Page 1: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Current Situation of

Solid Waste Management

in Yangon City

Presented by

Mr. Saw Win Maung

Deputy Head of Department

Environmental Management Authority

Yangon City Development Committee

ヤンゴン市における廃棄物の現状

ヤンゴン市環境管理局

副局長 Mr. Saw Win Maung

Page 2: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Area - 292.426 Square Miles.

Population - 5.6 million (2014)

Township - 33 Townships

Generation Rate - 0.41 Kg / Capita / Day

Household Waste Generated - 2500 tons per day

Industrial Waste Generated - 250 tons per day

Health Care Waste Generated - 87.9 tons per day

Profile of Yangon City

2

ヤンゴン市のプロフィール

面積

町区

人口

ゴミの排出量

家庭ごみの排出量

事業ごみの排出量

医療系ごみの排出量

Page 3: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Organizational Chart of YCDC

Mayor

Secretary

2 persons of

Committee Members

7 Authorities + 3 Departments

( Including Environmental Management Authority)

Joint-Secretary

3

3

ヤンゴン市の組織図

市長

副市長

Page 4: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

4

Waste Flow in Yangon (2018)

Generation

East District

South District

North District

West District

Collection and Transportation

Direct Haul Disposal

-Bell-Ringing Collection

-(3)Weels Cycle

-Hopper Truck

-Door to Door

-Compactor Truck

Transfer Point

25 m3 Containers FDS

Htawei Chaung

Collection Point

Dust Bins,

Brick Tanks

FDS

Htain Pin

Healthcare Waste

Hazardous Waste Direct Haul and Special Treatment, On Call

Cemetery

Designated Box Type Container

Vehicle

4

ヤンゴン市の廃棄物フロー

南地区

処分収集・運搬

ゴミ

中継地

西地区

北地区

東地区

危険物

医療系ゴミ

Page 5: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Waste

Industry

Construction

Hazardous

Healthcare

Commercial

Garden

Offensive

Normal

Household waste

Organic Waste

Waste Define in Yangon

5

Inorganic Waste

死骸等

ゴミ

ゴミの分類

医療系

建設

危険物

産業

普通

樹木

商業

無機性

有機ゴミ

家庭ごみ

Page 6: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2
Page 7: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Critical Urban Environment Issues

7

Urban Infrastructure Development

and Management

Social Service

Water Supply/

Sewerage and Drainage

Solid Waste Management

Landscapeand

Management

Public Parks andGreenery Area

喫緊の都市環境課題

Page 8: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

0

0.05

0.1

0.15

0.2

0.25

0.3

0.35

0.4

0.45

0.5

0.395

0.3120.287

0.267

0.3960.41 0.45

0.5

Year

Kg/capita/day

Waste Generation Amount of Yangon City

7-Jan-19 8

ヤンゴン市からでるゴミの量

Page 9: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

6.087.4

910.95

12.45

16.09

0.62 0.72 0.82 0.92 1.02 1.22

2020 2025 2030 2035 2040 2050

Population Rate(%) Waste Generated Amount/Person(kg/capita/day)

37695325

7379

10072

12696

19630

2020 2025 2030 2035 2040 2050

Waste Generation Amount (Ton)

Estimation of Waste Generation Amount from 2020 to 20502020年から2050年のゴミ

排出量予想

Page 10: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Location Map of Final Disposal Sites処分場の場所

Page 11: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

11

Current Situation of Final Disposal Sites

NoName of

FDS

Constructed

Year

Site ( Plant)

Area

Remaining

Area

Dispose Ton

Per Day

( Current

EST)

Remark

1 Htain Bin 2002290- Acre

Used- 220 Ac70 - Acre 1111.12

Open

Dumping

2Htwei

Chaung2001

141- Acre

Used- 110 Ac31 945.61

Open

Dumping

3 Dala 20031.3- Acre

Used- 1.0 Ac0.3 - Acre 33.36

Low Landfill

Temporary

Site

4Seikkyi

Khaungto2003

0.25- Acre

Used- 0.1Ac0.15- Acre 7.11

Low Landfill

Temporary

Site

Daily Waste Generated Amount = 2500 Ton/Day(Approx.)最終処分場の状況

Page 12: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Operation and Management of Final Disposal Sites最終処分場の管理運営の状況

Page 13: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Yangon Waste to Energy Plant Project

CHASSON INTERNATIONAL CO.,LTD 13

Cooperated

OrganizationsYCDC-PCCD,

JFE Engineering Corporation

Location Taw KyaungKalay cemetery,

ShwePyiThar township

Construction Period 2015-2017

Investments 16 Millions as of the JCM

Scheme (8 Millions from YCDC

and 8 Millions from Japan

Government)

Incineration

Capacity

60 ton/day

Power Generation

Capacity

700 KW

self-sustain about 400KW and

300KW for sale)

Operation Started 7th April 2017

✓Implemented by the Leap Frog Program JCM Scheme supported by Japan

Government.

ヤンゴン市焼却処分プラントプロジェクト

日本政府支援 ヤンゴン市PCCDとJFEの協働事業

ヤンゴン市シェピター地区

投資内容

建設期間

JCM総額$16mil (ヤンゴン市より$800万ドル、日本より800万ドル)

60トン/日焼却能力

自己運転に400、売電300

運営開始

発電能力

Page 14: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Crematorium

A Pilot landfill site2.4Acre(1ha)

Proposed Sanitary landfill Site

Model landfill site(27m×27m)

Proposed Sanitary Landfill Project collaborating between YCDC-PCCD and

Fukuoka City, Japan

Cooperated

OrganizationsYCDC-PCCD,

Fukuoka City, Japan

Location

Htein Bin FDS,

Hlaing Tharyar

township

Project Period 2018-2020

Project Cost

Expenditure

Procured by YCDC

(Fukuoka City will

only provide technical

cooperation)

TechnologySanitary Landfill using

Fukuoka Method

Total Land

Used Area2.4 Acres (1 Ha)

福岡市との協力による処分場パイロットプロジェクト

面積

ヤンゴン市が資材費用負担、福岡非が技術協力供与

プロジェクト費用

実施期間:

場所:ヒエンビン

ヤンゴン市PCCDと福岡市

福岡方式衛生埋め立て技術

Page 15: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Implementation Fukuoka Landfill Pre Pilot Project (January 2018)福岡方式パイロットプロジェクト

Page 16: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Fire Incident in Htein Bin Final Disposal Site, one of the biggest FDSs in

Yangon City located in Northern Part of the City (April, 2018)

Started Used Date 2003

Total Land Area 150 Acres ( 60 Ha)

Daily Waste

Disposed Amount

1200 – 1500

tons/day

Fire occurred Date 21st April 2018

Burnt Area 120 Acres (48 Ha)

Completed Fire

Extinguishing 3rd May 2018

Causes to Fire

Incident

-Chemical reaction

from biological

decomposition

-heat resulting in

high temperatures

- it may cause a fire

to occur and spread

from beneath

2018年4月に処分場で発生した火災

消火完了日

面積

処分場使用開始年

火災発生日

ゴミ量 トン/日

60ヘクタール

48ヘクタール消失面積

火災の原因

微生物分解による化学反応の温度上昇によって内部から発火し拡大した可能性がある

Page 17: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Extending sound waste collection service to all citizens and eliminate uncontrolled disposal and open burning

Extending sustainable and environmentally sound management of industrial and other hazardous wastes

Substantively prevent waste through 3Rs (reduce, reuse, recycling) and there by establish a resource circular society

Ensure sustainable financing mechanisms

Awareness Raising, Advocacy and Capacity Building

Compliance, Monitoring, Enforcement and Recognition

Goal A

Goal B

Goal C

Goal D

Goal E

Goal F

Setting Goals of National Waste Management Strategy and

Master Plan

コンプライアンス、モニタリング等の徹底

3Rの普及によるゴミの削減と資源循環社会の確立

産業廃棄物や危険廃棄物の持続可能で環境に配慮した管理

適切な廃棄物回収の全域への普及とダンプサイトの閉鎖

国家廃棄物戦略とマスタープラン

注意喚起、普及啓発と人材育成

持続可能な財政の確立

Page 18: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Goals Implementation Activities Short Term (ST)

2017-2020

Mid Term (MT)

2021-2025

Long Term(LT)

2026-2030

A Active Sound Waste Collection

Service for all Citizen

70% 85% 100%

Eliminate the uncontrolled

dumping and burning in the

cities and mandate the

operation of environmentally

sound disposal facilities

Major Cities

(Yangon, Mandalay,

Nay Pyi Taw)

50% 100%

B Mandate separate collection

and sound treatment of

hazardous waste

Major Cities

(Yangon, Mandalay,

Nay Pyi Taw)

50% 100%

Mandate sound collection and

environmentally friendly

treatment of all industrial waste

Major Cities

(Yangon, Mandalay,

Nay Pyi Taw)

50% 100%

C Mandate the development of

city waste management

strategies and action plans with

actual waste reduction targets

by all CDCs and TDCs

25% 50% 80%

Mandate the introduction of

targets for diverting the food

waste from LFs

15% 35% 60%

Mandate the separate 15% 35% 60%

Page 19: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

Goals Implementation Activities Short Term (ST)

2017-2020

MidTerm (MT)

2021-2025

Long Term(LT)

2026-2030

D All City and Township Development

Committee conduct full cost

accounting for waste service

50% 75% 100%

All City and Township Development

Committee establish cost reflective

tariffs for waste management

services

50% 75% 100%

E Increase in the number of townships

that have implemented standard

awareness-raising programmes for

their residents

25% 50% 100%

Increase in the number of schools in

the townships that have established

environmental education

programmes for their students

25% 50% 100%

F City and Township Development

Committees establish benchmark

performance indicators

50% 75% 100%

Increase in the no. of successful

enforcement actions filed against

non-complaint entities by CDC and

TDCs

50% 75% 100%

Page 20: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

ROLE OF THE PLATFORM OF SDGS

Local

GovernmentsAccelerating

Innovation

Promoting Partnerships

Achieving the SDGs and Building Sustainable Communities with

economy, society and environment.

Creating of Pilot Initiatives Activities through city to city collaboration.

SDGプラットフォームの役割

イノベーションの促進地方行政

パートナーシップの推進

SDGsと持続可能なコミュニティと社会の実現、都市間連携によるパイロット事業活動の創出

Page 21: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

PROMOTES 3RS, RESOURCE EFFICIENCY TO ACHIEVE

MULTIPLE SDGS

3Rs, resource efficiency, and promoting the principles

of a circular economy can contribute to achieving the

SDGs.

Formulate on the 3Rs and resource efficiency to

achieve clean land, water and air.

Follow up with Myanmar Climate Change Alliance

(MCCA)

Low Carbon Emission Reduction

Creating Low Carbon Society

複数のSDGsを実現するための3Rの推進や資源の効率化

Page 22: Current Situation of Solid Waste Management in …...Solid Waste Management Landscape and Management Public Parks and Greenery Area 喫緊の都市環境課題 0 0.05 0.1 0.15 0.2

THANKYOU FORYOUR ATTENTION