Download docx - JEETESH KUMAR SINGH - Final

Transcript
Page 1: JEETESH KUMAR SINGH - Final

WORK EXERIENCE WHO AM I ?Since Jan.’10 with Wockhardt Ltd. ,Waluj Aurangabad as Asst. General Manager Production for Oral Solid Dosages Forms (Team Size:265) Responsible for entire Production/Warehouse operations .Additionally responsible for new project.

Jul.’08-Jan.’10 with IPCA Laboratories Ltd. , Pithampur ,Indore as Astt. Manager (Team Size: 120).Responsible for entire Production operation. Additionally responsible for new project.

March’07-Jul.’08 with Ranbaxy Labs. Ltd., Paonta Sahib as Executive Production (Team Size: 96).Responsible for entire Production operation.

Nov.’05-March’07 with Torrent Pharmaceuticals Ltd. Baddi as Executive Production (Team Size: 43).Responsible for entire Compression operation.

Jan.’05-Nov.’05 with Sun Pharmaceuticals Ltd. Halol as Senior Officer Production (Team Size: 52).

Dec.’2000-Jan.’05 with Win Medicare Ltd.Meerut as Technical Supervisor (Team Size: 34).

EDUCATION AUDIT FACED

COURSE STUDIED COURSE STUDIED

USFDA22%

MHRA19%

MCC7%UGANDA

11%JAPAN

7%

GERMANY4%

WHO11%

MEXICO4%

PERU4%

ANVISA4%

COLOMBIA4%

CANADA4%B. Pharm. in Pharmaceutical

Science from North Maharashtra University Jalgaon in 2000.

M.S. Operation& Administration from BITS Pilani Rajasthan in 2015

TIME LINE MAP

- - - - - - - - - - - - - - - - - - - -

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

2016

B. PharmWin Medicare

Ltd SUN

Tor

ren

t

Ran

bax

y

IPCA Wockhardt Ltd. & M.S.

Operation& Administration

PROFESSIONAL SKILS TEAM SIZE

Change ManagementProduction Management

Conflict ManagementContinual Improvement

Plant OperationsDecision Making

DelegationAudit and ComplianceEmotional Intelligence

HSE MangementEmpowering Others

InnovationInitiative

Systems ThinkingTechnology Use/Management

Project ManagementNegotiating

90

80

90

80

80

95

80

80

70

90

95

70

95

80

75

65

65

Wockhardt Ltd.

IPCA Ltd. Ranbaxy Ltd.,

Torrent Pharma

Sun Pharma Win Medicare

Ltd.

0

50

100

150

200

250

300

265

120

96

43 5234

Team Size Chart

Page 1 of 4

JEETESH KUMAR SINGHHEAD – PRODUCTION

OBJECTIVE:Enthusiastic, hardworking production professional seeking to obtain a challenging position providing professional career growth in the pharmaceutical industry

B 1/7, Kasliwal Vishwa, behind Sant Eknath Hospital Ulkanagari, Aurangabad

+91 9657710102 & +91 9657720102

[email protected]

https://in.linkedin.com/in/jeetesh-kumar-

singh-57015623

Page 2: JEETESH KUMAR SINGH - Final

PROFESSIONAL SYNOPSIS 16 years of experience in Strategic Production Planning, Production & Project Management, Product Development,

Process Improvement in the regulated Pharmaceutical industry.

Exposure in solid oral dosages forms eg. Tablets, Capsules and Dry syrups

Proficient in developing & streamlining systems with proven ability to enhance operational effectiveness and meet operational goals within the cost, time & quality parameters.

Experience in conceptualizing profitable projects and managing operations encompassing procurement, quality and industrial relations.

Adept in installation, validation & operational start-up of various equipment’s and preparing documents.

Gained experience in production of Tablets, oral liquids, pellets, capsules, packaging, etc.

Strong knowledge of various Quality Assurance Systems, Statutory Requirements and Safety Aspects used in the Pharmaceutical Plants.

Possess strong analytical, problem-solving and interpersonal communication skills.

KEY RESULT AREAS: Strategic Production Planning Formulating and implementing strategies for achieving annual business goals for the division & managing overall

operations of the unit

Coordinating various functions; ensuring optimum utilization of the resources and implementing & maintaining the Quality Systems as per c GMP and regulatory requirements

Programming, planning and executing raw materials, production and delivery activities; managing documentation as per the standards

Ensuring quality product delivery; managing overall operations involved in production planning including coordinating with SCM, manpower management, supplies and up-time of equipment’s

Responsible for overall planning, scheduling, controlling and achievement of production target with optimum utilization of resources, Calculation of overall capacity planning, creation of Capacity

Preparation of Monthly WIP/Stock report & Monthly Production report

Production Ensuring Quality Product Delivery; managing overall operations involved in production planning including coordination

with R&D, Regulatory and CQA

Manpower management (recruitment, training), procurement and qualification of equipment’s

Monitoring functioning of plant in co-ordination with QA, QC, Engineering, HR and EHS

Overseeing production and implementing plans with a view to ensure timely accomplishment of production targets within the cost parameters

Ensuring timely accomplishment of production targets within the cost parameters

Process Improvement Planning and organising new product research activities related to site and resolving procedural & logistical problems as

appropriate to the timely completion of submission to regulatory bodies

Formulating plant safety plans for new products for ensuring Environment, Health & Safety

Monitoring changes in norms & its effective implementation with cost effective and logical systems

To follow & implement EHS related procedures in department

Continuous improvement planning and execution

Process simplification in co-ordination with R & D

Quality System Handling & review of Deviation, Change Control, Investigation and CAPA management

Risk assessment and gap analysis against conventional system & regulatory requirement

SOP, BMR Review & Approval

Job Description, Training Compliances against the defined role to curriculum for the associates

Review of Site Master File (SMF) and Validation Master Plan (VMP)

Page 2 of 4

Page 3: JEETESH KUMAR SINGH - Final

Investigation of Deviations, Market complaints and product recalls using different kind of tools

To review and approval of all kind of QMS documents with respect to manufacturing function

Review of Quality Risk Management against the identified, residual or calculated risk

Cost Management

Preparation & Control of CAPEX Budget and Revenue Budget

Control of CCPC cost

Waste Control e.g. Process waste, Change over time, Break down Time etc.

Working towards operational excellence to have the positive impact on cost factor

Human Resources

Building People Capabilities by empowering Team, Coaching/mentoring & providing opportunity

100% Employee engagement with motivation towards organization Goal

Holding Employees by Spot recognition, Clarity, Job enrichment & Leadership

Leading teams towards the achievement of organisational goals and industry best practices

Engineering & Qualification

Predictive Maintenance for controlling Breakdown of Equipment’s

Ensure that calibration and preventive maintenance programme implementation

Ensure qualification for area, Equipment’s, Water system, HVAC & Compressed Air

Leading the equipment and area qualification management in manufacturing phase for the new equipment, area modification/expansion and equipment requalification

IT

Well versed with Windows 98/2000, SAP, Microsoft Office - Word and Internet

LMS- SABA, Track wise, DMS software’s handling, PLC Validation, Computer System Validation

SIGNIFICANT HIGHLIGHTS:

Credited for Productivity improvement at Wockhardt Ltd. From 55 MIO to 350 MIO and 97% product availability OTIF regularly through line balancing and lean six sigma projects

Highest Products Launch Timely in last 2-3 years consistently

Line balancing with Existing and New Products Planning

Active member in transition of projects to commercialisation of plant at Torrent & Ranbaxy

Credited for yield improvement project at Wockhardt Ltd. which led to savings up to INR 600 Lakhs

Significant contribution to reduction in Cost per ‘000’ at Wockhardt Ltd.

Proactive member of Cross Functional Team involved in regulatory audits; part of Safety Team for implementing HSE practices

Zero % Accident in last 1-2 years through Awareness

Job enrichment of second line Managers

Talent hiring and training of manufacturing & Packaging personnel

Attrition reduction from 33% to 5% in last 3-4 years

Ensure site safety with respect to process, operation and equipment

Focus on product yields, productivity by minimizing the batch cycle timings, to produce more tonnage without effecting of quality

Set annual goals for the team, monitor performance and provide constructive feedback for continuous improved performance

Identify the training needs of the team and ensure the fulfilment

Investigate and take appropriate action in case of any process deviation, non-compliance, market complaints, product failure, product recall

Page 3 of 4

Page 4: JEETESH KUMAR SINGH - Final

USFDA faced successfully after import alert with Zero 483 observations for OSD

Waste Reduction - Cost saving of 710 lakhs rupees in current year through yield improvements, process cycle time reduction and change over time reduction

Have initiated measures to minimise downtime during process optimisation

Involved in trouble shooting & optimisation of difficult to make products

Process improvement

Successful completion of FAT of Roll compactor at GERMANY and Sejong Auto coater at South Korea

Self Enhancement Programs (Trainings)

Machine Familiarization on CAD Press at Cadmach, Sejong, FETTE

cGMP Training at IPCA, Ranbaxy

Total Productive Maintenance

Total Quality Management

Training on regulatory updates

Maintenance and Inspection of Tablet Tools

Communication And Presentation Skills By Nitin Thakur (Abecone Consultant , Singapore)

Data Integrity By Dr. Raun from Paraxel Consultant (U.S.)

Glatt Techniques

Interviewing Skills and Recruitment Champion

Manager Fundamentals

PERSONAL DOSSIER

Date of Birth :1st August 1977

Present Address : B 1/7, Kasliwal Vishwa, behind sant Eknath hospital Ulkanagari, Aurangabad

Permanent Address : Dr. Tejpal Singh, Kaurara Road, Sirsaganj , Firozabad (U.P.)

Languages Known : English and Hindi

Hobbies : Reading Books, Singing, Listening to Music.

Marital Status : Married

References will be provided based on the request

Declaration:

I hereby declare that above Information and particulars are true and correct to the best of my personal knowledge and belief.

Place : Aurangabad

Date : (Jeetesh Kumar Singh)

Page 4 of 4


Recommended