Download xls - Analisa Sni

Transcript

XXXX

Bhn & UphPANGKAL PINANGJakartaDAFTAR HARGA SATUAN BAHANHRG JKT (+ %)Jurnal 2013URAIAN BAHANKeteranganHRG SATUANSATUANHarga satuanMATERIAL SEMENnaik 5%SEMEN (+15%)Semen PC / 50 kg65,000.00/zak72,450.0063,000.00Semen Putih 40 kg (ex Tiga Roda)84,000.00/zak92,000.0080,000.00Semen warna10,500.00/Kg11,500.0010,000.00Semen Merah183,750.00/M3201,250.00175,000.00MATERIAL MORTAR UTAMA (MU)naik 5%MORTAR (+15%)Plester premium (MU 100)63,000.00/zak 40Kg69,000.0060,000.00Plester trasraam (MU 101)94,500.00/zak 40Kg103,500.0090,000.00Acian plesteran / beton expose (MU 200)166,425.00/zak 40Kg182,275.00158,500.00Acian plesteran (MU 250)101,850.00/zak 40Kg111,550.0097,000.00Acian profil (MU 260)200,025.00/zak 25Kg219,075.00190,500.00Acian putih (MU 270)Perekat keramik area lembab163,800.00/zak 25Kg179,400.00156,000.00Finish plester (MU 290)101,850.00/zak 40Kg111,550.0097,000.00Pasangan bata (MU 300)53,025.00/zak 40Kg58,075.0050,500.00Pasangan & plesteran bata (MU 301)60,375.00/zak 40Kg66,125.0057,500.00Perekat bata ringan (MU 380)157,500.00/zak 40Kg172,500.00150,000.00Perekat keramik dinding (MU 400)142,800.00/zak 25Kg156,400.00136,000.00Pengisi naad keramik (MU 408)12,075.00/Kg13,225.0011,500.00Perata lantai (MU 440)56,700.00/zak 40Kg62,100.0054,000.00Perata lantai premium (MU 445)103,950.00/zak 40Kg113,850.0099,000.00Perekat keramik lantai (MU450)204,750.00/zak 40Kg224,250.00195,000.00Perekat keramik daerah basah (MU 460)449,400.00/zak 25Kg492,200.00428,000.00Perekat keramik diatas keramik (MU 480)241,500.00/zak 25Kg264,500.00230,000.00Multi Purpose Tile Adhesive (MU 485)1,155,000.00/40Kg set1,265,000.001,100,000.00Fast Setting Tile Adhesive (MU 490)336,000.00/zak 25Kg368,000.00320,000.00Perekat mortar & beton / Bonding Agent (MU L-500)210,525.00/ 2Kg230,575.00200,500.00Pelapis kedap air (MU 600)1,113,000.00/30Kg set1,219,000.001,060,000.00Floor Hardener (MU 700)144,375.00/zak 25Kg158,125.00137,500.00Non shrink grout (MU 800)161,700.00/zak 40Kg177,100.00154,000.00Perbaikan permukaan beton (MU 830)269,850.00/zak 40Kg295,550.00257,000.00Pengisi celah beton / Finish Coat Repair (MU 840)336,000.00/ 25Kg set368,000.00320,000.00MATERIAL PASIR, BATU & BATAnaik 5%PASIR, BATU (+10%)Pasir beton270,375.00/M3283,250.00257,500.00Pasir extra beton273,000.00/M3286,000.00260,000.00Pasir Putih (Bangka)315,000.00/M3330,000.00300,000.00Pasir Pasang265,125.00/M3277,750.00252,500.00Kapur Padam210,000.00/M3220,000.00200,000.00Pasir Urug darat291,375.00/M3305,250.00277,500.00Sirtu256,200.00/M3268,400.00244,000.00Batu pecah / Split ukuran 1-2 cm267,750.00/M3280,500.00255,000.00Batu pecah / Split ukuran 2-3 cm269,500.35/M3282,333.70256,667.00Koral beton286,125.00/M3299,750.00272,500.00Batu kali belah257,250.00/M3269,500.00245,000.00Makadam / batu pecah 5-7 cm262,500.00/M3275,000.00250,000.00Abu batu 5 mm241,500.00/M3253,000.00230,000.00Sreening 5-13 mm255,937.50/M3268,125.00243,750.00Batu bata press mesin700.35/bh733.70667.00Batu bata uk. 5 x 11 x 23 cm (ukuran besar) proses tangan630.00/bh660.00600.00Batu bata uk. 4 x 9.5 x 20 cm (ukuran kecil) proses tangan512.40/bh536.80488.00Batu bata ringan (ex Hebel), 10x16x60 cm889,875.00/M3932,250.00847,500.008,542.80/bh8,949.608,136.00Batu bata ringan (ex Hebel), 7x16x60 cm889,875.00/M3932,250.00847,500.005,979.96/bh6,264.725,695.20Batu bata ringan (ex Broco), 10x16x60 cm889,875.00/M3932,250.00847,500.008,542.80/bh8,949.608,136.00Batu bata ringan (ex Broco), 7x16x60 cm880,687.50/M3922,625.00838,750.005,918.22/bh6,200.045,636.40Batako Semen (semen, pasir, abu batu) 9x19x39 cm4,200.00/bh4,400.004,000.00Batako Semen (semen, batu apung, pumis) 9x19x39 cm4,987.50/bh5,225.004,750.00Glassblock 20/2031,500.00/bh33,000.0030,000.00Rooster beton 20x20x7 cm6,063.75/bh6,352.505,775.00Rooster bata merah 12x11,5x24 cm5,075.70/bh5,317.404,834.00Lempengan garis uk. 9x19x39 cm3,675.00/bh3,850.003,500.00Tanah merah262,500.00/M3275,000.00250,000.00I j u k31,500.00/kg33,000.0030,000.00MATERIAL BESInaik 5%BESI (+10%)Besi beton polos13,125.00/kg13,750.0012,500.00Besi beton ulir13,125.00/kg13,750.0012,500.00Besi plat strip14,542.50/kg15,235.0013,850.00Baja profil siku14,455.35/kg15,143.7013,767.00Baja WF13,125.00/kg13,750.0012,500.00Baja H Beam14,437.50/kg15,125.0013,750.00Baja Kanal C (Channal)14,568.75/kg15,262.5013,875.00Besi plat hitam (segala ukuran)15,750.00/kg16,500.0015,000.00Besi plat putih (segala ukuran)14,595.00/kg15,290.0013,900.00Besi plat bordes26,512.50/kg27,775.0025,250.00Kanal C galvaspan HI-TEN, type C 100.1670,612.50/M'73,975.0067,250.00Kanal C galvaspan HI-TEN, type C 100.2084,525.00/M'88,550.0080,500.00Kanal C galvaspan HI-TEN, type C 125.1673,500.00/M'77,000.0070,000.00Kanal C galvaspan HI-TEN, type C 125.2085,050.00/M'89,100.0081,000.00Kanal C galvaspan HI-TEN, type C 150.1683,737.50/M'87,725.0079,750.00Kanal C galvaspan HI-TEN, type C 150.20105,000.00/M'110,000.00100,000.00Kanal C galvaspan HI-TEN, type C 150.25115,500.00/M'121,000.00110,000.00Kanal C galvaspan HI-TEN, type C 200.16105,000.00/M'110,000.00100,000.00Kanal C galvaspan HI-TEN, type C 200.20131,250.00/M'137,500.00125,000.00Kanal C galvaspan HI-TEN, type C 200.25162,750.00/M'170,500.00155,000.00Besi Wire Mesh DM-8F1, 540 x 210 cm (11,34 M2)567,541.00/lembar52,550.09/M255,052.4850,047.71Besi Wire Mesh DM-7F1, 540 x 210 cm (11,34 M2)434,542.00/lembar40,235.37/M242,151.3438,319.40Besi Wire Mesh DM-6F1, 540 x 210 cm319,271.00/lembar29,562.13/M230,969.8528,154.41Besi Wire Mesh DM-5F1, 540 x 210 cm224,381.00/lembar20,776.02/M221,765.3519,786.68Besi Wire Mesh DM-4, 540 x 210 cm166,126.00/lembar15,382.04/M216,114.5114,649.56Kawat beton20,212.50/kg21,175.0019,250.00Kawat Las31,500.00/m33,000.0030,000.00Kawat duri 10 kg (60 m')165,375.00/roll173,250.00157,500.00Paku halus (2 - 3 cm)19,950.00/kg20,900.0019,000.00Paku ukuran sedang (4 - 5 cm)18,637.50/kg19,525.0017,750.00Paku ukuran sedang (6 - 7 cm)15,356.25/kg16,087.5014,625.00Paku ukuran (10-15 cm)15,356.25/kg16,087.5014,625.00Seng Gelombang 180x90x0,0547,250.00/lmbr49,500.0045,000.00belum di updateSeng Gelombang 180x90x0,0364,050.00/lmbr67,100.0061,000.00Plat Seng tebal 0,5 mm, lebar 90 cm31,500.00/M'33,000.0030,000.00Plat Seng tebal 0,3 mm, lebar 90 cm36,750.00/M'38,500.0035,000.00Paku Seng26,250.00/kg27,500.0025,000.00Hollow 40x40 mm galvanized (tebal standart)Rgk plafond/Partisi5,250.00/M'5,500.005,000.00Hollow 20x40 mm galvanized (tebal standart)Rgk plafond/Partisi5,250.00/M'5,500.005,000.00Hollow 40x40 mm dimenie (tebal standart)Rgk plafond/Partisi6,300.00/M'6,600.006,000.00Hollow 20x40 mm dimenie (tebal standart)Rgk plafond/Partisi4,725.00/M'4,950.004,500.00Metal Furing 75 mmRgk plafond/Partisi9,450.00/M'9,900.009,000.00Hollow 40x40x1 mmRgk. Pintu besi/konstruksi219,450.00/btg/6m229,900.00209,000.00Hollow 20x40x1 mmRgk. Pintu besi/konstruksi110,250.00/btg/6m115,500.00105,000.00Besi Hollow 40x40x1,2 (rangka utama)Rgk. Pintu besi/konstruksi225,750.00/btg/6m236,500.00215,000.00Besi Hollow 20x40x1,2 (rangka pembagi)Rgk. Pintu besi/konstruksi115,500.00/btg/6m121,000.00110,000.00Folding Gate :- Folding Gate, bahan besi plate tbl. 0.3 mmlengkap dg finishing & kunci dll.336,000.00/m2352,000.00320,000.00informasi arimata steel- Folding Gate, bahan besi plate tbl. 0.4 mmlengkap dg finishing & kunci dll.357,000.00/m2374,000.00340,000.00tgl 7 Mei 2013- Folding Gate, bahan besi plate tbl. 0.5 mmlengkap dg finishing & kunci dll.367,500.00/m2385,000.00350,000.00- Folding Gate, bahan galvalum, tbl. 0.3 mmlengkap dg finishing & kunci dll.372,750.00/m2390,500.00355,000.00- Folding Gate, bahan galvalum, tbl. 0.4 mmlengkap dg finishing & kunci dll.393,750.00/m2412,500.00375,000.00- Folding Gate, bahan galvalume, tbl. 0.5 mmlengkap dg finishing & kunci dll.414,750.00/m2434,500.00395,000.00Rolling Door :- Folding Gate, bahan besi plate tbl. 0.3 mmlengkap dg finishing & kunci dll.241,500.00/m2253,000.00230,000.00- Folding Gate, bahan Galvalum tbl. 0.3 mmlengkap dg finishing & kunci dll.294,000.00/m2308,000.00280,000.00- Folding Gate, bahan Allumunium tbl. 0.3 mmlengkap dg finishing & kunci dll.336,000.00/m2352,000.00320,000.00MATERIAL KAYUnaik 5%KAYU (+ 10%)Kayu Meranti basah- Balok Meranti basah (8/15,8/12,6/15,6/12, 5/10x400 cm)3,360,000.00/M33,520,000.003,200,000.00- Kasau Meranti basah (5/7x400, 4/6x400 cm)2,730,000.00/M32,860,000.002,600,000.00- Reng (3/4x400, 2/3x400)2,625,000.00/M32,750,000.002,500,000.00- Papan Meranti basah (3/30, 3/20 & 2/30x400 cm)4,200,000.00/M34,400,000.004,000,000.00Kayu Rimba Campuran (KRC) basah- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)2,415,000.00/M32,530,000.002,300,000.00- Kasau (5/7x400, 4/6x400 cm)1,995,000.00/M32,090,000.001,900,000.00- Reng (3/4x400, 2/3x400)1,890,000.00/M31,980,000.001,800,000.00- Papan (3/30, 3/20 & 2/30x400 cm)( u/. Bekisting )3,045,000.00/M33,190,000.002,900,000.00- Kayu Dolken (kayu Galam 8-10cm, L=4m)( u/. Bekisting )36,750.00/btg38,500.0035,000.00- Plastik cor( u/. Bekisting )6,300.00/M26,600.006,000.00Kayu Terentang- Papan uk. 3/30x400, 3/20x400 & 2/30x400 cm( u/. Bekisting )2,835,000.00/M32,970,000.002,700,000.00Kayu Kamper Samarinda basah- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)(u/. Rngk.Atap)7,350,000.00/M37,700,000.007,000,000.00- Kasau (5/7x400, 4/6x400 cm)(u/. Rngk.Atap)6,825,000.00/M37,150,000.006,500,000.00- Reng (3/4x400)(u/. Rngk.Atap)5,250,000.00/M35,500,000.005,000,000.00- Papan (3/20 & 2/30x400 cm)(u/. Rngk.Atap)8,505,000.00/M38,910,000.008,100,000.00Kayu Borneo/Meranti Super- Balok Borneo/Meranti Super, kelas-3(u/. Rngk.Atap)4,725,000.00/M34,950,000.004,500,000.00- Kasau Borneo/Meranti Super(u/. Rngk.Atap)4,462,500.00/M34,675,000.004,250,000.00Kayu Kruing- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)(u/. Rngk.Atap)5,040,000.00/M35,280,000.004,800,000.00- Kasau (5/7x400, 4/6x400 cm)(u/. Rngk.Atap)4,725,000.00/M34,950,000.004,500,000.00- Papan (3/20 & 2/30x400 cm)(u/. Rngk.Atap)6,825,000.00/M37,150,000.006,500,000.00Kayu Kamper Medan- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)(u/. Rngk.Atap)5,775,000.00/M36,050,000.005,500,000.00- Kasau (5/7x400, 4/6x400 cm)(u/. Rngk.Atap)5,512,500.00/M35,775,000.005,250,000.00- Papan (3/20 & 2/30x400 cm)(u/. Rngk.Atap)6,037,500.00/M36,325,000.005,750,000.00Kayu Bengkirai- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)(u/. Rngk.Atap)7,350,000.00/M37,700,000.007,000,000.00- Kasau (5/7x400, 4/6x400 cm)(u/. Rngk.Atap)7,140,000.00/M37,480,000.006,800,000.00- Papan (3/20 & 2/30x400 cm)(u/. Rngk.Atap)7,612,500.00/M37,975,000.007,250,000.00Kayu Kamper Singkil- Balok (8/15,8/12,6/15,6/12, 5/10x400 cm)(u/. Rngk.Atap)7,350,000.00/M37,700,000.007,000,000.00- Kasau (5/7x400, 4/6x400 cm)(u/. Rngk.Atap)7,140,000.00/M37,480,000.006,800,000.00Kayu Jati Kelas I (Jawa Timur)- Balok Jati Jawa Timur, Kelas-I(u/. Kosen/pintu)57,750,000.00/M360,500,000.0055,000,000.00- Papan Jati Jawa Timur, Kelas-I(u/. Kosen/pintu)60,375,000.00/M363,250,000.0057,500,000.00- Balok Jati Jawa Timur, Super(u/. Kosen/pintu)68,250,000.00/M371,500,000.0065,000,000.00- Papan Jati Jawa Timur, Super(u/. Kosen/pintu)70,875,000.00/M374,250,000.0067,500,000.00Kayu Jati Kelas II Basah (Jawa Tengah)- Balok uk. 6x15x100 - 190 cm38,850,000.00/M340,700,000.0037,000,000.00- Balok uk. 6x15x200 - 240 cm47,250,000.00/M349,500,000.0045,000,000.00- Balok uk. 6x15x240 - 290 cm52,500,000.00/M355,000,000.0050,000,000.00- Balok uk. 6x15x240 - 340 cm52,500,000.00/M355,000,000.0050,000,000.00- Balok uk. 6x15x340 - 390 cm63,000,000.00/M366,000,000.0060,000,000.00Kayu Kruing oven- Balok Kamper Kruing (oven)(u/. Kosen/pintu)6,300,000.00/M36,600,000.006,000,000.00- Balok Kamper Medan (oven)(u/. Kosen/pintu)6,300,000.00/M36,600,000.006,000,000.00Kayu Kamper Singkil oven- Balok Kamper Singkil (oven)(u/. Kosen/pintu)7,875,000.00/M38,250,000.007,500,000.00- Papan Kamper Singkil (oven)(u/. Kosen/pintu)8,137,500.00/M38,525,000.007,750,000.00Kayu Kamper Samarinda (kering oven)- Balok (8/12 x400 & 6/15x400 cm)(u/. Kosen)9,975,000.00/M310,450,000.009,500,000.00- Kasau (5/7x400, 4/6x400 cm)9,240,000.00/M39,680,000.008,800,000.00- Reng (3/4x400)7,140,000.00/M37,480,000.006,800,000.00- Papan (3/20x400 cm)10,395,000.00/M310,890,000.009,900,000.00- Papan (4/30, 4/25x400 cm)(u/. Pintu)10,395,000.00/M310,890,000.009,900,000.00- Balok Kamper Samarinda, super (oven)(u/. Kosen/pintu)10,500,000.00/M311,000,000.0010,000,000.00- Papan Kamper Samarinda, super (oven)(u/. Kosen/pintu)11,025,000.00/M311,550,000.0010,500,000.00- Papan Meranti oven(u/. Kosen/pintu)6,300,000.00/M36,600,000.006,000,000.00Kayu Bengkirai- Balok Bengkirai(u/. Kosen/pintu)7,875,000.00/M38,250,000.007,500,000.00- Papan Bengkirai(u/. Kosen/pintu)8,137,500.00/M38,525,000.007,750,000.00Kayu Merbau- Balok Merbau (oven)(u/. Kosen/pintu)10,500,000.00/M311,000,000.0010,000,000.00- Papan Merbau (oven)(u/. Kosen/pintu)10,762,500.00/M311,275,000.0010,250,000.00MATERIAL MULTIPLEKSnaik 5%Multipleks, 1220x2440x25 mm299,250.00/lmbr313,500.00285,000.00Multipleks, 1220x2440x22 mm278,250.00/lmbr291,500.00265,000.00Multipleks, 1220x2440x20 mm252,000.00/lmbr264,000.00240,000.00Multipleks, 1220x2440x18 mm207,900.00/lmbr217,800.00198,000.00Informasi bahan bangunanMultipleks, 1220x2440x15 mm187,950.00/lmbr196,900.00179,000.00tgl. 4 Mei 2013Multipleks, 1220x2440x12 mm156,450.00/lmbr163,900.00149,000.00Multipleks, 1220x2440x9 mm110,250.00/lmbr115,500.00105,000.00Multipleks, 1220x2440x6 mm80,850.00/lmbr84,700.0077,000.00Multipleks, 1220x2440x4 mm57,750.00/lmbr60,500.0055,000.00Teakwood 1220x2440x3 mm105,000.00/lmbr110,000.00100,000.00Plywood Sungkai, uk. 1220x2440x3 mm105,000.00/lmbr110,000.00100,000.00Plywood Sungkai, uk. 1220x2440x4 mm110,250.00/lmbr115,500.00105,000.00Plywood Sungkai, uk. 1220x2440x18 mm (1 muka)232,575.00/lmbr243,650.00221,500.00Plywood Sungkai, uk. 1220x2440x18 mm (2 muka)269,850.00/lmbr282,700.00257,000.00Bloktik, uk. 1220x2440x18 mm (1 muka)248,587.50/lmbr260,425.00236,750.00Melamin, uk. 1220x2440x3 mm (mengkilap)82,425.00/lmbr86,350.0078,500.00Formika, 92 x 212 mm89,250.00/lmbr93,500.0085,000.00HPL 4' x 8'183,750.00/lmbr192,500.00175,000.00MATERIAL GYPSUM, CALSIUM, GRCnaik 5%GYPSUM (+ 15%)Gypsum board 9 mm (water resistants)102,500.00/lmbr120,750.00105,000.00Gypsum board 9 mm59,000.00/lmbr69,000.0060,000.00Gypsum board 12 mm78,750.00/lmbr86,250.0075,000.00Calcium Silikat 6 mm106,365.00/lmbr116,495.00101,300.00Gypsum Tile 600x1200x9mm18,375.00/lmbr20,125.0017,500.00AcousticTile 600x1200x15 mmEx Armstrong37,800.00/lmbr41,400.0036,000.00Profil allumunium Main Tee (p. 3,6m)7,291.67/m'7,986.116,944.44Profil allumunium Cross Tee (p. 1,2 m)6,562.50/m'7,187.506,250.00Profil allumunium Cross Tee (p. 0,60 m)8,750.00/m'9,583.338,333.33Gypsum bubuk (compound)4,725.00/kg5,175.004,500.00Paku skrup gypsum42,000.00/Kg46,000.0040,000.00Textile tape18,375.00/roll20,125.0017,500.00List gypsum profil 5-10 cm5,250.00/m'5,750.005,000.00List plafond allumunium (Wall angle)6,825.00/m'7,475.006,500.00GRC BOARD, 1220x2440x5 mm73,500.00/lmbr80,500.0070,000.00GRC BOARD, 1220x2440x6 mm84,000.00/lmbr92,000.0080,000.00GRC BOARD, 1220x2440x8 mm115,500.00/lmbr126,500.00110,000.00GRC BOARD, 1220x2440x10 mm136,500.00/lmbr149,500.00130,000.00GRC SPR PANEL, 1220x2440x9 mm183,750.00/lmbr201,250.00175,000.00GRC SPR PANEL, 1220x2440x12 mm210,000.00/lmbr230,000.00200,000.00GRC SPR PANEL, 1220x2440x15 mm262,500.00/lmbr287,500.00250,000.00Compound GRC (A +B)60,375.00/kg66,125.0057,500.00Asbes plat 100x100x0,4 cm47,250.00/M251,750.0045,000.00Lem kayu42,000.00/Kg46,000.0040,000.00MATERIAL KACAnaik 5%KACA (+20%)Kaca polos tempered 12 mm, ex Asahi Masharga terpasang619,500.00/ M2708,000.00590,000.00Kaca warna tempered 12 mm, ex Asahi Masharga terpasang813,750.00/ M2930,000.00775,000.00Kaca polos tempered 12 mm (lubang dll), khusus pintuharga terpasang672,000.00/ M2768,000.00640,000.00Kaca warna tempered 12 mm (lubang dll), khusus pintuharga terpasang866,250.00/ M2990,000.00825,000.00Kaca tempered 10 mm, ex Asahi Masharga terpasang558,600.00/ M2638,400.00532,000.00Kaca polos 12 mm, ex Asahi Masharga terpasang446,250.00/ M2510,000.00425,000.00Kaca polos 10 mm, ex Asahi Masharga terpasang393,750.00/ M2450,000.00375,000.00Kaca polos 8 mm, ex Asahi Masharga terpasang236,250.00/ M2270,000.00225,000.00Kaca polos 8 mm tempered, ex Asahi Masharga terpasang404,250.00/ M2462,000.00385,000.00Kaca warna 8 mm, ex Asahi Masharga terpasang262,500.00/ M2300,000.00250,000.00Kaca warna 8 mm, ex Asahi Mas (Reflective)harga terpasang393,750.00/ M2450,000.00375,000.00Kaca polos 6 mm tempered, ex Asahi Masharga terpasang215,000.00/ M2270,000.00225,000.00Kaca polos 6 mm, ex Asahi Masharga terpasang168,000.00/ M2192,000.00160,000.00Kaca warna 6 mm, ex Asahi Masharga terpasang183,750.00/ M2210,000.00175,000.00Kaca polos 5 mm, ex Asahi Masharga terpasang147,000.00/ M2168,000.00140,000.00Kaca Stopsol Plat Laminated, polos tebal 6 mmharga terpasang420,000.00/ M2480,000.00400,000.00Kaca Stopsol Plat Laminated, polos tebal 8 mmharga terpasang708,750.00/ M2810,000.00675,000.00Kaca Stopsol Plat Laminated, polos tebal 10 mmharga terpasang1,076,250.00/ M21,230,000.001,025,000.00MATERIAL ALLUMUNIUMnaik 5%ALLUMUNIUM (+20%)ALLUMUNIUM PRODUK YKKProfil kosen Allumunium 1 3/4 x 3", Silver Clear Anodized ex YKK94,500.00/ M'108,000.0090,000.00Profil kosen Allumunium 1 3/4 x 4", Silver Clear Anodized ex YKK115,500.00/ M'132,000.00110,000.00Profil Frame Allumunium Pintu kaca, Silver Clear Anodized ex YKK105,000.00/ M'120,000.00100,000.00Profil Frame Allumunium Jendela kaca, Silver Clear Anodized ex YKK89,250.00/ M'102,000.0085,000.00Profil kosen Allumunium 1 3/4 x 3", Black/Brown Anodized ex YKK115,500.00/ M'132,000.00110,000.00Profil kosen Allumunium 1 3/4 x 4", Black/Brown Anodized ex YKK157,500.00/ M'180,000.00150,000.00Profil Frame Allumunium Pintu kaca, Black/Brown Anodized ex YKK147,000.00/ M'168,000.00140,000.00Profil Frame Allumunium Jendela kaca, Black/Brown Anodized ex YKK105,000.00/ M'120,000.00100,000.00Profil kosen Allumunium 1 3/4 x 3", Powder Coating ex YKK147,000.00/ M'168,000.00140,000.00Profil kosen Allumunium 1 3/4 x 4", Powder Coating ex YKK168,000.00/ M'192,000.00160,000.00Profil Frame Allumunium Pintu kaca, Powder Coating ex YKK161,700.00/ M'184,800.00154,000.00Profil Frame Allumunium Jendela kaca, Powder Coating ex YKK126,000.00/ M'144,000.00120,000.00ALLUMUNIUM PRODUK ALEXINDOProfil kosen Allumunium 1 3/4 x 3", Silver Clear Anodized ex Alexindo52,500.00/ M'60,000.0050,000.00Profil kosen Allumunium 1 3/4 x 4", Silver Clear Anodized ex Alexindo68,250.00/ M'78,000.0065,000.00Profil Frame Allumunium Pintu kaca, Silver Clear Anodized ex Alexindo63,000.00/ M'72,000.0060,000.00Profil Frame Allumunium Jendela kaca, Silver Clear Anodized ex Alexindo52,500.00/ M'60,000.0050,000.00Profil kosen Allumunium 1 3/4 x 3", Black/Brown Anodized ex Alexindo68,250.00/ M'78,000.0065,000.00Profil kosen Allumunium 1 3/4 x 4", Black/Brown Anodized ex Alexindo78,750.00/ M'90,000.0075,000.00Profil Frame Allumunium Pintu kaca, Black/Brown Anodized ex Alexindo73,500.00/ M'84,000.0070,000.00Profil Frame Allumunium Jendela kaca, Black/Brown Anodized ex alexindo63,000.00/ M'72,000.0060,000.00Profil kosen Allumunium 1 3/4 x 3", Powder Coating serat kayu, ex Alexindo136,500.00/ M'156,000.00130,000.00Profil kosen Allumunium 1 3/4 x 4", Powder Coating serat kayu, ex Alexindo168,000.00/ M'192,000.00160,000.00Profil Frame Allumunium Pintu kaca, Powder Coating serat kayu, ex Alexindo157,500.00/ M'180,000.00150,000.00Profil Frame Allumunium Jendela kaca, Powder Coating serat kayu, ex Alexindo126,000.00/ M'144,000.00120,000.00Sealant kaca8,531.25/ M'10,156.258,125.00Karet kaca2,887.50/ M'3,437.502,750.00Allumunium plat tebal 0,4 mm, uk. 1000x2000 mm129,675.00/lmbr154,375.00123,500.00Allumunium plat tebal 0,4 mm, uk. 1220x2440 mm192,675.00/lmbr229,375.00183,500.00Allumunium plat tebal 0,5 mm, uk. 1000x2000 mm162,225.00/lmbr193,125.00154,500.00Allumunium plat tebal 0,5 mm, uk. 1220x2440 mm240,975.00/lmbr286,875.00229,500.00Allumunium Bordes tebal 2 mm, uk. 1000x2000 mm752,325.00/lmbr895,625.00716,500.00Allumunium Bordes tebal 3 mm, uk. 1000x2000 mm1,128,225.00/lmbr1,343,125.001,074,500.00MATERIAL ATAPnaik 5%BAHAN ATAP (+ 20%)Genteng Plentong Glazur, ex Jatiwangi4,462.50/bh5,100.004,250.00Nok Genteng Plentong Glazur, ex Jatiwangi7,875.00/bh9,000.007,500.00Genteng Plentong tidak Glazur, ex Jatiwangi3,675.00/bh4,200.003,500.00Nok Genteng Plentong tidak Glazur, ex Jatiwangi6,300.00/bh7,200.006,000.00Genteng Keramik Glazur ex KanmuriStandar Espanica Natural12,285.00/bh14,040.0011,700.00Genteng Keramik Glazur ex KanmuriStandar Espanica Medium13,125.00/bh15,000.0012,500.00Genteng Keramik Glazur ex KIAStadar Natural13,125.00/bh15,000.0012,500.00Nok Genteng Keramik Glazur, ex KIAStadar Natural26,565.00/bh30,360.0025,300.00Genteng Keramik ex Cisangkan type Victoria12,600.00/bh14,400.0012,000.00Nok Genteng Keramik, ex Cisangkan26,250.00/bh30,000.0025,000.00Genteng Morando Glazur, ex Jatiwangi3,675.00/bh4,200.003,500.00Genteng Morando tidak Glazur, ex Jatiwangi4,200.00/bh4,800.004,000.00Nok Genteng Morando tidak Glazur, ex Jatiwangi10,500.00/bh12,000.0010,000.00Genteng Beton ex Karangpilang (berwarna)12,600.00/bh14,400.0012,000.00Genteng Nok Beton Karangpilang (berwarna)26,250.00/bh30,000.0025,000.00Djabes gelombang kecil (B100) uk. 300x105, tbl. 6mm141,750.00/Lbr162,000.00135,000.00Djabes gelombang kecil (B100) uk. 300x105, tbl. 5mm126,000.00/Lbr144,000.00120,000.00Djabes gelombang kecil (K200) uk. 300x105, tbl. 4mm94,500.00/Lbr108,000.0090,000.00Skrup + ring472.50/bh540.00450.00Atap Sirap236,250.00/M2270,000.00225,000.00Paku sirap31,500.00/Kg36,000.0030,000.00Atap Gelombang GALVALUME, type SPANDEK LYSAGHT, tebal 0,75 mm(ex. CV. Cipta Prima Sentosa)177,975.00/M2203,400.00169,500.00Atap Gelombang GALVALUME, type SPANDEK LYSAGHT, tebal 0,50 mm(ex. CV. Cipta Prima Sentosa)91,875.00/M2105,000.0087,500.00Atap Metal ZINCALUM, type ada sterofoam 5cm210,000.00/M2240,000.00200,000.00Atap Metal Spandex Zincalum tebal 0,5 mm(ex. CV. Cipta Prima Sentosa)121,800.00/M2139,200.00116,000.00MATERIAL WATERPROOFINGLapisan Coating PF Primerwaterproofing atap beton18,375.00/M221,000.0017,500.00Waterproofing Membrane, Sopralene 4 mmwaterproofing atap beton157,500.00/M2180,000.00150,000.00Waterproofing Membrane, Gardigum 4 mmwaterproofing atap beton141,750.00/M2162,000.00135,000.00Waterproofing jenis coating ex Sika/AM/setara52,500.00/Kg60,000.0050,000.00MATERIAL KERAMIK, MARMER, GRANIT & HOMOGENOUS TILEKERAMIK (+ 10%)Granit Import- Granit Import (Red China & Black China) jenis Slab577,500.00/M2605,000.00550,000.00- Granit Import (Nero Absolute India) jenis slab1,023,750.00/M21,072,500.00975,000.00Homogenous Tile Niro Granite- Niro Granite 80x80 Cm257,250.00/M2269,500.00245,000.00- Niro Granite 60x60 Cm231,000.00/M2242,000.00220,000.00- Niro Granite 60x60 Cm (un-polish)210,000.00/M2220,000.00200,000.00- Niro Granite 40x40 Cm168,000.00/M2176,000.00160,000.00Homogenous Tile Granito- Granito Salsa 60x60 Cm (polished)W : Pearl White, Ivory255,255.00/M2267,410.00243,100.00- Granito Salsa 60x60 Cm (polished)W : Water stone, White stone313,005.00/M2327,910.00298,100.00- Granito group Diamon 60x60 Cm (polished)W : Water stone, White stone272,580.00/M2285,560.00259,600.00- Granito Palazzo 60x60 Cm (polished)W : Sanrosa331,485.00/M2347,270.00315,700.00- Granito Aurora group Silver 60x60 Cm (polished)W : Slamon type miror301,455.00/M2315,810.00287,100.00- Granito Aurora Group Gold 60x60 Cm (polished)W : Astro371,910.00/M2389,620.00354,200.00- Granito Lunar group Silver 60x60 Cm (un-polished)W : Terra, Zephyr type Rustic259,875.00/M2272,250.00247,500.00- Granito Lunar group Gold 60x60 Cm (un-polished)W : Amber, Quartz type Rustic307,461.00/M2322,102.00292,820.00- Granito Lunar group Bronze 60x60 Cm (un-polished)W : Solar, Helium type Rustic248,325.00/M2260,150.00236,500.00- Granito Lunar 60x60 Cm (un-polished)W : Alumina, Oxide358,050.00/M2375,100.00341,000.00- Granitto Aurora 30x60 Cm (polished), Group SilverW : Waffel, Latte type miror310,695.00/M2325,490.00295,900.00- Granitto Lunar 30x60 Cm (Un-polished), Group BronzeW : Solar, Helium type Rustic257,565.00/M2269,830.00245,300.00- Granitto Lunar 30x60 Cm (Un-polished), Group SilverW : Terra, Zephyr type Rustic269,115.00/M2281,930.00256,300.00- Granitto Lunar 30x60 Cm (Un-polished), Group GoldW : Amber, Quartz type Rustic307,461.00/M2322,102.00292,820.00- Granitto 40/40 Cm (polish) Group Silver, type CrystalW : Pearl White, Ivory, Mustand170,940.00/M2179,080.00162,800.00- Granitto 40/40 Cm (polish) Group SilverW : Greystone, Line197,505.00/M2206,910.00188,100.00- Granitto 40/40 Cm (polish) Group Gold, type CrystaW : Black225,750.00/M2236,500.00215,000.00- Granitto 40/40 Cm (Un-polish) Group Gold, type OasisW : Forest Green, Brick, Cocoa, Black192,885.00/M2202,070.00183,700.00- Granitto Gastello 30x30 Cm (Un-polish) Group Silver, type rusticW : Capucino, expreso, crme157,080.00/M2164,560.00149,600.00- Homogenous Tile 60x60 Cm, ex China136,500.00/M2143,000.00130,000.00Homogenous Tile Inesa- Inesa, 30/30,40/40, Onix (Un-Polished)102,375.00/M2107,250.0097,500.00- Group A (Pearl, Opal, Agate, Cateye, Topaz, Zamrud)Inesa, uk. 30/30 & 40/40 (Polished)144,900.00/M2151,800.00138,000.00- Group A (Pearl, Opal, Agate, Cateye, Topaz, Zamrud)Inesa, 30/30,40/40 UP (Onix, Phyrus, Ruby, Jade)Group C132,300.00/M2138,600.00126,000.00- Inesa, 30/30, 40/40 P (Onix, Phyrus, Ruby, Jade)Group C146,265.00/M2153,230.00139,300.00- Inesa, 40/40 Group A (Corypha polish)169,575.00/M2177,650.00161,500.00- Inesa, 60 x 60 Group A (Corypha polish)214,987.50/M2225,225.00204,750.00- Inesa, 40x40 (Polish), warna Topaz159,075.00/M2166,650.00151,500.00- Inesa, 60/60 (P), Raphia214,987.50/M2225,225.00204,750.00Homogenous Tile Essenza- Essenza 30/30, Papper Grey (Un-Polished)157,500.00/M2165,000.00150,000.00- Essenza 30/30, Papper Grey (Polished)183,750.00/M2192,500.00175,000.00- Essenza Group A 40x40, Papper Grey (Un-Polished)173,712.00/M2181,984.00165,440.00- Essenza Group A 40x40 polishwarna : prince rubber, silver star198,660.00/M2208,120.00189,200.00- Essenza 60x60, Blak Orchid (Polished)288,750.00/M2302,500.00275,000.00- Essenza Group B 60x60 (Polished)warna : Corypha300,646.50/M2314,963.00286,330.00- Essenza Group A 60x60 polishwarna : prince rubber, silver star243,936.00/M2255,552.00232,320.00Homogenous Tile Uero Grace- Uero Grace 60/60, FHQ 6207 (pgnt Raphia)178,500.00/M2187,000.00170,000.00- Uero Grace 30/30, FHQ 6207131,250.00/M2137,500.00125,000.00- Uero Grace 60/60, Golden Black (pgnt Onix)236,250.00/M2247,500.00225,000.00Marmer- Marmer Import Crema EvoryJenis slab682,500.00/M2715,000.00650,000.00- Marmer Import Golden PerlantoJenis slab682,500.00/M2715,000.00650,000.00- Marmer Import VolacasJenis slab997,500.00/M21,045,000.00950,000.00- Marmer Import TravertineJenis slab1,365,000.00/M21,430,000.001,300,000.00- Marmer Import Rossi VietnamJenis slab630,000.00/M2660,000.00600,000.00- Marmer Tulung Agung, 60/60 cm420,000.00/M2440,000.00400,000.00- Marmer Tulung AgungJenis slab498,750.00/M2522,500.00475,000.00- Marmer Ujung Pandang (acid wash), 600x600 mmJenis slab609,000.00/M2638,000.00580,000.00- Marmer ex Citatah, 30/30170,625.00/M2178,750.00162,500.00- Marmer ex Citatah, 60/60275,625.00/M2288,750.00262,500.00- Teralux Marmer 60x60 cm367,500.00/M2385,000.00350,000.00Floor Hardener- Floor Hardener (Gan's Floor)9,450.00/kg9,900.009,000.00- Epoxy Resin12,600.00/kg13,200.0012,000.00Keramik Tile- Porselen 11 x 11 cm57,750.00/M260,500.0055,000.00- Keramik Artistik 5x20 Cm68,250.00/M271,500.0065,000.00- Keramik lokal 10x20 Cm (ex Roman)57,750.00/M260,500.0055,000.00- Keramik lokal 20/20 Cm (ex Roman) Gol A86,100.00/M290,200.0082,000.00- Keramik lokal 20/25 Cm (ex Roman) Gol A79,800.00/M283,600.0076,000.00- Keramik lokal 30x30 Cm (ex Roman) Gol B73,500.00/M277,000.0070,000.00- Keramik lokal 33,3x33,3 Cm (ex Roman) Gol A97,650.00/M2102,300.0093,000.00- Keramik lokal 30x60 Cm (ex Roman) Gol AWall tile134,925.00/M2141,350.00128,500.00- Keramik lokal 20x40 Cm (ex Roman) Gol A84,000.00/M288,000.0080,000.00- Keramik lokal 40/40 Cm (ex Roman) Gol A82,500.00/M2101,200.0092,000.00- Keramik Homogenous 30/30 Cm (ex Roman Gress)Gol. D96,600.00/M2101,200.0092,000.00- Keramik Homogenous 60/60 Cm (ex Roman Gress)Gol. B176,400.00/M2184,800.00168,000.00MATERIAL LANTAI PARQUETPARQUET (+ 10%)- Red Oak lam parquet uk. 1,5 x 6 x 30 cm121,380.00/M2127,160.00115,600.00- Red Oak lam parquet uk. 1 x 5 x 30 cm110,775.00/M2116,050.00105,500.00- Jati lem parquet uk. 1 x 5 x 30 cm145,923.75/M2152,872.50138,975.00- Jati lem parquet uk. 1 x 7 x 35 cm156,187.50/M2163,625.00148,750.00- Jati lem parquet uk. 1 x 5 x 25 cm103,635.00/M2108,570.0098,700.00- Tg. Parquet Jati uk. 1,8 x 5 x 30 cm107,730.00/M2112,860.00102,600.00- Graculad174,510.00/M2182,820.00166,200.00- Gracewood 144188,685.00/M2197,670.00179,700.00- Parkit (Kronospan) uk. 19 x 120 cm189,000.00/M2198,000.00180,000.00- Parkit (Dream Wood) uk. 19 x 120 cm189,000.00/M2198,000.00180,000.00- Underlayer / Rubber corrugatedDasaran lantai karpet31,500.00/M230,000.00- Karpet Sheet ex LokalKualitas baik52,500.00/M250,000.00- Carpet Tile 50x50, ex Leiko236,250.00/M2225,000.00- Vinyl tile 30x30 cm, ex ..157,500.00/M2150,000.00- Parket sintetis uk. 10 x 90 cm78,750.00/M282,500.0075,000.00MATERIAL BATU ALAMBATU ALAM (+ 15%)- Batu Candi 20x40 cm133,000.35/M2145,667.05126,667.00- Batu alur Candi 20x40 cm156,187.50/M2171,062.50148,750.00- Batu Alam susun hitam 3x30 cm157,500.00/M2172,500.00150,000.00- Batu alam Paliaman 20X40147,000.00/M2161,000.00140,000.00- Batu acak Sukabumi110,250.00/M2120,750.00105,000.00- Batu acak Garut110,250.00/M2120,750.00105,000.00- Batu acak Purwakarta110,250.00/M2120,750.00105,000.00- Batu alam Purwakarta136,500.00/M2149,500.00130,000.00- Batu alam Andesit 20/20 & 15/30 cm168,000.00/M2184,000.00160,000.00- Batu alam Andesit 20/30 cm178,500.00/M2195,500.00170,000.00- Batu alam Andesit 20/40 s/d 30/40 cm189,000.00/M2207,000.00180,000.00- Paras Jogja 20/30s/d40/40 (cream/putih)99,750.00/M2109,250.0095,000.00- Paras Jogja 20/40s/d40/60 (cream/putih)115,500.00/M2126,500.00110,000.00MATERIAL CONBLOCK / INTERBLOCK (Ex. INTERNUSA)CONBLOCK (+ 15%)Interblock 16.6, warna abu-abu99,750.00/M2109,250.0095,000.00Interblock 16.6, warna Mrh, Htm, Kng, Klasik131,250.00/M2143,750.00125,000.00Interblock 16.6, warna Hijau141,750.00/M2155,250.00135,000.00Interblock 16.8, warna abu-abu136,500.00/M2149,500.00130,000.00Interblock 16.8, warna Mrh, Htm, Kng, Klasik147,000.00/M2161,000.00140,000.00Interblock 16.8, warna Hijau157,500.00/M2172,500.00150,000.00Zurich 12.6 / Tiga berlian 6, abu-abu124,110.00/M2135,930.00118,200.00Zurich 12.6 / Tiga berlian 6, (Mrh, Htm, Kng, Klasik)143,010.00/M2156,630.00136,200.00Zurich 12.6 / Tiga berlian 6, Hijau157,500.00/M2172,500.00150,000.00Zurich 12.8 / Tiga berlian 8, abu-abu144,900.00/M2158,700.00138,000.00Zurich 12.8 / Tiga berlian 8, (Mrh, Htm, Kng, Klasik)163,800.00/M2179,400.00156,000.00Zurich 12.8 / Tiga berlian 8, Hijau181,440.00/M2198,720.00172,800.00Grassblock 20.10.40 (abu-abu)143,010.00/M2156,630.00136,200.00Grassblock 20.8.40 (abu-abu)117,810.00/M2129,030.00112,200.00Kansteen 15 x 30 x 4039,900.00/Bh43,700.0038,000.00MATERIAL BUIS BETONBuis beton dia. 20 cm tanpa tulang, panjang 1 m63,525.00/Bh60,500.00Buis beton dia. 30 cm tanpa tulang, panjang 1 m88,935.00/Bh84,700.00Buis beton 1/2 dia. 20 cm tanpa tulang, panjang 0,50 m38,115.00/Bh36,300.00Buis beton 1/2 dia. 30 cm tanpa tulang, panjang 0,50 m53,130.00/Bh50,600.00MATERIAL CATCAT (+ 20%)Cat Duco Danagloss88,725.00/Kg101,400.0084,500.00Cat Duco Nippe 200049,875.00/Kg57,000.0047,500.00Dempul Duco Sanpolac36,750.00/Kg42,000.0035,000.00Tinner Up28,875.00/Kg33,000.0027,500.00Cat Tembok Catylac (Acrilyc Emulsion), putih26,250.00/Kg30,000.0025,000.00Cat Tembok Dulux ICI (Acrilyc Emulsion)Dulux Pentalite warna standart44,257.50/Kg50,580.0042,150.0042,142.86Cat Tembok Dulux ICI (Acrilyc Emulsion)Dulux Pentalite warna khusus51,292.50/Kg58,620.0048,850.0048,857.14Cat Tembok Dulux ICI (Acrilyc Emulsion), warna tua47,250.00/Kg54,000.0045,000.00Cat Tembok luar (ICI Dulux Weathershield)Warna standart60,375.00/Kg69,000.0057,500.0068,571.43Cat Tembok luar (ICI Dulux Weathershield)Warna khusus80,398.50/Kg91,884.0076,570.0076,571.43Cat Tembok luar (ICI Dulux Weathershield), warna tua86,992.50/Kg99,420.0082,850.0082,857.14Alkali Resistants Dulux ICI45,596.25/Kg52,110.0043,425.0043,428.57Cat Tembok Mowilex (Acrilyc Emulsion)39,375.00/Kg45,000.0037,500.00Cat Tembok Mowilex (Wather Coat)57,750.00/Kg66,000.0055,000.00Cat Tembok (cat minyak) ex Mowilex60,000.00/KgCat Tembok Vinilex Super20,000.00/Kg24,000.0020,000.00Plamur Tembok Matex (5 kg)18,375.00/Kg21,000.0017,500.00Cat Kayu/besi (ICI Dulux Super Gloss)57,750.00/Kg66,000.0055,000.00Cat Kayu/besi (ex Danapaint, Gloss)52,500.00/Kg60,000.0050,000.00Cat Kayu / besi (kwalitas sedang, Ftalit, Kuda Terbang)47,250.00/Kg54,000.0045,000.00Plamur kayu26,250.00/Kg30,000.0025,000.00Pelitur52,500.00/Kg60,000.0050,000.00Melamik Ultran63,000.00/Kg72,000.0060,000.00Cat warna Ultran52,500.00/Kg60,000.0050,000.00Sanding Ultran55,125.00/Kg63,000.0052,500.00Filler Ultran52,500.00/Kg60,000.0050,000.00Menie Kayu23,625.00/Kg27,000.0022,500.00Residu18,375.00/Kg21,000.0017,500.00Kuas Roll36,750.00/Bh42,000.0035,000.00Kuas15,750.00/Bh18,000.0015,000.00Ampelas2,887.50/Bh3,300.002,750.00DAFTAR UPAH TENAGA KERJAJakarta, Juni 2013PANGKAL PINANGJKT, Jurnal 2013DAFTAR PEKERJABIDANG PEKERJAANUPAHUpah/hariUpah/hariMandorBerlaku untuk keseluruhan110,000.00/org/hari155,000.00143,221.00Kepala Tukang Kayu105,000.00/org/hari125,000.00126,598.00Tukang Kayu (konstruksi)Pek. Rangka atap90,000.00/org/hari98,000.00109,960.00Tukang Kayu halusPek. Kosen, pintu & jendela95,000.00/org/hari105,000.00115,000.00Tukang Kayu MebelPek. Furniture100,000.00/org/hari110,000.00120,000.00Kepala Tukang Batu100,000.00/org/hari125,000.00126,598.00Tukang batuPek. Pasangan batu/bata90,000.00/org/hari99,000.00109,960.00Tukang batu halusPek. Finishing95,000.00/org/hari105,000.00115,000.00Kepala Tukang Gypsum95,000.00/org/hari125,000.00126,598.00Tukang GypsumPek. Plafond / Partisi90,000.00/org/hari99,000.00109,960.00Kepala Tukang BesiPembesian konstrusi beton90,000.00/org/hari125,000.00126,598.00Tukang besi85,000.00/org/hari99,000.00109,960.00Tukang Las konstruksi100,000.00/org/hari150,000.00109,960.00Kepala Tukang Gali90,000.00/org/hari125,000.00126,598.00Tukang GaliPek. Galian tanah109,960.00/org/hari99,000.00109,960.00Kepala Tukang Cat90,000.00/org/hari125,000.00126,598.00Tukang CatFinishing pengecatan100,000.00/org/hari99,000.00109,960.00Tukang Pelitur/melamik100,000.00/org/hari99,000.00115,000.00Kepala Tukang Allumunium90,000.00/org/hari125,000.00126,598.00Tukang khusus allumunium100,000.00/org/hari105,000.00109,960.00Kepala Tukang pipa90,000.00/org/hari125,000.00126,598.00Tukang pipa109,960.00/org/hari99,000.00109,960.00P e k e r j aBerlaku untuk keseluruhan75,000.00/org/hari85,000.0093,351.00

&CRAB - 0&P

AnalisaANALISA HARGA SATUAN PEKERJAAN, BERDASARKAN SNINO.URAIAN PEKERJAANSNIANALISA HARGA BAHAN & UPAHHARGA SATUANkfsnsathrg. sat.Total hargaPEKERJAANI.PEK. PERSIAPAN & TAPAK1.1.PEK. BOWPLANK / M'BOWBahan :Kayu Meranti Palembang papan0.007M34,200,000.0027,720.00Kayu Meranti Palembang kaso0.010M32,730,000.0026,276.25Paku biasa 2"-5"0.020Kg15,356.25307.13Sub - Bahan54,303.38Rp54,303.38Upah :Kep. Tukang Kayu0.010Org105,000.001,050.00Tukang Kayu0.100Org90,000.009,000.00Pekerja0.100Org75,000.007,500.00Mandor0.005Org110,000.00550.00Sub - Upah18,100.00Rp18,100.00TOTALRp72,403.381.2.PAGAR SEMENTARA dari Seng Gelombang tg. 2 m / M'Bahan :Semen PC2.500zak1,300.003,250.00Pasir beton0.005M3270,375.001,351.88Batu pecah/split 2/30.009M3269,500.352,425.50Seng gelombang 3x6 ft BJLS 20 (0,2 mm)1.200lbr47,250.0056,700.00Kayu dolken 8-10/400 cm1.250btg36,750.0045,937.50Kayu Meranti Palembang kaso0.014M32,730,000.0038,220.00Paku biasa 2"-5"0.060Kg15,356.25921.38Cat meni besi0.450Kg23,625.0010,631.25Sub - Bahan159,437.50Rp159,437.50Upah :Kep. Tukang Kayu0.020Org105,000.002,100.00Tukang Kayu0.200Org90,000.0018,000.00Pekerja0.400Org75,000.0030,000.00Mandor0.020Org110,000.002,200.00Sub - Upah52,300.00Rp52,300.00TOTALRp211,737.501.3.PEMB. JALAN SEMENTARA, tebal 20 cm / M2Bahan :Batu belah 15/200.150M3257,250.0038,587.50Batu pecah 5/70.090M3262,500.0023,625.00Pasir pasang0.010M3265,125.002,651.25Sub - Bahan64,863.75Rp64,863.75Upah :Pekerja1.000Org75,000.0075,000.00Mandor0.050Org110,000.005,500.00Sub - Upah80,500.00Rp80,500.00TOTALRp145,363.751.4.PEMB. KANTOR SEMENTARA, lantai plesteran, atap Seng / M2Bahan :Kayu dolken 8-10/400 cm1.250btg36,750.0045,937.50Kayu Meranti Palembang kaso0.018m2,730,000.0049,140.00Paku biasa 2"-5"0.850kg15,356.2513,052.81Besi pelat strip1.100kg14,542.5015,996.75Semen portland35.000kg1,300.0045,500.00Pasir pasang0.150m265,125.0039,768.75Pasir beton0.100m270,375.0027,037.50Batu pecah/split 2/30.150m269,500.3540,425.05Bata merah30.000bh630.0018,900.00Seng gelombang 3x6 ft BJLS 20 (0,2 mm)0.250Lbr47,250.0011,812.50Jendela nako (rangka)7.000daun15,000.00105,000.00Kaca 3 mm0.080m75,000.006,000.00Kunci tanam sederhana0.150bh60,000.009,000.00Teakwood 4x8 ft 3 mm0.060lbr105,000.006,300.00Sub - Bahan433,870.87Rp433,870.87Upah :Kep. Tukang Kayu0.300Org105,000.0031,500.00Tukang Kayu2.000Org90,000.00180,000.00Tukang Batu1.000Org90,000.0090,000.00Pekerja1.000Org75,000.0075,000.00Mandor0.050Org110,000.005,500.00Sub - Upah382,000.00Rp382,000.00TOTALRp815,870.871.5.GUDANG SEMEN & PERALATAN, lantai plesteran, atap Seng / M2Bahan :Kayu dolken 8-10/400 cm1.700btg36,750.0062,475.00Kayu Meranti Palembang kaso0.021m2,730,000.0057,330.00Paku biasa 2"-5"0.300kg15,356.254,606.88Semen portland10.500kg1,300.0013,650.00Pasir beton0.030m270,375.008,111.25Batu pecah/split 2/30.050m269,500.3513,475.02Seng gelombang 3x6 ft BJLS 20 (0,2 mm)1.500Lbr47,250.0070,875.00Sub - Bahan230,523.14Rp230,523.14Upah :Kep. Tukang Kayu0.200Org105,000.0021,000.00Tukang Kayu2.000Org90,000.00180,000.00Pekerja1.000Org75,000.0075,000.00Mandor0.050Org110,000.005,500.00Sub - Upah281,500.00Rp281,500.00TOTALRp512,023.141.6.PAGAR PERIMETER, dari kawat duri tinggi 70 cm / M'Bahan :Besi siku6.750kg14,455.3597,573.61Semen portland2.000kg1,300.002,600.00Pasir beton0.005m270,375.001,351.88Batu pecah/split 2/30.009m269,500.352,425.50Paku biasa 2"-5"0.060kg15,356.25921.38Kawat duri (10kg/60m/rol)0.050kg16,537.50826.88Sub - Bahan105,699.24Rp105,699.24Upah :Kep. Tukang Kayu0.020Org105,000.002,100.00Tukang Kayu0.200Org90,000.0018,000.00Pekerja0.300Org75,000.0022,500.00Mandor0.020Org110,000.002,200.00Sub - Upah44,800.00Rp44,800.00TOTALRp150,499.241.7.PEK. TANAH DILAKSANAKAN SECARA KONVENSIONAL1PEMBERSIHAN LAPANGAN dan PERATAAN / M2Upah :Pekerja0.100Org75,000.007,500.00Mandor0.050Org110,000.005,500.00Sub - Upah13,000.00Rp13,000.002PENGUPASAN LAPISAN ATAS / M2Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.012Org110,000.001,320.00Sub - Upah20,070.00Rp20,070.003GALIAN TANAH BIASA, sedalam 1 m / M3SNIUpah :Pekerja0.750Org75,000.0056,250.00Mandor0.025Org110,000.002,750.00Sub - Upah59,000.00Rp59,000.004GALIAN TANAH BIASA, sedalam 2 m / M3SNIUpah :Pekerja0.900Org75,000.0067,500.00Mandor0.045Org110,000.004,950.00Sub - Upah72,450.00Rp72,450.005GALIAN TANAH BIASA, sedalam 3 m / M3SNIUpah :Pekerja1.050Org75,000.0078,750.00Mandor0.067Org110,000.007,370.00Sub - Upah86,120.00Rp86,120.006GALIAN TANAH KERAS, sedalam 1 m / M3SNIUpah :Pekerja1.000Org75,000.0075,000.00Mandor0.032Org110,000.003,520.00Sub - Upah78,520.00Rp78,520.007GALIAN TANAH CADAS, sedalam 1 m / M3SNIUpah :Pekerja1.500Org75,000.00112,500.00Mandor0.060Org110,000.006,600.00Sub - Upah119,100.00Rp119,100.008GALIAN TANAH LUMPUR, sedalam 1 m / M3SNIUpah :Pekerja1.200Org75,000.0090,000.00Mandor0.045Org110,000.004,950.00Sub - Upah94,950.00Rp94,950.009STRPPING TEBING, setinggi 1 m / M2SNIUpah :Pekerja0.050Org75,000.003,750.00Mandor0.005Org110,000.00550.00Sub - Upah4,300.00Rp4,300.0010MEMBUANG TANAH, sejauh 150 m / M3SNIUpah :Pekerja0.516Org75,000.0038,700.00Mandor0.050Org110,000.005,500.00Sub - Upah44,200.00Rp44,200.0011URUGAN TANAH KEMBALI / M3SNIUpah :Pekerja0.250Org75,000.0018,750.00Mandor0.008Org110,000.00880.00Sub - Upah19,630.00Rp19,630.0012PERATAAN & PEMADATAN URUGAN TANAHUpah :meratakan & memadatkanPekerja0.500Org75,000.0037,500.00Mandor0.050Org110,000.005,500.00Sub - Upah43,000.00Rp43,000.0013URUGAN TANAH DARI LUAR / M3BOWBahan :Tanah Urug1.200M3262,500.00315,000.00Angkutan Truk1.200M325,000.0030,000.00Sub - Bahan345,000.00Rp345,000.00Upah :menimbun, meratakan & memadatkanPekerja0.200Org75,000.0015,000.00Mandor0.010Org110,000.001,100.00Sub - Upah16,100.00Rp16,100.00TOTALRp361,100.0014PEK. GALIAN TANAH (CUT) dengan Alat Berat / M3SNIUpah :Pekerja0.109Org75,000.008,175.00Mandor0.054Org110,000.005,940.00Sub - Upah14,115.00Rp14,115.00Harga pemakaian alat berat-EXCAVATOR 150 HP Kobelco SK2000.054jam469,389.8025,347.05-DUMP TRUCK 3-4 M3 / 6 ton0.100jam242,640.2024,264.02-Alat bantu1.000ls10,000.0010,000.00Sub - Sewa Peralatan59,611.07Rp59,611.07TOTALRp73,726.0715PEK URUGAN TANAH (FILL) dengan Alat Berat / M3SNIBahan :Tanah Urug1.200M3262,500.00315,000.00Sub - Bahan315,000.00Rp315,000.00Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.025Org110,000.002,750.00Sub - Upah21,500.00Rp21,500.00Harga pemakaian alat berat-WHEEL LOADER 1-1,6 m30.020jam267,270.305,345.41-DUMP TRUCK 3-4 M3 / 6 ton0.331jam242,640.2080,313.91-MOTOR GRADER 100 HP0.007jam288,512.402,019.59-VIBRATOR ROLLER 5-8 Ton0.011jam247,328.402,720.61-WATER TANK TRUCK0.008jam145,530.001,164.24-Alat bantu1.000ls10,000.0010,000.00Sub - Sewa Peralatan101,563.75Rp101,563.75TOTALRp438,063.751.8.PEK. URUGAN PASIR URUG / M3SNI-2008Bahan :Pasir Urug1.200M3291,375.00349,650.00Sub - Bahan349,650.00Rp349,650.00Upah :Pekerja0.300Org75,000.0022,500.00Mandor0.010Org110,000.001,100.00Sub - Upah23,600.00Rp23,600.00TOTALRp373,250.001.9.PEK. URUGAN SIRTU / M3SNI-2008Bahan :Sirtu1.200M3256,200.00307,440.00Sub - Bahan307,440.00Rp307,440.00Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.025Org110,000.002,750.00Sub - Upah21,500.00Rp21,500.00TOTALRp328,940.001.10.PEK. URUGAN PASIR EXTRA BETON / M3SNI-2008Bahan :Pasir Extra beton1.200M3273,000.00327,600.00Sub - Bahan327,600.00Rp327,600.00Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.025Org110,000.002,750.00Sub - Upah21,500.00Rp21,500.00TOTALRp349,100.001.11.PEK. URUGAN PENETRASI /SPLIT 2-3 cm / M3SNI-2008Bahan :Batu split 2-3 cm1.200M3269,500.35323,400.42Sub - Bahan323,400.42Rp323,400.42Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.025Org110,000.002,750.00Sub - Upah21,500.00Rp21,500.00TOTALRp344,900.421.12.PEK. LAPISAN MAKADAM BATU BELAH / M3SNI-2008Bahan :Makadam/batu pecah 5-7 cm1.200M3257,250.00308,700.00Sub - Bahan308,700.00Rp308,700.00Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.025Org110,000.002,750.00Sub - Upah21,500.00Rp21,500.00TOTALRp330,200.001.13.PEK. LAPISAN MAKADAM BATU PECAH 5-7 cm / M3SNI-2008Bahan :Makadam/batu pecah 5-7 cm1.200M3262,500.00315,000.00Sub - Bahan315,000.00Rp315,000.00Upah :Pekerja0.250Org75,000.0018,750.00Mandor0.025Org110,000.002,750.00Sub - Upah21,500.00Rp21,500.00TOTALRp336,500.001.14.PEK. LAPISAN IJUK TEBAL 10 CM (u/. Dinding resapan)SNI-2008Bahan :I j u k6.000kg31,500.00189,000.00Sub - Bahan189,000.00Rp189,000.00Upah :Pekerja0.150Org75,000.0011,250.00Mandor0.015Org110,000.001,650.00Sub - Upah12,900.00Rp12,900.00TOTALRp201,900.001.15.PEKERJAAN BONGKARAN1Pek. Bongkar beton bertulang / M3Upah :Pekerja6.667Org75,000.00500,025.00Mandor0.333Org110,000.0036,630.00Sub - Upah536,655.00Rp536,655.00TOTALRp536,655.002Pek. Bongkar dinding tembok bata merah / M3Upah :Pekerja0.667Org75,000.0050,025.00Mandor0.033Org110,000.003,630.00Sub - Upah53,655.00Rp53,655.00TOTALRp53,655.003Pek. Bongkar dinding 1/2 bata / M2Upah :Pekerja0.073Org75,000.005,475.00Mandor0.004Org110,000.00440.00Sub - Upah5,915.00Rp5,915.00TOTALRp5,915.004Pek. Bongkar plat beton bertulang / M2Upah :Pekerja0.800Org75,000.0060,000.00Mandor0.040Org110,000.004,400.00Sub - Upah64,400.00Rp64,400.00TOTALRp64,400.005Pek. Bongkar batu kali (tebal kurang dari 50 cm) / M3Upah :Pekerja1.500Org75,000.00112,500.00Mandor0.075Org110,000.008,250.00Sub - Upah120,750.00Rp120,750.00TOTALRp120,750.006Pek. Bongkar batu kali (tebal lebih dari 50 cm) / M3Upah :Pekerja3.000Org75,000.00225,000.00Mandor0.150Org110,000.0016,500.00Sub - Upah241,500.00Rp241,500.00TOTALRp241,500.007Pek. Bongkar finishing lantai / M2Upah :Pekerja0.100Org75,000.007,500.00Mandor0.010Org110,000.001,100.00Sub - Upah8,600.00Rp8,600.00TOTALRp8,600.008Pek. Bongkar paving block / M2Upah :Pekerja0.100Org75,000.007,500.00Mandor0.005Org110,000.00550.00Sub - Upah8,050.00Rp8,050.00TOTALRp8,050.009Pek. Bongkar plesteran / M2Upah :Pekerja0.075Org75,000.005,625.00Mandor0.005Org110,000.00550.00Sub - Upah6,175.00Rp6,175.00TOTALRp6,175.0010Pek. Bongkar Atap genteng / M2Upah :Pekerja0.020Org75,000.001,500.00Mandor0.010Org110,000.001,100.00Sub - Upah2,600.00Rp2,600.00TOTALRp2,600.0011Pek. Bongkar karpusan Atap genteng / M'Upah :Pekerja0.060Org75,000.004,500.00Mandor0.015Org110,000.001,650.00Sub - Upah6,150.00Rp6,150.00TOTALRp6,150.0012Pek. Bongkar Atap Seng/Asbes / M2Upah :Pekerja0.050Org75,000.003,750.00Mandor0.025Org110,000.002,750.00Sub - Upah6,500.00Rp6,500.00TOTALRp6,500.0013Pek. Bongkar kaso reng kayu (kayu akan dipakai lagi) / M2Upah :Pekerja0.100Org75,000.007,500.00Tukang kayu0.025Org90,000.002,250.00Kepala Tukang0.003Org105,000.00315.00Mandor0.005Org110,000.00550.00Sub - Upah10,615.00Rp10,615.00TOTALRp10,615.0014Pek. Bongkar kaso reng kayu (kayu tidak dipakai lagi) / M2Upah :Pekerja0.100Org75,000.007,500.00Mandor0.005Org110,000.00550.00Sub - Upah8,050.00Rp8,050.00TOTALRp8,050.0015Pek. Bongkar kuda2 & loteng kayu (kayu akan dipakai lagi) / M3Upah :Pekerja2.666Org75,000.00199,950.00Tukang kayu4.000Org90,000.00360,000.00Kepala Tukang0.400Org105,000.0042,000.00Mandor0.133Org110,000.0014,630.00Sub - Upah616,580.00Rp616,580.00TOTALRp616,580.0016Pek. Bongkar kuda2 & loteng kayu (kayu tidak dipakai lagi) / M3Upah :Pekerja4.000Org75,000.00300,000.00Mandor0.400Org110,000.0044,000.00Sub - Upah344,000.00Rp344,000.00TOTALRp344,000.0017Pek. Bongkar rangka plafond kayu / M2Upah :Pekerja0.100Org75,000.007,500.00Mandor0.005Org110,000.00550.00Sub - Upah8,050.00Rp8,050.00TOTALRp8,050.0018Pek. Bongkar penutup plafond / M2Upah :Pekerja0.030Org75,000.002,250.00Mandor0.003Org110,000.00330.00Sub - Upah2,580.00Rp2,580.00TOTALRp2,580.00III.PEKERJAAN BETON3.1.BETON TIDAK BERTULANG1MEMBUAT 1 M3 BETON, mutu f'c = 7,4 Mpa (K 100)SNI-2008(Slump 12 cm, w/c = 0,87)Bahan :Semen PC247.00kg1,300.00321,100.00Pasir beton (BD 1400)869.00kg193.13167,825.63Kerikil / split (2-3 cm) (BD 1350)999.00Kg199.63199,430.26Air215.00liter100.0021,500.00Sub - Bahan709,855.88Rp709,855.88Upah :Pekerja1.650Org75,000.00123,750.00Tukang batu0.275Org90,000.0024,750.00Kepala Tukang batu0.028Org100,000.002,800.00Mandor0.083Org110,000.009,130.00Sub - Upah160,430.00Rp160,430.00TOTALRp870,285.882MEMBUAT 1 M3 BETON, mutu f'c = 7,4 Mpa (K 100)SNI-2008(Slump 3-6 cm, w/c = 0,87)Bahan :Semen PC230.00kg1,300.00299,000.00Pasir beton893.00kg193.13172,460.63Kerikil / split (2-3 cm)1,027.00Kg199.63205,019.90Air200.00liter100.0020,000.00Sub - Bahan696,480.52Rp696,480.52Upah :Pekerja1.200Org75,000.0090,000.00Tukang batu0.200Org90,000.0018,000.00Kepala Tukang batu0.020Org100,000.002,000.00Mandor0.060Org110,000.006,600.00Sub - Upah116,600.00Rp116,600.00TOTALRp813,080.523MEMBUAT 1 M3 BETON, mutu f'c = 9.8 Mpa (K 125)SNI-2008(Slump 12 cm, w/c = 0,78)Bahan :Semen PC276.00kg1,300.00358,800.00Pasir beton828.00kg193.13159,907.50Kerikil / split (2-3 cm)1,012.00Kg199.63202,025.45Air215.00liter100.0021,500.00Sub - Bahan742,232.95Rp742,232.95Upah :Pekerja1.650Org75,000.00123,750.00Tukang batu0.275Org90,000.0024,750.00Kepala Tukang batu0.028Org100,000.002,800.00Mandor0.083Org110,000.009,130.00Sub - Upah160,430.00Rp160,430.00TOTALRp902,662.954MEMBUAT 1 M3 BETON, mutu f'c = 12,2 Mpa (K 150)SNI-2008(Slump 12 cm, w/c = 0,72)Bahan :Semen PC299.00kg1,300.00388,700.00Pasir beton799.00kg193.13154,306.88Kerikil / split (2-3 cm)1,017.00Kg199.63203,023.60Air215.00liter100.0021,500.00Sub - Bahan767,530.47Rp767,530.47Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp927,960.475MEMBUAT 1 M3 BETON, mutu f'c = 14,5 Mpa (K 175)SNI-2008(Slump 12 cm, w/c = 0,66)Bahan :Semen PC326.00kg1,300.00423,800.00Pasir beton760.00kg193.13146,775.00Kerikil / split (2-3 cm)1,029.00Kg199.63205,419.16Air215.00liter100.0021,500.00Sub - Bahan797,494.16Rp797,494.16Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp957,924.166MEMBUAT 1 M3 BETON, mutu f'c = 16,9 Mpa (K 200)SNI-2008(Slump 12 cm, w/c = 0,61)Bahan :Semen PC352.00kg1,300.00457,600.00Pasir beton731.00kg193.13141,174.38Kerikil / split (2-3 cm)1,031.00Kg199.63205,818.42Air215.00liter100.0021,500.00Sub - Bahan826,092.79Rp826,092.79Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp986,522.797MEMBUAT 1 M3 BETON, mutu f'c = 19,3 Mpa (K 225)SNI-2008(Slump 12 cm, w/c = 0,58)Bahan :Semen PC352.00kg1,300.00457,600.00Pasir beton731.00kg193.13141,174.38Kerikil / split (2-3 cm)1,031.00Kg199.63205,818.42Air215.00liter100.0021,500.00Sub - Bahan826,092.79Rp826,092.79Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp986,522.798MEMBUAT 1 M3 BETON, mutu f'c = 21,7 Mpa (K 250)SNI-2008(Slump 12 cm, w/c = 0,56)Bahan :Semen PC384.00kg1,300.00499,200.00Pasir beton692.00kg193.13133,642.50Kerikil / split (2-3 cm)1,039.00Kg199.63207,415.45Air215.00liter100.0021,500.00Sub - Bahan861,757.95Rp861,757.95Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp1,022,187.959MEMBUAT 1 M3 BETON, mutu f'c = 24,00 Mpa (K 275)SNI-2008(Slump 12 cm, w/c = 0,53)Bahan :Semen PC406.00kg1,300.00527,800.00Pasir beton684.00kg193.13132,097.50Kerikil / split (2-3 cm)1,026.00Kg199.63204,820.27Air215.00liter100.0021,500.00Sub - Bahan886,217.77Rp886,217.77Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp1,046,647.7710MEMBUAT 1 M3 BETON, mutu f'c = 26,4 Mpa (K 300)SNI-2008(Slump 12 cm, w/c = 0,52)Bahan :Semen PC413.00kg1,300.00536,900.00Pasir beton681.00kg193.13131,518.13Kerikil / split (2-3 cm)1,021.00Kg199.63203,822.12Air215.00liter100.0021,500.00Sub - Bahan893,740.24Rp893,740.24Upah :Sama dengan upah kerja beton K-125Sub - UpahRp160,430.00TOTALRp1,054,170.2411MEMBUAT 1 M3 BETON, mutu f'c = 28,8 Mpa (K 325)SNI-2008(Slump 12 cm, w/c = 0,49)Bahan :Semen PC439.00kg1,300.00570,700.00Pasir beton670.00kg193.13129,393.75Kerikil / split (2-3 cm)1,006.00Kg199.63200,827.67Air215.00liter100.0021,500.00Sub - Bahan922,421.42Rp922,421.42Upah :Pekerja2.100Org75,000.00157,500.00Tukang batu0.350Org90,000.0031,500.00Kepala Tukang batu0.035Org100,000.003,500.00Mandor0.105Org110,000.0011,550.00Sub - Upah204,050.00Rp204,050.00TOTALRp1,126,471.4212MEMBUAT 1 M3 BETON, mutu f'c = 31,2 Mpa (K 350)SNI-2008(Slump 12 cm, w/c = 0,48)Bahan :Semen PC439.00kg1,300.00570,700.00Pasir beton670.00kg193.13129,393.75Kerikil / split (2-3 cm)1,006.00Kg199.63200,827.67Air215.00liter100.0021,500.00Sub - Bahan922,421.42Rp922,421.42Upah :Sama dengan upah kerja beton K-325Sub - UpahRp204,050.00TOTALRp1,126,471.4213MEMBUAT 1 M3 BETON KEDAP AIR, dengan Strorok-100SNI-2008Bahan :Semen PC400.00kg1,300.00520,000.00Pasir beton0.48m3270,375.00129,780.00Kerikil / split (2-3 cm)0.80m3269,500.35215,600.28Strorok-1001.20kg50,000.0060,000.00Air210.00liter100.0021,000.00Sub - Bahan946,380.28Rp946,380.28Upah :Sama dengan upah kerja beton K-325Sub - UpahRp204,050.00TOTALRp1,150,430.283.2.BETON BERTULANG (Lengkap)1MEMBUAT 1 M' KOLOM PRAKTIS (11 x 11 cm)SNI-2008Bahan :Semen PC4.000kg1,300.005,200.00Pasir beton0.006m3270,375.001,622.25Kerikil / split (2-3 cm)0.009m3269,500.352,425.50Kayu kelas III (kayu papan Terentang)0.002M33,045,000.006,090.00Paku 5-12 cm0.010Kg15,356.25153.56Besi beton polos3.000Kg13,125.0039,375.00Kawat beton0.045Kg20,212.50909.56Sub - Bahan55,775.88Rp55,775.88Upah :Pekerja0.180Org75,000.0013,500.00Tukang batu0.020Org90,000.001,800.00Tukang kayu0.020Org90,000.001,800.00Tukang besi0.020Org85,000.001,700.00Kepala Tukang batu0.006Org100,000.00600.00Mandor0.009Org110,000.00990.00Sub - Upah20,390.00Rp20,390.00TOTALRp76,165.880.0121Harga/m3Rp6,294,700.672MEMBUAT 1 M' RING BALOK PRAKTIS (11 x 15 cm)SNI-2008Bahan :Semen PC5.500kg1,300.007,150.00Pasir beton0.009m3270,375.002,433.38Kerikil / split (2-3 cm)0.015m3269,500.354,042.51Kayu kelas III (kayu papan Terentang)0.003M33,045,000.009,135.00Paku 5-12 cm0.020Kg15,356.25307.13Besi beton polos3.600Kg13,125.0047,250.00Kawat beton0.050Kg20,212.501,010.63Sub - Bahan71,328.63Rp71,328.63Upah :Pekerja0.297Org75,000.0022,275.00Tukang batu0.033Org90,000.002,970.00Tukang kayu0.033Org90,000.002,970.00Tukang besi0.033Org85,000.002,805.00Kepala Tukang batu0.010Org100,000.001,000.00Mandor0.015Org110,000.001,650.00Sub - Upah33,670.00Rp33,670.00TOTALRp104,998.630.0165Harga/m3Rp6,363,553.353MEMBUAT 1 M3 SLOOF BETON BERTULANGSNI-2008(200 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.270M33,045,000.00822,150.00Paku 5-12 cm2.000Kg15,356.2530,712.50Minyak bekisting0.600liter35,000.0021,000.00Besi beton polos210.000Kg13,125.002,756,250.00Kawat beton3.000Kg20,212.5060,637.50Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Sub - Bahan4,491,847.78Rp4,491,847.78Upah :Pekerja5.650Org75,000.00423,750.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.560Org90,000.00140,400.00Tukang besi1.400Org85,000.00119,000.00Kepala Tukang batu0.323Org100,000.0032,300.00Mandor0.283Org110,000.0031,130.00Sub - Upah771,330.00Rp771,330.00TOTALRp5,263,177.784MEMBUAT 1 M3 PONDASI BETON BERTULANGSNI-2008(150 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.200M33,045,000.00609,000.00Paku 5-12 cm1.500Kg15,356.2523,034.38Minyak bekisting0.400liter35,000.0014,000.00Besi beton polos157.500Kg13,125.002,067,187.50Kawat beton2.250Kg20,212.5045,478.13Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Sub - Bahan3,559,797.78Rp3,559,797.78Upah :Pekerja5.300Org75,000.00397,500.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.300Org90,000.00117,000.00Tukang besi1.050Org85,000.0089,250.00Kepala Tukang batu0.262Org100,000.0026,200.00Mandor0.265Org110,000.0029,150.00Sub - Upah683,850.00Rp683,850.00TOTALRp4,243,647.785MEMBUAT 1 M3 KOLOM BETON BERTULANGSNI-2008(300 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.400M33,045,000.001,218,000.00Paku 5-12 cm4.000Kg15,356.2561,425.00Minyak bekisting2.000liter35,000.0070,000.00Besi beton polos315.000Kg13,125.004,134,375.00Kawat beton4.500Kg20,212.5090,956.25Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.150M33,360,000.00504,000.00Plywood/multiplex 9mm3.500lmbr110,250.00385,875.00Dolken kayu Galam, dia. 8-10cm, panjang 4m20.000btg36,750.00735,000.00Sub - Bahan8,000,729.03Rp8,000,729.03Upah :Pekerja7.050Org75,000.00528,750.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.650Org90,000.00148,500.00Tukang besi2.100Org85,000.00178,500.00Kepala Tukang batu0.403Org100,000.0040,300.00Mandor0.353Org110,000.0038,830.00Sub - Upah959,630.00Rp959,630.00TOTALRp8,960,359.035.aMEMBUAT 1 M3 KOLOM BETON BERTULANGSNI-2008(250 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.400M33,045,000.001,218,000.00Paku 5-12 cm4.000Kg15,356.2561,425.00Minyak bekisting2.000liter35,000.0070,000.00Besi beton polos262.500Kg13,125.003,445,312.50Kawat beton4.500Kg20,212.5090,956.25Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.150M33,360,000.00504,000.00Plywood/multiplex 9mm3.500lmbr110,250.00385,875.00Dolken kayu Galam, dia. 8-10cm, panjang 4m20.000btg36,750.00735,000.00Sub - Bahan7,311,666.53Rp7,311,666.53Upah :Pekerja7.050Org75,000.00528,750.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.650Org90,000.00148,500.00Tukang besi1.750Org85,000.00148,750.00Kepala Tukang batu0.403Org100,000.0040,300.00Mandor0.353Org110,000.0038,830.00Sub - Upah929,880.00Rp929,880.00TOTALRp8,241,546.535.bMEMBUAT 1 M3 KOLOM BETON BERTULANGSNI-2008(200 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.400M33,045,000.001,218,000.00Paku 5-12 cm4.000Kg15,356.2561,425.00Minyak bekisting2.000liter35,000.0070,000.00Besi beton polos210.000Kg13,125.002,756,250.00Kawat beton4.500Kg20,212.5090,956.25Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.150M33,360,000.00504,000.00Plywood/multiplex 9mm3.500lmbr110,250.00385,875.00Dolken kayu Galam, dia. 8-10cm, panjang 4m20.000btg36,750.00735,000.00Sub - Bahan6,622,604.03Rp6,622,604.03Upah :Pekerja7.050Org75,000.00528,750.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.650Org90,000.00148,500.00Tukang besi1.400Org85,000.00119,000.00Kepala Tukang batu0.403Org100,000.0040,300.00Mandor0.353Org110,000.0038,830.00Sub - Upah900,130.00Rp900,130.00TOTALRp7,522,734.036MEMBUAT 1 M3 "BALOK PLAT" BETON BERTULANGSNI-2008(200 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.320M33,045,000.00974,400.00Paku 5-12 cm3.200Kg15,356.2549,140.00Minyak bekisting1.600liter35,000.0056,000.00Besi beton polos210.000Kg13,125.002,756,250.00Kawat beton3.000Kg20,212.5060,637.50Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.140M33,360,000.00470,400.00Plywood/multiplex 9mm2.800lmbr110,250.00308,700.00Dolken kayu Galam, dia. 8-10cm, panjang 4m16.000btg36,750.00588,000.00Sub - Bahan6,064,625.28Rp6,064,625.28Upah :Pekerja6.350Org75,000.00476,250.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.650Org90,000.00148,500.00Tukang besi1.400Org85,000.00119,000.00Kepala Tukang batu0.333Org100,000.0033,300.00Mandor0.318Org110,000.0034,980.00Sub - Upah836,780.00Rp836,780.00TOTALRp6,901,405.287MEMBUAT 1 M3 "PLAT LANTAI" BETON BERTULANGSNI-2008(150 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.320M33,045,000.00974,400.00Paku 5-12 cm3.200Kg15,356.2549,140.00Minyak bekisting1.600liter35,000.0056,000.00Besi beton polos157.500Kg13,125.002,067,187.50Kawat beton2.250Kg20,212.5045,478.13Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.120M33,360,000.00403,200.00Plywood/multiplex 9mm2.800lmbr110,250.00308,700.00Dolken kayu Galam, dia. 8-10cm, panjang 4m32.000btg36,750.001,176,000.00Sub - Bahan5,881,203.41Rp5,881,203.41Upah :Pekerja5.300Org75,000.00397,500.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.300Org90,000.00117,000.00Tukang besi1.050Org85,000.0089,250.00Kepala Tukang batu0.265Org100,000.0026,500.00Mandor0.265Org110,000.0029,150.00Sub - Upah684,150.00Rp684,150.00TOTALRp6,565,353.418MEMBUAT 1 M3 "PLAT LANTAI" BETON BERTULANGSNI-2008(150 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.320M33,045,000.00974,400.00Paku 5-12 cm3.200Kg15,356.2549,140.00Minyak bekisting1.600liter35,000.0056,000.00Besi beton polos157.500Kg13,125.002,067,187.50Kawat beton2.250Kg20,212.5045,478.13Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.120M33,360,000.00403,200.00Plywood/multiplex 9mm2.800lmbr110,250.00308,700.00Dolken kayu Galam, dia. 8-10cm, panjang 4m32.000btg36,750.001,176,000.00Sub - Bahan5,881,203.41Rp5,881,203.41Upah :Pekerja5.300Org75,000.00397,500.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.300Org90,000.00117,000.00Tukang besi1.050Org85,000.0089,250.00Kepala Tukang batu0.265Org100,000.0026,500.00Mandor0.265Org110,000.0029,150.00Sub - Upah684,150.00Rp684,150.00TOTALRp6,565,353.418.aMEMBUAT 1 M3 "PLAT LANTAI" BETON BERTULANGSNI-2008(125 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.320M33,045,000.00974,400.00Paku 5-12 cm3.200Kg15,356.2549,140.00Minyak bekisting1.600liter35,000.0056,000.00Besi beton polos131.250Kg13,125.001,722,656.25Kawat beton2.250Kg20,212.5045,478.13Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.120M33,360,000.00403,200.00Plywood/multiplex 9mm2.800lmbr110,250.00308,700.00Dolken kayu Galam, dia. 8-10cm, panjang 4m32.000btg36,750.001,176,000.00Sub - Bahan5,536,672.16Rp5,536,672.16Upah :Pekerja5.300Org75,000.00397,500.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.300Org90,000.00117,000.00Tukang besi1.050Org85,000.0089,250.00Kepala Tukang batu0.265Org100,000.0026,500.00Mandor0.265Org110,000.0029,150.00Sub - Upah684,150.00Rp684,150.00TOTALRp6,220,822.168.bMEMBUAT 1 M3 "PLAT LANTAI" BETON BERTULANGSNI-2008(100 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.320M33,045,000.00974,400.00Paku 5-12 cm3.200Kg15,356.2549,140.00Minyak bekisting1.600liter35,000.0056,000.00Besi beton polos105.000Kg13,125.001,378,125.00Kawat beton2.250Kg20,212.5045,478.13Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.120M33,360,000.00403,200.00Plywood/multiplex 9mm2.800lmbr110,250.00308,700.00Dolken kayu Galam, dia. 8-10cm, panjang 4m32.000btg36,750.001,176,000.00Sub - Bahan5,192,140.91Rp5,192,140.91Upah :Pekerja5.300Org75,000.00397,500.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.300Org90,000.00117,000.00Tukang besi1.050Org85,000.0089,250.00Kepala Tukang batu0.265Org100,000.0026,500.00Mandor0.265Org110,000.0029,150.00Sub - Upah684,150.00Rp684,150.00TOTALRp5,876,290.919MEMBUAT 1 M3 "DINDING" BETON BERTULANGSNI-2008(150 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.240M33,045,000.00730,800.00Paku 5-12 cm3.200Kg15,356.2549,140.00Minyak bekisting1.600liter35,000.0056,000.00Besi beton polos157.500Kg13,125.002,067,187.50Kawat beton2.250Kg20,212.5045,478.13Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.160M33,360,000.00537,600.00Plywood/multiplex 9mm2.800lmbr110,250.00308,700.00Dolken kayu Galam, dia. 8-10cm, panjang 4m24.000btg36,750.00882,000.00Sub - Bahan5,478,003.41Rp5,478,003.41Upah :Pekerja5.300Org75,000.00397,500.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.300Org90,000.00117,000.00Tukang besi1.050Org85,000.0089,250.00Kepala Tukang batu0.262Org100,000.0026,200.00Mandor0.265Org110,000.0029,150.00Sub - Upah683,850.00Rp683,850.00TOTALRp6,161,853.419.aMEMBUAT 1 M3 "DINDING" BETON BERTULANGSNI-2008(200 kg besi + bekisting)Bahan :Kayu kelas III (kayu papan Terentang)0.250M33,045,000.00761,250.00Paku 5-12 cm3.000Kg15,356.2546,068.75Minyak bekisting1.200liter35,000.0042,000.00Besi beton polos210.000Kg13,125.002,756,250.00Kawat beton3.000Kg20,212.5060,637.50Semen PC336.000kg1,300.00436,800.00Pasir beton0.540m3270,375.00146,002.50Kerikil / split (2-3 cm)0.810m3269,500.35218,295.28Kayu kelas II (kayu Meranti basah Balok)0.105M33,360,000.00352,800.00Plywood/multiplex 9mm2.500lmbr110,250.00275,625.00Dolken kayu Galam, dia. 8-10cm, panjang 4m24.000btg36,750.00882,000.00Sub - Bahan5,977,729.03Rp5,977,729.03Upah :Pekerja5.650Org75,000.00423,750.00Tukang batu0.275Org90,000.0024,750.00Tukang kayu1.560Org90,000.00140,400.00Tukang besi1.400Org85,000.00119,000.00Kepala Tukang batu0.323Org100,000.0032,300.00Mandor0.283Org110,000.0031,130.00Sub - Upah771,330.00Rp771,330.00TOTALRp6,749,059.0310MEMASANG 1M' PVC WATERSTOP, lebar 20 cmSNI-2008Bahan :Waterstop lebar 20 cm1.05m'60,000.0063,000.00Sub - Bahan63,000.00Rp63,000.00Upah :Pekerja0.070Org75,000.005,250.00Tukang batu0.035Org90,000.003,150.00Kepala Tukang batu0.004Org100,000.00400.00Mandor0.004Org110,000.00440.00Sub - Upah9,240.00Rp9,240.00TOTALRp72,240.0011PEK. BETON TUMBUK (1 : 3 : 5) / M3 (slump = 12 cm)Bahan :Semen PC247.000kg1,300.00321,100.00Pasir beton0.500M3270,375.00135,187.50Koral beton1.000Kg286,125.00286,125.00Air215.000ltr100.0021,500.00Sub - Bahan763,912.50Rp763,912.50Upah :Kep. Tukang Batu0.028Org100,000.002,800.00Tukang batu0.275Org90,000.0024,750.00Pekerja1.650Org75,000.00123,750.00Mandor0.083Org110,000.009,130.00Sub - Upah160,430.00Rp160,430.00Rp924,342.50Lantai kerja tebal 5 cmRp46,217.1312PEK. BETON SIKLUP SUMURAN / M3 (40% bt.belah + 60% beton 1:2:3)SNI-2008Bahan :Semen PC194.00Kg1,300.00252,200.00(beton)Batu kali0.480M3257,250.00123,480.00Pasir beton0.312M3270,375.0084,357.00Koral beton0.468M3286,125.00133,906.50Besi beton126.00Kg13,125.001,653,750.00Kawat beton1.800M320,212.5036,382.50Sub - Bahan2,284,076.00Rp2,284,076.00Upah :Pekerja3.400Org75,000.00255,000.00Tukang batu0.850Org90,000.0076,500.00Kep. Tukang Batu0.085Org100,000.008,500.00Mandor0.170Org110,000.0018,700.00Sub - Upah358,700.00Rp358,700.00TOTALRp2,642,776.0013PEK. BETON LT. KERJA (1 : 3 : 5) + TUL. RINGAN / M3Bahan :Semen PC5.300zak65,000.00344,500.00Pasir beton0.500M3270,375.00135,187.50Koral beton1.000Kg286,125.00286,125.00Sub - Bahan765,812.50Rp765,812.50Upah :Kep. Tukang Batu0.050Org100,000.005,000.0050%Tukang batu0.500Org90,000.0045,000.00Pekerja6.000Org75,000.00450,000.00Mandor0.300Org110,000.0033,000.00Sub - Upah533,000.00Rp266,500.00Bahan :Besi beton (45 kg)45.000Kg13,125.00590,625.00(besi)Kawat beton0.400M320,212.508,085.00Sub - Bahan598,710.00Rp598,710.00Upah :100 kg pembesian (75%)Kep. Tukang Besi0.350Org90,000.0031,500.00Tukang besi1.050Org85,000.0089,250.00Pekerja3.150Org75,000.00236,250.00Mandor0.020Org110,000.002,200.00Sub - Upah359,200.00Sub-Upah 100kg (75%)269,400.00Rp121,230.00Rp1,752,252.5014BETON PLAT (diatas tanah) (1 : 2 : 3) + TUL. RINGAN / M3Bahan :Semen PC7.000zak65,000.00455,000.00Pasir Beton0.540M3270,375.00146,002.50Split0.820M3269,500.35220,990.29Sub - Bahan821,992.79Rp821,992.79Upah :Kep. Tukang Batu0.040Org100,000.004,000.00Tukang batu0.400Org90,000.0036,000.00Pekerja4.000Org75,000.00300,000.00Mandor0.020Org110,000.002,200.00Sub - Upah342,200.00Rp342,200.00Bahan :Besi beton (tul 8-20, 1 lps)75.000Kg13,125.00984,375.00(besi)Kawat beton0.500M320,212.5010,106.25Sub - Bahan994,481.25Rp994,481.25Upah :untuk pembesian 75 kgRp202,050.00Rp2,360,724.043.3PEKERJAAN BEKISTING1MEMASANG 1 M2 BEKISTING untuk BALOKSNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.040M32,415,000.0096,600.00Balok kayu kelas II (kayu Rimba Campuran)0.018M32,415,000.0043,470.00Kayu Dolken (kayu Galam 8-10cm - 400cm2.000btg36,750.0073,500.00Plywood tebal 9 mm (122x244 cm)0.350M2110,250.0038,587.50Minyak bekisting0.200liter30,000.006,000.00Paku 5-12 cm0.400Kg15,356.256,142.50bekisting 2x pakaiSub - Bahan264,300.00Rp264,300.00132,150.00Upah :Kep. Tukang Kayu0.033Org105,000.003,465.00Tukang kayu0.330Org90,000.0029,700.00Pekerja0.660Org75,000.0049,500.00Mandor0.033Org110,000.003,630.00Sub - Upah86,295.00Rp86,295.0086,295.00TOTALRp350,595.00218,445.002MEMASANG 1 M2 BEKISTING untuk KOLOMSNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.040M32,415,000.0096,600.00Balok kayu kelas II (kayu Rimba Campuran)0.015M32,415,000.0036,225.00Kayu Dolken (kayu Galam 8-10cm - 400cm2.000btg36,750.0073,500.00Plywood tebal 9 mm (122x244 cm)0.350M2110,250.0038,587.50Minyak bekisting0.200liter30,000.006,000.00Paku 5-12 cm0.400Kg15,356.256,142.50bekisting 2x pakaiSub - Bahan257,055.00Rp257,055.00128,527.50Upah :Kep. Tukang Kayu0.033Org105,000.003,465.00Tukang kayu0.330Org90,000.0029,700.00Pekerja0.660Org75,000.0049,500.00Mandor0.033Org110,000.003,630.00Sub - Upah86,295.00Rp86,295.0086,295.00TOTALRp343,350.00214,822.503MEMASANG 1 M2 BEKISTING untuk PLAT LANTAISNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.040M32,415,000.0096,600.00Balok kayu kelas II (kayu Rimba Campuran)0.015M32,415,000.0036,225.00Kayu Dolken (kayu Galam 8-10cm - 400cm6.000btg36,750.00220,500.00Plywood tebal 9 mm (122x244 cm)0.350M2110,250.0038,587.50Minyak bekisting0.200liter30,000.006,000.00Paku 5-12 cm0.400Kg15,356.256,142.50bekisting 2x pakaiSub - Bahan404,055.00Rp404,055.00202,027.50Upah :Sama dengan upah bekisting Kolom/balokSub - UpahRp86,295.0086,295.00TOTALRp490,350.00288,322.504MEMASANG 1 M2 BEKISTING untuk TANGGASNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.030M32,415,000.0072,450.00Balok kayu kelas II (kayu Rimba Campuran)0.015M32,415,000.0036,225.00Kayu Dolken (kayu Galam 8-10cm - 400cm2.000btg36,750.0073,500.00Plywood tebal 9 mm (122x244 cm)0.350M2110,250.0038,587.50Minyak bekisting0.150liter30,000.004,500.00Paku 5-12 cm0.400Kg15,356.256,142.50bekisting 2x pakaiSub - Bahan231,405.00Rp231,405.00115,702.50Upah :Sama dengan upah bekisting Kolom/balokSub - UpahRp86,295.0086,295.00TOTALRp317,700.00201,997.505MEMASANG 1 M2 BEKISTING untuk DINDINGSNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.030M32,415,000.0072,450.00Balok kayu kelas II (kayu Rimba Campuran)0.020M32,415,000.0048,300.00Kayu Dolken (kayu Galam 8-10cm - 400cm3.000btg36,750.00110,250.00Plywood tebal 9 mm (122x244 cm)0.350M2110,250.0038,587.50Minyak bekisting0.200liter30,000.006,000.00Paku 5-12 cm0.400Kg15,356.256,142.50Formite/spacer/penjaga jarak bekisting4.000bh10,000.0040,000.00bekisting 2x pakaiSub - Bahan321,730.00Rp321,730.00160,865.00Upah :Sama dengan upah bekisting Kolom/balokSub - UpahRp86,295.0086,295.00TOTALRp408,025.00247,160.006MEMASANG 1 M2 BEKISTING untuk PONDASISNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.040M32,415,000.0096,600.00Minyak bekisting0.300liter30,000.009,000.00Paku 5-12 cm0.100Kg15,356.251,535.63Sub - Bahan107,135.63Rp107,135.63Upah :Kep. Tukang Kayu0.026Org105,000.002,730.00Tukang kayu0.260Org90,000.0023,400.00Pekerja0.520Org75,000.0039,000.00Mandor0.026Org110,000.002,860.00Sub - Upah67,990.00Rp67,990.00TOTALRp175,125.637MEMASANG 1 M2 BEKISTING untuk SLOOFSNI-2008Bahan :Kayu kelas III (Kayu Rimba Campuran)0.045M32,415,000.00108,675.00Minyak bekisting0.300liter30,000.009,000.00Paku 5-12 cm0.100Kg15,356.251,535.63Sub - Bahan119,210.63Rp119,210.63Upah :Kep. Tukang Kayu0.026Org105,000.002,730.00Tukang kayu0.260Org90,000.0023,400.00Pekerja0.520Org75,000.0039,000.00Mandor0.026Org110,000.002,860.00Sub - Upah67,990.00Rp67,990.00TOTALRp187,200.633.4PEK. PEMBESIAN1PEMBESIAN (10 Kg) dengan besi polos atau ulirSNI-2008Bahan :Besi beton10.50Kg13,125.00137,812.50Kawat beton0.15Kg20,212.503,031.88Sub - Bahan140,844.38Rp140,844.38Upah :Pekerja0.070Org75,000.005,250.00Tukang besi0.070Org85,000.005,950.00Kep. Tukang Besi0.007Org90,000.00630.00Mandor0.004Org110,000.00440.00Sub - Upah12,270.00Rp12,270.00SUB-TOTALRp153,114.38atau / KGRp15,311.442MEMASANG 10 Kg KABEL PRESSTRESEDSNI-2008POLOS/STARNDSBahan :Besi beton10.50Kg13,125.00137,812.50Kawat beton0.10Kg20,212.502,021.25Sub - Bahan139,833.75Rp139,833.75Upah :Pekerja0.050Org75,000.003,750.00Tukang besi0.050Org85,000.004,250.00Kep. Tukang Besi0.005Org90,000.00450.00Mandor0.003Org110,000.00330.00Sub - Upah8,780.00Rp8,780.00SUB-TOTALRp148,613.75atau / KGRp14,861.383MEMASANG 1 KG JARING KAWAT BAJA / WIRE MESHSNI-2008Bahan :Jaring kawat baja dilas (wire mesh)1.02Kg12,500.0012,750.00Kawat beton0.05Kg20,212.501,010.63Sub - Bahan13,760.63Rp13,760.63Upah :Pekerja0.025Org75,000.001,875.00Tukang besi0.025Org85,000.002,125.00Kep. Tukang Besi0.002Org90,000.00180.00Mandor0.001Org110,000.00110.00Sub - Upah4,290.00Rp4,290.00SUB-TOTALRp18,050.634PEMBESIAN (115 Kg) / M3 BETONBahan :Besi beton126.50Kg13,125.001,660,312.50Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan1,700,737.50Rp1,700,737.50Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp141,105.00SUB-TOTALRp1,841,842.505PEMBESIAN (125 Kg) / M3 BETONBahan :Besi beton137.50Kg13,125.001,804,687.50Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan1,845,112.50Rp1,845,112.50Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp153,375.00SUB-TOTALRp1,998,487.506PEMBESIAN (150 Kg) / M3 BETONBahan :Besi beton165.00Kg13,125.002,165,625.00Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan2,206,050.00Rp2,206,050.00Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp184,050.00SUB-TOTALRp2,390,100.007PEMBESIAN (175 Kg) / M3 BETONBahan :Besi beton192.50Kg13,125.002,526,562.50Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan2,566,987.50Rp2,566,987.50Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp214,725.00SUB-TOTALRp2,781,712.508PEMBESIAN (200 Kg) / M3 BETONBahan :Besi beton220.00Kg13,125.002,887,500.00Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan2,927,925.00Rp2,927,925.00Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp245,400.00SUB-TOTALRp3,173,325.009PEMBESIAN (225 Kg) / M3 BETONBahan :Besi beton247.50Kg13,125.003,248,437.50Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan3,288,862.50Rp3,288,862.50Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp276,075.00SUB-TOTALRp3,564,937.5010PEMBESIAN (250 Kg) / M3 BETONBahan :Besi beton275.00Kg13,125.003,609,375.00Kawat beton2.00Kg20,212.5040,425.00Sub - Bahan3,649,800.00Rp3,649,800.00Upah : Dasar upah / Kg, sama dengan upah besi 100 KgRp306,750.00SUB-TOTALRp3,956,550.003.5.REKAPITULASI PEKERJAAN BETON TULANG3.5.1HARGA BETON TULANG PLAT DAK / M3, TBL. 12 CM1.BETON PLAT DAK, TULANGAN 100 Kg /M3A.BEKISTING8.33M2490,350.004,086,250.00B.BETON, mutu f'c = 19,3 Mpa (K 225)1.00M3986,522.79986,522.79C.PEMBESIAN 100 KG100.00KG15,311.441,531,143.75Rp6,603,916.542.BETON PLAT DAK, TULANGAN 100 Kg /M3A.BEKISTING8.33M2490,350.004,086,250.00B.BETON, mutu f'c = 19,3 Mpa (K 225)1.00M3986,522.79986,522.79C.PEMBESIAN 125 KG125.00KG15,311.441,913,929.69Rp6,986,702.483.5.2HARGA BETON TULANG BALOK PLAT / M31.BETON BALOK PLAT , TULANGAN 150 Kg /M3A. HARGA BEKISTING0.00B. HARGA BETON 1Pc : 2Ps : 3Spl0.00C. HARGA PEMBESIAN (150 Kg)0.000.03.5.3HARGA BETON TULANG KOLOM / M31.BETON KOLOM, TULANGAN 150 Kg / M3A. HARGA BEKISTING0.00B. HARGA BETON 1Pc : 2Ps : 3Spl0.00C. HARGA PEMBESIAN (150 Kg)0.000.03.5.4BETON BALOK TEA-BEAM / M3A. HARGA BEKISTING0.00B. HARGA BETON 1Pc : 2Ps : 3Spl0.00C. HARGA PEMBESIAN (175 Kg), 6 d 13 + d8-2000.000.03.5.5HARGA BETON TULANG PND. POER / M31.BETON PONDASI POER, TULANGAN 100 Kg / M3A. HARGA BEKISTING0.00B. HARGA BETON 1Pc : 2Ps : 3Spl0.00C. HARGA PEMBESIAN (100 Kg)0.000.03.5.6HARGA BETON TULANG JEMBATAN MASUK / M31BETON JEMBATAN BETON MASUK, TULANGAN 150 Kg / M3A.BEKISTING6.67M2490,350.003,269,000.00B.BETON, mutu f'c = 19,3 Mpa (K 225)1.00M3986,522.79986,522.79C.PEMBESIAN 125 KG150.00KG15,311.442,296,715.63Rp6,552,238.42IV.PEK. PASANGAN4.1.PAS. AANSTAMPENG BATU KALISNI-2008Bahan :Batu kali1.200M3257,250.00308,700.00Pasir urug0.432M3291,375.00125,874.00Sub - Bahan434,574.00Rp434,574.00Upah :Pekerja0.780Org75,000.0058,500.00Tukang batu0.390Org90,000.0035,100.00Kep. Tukang Batu0.039Org100,000.003,900.00Mandor0.039Org110,000.004,290.00Sub - Upah101,790.00Rp101,790.00Total Harga Pond. Bt. Kali 1Pc : 3Ps / m3Rp536,364.004.2.PEK. PONDASI BT. KALI1PEK. PONDASI BT. KALI 1Pc : 3PsBahan :Semen PCSNI-2008202.000Kg1,300.00262,600.00Batu kali1.200M3257,250.00308,700.00Pasir pasang0.485M3265,125.00128,585.63Sub - Bahan699,885.63Rp699,885.63Upah :Pekerja1.500Org75,000.00112,500.00Tukang batu0.750Org90,000.0067,500.00Kep. Tukang Batu0.075Org100,000.007,500.00Mandor0.075Org110,000.008,250.00Sub - Upah195,750.00Rp195,750.00Total Harga Pond. Bt. Kali 1Pc : 3Ps / m3Rp895,635.632PEK. PONDASI BT. KALI 1Pc : 4PsBahan :Semen PCSNI-2008163.000Kg1,300.00211,900.00Batu kali1.200M3257,250.00308,700.00Pasir pasang0.520M3265,125.00137,865.00Sub - Bahan658,465.00Rp658,465.00Upah : sama dengan upah Pond. 1Pc : 3PsRp195,750.00Total Harga Pond. Bt. Kali 1Pc : 4Ps / m3Rp854,215.003PEK. PONDASI BT. KALI 1Pc : 5PsSNI-2008Bahan :Semen PC136.000Kg1,300.00176,800.00Batu kali1.200M3257,250.00308,700.00Pasir pasang0.544M3265,125.00144,228.00Sub - Bahan629,728.00Rp629,728.00Upah : sama dengan upah Pond. 1Pc : 3PsRp195,750.00Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3Rp825,478.004PEK. PONDASI BT. KALI 1Pc : 6PsSNI-2008Bahan :Semen PC117.000Kg1,300.00152,100.00Batu kali1.200M3257,250.00308,700.00Pasir pasang0.561M3265,125.00148,735.13Sub - Bahan609,535.13Rp609,535.13Upah : sama dengan upah Pond. 1Pc : 3PsRp195,750.00Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3Rp805,285.135PEK. PONDASI BT. KALI 1Pc : 8PsSNI-2008Bahan :Semen PC91.000Kg1,300.00118,300.00Batu kali1.200M3257,250.00308,700.00Pasir pasang0.584M3265,125.00154,833.00Sub - Bahan581,833.00Rp581,833.00Upah : sama dengan upah Pond. 1Pc : 3PsRp195,750.00Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3Rp777,583.006PEK. PONDASI BT. KALI 1KP : 1SM : 2PsSNI-2008Bahan :Kapur padam0.170M3210,000.0035,700.00Semen Merah0.170M3183,750.0031,237.50Batu kali1.200M3257,250.00308,700.00Pasir pasang0.340M3265,125.0090,142.50Sub - Bahan465,780.00Rp465,780.00Upah : sama dengan upah Pond. 1Pc : 3PsRp195,750.00Total Harga Pond. Bt. Kali 1Pc : 5Ps / m3Rp661,530.004.3.PEK. DINDING BATA MERAH (1 Batu)1PEK. DINDING BATA MERAH (1 Batu), 1Pc : 2Ps / M2SNI-2008Bahan :Semen PC43.500kg1,300.0056,550.00Batu bata uk. 5 x 11 x 22 cm140.00Bh630.0088,200.00Pasir pasang0.080M3265,125.0021,210.00Sub - Bahan165,960.00Rp165,960.00Upah :Pekerja0.600Org75,000.0045,000.00Tukang batu0.200Org90,000.0018,000.00Kep. Tukang Batu0.020Org100,000.002,000.00Mandor0.030Org110,000.003,300.00Sub - Upah68,300.00Rp68,300.00Total harga / M2Rp234,260.002PEK. DINDING BATA MERAH (1 Batu), 1Pc : 3Ps / M2SNI-2008Bahan :Semen PC32.950kg1,300.0042,835.00Batu bata uk. 5 x 11 x 22 cm140.00Bh630.0088,200.00Pasir pasang0.091M3265,125.0024,126.38Sub - Bahan155,161.38Rp155,161.38Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp68,300.00Total harga / M2Rp223,461.383PEK. DINDING BATA MERAH (1 Batu), 1Pc : 4Ps / M2SNI-2008Bahan :Semen PC26.550kg1,300.0034,515.00Batu bata uk. 5 x 11 x 22 cm140.00Bh630.0088,200.00Pasir pasang0.093M3265,125.0024,656.63Sub - Bahan147,371.63Rp147,371.63Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp68,300.00Total harga / M2Rp215,671.634PEK. DINDING BATA MERAH (1 Batu), 1Pc : 5Ps / M2SNI-2008Bahan :Semen PC22.200kg1,300.0028,860.00Batu bata uk. 5 x 11 x 22 cm140.00Bh630.0088,200.00Pasir pasang0.102M3265,125.0027,042.75Sub - Bahan144,102.75Rp144,102.75Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp68,300.00Total harga / M2Rp212,402.755PEK. DINDING BATA MERAH (1 Batu), 1Pc : 6Ps / M2SNI-2008Bahan :Semen PC18.500kg1,300.0024,050.00Batu bata uk. 5 x 11 x 22 cm140.00Bh630.0088,200.00Pasir pasang0.122M3265,125.0032,345.25Sub - Bahan144,595.25Rp144,595.25Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp68,300.00Total harga / M2Rp212,895.254.4.PEK. DINDING BATA MERAH (1/2 Batu)1PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 2Ps / M2SNI-2008Bahan :Semen PC18.950kg1,300.0024,635.00Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Pasir pasang0.038M3265,125.0010,074.75Sub - Bahan78,809.75Rp78,809.75Upah :Pekerja0.300Org75,000.0022,500.00Tukang batu0.100Org90,000.009,000.00Kep. Tukang Batu0.010Org100,000.001,000.00Mandor0.015Org110,000.001,650.00Sub - Upah34,150.00Rp34,150.00Total harga / M2Rp112,959.752PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 3Ps / M2SNI-2008Bahan :Semen PC14.370kg1,300.0018,681.00Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Pasir pasang0.040M3265,125.0010,605.00Sub - Bahan73,386.00Rp73,386.00Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp34,150.00Total harga / M2Rp107,536.003PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 4Ps / M2SNI-2008Bahan :Semen PC11.500kg1,300.0014,950.00Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Pasir pasang0.043M3265,125.0011,400.38Sub - Bahan70,450.38Rp70,450.38Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp34,150.00Total harga / M2Rp104,600.384PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 5Ps / M2SNI-2008Bahan :Semen PC9.680kg1,300.0012,584.00Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Pasir pasang0.045M3265,125.0011,930.63Sub - Bahan68,614.63Rp68,614.63Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp34,150.00Total harga / M2Rp102,764.635PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 6Ps / M2SNI-2008Bahan :Semen PC8.320kg1,300.0010,816.00Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Pasir pasang0.049M3265,125.0012,991.13Sub - Bahan67,907.13Rp67,907.13Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp34,150.00Total harga / M2Rp102,057.136PEK. DINDING BATA MERAH (1/2 Batu), 1Pc : 8Ps / M2SNI-2008Bahan :Semen PC6.500kg1,300.008,450.00Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Pasir pasang0.050M3265,125.0013,256.25Sub - Bahan65,806.25Rp65,806.25Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp34,150.00Total harga / M2Rp99,956.257DINDING BATA MERAH (1/2 Batu), 1Pc : 3KP : 10Ps / M2SNI-2008Bahan :Semen PC4.500kg1,300.005,850.00Kapur Padam0.015M3210,000.003,150.00Pasir pasang0.050M3265,125.0013,256.25Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Sub - Bahan66,356.25Rp66,356.25Upah :Pekerja0.300Org75,000.0022,500.00Tukang batu0.100Org90,000.009,000.00Kep. Tukang Batu0.010Org100,000.001,000.00Mandor0.015Org110,000.001,650.00Sub - Upah34,150.00Rp34,150.00Total harga / M2Rp100,506.258DINDING BATA MERAH (1/2 Batu), 1KP : 1SM : 1Ps / M2SNI-2008Bahan :Semen Merah0.018m3183,750.003,307.50Kapur Padam0.018M3210,000.003,780.00Pasir pasang0.018M3265,125.004,772.25Batu bata uk. 5 x 11 x 22 cm70.00Bh630.0044,100.00Sub - Bahan55,959.75Rp55,959.75Upah :Sama dengan upah pas 1Pc : 2PsSub - UpahRp34,150.00Total harga / M2Rp90,109.754.5.PEK. DINDING "HEBEL1PEK. DINDING "HEBEL" (tbl 10 cm) 1Pc : 3Ps / M2Bahan :Semen PC (ambil koefisien pas bata 1Pc : 3Ps)14.370kg1,300.0018,681.00Batu bata ringan (ex Hebel), 10x16x60 cm8.340bh8,542.8071,246.95Pasir pasang (keofesien diragukan)0.7280.0728M3265,125.0019,301.10Sub - Bahan109,229.05Rp109,229.05Upah :Pekerja0.350Org75,000.0026,250.00Tukang batu0.150Org90,000.0013,500.00Kep. Tukang Batu0.015Org100,000.001,500.00Mandor0.018Org110,000.001,980.00Sub - Upah43,230.00Rp43,230.00Total harga / M2Rp152,459.052PEK. DINDING "HEBEL" (tbl 7 cm) 1Pc : 3Ps / M2Bahan :Semen PC (ambil koefisien pas bata 1Pc : 3Ps)14.370kg1,300.0018,681.00Batu bata ringan (ex Hebel), 7x16x60 cm8.340bh5,979.9649,872.87Pasir pasang (keofesien diragukan)0.7280.0728M3265,125.0019,301.10Sub - Bahan87,854.97Rp87,854.97Upah :Sama dengan upah pas Hebel 10 cmSub - UpahRp43,230.00Total harga / M2Rp131,084.973PEK. DINDING "HEBEL" (tbl 10 cm), perekat Mortar / M2Bahan :Batu bata ringan (ex Hebel), 10x16x60 cm8.500bh8,542.8072,613.80Perekat PM-100 / MU-100 (perekat)3.200kg1,575.005,040.00Sub - Bahan77,653.80Rp77,653.80Upah :Pekerja0.300Org75,000.0022,500.00Tukang batu0.150Org90,000.0013,500.00Kep. Tukang Batu0.015Org100,000.001,500.00Mandor0.015Org110,000.001,650.00Sub - Upah39,150.00Rp39,150.00Total harga / M2Rp116,803.804PEK. DINDING "HEBEL" (tbl 7 cm), perekat Mortar / M2Bahan :Batu bata ringan (ex Hebel), 7x16x60 cm8.500bh5,979.9650,829.66Perekat PM-100 / MU-100 (perekat)2.400M31,575.003,780.00Sub - Bahan54,609.66Rp54,609.66Upah :Sama dengan upah pas Hebel 10 cmSub - UpahRp39,150.00Total harga / M2Rp93,759.664.6.PEK. DINDING BATACO 1Pc : 3Ps / M2Bahan :Semen PC (ambil koefisien pas bata 1Pc : 3Ps)14.370kg1,300.0018,681.00Bataco semen, 10x19x40 cm12.50Bh4,200.0052,500.00Pasir pasang (keofesien diragukan)0.7280.0728M3265,125.0019,301.10Sub - Bahan90,482.10Rp90,482.10Upah :Pekerja0.350Org75,000.0026,250.00Tukang batu0.150Org90,000.0013,500.00Kep. Tukang Batu0.015Org100,000.001,500.00Mandor0.018Org110,000.001,980.00Sub - Upah43,230.00Rp43,230.00T O T A LRp133,712.104.7.PEK. DINDING GLASSBLOCK / M2Bahan :Semen PC (ambil koefisien pas bata 1Pc : 3Ps)14.370kg1,300.0018,681.00Glassblock 20/2025.000Bh31,500.00787,500.00Pasir pasang (keofesien diragukan)0.0420M3265,125.0011,135.25Sub - Bahan817,316.25Rp817,316.25Upah :Pekerja0.350Org75,000.0026,250.00Tukang batu0.150Org90,000.0013,500.00Kep. Tukang Batu0.015Org100,000.001,500.00Mandor0.018Org110,000.001,980.00Sub - Upah43,230.00Rp43,230.00T O T A LRp860,546.254.8.PEK. DINDING BATA KRAWANG / M2Bahan :Semen PC0.420zak65,000.0027,300.00Rooster bata merah 12x24x24 cm16.000Bh5,075.7081,211.20Pasir pasang0.050M3265,125.0013,256.25Sub - Bahan121,767.45Rp121,767.45Upah : sama dg upah pas glassblokRp43,230.00T O T A LRp164,997.454.9.PEK. DINDING ALLUMUNIUM COMPOSIT PANEL (ACP) / M2Bahan :Allumunium Composit Panel (ACP)1.0000m2400,000.00400,000.00Rangka allumunium hollow5.000m'12,500.0062,500.00Paku skrup0.580kg45,000.0026,100.00Sealant0.8000m'8,531.256,825.00Sub - Bahan495,425.00Rp495,425.00Upah :Pekerja1.500Org75,000.00112,500.00Tukang allumunium1.500Org100,000.00150,000.00Kep. Tukang0.150Org90,000.0013,500.00Mandor0.600Org110,000.0066,000.00Sub - Upah342,000.00Rp239,400.00Total harga / M2Rp734,825.004.10.PEK. CURTAINWALL KACA / M2(Diambil sample 20x20 m = 400 m2)Bahan :Curtainwall Transom Hitam (horizontal)280.00m'157,500.0044,100,000.00Curtainwall Mulion Hitam (vertical)240.00m'189,000.0045,360,000.00Frame Allumunium Casement Jendelam'105,000.000.00Kaca Stopsol 8mm400.00m'708,750.00283,500,000.00Sealant520.00m'8,531.254,436,250.00Nilai harga untuk seluas 400m2377,396,250.00Rp377,396,250.00Total harga / M2Rp943,490.63V.PEKERJAAN BAJA1MEMASANG BESI PROFIL / KGSNI-2008Bahan :Besi profil (besi siku)1.150kg14,455.3516,623.65Sub - Bahan16,623.65Rp16,623.65Upah :Pekerja0.060Org75,000.004,500.0050%Tukang Las konstruksi0.060Org100,000.006,000.00Kepala tukang0.006Org90,000.00540.00Mandor0.003Org110,000.00330.00Sub - Upah11,370.00Rp5,685.00T O T A LRp22,308.652MEMASANG BESI BAJA IWF / KGSNI-2008Bahan :Besi baja IWF1.150kg13,125.0015,093.75Sub - Bahan15,093.75Rp15,093.75Upah :Pekerja0.060Org75,000.004,500.0050%Tukang Las konstruksi0.060Org100,000.006,000.00Kepala tukang0.006Org90,000.00540.00Mandor0.003Org110,000.00330.00Sub - Upah11,370.00Rp5,685.00T O T A LRp20,778.753MENGERJAKAN 100 KG PEK. PERAKITANSNI-2008Bahan :Solar1.000liter4,500.004,500.00Minyak pelumas0.100liter35,000.003,500.00Sub - Bahan8,000.00Rp8,000.00Upah :Pekerja0.100Org75,000.007,500.00Tukang besi konstruksi0.100Org85,000.008,500.00Kepala tukang0.001Org90,000.0090.00Mandor0.005Org110,000.00550.00Sub - Upah16,640.00Rp16,640.00Sewa Alat0.800jam50,000.0040,000.00Rp40,000.00T O T A LRp64,640.00Biaya untuk perakitan / kgRp646.404PEK. PINTU BESI DOUBLE PLAT 2MM, RANGKA SIKU / M2SNI-2008Bahan :Besi siku 30x30x3mm15.000kg14,455.35216,830.25Besi plat baja32.800kg15,750.00516,600.00Kawat Las0.050kg31,500.001,575.00Sub - Bahan735,005.25Rp735,005.25Upah :Pekerja1.050Org75,000.0078,750.00Tukang Las konstruksi1.050Org100,000.00105,000.00Kepala tukang0.105Org90,000.009,450.00Mandor0.052Org110,000.005,720.00Sub - Upah198,920.00Rp198,920.00T O T A LRp933,925.255PEK. PENGELASAN 10 CM, dengan Las listrikSNI-2008Bahan :Kawat las listrik0.400kg31,500.0012,600.00Solar0.300liter4,500.001,350.00Minyak pelumas0.040liter35,000.001,400.00Sub - Bahan15,350.00Rp15,350.00Upah :Pekerja0.040Org75,000.003,000.00Tukang Las konstruksi0.020Org100,000.002,000.00Kepala tukang0.002Org90,000.00180.00Mandor0.002Org110,000.00220.00Sub - Upah5,400.00Rp5,400.00Sewa Alat0.170jam50,000.008,500.00Rp8,500.00T O T A LRp29,250.00Biaya untuk 1m pengelasanRp292,500.006MEMASANG PINTU ROLLING DOOR BESI / M2SNI-2008Bahan :Pintu gulung besi1.000M2450,000.00450,000.00Sub - Bahan450,000.00Rp450,000.00Upah :Pekerja1.200Org75,000.0090,000.00Tukang Las konstruksi1.200Org100,000.00120,000.00Kepala tukang0.120Org90,000.0010,800.00Mandor0.006Org110,000.00660.00Sub - Upah221,460.00Rp221,460.00T O T A LRp671,460.007MEMASANG SUNSCREEN ALLUMUNIUM / M2SNI-2008Bahan :Sunscreen allumunium1.000M2300,000.00300,000.00Sub - Bahan300,000.00Rp300,000.00Upah :Pekerja0.080Org75,000.006,000.00Tukang Allumunium0.800Org100,000.0080,000.00Kepala tukang0.080Org90,000.007,200.00Mandor0.004Org110,000.00440.00Sub - Upah93,640.00Rp93,640.00T O T A LRp393,640.008MEMASANG ROLLING ALLUMUNIUM / M2SNI-2008Bahan :Rolling Door Allumunium1.000M2550,000.00550,000.00Sub - Bahan550,000.00Rp550,000.00Upah :Pekerja1.000Org75,000.0075,000.00Tukang Allumunium1.000Org100,000.00100,000.00Kepala tukang0.100Org90,000.009,000.00Mandor0.050Org110,000.005,500.00Sub - Upah189,500.00Rp189,500.00T O T A LRp739,500.009Pekerjaan Railling Besi (black steel) Teras/Balkon /M'(modul 4,2 m / unit)- Railling besi bahan pipa besi hitam dia. 2" (hand rail)m'4.20m'$142,967600,460.00- Railling besi bahan pipa besi hitam dia. 1,5" (tiang)m'6.60m'$112,800744,480.00- Railling besi bahan pipa besi hitam dia. 1" (pembagi)m'16.80m'$65,9671,108,240.00- Base plate + baut angkurbh6.00bh40,000.00240,000.00- Finishing pengecatanlot1.00lot245,318.00245,318.00- Upah pasanglot1.00lot734,624.50734,624.50Total harga / unit3,673,122.50Harga / m'874,552.9810Pekerjaan Railling Besi (Black steel) Tangga /M'(modul 3,50 m'/ unit)- Railling besi bahan pipa besi hitam dia. 2" (hand rail)3.50m'$142,967500,383.33- Railling besi bahan pipa besi hitam dia. 1,5" (tiang)4.40m'$112,800496,320.00- Railling besi bahan pipa besi hitam dia. 1" (pembagi)14.00m'$65,967923,533.33- Base plate + baut angkur4.00bh40,00