Transcript
  • WSD10

    Frequency band: channel 1-11(2412-2462 MHz)Radio-frequency power:

  • 121110AC~ (Steps: 6-11)7 98

    181716DC= (Steps: 12-17)13 1514

    1 2

    open access point

    Setup your PV system in a few minutes.

    START INSTALLATION

    LOGIN

    Log in with your Fronius credentials (email adress& password) in order to get the most out of thePV System. Installing a new product does notrequire a Login.

    Imprint & Contact Terms & ConditionsData Privacy

    Fronius Solar.start

    23

    OkStandbyWarning(flashing)

    Error Error

    Connecting(flashing)

    Connected

    1x WLAN access point2x WPS3-6 sec. Quit Service Message,Activate/Deactivate Key Lock

    22CLOSE & COMMISSION (Steps: 18-23)19 20

    54

    ≥ 200 mm(≥ 7.87 inch)

    ≥ 200 mm(≥ 7.87 inch)

    ≥ 445 mm(≥ 17.52 inch)

    ≥ 250 mm(≥ 9.84 inch)

    ≥ 225 mm(≥ 8.86 inch)

    ≥ 275 mm(≥ 10.83 inch)

    ≥ 150 mm(≥ 5.91 inch)

    ≥ 100 mm(≥ 3.94 inch)

    -25°C - +60°C0 - 100%

    MOUNTING (Steps: 1-6)1 32

    min. 10° IP 66

    DUSTDUST

    NH3

    UDCmax =1000V

    UDCmax =920V

    UDCmax =835V

    3500m

    3001m

    4000m> 4001m

    3501m

    3000m

    0m

    IP WLAN: 192.168.250.181 | Password: 12345678IP LAN1: 169.254.0.180

    PV point clamp

    6

    21

    ≥ 200 mm(≥ 7.87 inch)

    ≥ 200 mm(≥ 7.87 inch)

    ≥ 440 mm(≥ 17.32 inch)

    ≥ 250 mm(≥ 9.84 inch)

    ≥ 225 mm(≥ 8.86 inch)

    ≥ 270 mm(≥ 10.63 inch)

    ≥ 150 mm(≥ 5.91 inch)

    ≥ 100 mm(≥ 3.94 inch)

    -25°C - +60°C0 - 100%

    Symo GEN24 3-5 kW Symo GEN24 6-10 kW


Recommended