CVCarlo Magno R. Muñiz T +971 50 4573704 E [email protected]
With over 26 years of professional and diversified
experience in the design of Mixed-Use, High-Rise, Hotel,
Office, Commercial, Residential and Recreational projects
both Design and Construction in the Middle East and Asia
I have gained a breadth of International experience and
understanding that allowed me to relate to client
perspectives and goals while still providing innovative
solutions.
In addition to my Architectural responsibilities, I am
a member of the RMJM CAD Committee as Group
Lead CAD coordinator involved in coordination, research
and implementing CAD standards in RMJM across all
disciplines.
Position in RMJMPosition in RMJMPosition in RMJMPosition in RMJM
Technical Technical Technical Technical AAAArchitectrchitectrchitectrchitect
Education & Education & Education & Education & Professional MembershipProfessional MembershipProfessional MembershipProfessional Membership
Far Eastern University - Manila, Philippines
Bachelor of Science in Architecture
Society of Engineers -Dubai (Member)
Countries of Work ExperienceCountries of Work ExperienceCountries of Work ExperienceCountries of Work Experience
UAE, Philippines
Employment RecordEmployment RecordEmployment RecordEmployment Record
RMJM RMJM RMJM RMJM INTERNATIONALINTERNATIONALINTERNATIONALINTERNATIONAL
Technical Architect (13 years) - Middle East
September 2002 – Present -Dubai, UAE
ATKINSATKINSATKINSATKINS (W.S. Atkins & Partners Overseas)(W.S. Atkins & Partners Overseas)(W.S. Atkins & Partners Overseas)(W.S. Atkins & Partners Overseas)
Architect (9 years) - Middle East
September 1993 – September 2002, Dubai, UAE
PRSP PRSP PRSP PRSP ARCHITECTSARCHITECTSARCHITECTSARCHITECTS
Architect / Lead CAD (4 years) - Asia
November 1991 – September 1993
Assistant Architect / CAD Coordinator
October 1989 – November 1991
Makati, Philippines
Duties and ResponsibilitiesDuties and ResponsibilitiesDuties and ResponsibilitiesDuties and Responsibilities
• Prepare Concept / Schematic design and drawing
design development in schematic code conformance
ensuring the Quality System Procedures (QSP) and
operational standards are maintained.
• In-charge of coordination and liaison with MEP,
Structural, Statutory Authority, Sub-consultants,
Contractors, Sub-Contractors, Suppliers and
Manufacturers ensuring construction drawings are fully
reviewed and coordinated prior to submission.
• Prepare the local authority submissions in accordance
with the relevant authority requirements and complied
with international building code standards to ensure all
submissions are monitored to obtain approvals and
every issuance of drawings or submissions are correct
and collated in order.
• Assist in site inspection, if required. Response on a
daily bases regarding site issues, closing the RFI,
coordinate with the site team, Consultant and Client to
close the site issues, coordinate with other Design and
Engineering team related to Structural, Electrical &
MEP. Review and approve Sub-contractors’ shop
drawings. Manage the team to update the drawings as
per the site condition.
• Take responsibility, where required by the project
leader, for specific areas of the design and project
development.
• Design Studio Team member involved in concept to
scheme to produce design, analysis, and presentations
using free hand sketching and other 2D/3D platform
design media.
• CAD Group Lead Coordinator- CAD management,
training and monitoring of staffs in terms of standards
and procedures
Relevant Project ExperienceRelevant Project ExperienceRelevant Project ExperienceRelevant Project Experience ---- Asia & Asia & Asia & Asia & MiddleMiddleMiddleMiddle----EastEastEastEast
High Rise / High Rise / High Rise / High Rise / MixedMixedMixedMixed----UUUUsesesese Development & Commercial Development & Commercial Development & Commercial Development & Commercial
• THE SPINE GARDENS (2B+G+2L Retail/Podium),
1 km. Project: Dubai, UAE
• METROPOL (500,000 sqm Project w/ 3 Towers -Hotel /
Office / Luxury Apartment & Retail 30,000 sqm).
Istanbul, Turkey
• STELLA MARIS TOWER (59 Storey), Dubai, UAE
• ADNEC Capital Gate, Abu Dhabi, UAE
• Dubai Tower, Doha, Qatar
• Lamar Towers, Jeddah, KSA
• DWTC Convention & Exhibition Center, Dubai, UAE*
• Dubaï Stable & Seeh Al Salam Endurance, Dubai, UAE
• Burj Al Arab Hotel, Dubai, UAE*
• Jumeirah Beach Hotel, Dubai, UAE*
• Dubai Internet City- Phase 1 & 2, Dubai, UAE*
• Citibank Headquarter Tower, Makati, Philippines*
• Renaissance Mixed-use Development,
(3 Towers+Retail) Ortigas, Philippines*
TransportationTransportationTransportationTransportation
• Abu Dhabi Metro Rail System, Abu Dhabi, UAE*
Recreational / Leisure & AmusementRecreational / Leisure & AmusementRecreational / Leisure & AmusementRecreational / Leisure & Amusement
• Wonderland Water & Amusement Theme Park,
Dubai, UAE*
• Wild Wadi Water Theme Park, Dubai, UAE*
• Zabeel Park,(Area=510,000 sqm) Dubai, UAE*
ResidentialResidentialResidentialResidential
• Emaar Plot 26 to 27 - The Greens, Dubai, UAE
• Al Rayyan Hills Development, Sana’a, Yemen
EducationEducationEducationEducation
• American School of Dubai, Dubai, UAE
• King’s Dubai Primary School, Dubai, UAE
**** Experience prior to joining RMJM
Design competitions:Design competitions:Design competitions:Design competitions:
An architect in the Concept Team participating in
various responsibilities with high profile project
competitions ranging from conceptualization, design
and presentation.
• Emirates Towers 3 (Expansion Phase feasibility) • Jumeirah Palm Island • Dubai Autodrome • Radisson Hotel Jumeirah Palm • Dubai Chamber of Commerce and Industry • Akoya Development - Masterplan • Global Village Dubai • Dubai Civil Aviation Executive Hangar
With RMJMWith RMJMWith RMJMWith RMJM ---- Middle EastMiddle EastMiddle EastMiddle East----AsiaAsiaAsiaAsia
SeptemberSeptemberSeptemberSeptember 2222002 002 002 002 ---- PresentPresentPresentPresent
High Rise/ High Rise/ High Rise/ High Rise/ MixedMixedMixedMixed----UseUseUseUse CommercialCommercialCommercialCommercial & & & & HotelHotelHotelHotel
ADNEC Capital Gate Phase 3, Abu Dhabi, UAE ADNEC Capital Gate Phase 3, Abu Dhabi, UAE ADNEC Capital Gate Phase 3, Abu Dhabi, UAE ADNEC Capital Gate Phase 3, Abu Dhabi, UAE
The Capital Gate feature tower flanks Abu Dhabi’s
historical Grandstand, one of the city’s cultural landmarks.
The feature tower acts as a dramatic termination to the
organic free-form stainless steel mesh canopy that forms
the Grandstand roof and provides a visual anchor for the
ADNEC Capital Centre Development as a whole within the
Abu Dhabi City Skyline. Phase 3- the Capital Gate feature
tower is now in construction. At 35 storeys high, it will offer
over 20,000 m2 of high quality offices and retail units as
well as Abu Dhabi’s first Hyatt hotel, ‘The Hyatt@Capital
Centre’. Standing at over 160m tall, the building has been
designed to be the landmark statement for the whole of the
ADNEC exhibition development.
Site Area: 53,000m2
Client: ADNEC
Status: Constructed
Role: Design & Production team / Architect
(Concept to Detail Design stage)
Dubai Tower, Doha, QatarDubai Tower, Doha, QatarDubai Tower, Doha, QatarDubai Tower, Doha, Qatar
The client’s aspiration for the project was for it to be a
beacon for Dubai in Doha, Qatar. The project brief was for
an extremely high end building. The tower is a combination
of hotel, serviced apartments, offices, residential
apartments and retail space.
Site Area: 90 storeys
Client: Sama Dubai
Status: Under construction
Role: Design & Production Team/ Architect
(Review & coordination all MEP package)
Capital Centre Hotel, Abu Dhabi, UAECapital Centre Hotel, Abu Dhabi, UAECapital Centre Hotel, Abu Dhabi, UAECapital Centre Hotel, Abu Dhabi, UAE
The Capital Centre Hotel provides an iconic and intelligent
architectural solution for a 725 key, 5-star business hotel
located along the waterfront at the heart of the Capital
Centre District, Abu Dhabi. The project is a G+22 storey
development comprised of 702 hotel rooms and suites and
23 serviced apartments with private terraces. Its main
features include a 20 storey central atrium and podium
level containing a health club, pool and restaurants.
Site Area:100,000m2
Client: National Corporation for Tourism and Hotels
Status: Detail Design
Role: Design & Production Team / Architect
(Concept to Schematic design package)
LLLLAMAR AMAR AMAR AMAR ToToToTowers, mixedwers, mixedwers, mixedwers, mixed----use development, Jeddah, KSA use development, Jeddah, KSA use development, Jeddah, KSA use development, Jeddah, KSA
A Twin tower development located on the shores of the
Red Sea. This mixed-use development consists of two
residential towers of 61 and 69 storeys and a ten storey
office building all located above a retail mall. The V shaped
towers afford views to all apartments over the sea towards
the setting sun.
Site Area: 415,000m2
Client: Cayan Investments
Status: Under Construction
Role: Design & Production team / Architect
(Concept to Detail Design stage)
Dubai Towers, Jeddah, KSADubai Towers, Jeddah, KSADubai Towers, Jeddah, KSADubai Towers, Jeddah, KSA
The design for Dubai Towers – Jeddah is an iconic multi-
storey elegantly proportioned skyscraper, providing over
450,000m2 of gross built-up area consisting of offices, 5-
star hotel, serviced apartments, residential apartments,
spa, ballroom, marina and a retail podium with three
underground parking levels.
Site Area: 450,000m2
Client: Sama Dubai
Status: Detail Design
Role: Design & Production team / Architect
(Concept to Schematic design package)
Hyatt RegencyHyatt RegencyHyatt RegencyHyatt Regency Creek Creek Creek Creek Hotel & Apartments, Hotel & Apartments, Hotel & Apartments, Hotel & Apartments, Dubai, UAEDubai, UAEDubai, UAEDubai, UAE
Situated near the Dubai creek, these 166.5m high towers
are intended to provide amazing views of Dubai Creek and
Sheikh Zayed Road skyline. The development will contain
world-class retail, offices, hotel, and serviced apartment
units. Three service floors are introduced at both towers to
satisfy servicing requirements.
Site Area: 201,018m2
Client: Dubai Healthcare City
Status: Constructed
Role: Design & Production team/ Architect
(Concept to Detail Design stage)
RRRResidential esidential esidential esidential
EMAAR Plot 26 & 27 EMAAR Plot 26 & 27 EMAAR Plot 26 & 27 EMAAR Plot 26 & 27 –––– The GREENThe GREENThe GREENThe GREENSSSS
RMJM were commissioned to design two residential
buildings in The Greens. And the design provides mid-rise
apartment blocks defined by delicate detail, ornamentation
and symmetrical expressions inherent in Mediterranean
architecture. The accommodation is complemented by
leisure facilities such as swimming pool, children’s wading
pool, gymnasium, resort-style pool deck, barbeque areas
and a multi-purpose entertainment room.
Client: Emaar properties, PSJC
Status: Constructed
Role: Design & Production team / Architect
(Concept to Schematic design package)
Rayyan Hills Rayyan Hills Rayyan Hills Rayyan Hills DevelopmentDevelopmentDevelopmentDevelopment----Phase 1Phase 1Phase 1Phase 1---- Sana’a, YemenSana’a, YemenSana’a, YemenSana’a, Yemen
RMJM were commissioned in 2009 to provide
Architectural, Structural and MEP Design Services for the
Al Rayyan Hills project. The Al Rayyan Hills Project is
located on the Faj Attan Hill and Phase 1 consists of 172
residential villas and one residential apartment block. The
site is located on an exclusive steep-sided plateau of
about 440000sqm located within Sana’a city limits. It is
approximately 200m higher than the surrounding areas
giving it an impressive panoramic view from all sides to
various sections of the Capital, Sana’a.
Site Area: 440,000m2
Client: Consolidated Contractors Group Sal
(Offshore) (CCC)
Status: Constructed
Role: Production team / Architect
(Concept to Schematic design package)
Education Education Education Education
American School of Dubai, UAEAmerican School of Dubai, UAEAmerican School of Dubai, UAEAmerican School of Dubai, UAE
Designed to be a model of best practices for sustainable
design in the Middle East, the new campus for the
American School of Dubai is set on a 27-acre site in the Al
Barsha district of Dubai within a kilometer of Arabian Gulf
beaches and the famous Burj Al Arab Hotel. The school
accommodates 1,600 students in a Pre-K through 12th
grade curriculum.
Site area: 50,000m2
Client: American School of Dubai
Status: Constructed
Role: Production team / Architect
(Schematic design stage)
SkillsSkillsSkillsSkills and Abilitiesand Abilitiesand Abilitiesand Abilities::::
• Adapting technical design planning according to
Local / International Building Code standards and
regulation authority requirements in resolving any
problems/ circumstances that may arise during
construction.
• Creating building designs and highly detailed
drawing both by sketch freehand and by using
2D/3D specialist computer-aided design (CAD)
applications
• Working closely with a team of other professionals
such as building service engineer, construction
managers, quantity surveyors and arch’l technician.
• Knowledgeable in AutoCAD, Revit-(Basic),
Microsoft Office and Excel
• Basic to intermediate knowledge of Sketch Up
and Adobe Photoshop
Major Major Major Major Project Project Project Project Undertaken Undertaken Undertaken Undertaken ---- Visual photosVisual photosVisual photosVisual photos
RRRR MMMM JJJJ M M M M INTERNATIONALINTERNATIONALINTERNATIONALINTERNATIONAL ---- PPPP oooo rrrr tttt ffff oooo llll i i i i oooo
September 2002 – Present -Dubai, UAE
Website: http://www.rmjm.com/
THE SPINETHE SPINETHE SPINETHE SPINE GARDENS GARDENS GARDENS GARDENS (1km(1km(1km(1km ---- Commercial RetailCommercial RetailCommercial RetailCommercial Retail / Podium/ Podium/ Podium/ Podium))))
Dubai,UAEDubai,UAEDubai,UAEDubai,UAE
MixedMixedMixedMixed----Use DevelopmentUse DevelopmentUse DevelopmentUse Development
Status: Preliminary Concept to Design Development
Role: Production team / Architect / Liaison all MEP
coordination with all Discipline (Engineers)
METROPOL (ATASEHIR) Istanbul, TurkeyMETROPOL (ATASEHIR) Istanbul, TurkeyMETROPOL (ATASEHIR) Istanbul, TurkeyMETROPOL (ATASEHIR) Istanbul, Turkey
MixedMixedMixedMixed----Use DevelopmentUse DevelopmentUse DevelopmentUse Development
Status: Under Construction
Role: Production team / Architect / Lead CAD
W HOTEL & RESIDENCEW HOTEL & RESIDENCEW HOTEL & RESIDENCEW HOTEL & RESIDENCE, , , , Dubai, UAEDubai, UAEDubai, UAEDubai, UAE
Luxury Hotel & Serviced ApartmentsLuxury Hotel & Serviced ApartmentsLuxury Hotel & Serviced ApartmentsLuxury Hotel & Serviced Apartments
Status: Under Construction
Role: Production team / Architect
STELLA MARIS TOWERSTELLA MARIS TOWERSTELLA MARIS TOWERSTELLA MARIS TOWER, Dubai, UAE, Dubai, UAE, Dubai, UAE, Dubai, UAE
Luxury ApartmentsLuxury ApartmentsLuxury ApartmentsLuxury Apartments & Retail / F&B& Retail / F&B& Retail / F&B& Retail / F&B
Status: For Construction
Role: Production team / Architect / Liaison all MEP
coordination with all Discipline (Engineers)
LOTUS COMPLEX LOTUS COMPLEX LOTUS COMPLEX LOTUS COMPLEX Mumbai, IndiaMumbai, IndiaMumbai, IndiaMumbai, India
MixedMixedMixedMixed----Use DevelopmentUse DevelopmentUse DevelopmentUse Development (Office, Hotel,Retail & Residential)(Office, Hotel,Retail & Residential)(Office, Hotel,Retail & Residential)(Office, Hotel,Retail & Residential)
Status: Constructed
DWTC DWTC DWTC DWTC CONVENTION CENTER CONVENTION CENTER CONVENTION CENTER CONVENTION CENTER –––– Dubai, UAEDubai, UAEDubai, UAEDubai, UAE
MixedMixedMixedMixed----Use DevelopmentUse DevelopmentUse DevelopmentUse Development (Office, Hotel & Exhibition Hall)(Office, Hotel & Exhibition Hall)(Office, Hotel & Exhibition Hall)(Office, Hotel & Exhibition Hall)
Status: Constructed
AAAA TTTT KKKK IIII NNNN S S S S –––– PPPP oooo rrrr tttt ffff oooo llll i i i i oooo
September 1993 – September 2002, Dubai, UAE
Website: http://www.atkinsglobal.com/en-GB/middle-east
BURJ AL ARAB 7BURJ AL ARAB 7BURJ AL ARAB 7BURJ AL ARAB 7----STAR HOTEL, Dubai, UAESTAR HOTEL, Dubai, UAESTAR HOTEL, Dubai, UAESTAR HOTEL, Dubai, UAE
Jumeirah Beach Hotel, Dubai, UAEJumeirah Beach Hotel, Dubai, UAEJumeirah Beach Hotel, Dubai, UAEJumeirah Beach Hotel, Dubai, UAE
Status: Constructed
Role: Concept Design stage / Design Production Team
DUBAI INTERNET CITY, Dubai, UAEDUBAI INTERNET CITY, Dubai, UAEDUBAI INTERNET CITY, Dubai, UAEDUBAI INTERNET CITY, Dubai, UAE
Status: Constructed (Master plan)
Role: Production team / Architect. Concept & Schematic
Design stage
ZABEEL PARK (Area = 510,000 sqm), Dubai, UAEZABEEL PARK (Area = 510,000 sqm), Dubai, UAEZABEEL PARK (Area = 510,000 sqm), Dubai, UAEZABEEL PARK (Area = 510,000 sqm), Dubai, UAE
Status: Constructed (Master plan)
Role: Production team / Architect. Concept, Schematic &
Detail Design stage
PPPP RRRR SSSS P P P P ARCHITECTS ARCHITECTS ARCHITECTS ARCHITECTS –––– PPPP oooo rrrr tttt ffff oooo llll i i i i oooo
October 1989 – September 1993, Makati, Philippines
Website: http://www.prsparchitects.com/Index.html
Renaissance Residential Renaissance Residential Renaissance Residential Renaissance Residential 3333----TowerTowerTowerTowerssss, , , , Pasig, Pasig, Pasig, Pasig, PhilippinesPhilippinesPhilippinesPhilippines
Status: Constructed
Role: Production team / Architect. Concept, Schematic &
Detail Design to Construction stage
CITIBANK TOWER CITIBANK TOWER CITIBANK TOWER CITIBANK TOWER –––– Office, Makati, PhilippinesOffice, Makati, PhilippinesOffice, Makati, PhilippinesOffice, Makati, Philippines
Status: Constructed
Role: Production team / Architect. Concept, Schematic &
Detail Design to Construction stage
CCCCEBUEBUEBUEBU HOLDING CENTRE, Cebu city, PhilippinesHOLDING CENTRE, Cebu city, PhilippinesHOLDING CENTRE, Cebu city, PhilippinesHOLDING CENTRE, Cebu city, Philippines
Cebu Business Park Cebu Business Park Cebu Business Park Cebu Business Park –––– Office BuildingOffice BuildingOffice BuildingOffice Building
Status: Constructed
Role: Production team Concept & Schematic stage