to the city centre of Gdansk.
In order to respect and reinforce the qualities of the existing buildings, we keep and preserve as many of the existing buildings and structures as possible in the Young City development. This approach also addresses aspects of social and environmental sustainability.
Integrated among the industrial cultural heritage, we introduce three new building typologies. Apart of urban morphology, they are offering diversified types of communities, from local courtyard neighborhood, to more alternative ways of living in vertical comminities.
In the shipyard area, new housing typologies are integrated among the culturally historical structures by interpreting the hall typology of shipyard architecture and Old Town city block. These are kept in a dense, and relative small scale in respect to the existing buildings, which are seen as the key value of the entire area.
Young City overview
Dock
Promenade
Creative Cluster
Museum
Foodcourt
Spine
Lighthouse
Gate Tower
Road to Freedom
Marina Forest
Popieluszki
Gathering Plaza
PromenadeSpine PassagesUrban Anchor pointsUrban Street - Popieluszki
Masterplan layersPublic space hierarchy
Young CityPlan of public spaces
Spine
Dock
Lighthouse
Gate Tower
Gathering Plaza
Road to FreedomCreative Cluster
Foodcourt
Museum
Popieluszki
Promenade
Marina Forest
View from the Promenade
View from the Spine
Preservation strategygeneral concept
1. Existing state 3. Exposing inner structures2. Preserving original walls, adding new openings 4. New substanceoffice atrium
offices new openings parking exposed structure
original windows
housing
add-on
Museum
FoodmarketHousing
HousingHousing
Cafe gallery
Restaurant
Restaurant
O�ces
O�ces
O�ces
O�ces
O�ces
Retail
Creative Cluster
Sustainability strategymicroclimate, daylight and visibility
Sunlight simulation seen form South/West
Views simulation seen form North/East
51% of the residential and hotel facades have water views“
All apartments have a minimum 1.5 hours of sunlight at equinox“
Sunlight hours
3 74 865 9 100 1 2
View to the water
Wind from South, inclusive vegetation
Sout
h - 6
m/s
in
10
met
ers
heig
ht
We have been able to extend summer by approximately 7 weeks“
0% of the year
0% of the year
27% of the year
42% of the year
73% of the year
58% of the year
Exsisting weahter data from Gdansk
Comfortable 27% of the yearUTCI temperature between 9-26 0C
Comfortable 42% of the yearUTCI temperature between 9-26 0C
If we can reduce the wind speed to an average of 2 m/s
then we can extend the summer with up to 7 weeks
ks. Jerzego Popie39/64uszki
Dok
owa
Popieluszki
Narzedziowcow
Narzedziowcow
Ryba
ki G
orne
ks. Jerzego Popie39/64uszki
Dok
owa
Popieluszki
Narzedziowcow
Narzedziowcow
Ryba
ki G
orne
259 PP
250 PP
143 PP
89 PP
175 PP
130 PP
91 PP
267 PP
341 PP
257 PP
256 PP
266 PP
285 PP
202 PP
696 PP
Dok
owa
Lagiewniki
Jana z Kolna
Nowomiejska
Stefana Jaracza
Robotnicza
Monterow
Narzedziowcow
Popieluszki
Popieluszki
Podstoczna
Ryba
ki G
orne
Lisia
Gro
bla
Walowa
Gazownicza
Dok
i
Glo
wna
Narzedziowcow
Tra�c strategyroad network, bike mobility, parking
separated bike path
bike lines or mixed tra�c
outdoor parking racks
public bikes stations
main road
distribution road
local roads
woonerf
shared zone
crossings to the site
Bicycle strategy Sheltered parking
Road networkPublic transportation
ks. Jerzego Popie39/64uszki
ks. Jerzego Popie39/64uszki
ks. Jerzego Popie39/64uszki
SMALL SERVICES/ RETAIL
SPA CENTER
SERVICE/
RETAIL
RESTAURANT
SPA CENTER
RESTAURANTS
SERVICES/RETAIL
SUPERMARKET
entrance
SMALL SERVICES/ RETAIL
check out
area
storage/
back of house
OFFICE BUILDINGSMALL SERVICES/ RETAIL
SMALL SERVICES/ RETAIL
CORNER CAFES
SMALL SERVICES/ RETAIL
SMALL SERVICES/ RETAIL
check out
area
entrance
OFFICE
RESTAURANTS
housing services storage/laundry/common kitchen/others
STUDENT HOUSING
LOBBY
SMALL SERVICES/ RETAIL
housing servicesstorage/laundry/others
AFFORDABLE HOUSING
parking under the courtyard
parking under the courtyard
CORNERCAFE
SMALL SERVICES/ RETAIL
stor
age/
laun
dry/
othe
rs
hous
ing
serv
ices
stor
age/
laun
dry/
othe
rs
hous
ing
serv
ices
hous
ing
serv
ices
stor
age/
laun
dry/
othe
rs
SMA
LLO
FFIC
E
SMA
LLO
FFIC
E
SMA
LL S
ERV
ICES
/ RE
TAIL
SERVICE/RETAIL
SMA
LL S
ERV
ICES
/ RE
TAIL
SMA
LL O
FFIC
ES
SERVICE/RETAIL
SMA
LL
SERV
ICES
/RE
TAIL
entrance/info desk/informal readingarea
LIBRARY
SMALL SERVICES/ RETAIL
PARKING HOUSE
lobby
KINDERGARDENdinningarea SMA
LL S
ERVI
CES
/ RE
TAIL
bighall
entrance/administration
clas
sroo
ms/
play
ing
area
s
bookshelvesarea
bookshelvesarea
parking under the courtyard
SMALL SERVICES/ RETAIL
ELDERY HOUSINGcommon sevices
parking under the courtyard
CO-HOUSING
CA
FE/G
ALL
ERY
RESTAURANTCAFE
RESTAURANT
RESTAURANT
GALLERY
SMALL OFFICES
LOCAL ACTIVITIESCENTER
SERVICE/ RETAIL
SERVICE/ RETAIL
OFF
ICE
BUIL
DIN
G
SERVICE/ RETAIL
SMA
LL S
ERV
ICES
/ RE
TAIL
LOCAL CULTURALCENTER
STRE
ET F
OO
D
office lobby/reception
SMA
LL O
FFIC
ES
SMA
LL O
FFIC
ES
SMA
LL O
FFIC
ES
SMA
LL O
FFIC
ES
lobb
y/re
cept
ion
lobb
y/re
cept
ion
SUPERMARKET
LARGE SERVICE/RETAIL
SERVICE/ RETAIL
SERVICE/ RETAIL
SERVICE/ RETAIL
URBAN SPORTS CENTER
URBAN SPORTS CENTER
URBAN SPORTS CENTER
RESTAURANT
OFF
ICE
BUIL
DIN
G
OFFICE BUILDING
RENTALSPACE
MUSEUM
MUSEUMCAFE
LIBRARY
KINDERGARDEN
hous
ing
serv
ices
stor
age/
laun
dry/
othe
rs
hous
ing
serv
ices
stor
age/
laun
dry/
othe
rs
parking under the courtyard
kidsreadingarea
readingarea
SMAL
L SE
RVIC
ES/ R
ETAI
L
SMALL SERVICES/ RETAIL
SERVICE/
RETAIL
RESTAURANTS
HOTELentrance/ reception/lobby/ administration
SERVICE/ RETAIL
Young CityPlan of groundfloor functions
Spine
Dock
The Lighthouse
The Gate Tower
Gathering Plaza
Road to FreedomCreative Cluster
Foodcourt
Museum
Popieluszki
Promenade
Marina Forest
housing
o�ce
commercial
public program
other
housing 298.000GFA
office 61.600GFA
retail 32.526GFA
musuem 3.850GFA
hotel 7.052GFA
total 403.030GFA
Building programme typologies, programs and areas
Option 1
Alternative 1 intensification of housing investments
Alternative 2intensification of office investments
Option 2
Option 3 Option 4
Two housing blocks One housing blockoffice building
One housing blockone office complex
Open housing block
Robustness and �exibilityScenarios in case of market change or extended list of protected elements
Scenario 1 - minimal intervention
Scenario 2 - protecting harbourline
Massing and density where list of protected buildings is extended. To keep the number close to 400.000 GFA is to use the left space on plot B5 and add one floor to tall buildings.
In this scenario the list is extended by slipways. Without losing area we can achieve that by moving towers on the East edge of the plot instead of proposed dock.