Planilha de Quant. de Preos
ORAMENTOPODER JUDICIRIOJUSTIA FEDERAL NA PARABAREFORMA E MODERNIZAO DA INSTALAES EDIFCIO SEDE DA JUSTIA FEDERAL NA PARABAENDEREO: JOO TEXEIRA DE CARVALHO, 480. BRISAMAR. JOO PESSOASERVIO: MODERNIZAO DAS INSTALAES DA ANTIGA 5 VARA - FUTURO ANEXO DA SECRETARIA ADMINISTRATIVAANEXO IXPLANILHA ORAMENTRIALEIS SOCIAIS125%BDI25%1DIVERSOSR$ 2,921.52R$ 3,651.90CdigoDescrioUn.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)Preo Total + BDI (R$)1.2TAPUME DE CHAPA DE MADEIRAm15.9053.30847.451059.321.3LIMPEZA PERMANENTEm475.004.372074.072592.592DEMOLIES E REMOESR$ 26,195.95R$ 32,744.93CdigoDescrioUn.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)Preo Total + BDI (R$)2.1DEMOLIO DE ALVENARIA DE TIJOLOS CERMICOSm7.2024.43175.92219.902.2DEMOLIO DE FORRO DE GESSO ACARTONADOm443.0623.6110462.4013078.002.3DEMOLIO DE PAREDE DE GESSO ACARTONADOm82.6527.632283.952854.942.4RETIRADA DE REVESTIMENTO DE POLIESTIRENOm31.4722.31702.11877.642.5DEMOLIO DE PISO DE GRANITO CINZA ANDORINHA COM REAPROVEITAMENTOm35.9023.74852.141065.172.6RETIRADA DE PISO VINLICOm401.219.733904.204880.252.7RETIRADA DE RODAP DE MADEIRA COM REAPROVEITAMENTOm269.487.391990.542488.182.8RETIRADA DE ESQUADRIA DE ALUMNIOm2.935.8317.0421.302.9RETIRADA DE PAINEL DE VIDRO TEMPERADO COM PORTA COM REAPROVEITAMENTOm12.0015.50186.06232.572.10RETIRADA DE PORTA DE MADEIRA, INCLUSIVE FORRA COM REAPROVEITAMENTOund7.0032.31226.19282.742.11RETIRADA DE TABLADO DE MADEIRA COM REAPROVEITAMENTOund2.0056.71113.42141.782.12RETIRADA DE INTERRUPTORES, TOMADAS E AFINS COM REAPROVEITAMENTOund226.009.552158.632698.292.13RETIRADA DE LUMINRIAS COM REAPROVEITAMENTOund105.0013.471414.731768.412.14RETIRADA DE DUTOS DO SISTEMA DE AR CONDICIONADOm85.3017.001450.011812.512.15RETIRADA DO MAQUINRIO DE REFRIGERAOund1.00258.60258.60323.253PISOSR$ 29,872.80R$ 37,341.00CdigoDescrioUn.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)Preo Total + BDI (R$)3.1LASTRO DE CONCRETO LEVEm3.89513.201997.372496.713.2REGULARIZAO SARRAFEADA e=1,5cmm454.5119.078665.3610831.693.3PISO VINLICOm454.5142.2719210.0724012.594PAREDES E REVESTIMENTOSR$ 27,413.65R$ 34,267.06CdigoDescrioUn.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)Preo Total + BDI (R$)4.1PAREDE DRY WALLm79.9587.306979.738724.664.2ALVENARIA DE TIJOLOS DE 8 FUROSm2.7326.7473.0091.254.3CHAPISCOm2.738.5423.3329.164.4REBOCOm2.7318.2649.8562.324.5EMASSAMENTO DE PAREDEm378.517.973018.583773.224.6PINTURA DE PAREDES COM TINTA LATEX PVAm929.5510.029312.6111640.774.7PINTURA DE PORTASm41.2211.50473.90592.374.8PINTURA EM SUPERFCIE METLICAm11.3910.50119.56149.454.9RECUPERAO E REINSTALAO DE RODAP DE MADEIRAm269.1727.357363.099203.875FORRO E REVESTIMENTOSR$ 38,056.33R$ 47,570.41CdigoDescrioUn.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)Preo Total + BDI (R$)5.1FORRO REMOVVEL MODULADOm313.9082.0125742.0932177.615.2FORRO DE GESSO ACARTONADOm155.5661.179515.1911893.995.3EMASSAMENTO DE FORROm155.567.971240.581550.735.4PINTURA DE FORRO COM TINTA LATEX PVAm155.5610.021558.461948.086PORTAS E ESQUADRIASR$ 7,601.43R$ 9,501.79CdigoDescrioUn.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)Preo Total + BDI (R$)6.1FORNECIMENTO E INSTALAO DE ESQUADRIA DE ALUMINIOm2.93241.21705.53881.916.2MANUTENO PREVENTIVA EM ESQUADRIAS DE ALUMNIO EXISTENTESm183.9926.184816.766020.956.3RECOLOCAO DE PORTAS DE MADEIRAund4.00169.79679.16848.946.4INSTALAO DE FECHADURAS EM PORTAS EXISTENTESund10.00140.001399.991749.997INSTALAESR$ 29,873.62R$ 37,342.03CdigoDescrioUn.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)Preo Total + BDI (R$)7.1PONTO DE SOM AMBIENTEUn.14.00218.053052.693815.867.2CENTRAL DE CONTROLE DO SOM AMBIENTEUn.1.002353.512353.512941.897.3MODERNIZAO DE PONTOS ELTRICOS - TOMADASund79.0022.331764.362205.457.4MODERNIZAO DE PONTOS ELTRICOS - INTERRUPTORESund13.0022.33290.34362.927.5MODERNIZAO DE PONTOS ELTRICOS - TAMPAS CEGASund77.0014.761136.801421.007.6INSTALAO DE PONTOS ELTRICOS NOVOS - TOMADASund40.0034.651386.111732.647.7INSTALAO DE PONTOS ELTRICOS NOVOS - INTERRUPTORESund4.0034.65138.61173.267.8LUMINRIA DE EMBUTIR EM FORRO MODULADOund95.00189.9418043.8422554.807.9ELETRODUTO DE 2"m70.0024.391707.372134.218REDE ESTRUTURADAR$ 11,568.16R$ 14,460.20CdigoDescrioUn.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)Preo Total + BDI (R$)8.1REMANEJAMENTO DE PONTO DE REDEund62.0076.704755.155943.948.2PONTO DE REDE NOVO - 02 SAIDASund16.0041.19659.07823.848.3PONTO DE REDE NOVO - 04 SAIDASund3.0058.55175.66219.578.4CABO UTP CAT 5em395.008.733447.704309.638.5ELETRODUTO PVC RIGIDO 1"m113.5021.142399.272999.098.6CONDULETE TIPO "T"und4.0026.03104.10130.138.7CONDULETE TIPO "X"und1.0027.2027.2034.00TOTAL GERALPREO TOTALPREO TOTAL + BDIR$ 173,503.46R$ 216,879.33BDIR$ 43,375.87
CRONOGRAMA-DETPODER JUDICIRIOJUSTIA FEDERAL NA PARABAREFORMA E MODERNIZAO DA INSTALAES EDIFCIO SEDE DA JUSTIA FEDERAL NA PARABAENDEREO: JOO TEXEIRA DE CARVALHO, 480. BRISAMAR. JOO PESSOASERVIO: MODERNIZAO DAS INSTALAES DA ANTIGA 5 VARA - FUTURO ANEXO DA SECRETARIA ADMINISTRATIVAANEXO IXCRONOGRAMA FISICO-FINANCEIROITEMSERVIOSVALOR DO ITEM30 Dias60 Dias90 Dias120 Dias(R$)%(R$)%(R$)%(R$)%(R$)1DIVERSOSR$ 3,651.9046.76%1,707.4617.75%648.1517.75%648.1517.75%648.151.2TAPUME DE CHAPA DE MADEIRAR$ 1,059.32100.00%1,059.320.00.00.0100.00%1.3LIMPEZA PERMANENTER$ 2,592.5925.00%648.1525.00%648.1525.00%648.1525.00%648.15100.00%2DEMOLIES E REMOESR$ 32,744.93100.00%32,744.930.00%0.00.00%0.00.00%0.0100.00%2.1DEMOLIO DE ALVENARIA DE TIJOLOS CERMICOSR$ 219.90100.00%219.900.00.00.0100.00%2.2DEMOLIO DE FORRO DE GESSO ACARTONADOR$ 13,078.00100.00%13,078.000.00.00.0100.00%2.3DEMOLIO DE PAREDE DE GESSO ACARTONADOR$ 2,854.94100.00%2,854.940.00.00.0100.00%2.4RETIRADA DE REVESTIMENTO DE POLIESTIRENOR$ 877.64100.00%877.640.00.00.0100.00%2.5DEMOLIO DE PISO DE GRANITO CINZA ANDORINHA COM REAPROVEITAMENTOR$ 1,065.17100.00%1,065.170.00.00.0100.00%2.6RETIRADA DE PISO VINLICOR$ 4,880.25100.00%4,880.250.00.00.0100.00%2.7RETIRADA DE RODAP DE MADEIRA COM REAPROVEITAMENTOR$ 2,488.18100.00%2,488.180.00.00.0100.00%2.8RETIRADA DE ESQUADRIA DE ALUMNIOR$ 21.30100.00%21.300.00.00.0100.00%2.9RETIRADA DE PAINEL DE VIDRO TEMPERADO COM PORTA COM REAPROVEITAMENTOR$ 232.57100.00%232.570.00.00.0100.00%2.10RETIRADA DE PORTA DE MADEIRA, INCLUSIVE FORRA COM REAPROVEITAMENTOR$ 282.74100.00%282.740.00.00.0100.00%2.11RETIRADA DE TABLADO DE MADEIRA COM REAPROVEITAMENTOR$ 141.78100.00%141.780.00.00.0100.00%2.12RETIRADA DE INTERRUPTORES, TOMADAS E AFINS COM REAPROVEITAMENTOR$ 2,698.29100.00%2,698.290.00.00.0100.00%2.13RETIRADA DE LUMINRIAS COM REAPROVEITAMENTOR$ 1,768.41100.00%1,768.410.00.00.0100.00%2.14RETIRADA DE DUTOS DO SISTEMA DE AR CONDICIONADOR$ 1,812.51100.00%1,812.510.00.00.0100.00%2.15RETIRADA DO MAQUINRIO DE REFRIGERAOR$ 323.25100.00%323.250.00.00.0100.00%3PISOSR$ 37,341.000.00%0.0100.00%37,341.000.00%0.00.00%0.0100.00%3.1LASTRO DE CONCRETO LEVER$ 2,496.710.0100.00%2,496.710.00.0100.00%3.2REGULARIZAO SARRAFEADA e=1,5cmR$ 10,831.690.0100.00%10,831.690.00.0100.00%3.3PISO VINLICOR$ 24,012.590.0100.00%24,012.590.00.0100.00%4PAREDES E REVESTIMENTOSR$ 34,267.060.53%182.7235.22%12,069.3349.73%17,042.1714.51%4,972.84100.00%4.1PAREDE DRY WALLR$ 8,724.660.050.00%4,362.3350.00%4,362.330.0100.00%4.2ALVENARIA DE TIJOLOS DE 8 FUROSR$ 91.25100.00%91.250.00.00.0100.00%4.3CHAPISCOR$ 29.16100.00%29.160.00.00.0100.00%4.4REBOCOR$ 62.32100.00%62.320.00.00.0100.00%4.5EMASSAMENTO DE PAREDER$ 3,773.220.050.00%1,886.6150.00%1,886.610.0100.00%4.6PINTURA DE PAREDES COM TINTA LATEX PVAR$ 11,640.770.050.00%5,820.3850.00%5,820.380.0100.00%4.7PINTURA DE PORTASR$ 592.370.00.050.00%296.1850.00%296.18100.00%4.8PINTURA EM SUPERFCIE METLICAR$ 149.450.00.050.00%74.7350.00%74.73100.00%4.9RECUPERAO E REINSTALAO DE RODAP DE MADEIRAR$ 9,203.870.00.050.00%4,601.9350.00%4,601.93100.00%5FORRO E REVESTIMENTOSR$ 47,570.410.00%0.05.00%2,378.8050.00%23,785.2045.00%21,406.41100.00%5.1FORRO REMOVVEL MODULADOR$ 32,177.610.00.00%0.050.00%16,088.8150.00%16,088.81100.00%5.2FORRO DE GESSO ACARTONADOR$ 11,893.990.020.00%2,378.8050.00%5,946.9930.00%3,568.20100.00%5.3EMASSAMENTO DE FORROR$ 1,550.730.00.050.00%775.3750.00%775.37100.00%5.4PINTURA DE FORRO COM TINTA LATEX PVAR$ 1,948.080.00.050.00%974.0450.00%974.04100.00%6PORTAS E ESQUADRIASR$ 9,501.790.00%0.054.64%5,191.8545.36%4,309.940.00%0.0100.00%6.1FORNECIMENTO E INSTALAO DE ESQUADRIA DE ALUMINIOR$ 881.910.0100.00%881.910.00.0100.00%6.2MANUTENO PREVENTIVA EM ESQUADRIAS DE ALUMNIO EXISTENTESR$ 6,020.950.050.00%3,010.4750.00%3,010.470.0100.00%6.3RECOLOCAO DE PORTAS DE MADEIRAR$ 848.940.050.00%424.4750.00%424.470.0100.00%6.4INSTALAO DE FECHADURAS EM PORTAS EXISTENTESR$ 1,749.990.050.00%874.9950.00%874.990.0100.00%7INSTALAESR$ 37,342.035.72%2,134.213.58%1,335.1544.08%16,459.3546.63%17,413.32100.00%7.1PONTO DE SOM AMBIENTER$ 3,815.860.025.00%953.9625.00%953.9650.00%1,907.93100.00%7.2CENTRAL DE CONTROLE DO SOM AMBIENTER$ 2,941.890.00.050.00%1,470.9450.00%1,470.94100.00%7.3MODERNIZAO DE PONTOS ELTRICOS - TOMADASR$ 2,205.450.00.050.00%1,102.7250.00%1,102.72100.00%7.4MODERNIZAO DE PONTOS ELTRICOS - INTERRUPTORESR$ 362.920.00.050.00%181.4650.00%181.46100.00%7.5MODERNIZAO DE PONTOS ELTRICOS - TAMPAS CEGASR$ 1,421.000.00.050.00%710.5050.00%710.50100.00%7.6INSTALAO DE PONTOS ELTRICOS NOVOS - TOMADASR$ 1,732.640.020.00%346.5340.00%693.0640.00%693.06100.00%7.7INSTALAO DE PONTOS ELTRICOS NOVOS - INTERRUPTORESR$ 173.260.020.00%34.6540.00%69.3140.00%69.31100.00%7.8LUMINRIA DE EMBUTIR EM FORRO MODULADOR$ 22,554.800.00.050.00%11,277.4050.00%11,277.40100.00%7.9ELETRODUTO DE 2"R$ 2,134.21100.00%2,134.210.00.00.0100.00%8REDE ESTRUTURADAR$ 14,460.2016.71%2,415.8343.72%6,322.6837.40%5,408.672.16%313.02100.00%8.1REMANEJAMENTO DE PONTO DE REDER$ 5,943.9430.00%1,783.1840.00%2,377.5730.00%1,783.180.0100.00%8.2PONTO DE REDE NOVO - 02 SAIDASR$ 823.840.020.00%164.7750.00%411.9230.00%247.15100.00%8.3PONTO DE REDE NOVO - 04 SAIDASR$ 219.570.020.00%43.9150.00%109.7830.00%65.87100.00%8.4CABO UTP CAT 5eR$ 4,309.630.050.00%2,154.8150.00%2,154.810.0100.00%8.5ELETRODUTO PVC RIGIDO 1"R$ 2,999.0920.00%599.8250.00%1,499.5530.00%899.730.0100.00%8.6CONDULETE TIPO "T"R$ 130.1320.00%26.0350.00%65.0630.00%39.040.0100.00%8.7CONDULETE TIPO "X"R$ 34.0020.00%6.8050.00%17.0030.00%10.200.0100.00%TOTAL GERALR$ 216,879.33TOTAL MENSAL EXECUTADO18.07%R$ 39,185.1630.10%R$ 65,286.9531.19%R$ 67,653.4820.64%R$ 44,753.74TOTAL ACUMULADO18.07%R$ 39,185.1648.17%R$ 104,472.1079.36%R$ 172,125.59100.00%R$ 216,879.33
QUANTITATIVOSPODER JUDICIRIOJUSTIA FEDERAL NA PARABAQUANTITATIVO DE SERVIOSITEMDESCRIMINAOUn.TOTAL1DIVERSOS1.2TAPUME DE CHAPA DE MADEIRAm15.901.3LIMPEZA PERMANENTEm475.002DEMOLIES E REMOESCORREDOR ACESSOCARTRIODIRETOR CARTRIOARQUIVOBANHEIROS E COPAAUDINCIA TITULARAUDINCIA SUBSTITUTOJUIZ TITULARJUIZ SUBSTITUTOASSESSORIASSALA MQUINAS2.1DEMOLIO DE ALVENARIA DE TIJOLOS CERMICOSm7.200.00.00.00.00.00.00.00.00.00.07.202.2DEMOLIO DE FORRO DE GESSO ACARTONADOm443.0648.88137.4212.700.00.042.4943.2140.1330.0488.190.02.3DEMOLIO DE PAREDE DE GESSO ACARTONADOm82.659.900.07.200.00.035.403.3018.008.850.02.4RETIRADA DE REVESTIMENTO DE POLIESTIRENOm31.470.00.00.00.00.00.00.00.00.00.031.472.5DEMOLIO DE PISO DE GRANITO CINZA ANDORINHA COM REAPROVEITAMENTOm35.9035.900.00.00.00.00.00.00.00.00.00.02.6RETIRADA DE PISO VINLICOm401.210.0137.4212.707.030.042.4943.2140.1330.0488.190.02.7RETIRADA DE RODAP DE MADEIRA COM REAPROVEITAMENTOm269.4828.8555.5111.2211.300.026.3926.4826.8123.2859.642.8RETIRADA DE ESQUADRIA DE ALUMNIOm2.930.00.00.00.00.00.00.00.00.00.02.932.9RETIRADA DE PAINEL DE VIDRO TEMPERADO COM PORTA COM REAPROVEITAMENTOm12.000.00.012.000.00.00.00.00.00.00.00.02.10RETIRADA DE PORTA DE MADEIRA, INCLUSIVE FORRA COM REAPROVEITAMENTOund7.000.00.00.00.00.03.001.000.01.001.001.002.11RETIRADA DE TABLADO DE MADEIRA COM REAPROVEITAMENTOund2.000.00.00.00.00.01.001.000.00.00.00.02.12RETIRADA DE INTERRUPTORES, TOMADAS E AFINS COM REAPROVEITAMENTOund226.004.0051.003.002.000.025.0026.0035.0018.0061.001.002.13RETIRADA DE LUMINRIAS COM REAPROVEITAMENTOund105.008.0033.002.001.000.09.009.0011.008.0024.000.02.14RETIRADA DE DUTOS DO SISTEMA DE AR CONDICIONADOm85.3014.2526.156.700.00.012.002.709.202.7011.600.02.15RETIRADA DO MAQUINRIO DE REFRIGERAOund1.000.00.00.00.00.00.00.00.00.00.01.003PISOSTREIN. INFOTREINAMENTOSCISOFCONTADORIAARQUIVO SCIARQUIVO SOFLICITAESCOMUNICAOARQUITETURAPATRIMONIOCOMPRASMANUTENOREPROGRAFIACIRCULAOESCADA3.1LASTRO DE CONCRETO LEVEm3.890.00.00.00.00.00.00.00.00.00.00.00.00.00.03.893.2REGULARIZAO SARRAFEADA e=1,5cmm454.5141.4844.4031.2640.6644.0114.9713.7433.1126.8221.0420.8520.7722.047.0372.333.3PISO VINLICOm454.5141.4844.4031.2640.6644.0114.9713.7433.1126.8221.0420.8520.7722.047.0372.334PAREDES E REVESTIMENTOSTREIN. INFOTREINAMENTOSCISOFCONTADORIAARQUIVO SCIARQUIVO SOFLICITAESCOMUNICAOARQUITETURAPATRIMONIOCOMPRASMANUTENOREPROGRAFIACIRCULAOESCADA4.1PAREDE DRY WALLm79.950.00.016.803.303.3027.3620.790.00.00.00.00.00.08.404.2ALVENARIA DE TIJOLOS DE 8 FUROSm2.730.00.00.00.00.00.00.02.730.00.00.00.00.00.00.04.3CHAPISCOm2.730.00.00.00.00.00.00.02.730.00.00.00.00.00.00.04.4REBOCOm2.730.00.00.00.00.00.00.02.730.00.00.00.00.00.00.04.5EMASSAMENTO DE PAREDEm378.5118.717.9416.6839.5313.264.804.284.1543.4112.0611.7011.7039.693.3915.92131.284.6PINTURA DE PAREDES COM TINTA LATEX PVAm929.5580.7679.4470.6880.4342.9648.0042.7841.5243.4112.0611.7011.7039.6933.90159.24131.284.7PINTURA DE PORTASm41.225.1510.305.155.150.05.155.155.155.154.8PINTURA EM SUPERFCIE METLICAm11.390.00.00.00.00.00.00.00.111.1610.124.9RECUPERAO E REINSTALAO DE RODAP DE MADEIRAm269.1726.9226.4823.5626.8114.3016.0014.2512.3115.783.903.903.9013.2311.3056.535FORRO E REVESTIMENTOSTREIN. INFOTREINAMENTOSCISOFCONTADORIAARQUIVO SCIARQUIVO SOFLICITAESCOMUNICAOARQUITETURAPATRIMONIOCOMPRASMANUTENOREPROGRAFIACIRCULAOESCADA5.1FORRO REMOVVEL MODULADOm313.9030.2431.7623.9430.3631.7610.078.0920.8919.8314.0414.0414.0414.880.049.965.2FORRO DE GESSO ACARTONADOm155.5611.8112.776.7510.3112.835.295.2512.227.006.476.826.747.707.0336.575.3EMASSAMENTO DE FORROm155.5611.8112.776.7510.3112.835.295.2512.227.006.476.826.747.707.0336.575.4PINTURA DE FORRO COM TINTA LATEX PVAm155.5611.8112.776.7510.3112.835.295.2512.227.006.476.826.747.707.0336.576PORTAS E ESQUADRIASTREIN. INFOTREINAMENTOSCISOFCONTADORIAARQUIVO SCIARQUIVO SOFLICITAESCOMUNICAOARQUITETURAPATRIMONIOCOMPRASMANUTENOREPROGRAFIACIRCULAOESCADA6.1FORNECIMENTO E INSTALAO DE ESQUADRIA DE ALUMINIOm2.930.00.00.00.00.00.00.02.930.00.00.00.00.00.00.00.06.2MANUTENO CORRETIVA EM ESQUADRIASm183.998.6419.055.407.928.400.00.00.09.723.243.243.249.720.013.436.3RECOLOCAO DE PORTAS DE MADEIRAund4.001.001.001.001.006.4INSTALAO DE FECHADURAS EM PORTAS EXISTENTESund10.002.001.001.001.001.001.003.007INSTALAESTREIN. INFOTREINAMENTOSCISOFCONTADORIAARQUIVO SCIARQUIVO SOFLICITAESCOMUNICAOARQUITETURAPATRIMONIOCOMPRASMANUTENOREPROGRAFIACIRCULAOESCADA7.1PONTO DE SOM AMBIENTEund14.001.001.001.001.001.000.00.01.001.001.001.001.001.000.03.007.2CENTRAL DE CONTROLE DO SOM AMBIENTEund1.000.00.00.00.00.00.00.00.00.00.00.00.00.00.01.000.07.3MODERNIZAO DE PONTOS ELTRICOS - TOMADASund79.008.009.0010.0014.0010.002.001.002.004.004.002.002.006.002.003.007.4MODERNIZAO DE PONTOS ELTRICOS - INTERRUPTORESund13.000.01.000.01.001.000.00.01.001.001.001.001.001.001.003.007.5MODERNIZAO DE PONTOS ELTRICOS - TAMPAS CEGASund77.008.0010.0010.0014.006.001.002.002.005.003.001.003.006.000.06.007.6INSTALAO DE PONTOS ELTRICOS NOVOS - TOMADASund40.004.000.02.000.04.000.00.08.004.004.005.005.000.00.04.007.7INSTALAO DE PONTOS ELTRICOS NOVOS - INTERRUPTORESund4.001.000.01.000.00.01.001.000.00.00.00.00.00.00.00.07.8LUMINRIA DE EMBUTIR EM FORRO MODULADOund95.006.008.007.007.008.002.002.007.006.004.004.004.005.001.0024.007.9ELETRODUTO DE 2"m70.0070.008REDE ESTRUTURADATREIN. INFOTREINAMENTOSCISOFCONTADORIAARQUIVO SCIARQUIVO SOFLICITAESCOMUNICAOARQUITETURAPATRIMONIOCOMPRASMANUTENOREPROGRAFIACIRCULAOESCADA8.1REMANEJAMENTO DE PONTO DE REDEund62.000.04.004.006.006.000.00.010.004.006.004.006.008.000.04.000.08.2PONTO DE REDE NOVO - 02 SAIDASund16.000.00.00.00.00.00.00.02.003.003.003.003.002.000.00.00.08.3PONTO DE REDE NOVO - 04 SAIDASund3.000.00.00.00.01.000.00.01.000.00.00.00.01.000.00.00.08.4CABO UTP CAT 5em395.000.00.070.00160.0075.000.00.00.00.00.090.000.00.00.00.00.08.5ELETRODUTO PVC RIGIDO 1"m113.500.03.007.5012.0010.000.00.022.005.005.0013.0017.009.000.010.000.08.6CONDULETE TIPO "T"und4.000.00.00.00.00.00.00.01.000.00.01.002.000.00.00.08.7CONDULETE TIPO "X"und1.000.00.00.00.00.00.00.00.00.00.00.00.00.01.000.0
REA DE PINTURA DE UMA PORTADeoclcio Vieira de Melo Neto:duplicado por considerar interno e externo
COMPOSIESPODER JUDICIRIOJUSTIA FEDERAL NA PARABAREFORMA E MODERNIZAO DA INSTALAES EDIFCIO SEDE DA JUSTIA FEDERAL NA PARABAENDEREO: JOO TEXEIRA DE CARVALHO, 480. BRISAMAR. JOO PESSOASERVIO: MODERNIZAO DAS INSTALAES DA ANTIGA 5 VARA - FUTURO ANEXO DA SECRETARIA ADMINISTRATIVAANEXO IVCOMPOSIES DE PREOS UNITRIOSLEIS SOCIAIS125%BDI1DIVERSOSADMINISTRAOCdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)QUANTIDADE0.02501.01JFPBTAPUME de chapa de madeira compensada, inclusive montagem - madeira compensada resinada e=8 mmm1,0053.30PREO6.981213SINAPICarpinteirohM.O.0,83.682.946115SINAPIServentehM.O.0,82.942.352707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.173107SINAPIFerrolhoundMAT.1.006.416.4111441SINAPIDobradicasundMAT.3.004.0812.2411130SINAPIChapa compensada resinada (espessura: 8,00 mm)mMAT.1,114.4215.865061SINAPIPrego 18 x 27 com cabea (dimetro da cabea: 3,4 mm / comprimento: 62,1 mm)kgMAT.0,157.001.054513SINAPIPontalete 3a. construo (seo transversal: 3x3 " / tipo de madeira: cedro)mMAT.3,151.183.72Total s/ Taxas(Mat.):39.28Total s/ Taxas(MO):6.23LS(%):125%Valor LS:7.79TOTAL53.30BDI(%):0%Valor BDI:0.00TOTAL + BDI53.30CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)01.02JFPBLIMPEZA PERMANENTE DA OBRAm2SERV1,004.378787SBCENTULHO EM CAMINHAO CUSTO BOTA/FORA P/m3m3SERV0.0532.021.6099900SBCSERVENTEHM.O0.102.940.292707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):1.60Total s/ Taxas(MO):1.23LS(%):125%Valor LS:1.54TOTAL4.37BDI(%):0%Valor BDI:0.00TOTAL + BDI4.372DEMOLIES E REMOESCdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.01JFPBDEMOLIO de alvenaria de tijolo comum, sem reaproveitamentoM3SERV1,0024.434750SINAPIPedreirohM.O.0,33.681.1010513SINAPIServentehM.O.3.002.948.822707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):10.86LS(%):125%Valor LS:13.57TOTAL24.43BDI(%):0%Valor BDI:0.00TOTAL + BDI24.43CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.02JFPBDEMOLIO de forro de gesso CARTONADOM2SERV1,0023.614750SINAPIPedreirohM.O.1.003.683.6810513SINAPIServentehM.O.2.002.945.882707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):10.50LS(%):125%Valor LS:13.12TOTAL23.61BDI(%):0%Valor BDI:0.00TOTAL + BDI23.61CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.03JFPBDEMOLIO de PAREDE de gesso CARTONADOM2SERV1,0027.634750SINAPIPEDREIROHM.O1.713.686.3110513SINAPISERVENTEHM.O1.712.945.042707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):12.28LS(%):125%Valor LS:15.35TOTAL27.63BDI(%):0%Valor BDI:0.00TOTAL + BDI27.63CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.04JFPBRETIRADA de revestimento de PoliestirenoM2SERV1,0022.314750SINAPIPEDREIROhM.O1.2963.684.7710513SINAPISERVENTEhM.O1.4332.944.212707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):9.92LS(%):125%Valor LS:12.40TOTAL22.31BDI(%):0%Valor BDI:0.00TOTAL + BDI22.31CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.05JFPBRETIRADA Cuidadosa de Piso em granito Cinza AndorinhaM2SERV1,0023.744755SINAPIMARMORISTAhM.O0.8633.683.1810513SINAPISERVENTEhM.O2.192.946.442707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):10.55LS(%):125%Valor LS:13.19TOTAL23.74BDI(%):0%Valor BDI:0.00TOTAL + BDI23.74CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.06JFPBRETIRADA de piso VinlicoM2SERV1,009.734750SINAPIPEDREIROhM.O0.2943.681.0810513SINAPISERVENTEhM.O0.7852.942.312707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):4.32LS(%):125%Valor LS:5.41TOTAL9.73BDI(%):0%Valor BDI:0.00TOTAL + BDI9.73CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.07JFPBRETIRADA de rodap de madeira com reaproveitamentoMSERV1,007.391214SINAPICARPINTEIRO DE ESQUADRIAhM.O0.6383.682.352707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):3.28LS(%):125%Valor LS:4.10TOTAL7.39BDI(%):0%Valor BDI:0.00TOTAL + BDI7.39CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.08JFPBRETIRADA de esquadria metlica com reaproveitamentoM2SERV1,005.834750SINAPIPEDREIROhM.O0.053.680.1810513SINAPISERVENTEhM.O0.52.941.472707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):2.59LS(%):125%Valor LS:3.24TOTAL5.83BDI(%):0%Valor BDI:0.00TOTAL + BDI5.83CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.09JFPBRETIRADA de Painel de VIDRO TEMPERADO COM PORTAM2SERV1,0015.5010489SINAPIVIDRACEIROhM.O0.53.681.8410513SINAPISERVENTEhM.O1.42.944.122707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):6.89LS(%):125%Valor LS:8.61TOTAL15.50BDI(%):0%Valor BDI:0.00TOTAL + BDI15.50CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.10JFPBRETIRADA de porta de madeira, inclusive forra, com reaproveitamentoUNDSERV1,0032.311214SINAPICARPINTEIRO DE ESQUADRIAhM.O1.7673.686.5010513SINAPISERVENTEhM.O2.3552.946.922707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):14.36LS(%):125%Valor LS:17.95TOTAL32.31BDI(%):0%Valor BDI:0.00TOTAL + BDI32.31CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.11JFPBRETIRADA de TABLADO de madeira, com reaproveitamentoUNDSERV1,0056.711214SINAPICARPINTEIRO DE ESQUADRIAhM.O33.6811.0410513SINAPISERVENTEhM.O4.52.9413.232707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):25.21LS(%):125%Valor LS:31.51TOTAL56.71BDI(%):0%Valor BDI:0.00TOTAL + BDI56.71CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.12JFPBRETIRADA de interruptores, tomadas e afins, com reaproveitamentoUNDSERV1,009.552436SINAPIELETRICISTAhM.O0.53.681.846113SINAPIAJUDANTE ELETRICISTAhM.O0.52.941.472707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):4.25LS(%):125%Valor LS:5.31TOTAL9.55BDI(%):0%Valor BDI:0.00TOTAL + BDI9.55CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.13JFPBRETIRADA de luminrias, com reaproveitamentoUNDSERV1,0013.472436SINAPIELETRICISTAhM.O0.7463.682.756113SINAPIAJUDANTE ELETRICISTAhM.O0.7852.942.312707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):5.99LS(%):125%Valor LS:7.49TOTAL13.47BDI(%):0%Valor BDI:0.00TOTAL + BDI13.47CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.14JFPBRETIRADA de dutos de refrigeraomSERV1,0017.004750SINAPIPEDREIROhM.O13.683.6810513SINAPISERVENTEhM.O12.942.942707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):7.56LS(%):125%Valor LS:9.44TOTAL17.00BDI(%):0%Valor BDI:0.00TOTAL + BDI17.00CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)02.15JFPBRETIRADA de maquinrio de refrigeraomSERV1,00258.602436SINAPIELETRICISTAhM.O153.6855.206113SINAPIAJUDANTE ELETRICISTAhM.O202.9458.802707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):114.94LS(%):125%Valor LS:143.67TOTAL258.60BDI(%):0%Valor BDI:0.00TOTAL + BDI258.603PISOSCdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)03.01JFPBLASTRO DE CONCRETO leve, com agregado de poliestireno expandido , densidade 1.000 kg/m, fck 3,8 MPaM3SERV1,00513.206115SINAPIAJUDANTEhM.O.0,3432.941.0084210513SINAPISERVENTEhM.O6.52.9419.11370SINAPIAreia lavada tipo mdiamMAT.0,35830.5410.933321379SINAPICimento Portland CP II-E-32 (resistncia: 32,00 MPa)kgMAT.4000,3915603340.3.1.1PINIPoliestireno expandido (isopor) em perolaskgMAT.10,528.431298.525514250SINAPIEnergia eltricakWMAT.0,51450,420.2160910535SINAPIBetoneira, motor eltrico monofsico, potncia 2 HP, capacidade 400 l - aquisiounEQ.AQ.0,00005529162784.50.15395946022707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):465.83Total s/ Taxas(MO):21.05LS(%):125%Valor LS:26.32TOTAL513.20BDI(%):0%Valor BDI:0.00TOTAL + BDI513.20CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)03.02JFPBREGULARIZAO SARRAFEADA de base para revestimento de piso com argamassa de cimento e areia sem peneirar trao 1:3, e=3 cmmSERV1,0019.074750SINAPIPedreirohM.O.0.253.680.9210513SINAPIServentehM.O.1.22322.943.60370SINAPIAreia lavada tipo mdiamMAT.0.03646530.541.111379SINAPICimento Portland CP II-E-32 (resistncia: 32,00 MPa)kgMAT.14.580,395.692707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):6.80Total s/ Taxas(MO):5.45LS(%):125%Valor LS:6.81TOTAL19.07BDI(%):0%Valor BDI:0.00TOTAL + BDI19.07CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)03.03JFPBPISO VINLICO 2mm Paviflex sem camada regularizadoraM2SERV1,0042.274750SINAPILADRILHEIROhM.O.0.23.680.73610513SINAPISERVENTEhM.O0.22.940.5884791SINAPICOLA DE CONTATO PARA PISO TAPETE 4,8kg/m2KGMAT.0.217.653.534790SINAPIPISO VINILICO 30x30cm ESPESSURA 2mmkgMAT.1.0532,0533.65252707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):37.18Total s/ Taxas(MO):2.26LS(%):125%Valor LS:2.82TOTAL42.27BDI(%):0%Valor BDI:0.00TOTAL + BDI42.274PAREDES E REVESTIMENTOSCdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)04.01JFPBPAREDE 95mm PAINEL GESSO ACART. KNAUF GKE 12,5mm C/PERFIL MET.M2SERV1,0087.3012872SINAPIGESSEIROHM.O0.3053.681.12246110SINAPISERRALHEIROHM.O0.1483.680.544643157SBCPORCA ACO SEXTAVADA A325 1/4"UNMAT1.50.080.125809SBCCARGA DETONADORA CARTUCHO CALIBRE L.22UNMAT1.50.560.8428634SBCPINO DE FIXACAO PAINEIS DE GESSO COM ROSCAUNMAT1.51.512.26528635SBCPAINEL DE GESSO ACARTONADO KNAUF GKE 12,5mmM2MAT2.121.1244.35228636SBCGUIA U 70mm KNAUFMMAT0.915.6214.05828637SBCMONTANTE 70mm KNAUF PARA PAREDE GESSO ACARTONADOMMAT2.16.6313.92328638SBCPARAFUSO GN 25 PARA FORRO KNAUFUNMAT260.030.7828639SBCFITA PARA JUNTA KNAUFMMAT3.080.180.554428640SBCMASSA PARA PREPARO DE ACABAMENTO GESSO KNAUFKGMAT0.994.64.5542707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):81.45Total s/ Taxas(MO):2.60LS(%):125%Valor LS:3.25TOTAL87.30BDI(%):0%Valor BDI:0.00TOTAL + BDI87.30CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)04.02JFPBALVENARIA de vedao com blocos cermico furados 9 x 19 x 19 cm (furos horizontais), espessura da parede 9 cm, juntas de 12 mm com argamassa mista de cal hidratada e areia sem peneirar trao 1:4, com 100 kg de cimento - tipo 1M2SERV1,0026.744750SINAPIPedreirohM.O.13.683.6810513SINAPIServentehM.O.1.1120322.943.27370SINAPIAreia lavada tipo mdiamMAT.0,0134248830.540.411106SINAPICal hidratada CH IIIkgMAT.2.0027280,280.561379SINAPICimento Portland CP II-E-32 (resistncia: 32,00 MPa)kgMAT.1,20,390.477271SINAPIBloco cermico furado de vedao 9 x 19 x 19 (comprimento: 190 mm / altura: 190 mm / largura: 90 mm)unMAT.270,287.562707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):9.00Total s/ Taxas(MO):7.88LS(%):125%Valor LS:9.86TOTAL26.74BDI(%):0%Valor BDI:0.00TOTAL + BDI26.74CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)04.03JFPBCHAPISCO rolado com mistura de cimento, areia e adesivo a base acrlica, trao 1:3mSERV1,008.544750SINAPIPedreirohM.O.0,23.680.746115SINAPIServentehM.O.0,252.940.74370SINAPIAreia lavada tipo mdiamMAT.0,0130.540.311379SINAPICimento Portland CP II-E-32 (resistncia: 32,00 MPa)kgMAT.2,450,390.967334SINAPIAdesivo a base acrlicalMAT.0,257.481.872707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):3.13Total s/ Taxas(MO):2.41LS(%):125%Valor LS:3.01TOTAL8.54BDI(%):0%Valor BDI:0.00TOTAL + BDI8.54CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)04.04TCPOEMBOO para parede externa com argamassa mista de cimento, cal hidratada e areia sem peneirar trao 1:2:6, e=20 mmmSERV1,0018.264750SINAPIPedreirohM.O.0,823.683.026115SINAPIServentehM.O.0,662.941.94370SINAPIAreia lavada tipo mdiamMAT.0,030530.540.931106SINAPICal hidratada CH IIIkgMAT.6.080,281.701379SINAPICimento Portland CP II-E-32 (resistncia: 32,00 MPa)kgMAT.6.080,392.372707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):5.00Total s/ Taxas(MO):5.89LS(%):125%Valor LS:7.37TOTAL18.26BDI(%):0%Valor BDI:0.00TOTAL + BDI18.26CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)04.05JFPBEMASSAMENTO de parede interna com massa corrida base de PVA com duas demos, para pintura PVAmSERV1,007.976115SINAPIAjudante de pintorhM.O.0,22.940.594783SINAPIPintorhM.O.0,33.681.104048SINAPIMassa corrida base PVAkgMAT.0,72.801.963767SINAPILixa para superfcie madeira/massa grana 100unMAT.0,40,260.102707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):2.06Total s/ Taxas(MO):2.63LS(%):125%Valor LS:3.28TOTAL7.97BDI(%):0%Valor BDI:0.00TOTAL + BDI7.97CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)04.06JFPBPINTURA COM TINTA LTEX PVA em parede interna, com duas demos, sem massa corrida.mSERV1,0010.026115SINAPIAjudante de pintorhM.O.0,352.941.034783SINAPIPintorhM.O.0,43.681.476090SINAPISelador base PVA para pintura ltexlMAT.0,125.570.673767SINAPILixa para superfcie madeira/massa grana 100unMAT.0,250,260.077345SINAPITinta ltex PVA (tipo de acabamento: FOSCO )lMAT.0,179.141.552707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):2.29Total s/ Taxas(MO):3.44LS(%):125%Valor LS:4.30TOTAL10.02BDI(%):0%Valor BDI:0.00TOTAL + BDI10.02CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)04.07JFPBPINTURA COM VERNIZ em esquadria de madeira, com trs demosmSERV1,0011.506115SINAPIAjudante de pintorhM.O.0,32.940.884783SINAPIPintorhM.O.0,43.681.476085SINAPISelador para madeiralMAT.0,034.780.145318SINAPIAguarrs minerallMAT.0,066.000.363767SINAPILixa para superfcie madeira/massa grana 100unMAT.1.000,260.2610482SINAPIVerniz sintticolMAT.0,1916.603.155318SINAPISolvente para produtos base de nitroceluloselMAT.0,036.000.182707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):4.10Total s/ Taxas(MO):3.29LS(%):125%Valor LS:4.11TOTAL11.50BDI(%):0%Valor BDI:0.00TOTAL + BDI11.50CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)04.08JFPBPINTURA COM TINTA ESMALTE sinttico em estrutura de ao carbono com duas demos, com trincha (espessura: 50 micra)M2SERV1,0010.506115SINAPIAjudante de pintorhM.O.0,22.940.594783SINAPIPintorhM.O.0,43.681.475318SINAPIAguarrs minerallMAT.0,026.000.1213131SBCTrincha dupla (largura: 2 ")unMAT.0,08151.207311SINAPIEsmalte sinttico para madeiras e metais (tipo de acabamento: ACETINADO )lMAT.0,1515.832.373767SINAPILixa para superfcie madeira/massa grana 100unMAT.0,250,260.072707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):3.76Total s/ Taxas(MO):3.00LS(%):125%Valor LS:3.74TOTAL10.50BDI(%):0%Valor BDI:0.00TOTAL + BDI10.50CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)04.09JFPBRECUPERAO E REINSTALAO de rodap de madeira existenteMSERV1,0027.356115SINAPIAJUDANTE DE CARPINTEIROHM.O.0.7852.942.311214SINAPICARPINTEIRO DE ESQUADRIAHM.O.0.6473.682.384783SINAPIPINTORHM.O.0.2463.680.916115SINAPIAJUDANTE DE PINTORHMAT.0.7852.942.315067SINAPIPREGO FERRO GALVANIZADO 16x24 (285 un/kg)KGMAT.0.057.200.3610480SINAPIVERNIZ POLIURETANOLMAT.0.10816.381.773767SINAPILIXA PARA MASSA A257 GRAO 60UNMAT.2.050,265.342707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):7.47Total s/ Taxas(MO):8.84LS(%):125%Valor LS:11.05TOTAL27.35BDI(%):0%Valor BDI:0.00TOTAL + BDI27.355FORROCdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)Preo Ata de registroPreo obra CGPREO CLIMACOPREO MDIO05.01JFPBFORRO REMOVVEL MODULADOM2SERV1,0082.01Forromo de obraForroMo de obraForromo de obraForromo de obra1CGAPLICADOR DE FORRO MODULADOHM.O15.705.7048.81046.1610.045881260.986666666710.6816666667*JFPBFORRO MODULADO AMF KNAUF THERMATEX ACOUSTICM2MAT.1.160.9967.092707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):67.09Total s/ Taxas(MO):6.63LS(%):125%Valor LS:8.29TOTAL82.01BDI(%):0%Valor BDI:0.00TOTAL + BDI82.01CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)05.02JFPBFORRO GESSO ACARTONADO D112 KNAUF UNIDIRECIONALM2SERV1,0061.1712872SINAPIGESSEIROHM.O.0.33.681.106110SINAPISERRALHEIROHM.O.0.153.680.55335SINAPIARAME GALVANIZADO #10 AWGKGMAT.0.0088.720.073157SBCPORCA ACO SEXTAVADA A325 1/4"UNMAT.20.080.165809SBCCARGA DETONADORA CARTUCHO CALIBRE L.22UNMAT.20.561.1228634SBCPINO DE FIXACAO PAINEIS DE GESSO COM ROSCAUNMAT.21.513.0228635SBCPAINEL DE GESSO ACARTONADO KNAUF GKE 12,5mmM2MAT.1.0221.1221.5428638SBCPARAFUSO GN 25 PARA FORRO KNAUFUNMAT.150.030.4528639SBCFITA PARA JUNTA KNAUFMMAT.1.50.180.2728640SBCMASSA PARA PREPARO DE ACABAMENTO GESSO KNAUFKGMAT.0.44.601.8428641SBCPERFIL F47 FORRO KNAUFMMAT.2.194.239.2628642SBCCONECTOR FORRO GESSO KNAUFUNMAT.0.30.360.1128644SBCSUPORTE NIVELADO PARA FORRO KNAUFUNMAT.27.4514.9028655SBCCANTONEIRA 25x30x3000 FORRO GYPSUM FGEMMAT.0.396.652.592707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):55.34Total s/ Taxas(MO):2.59LS(%):125%Valor LS:3.24TOTAL61.17BDI(%):0%Valor BDI:0.00TOTAL + BDI61.17CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)05.03JFPBEMASSAMENTO de FORRO DE GESSO com massa corrida base de PVA com duas demos, para pintura PVAmSERV1,007.976115SINAPIAjudante de pintorhM.O.0,22.940.594783SINAPIPintorhM.O.0,33.681.104048SINAPIMassa corrida base PVAkgMAT.0,72.801.963767SINAPILixa para superfcie madeira/massa grana 100unMAT.0,40,260.102707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):2.06Total s/ Taxas(MO):2.63LS(%):125%Valor LS:3.28TOTAL7.97BDI(%):0%Valor BDI:0.00TOTAL + BDI7.97CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)05.04JFPBPINTURA COM TINTA LTEX PVA em FORRO DE GESSO, com duas demos, sem massa corrida.mSERV1,0010.026115SINAPIAjudante de pintorhM.O.0,352.941.034783SINAPIPintorhM.O.0,43.681.476090SINAPISelador base PVA para pintura ltexlMAT.0,125.570.673767SINAPILixa para superfcie madeira/massa grana 100unMAT.0,250,260.077345SINAPITinta ltex PVA (tipo de acabamento: FOSCO )lMAT.0,179.141.552707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):2.29Total s/ Taxas(MO):3.44LS(%):125%Valor LS:4.30TOTAL10.02BDI(%):0%Valor BDI:0.00TOTAL + BDI10.026PORTAS E ESQUADRIASCdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)06.01JFPBJANELA de alumnio sob encomenda, colocao e acabamento , maxim-ar, com contramarcosmSERV1,00241.214750SINAPIPedreirohM.O.1,53.685.526115SINAPIServentehM.O.1.002.942.94370SINAPIAreia lavada tipo mdiamMAT.0,004930.540.151379SINAPICimento Portland CP II-E-32 (resistncia: 32,00 MPa)kgMAT.1,940,390.76601SINAPICaixilho de alumnio sob encomenda maxim-ar (tipo de acabamento: NATURAL)mMAT.1.00219.16219.162707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):220.07Total s/ Taxas(MO):9.40LS(%):125%Valor LS:11.74TOTAL241.21BDI(%):0%Valor BDI:0.00TOTAL + BDI241.21CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)06.02JFPBMANUTENO PREVENTIVA DAS ESQUADRIAS EXISTENTESmSERV1.0026.1810489SINAPIVidraceirohM.O.1.003.683.686115SINAPIServentehM.O.2.002.945.8811622SINAPIPoliuretanokgMAT.0.0541.642.085333SINAPILubrificantelMAT.0.059.670.482707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):2.57Total s/ Taxas(MO):10.50LS(%):125%Valor LS:13.12TOTAL26.18BDI(%):0%Valor BDI:0.00TOTAL + BDI26.18CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)06.03JFPBREINSTALAO DE PORTAS EXISTENTESUNDSERV1.00169.796115SINAPIAJUDANTE DE CARPINTEIROHM.O.32.948.821214SINAPICARPINTEIRO DE ESQUADRIAHM.O.33.6811.0412519SBCFECHADURA EXTERNA LA FONTE TENDENCY REF.401UNDMAT.1123.00123.002707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):123.00Total s/ Taxas(MO):20.80LS(%):125%Valor LS:25.99TOTAL169.79BDI(%):0%Valor BDI:0.00TOTAL + BDI169.79CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)06.04JFPBINSTALAO DE FECHADURAS EM PORTAS EXISTENTESUNDSERV1.00140.006115SINAPIAJUDANTE DE CARPINTEIROHM.O.12.942.941214SINAPICARPINTEIRO DE ESQUADRIAHM.O.13.683.6812519SBCFECHADURA EXTERNA LA FONTE TENDENCY REF.401UNDMAT.1123.00123.002707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):123.00Total s/ Taxas(MO):7.56LS(%):125%Valor LS:9.44TOTAL140.00BDI(%):0%Valor BDI:0.00TOTAL + BDI140.007INSTALAESCdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)07.01JFPBPONTO DE SOM AMBIENTEUNDSERV1.00218.0510489SINAPITcnico de somhM.O.2.003.687.366115SINAPIAjudantehM.O.3.002.948.82*JFPBCasador de impedncia primrio 125 R Secundrio 0-4-8RUNDMAT.1.0020.5020.50*JFPBCaixa acstica - arandela tipo 6 Potncia 25 W RMS Impedncia 8RUNDMAT.1.0095.0095.00*JFPBAtenuador de fio impedncia de 30RUNDMAT.1.0022.5022.50*JFPBKnob com parafusoUNDMAT.1.004.504.501879SINAPICurva 90 de PVC rgido roscvel para eletroduto (dimetro da seo: 3/4 ")unMAT.3.001.203.602674SINAPIEletroduto de PVC rgido roscvel (dimetro da seo: 3/4 ")mMAT.5.001.698.451891SINAPILuva de PVC rgido roscvel para eletroduto (dimetro da seo: 3/4 ")unMAT.6.000,694.1420244SINAPIFio para instalao eletrnica - som - bicolormMAT.15.001.3920.852707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):179.54Total s/ Taxas(MO):17.12LS(%):125%Valor LS:21.39TOTAL218.05BDI(%):0%Valor BDI:0.00TOTAL + BDI218.05CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)07.02JFPBCENTRAL DE CONTROLE DE SOM AMBIENTEUNDSERV1.002,353.5110489SINAPITcnico de somhM.O.2.003.687.366115SINAPIAjudantehM.O.3.002.948.82*JFPBPlug P10 diversosUNDMAT.12.005.2563.00*JFPBFio cooaxial 0,30mmmMAT.10.002.7527.50*JFPBMesa de som 8 canaisUNDMAT.1.00322.50322.50*JFPBEqualizador para mesa de 8 canaisUNDMAT.1.00377.50377.50*JFPBAmplificador para mesa de 8 canaisUNDMAT.1.001587.501,587.502707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):2,315.00Total s/ Taxas(MO):17.12LS(%):125%Valor LS:21.39TOTAL2,353.51BDI(%):0%Valor BDI:0.00TOTAL + BDI2,353.51CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)07.03JFPBINTERRUPTOR , uma tecla simples 10 A - 250 Vun1,0022.336113SINAPIAjudante de eletricistahM.O.0,212.940.622436SINAPIEletricistahM.O.0,213.680.771872SINAPICaixa PVC 4 x 2 para eletrodutounMAT.1.000,900.90*JFPBInterruptor de embutir 1 tecla simples, com placa (corrente eltrica: 10 A / tenso: 250 V)unMAT.1.0013.7213.724750SINAPIPedreirohM.O.0.103.680.376115SINAPIServentehM.O.0.252.940.742707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):14.62Total s/ Taxas(MO):3.43LS(%):125%Valor LS:4.29TOTAL22.33BDI(%):0%Valor BDI:0.00TOTAL + BDI22.33CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)07.04JFPBTOMADA universal trs plos 10 A - 250 Vun1,0022.336113SINAPIAjudante de eletricistahM.O.0,212.940.622436SINAPIEletricistahM.O.0,213.680.771872SINAPICaixa PVC 4 x 2 para eletrodutounMAT.1.000,900.90*JFPBTOMADA EMBUTIR 2P + T 15A/250V C/PLACAunMAT.1.0013.7213.724750SINAPIPedreirohM.O.0.103.680.376115SINAPIServentehM.O.0.252.940.742707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):14.62Total s/ Taxas(MO):3.43LS(%):125%Valor LS:4.29TOTAL22.33BDI(%):0%Valor BDI:0.00TOTAL + BDI22.33CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)07.05JFPBTAMPA CEGA PARA TOMADA 4X2 OU 4X4un1,0014.766113SINAPIAjudante de eletricistahM.O.0,212.940.622436SINAPIEletricistahM.O.0,213.680.771872SINAPICaixa PVC 4 x 2 para eletrodutounMAT.1.000,900.90*JFPBTAMPA CEGA PARA TOMADA 4X2 OU 4X4unMAT.1.006.156.154750SINAPIPedreirohM.O.0.103.680.376115SINAPIServentehM.O.0.252.940.742707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):7.05Total s/ Taxas(MO):3.43LS(%):125%Valor LS:4.29TOTAL14.76BDI(%):0%Valor BDI:0.00TOTAL + BDI14.76CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)07.06JFPBPONTO de tomada com eletroduto de PVC rgido, com placa, 3/4"un1,0034.656113SINAPIAjudante de eletricistahM.O.0.212.940.622436SINAPIEletricistahM.O.0.213.680.77938SINAPIFio isolado em PVC (encordoamento: classe 1 / seo transversal: 1,50 mm / tenso: 750,00 V)mMAT.5.000,552.751879SINAPICurva 90 de PVC rgido roscvel para eletroduto (dimetro da seo: 3/4 ")unMAT.1.001.201.202674SINAPIEletroduto de PVC rgido roscvel (dimetro da seo: 3/4 ")mMAT.2.001.693.381891SINAPILuva de PVC rgido roscvel para eletroduto (dimetro da seo: 3/4 ")unMAT.1.000,690.691872SINAPICaixa PVC 4 x 2 para eletrodutounMAT.1.000,900.90*JFPBTOMADA EMBUTIR 2P + T 15A/250V C/PLACAunMAT.1.0013.7213.724750SINAPIPedreirohM.O.0.103.680.376115SINAPIServentehM.O.0.252.940.744750SINAPIPedreirohM.O.0.333.681.216115SINAPIServentehM.O.0.212.940.62370SINAPIAreia lavada tipo mdiamMAT.0.001530.540.051106SINAPICal hidratada CH IIIkgMAT.0.220,280.061379SINAPICimento Portland CP II-E-32 (resistncia: 32,00 MPa)kgMAT.0.180,390.072707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):22.82Total s/ Taxas(MO):5.26LS(%):125%Valor LS:6.58TOTAL34.65BDI(%):0%Valor BDI:0.00TOTAL + BDI34.65CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)07.07JFPBPONTO de INTERRUPTOR com eletroduto de PVC rgido, com placa, 3/4"un1,0034.656113SINAPIAjudante de eletricistahM.O.0.212.940.622436SINAPIEletricistahM.O.0.213.680.77938SINAPIFio isolado em PVC (encordoamento: classe 1 / seo transversal: 1,50 mm / tenso: 750,00 V)mMAT.5.000,552.751879SINAPICurva 90 de PVC rgido roscvel para eletroduto (dimetro da seo: 3/4 ")unMAT.1.001.201.202674SINAPIEletroduto de PVC rgido roscvel (dimetro da seo: 3/4 ")mMAT.2.001.693.381891SINAPILuva de PVC rgido roscvel para eletroduto (dimetro da seo: 3/4 ")unMAT.1.000,690.691872SINAPICaixa PVC 4 x 2 para eletrodutounMAT.1.000,900.90*JFPBInterruptor de embutir 1 ou 2 teclas, com placa (corrente eltrica: 10 A / tenso: 250 V)unMAT.1.0013.7213.724750SINAPIPedreirohM.O.0.103.680.376115SINAPIServentehM.O.0.252.940.744750SINAPIPedreirohM.O.0.333.681.216115SINAPIServentehM.O.0.212.940.62370SINAPIAreia lavada tipo mdiamMAT.0.001530.540.051106SINAPICal hidratada CH IIIkgMAT.0.220,280.061379SINAPICimento Portland CP II-E-32 (resistncia: 32,00 MPa)kgMAT.0.180,390.072707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):22.82Total s/ Taxas(MO):5.26LS(%):125%Valor LS:6.58TOTAL34.65BDI(%):0%Valor BDI:0.00NORDIFECASA DOS LUSTRESEMPORIUM DA LUZSTYLUZPREO MDIOTOTAL + BDI34.65LUMINRIALAMPADA+REATORLUMINRIALAMPADA+REATORLUMINRIALAMPADA+REATORLUMINRIALAMPADA+REATORLUMINRIALAMPADA+REATOR11537.34139.55110550145.971.6119.833333333346.1133333333CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)152.34190.5155217.5165.946666666707.08JFPBLUMINRIA FLUORESCENTE completa comercial com 2 lmpada de 40 W, tipo calha de sobreporun1,00189.946113SINAPIAjudante de eletricistahM.O.1.102.943.232436SINAPIEletricistahM.O.1.103.684.05938SINAPIFio isolado em PVC (encordoamento: classe 1 / seo transversal: 1,50 mm / tenso: 750,00 V)mMAT.10.000,555.50*JFPBLuminria interna para lmpada fluorescente tubular tipo calha de sobrepor em chapa de ao (nmero de lmpadas: 4 / potncia da lmpada: 16 W) inclusive lmpadas, reator de partida rpida, soquetes. Modulao 625 mm x 625 mm.unMAT.1.00165.95165.952707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):171.45Total s/ Taxas(MO):8.22LS(%):125%Valor LS:10.27TOTAL189.94BDI(%):0%Valor BDI:0.00TOTAL + BDI189.94CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)07.08JFPBELETRODUTO de PVC rgido roscvel, com conexes 60 mm (2")m1,0024.396113SINAPIAjudante de eletricistahM.O.0,452.941.3232436SINAPIEletricistahM.O.0,453.681.6562681SINAPIEletroduto de PVC rgido roscvel (dimetro da seo: 2 ")mMAT.1.16.16.71337SINAPIArame recozidokgMAT.0.0159.820.14731876SINAPICurva de PVC para eletroduto roscvel de 2"undMAT.0.154.280.6426115SINAPIServentehM.O.0.52.941.476115SINAPIServentehM.O.0.52.941.472707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):8.97Total s/ Taxas(MO):6.85LS(%):125%Valor LS:8.57TOTAL24.39BDI(%):0%Valor BDI:0.00TOTAL + BDI24.398REDE ESTRUTURADACdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)08.01JFPBREMANEJAMENTO DE PONTO DE REDE EXISTENTEUNDSERV1,0076.702418SINAPIEletrotcnicohM.O.48.2933.1522707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(MO):34.09LS(%):125%Valor LS:42.61TOTAL76.70BDI(%):0%Valor BDI:0.00TOTAL + BDI76.70CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)08.02JFPBPONTO DE REDE NOVO - 02 saidasUNDSERV1,0041.192418SINAPITcnico especializadohM.O.18.298.288*JFPBCONECTOR FMEA CASTONE CAT 5e - FURUKAWAundMAT.28.0716.14*JFPBESPELHO 4X2 2 SAIDAS - FURUKAWAundMAT.13.403.41872SINAPICAIXA PVC 4X2undMAT.10,900.92707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):20.44Total s/ Taxas(MO):9.22LS(%):125%Valor LS:11.53TOTAL41.19BDI(%):0%Valor BDI:0.00TOTAL + BDI41.19CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)08.03JFPBPONTO DE REDE NOVO - 04 saidasUNDSERV1,0058.552418SINAPITcnico especializadohM.O.18.298.288*JFPBCONECTOR FMEA CASTONE CAT 5e - FURUKAWAundMAT.48.0732.28*JFPBESPELHO 4X4 4 SAIDAS - FURUKAWAundMAT.14.104.11873SINAPICAIXA PVC 4X4undMAT.11.421.422707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):37.80Total s/ Taxas(MO):9.22LS(%):125%Valor LS:11.53TOTAL58.55BDI(%):0%Valor BDI:0.00TOTAL + BDI58.55CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)08.04JFPBCABO UTP CAT 5emSERV1,008.732418SINAPITcnico especializadohM.O.0.38.292.4864*JFPBCABO UTP CAT 5eMMAT.11.031.032707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):1.03Total s/ Taxas(MO):3.42LS(%):125%Valor LS:4.28TOTAL8.73BDI(%):0%Valor BDI:0.00TOTAL + BDI8.73CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)08.05JFPBELETRODUTO de PVC rgido roscvel, com conexes 25 mm (1")m1,0021.146113SINAPIAjudante de eletricistahM.O.12.942.942436SINAPIEletricistahM.O.0.53.681.842681SINAPIEletroduto de PVC rgido roscvel (dimetro da seo: 1 ")mMAT.1.12.562.8161884SINAPICurva de PVC para eletroduto roscvel de 1"undMAT.0.11.840.184**TirantemMAT.21.53393SINAPIAbraadeira tipo D 1" com parafusoundMAT.30,762.282707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):8.28Total s/ Taxas(MO):5.72LS(%):125%Valor LS:7.14TOTAL21.14BDI(%):0%Valor BDI:0.00TOTAL + BDI21.14CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)08.06JFPBCONDULETE TIPO "T"m1,0026.036113SINAPIAjudante de eletricistahM.O.12.942.942436SINAPIEletricistahM.O.0.53.681.842586SINAPICONDULETE TIPO "T" EM ALUMINIO PARA ELETRODUTO 1"UNDMAT.1.111.9713.1672707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):13.17Total s/ Taxas(MO):5.72LS(%):125%Valor LS:7.14TOTAL26.03BDI(%):0%Valor BDI:0.00TOTAL + BDI26.03CdigoFonteDescrioUn.Clas.Qtd/Coef.Preo Unit.(R$)Preo Total(R$)08.07JFPBCONDULETE TIPO "X"m1,0027.206113SINAPIAjudante de eletricistahM.O.12.942.942436SINAPIEletricistahM.O.0.53.681.842581SINAPICONDULETE TIPO "X" EM ALUMINIO PARA ELETRODUTO 1"UNDMAT.1.113.0414.3442707SINAPIENGENHEIROhM.O0.02500030.430.76**ADMINISTRAOhM.O0.0250006.980.17Total s/ Taxas(Mat.):14.34Total s/ Taxas(MO):5.72LS(%):125%Valor LS:7.14TOTAL27.20BDI(%):0%Valor BDI:0.00TOTAL + BDI27.20
deoclecio:PREO DA PINI PARA PERNAMBUCO R$21,87EM 22/07/09 CONFORME PAGINA IMPRESSA. CONSIDERADO FRETE DE 30% NO PREO PARA PBDeoclcio Vieira de Melo Neto:COMPOSIO BASEADA NA 23155 SBCDeoclcio Vieira de Melo Neto:COMPOSIO BASEADA NA 90804 SBCDeoclcio Vieira de Melo Neto:baseada na composio 23716 SBCDeoclcio Vieira de Melo Neto:PREO MDIO AO LADODeoclcio Vieira de Melo Neto:baseada na composio 02220.8.1.2 TCPODeoclcio Vieira de Melo Neto:BASEADA NA COMPOSIO 24401 SBCDeoclcio Vieira de Melo Neto:BASE 22747 SBCDeoclcio Vieira de Melo Neto:BASE 22710 SBCDeoclcio Vieira de Melo Neto:BASE 99360 SBCDeoclcio Vieira de Melo Neto:BASE 02225.8.2.1 TCPODeoclcio Vieira de Melo Neto:BASE 22711 SBCDeoclcio Vieira de Melo Neto:BASE 23558 SBCDeoclcio Vieira de Melo Neto:BASE 03340.8.2.1 TCPODeoclcio Vieira de Melo Neto:BASE 096815.8.1.3 TCPODeoclcio Vieira de Melo Neto:BASE 170140 SBCDeoclcio Vieira de Melo Neto:BASE 04211.8.2.1 TCPODeoclcio Vieira de Melo Neto:BASE 09705.8.12.6Deoclcio Vieira de Melo Neto:BASE 09705.8.2.21 TCPODeoclcio Vieira de Melo Neto:BASE 09906.8.3.1 TCPODeoclcio Vieira de Melo Neto:BASE 09115.8.12.1 TCPODeoclcio Vieira de Melo Neto:BASE 09115.8.14.1 TCPODeoclcio Vieira de Melo Neto:09115.8.9.10 TCPODeoclcio Vieira de Melo Neto:BASE 09906.8.3.1 TCPODeoclcio Vieira de Melo Neto:BASE 09115.8.12.1 TCPODeoclcio Vieira de Melo Neto:BASE 08520.8.1.4 TCPODeoclcio Vieira de Melo Neto:BASE 16143.8.2.9 TCPO04.050.5.1.1 TCPODeoclcio Vieira de Melo Neto:Melo Neto:BASE 16143.8.2.9 TCPO04.050.5.1.1 TCPODeoclcio Vieira de Melo Neto:Melo Neto:BASE 16143.8.2.9 TCPO04.050.5.1.1 TCPODeoclcio Vieira de Melo Neto:Melo Neto:BASE 16143.8.2.9 TCPO04.050.5.1.1 TCPO03850.8.1.3 TCPODeoclcio Vieira de Melo Neto:BASE 16143.8.2.9 TCPO04.050.5.1.1 TCPO03850.8.1.3 TCPO
MAO-DE-OBRALEIS SOCIAIS125.00%ADICIONAL NOTURNO20.00%SINAPIPROFISSIONALCOM LSHORA SEM LSSEM A.NCOM A.N6115AJUDANTE5.51252.452.946114AJUDANTE DE ARMADOR5.51252.452.946117AJUDANTE DE CARPINTEIRO5.51252.452.946113AJUDANTE DE ELETRICISTA5.51252.452.946116AJUDANTE DE ENCANADOR5.51252.452.94248AJUDANTE DE OPERAO EM GRAL5.51252.452.946127AJUDANTE DE PEDREIRO5.51252.452.94242AJUDANTE ESPECIALIZADO5.51252.452.94243AJUDANTE EM SONDAGEM5.51252.452.946128AJUDANTE GERAL5.51252.452.946129AJUDANTE INSTALADOR ELETRICO5.51252.452.946130AJUTANDE INSTALADOR HIDRAULICO5.51252.452.9410513SERVENTE5.51252.452.942696ENCANADOR OU BOMBEIRO HIDRULICO6.93.073.684750PEDREIRO6.93.073.681213CARPINTEIRO DE FORMA6.93.073.681214CARPINTEIRO DE ESQUADRIA6.93.073.68378ARMADOR OU FERREIRO6.93.073.682436ELETRICISTA6.93.073.682439ELETRICISTA INDUSTRIAL10.964.875.854760AZULEJISTA OU LADRILISTA6.93.073.684755MARMORISTA/GRANITEIRO6.93.073.686110SERRALHEIRO6.93.073.6812868MARCENEIRO6.93.073.684783PINTOR6.93.073.682707ENGENHEIRO57.0525.3630.434083ENCAREGADO8.1523.624.3512873IMPERMEABILIZADOR6.93.073.6810489VIDRACEIRO6.93.073.6812872GESSEIRO6.93.073.68XAPLICADOR FORRO KNAUF10.68166666674.755.702418ELETROTCNICO15.546.918.2913004 SBCFERRAMENTAS E EPI PARA 20 OPERRIOS / MSInsumoDescrioUnidadendicePreo Unit.Preo Total15VASSOURA PIASSAVA QUADRADA GRANDEUN0.182122.18419MARTELO TIPO UNHA 25"UN0.47714.56.916524SERROTE DE ACO 18" RAMADA DIAMANTEUN0.29819.955.94514101CAPACETE DE IDENTIFICACAO COR LARANJAUN16.56.764102CINTURAO DE SEGURANCA PARA OPERARIO EM ANDAIMEUN0.04247519.954104LUVA PROTECAO MANUAL EM LONAPR0.11610.21.18324106CABO DE NYLON ENTRELACADO 3/4"M0.680.820.55764125CARRINHO DE MAO CHAPA DE ACO RODA COM CAMARAUN0.4187832.6044128PA QUADRADA COM CABOUN0.50619.39.76584129TALHADEIRA DE ACO 24cmUN0.9928.618.541127214CHAVE DE FENDA 1/8"x 5"PC0.0435.60.24087218ENXADAO 3 LIBRAS COM CABOUN0.44225.311.18267222FOICE DE ACO COM CABOUN0.53114.367.625167229PONTEIRO DE ACO PARA DESBASTE 10"x3/4"UN0.4828.724.203047245CORDA DE 1/2" (ROLO DE 10,0m) SIZALRO0.9853.33.25057256CAPA VINILONA COM MANGA PARA PROTECAOUN194.55101.830357258CAPACETE DE IDENTIFICACAO COR AZULUN0.9326.56.0587259CAPACETE DE IDENTIFICACAO COR BRANCOUN0.0626.50.4037405BOTAS DE PLASTICO CANO MEDIOPR0.9573129.66712757CAVADEIRA ARTICULADA COM 2 CABOSUN0.20327.55.582512759DESEMPENADEIRA DE ACO LISA/DENTADAUN0.3669.163.3525612760ENXADA 2.1/2" TARZA COM CABOUN0.346248.30412761GARFO (FORCADO) 10 DENTES COM CABOUN0.33618.66.249612762MARRETA ACO OITAVADO COM CABO 1 QUILOUN0.50117.968.9979612764PICARETA ACO CARBONO FORJADO 6 LIBRASUN0.101404.0412765FIO DE PRUMO N 3UN0.27722.36.177113110ESCADA PINTOR MADEIRA 6 DEGRAUSUN0.031652.01531050METRO ARTICULADO AMARELO 2,0m com 6 REGUAS DE MADEIRAUN0.01612.30.196872500CAPACETE DE IDENTIFICACAO COR AMARELOUN0.8546.55.551VALOR TOTAL :309.33429TEMPO DE SERVIO(MESES)41237.33716
INSUMOS_SINAPICDIGODESCRIOUNPREO (R$)DATA00000414ABRACADEIRA DE NYLON PARA AMARRACAO DE CABOS, COMPRIM= 100MMUN0,0500000410ABRACADEIRA DE NYLON PARA AMARRACAO DE CABOS, COMPRIM= 158MMUN0,0800000411ABRACADEIRA DE NYLON PARA AMARRACAO DE CABOS, COMPRIM= 199MMUN0,1000000409ABRACADEIRA DE NYLON PARA AMARRACAO DE CABOS, COMPRIM= 205MMUN0,1500000412ABRACADEIRA DE NYLON PARA AMARRACAO DE CABOS, COMPRIM= 232MMUN0,1800000408ABRACADEIRA DE NYLON PARA AMARRACAO DE CABOS, COMPRIM= 390MMUN0,2000000394ABRACADEIRA TIPO D 1 1/2" C/PARAFUSO"UN0,7600000395ABRACADEIRA TIPO D 1 1/4" C/ PARAFUSO"UN0,7000000392ABRACADEIRA TIPO D 1/2" C/ PARAFUSO"UN0,4000000393ABRACADEIRA TIPO D 1" C/ PARAFUSO"UN0,76Apr-0900000397ABRACADEIRA TIPO D 2 1/2" C/ PARAFUSO"UN1,0200000396ABRACADEIRA TIPO D 2" C/ PARAFUSO"UN1,0000000400ABRACADEIRA TIPO D 3/4" C/ PARAFUSO"UN0,5400000398ABRACADEIRA TIPO D 3" C/ PARAFUSO"UN1,4400000399ABRACADEIRA TIPO D 4" C/ PARAFUSO"UN2,5600000001ACETILENO (CILINDRO DE 7 A 9KG)KG27,0000000005ACIDO CLORIDRICO (SOLUCAO ACIDA)L2,2500000004ACIDO MURIATICO (CONCENTRADO)KG1,7700000003ACIDO MURIATICO (SOLUCAO ACIDA)L1,9300000020ACO CA-25 1/2" (12,70 MM)KG3,9700000022ACO CA-25 1/4" (6,35 MM)KG4,7100000025ACO CA-25 1" (25,40 MM)KG4,0800000019ACO CA-25 3/4" (19,05 MM)KG4,0800000026ACO CA-25 3/8" (9,52 MM)KG4,1400000023ACO CA-25 5/16" (7,94 MM)KG4,5900000021ACO CA-25 5/8" (15,87 MM)KG4,3100000024ACO CA-25 7/8" (22,22 MM)KG3,9700000031ACO CA-50 1/2" (12,70 MM)KG4,1700000032ACO CA-50 1/4" (6,35 MM)KG4,8300000028ACO CA-50 1" (25,40 MM)KG4,1100000030ACO CA-50 3/4" (19,05 MM)KG4,1100000034ACO CA-50 3/8" (9,52 MM)KG4,2900000033ACO CA-50 5/16" (7,94 MM)KG4,5300000027ACO CA-50 5/8" (15,87 MM)KG4,2300000029ACO CA-50 7/8" (22,22 MM)KG4,1100000035ACO CA-60 - 3,4MMKG5,2000000036ACO CA-60 - 4,2MMKG4,8300000037ACO CA-60 - 4,6MMKG4,9600000039ACO CA-60 - 5,0MMKG4,8900000040ACO CA-60 - 6,0MMKG4,8300000041ACO CA-60 - 6,4MMKG5,0800000042ACO CA-60 - 7,0MMKG4,7700000038ACO CA-60 - 8,0MMKG4,8300020063ACOPLAMENTO PVC AQUAPLUV D = 88MMUN5,2700010900ADAPTADOR EM LATAO P/ INSTALACAO PREDIAL DE COMBATE A INCENDIO ENGATE RAPIDO 1 1/2" X ROSCA NTERNA 5 FIOS 2 1/2"UN24,8200010899ADAPTADOR EM LATAO P/ INSTALACAO PREDIAL DE COMBATE A INCENDIO ENGATE RAPIDO 2 1/2" X ROSCA NTERNA 5 FIOS 2 1/2"UN42,2600000060ADAPTADOR PVC C/ REG P/ POLIETILENO PE-5 20 MM X 3/4"UN4,0200000055ADAPTADOR PVC P/ POLIETILENO PE-5 20 MM X 1/2"UN1,0100000061ADAPTADOR PVC P/ POLIETILENO PE-5 20 MM X 3/4"UN1,0300000062ADAPTADOR PVC P/ POLIETILENO PE-5 32 MM X 1"UN2,0200000077ADAPTADOR PVC P/ SIFAO METALICO C/ANEL BORRACHA 40MM X 1 1/2"UN2,2500000076ADAPTADOR PVC P/ SIFAO 40MM X 1 1/4"UN1,8000000084ADAPTADOR PVC P/ VALVULA PIA OU LAVATORIO 40MM X 1"UN1,3500000051ADAPTADOR PVC PBA A BOLSA DE FOFO JE DN 100 / DE 110MMUN53,1400012863ADAPTADOR PVC PBA A BOLSA DE FOFO JE DN 50 / DE 60MMUN20,2200000050ADAPTADOR PVC PBA A BOLSA DE FOFO JE DN 75 / DE 85MMUN38,5700020076ADAPTADOR PVC PBA A LUVA DE FIBROCIMENTO DN 100 / DE 110MMUN63,4500020074ADAPTADOR PVC PBA A LUVA DE FIBROCIMENTO DN 50 / DE 60MMUN18,5800020075ADAPTADOR PVC PBA A LUVA DE FIBROCIMENTO DN 75 / DE 85MMUN40,6300000047ADAPTADOR PVC PBA JE BOLSA / ROSCA DN 100 / DE 110MMUN42,6100000048ADAPTADOR PVC PBA JE BOLSA / ROSCA DN 50 / DE 60MMUN14,1200000046ADAPTADOR PVC PBA JE BOLSA / ROSCA DN 75 / DE 85MMUN30,2400000052ADAPTADOR PVC PBA PONTA/ROSCA JE DN 50 / DE 60MMUN8,0200000043ADAPTADOR PVC PBA PONTA/ROSCA JE DN 75 / DE 85MMUN21,7900000067ADAPTADOR PVC ROSCAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 1/2"UN5,5800000071ADAPTADOR PVC ROSCAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 1"UN9,7700000073ADAPTADOR PVC ROSCAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 3/4"UN6,8900000070ADAPTADOR PVC ROSCAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 1 1/4"UN9,4300000085ADAPTADOR PVC ROSCAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 2"UN13,3900000072ADAPTADOR PVC ROSCAVEL C/ FLANGES E ANEL DE VEDACAO P/CAIXA D'A GUA 1 1/2"UN10,8500000095ADAPTADOR PVC SOLDAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 20MM X 1/2"UN5,3600000096ADAPTADOR PVC SOLDAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 25MM X 3/4"UN6,6200000097ADAPTADOR PVC SOLDAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 32MM X 1"UN11,3900000098ADAPTADOR PVC SOLDAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 40MM 11/4"UN14,8500000099ADAPTADOR PVC SOLDAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 50MM X 11/2"UN15,2600000100ADAPTADOR PVC SOLDAVEL C/ FLANGES E ANEL DE VEDACAO P/ CAIXA D' AGUA 60MM X 2"UN23,9400000103ADAPTADOR PVC SOLDAVEL CURTO C/ BOLSA E ROSCA P/ REGISTRO 110MM X 4"UN31,3700000107ADAPTADOR PVC SOLDAVEL CURTO C/ BOLSA E ROSCA P/ REGISTRO 20MM X 1/2"UN0,3600000065ADAPTADOR PVC SOLDAVEL CURTO C/ BOLSA E ROSCA P/ REGISTRO 25MM X 3/4"UN0,4500000108ADAPTADOR PVC SOLDAVEL CURTO C/ BOLSA E ROSCA P/ REGISTRO 32MM X 1"UN0,9500000110ADAPTADOR PVC SOLDAVEL CURTO C/ BOLSA E ROSCA P/ REGISTRO 40MM X 1 1/2"UN4,1400000109ADAPTADOR PVC SOLDAVEL CURTO C/ BOLSA E ROSCA P/ REGISTRO 40MM X 1 1/4"UN2,0300000112ADAPTADOR PVC SOLDAVEL CURTO C/ BOLSA E ROSCA P/ REGISTRO 50MM X 1 1/2"UN2,4800000111ADAPTADOR PVC SOLDAVEL CURTO C/ BOLSA E ROSCA P/ REGISTRO 50MM X 1 1/4"UN4,3700000113ADAPTADOR PVC SOLDAVEL CURTO C/ BOLSA E ROSCA P/ REGISTRO 60MM X 2"UN6,5300000104ADAPTADOR PVC SOLDAVEL CURTO C/ BOLSA E ROSCA P/ REGISTRO 75MM X 2 1/2"UN12,7400000102ADAPTADOR PVC SOLDAVEL CURTO C/ BOLSA E ROSCA P/ REGISTRO 85MM X 3"UN20,2100000075ADAPTADOR PVC SOLDAVEL FLANGES LIVRES P/ CAIXA D' AGUA 110MM X 4"UN186,3500000114ADAPTADOR PVC SOLDAVEL FLANGES LIVRES P/ CAIXA D' AGUA 25MM X 3/4'UN7,5200000068ADAPTADOR PVC SOLDAVEL FLANGES LIVRES P/ CAIXA D' AGUA 32MM X 1 "UN9,2700000086ADAPTADOR PVC SOLDAVEL FLANGES LIVRES P/ CAIXA D' AGUA 40MM X 1 1/4"UN11,4800000066ADAPTADOR PVC SOLDAVEL FLANGES LIVRES P/ CAIXA D' AGUA 50MM X 1 1/2"UN21,6000000069ADAPTADOR PVC SOLDAVEL FLANGES LIVRES P/ CAIXA D' AGUA 60MM X 2 "UN30,9600000083ADAPTADOR PVC SOLDAVEL FLANGES LIVRES P/ CAIXA D' AGUA 75MM X 2 1/2'UN96,6600000074ADAPTADOR PVC SOLDAVEL FLANGES LIVRES P/ CAIXA D' AGUA 85 MM X 3"UN130,2300000106ADAPTADOR PVC SOLDAVEL LONGO C/ FLANGE LIVRE P/ CAIXA D' AGUA 1 10MM X 4"UN205,0700000087ADAPTADOR PVC SOLDAVEL LONGO C/ FLANGE LIVRE P/ CAIXA D' AGUA 2 5MM X 3/4"UN8,7300000088ADAPTADOR PVC SOLDAVEL LONGO C/ FLANGE LIVRE P/ CAIXA D' AGUA 32MM X 1UN10,7100000089ADAPTADOR PVC SOLDAVEL LONGO C/ FLANGE LIVRE P/ CAIXA D' AGUA 4 0MM X 1 1/4"UN13,3200000090ADAPTADOR PVC SOLDAVEL LONGO C/ FLANGE LIVRE P/ CAIXA D' AGUA 5 0MM X 1 1/2"UN24,9800000081ADAPTADOR PVC SOLDAVEL LONGO C/ FLANGE LIVRE P/ CAIXA D' AGUA 6 0MM X 2"UN34,0700000082ADAPTADOR PVC SOLDAVEL LONGO C/ FLANGE LIVRE P/ CAIXA D' AGUA 7 5MM X 2 1/2"UN106,2900000105ADAPTADOR PVC SOLDAVEL LONGO C/ FLANGE LIVRE P/ CAIXA D' AGUA 8 5MM X 3"UN143,2800000079ADAPTADOR PVC101,6MM X CERAMICO 100,0MM BOLSA/PONTA EB-644 P/ REDE COLET ESGUN22,7300000080ADAPTADOR PVC110,0MM X CERAMICO 100,0MM BOLSA/PONTA EB-644 P/ REDE COLET ESGUN21,7800000157ADESIVO EPOXI P/ TRINCAS E FISSURAS ESTRUTURAIS, TIPO SIKADUR 52 OU EQUIVALENTEKG115,7600000131ADESIVO ESTRUTURAL A BASE DE RESINA EPOXI TIPO SIKADUR 31 OU EQUIVKG42,3300000156ADESIVO ESTRUTURAL BASE EPOXI SIKADUR 32 OU EQUIVKG45,9000007333ADESIVO ESTRUTURAL BASE EPOXI TP COMPOUND ADESIVO OTTO BAUMGART OU EQUIV.KG30,0600007334ADESIVO P/ ARGAMASSAS E CHAPISCO - TP BIANCO OTTO BAUMGART OU EQUIVL7.48Apr-0900000117ADESIVO P/ PVC BISNAGA C/ 17GUN1,1500000119ADESIVO P/ PVC BISNAGA C/ 75GUN2,1900020080ADESIVO P/ PVC FRASCO C/ 175GUN4,8100007335ADESIVO P/ TRINCA / FISSURA ESTRUTURA COMPOUND INJECAO - OTTO BAUMGARTKG121,9900021114ADESIVO P/ TUBOS CPVC (AQUATHERM) - 65GUN9,3900003410ADESIVO PARA ISOPORKG11,3100000122ADESIVO PVC FRASCO C/ 850GUN18.7Nov-0800000124ADITIVO ACELERADOR DE PEGA E ENDURECIMENTO P/ ARGAMASSA E CONCRETO TIPO SIKA 3 OU EQUIVL4,8900000123ADITIVO IMPERMEABILIZANTE PEGA NORMAL P/ ARGAMASSA TIPO SIKA1 OU VEDACITL3,1100000126ADITIVO IMPERMEABILIZANTE PEGA RAPIDA P/ ARGAMASSA TP SIKA 4A OU EQUIVL5,6700000127ADITIVO IMPERMEABILIZANTE PEGA ULTRA-RAPIDA P/ ARGAMASSA TIPO SIKA 2 OU EQUIVL7,7600000132ADITIVO PLASTIFICANTE / RETARDADOR / DENSIFICADOR P/ CONCRETO TP PLASTIMENT VZ SIKA OU EQUIVKG2,3000000159ADUBO ORGANICO BOVINOM358,0000000174ADUELA/BATENTE DUPLO/CAIXAO/GRADE CAIXA 13 X 3,5CM P/ PORTA 0,60 A 1,20 X 2,10M MADEIRA IPE/MOGNO/CEREJEIRA OU SIMILARJG62,4100000184ADUELA/BATENTE DUPLO/CAIXAO/GRADE CAIXA 13 X 3CM P/ PORTA 0,60 A 1,20 X 2,10M MADEIRA CEDRINHO/PINHO/CANELA OU SIMILARJG33,6200000173ADUELA/BATENTE DUPLO/CAIXAO/GRADE CAIXA 13 X 3CM P/ PORTA 0,60 A 1,20 X 2,10M MADEIRA 'CEDRO/IMBUIA/JEQUITIBA OU SIMILAR AGEM ELETRICO TRIFASICO 10CVJG44,9000000183ADUELA/BATENTE DUPLO/CAIXAO/GRADE CAIXA 13 X 3CM P/ PORTA 0,60 A 1,20 X 2,10M MADEIRA 'IPE/MOGNO/CEREJEIRA OU SIMILARJG60,0000000175ADUELA/BATENTE DUPLO/CAIXAO/GRADE CAIXA 15 X 3,5CM P/ PORTA 0,60 A 1,20 X 2,10M MADEIRAJG82,06IPE/MOGNO/CEREJEIRA OU SIMILAR00020001ADUELA/BATENTE DUPLO/CAIXAO/GRADE CAIXA 15 X 3CM P/ PORTA 0,60 A 1,20 X 2,10M MADEIRAJG45,96CEDRINHO/PINHO/CANELA OU SIMILAR00000181ADUELA/BATENTE DUPLO/CAIXAO/GRADE CAIXA 15 X 3CM P/ PORTA 0,60 A 1,20 X 2,10M MADEIRAJG61,50CEDRO/IMBUIA/JEQUITIBA OU SIMILAR00000164ADUELA/BATENTE DUPLO/CAIXAO/GRADE CAIXA 15 X 3CM P/ PORTA 0,60 A 1,20 X 2,10M MADEIRAJG69,70IPE/MOGNO/CEREJEIRA OU SIMILAR00000216ADUFA FUNDO FOFO SIMPLES PN-10 DN 100UN333,8800000232ADUFA FUNDO FOFO SIMPLES PN-10 DN 150UN431,1100000217ADUFA FUNDO FOFO SIMPLES PN-10 DN 200UN635,8800000231ADUFA FUNDO FOFO SIMPLES PN-10 DN 250UN758,3900000230ADUFA FUNDO FOFO SIMPLES PN-10 DN 300UN900,7300000218ADUFA FUNDO FOFO SIMPLES PN-10 DN 400UN2.065,1500000225ADUFA PAREDE FOFO C/ PARAFUSOS DN 100UN600,0000000201ADUFA PAREDE FOFO C/ PARAFUSOS DN 150UN729,2200000202ADUFA PAREDE FOFO C/ PARAFUSOS DN 200UN1.140,5000000203ADUFA PAREDE FOFO C/ PARAFUSOS DN 250UN3.004,3700000213ADUFA PAREDE FOFO C/ PARAFUSOS DN 300UN3.845,3700000214ADUFA PAREDE FOFO C/ PARAFUSOS DN 400UN5.561,8300000215ADUFA PAREDE FOFO C/ PARAFUSOS DN 500UN8.715,9500000233ADUFA PAREDE FOFO C/ PARAFUSOS DN 600UN14.088,4800000197ADUFA PAREDE FOFO C/ PARAFUSOS DN 75UN299,4700004319AFASTADOR P/ TELHA FIBROCIMENTO CANALETE 90 OU KALHETAOUN0,3700007332AGENTE DE DESFORMA P/ CONCRETO TP DESMOL OTTO BAUMGART OU EQUIVL8,1900000235AGREGADO ALTA RESISTENCIA P/ PISO INDUSTRIAL COR BRANCAKG0,3500000236AGREGADO ALTA RESISTENCIA P/ PISO INDUSTRIAL COR CINZAKG0,3300000238AGREGADO ALTA RESISTENCIA P/ PISO INDUSTRIAL COR PRETA (INCLUI PIGMENTO COR)KG0,3500000240AGREGADO ALTA RESISTENCIA P/ PISO INDUSTRIAL COR VERDE (INCLUI PIGMENTO COR)KG0,4700000237AGREGADO ALTA RESISTENCIA P/ PISO INDUSTRIAL MARROM (INCLUI PIGMENTO COR)KG0,5400000239AGREGADO ALTA RESISTENCIA P/ PISO INDUSTRIAL VERMELHO (INCLUI PIGMENTO COR)KG0,5200000234AGREGADO DE ALTA RESISTENCIA P/ PISO INDUSTRIALKG0,4000003411AGREGADO LEVE PARA PROTECAO TERMICA (PEROLAS DE ISOPOR)KG5,0300006115AJUDANTEH4,2500006114AJUDANTE DE ARMADORH4,3300006117AJUDANTE DE CARPINTEIROH4,3300006113AJUDANTE DE ELETRICISTAH4,3300006116AJUDANTE DE ENCANADORH4,3300000248AJUDANTE DE OPERACAO EM GERALH7,4000006127AJUDANTE DE PEDREIROH4,3300000242AJUDANTE ESPECIALIZADOH4,2100000243AJUDANTE ESPECIALIZADO EM SONDAGEMH3,3800006128AJUDANTE GERALH4,3300006129AJUDANTE INSTALADOR ELETRICOH4,3300006130AJUDANTE INSTALADOR HIDRAULICOH4,4000025957AJUSTADOR MECNICO ( AJUSTADOR DE ESTRUTURA METLICA TRELIADA)H6,9700000427ALCA PRE-FORMADA DE CONTRA POSTE (GPH) EM ACO P/ CABO 3/16" , COMPRIM= 870MMUN2,8600011272ALCA PRE-FORMADA DE DISTRIBUICAO DG-4542 PLPUN2,2700011273ALCA PRE-FORMADA DE DISTRIBUICAO P/ CONDUTORES DE ALUMINIO # 1/0; 6/1 CAA"UN3,9800000418ALCA PRE-FORMADA DE DISTRIBUICAO PLP P/ CABO ALUMINIO 25MM2UN2,0500000417ALCA PRE-FORMADA DE LINHA, EM ALUMINIO P/ CABO DE ALUMINIO DIAM 16MM2UN1,4300011275ALCA PRE-FORMADA DE SERVICO P/ CONDUTORES DE ALUMINIO # 4; 6/1 CAA"UN1,3500011274ALCA PRE-FORMADA DE SERVICO SG-4500 PLPUN2,2000004223ALCOOL HIDRATADO COMBUSTIVEL COMUML2,4800010658ALISADORA DE CONCRETO WACKER MOD CT 36/ADT C/ MOTOR A GASOLINA 5,5HP**CAIXA**UN9.339,2000020003ALIZAR / GUARNICAO 4 X 1CM MADEIRA CEDRINHO/PINHO/CANELA OU SIMILARM2,0400020002ALIZAR / GUARNICAO 4 X 1CM MADEIRA CEDRO/IMBUIA/JEQUITIBA OU SIMILARM2,0400000185ALIZAR / GUARNICAO 4 X 1CM MADEIRA IPE/MOGNO/CEREJEIRA OU SIMILARM3,1300020018ALIZAR / GUARNICAO 5 X 1,5CM MADEIRA CEDRINHO/PINHO/CANELA OU SIMILARM2,0400020017ALIZAR / GUARNICAO 5 X 1,5CM MADEIRA CEDRO/IMBUIA/JEQUITIBA OU SIMILARM2,4600000188ALIZAR / GUARNICAO 5 X 1,5CM MADEIRA IPE/MOGNO/CEREJEIRA OU SIMILARM3,3900020005ALIZAR / GUARNICAO 5 X 1CM MADEIRA CEDRINHO/PINHO/CANELA OU SIMILARM2,0400020004ALIZAR / GUARNICAO 5 X 1CM MADEIRA CEDRO/IMBUIA/JEQUITIBA OU SIMILARM2,2800000186ALIZAR / GUARNICAO 5 X 1CM MADEIRA IPE/MOGNO/CEREJEIRA OU SIMILARM3,3600020007ALIZAR / GUARNICAO 5 X 2CM MADEIRA CEDRINHO/PINHO/CANELA OU SIMILARM2,0400020006ALIZAR / GUARNICAO 5 X 2CM MADEIRA CEDRO/IMBUIA/JEQUITIBA OU SIMILARM2,6600000187ALIZAR / GUARNICAO 5 X 2CM MADEIRA IPE/MOGNO/CEREJEIRA OU SIMILARM3,5900000253ALMOXARIFEH7,7400000583ALUMINIO ANODIZADOKG19,0100025935ALVAIDE - OXIDO DE ZINCO - USO INDUSTRIAL, TIPO RMSTKG5,8600000006AMONIAL1,5800025855ANDAIME METLICO FACHADEIRO LARGURA=1,20M ALT. 1,00MM2/MES0,9300020193ANDAIME METALICO TIPO FACHADEIRO LARG=1,20M ALTURA = 2,0MM2/MES0,9300010529ANDAIME METALICO TUBULAR DE ENCAIXE TIPO TORRE, C/ LARGURA ATE 2M, ALTURA 1,00MKG/MES0,1100010528ANDAIME METALICO TUBULAR DE ENCAIXE TIPO TORRE, C/ LARGURA ATE 2M, ALTURA 1,00MM2/MES2,7900010527ANDAIME METALICO TUBULAR DE ENCAIXE TIPO TORRE, C/ LARGURA ATE 2M, ALTURA 1,00MM/MES3,2500010526ANDAIME SUSPENSO PLATAFORMA C/ 1,50M DE LARGURA CAP. CARGA ATE 500 KG CABO 45MMES153,1300000301ANEL BORRACHA P/ TUBO ESGOTO PREDIAL EB 608 DN 100MMUN1,1600000295ANEL BORRACHA P/ TUBO ESGOTO PREDIAL EB 608 DN 40MMUN0,6000000296ANEL BORRACHA P/ TUBO ESGOTO PREDIAL EB 608 DN 50MMUN0,6300000297ANEL BORRACHA P/ TUBO ESGOTO PREDIAL EB 608 DN 75MMUN0,8100000311ANEL BORRACHA P/ TUBO PVC DE FOFO EB-1208 DN 100UN2,8800000318ANEL BORRACHA P/ TUBO PVC DE FOFO EB-1208 DN 150UN4,7800000319ANEL BORRACHA P/ TUBO PVC DE FOFO EB-1208 DN 200UN6,9200000320ANEL BORRACHA P/ TUBO PVC DE FOFO EB-1208 DN 250UN17,8600000314ANEL BORRACHA P/ TUBO PVC DE FOFO EB-1208 DN 300UN26,3600000303ANEL BORRACHA P/ TUBO PVC REDE ESGOTO EB 644 DN 100MMUN1,9000000304ANEL BORRACHA P/ TUBO PVC REDE ESGOTO EB 644 DN 125MMUN3,6200000305ANEL BORRACHA P/ TUBO PVC REDE ESGOTO EB 644 DN 150MMUN4,6400000306ANEL BORRACHA P/ TUBO PVC REDE ESGOTO EB 644 DN 200MMUN6,8900000307ANEL BORRACHA P/ TUBO PVC REDE ESGOTO EB 644 DN 250MMUN13,3200000308ANEL BORRACHA P/ TUBO PVC REDE ESGOTO EB 644 DN 300MMUN23,6900000309ANEL BORRACHA P/ TUBO PVC REDE ESGOTO EB 644 DN 350MMUN28,4400000310ANEL BORRACHA P/ TUBO PVC REDE ESGOTO EB 644 DN 400MMUN35,7100000299ANEL BORRACHA P/ TUBO SERIE R DN 100MMUN1,2000000300ANEL BORRACHA P/ TUBO SERIE R DN 150MMUN6,8500020084ANEL BORRACHA P/ TUBO SERIE R DN 40MMUN0,7000020085ANEL BORRACHA P/ TUBO SERIE R DN 50MMUN0,7700000298ANEL BORRACHA P/ TUBO SERIE R DN 75MMUN0,8800020326ANEL BORRACHA P/ TUBO/CONEXAO PVC PBA P/ REDE AGUA DN 60MMUN1,1600000328ANEL BORRACHA P/ TUBO/CONEXAO PVC PBA P/ REDE AGUA DN 100MMUN2,7100000325ANEL BORRACHA P/ TUBO/CONEXAO PVC PBA P/ REDE AGUA DN 50MMUN1,1200000326ANEL BORRACHA P/ TUBO/CONEXAO PVC PBA P/ REDE AGUA DN 65MMUN2,1100000329ANEL BORRACHA P/ TUBO/CONEXAO PVC PBA P/ REDE AGUA DN 75MMUN2,5300020975ANEL DE EXPANSAO EM COBRE P/ EMPATACAO MANGUEIRA DE COMBATE A INCENDIO ENGATE RAPIDO 1 1/2"UN4,0800020976ANEL DE EXPANSAO EM COBRE P/ EMPATACAO MANGUEIRA DE COMBATE A INCENDIO ENGATE RAPIDO 2 1/2"UN8,5800013111ANEL OU ADUELA CONCRETO ARMADO D = 0,40M, H = 0,40MUN40,6800013113ANEL OU ADUELA CONCRETO ARMADO D = 0,60M, H = 0,10MUN8,1400013114ANEL OU ADUELA CONCRETO ARMADO D = 0,60M, H = 0,15MUN12,2000012530ANEL OU ADUELA CONCRETO ARMADO D = 0,60M, H = 0,30MUN24,4100012531ANEL OU ADUELA CONCRETO ARMADO D = 0,60M, H = 0,40MUN88,1400012532ANEL OU ADUELA CONCRETO ARMADO D = 0,60M, H = 0,50MUN35,2500012533ANEL OU ADUELA CONCRETO ARMADO D = 0,80M, H = 0,30MUN46,1000012544ANEL OU ADUELA CONCRETO ARMADO D = 0,80M, H = 0,50MUN47,4600012546ANEL OU ADUELA CONCRETO ARMADO D = 1,00M, H = 0,40MUN206,1000012547ANEL OU ADUELA CONCRETO ARMADO D = 1,00M, H = 0,50MUN48,8100012548ANEL OU ADUELA CONCRETO ARMADO D = 1,10M, H = 0,30MUN62,3700012551ANEL OU ADUELA CONCRETO ARMADO D = 1,20M, H = 0,50MUN86,7800012563ANEL OU ADUELA CONCRETO ARMADO D = 1,50M, H = 0,50MUN154,5800012565ANEL OU ADUELA CONCRETO ARMADO D = 2,00M, H = 0,50MUN317,2900012567ANEL OU ADUELA CONCRETO ARMADO D = 2,50M, H = 0,50MUN488,1400012568ANEL OU ADUELA CONCRETO ARMADO D = 3,00M, H = 0,50MUN569,4900011789ANEL PARA GUIA DE 10MM PARA FIO FE-160UN2,8600010560ANTRACITOM32.091,5800012888APARELHO APOIO ESTRUTURAL DE NEOPRENE FRETADODM391,7800012889APARELHO APOIO ESTRUTURAL DE NEOPRENE NAO FRETADODM339,0000013761APARELHO CORTE OXI-ACETILENOUN2.199,4800003332APARELHO CORTE OXI-ACETILENOH0,9800007600APARELHO MISTURADOR CROMADO P/ BIDE C/ DUCHACJ188,0600011770APARELHO MISTURADOR CROMADO P/ CHUVEIRO 3/4" REF 2116UN71,3100011769APARELHO MISTURADOR CROMADO P/ LAVATORIO REF 1875UN155,4400011771APARELHO MISTURADOR CROMADO P/ PIA REF 1258UN228,9700004814APARELHO SINALIZADOR DE SAIDA DE GARAGEM COMPLETO C/ CELULA FOTOELETRICA E BRACADEIRAUN253,8800025967APOIO DO PORTA DENTE FRESADORA CIBER W 1900 .UN1.247,1900006122APONTADOR OU APROPRIADORH7,7400011816AQUECEDOR DE AGUA ELETRICO HORIZONTAL 100L CILINDRO COBRE / INOXUN1.849,0000011811AQUECEDOR DE AGUA ELETRICO HORIZONTAL 200L CILINDRO COBRE / INOXUN2.823,0500014185AQUECEDOR DE AGUA ELETRICO INDUSTRIAL CAPACIDADE 750L, TENSAO NOMINAL 220VUN4.743,5900014186AQUECEDOR DE AGUA ELETRICO INDUSTRIAL 1000L, TENSAO NOMINAL 220VUN5.793,6400011814AQUECEDOR DE AGUA ELETRICO INDUSTRIAL 500L, TENSAO NOMINAL 220VUN3.627,9000021100AQUECEDOR OU BOYLER DE ACUMULACAO AGUA - A GAS GLP/GN - 50 LITROSUN971,3000010700ARADO REVERSIVEL MARCA LAVRALE MOD. AR - 3 X 2" / TM, REBOCAVEL**CAIXA**"UN10.076,8900000346ARAME DE ACO OVALADO 15 X 17 (ROLO 1000M- 45KG-700KGF)KG6,6300003312ARAME DE AMARRACAO P/ GABIAO GALV - DIAM. 2,2 MMKG6,3400000339ARAME FARPADO GALVANIZADO 14 BWG - CLASSE 250M0,3600000338ARAME FARPADO 16 BWG - 0,047 KG/MKG7,5300000340ARAME FARPADO 16 BWG 4 X 4" - 23,50 KG/ROLO 500MM0,3500000334ARAME GALVANIZADO 8 BWG - 4,19MM - 101,00 G/MKG7,3800000335ARAME GALVANIZADO 10 BWG - 3,40MM - 71,30 G/MKG8.72Apr-0900000342ARAME GALVANIZADO 12 BWG - 2,60MM - 48,00 G/MKG7,4800000343ARAME GALVANIZADO 14 BWG - 2,10MM - 27,20 G/MM0,2200000333ARAME GALVANIZADO 14 BWG - 2,10MM - 27,20 G/MKG8,1300000344ARAME GALVANIZADO 16 BWG - 1,65MM - 16,60 G/MKG8,7400000341ARAME GALVANIZADO 18 BWG - 1,24MM - 9,0 G/MM0,0900000345ARAME GALVANIZADO 18 BWG - 1,24MM - 9,0 G/MKG5,8100011107ARAME GALVANIZADO 6 BWG - 5,16MM - 157,00 G/MKG7,1000003313ARAME PROTEGIDO C/ PVC P/ GABIAO 2,2MMKG8,0800000337ARAME RECOZIDO 18 BWG - 1,25MM - 9,60 G/MKG9.82Apr-0900012227ARANDELA C/ BASE EM CHAPA DE ACO PINTADA E GLOBO DE VIDRO LEITOSO - BOCA 10CM DIAM 20CMUN63,4700012223ARANDELA 45 GRAUS PROVA DE TEMPO, GASES E VAPORESUN70,7600000348ARBUSTO REGIONAL ALTURA MAIOR QUE 1MUN3,8700010826ARBUSTO REGIONAL DE 50 A 100CM DE ALTURAUN14,0000014454AREIA ASFALTICA USINADA A QUENTET681,5800000366AREIA FINAM329.31Nov-0800000367AREIA GROSSAM330Nov-0800000370AREIA MEDIAM330.54Apr-0900000368AREIA P/ ATERROM312,8600011075AREIA P/ LEITO FILTRANTE (1,68 A 0,42MM)M3242,8600011076AREIA PRETA P/ EMBOCOM329,0700011077AREIA SELECIONADA P/ LEITO FILTRANTE - D = 0,5 A 0,7 MMM3248,5400011078AREIA SELECIONADA P/ LEITO FILTRANTE - D = 0,7 A 1 MMM3248,5400000369ARENOSO, AREIA BARRADA OU AREIA AMARELAM323,5700000134ARGAMASSA AUTONIVELANTE P/ GROUTEAMENTO EM GERAL TP SIKAGROUT OU EQUIVKG1,2700000129ARGAMASSA CORRETIVA DE REVESTIMENTO SIKA TOP 121 - SIKAKG6,2500000135ARGAMASSA IMPERMEAVEL SIKA 101 - SIKAKG4,2500001381ARGAMASSA OU CIMENTO COLANTE EM PO PARA FIXACAO DE PECAS CERAMICASKG0,1800000130ARGAMASSA PARA REPARO ESTRUTURAL TP SIKA TOP 122 OU EQUIVKG5,5500000375ARGAMASSA PRONTA PARA REVESTIMENTO EXTERNO EM PAREDESKG0,1800000371ARGAMASSA PRONTA PARA REVESTIMENTO EXTERNO OU INTERNOKG0,2200000374ARGAMASSA PRONTA PARA REVESTIMENTO INTERNO EM PAREDESKG0,1800006079ARGILA, ARGILA VERMELHA OU ARGILA ARENOSAM322,0000001097ARMACAO VERTICAL C/ HASTE E CONTRA-PINO EM CHAPA DE FERRO GALV 3/16'' C/ 4 ESTRIBOS SEMUN17,74ISOLADORES00001091ARMACAO VERTICAL C/ HASTE E CONTRA-PINO EM CHAPA DE FERRO GALV 3/16" C/ 1 ESTRIBO E 1 ISOLADOR"UN6,8200001094ARMACAO VERTICAL C/ HASTE E CONTRA-PINO EM CHAPA DE FERRO GALV 3/16" C/ 1 ESTRIBO SEM ISOLADORES"UN5,1200001092ARMACAO VERTICAL C/ HASTE E CONTRA-PINO EM CHAPA DE FERRO GALV 3/16" C/ 2 ESTRIBOS E 2 ISOLADORES"UN12,4400001095ARMACAO VERTICAL C/ HASTE E CONTRA-PINO EM CHAPA DE FERRO GALV 3/16" C/ 2 ESTRIBOS SEMUN9,92ISOLADORES"00001093ARMACAO VERTICAL C/ HASTE E CONTRA-PINO EM CHAPA DE FERRO GALV 3/16" C/ 3 ESTRIBOS E 3 ISOLADORES"UN17,1000001090ARMACAO VERTICAL C/ HASTE E CONTRA-PINO EM CHAPA DE FERRO GALV 3/16" C/ 3 ESTRIBOS SEM ISOLADOR"UN13,3900001096ARMACAO VERTICAL C/ HASTE E CONTRA-PINO EM CHAPA DE FERRO GALV 3/16" C/ 4 ESTRIBOS E 4 ISOLADORES"UN24,9800000378ARMADOR OU FERREIROH5,4700020237ARMARIO C/ PERFIS ALUM ANOD EMBUTIR 75 X 49 X 10CMUN140,3200000376ARMARIO PLASTICO DE EMBUTIR C/ ESPELHO, DE 34 X 49CMUN54,5100000446ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 50UN2,9000000467ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 80UN9,4300000447ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 100UN6,6200000448ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 150UN14,6800000449ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 200UN24,5600000450ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 250UN45,8600000466ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 300UN54,7800000452ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 400UN111,9700000454ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 500UN167,8800000479ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 600UN201,3700000455ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 700UN503,5600000456ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 800UN559,3400000457ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 900UN850,3300000478ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 1000UN1.074,1800000458ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-16 DN 1200UN1.074,1800000461ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 100UN6,6200000477ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 150UN14,6800000462ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 200UN24,5600000463ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 250UN45,8600000476ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 300UN54,7800000464ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 350UN67,0200000465ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 400UN111,9700000475ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 500UN167,8800000469ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 600UN201,3700000470ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 700UN503,5600000471ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 800UN559,3400000474ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 900UN850,3300000472ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 1000UN1.074,1800000473ARRUELA AMIANTO GRAFITADO P/ FLANGE PN-25 DN 1200UN1.074,1800000480ARRUELA BORRACHA P/ FLANGE PN-10 DN 50UN12,7500000485ARRUELA BORRACHA P/ FLANGE PN-10 DN 80UN17,0800000486ARRUELA BORRACHA P/ FLANGE PN-10 DN 100UN22,6100000484ARRUELA BORRACHA P/ FLANGE PN-10 DN 150UN31,3300000483ARRUELA BORRACHA P/ FLANGE PN-10 DN 200UN38,7300000487ARRUELA BORRACHA P/ FLANGE PN-10 DN 250UN76,0800000488ARRUELA BORRACHA P/ FLANGE PN-10 DN 300UN137,2400000482ARRUELA BORRACHA P/ FLANGE PN-10 DN 350UN168,0400000481ARRUELA BORRACHA P/ FLANGE PN-10 DN 400UN181,0900000490ARRUELA BORRACHA P/ FLANGE PN-10 DN 500UN185,9600000496ARRUELA BORRACHA P/ FLANGE PN-10 DN 600UN386,8300000491ARRUELA BORRACHA P/ FLANGE PN-10 DN 700UN712,1400000492ARRUELA BORRACHA P/ FLANGE PN-10 DN 800UN854,5500000493ARRUELA BORRACHA P/ FLANGE PN-10 DN 900UN931,3500000494ARRUELA BORRACHA P/ FLANGE PN-10 DN 1000UN1.095,4800000495ARRUELA BORRACHA P/ FLANGE PN-10 DN 1200UN1.216,8400011267ARRUELA DE LATAO FURO D=34 MM ESP=2,5 MM DIAM FURO=17 MMUN0,7800004359ARRUELA PLASTICA 4 X 16UN0,1200000379ARRUELA QUADRADA ACO GALV D = 38MM ESP= 3MM DFURO= 18 MMUN0,8900013348ARRUELA REDONDA FG DIAM EXT= 35MM ESP= 3MM DIAM FURO= 18MMUN0,1000000359ARVORE REGIONAL MAIOR QUE 2MUN46,2000004757ASFALTADOR/PROFISSIONAL QUALIFICADOH5,6300010540ASFALTO DILUIDO A GRANEL CR-250 P/ PAVIMENTACAO ASFALTICAKG1,6200000500ASFALTO DILUIDO CM 70 P/ PAVIMENTACAO ASFALTICAKG1,8200000626ASFALTO ELASTOMERICO TP DENVERPREN OU SIMILARKG7,2600000517ASFALTO EMULSIONADO TP VITBASE (ALFALTOS VITORIA), TP II (TORO) OU EQUIVL2,8600000509ASFALTO OXIDADO P/ IMPERM C/ COEFICIENTE DE PENETRACAO 15-25KG3,4100000516ASFALTO OXIDADO P/ IMPERM C/ COEFICIENTE DE PENETRACAO 20-35KG2,3700000510ASFALTO OXIDADO P/ IMPERM C/ COEFICIENTE DE PENETRACAO 25-40KG2,5400000513ASFALTO OXIDADO P/ IMPERM C/ COEFICIENTE DE PENETRACAO 40-55KG2,3300002699ASSENTADOR DE TUBOSH7,0100020278ASSENTAMENTO DE CARPETE - SOMENTE MAO DE OBRAM22,2700020277ASSENTAMENTO DE FORMICA - SOMENTE MAO DE OBRAM26,8100000518ASSENTAMENTO DE PISO VINILICO EM PLACAS - SOMENTE MAO DE OBRAM23,1800000522ASSENTAMENTO DE RODAPE VINILICO - SOMENTE MAO DE OBRAM0,3200011761ASSENTO P/ VASO SANITARIO INFANTIL DE PLASTICOUN13,8400012332AUTOMATICO DE BOIA INFERIOR 10A/250VCJ25,1300007588AUTOMATICO DE BOIA SUPERIOR 10A/250VUN22,7700006121AUXILIARH4,2100000531AUXILIAR DE CALCULO TOPOGRAFICOH7,7700002359AUXILIAR DE DESENHISTAH2,9800000247AUXILIAR DE ELETRICISTAH4,2100000246AUXILIAR DE ENCANADOR OU BOMBEIRO HIDRAULICOH4,2100000532AUXILIAR DE ENGENHARIAH15,5900002350AUXILIAR DE ESCRITORIOH6,1700000245AUXILIAR DE LABORATORIOH4,2100000251AUXILIAR DE MECANICOH4,2100000252AUXILIAR DE SERRALHEIROH4,2100000244AUXILIAR DE TOPOGRAFIAH8,2600000528AUXILIAR TECNICOH8,4700004760AZULEJISTA OU LADRILHISTAH5,4700000533AZULEJO BRANCO BRILHANTE 15 X 15CM COMERCIAL OU 2A QUALIDADEM214,1700000536AZULEJO BRANCO BRILHANTE 15 X 15CM EXTRA OU 1A QUALIDADEM217,0000000534AZULEJO COR BRILHANTE 15 X 15CM COMERCIAL OU 2A QUALIDADEM214,1700000535AZULEJO COR BRILHANTE 15 X 15CM EXTRAM217,0000011784BACIA TURCA BRANCA 51 X 71CMUN56,9800011785BACIA TURCA C/SIFAO 60 X 48 X 37CMUN63,7900011788BACIA TURCA CELITE 003. 006 - SIFAO INTEGRADOUN59,9200020259BAGUETE DE BORRACHA P/ JANELA 1,5 X 1,0CMM0,7500010971BAINHA ACO GALV D = 100MMM101,3200010972BAINHA ACO GALV D = 30MMM31,7900010973BAINHA ACO GALV D = 40MMM39,5700010974BAINHA ACO GALV D = 45MMM43,5700010975BAINHA ACO GALV D = 50MMM56,6100010976BAINHA ACO GALV D = 55MMM53,6700010977BAINHA ACO GALV D = 65MMM62,9600010978BAINHA ACO GALV D = 85MMM80,7200010979BAINHA ACO GALV D = 95MMM92,9800010980BAINHA METALICA PRETA D = 100MMM66,0400010981BAINHA METALICA PRETA D = 30MMM20,5600010982BAINHA METALICA PRETA D = 40MMM26,4700010983BAINHA METALICA PRETA D = 45MMM28,4900010984BAINHA METALICA PRETA D = 50MMM33,8100010985BAINHA METALICA PRETA D = 55MMM35,9400010986BAINHA METALICA PRETA D = 65MMM42,6900010987BAINHA METALICA PRETA D = 75MMM48,4200010988BAINHA METALICA PRETA D = 85MMM53,1900010989BAINHA METALICA PRETA D = 95MMM62,2200000010BALDE PLASTICO CAP 10LUN2,7300000009BALDE PLASTICO CAP 4LUN1,6400004815BALDE VERMELHO P/ SINALIZACAOUN2,1800011687BANCA ACO INOX L=60 CMM170,6200011689BANCA ACO INOX L=70 CMM210,0400000537BANCA C/ CUBA - MARMORITE/GRANILITE OU GRANITINA - 120 X 60CM P/ PIA COZINHAUN45,2200000539BANCA C/ CUBA - MARMORITE/GRANILITE OU GRANITINA - 150 X 60CM P/ PIA COZINHAUN59,4900000540BANCA C/ CUBA - MARMORITE/GRANILITE OU GRANITINA - 200 X 60CM P/ PIA COZINHAUN78,3600011693BANCA GRANILITE P/ PIA OU LAVATORIO (SEM CUBA)M2135,5500011791BANCA GRANITO PRETO 100 X 60CM, E = 2CM, C/1 ABERTURAUN197,5500011792BANCA GRANITO PRETO 200 X 60CM, E = 3CM, C/2 ABERTURASUN430,0000011793BANCA GRANITO PRETO 200 X 60CM, ESP = 2CM, SEM ABERTURAUN290,0000000545BANCA MARMORE BRANCO NACIONAL E = 3CM, POLIDO C/ FURO PARA CUBAM2168,8800000544BANCA MARMORE BRANCO NACIONAL E = 3CM, POLIDO 120 X 60CMUN127,6700000541BANCA MARMORE SINTETICO 120 X 60CM C/ CUBAUN39,6900000542BANCA MARMORE SINTETICO 150 X 50CM C/ CUBAUN53,1200014618BANCADA DE SERRA CIRCULAR C/ MOTOR ELETRICO *5HP* PICAPAU MECAN COM COIFA PROTETORA P/ DISCOUN1.048,58DE 10"00010790BANCADA P/ DISCO SERRA C/ MOTOR ELETRICO TRIFASICO 3 A 5HP C/ CHAVE E COIFA PROT. P/ CARPINTARIAH0,2800003425BANDEIRA P/ PORTA/ JAN MAD REGIONAL 1A P/ VIDROM252,2600003426BANDEIRA P/ PORTA/ JAN MAD REGIONAL 2A P/ VIDROM234,0800003427BANDEIRA P/ PORTA/ JAN MAD REGIONAL 3A P/ VIDROM222,7200020238BANHEIRA EM POLIESTER C/ FIBRA VIDRO 140L 170 X 79,5 X 38CM S/ HIDROMUN1.004,0200000556BARRA FERRO RETANGULAR CHATA QUALQUER BITOLA X E = 1/2"KG3,9400000554BARRA FERRO RETANGULAR CHATA QUALQUER BITOLA X E = 1/4"KG3,7600000546BARRA FERRO RETANGULAR CHATA QUALQUER BITOLA X E = 1/8"KG4,0700000550BARRA FERRO RETANGULAR CHATA QUALQUER BITOLA X E = 3/16"KG3,8100000561BARRA FERRO RETANGULAR CHATA QUALQUER BITOLA X E = 3/8"KG3,8900000555BARRA FERRO RETANGULAR CHATA 1 X 1/4" - (1,2265KG/M)M4,7600000565BARRA FERRO RETANGULAR CHATA 1 X 3/16" - (1,73 KG/M)M6,5100000557BARRA FERRO RETANGULAR CHATA 1 1/2 X 1/2" - (3,79 KG/M)M14,4300000552BARRA FERRO RETANGULAR CHATA 1 1/2 X 1/4" - (1,89 KG/M)M7,2000000566BARRA FERRO RETANGULAR CHATA 1/8 X 3/4" - (0,47 KG/M)M2,0000000549BARRA FERRO RETANGULAR CHATA 2 X 1/2" - (5,06 KG/M)M18,8200000558BARRA FERRO RETANGULAR CHATA 2 X 1/4" - (2,53KG/M)KG3,8100000551BARRA FERRO RETANGULAR CHATA 2 X 1" - (10,12 KG/M)M38,9700000547BARRA FERRO RETANGULAR CHATA 2 X 3/8" - (3,79 KG/M)M13,9300000560BARRA FERRO RETANGULAR CHATA 2 X 5/16" - (3,162KG/M)M11,9000000559BARRA FERRO RETANGULAR CHATA 2 X1/4" - (2,53KG/M)M9,6300000564BARRA FERRO RETANGULAR CHATA 3/4 X 1/8" - (0,47 KG/M)M1,9100000563BARRA FERRO RETANGULAR CHATA 3/8 X 1 1/2" - (2,84KG/M)M10,6900006081BARRO (POSTO OBRA)M322,0000006077BARRO PARA ATERRO (RETIRADO NA BARREIRA - SEM TRANSPORTE)M38,3300000581BASCULANTE ALUMINIO 80 X 60CM - SERIE 25M2279,6600011190BASCULANTE CHAPA DOBRADA ACO C/ ADICAO DE COBRE PRE-ZINCADO 4B (2/3 MOVEIS) 60 X 60CMUN94,7500011183BASCULANTE CHAPA DOBRADA ACO C/ ADICAO DE COBRE PRE-ZINCADO 4B CAIXILHO FIXO 100 X 100CMUN150,3800011184BASCULANTE CHAPA DOBRADA ACO C/ ADICAO DE COBRE PRE-ZINCADO 4B CAIXILHO FIXO 150 X 120CMUN317,7200000615BASCULANTE CHAPA DOBRADA ACO C/ ADICAO DE COBRE PRE-ZINCADO 60 X 80CMM2202,5900011231BASCULANTE EM CANTONEIRA DE FERRO 3/4" X 1/8" - 80 X 80CMM2106,2200000617BASCULANTE EM CANTONEIRA DE FERRO 5/8" X 1/8" - LINHA POPULAR - 60 X 100CMUN68,0000000616BASCULANTE EM CANTONEIRA DE FERRO 5/8" X 1/8" - LINHA POPULAR - 60 X 80CMUN56,1700000603BASCULANTE EM CANTONEIRA DE FERRO 5/8" X 1/8" - LINHA POPULAR - 60 X 80CMM2141,4400011192BASCULANTE EM CANTONEIRA DE FERRO 5/8" X 1/8" - 4 BANDEIRAS (2 FIXAS, 2 MOVEIS) - 80 X 80CMUN68,6800003437BASCULANTE MAD REGIONAL 3AM256,2400000625BASE CIMENTO CRISTALIZANTE TIPO DENVERLIT OU SIMILARKG2,4100013373BASE P/ FUSIVEIS NH TAMANHO 00, DE 6 A 160A, TIPO 3 NH 3 030-Z DA SIEMENS OU EQUIVUN11,2400013374BASE P/ FUSIVEIS NH TAMANHO 01, DE 40 A 250A, TIPO 3 NH 3 230-Z DA SIEMENS OU EQUIVUN31,9700010956BASE P/ MASTRO DE PARA-RAIOS - 2"UN41,0700000641BATE ESTACA-MARTELO ATE 3,0T DIESEL 160 HP TORRE 15 M MAGAN IM 1520 BSH52,4000000646BETONEIRA 320L DIESEL 5,5HP C/ CARREGADOR MECANICOH2,2100000643BETONEIRA 320L DIESEL 5,5HP S/ CARREGADOR MECANICOH1,7700010537BETONEIRA 320L DIESEL 5,5HP S/ CARREGADOR MECANICOUN10.607,4700010534BETONEIRA 320L ELETRICA TRIFASICA 3HP C/ CARREGADOUN2.660,6300010531BETONEIRA 320L ELETRICA TRIFASICA 3HP C/ CARREGADOR MECANICOH0,9800010532BETONEIRA 320L ELETRICA TRIFASICA 3HP S/ CARREGADOR MECANICOH0,5400010535BETONEIRA 320L ELETRICA TRIFASICA 3HP S/ CARREGADOR MECANICOUN2784.5Apr-0900013891BETONEIRA 320L GASOLINA S/ CARREGADOR MECANICOUN3.372,4900025975BETONEIRA 580L , A GASOLINA, 10 KW, CONSUMO 3L/H, ROTATIVA, COM CARREGADOR DE MATERIAL E MEDIDORUN14.641,50DE AGUA00000644BETONEIRA 580L DIESEL 7,5HP C/ CARREGADOR MECANICOH3,2900010539BETONEIRA 580L DIESEL 7,5HP C/ CARREGADOR MECANICOUN20.444,9300014628BETONEIRA 580L DIESEL 7,5HP S/ CARREGADOR MECANICOUN13.138,9000010533BETONEIRA 580L ELETRICA TRIFASICA 7,5HP C/ CARREGADOR MECANICOH1,5800010536BETONEIRA 580L ELETRICA TRIFASICA 7,5HP S/ CARREGADOR MECANICOUN9.877,8200011797BIDE LOUCA BRANCA C/ 3 FUROS - LINHA PADRAO MEDIOUN44,4100020265BIDE LOUCA COR C/ 3 FUROSUN41,0600000647BLASTER, DINAMITADOR OU CABO DE FOGOH6,7400025070BLOCO CONCRETO ESTRUTURAL FCK 4,5MPA 14X19X39CM NBR 6136 PAREDE=>25MMUN1,4800025067BLOCO CONCRETO ESTRUTURAL FCK 4,5MPA 19X19X39CM NBR 6136 PAREDE TRANS-VERSAL =>25MM EUN1,98LONGITUDINAL =>32MM00025071BLOCO CONCRETO ESTRUTURAL FCK 4,5MPA 9X19X39CMUN1,0400010610BLOCO ESTRUTURAL CERAMICO - 14 X 19 X 29 CMUN0,5400000709BLOCO POLIETILENO ALTA DENSIDADE 27 X 30 X 100 CM MODELO MAXBLOCO LEOTECH, ACOMPANHADOSUN348,29PLACAS TERMINAIS E LONGARINAS00000708BLOCO SEXTAVADO COMUM CONCRETO (TIPO BLOKRET) E = 5,0CM 19 X 19CMM212,2900000691BLOCO SEXTAVADO COMUM CONCRETO (TIPO BLOKRET) E = 6,5CM 30 X 30CMM215,5900000713BLOCO SEXTAVADO COMUM CONCRETO (TIPO BLOKRET) E = 8,0CM 30 X 30CMM216,4300011117BLOCO SEXTAVADO COMUM CONCRETO (TIPO BLOKRET) E = 8,0CM 30 X 30CMUN1,4400011118BLOCO SEXTAVADO COMUM CONCRETO (TIPO BLOKRET) E = 9,0CM 30 X 30CMUN1,6500013852BLOCO SEXTAVADO COMUM CONCRETO (TIPO BLOKRET) E= 10,0CMM218,1300011119BLOCO SEXTAVADO COMUM CONCRETO 30 X 30 X 8CMM213,2500000677BLOCO SEXTAVADO CONCRETO 20 X 20 X 10CMM221,3000000710BLOCO SEXTAVADO CONCRETO 20 X 20 X 6CMM215,0300000676BLOCO SEXTAVADO CONCRETO 20 X 20 X 8CMM219,7100000679BLOCO SEXTAVADO CONCRETO 25 X 25 X 10CMM225,1500000711BLOCO SEXTAVADO CONCRETO 25 X 25 X 6CMM215,1900000712BLOCO SEXTAVADO CONCRETO 25 X 25 X 8CMM218,0200000678BLOCO SEXTAVADO CONCRETO 30 X 30 X 10CMM219,8800000714BLOCO SEXTAVADO CONCRETO 30 X 30 X 8CMM216,5700000695BLOCO TIPO RAQUET DE CONCRETO E=6CM PISO 10 FACES COD 1035 NM215,8500000674BLOCO VEDACAO CONCRETO CELULAR 10 X 30 X 60CMM224,6000000652BLOCO VEDACAO CONCRETO CELULAR 20 X 30 X 60CMM249,2300011979BLOCO VEDACAO CONCRETO POROSO 20 X 20 X 20CMUN0,8500000650BLOCO VEDACAO CONCRETO 10 X 20 X 40CMUN0,8900000651BLOCO VEDACAO CONCRETO 15 X 20 X 40CMUN1,2300000654BLOCO VEDACAO CONCRETO 20 X 20 X 40CMUN1,5300000715BLOCO VIDRO INCOLOR CANELADO 19 X 19 X 8CMUN11,2400011981BLOCO VIDRO INCOLOR VENEZIANA 20 X 10 X 8CMUN6,6800000716BLOCO VIDRO INCOLOR XADREZ 20 X 20 X 10CMUN12,1800012614BOCAL PVC MR AQUAPLUV BEIRAL D =125X88 MMUN27,2000012294BOCAL/SOQUETE/RECEPTACULO CONTRA INTEMPERIES C/ RABICHOUN1,6300012295BOCAL/SOQUETE/RECEPTACULO DE BAQUELITEUN1,8900012296BOCAL/SOQUETE/RECEPTACULO DE PORCELANAUN1,4500006140BOLSA DE LIGACAO EM PVC FLEXIVEL P/ VASO SANITARIO 1.1/2" (40MM)UN1.98Sep-0800010575BOMBA AUTO-ASPIRANTE C/ MOTOR ELETRICO MONOFASICO 1/4 CV BOCAIS 3/4" X 3/4" SCHNEIDER MOD. ASP-56UN362,90**CAIXA**"00014013BOMBA C/MOTOR NACIONAL P/SONDAGEMUN21.467,2400000733BOMBA CENTRIFUGA C/ MOTOR ELETRICO MONOFASICO MOD. BC 91S 3/4 CV - AMT= 11 MCA, Q= 7,3 M/H- AMT= 23UN356,42MCA, Q= 3,4 M, SCHEIDER**CAIXA**. PARA UTILIZACAO EM AGUAS LIMPAS, APLIC. AGRICULTURA, INDUSTRIA ERESI00000731BOMBA CENTRIFUGA C/ MOTOR ELETRICO MONOFASICO 1/2CV BOCAIS 1" X 3/4" DANCOR SERIE CAMW4 MOD.UN276,50114 **CAIXA**"00000729BOMBA CENTRIFUGA C/ MOTOR ELETRICO MONOFASICO 1/3HP BOCAIS 1" X 3/4" DANCOR SERIE CAMW4 MOD.UN249,02103 **CAIXA**"00000738BOMBA CENTRIFUGA C/ MOTOR ELETRICO TRIFASICO 5CV BOCAIS 2" X 1.1/2" X 1" DANCOR SERIE CAM MOD.UN1.328,48618 - TJM HM/ Q = 40M / 25M3/H A 47M / 16M3/H**CAIXA**"00000734BOMBA CENTRIFUGA C/ MOTOR ELETRICO TRIFASICO 1 1/2CV BOCAIS 1 1/4" X 1" SCHNEIDER MOD.BC92UN531,39**CAIXA**"00000732BOMBA CENTRIFUGA C/ MOTOR ELETRICO TRIFASICO 1CV BOCAIS 1" X 1 " DANCOR SERIE CAM MOD. 250, HM /Q =UN382,7314M / 7,1M3 /H A 34M / 5M3 / H**CAIXA**"00000737BOMBA CENTRIFUGA C/ MOTOR ELETRICO TRIFASICO 15CV BOCAIS 2 1/2" " X 2" DANCOR SERIE CAM MOD. 687 -UN2.268,14TJM HM/Q = 54M / 47M3 / H A 70M / 25M3 / H**CAIXA**"00000736BOMBA CENTRIFUGA C/ MOTOR ELETRICO TRIFASICO 3CV BOCAIS 1 1/2" X 1 1/4" DANCOR SERIE CAM MOD.510UN631,10**CAIXA**"00014161BOMBA CENTRIFUGA C/ MOTOR ELETRICO 3/4CV SCHNEIDER BC-91 **CAIXA**UN378,0200000740BOMBA CENTRIFUGA DE ESTAGIOS C/ MOTOR ELETRICO TRIFASICO 10CV B OCAIS 1 1/2" X 1" SCHNEIDER MOD.UN1.980,37ME-BR 24100 **CAIXA**"00000735BOMBA CENTRIFUGA DE ESTAGIOS C/ MOTOR ELETRICO TRIFASICO 2CV BOCAIS 1" X 3/4" SCHNEIDER MOD. MEUN849,80BR-1420,HM/ Q = 30M / 7,2M3 / H A 70M / 1,9M3 / H**CAIXA**"00025932BOMBA HIDRAULICA ALTA PRESSO (UNIDADE MOTRIZ), VAZO DE 3,0L/MIN, ATINGINDO PRESSESDIA188,00MANOMTRICAS DE AT 100KGF/CM2 - LOCAO00000745BOMBA PARA TESTE HIDROSTATICO ATE 850 LIBRASH1,1200010753BOMBA PRESSURIZADORA ELETRICA ATE 2HP, 1 1/2"H0,4100000755BOMBA SUBMERSA DA MARCA LEAO S65-7, 27HP, ELETR. TRIFASICA, 220/380VUN7.873,0000000756BOMBA SUBMERSA DA MARCA LEAO S65-9, 32HP, ELETR. TRIFASICA 220/