Transcript
Page 1: 1 00 - GROUND FLOORagarchitects.co.uk/perch/resources/ygb-aga-xx-00... · wc/hygiene facilities n-g061 toiled/cyfleusterau hylendid 4.5 m community store n-g016 storfa gymunedol 42.2

UP

By Department Legend

Adnoddau Dysgu - Learning Resources

Neuadd - Hall

Dysgu Sylfaenol - Basic Teaching

Storfa Dysgu - Teaching Storage

Dysgu Sylfaenol (meithrin) - Basic Teaching

Storfa Arall - Other Storage

Atodol - Supplementary

Ardal Di-net - Non-net Area

Cylchrediad - Ardal Di-net - Circulation - Non-net Area

Staff a Gweinyddiaeth - Staff and Admin

8.5 m²KITCHEN

N-G024

CEGIN

60.7 m²ALN CLASSROOM (3-6)

N-G040

DOSBARTH ADY (3-6)

60.1 m²ALN CLASSROOM (6-10)

N-G046

DOSBARTH ADY (6-10)

12.1 m²PRACTICAL TEACHING AREA

N-G043

ARDAL ADDYSG YMARFEROL

4.4 m²WC

N-G042

TOILED

4.2 m²WC

N-G049

TOILED

12.1 m²HYGEINE FACILITIES 2

N-G045

CYFLEUSTERAU HYLENDID 2

5.0 m²EXTERNAL STORE

N-G094

STORFA ALLANOL

65.4 m²CYLCH MEITHRIN CLASSROOM

N-G054

DOSBARTH CYLCH MEITHRIN

10.0 m²WC

N-G077

TOILED

66.0 m²NURSERY CLASSROOM

N-G074

DOSBARTH MEITHRIN

9.2 m²WC

N-G058

TOILED

12.1 m²SENco

N-G066

?

66.0 m²RECEPTION CLASSROOM

N-G088

DOSBARTH DERBYN

12.0 m²WC

N-G084

TOILED

66.0 m²RECEPTION CLASSROOM

N-G080

DOSBARTH DERBYN

60.1 m²YEAR 1 CLASSROOM

N-G071

DOSBARTH BLWYDDYN 1

60.0 m²YEAR 1 CLASSROOM

N-G068

DOSBARTH BLWYDDYN 1

60.1 m²YEAR 2 CLASSROOM

N-G091

DOSBARTH BLWYDDYN 2

10.0 m²WC

N-G078

TOILED

60.1 m²YEAR 2 CLASSROOM

N-G085

DOSBARTH BLWYDDYN 2

67.5 m²ICT/GROUP ROOM/FLOATING CLASSROOM

N-G064

TGCh/YSTAFELL GRWP

150.1 m²MAIN HALL

N-G025

PRIF NEUADD82.2 m²SMALL HALL

N-G021

NEUADD BACH

9.0 m²SMALL GROUP ROOMS (3/3)

N-G082

YSTAFELL GRŴP BACH

10.4 m²STAGING/APPLIANCE STORE

N-G023

STORFA LLWYFAN/CYMHWYSIADAU10.6 m²

CHANGING ROOM

N-G018

YSTAFELL NEWID

10.5 m²CHANGING ROOM

N-G019

YSTAFELL NEWID

2.4 m²SICK BAY

N-G010

BAE SALWCH

13.3 m²GENERAL OFFICE

N-G014

SWYDDFA GYFFREDINOL

14.3 m²WC/HYGIENE FACILITIES

N-G061

TOILED/CYFLEUSTERAU HYLENDID

4.5 m²COMMUNITY STORE

N-G016

STORFA GYMUNEDOL

42.2 m²PLANT

N-G095

?

9.1 m²ENTRANCE/RECEPTION

N-G001

MYNEDFA/DERBYNFA

4.0 m²STAFF WC

N-G051

TOILED STAFF

3.7 m²VISITOR WC

N-G007

TOILEDAU YMWELWYR

7.9 m²INTERVIEW ROOM

N-G013

YSTAFELL CYFWELIAD

7.5 m²CARE/MAINTENANCE

N-G006

GOFALWR/CYNNAL A CHADW

58.0 m²STAFF ROOM

N-G003

YSTAFELL STAFF

65.9 m²WAITING AREA

N-G002

ARDAL AROS

15.0 m²PE STORE

N-G026

STORFA AG

10.0 m²WC

N-G063

TOILED

6.1 m²REPROGRAPHICS BAY

N-G011

BAE

18.6 m²PPA

N-G012

CPA

6.0 m²OFFICE

N-G056

SWYDDFA

6.0 m²KITCHEN

N-G057

CEGIN

3.9 m²STORE

N-G059

STORFA

4.2 m²CHANGING ROOM

N-G060

YSTAFELL NEWID

7.6 m²LOBBY

N-G039

LOBI

EXTERNAL SPRINKLER TANK

3.5 m²STORE

N-G022

STORFA

EXTERNAL TEACHING SPACE

PLANTING BED

PLANTING BED

EXTERNAL TEACHING SPACE

2.0 m²

PLATFORM

LIFT

N-G037

?

BIN STORE

RECYCLING

STORE

MUGA

SCALE DATE DRAWN CHECKED

PROJECT

REV DESCRIPTION DATE BY

THE OLD POLICE STATION, 15 GLYNNE WAY, HAWARDEN, CH5 3NS

Tel: 01244 537 100 | [email protected] | www.agarchitects.co.uk

DRAWING TITLE

JOB No DRAWING No REV

Ainsley Gommon Architects Ltd. Registered in England & Wales No.4187948

Registered Office: 1 Price Street, Hamilton Square, Birkenhead CH41 6JN

THIS DRAWING IS THE COPYRIGHT OF AINSLEY GOMMON ARCHITECTS. DO NOT

SCALE FROM THIS DRAWING. WORK TO FIGURED DIMENSIONS ONLY. CHECK ALL

DIMENSIONS ON SITE. ANY DISCREPANCIES TO BE NOTIFIED TO THE ARCHITECT.

ELEMENTS OF STRUCTURE SHOWN ARE INDICATIVE AND FOR GUIDANCE.

FINAL DESIGN TO BE AS STRUCTURAL ENGINEERS DETAILS AND SPECIFICATION.

@A1

A1PRINTED:

STATUS PURPOSE OF ISSUE

FOR COMMENTS

1 : 200

20/07/2018 14:20:29

P8

PLANNING - GROUND

FLOOR PLAN

29/01/18 GJ MF

YSGOL Y GARNEDD,

BANGOR

for CYNGOR GWYNEDD

C910|YGB-AGA-XX-00-DR-A-0004 |

S03

SCALE 1 : 200

00 - GROUND FLOOR1

Area Schedule (Gross Building)

Area Level

1075.9 m² 01 - FIRST FLOOR

2062.0 m² 00 - GROUND FLOOR

3137.9 m²

VISUAL SCALE 1:200 @ A1

20m4m 16m12m8m0m

P1 SKETCH PROPOSAL 13.02.18 GJ

P2 REVISED SKETCH PROPOSAL 23.02.18 GJ

P3 REVISED SKETCH PROPOSAL 08.03.18 GJ

P4 LAYOUT REVISED FOLLOWING

CONSULTATION MEETINGS

29.03.18 GJ

P5 CONSULTATION ISSUE 30.04.18 GJ

P6 RIBA STAGE 2 FOR APPROVAL DRAWINGS 14.05.18 GJ

C1 STAGE 2 SIGN OFF 06.06.18 GJ

P7 ISSUE FOR COMMENTS 06.06.18 MR

P8 ISSUE FOR PRE-PLANNING CONSULTATION 20.07.18 MR

NORTH

Recommended