CMC, 25 Jan. 07 Page 1
JAXA CCSDS Status
January 25, 2007
CMC
Colorado Springs, USA
Yoshitaka Taromaru
JAXA CCSDS Secretary Office( [email protected] )
CMC, 25 Jan. 07 Page 2
JAXA CCSDS Principal Delegate and Staff membersPrincipal Delegate Junjiro Nakahara
Area WG/BOF Staff
SE Area Space/Ground Interoperability Architecture BOF 1 staff Takahiro Yamada
Delta-DOR SIG 1 staff Hiroshi Takeuchi
MOIMS Area Navigation WG 3 staff Mina Ogawa
Spacecraft Monitor & Control WG Yamada Takahiro
Makoto Kawai
CSS Area Service Management WG 1 staff Nobuhiro Yagi
Cross Support Transfer Services WG
SOIS Area Subnetwork Services WG 1 staff Hiroshi Anegawa
Application Support Service WG
Onboard Plug & Play BOF
SLS Area RF Modulation WG 2 staff Masanobu Yajima
Space Link Protocols WG Takahiro Yamada
High Rate Uplink WG
SIS Area CFDP Interoperability Testing WG 2 staff Yoshitaka Taromaru
Asynchronous Message Service WG Takahiro Yamada
JAXA CCSDS Secretary Office 3 staff Kaneaki Narita
Yoshitaka Taromaru
Kiyohisa Suzuki
CMC, 25 Jan. 07 Page 3
CCSDS Implementation Status
Spacecraft JAXA adopted AOS (including TM) and/or TC for 10 spacecrafts
was launched and 5 spacecrafts will be launched in the near future.
Other Japanese organization adopted AOS and/or TC for 4 spacecrafts was launched.
Mission / Time
Telecommunication, ţ Ű Ű ţ Ţ
Positioning, Engeneering expt. ETS-VII USERS SERVIS1 ETS-VIII WINDS
Earth Observation ţ ţ ALOS ŢADEOS-II GOSAT
Lunar and Planetary ţ ţ Ţ
Exploration PLANET-B MUSES-C SELENE
Astronomical Observation ţ ASTRO-EII ţ ţ ţASTRO-E ASTRO-F SOLAR-B
Meteorological Å° Å°MTSAT-1R MTSAT-2
ISS Program Ţ Ţ ŢJ EM HTV
ţ:JAXA's satellite was launchedŢ:JAXA's satellite will be launched
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008
CMC, 25 Jan. 07 Page 4
CCSDS Implementation Status
Overview of SELENE
SELENE will be launched by H-IIA rocket in FY 2007.
The SELenological and ENgineering Explorer "SELENE", Japan’s first large lunar explorer, will be launched by the H-IIA rocket in 2007.
The major objectives of the mission are to understand the Moon’s origin and evolution, and to observe the moon in various ways in order to utilize it in the future.
Main orbiter↑ ←VRAD sat. (Vstar)
←Relay sat. (Rstar)
CMC, 25 Jan. 07 Page 5
CCSDS Implementation Status
Overview of JEM
JEM will be launched by Space Shuttle in FY 2007.
The Japanese Experiment Module (JEM) "KIBO," the first Japanese manned experimental facility, will be docked to the ISS in 2007.
KIBO consists of two facilities. The Pressurized Module which is 11.2 metres long and 4.4 metres in diameter, will allow astronauts to work in a comfortable environment with air composition and pressure similar to Earth’s. The Exposed Facility will be a staging area for long-term experiments in open space, as well as Earth and astronomical observations. The Exposed Facility is a unique facility in that it enables astronauts to conduct experiments with direct exposure to space without any modification.
CMC, 25 Jan. 07 Page 6
CCSDS Implementation Status
Overview of WINDS
WINDS will be launched by H-IIA rocket in FY 2007.
WINDS will be launched by an H-IIA Launch Vehicle in the fiscal year 2007 to establish the world's most advanced information and telecommunications network.
The WINDS project is responsible for the demonstration of the validity and usefulness of technologies related to large-capacity data communications in our space infrastructure project, "i-Space," the purpose of which is to promote the use of satellites in such fields as Internet communications, education, medicine, disaster measures and Intelligent Transport Systems.
CMC, 25 Jan. 07 Page 7
CCSDS Implementation Status
Overview of GOSAT
GOSAT will be launched by H-IIA rocket in FY 2008.
GOSAT is a satellite that aims to contribute to the Kyoto Protocol by monitoring the distribution of the density of carbon dioxide, which is one Greenhouse gas. GOSAT is scheduled to be launched in 2008 August.
GOSAT will enable the precise monitoring of the density of carbon dioxide by combining global observation data sent from space with data obtained on land, and with simulation models.
CMC, 25 Jan. 07 Page 8
CCSDS Implementation Status
Space Link Service (SLS)[Implementation] JAXA ground network provides the Telecommand and AOS co
mpatible capability (5 domestic stations and 4 overseas stations)
Katsuura, Masuda, Okinawa, Usuda and Uchinoura (Domestic)Kiruna, Perth, Maspalomas and Santiago (Overseas)
Two refurbished antennas at Katsuura and Okinawa will be added to the network in FY2007.
[Under studying]
As coding method, Turbo Code Decoder compliant with CCSDS standard is under studying for deep space mission.
CMC, 25 Jan. 07 Page 9
Katsuura [KTU1, S-band, 10m] [KTU2, S-band, 13m]
Masuda [MSD1, S-band, 10m]
Okinawa [OKN1, S-band, 10m][OKN2, S-band, 18m]
Usuda [UDSC, S/X-band, 64m]
Uchinoura [USC, S/X-band, 34m/20m/10m]
Tsukuba Space Center [TKSC] Tracking And Control Center [TACC]
Maspalomas [MSP1, S-band, 10m]
Santiago [SNT1, S-band, 10m]
Kiruna [KRN1, S-band, 10m]
Perth [PRT1, S-band, 10m]
Data Relay Test Satellite [DRTS, S/Ka-band, 90.75degE]
Sagamihara Space Operation Center [SSOC]
JAXA Network location
CCSDS Implementation Status
CMC, 25 Jan. 07 Page 10
CCSDS Implementation Status
SLE Transfer Service
JAXA implemented SLE GW at TACC (Tracking And Control Center at Tsukuba) and SSOC (Sagamihara Space Operation Center) , and these GWs are supporting LEOP and routine operations of ASTRO-F and SOLAR-B.
SLE GW at SSOC is also enabling MUSES-C and SELENE mission to utilize JPL/DSN.
JAXA started coordination with ESA on SLE connection for future emergency cross support architecture.
CMC, 25 Jan. 07 Page 11
CCSDS Implementation Status
@ Tsukuba@ Tsukuba @ Sagamihara@ Sagamihara
Usuda DeepSpace Center
UchinouraSpace Center
GN SN DSN
JPLJPL
SLE(RAF / FCLTU)
MUSES-C, SELENE
SLE(RAF / FCLTU)
ALOS, ETS-VIII, WINDS, GOSAT,MUSES-C,
ASTRO-E2, ASTRO-F, SOLAR-B, SELENE,
INDEX, etc.
ESAESA
SLE GWSLE GWSLE GW
Tracking and Control Center
(TACC)
Sagamihara Space Operation Center
(SSOC)
JAXA CCSDS S/C
Under coordinationSLE
JAXA Internal SLE connection
ESTRACK
CNESCNES
CMC, 25 Jan. 07 Page 12
CCSDS Implementation Status
SLE Service Management
Based upon IOAG-10 discussion, JAXA started development of Service Management prototype system for interoperability test.
2007 2008
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 ~
SM Red-1 compliant prototype
SM Red-2 compliant prototype Development
Interoperability TestDevelopment
CMC, 25 Jan. 07 Page 13
CCSDS Implementation Status
MOIMS/Navigation
For SELENE mission, JAXA is implementing ODM module on Flight Dynamics System.
JAXA/ISAS VLBI staff joined Delta-DOR SIG for white book development with ESA and NASA to contribute toward standardization of Delta-DOR method and related data transfer service.