KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI
PULAU PINANG
NO. SEBUTHARGA: SH/PPPNPP/T/001/2020
TAJUK:
MEROBOH DAN MEMBINA BANGUNAN TAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR
TARIKH TUTUP SEBUTHARGA : 25 MAC 2020
JAM : 12.00 TENGAHARI
JABATAN PERDANA MENTERI (ICU JPM)
TINGKAT 15, MENARA BOUSTEAD PENANG
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
UNIT PENYELARASAN DAN PERLAKSANAAN
JABATAN PERDANA MENTERI (ICU JPM)
TINGKAT 11, DAN 15, MENARA BOUSTEAD PENANG
39, JALAN SULTAN AHMAD SHAH
10050 PULAU PINANG
DOKUMEN SEBUTHARGA
Sebutharga : MEROBOH DAN MEMBINA BANGUNAN TAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR
No. Sebutharga : SH/PPPNPP/T/001/2020
Kandungan:-
1. Kenyataan Sebutharga SH/PPPNPP/T/001/2020
2. Senarai Semak 3. Arahan Kepada Penyebut Harga – Lampiran A 4. Syarat-syarat Sebutharga Untuk Kerja – Lampiran B 5. Borang Sebutharga - Lampiran C1 6. Ringkasan Sebutharga - Lampiran RS1 7. Penentuan Kerja. Syarat – syarat Am – Lampiran D 8. Lukisan Papan Tanda Projek – Lampiran E 9. Dokumen Sokongan Wajib – Lampiran F
10. Latarbelakang Penyebut harga - Lampiran F1 11. Senarai Kerja Dalam Tangan – Lampiran F2 12. Senarai Kerja Telah Disiapkan – Lampiran F3 13. Akuan Pembida – Lampiran G1 14. Akuan Pembida Berjaya – Lampiran G2
15. Lukisan dan Spesifikasi
(Dis 2019, Jan 2020, Feb 2020 )
Perlu disahkan oleh Pegawai Bank rujuk 2.1.8
Lukisan dan Spesifikasi tidak perlu
disertakan bersama Dokumen Sebutharga
LAMPIRAN A
ARAHAN KEPADA PENYEBUT HARGA 1. HAK KERAJAAN UNTUK MENERIMA / MENOLAK SEBUTHARGA Kerajaan adalah tidak terikat untuk menerima Sebutharga yang terendah atau mana-mana Sebutharga atau memberi apa-apa sebab di atas penolakan sesuatu Sebutharga.Keputusan Jawatankuasa Sebutharga adalah muktamad. 2. CARA-CARA MELENGKAPKAN DOKUMEN SEBUTHARGA
2.1 Penyediaan Sebutharga
Penyebut Harga adalah dikehendaki mengisi dengn dakwat segala maklumat berikut dengan sepenuhnya. 2.1.1 Harga dan tandatangan Penyebut Harga di Ringkasan Sebut Harga, 2.1.2 Harga, tempoh dan tandatangan dalam Borang Sebut Harga, 2.1.3 Senarai Kerja Dalam Tangan 2.1.4 Senarai Pengalaman Kerja 2.1.5 Jadual Kadar Harga (jika ada) 2.1.6 Butir-butir Spesifikasi (jika ada) 2.1.7 Surat Akuan Pembida 2.1.8 Maklumat kemampuan kewangan dalam bentuk Penyata Akaun
Bank yang disahkan oleh Pengurus Cawangan Bank berkenaan untuk 3 Bulan yang terakhir, Deposit Tetap, baki nilai Kemudahan Kredit dan nilai Kemudahan Kredit yang layak/akan diperolehi oleh Penyebut Harga daripada Institusi Kewangan. (Bagi Kerja melebihi RM200,000.00)
2.1.9 Jika berlaku kesilapan dalam mengisi maklumat-maklumat di atas
Penyebut Harga hendaklah menandatangi ringkas semua pembetulan.
2.1.10 Kegagalan mengisi/menandatangani Borang Sebut Harga akan
mengakibatkan Sebut Harga ditolak. 2.1.11 Sekiranya terdapat percanggahan di antara maklumat yang
dinyatakan dalam Ringkasan Sebut Harga dan Borang Sebutharga, maklumat di dalam Borang Sebut Harga diberi keutamaan.
2.1.12 Sekiranya Dokumen Sebut Harga disediakan dalam bentuk
softcopy (berbentuk CD dll), Penyebut Harga hendaklah mengemukakan Dokumen Sebut Harga dalam bentuk softcopy dan hardcopy. Sekiranya terdapat percanggahan maklumat antara softcopy dan hardcopy, Dokumen dalam hardcopy hendaklah digunapakai.
2.1.13 Sekiranya Penyebut harga didapati memberikan maklumat palsu
atau sengaja menyorok atau tidak memberikan mana-mana maklumat yang memberikan kesan negatif terhadap keupayaannya, Sebut Harganya akan ditolak dan tindakan tatatertib akan diperakukan terhadapnya.
2.2 ‘Integrity Pact’
2.2.1 Penyebut Harga wajib mengemukakan Surat Akuan Pembida
seperti di Lampiran G1 dimana ia berwaad untuk tidak menawar atau memberi rasuah kepada mana-mana individu lain sebagai sogokan untuk dipilih dalam tawaran ini. Wakil Syarikat yang menandatangani Surat Akuan Pembida ini hendaklah juga melampirkan Surat perwakilan Kuasa menandatangani bagi Pihak Syarikat.
2.2.2 Surat Akuan Pembida tersebut adalah menjadi salah satu dokumen
wajib dalam penilaian sebut Harga. Sekiranya penyebut harga gagal mengemukakan Surat Akuan tersebut, Penyebut harga akan dinilai sebagai gagal dalam penilain Sebut Harga.
2.2.3 Penyebut Harga yang berjaya wajib mengemukakan Surat Akuan
Pembida Berjaya seperti di Lampiran G2 beserta dengan Borang Perjanjian Inden Kerja yang telah ditandatngani di mana ia berwaad tidak akan memberi rasuah sebagai ganjaran kerna mendapat kontrak. Wakil Syarikat yang menandatangani Surat akuan Pembida ini hendaklah juga melampirkan Surat perwakilan Kuasa menandatangani bagi pihak Syarikat. Surat akuan ini akan menjadi sebahagian dari Dokumen Kontrak.
2.3 Penyerahan Dokumen Sebutharga
2.3.1 Dokumen Sebut Harga yang telah diisi dengan lengkap hendaklah
dimasukkan ke dalam sampul surat berlakri yang dicatatkan dengan bilangan Sebutharga SH/PPPNPP/T/001/2020 serta tajuk Sebut Harga. Dokumen tersebut hendaklah dimasukkan ke dalam peti Sebut Harga pada atau sebelum masa dan tempat yang ditetapkan dalam Notis Sebut Harga.
2.3.2 Jika Dokumen Sebutharga tidak diserahkan dengan tangan, Penyebut Harga hendaklah menghantar Dokumen tersebut dengan pos berdaftar supaya tiba pada atau sebelum masa dan di tempat yang di tetapkan seperti berikut:
Peti Sebutharga, Seksyen Teknikal, Pejabat Pembangunan Negeri Pulau Pinang, Tingkat 15 Menara Boustead, No. 39 Jalan Sultan Ahmad Shah, Pulau Pinang Tidak lewat dari jam 12.00 tengahari 25hb. Mac 2020
2.3.3 Sebutharga yang diserahkan selepas masa yang ditetapkan, atas
sebarang sebab, tidak akan dipertimbangkan.
2.4 Penjelasan Lanjut
Sekiranya terdapat maklumat dalam Dokumen Sebutharga yang tidak jelas atau bercanggah, Penyebut Harga boleh menghubungi pejabat yang menjual Dokumen Sebut Harga tersebut untuk penjelasan lanjut.
3. TEMPOH SIAP KERJA Kerja ini hendaklah disiapkan dalam tempoh tidak melebihi 6 bulan. Mana-mana penyebut harga yang menawarkan tempoh siap kerja melebihi tempoh siap kerja maksimum yang ditetapkan tidak akan dipertimbangkan.
4. PERBELANJAAN PENYEDIAAN SEBUT HARGA Semua perbelanjaan bagi penyediaan Sebut Harga ini hendaklah ditanggung oleh Penyebut harga sendiri.
5. TEMPOH SAH SEBUTHARGA Sebutharga ini sah selama 90 hari dari tarikh tutup Sebut Harga. Penyebut Harga tidak boleh menarik balik Sebut Harganya sebelum tamat tempoh sah laku Sebut Harga. Laporan mengenai penarikan balik Sebut Harga oleh Penyebut Harga akan dikemukakan kepada CIDB/BPKU untuk tindakan.
6. PERINGATAN MENGENAI KESALAHAN JENAYAH Semua Penyebut Harga adalah diingatkan supaya tidak terlibat dalam aktiviti jenayah rasuah berkaitan dengan perolehan ini. Sehubungan dengan itu, para Penyebut Harga diberi peringatan berikut:
6.1 Sebarang perbuatan atau percubaan rasuah untuk menawar atau memberi,
meminta atau menerima apa-apa suapan secara rasuah kepada dan daripada mana-mana orang berkaitan perolehan ini merupakan satu kesalahan jenayah di bawah Akta Suruhanjaya Pencegahan Rasuah Malaysia 2009 (Akta 694).
6.2 Sekiranya mana-mana pihak ada menawar atau memberi apa-apa suapan kepada mana-mana anggota perkhidmatan awam, maka pihak yang ditawar atau diberi suapan dikehendaki membuat aduan dengan segera ke pejabat Suruhanjaya Pencegahan Rasuah atau balai polis yang berhampiran. Kegagalan berbuat demikian adalah merupakan suatu kesalahan di bawah Akta Suruhanjaya Pencegahan Rasuah Malaysia 2009 (Akta 694).
6.3 Tanpa prejudis kepada tindakan-tindakan lain, tindakan tatatertib terhadap
anggota perkhidmatan awam dan menyenaraihitamkan Kontraktor boleh diambil sekiranya pihak-pihak terlibat dengan kesalahan rasuah di bawah Akta Suruhanjaya Pencegahan Rasuah Malaysia 2009 (Akta 694).
6.4 Mana-mana Kontraktor yang membuat tuntutan bayaran berkaitan perolehan
ini walaupun tiada kerja dibuat mengikut spesifikasi yang ditetapkan dan mana-mana anggota perkhidmatan awam yang mengesahkan tuntutan berkenaan adalah melakukan kesalahan di bawah Akta SuruhanjayaPencegahan Rasuah Malaysia 2009 (Akta 694).
LAMPIRAN B
SYARAT-SYARAT SEBUTHARGA UNTUK KERJA
1. PEMERIKSAAN TAPAKBINA
Kontraktor disifatkan telah memeriksa dan meneliti tapak bina dan sekitarnya, bentuk dan jenis tapak bina, takat dan jenis kerja, bahan dan barang yang perlu bagi menyiapkan Kerja, cara-cara perhubungan dan laluan masuk ke tapak bina dan hendaklah mendapatkan sendiri segala maklumat yang perlu tentang risiko, luar jangkaan dan segala hal-keadaan yang mempengaruhi dan menjejas Sebut Harganya. Sebarang tuntutan yang timbul akibat daripada kegagalan Kontraktor mematuhi kehendak ini tidak akan dipertimbangkan.
2. RINGKASAN SEBUT HARGA
2.1 Sebut Harga hendaklah menjadi sebahagian daripada Borang Sebut Harga
ini dan hendaklah menjadi asas Jumlah Harga Sebut Harga.
2.2 Harga-harga dalam Ringkasan Sebut Harga hendaklah mengambil kira semua kos termasuk kos pengangkutan, cukai, duti, levi, bayaran dan caj-caj lain yang perlu dan berkaitan bagi penyiapan Kerja dengan sempurnanya.
2.3 Tiada sebarang tuntutan akan dilayan bagi pelarasan harga akibat daripada
perubahan kos buruh, bahan-bahan dan semua duti dan cukai Kerajaan, sama ada dalam tempoh sah Sebut Harga atau dalam tempoh Kerja.
2.4 Harga-harga dalam Ringkasan Sebut Harga yang dikemukakan oleh Kontraktor hendaklah tertakluk kepada persetujuan sebelumnya daripada Pegawai Inden tentang kemunasabahannya. Persetujuan sebelumnya itu dan apa-apa pelarasan kemudiannya kepada harga-harga dalam Ringkasan Sebut Harga (jika perlu) hendaklah dibuat sebelum Inden Kerja dikeluarkan.
2.5 Apa-apa pelarasan harga dalam Ringkasan Sebut Harga menurut perenggan 2.4 tersebut di atas dan apa-apa kesilapan perkiraan dalam Ringkasan Sebut Harga hendaklah dilaras dan diperbetulkan sebelum Inden Kerja dikeluarkan. Jumlah amaun yang dilaraskan hendaklah sama dengan amaun jumlah harga pukal dalam Borang Sebut Harga. Amaun jumlah harga pukal dalam Borang Sebut Harga hendaklah tetap tidak berubah.
3. BON PELAKSANAAN1 PERKESO DAN POLISI INSURANS 3.1 Kontraktor hendaklah mengemukakan Bon Pelaksanaan2 sebanyak 5%
daripada nilai Sebut Harga3 dalam bentuk Jaminan Bank, Jaminan Syarikat Kewangan, Jaminan Insurans atau Jaminan Takaful. Sekiranya Kontraktor tidak mengemukakan Bon Pelaksanaan dalam bentuk Jaminan Bank atau Insurans, kaedah Wang Jaminan Pelaksanaan (WJP) hendaklah diguna pakai seperti mana ditetapkan dalam peraturan mengenai tatacara pengurusan tender yang berkuat kuasa.
3.2 Kontraktor hendaklah atas nama bersama Kerajaan dan Kontraktor
mengambil Insurans Liabiliti Awam dengan nilai minimum4 RM100,000.00 bagi setiap kemalangan bagi tempoh pelaksanaan Kerja termasuk tempoh kecacatan dan ditambah tiga (3) bulan dan empat belas (14) hari dan Insurans Kerja (sekiranya dinyatakan di dalam Butir-butir Ringkasan Sebut Harga) bagi tempoh pelaksanaan Kerja ini. Kontraktor hendaklah juga mengemukakan Nombor Kod Pendaftaran dengan PERKESO.
3.3 Kontraktor hendaklah mengemukakan kepada Pegawai Inden semua
Polisi Insurans dan Nombor Kod Pendaftaran dengan PERKESO yang tersebut di atas sebelum memulakan Kerja. Bagaimana pun untuk tujuan memulakan Kerja sahaja Nota-nota Perlindungan dan resit-resit bayaran premium adalah mencukupi.
4. BAYARAN PENDAHULUAN 4.1 Kontraktor boleh memohon Bayaran Pendahuluan sebanyak 25% atau
RM100,000 yang mana lebih rendah jika memenuhi kesemua syarat berikut: 4.1.1 Kerja yang dilaksanakan bernilai melebihi RM200,000 sehingga
RM500,000.
4.1.2 Tempoh siap kerja tidak kurang dari 3 bulan.
4.1.3 Permohonan daripada Kontraktor diterima dalam tempoh satu (1) bulan dari tarikh Inden Kerja dikeluarkan.
4.1.4 Polisi Insurans telah dikemukakan oleh Kontraktor.
4.1.5 Satu jaminan terhadap Bayaran Pendahuluan dikemukakan oleh
kontraktor sama ada dalam bentuk Jaminan Bank atau Jaminan Syarikat Kewangan atau Jaminan Insurans atau Jaminan Takaful. Nilai jaminan hendaklah sama dengan nilai bayaran pendahuluan yang dimohon.
4.1.6 Bayaran balik pendahuluan akan dibuat melalui potongan ke atas
bayaran kemajuan mengikut peringkat kerja yang telah disempurnakan dan diselesaikan selewat-Iewatnya semasa projek siap pada tahap 75%.
1 Potong jika tidak berkenaan.
2 Keluarkan perenggan ini jika tidak berkenaan.
3 Nilai bon pelaksanaan adalah 5% daripada nilai Sebut Harga
4 Pengiraan kadar liputan adalah berasaskan nilai Sebut Harga
.
4.1.7 Liabiliti di bawah Jaminan Bayaran Pendahuluan akan tamat apabila Kerajaan mengutip semula jumlah penuh pendahuluan yang telah dibayar. Walau bagaimanapun, jika jumlah penuh pendahuluan yang telah dibayar tidak boleh dicapai sebelum tarikh siap kontrak atau apa-apa pelanjutan yang diberi atau sebelum tarikh penamatan dalam kes kontrak yang ditamatkan, maka baki pendahuluan yang perlu dibayar balik kepada Kerajaan hendaklah dituntut daripada Jaminan Bayaran Pendahuluan.
5. PERATURAN PELAKSANAAN KERJA
5.1 Kerja-kerja yang dilaksanakan hendaklah mematuhi Spesifikasi, Pelan-pelan,
butir-butir kerja dalam Ringkasan Sebut Harga dan Syarat-syarat yang dinyatakan dalam Dokumen Sebut Harga ini serta arahan Pegawai Inden atau Wakilnya.
5.2 Kerja-kerja mekanikal dan elektrik yang dilaksanakan di samping mematuhi kehendak di perenggan 4.1 di atas, hendaklah juga mematuhi semua peraturan dan pekeliling, undang-undang dan undang-undang kecil yang diluluskan oleh Suruhanjaya/Jabatan/Pihak Berkuasa antara lainnya seperti berikut:
5.2.1 Suruhanjaya Tenaga 5.2.2 Jabatan Kesihatan dan Keselamatan Pekerjaan (JKKP) 5.2.3 Pemegang Lesen dan Pihak Berkuasa Bekalan Elektrik 5.2.4 Jabatan Bomba dan Penyelamat 5.2.5 Pihak Berkuasa Tempatan 5.2.6 Suruhanjaya Pengurusan Air Negara (SPAN)
6. KEGAGALAN KONTRAKTOR MEMULAKAN KERJA
Sekiranya Kontraktor gagal memulakan kerja selepas tujuh (7) hari dari tarikh akhir tempoh mula kerja yang dinyatakan dalam Inden Kerja, tanpa sebab-sebab yang munasabah, Inden Kerja boleh dibatalkan oleh Pegawai Inden dan tindakan tatatertib akan diambil terhadap Kontraktor.
7. 7.0 SUB-SEWA DAN MENYERAHHAK KERJA Kontraktor tidak dibenarkan mengsub-sewakan Kerja kepada Kontraktorkontraktor lain. Kontraktor tidak boleh menyerahhak apa-apa faedah di bawah Inden Kerja ini tanpa terlebih dahulu mendapatkan persetujuan bertulis daripada Pegawai Inden.
8. 8.0 PENOLAKAN BAHAN, BARANG DAN MUTU HASIL KERJA OLEH PEGAWAI INDEN 8.1 8.1 Pegawai Inden atau Wakilnya berhak menolak bahan, barang dan mutu
hasil kerja dari jenis piawaian yang tidak menepati seperti diperihalkan dalam Spesifikasi. Bahan, barang dan kerja-kerja yang ditolak hendaklah diganti dan sebarang kos tambahan yang terlibat hendaklah ditanggung oleh Kontraktor sendiri.
8.2 Kontraktor hendaklah dengan sepenuhnya atas perbelanjaan sendiri menyediakan sampel bahan dan barang-barang untuk ujian.
8.3 Tiada penggantian untuk peralatan, bahan dan cara kerja yang telah ditentukan di dalam Spesifikasi atau ditawarkan dan telah diterima, dibenarkan kecuali mendapat persetujuan daripada Pegawai Inden secara bertulis.
9. 9.0 PERCANGGAHAN DAN KECUKUPAN DOKUMEN SEBUT HARGA
9.1 Borang Perjanjian Inden Kerja, Surat Akuan Pembida Berjaya yang
ditandatangani oleh Kontraktor dan Dokumen Sebut Harga hendaklah disifatkan menjadi dan dibaca serta ditafsirkan sebagai sebahagian daripada Kontrak ini.
9.2 Dokumen Sebut Harga adalah dikira sebagai saling jelas-menjelas antara satu sama lain. Kontraktor hendaklah mengadakan segala yang perlu untuk melaksanakan kerja dengan sewajarnya sehinggalah siap mengikut tujuan dan maksud sebenar Dokumen Sebut Harga pada keseluruhannya sama ada atau tidak tujuan dan maksud itu ada ditunjuk atau diperihalkan secara khusus, dengan syarat bahawa tujuan dan maksud itu boleh difahamkan dengan munasabahnya dari dokumen Sebut Harga itu.
9.3 Jika Kontraktor mendapati apa-apa percanggahan dalam Dokumen Sebut
Harga, Kontraktor hendaklah merujuk kepada Pegawai Inden untuk mendapatkan keputusan.
10. KEGAGALAN KONTRAKTOR MENYIAPKAN KERJA DAN PENAMATAN
PENGAMBILAN KERJA KONTRAKTOR 10.1 Pegawai Inden berhak membatalkan Inden sekiranya Kontraktor berada
dalam keadaan berikut dan setelah menerima surat amaran daripada Pegawai Inden: 10.1.1 Kontraktor masih gagal menyiapkan Kerja dalam tempoh masa
yang telah ditetapkan;
10.1.2 Kemajuan Kerja terlalu lembab di mana Kontraktor didapati gagal menjalankan kerja dengan tekun dan teratur tanpa apa-apa sebab yang munasabah;
10.1.3 Penggantungan perlaksanaan seluruh atau sebahagian Kerja,
tanpa apa-apa sebab yang munasabah;
10.1.4 Tidak mematuhi arahan Pegawai Inden tanpa apa-apa alasan yang munasabah
10.2 Pegawai Inden berhak membatalkan Inden sekiranya Kontraktor diisytiharkan bankrap oleh pihak yang sah.
10.3 Walau apa pun di atas, sekiranya Kontrak ini ditamatkan di bawah perenggan 10.1 dan 10.2, Bon Pelaksanaan/WJP akan dirampas sepenuhnya.
11. 11.0 BAYARAN KEMAJUAN Pegawai Inden dibenarkan membuat bayaran interim sehingga kerja-kerja siap dilaksanakan.
12. 12.0 KERJA PERUBAHAN 12.1 Pegawai Inden boleh menurut budi bicaranya mengeluarkan arahan-arahan
yang berkehendakkan sesuatu perubahan kerja dengan secara bertulis. Tiada apa-apa perubahan yang dikeluarkan oleh Pegawai Inden atau yang disahkan kemudian oleh Pegawai Inden boleh membatalkan Sebut Harga ini.
12.2 Sebarang kerja perubahan yang diluluskan oleh Pegawai Inden akan diukur atau dinilai dengan menggunakan kadar harga yang ada dalam Senarai Kuantiti/Ringkasan Sebut Harga. Jika tidak terdapat sebarang kadar harga yang bersesuaian, kadar harga yang dipersetujui oleh Pegawai Inden dan Kontraktor hendaklah digunakan.
13. PENGUKURAN KUANTITI SEMENTARA
Setelah kerja-kerja yang melibatkan Kuantiti Sementara disiapkan di tapak, pengukuran semula kuantiti hendaklah dibuat secara bersama.
14. 14.0 PERAKUAN SIAP KERJA
Pegawai Inden hendaklah mengeluarkan Perakuan Siap Kerja sebaik sahaja kerja disiapkan sejajar dengan syarat-syarat dalam Dokumen Sebut Harga. Tempoh Tanggungan Kecacatan bermula daripada tarikh siap kerja.
15. TEMPOH TANGGUNGAN KECACATAN 15.1 Tempoh Tanggungan Kecacatan bagi Sebut Harga hendaklah
sekurangkurangnya enam (6) bulan dari tarikh kerja diperakukan siap. Bagi kerja-kerja mekanikal dan elektrik dimana tempoh waranti ke atas peralatan dan sistem adalah dua belas (12) bulan dan dalam kes-kes tertentu oleh kerana jenis dan kerumitan kerja, tempoh tanggungan kecacatan yang lebih lama daripada enam (6) bulan boleh dikenakan.
15.2 Kontraktor dipertanggungjawabkan untuk membaiki kecacatan, ketidaksempurnaan, kekecutan atau apa-apa jua kerosakan lain yang mungkin kelihatan dan yang disebabkan oleh bahan atau barang atau mutu hasil kerja yang tidak menepati Sebut Harga ini apabila diarahkan oleh Pegawai Inden dan dalam masa yang berpatutan. Kontraktor hendaklah membaiki kecacatan, ketidaksempurnaan, kekecutan atau apa-apa jua kerosakan lain atas kos Kontraktor sendiri.
15.3 Sekiranya Kontraktor gagal membaiki kecacatan, ketidaksempurnaan,
kekecutan atau apa-apa jua kerosakan lain seperti yang diarahkan, Pegawai Inden berhak memotong kos membaiki dari baki wang yang akan dibayar kepada kontraktor dan termasuk kenaan GST (sekiranya pembaikan dilaksanakan oleh pihak ketiga yang dilantik oleh Kerajaan) atau, jika baki itu tidak mencukupi, mengeluarkan surat pengesyoran kepada Lembaga Pembangunan Industri Pembinaan (CIDB) untuk menggantungkan pendaftaran Kontraktor, dan menghantar salinan-salinan surat tersebut kepada Bahagian Pembangunan Kontraktor dan Usahawan, Pengarah Kerja
Raya Negeri/Ketua Jabatan. Bagi kerja-kerja elektrik/mekanikal, salinan surat hendaklah dihantar kepada Pengarah Kanan Cawangan Kerja Elektrik/Pengarah Kanan Cawangan Kerja Mekanikal.
16. PERATURAN MEMBAYAR SELEPAS SIAP
Bayaran sepenuhnya hanya boleh dibuat setelah kontraktor menyiapkan kerja dengan sempurnanya dan Perakuan Siap Kerja dikeluarkan. Walaubagaimanapun, Pegawai Inden hendaklah membuat potongan atau menahan sejumlah amaun dari wang yang akan dibayar kepada Kontraktor sebagai kos untuk membaiki apa-apa kecacatan yang tidak dapat dibaiki oleh Kontraktor di dalam tempoh tanggungan kecacatan.
17. PERAKUAN SIAP MEMPERBAIKI KECACATAN Pegawai Inden hendaklah mengeluarkan Perakuan Siap Membaiki Kecacatan sebaik sahaja Kontraktor telah membaiki kecacatan, ketidaksempurnaan, kekecutan atau apa-apa jua kerosakan lain.
18. PEMATUHAN KEPADA UNDANG-UNDANG OLEH KONTRAKTOR Kontraktor hendaklah mematuhi segala kehendak Undang-undang Kecil dan Undang-undang Berkanun dalam Malaysia semasa pelaksanaan Kerja.Kontraktor tidak berhak menuntut sebarang kos dan bayaran tambahan kerana pematuhannya dengan Syarat-syarat ini.
19. PENAMATAN BERSABIT RASUAH, AKTIVITI MENYALAHI UNDANGUNDANG ATAU AKTIVITI HARAM 19.1 19.1 Tanpa menjejaskan apa-apa hak Kerajaan yang lain, jika kontraktor,
personel, kakitangan atau pekerjanya disabitkan bersalah oleh mahkamah kerana rasuah atau aktiviti menyalahi undang-undang atau aktiviti haram yang berkait dengan Perjanjian/ Kontrak ini atau mana-mana perjanjian lain yang Kontraktor mungkin ada dengan Kerajaan, Kerajaan berhak untuk menamatkan Perjanjian / Kontrak ini pada bila-bila masa, dengan memberi notis bertulis dengan segera yang membawa maksud sedemikian kepada Kontraktor.
19.2 Setelah penamatan tersebut, Kerajaan berhak terhadap semua kerugian, kos, ganti rugi dan perbelanjaan (termasuk apa-apa kos dan perbelanjaan sampingan) yang ditanggung oleh Kerajaan yang timbul daripada penamatan tersebut.
19.3 Bagi mengelakkan keraguan, kedua-dua pihak Kerajaan dan Kontraktor
bersetuju bahawa Kontraktor tidak layak terhadap sebarang bentuk kerugian termasuk kehilangan keuntungan, ganti rugi, tuntutan atau apa sekalipun setelah penamatan Kontrak ini.Kontraktor adalah dinasihatkan untuk memeriksa dan meneliti Tapakbina dan sekitarnya, bentuk dan jenis Tapakbina, takat dan jenis kerja, bahan dan barang yang perlu bagi menyiapkan kerja, cara-cara perhubungan dan laluan masuk ke Tapakbina dan hendaklah mendapatkan sendiri segala maklumat yang perlu tentang risiko, luar jangkaan dan segala hal-keadaan yang mempengaruhi dan menjejas Sebutharganya. Sebarang tuntutan yang timbul akibat daripada kegagalan Kontraktor mematuhi kehendak ini tidak akan dipertimbangkan.
LAMPIRAN C1
BORANG SEBUTHARGA Sebutharga Bil : SH/PPPNPP/T/001/2020 Tarikh Tutup : 25hb. Mac 2020
Pejabat Pembangunan Negeri Pulau Pinang, Unit Penyelarasan Pelaksanaan (ICU JPM) Tingkat 15 Menara Boustead, Jalan Sultan Ahmad Shah, 10050 Pulau Pinang.
Tuan,
MEROBOH DAN MEMBINA BANGUNAN TAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR
Di bawah dan tertakluk kepada Arahan Kepada Pentender, Syarat-syarat Am Sebutharga, Spesifikasi kerja dan pelan - pelan, saya yang bertandatangan di bawah ini adalah dengan ini menawarkan untuk melaksanakan dan menyiapkan kerja-kerja tersebut bagi jumlah harga pukal sebanyak:
Ringgit Malaysia: ........................................................................................................................................................................................................................... (RM..............................................)
2. Saya bersetuju menyiapkan kerja-kerja ini dalam masa .............................................................. (6 Bulan) dari tarikh akhir tempoh mula kerja saperti yang ditetapkan dibawah Fasal 2, Borang Inden Kerja.
Bertarikh pada .............. haribulan .................. 2020
......................…………………..…….. ………………………….…….. (Tandatangan Kontraktor) (Tandatangan Saksi)
Nama Penuh:...............………... Nama Penuh:...............................
No. K/P:..................…………….. No.K/P:..................................
Alamat:...................…………….. Alamat:……………..................
No.Telefon:.........................…… Atas sifat:..........................……………
................................…………………
(Meteri atau Cop Kontraktor)
LAMPIRAN D Sebutharga : MEROBOH DAN MEMBINA BANGUNAN TAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR
PENENTUAN KERJA TAMBAHAN
1.0 Syarat-Syarat Am 1.1 Kontraktor seharusnya telah hadir semasa lawatan tapak untuk mengenalpasti kerja-kerja bersangkutan sebelum memasuki sebutharga. Ukuran yang diberikan di dalam sebutharga adalah pengukuran kasar dan sementara. 1.2 Kerja-kerja pembinaan hendaklah dijalankan mengikut spesifikasi yang diluluskan dan diarahkan oleh Pegawai Penguasa/ Pegawai Inden. Sebarang perbezaan skop kerja di tapak berbanding sebutharga perlu dimaklumkan kepada pegawai inden/ pegawai penguasa sebelum dijalankan. 1.3 Bahan-bahan buangan pembersihan tapak, bahan binaan yang tidak digunakan hendaklah dibawa keluar dari kawasan tapak dan dibuang ke tempat pembuangan sendiri. 1.4 Dalam tempoh dua belas bulan (12) bulan dari tarikh siap kerja, kontraktor dikehendaki membaiki semula sebarang kecacatan sekiranya diarahkan berbuat demikian dengan kosnya sendiri. 1.5 Jika terdapat sebarang masalah atau kesulitan semasa kerja-kerja pembinaan hendaklah dimaklumkan dengan segera kepada Pegawai Penguasa/ Pegawai Inden untuk menyelesaikannya 1.6 Kontraktor perlu merancang serta mengambil langkah-langkah yang perlu bagi mengelakkan sebarang kerosakan pada bangunan sediada atau berhampiran. Sebarang kerosakan pada bangunan sediada akibat kelalaian semasa kerja pembinaan dijalankan hendaklah dibaiki dan diganti dengan kos sendiri. 1.7 Sekiranya berkaitan, semua kerja-kerja konkrit bertetulang hendaklah mengikut Kod Amalan Piawai BS 8110: 1997, kerja-kerja kayu hendaklah mengikut Kod Amalan Piawai MS 544:2003 manakala semua kerja-kerja keluli hendaklah mengikut Kod Amalan Piawai BS 5950: 2000. 1.8 Bagi skop kerja yang melibatkan kerja-kerja elektrikal, paip air dalaman dan sanitari, kontraktor perlu melantik subkontraktor yang mempunyai kompetensi dan lesen yang berkaitan. Kontraktor perlu memastikan kesesuaian laluan trunking, konduit, paip bagi kerja-kerja ini serta perlu dipersetujui oleh pegawai penguasa/ pegawai inden terlebih dahulu sebelum dimulakan. 1.9 Sekiranya tidak dinyatakan, kerja mengecat permukaan masonry/ berplaster mestilah terdiri daripada satu (1) lapisan primer dan dua (2) lapisan penyudah cat emulsi. Bagi kerja cat permukaan besi, satu (1) lapisan primer metallic diikuti satu (1) lapisan undercoat dan dua (2) lapis cat gloss enamel.
LAMPIRAN E
PAPANTANDA PROJEK
PAPAN TANDA PIAWAI 4’ 3’
• TULISAN : ARIAL
• WARNA PAPAN : BIRU ICU JPM
• WARNA TULISAN : PUTIH 4’
• WARNA TIANG : HITAM
ARAS TANAH 2’
PROJEK KERAJAAN PERSEKUTUAN
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
NAMA PROJEK: TARIKH MULA : TARIKH SIAP : NAMA KONTRAKTOR:
LAMPIRAN F
DOKUMEN SOKONGAN WAJIB
Borang Sebutharga mestilah dilampirkan dengan dokumen / maklumat seperti berikut :-
(i) Sesalinan Sijil Pendaftaran PKK atau CIDB yang masih sah laku. (ii) Sesalinan Penyata Akaun Bank Syarikat bagi bulan DISEMBER 2019, JANUARI
2020, FEBRUARI 2020 hendaklah disertakan bersama. (iii) Profail Syarikat yang ringkas dan mengandungi maklumat mengenai:
(a) Butiran Syarikat (b) Senarai Ahli Lembaga Pengarah / Pemilik Tunggal (c) Pengalaman mengenai pembekalan/perkhidmatan/kerja yang berkaitan
dengan skop perolehan. Mesti dinyatakan:
i) Jabatan / Agensi /Syarikat yang memberi kontrak. ii) Harga Kontrak. iii) Tahun Kontrak Diperolehi. iv) Status (Siap/Dalam Proses) bagi kerja yang telah siap Inden
Penyiapan Kerja atau Perakuan Siap Kerja yang berkaitan perlu dikemukakan
ataupun lengkapkan maklumat seperti di Lampiran berikut :-
i) Lampran F1 – Latarbelakang Penender ii) Lampiran F2 - Senarai Kerja Dalam Tangan iii) Lampiran F3 - Senarai Kerja yang telah
PERHATIAN : Sila ambil maklum bahawa kegagalan penyebutharga untuk mengemukakan Dokumen Sokongan Wajib seperti dinyatakan di atas akan menjejaskan penilaian ke atas sebut harga yang dikemukakan.
LAMPIRAN F1 LATARBELAKANG PENYEBUT HARGA
1. Nama : 2. Alamat :
3. Kelas Tajuk/ Tajuk Kecil Tarikh didaftarkan
4. Jika bertaraf Bumiputera, sila Lampirkan Salinan Surat Pendaftaran serta kemukakan
Salinan surat Pengiktirafan 5. Ahli-ahli Pengurusan
Bil Nama Jawatan Kelulusan akademik
LAMPIRAN F2
SENARAI KERJA DALAM TANGAN
Nama Projek/Kerja Jabatan/Agensi
yang Mengawasi Projek
Harga Tarikh Mula Tarikh Siap
LAMPIRAN F3
SENARAI KERJA YANG TELAH DISIAPKAN
Nama Projek/Kerja Jabatan/Agensi
yang Mengawasi Projek
Harga Tarikh Mula Tarikh Siap
sebenar
LAMPIRAN G1
SURAT AKUAN PEMBIDA
Bagi
MEROBOH DAN MEMBINA BANGUNAN TAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR
No.sebut harga : SH/PPPNPP/T/001/2020
Saya, ………………………………………… nombor K.P. ……………………… yang mewakili …………………………………… nombor Pendaftaran ……………………....... dengan ini mengisytiharkan bahawa saya atau mana-mana individu yang mewakili syarikat ini tidak akan menawar atau memberi rasuah kepada mana-mana individu dalam Pejabat Pembangunan Negeri Pulau Pinang, Unit Penyelarasan Pelaksanaan, Jabatan Perdana Menteri atau mana -mana individu lain, sebagai sogokan untuk dipilih dalam Tender/ Sebut Harga* seperti di atas. Bersama ini dilampirkan Surat Perwakilan Kuasa bagi saya mewakili syarikat seperti tercatat di atas untuk membuat pengisytiharan ini. 2. Sekiranya saya atau mana-mana individu yang mewakili syarikat ini didapati bersalah menawar atau memberi rasuah kepada mana-mana individu dalam Pejabat Pembangunan Negeri Pulau Pinang, Unit Penyelarasan Pelaksanaan, Jabatan Perdana Menteri atau mana-mana individu lain sebagai sogokan untuk dipilih dalam Tender/ Sebut Harga* seperti di atas, maka saya sebagai wakil syarikat bersetuju tindakan-tindakan berikut diambil:
2.1 Penarikan balik tawaran kontrak bagi Tender/ Sebut Harga * di atas; atau 2.2 Penamatan kontrak bagi Tender/ Sebut Harga * di atas; dan 2.3 disabitkan kesalahan di bawah Kanun Keseksaan (Akta 574); dan 2.4 tindakan tatatertib lain mengikut peraturan perolehan Kerajaan yang berkuat
kuasa. 3. Sekiranya terdapat mana-mana individu cuba meminta rasuah daripada saya atau mana-mana individu yang berkaitan dengan syarikat ini sebagai sogokan untuk dipilih dalam Tender/ Sebut Harga* seperti di atas, maka saya berjanji akan dengan segera melaporkan perbuatan tersebut kepada pejabat Suruhanjaya Pencegahan Rasuah Malaysia (SPRM) atau balai polis yang berhampiran. Yang Benar, ……….................…… Nama : No. KP: Cop Kontraktor :
LAMPIRAN G2
SURAT AKUAN PEMBIDA BERJAYA
Bagi MEROBOH DAN MEMBINA BANGUNAN TAMBAHAN BAHARU MASJID JAMEK
TUAN HAJI ABDUL LATIF, PERMATANG PASIR
No.sebut harga : SH/PPPNPP/T/001/2020 Saya, ………………………………………… nombor K.P. ……………………… yang mewakili ……………………………………........ nombor Pendaftaran ……………………....... dengan ini mengisytiharkan bahawa saya atau mana-mana individu yang mewakili syarikat ini tidak akan menawar atau memberi rasuah kepada mana-mana individu dalam Pejabat Pembangunan Negeri Pulau Pinang, Unit Penyelarasan Pelaksanaan, Jabatan Perdana Menteri atau mana -mana individu lain, sebagai ganjaran mendapatkan Tender/ Sebut Harga* seperti di atas. Bersama ini dilampirkan Surat Perwakilan Kuasa bagi saya mewakili syarikat seperti tercatat di atas untuk membuat pengisytiharan ini. 2. Sekiranya saya atau mana-mana individu yang mewakili syarikat ini didapati bersalah menawar atau memberi rasuah kepada mana-mana individu dalam Pejabat Pembangunan Negeri Pulau Pinang, Unit Penyelarasan Pelaksanaan, Jabatan Perdana Menteri atau mana-mana individu lain sebagai ganjaran mendapatkan Tender/ Sebut Harga* seperti di atas, maka saya sebagai wakil syarikat bersetuju tindakan-tindakan berikut diambil:
2.1 Penarikan balik tawaran kontrak bagi Tender/ Sebut Harga * di atas; atau 2.2 Penamatan kontrak bagi Tender/ Sebut Harga * di atas; dan 2.3 disabitkan kesalahan di bawah Kanun Keseksaan (Akta 574); dan 2.4 tindakan tatatertib lain mengikut peraturan perolehan Kerajaan yang berkuat
kuasa. 3. Sekiranya terdapat mana-mana individu cuba meminta rasuah daripada saya atau mana-mana individu yang berkaitan dengan syarikat ini sebagai ganjaran mendapatkan Tender/ Sebut Harga* seperti di atas, maka saya berjanji akan dengan segera melaporkan perbuatan tersebut kepada pejabat Suruhanjaya Pencegahan Rasuah Malaysia (SPRM) atau balai polis yang berhampiran. Yang Benar, ……….................…… Nama : No. KP: Cop Kontraktor :
SUMMARY OF PRICES FOR MECHANICAL & ELECTRICAL WORKS
ITEM DESCRIPTION PAGE NO. AMOUNT (RM)
A ELECTRICAL INSTALLATION
1 INTERNAL ELECTRICAL INSTALLATION BILL A1
B MECHANICAL INSTALLATION
1 AIR-CONDITIONING SYSTEM BILL B1
MEROBOH DAN MEMBINA BANGUNAN TAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF,
PERMATANG PASIR.
UNTUK:
AHLI JAWATAN KUASA MASJID JAMEK TUAN HAJI ABDUL LATIF
TOTAL FOR MECHANICAL & ELECTRICAL WORKS
SUM.ME -1/6
BILL "A1" - INTERNAL ELECTRICAL INSTALLATION
Note : The word "c/w" in all pages in this Bill shall mean complete with.
A1 INTERNAL ELECTRICAL INSTALLATION
To supply, install, testing and commissioning as per drawing and specifications.
1 METERING PANEL
1.1 Submission of A Form for upgrading existing 60A TPN meter to 100A TPN
meter
Lot 1
1.2 TNB Contribution Fees Lot 1
1.3 TNB Deposit meter Lot 1
2 MAIN SWITCH BOARD
2.1 The Main Distribution Boards 'MDB' Lot 1
shall consist of 100A 4P MCCB 25KA, earth leakage relay c/w current
transformer, outgoing MCCBs, incoming indicator light (LED type), tinned
copper busbar but not limiting, etc. as per drawing and specification.
2.2 The Automatic Power Factor Correction Board shall consist Lot 1
of sequence power factor regulator of circulating operation c/w indicator lights,
relays, mcb, capacitor Unit (dry type and self healing) 440V 50Hz ,
CONTACTORS with 2 N/C auxilary contacts 2 nos valid discharge resistor,
MCCBs (25kA, 1 sec.) min. rating shall be 155% of the rated capacitor currents,
206mm dia. Heavy Duty Ventilation Fan c/w dust filter, thermostat control, etc.
as per drawing and specification.
3 EARTHING SYSTEM
3.1 Supply and install complete earthing system c/w heavy duty RC earth chamber
and engraved labelling, etc. The work shall include piping across corridor to the
earth chamber.
Nos 1
4 DISTRIBUTION BOARDS
4.1 40A TPN New Distribution Board No 1
5 SUBMAINS CABLE
To supply, install, testing and commissioning
to use the following as per drawing and specifications.
5.1 Submain cable from TNB metering panel to MDB using 4 x 1C 35mm2 PVC
cable + 1 x 1C 16mm2 C.P.C Cable Laid in galvanised sheet steel trunking.
Mtr 15
5.2 4 x 1C 16 mm sq. PVC cable c/w 1 x 16mm sq CPC mtr 30
cable on hot dipped galvanised steel trunking c/w termination from
MDB to new db at Balai Lintang
SUB TOTAL FOR BILL "A1"
MEROBOH DAN MEMBINA BANGUNAN TAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR.
UNTUK:
AHLI JAWATAN KUASA MASJID JAMEK TUAN HAJI ABDUL LATIF
All quantities are PROVISIONAL. Actual quantities shall be measeured at site and final account to be adjusted accordingly
ITEM
NO.DESCRIPTION UNIT QTY RATE (RM) AMOUNT (RM)
BILL A1 - 2/6
BILL "A1" - INTERNAL ELECTRICAL INSTALLATION
MEROBOH DAN MEMBINA BANGUNAN TAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR.
UNTUK:
AHLI JAWATAN KUASA MASJID JAMEK TUAN HAJI ABDUL LATIF
All quantities are PROVISIONAL. Actual quantities shall be measeured at site and final account to be adjusted accordingly
ITEM DESCRIPTIONNO
5.3 4 x 1C 25mm sq. PVC cable c/w 1 x 16mm sq CPC mtr 3
cable on hot dipped galvanised steel trunking c/w termination from
MDB to Existing DB at Bilik Mesyuarat.
5.4 4 x 1C 25 mm sq. PVC cable c/w 1 x 16mm sq CPC mtr 10
cable on hot dipped galvanised steel trunking c/w termination from
MDB to Existing DB at Ruang Solat.
6 WIRING
* All wiring shall be in G.I conduit / galvanised
sheet steel trunking
6.1 Lighting point using 2 x 1.5mm sq. PVC cable & CPC cable Nos 94
c/w 10A 1 way/2 way SP flush switch.
6.2 Lighting point using 2 x 1.5mm sq. PVC cable & CPC cable Nos 3
c/w weatherproof switch.
6.3 Emergency Lighting point using 2 x 1.5mm sq. PVC cable Nos 7
& protective conductor
6.4 Exhaust fan point using 2 x 1.5mm sq. PVC cable & protective Nos 1
conductor c/w 10A SP flush switch mounting block,
3 plate ceiling rose, opening & frame.
6.5 Wall fan point using 2 x 1.5mm sq. PVC Nos 1
cable & protective conductor c/w 3 plate ceiling rose.
6.6 Ceiling mounted exhaust point using 2 x 1.5mm sq. PVC Nos 2
cable & protective conductor c/w 3 plate ceiling rose.
6.7 Ceiling fan point using 2 x 1.5mm sq. PVC Nos 11
cable & protective conductor
6.8 13A socket outlet point using 2 x 2.5mm sq. cable Nos 24
& protective conductor c/w 13A 3 pin flush swith socket outlet.
6.9 Aircond point using 2 x 4mm sq. cable & protective conductor Lot 4
c/w DOL Starter
6.10 Speaker point using speaker cable for new Box Speaker insallation Nos 2
6.9 From MDB to service box at Pintu gerbang using 1 x 4C 4mm sq. Mtr 30
PVC/SWA/PVC cable laid in ground/ conduit
UNIT QTY RATE (RM) AMOUNT (RM)
SUB TOTAL FOR BILL "A1"
BILL A1 - 3/6
BILL "A1" - INTERNAL ELECTRICAL INSTALLATION
MEROBOH DAN MEMBINA BANGUNAN TAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR.
UNTUK:
AHLI JAWATAN KUASA MASJID JAMEK TUAN HAJI ABDUL LATIF
All quantities are PROVISIONAL. Actual quantities shall be measeured at site and final account to be adjusted accordingly
ITEM DESCRIPTIONNO
7 LUMINAIRES AND EQUIPMENT
Note :-
All LED lighting shall comply to Specification For Low Voltage
Internal Electrical Installation (L-S1) Item 12.4
a) The LED luminous flux output of LED light source shall not be
depreciated to below 70% of the original output during life hours.
The initial luminous flux shall not be less than 90% of the rated
luminous flux.
b) The manufacturer shall provide a minimum 5 years warranty
certificate as stated in the defect liability / warranty/ contract period
(whichever is applicable) for the complete bulb to guarantee the long
life expectancy and maintenance free bulb. Warranty declaration
shall be filled and signed by manufacturer.
Failure in the functioning and operation of the LED luminaire/lamp
within the warranty period will result in the replacement of the
whole luminaire or required components by the manufacturer at no
cost to the goverment.
7.1 20W LED Recessed Round Downlight Nos 42
7.2 20W LED Recessed Round Downlight Nos 34
7.3 Single Bare Battern T8, 1 X 18W LED lamp Nos 17
7.4 Single Bare Battern T8, 1 X 10W LED lamp Nos 1
7.5 Bare Battern T8, 1 X 18W LED lamp (Linkable type) Nos 5
7.6 Surface ceiling mounted self-contained Emergency Light Nos 2
7.7 Ceiling type self-contained Emergency Light Nos 5
7.8 1500/60" ceiling mounted fan Nos 11
7.9 16" Wall mounted Fan Nos 1
7.10 12" Exhaust Fan Nos 1
7.11 LED Strip Light (3m length) Nos 2
7.12 Box Speaker Nos 2
7.13 Service Box Nos 1
AMOUNT (RM)
SUB TOTAL FOR BILL "A1"
UNIT QTY RATE (RM)
BILL A1 - 4/6
BILL "A1" - INTERNAL ELECTRICAL INSTALLATION
MEROBOH DAN MEMBINA BANGUNAN TAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR.
UNTUK:
AHLI JAWATAN KUASA MASJID JAMEK TUAN HAJI ABDUL LATIF
All quantities are PROVISIONAL. Actual quantities shall be measeured at site and final account to be adjusted accordingly
ITEM
AMOUNT
(RM)
1 SUB TOTAL BILL "A1" -1
2 SUB TOTAL BILL "A1" -2
3 SUB TOTAL BILL "A1" -3
TOTAL BILL "A1" CARRIED TO SUMMARY OF PRICE FOR
MECHANICAL & ELECTRICAL WORKS
DESCRIPTION
BILL A1 - 5/6
BILL "B1" - AIR-CONDITIONING SYSTEM
RATE AMOUNT
(RM) (RM)
B1 SPLIT UNIT AIR CONDITIONING
1 Supply and install complete set of R410A Split Unit Air Conditioning Unit c/w
indoor & outdoor units, wired remote controllers, blower fans, necessary
electrical works, brackets, trunking, refrigerant pipe, drain pipe and others
necessay accessories and works as per drawing and specifications.
1.1 Wall Mounted Type
a) 2.5 HP Nos 2
1.2 Ceiling Exposed Type
a) 2.5 HP Nos 2
TOTAL BILL "B1" CARRIED TO SUMMARY OF PRICE FOR
MECHANICAL & ELECTRICAL WORKS
MEROBOH DAN MEMBINA BANGUNAN TAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR.
UNTUK:
AHLI JAWATAN KUASA MASJID JAMEK TUAN HAJI ABDUL LATIF
All quantities are PROVISIONAL. Actual quantities shall be measeured at site and final account to be adjusted accordingly
ITEM
NO.DESCRIPTION UNIT QTY
BILL B1 - 6/6
SUSUNATUR SILING
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :-NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-SL
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
05/29
10/29
PERINCIAN TEMPAT WUDUK
PEREMPUAN
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MAJLIS/20/PG-WP
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
PERINCIAN TEMPAT WUDUK
PEREMPUAN
11/29
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MAJLIS/20/PG-WP
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
PERINCIAN TEMPAT WUDUK
PEREMPUAN
12/29
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MAJLIS/20/PG-WP
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
PERINCIAN TANGGA
14/29
PERINCIAN TANGGA
15/29
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/TG
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/TG
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
PERINCIAN TANGGA
15/29
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/TG
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
PERINCIAN TANGGA
16/29
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/TG
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
PERINCIAN RAMP
17/29
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-RAMP
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
'ALUMINIUM LOUVERS'
19/29
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-LV
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
'ALUMINIUM LOUVERS'
20/29
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-LV
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
PERINCIAN BUMBUNG
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-BM
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
21/29
PERINCIAN BUMBUNG
RATA KONKRIT
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-BM
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
22/29
PERINCIAN
'COPING'
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-CP
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
23/29
PERINCIAN
' FLOOR TRAP'
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-FT
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
24/29
PERINCIAN
LONGKANG
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :-NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-LK
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
25/29
PERINCIAN DINDING
PERINCIAN SAMBUNGAN DINDING
Skala 1 : 2
PERINCIAN JUBIN DINDING
(BAHAGIAN PENJURU)
Skala 1 : 2
PERINCIAN LEPAAN DINDING
(BAHAGIAN PENJURU)
Skala 1 : 2
26/29
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :-
NO. LUKISAN :-
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-PT
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
PERINCIAN
' SKIRTING '
TYPICAL SECTIONAL DETAIL OF SKIRTING
Scale 1 : 2
F.F.L.
STRUCTURAL. F.L.L.
27/29
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-TS
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
DETAIL OF WATERPROOFING AT TOILET
Scale 1 : 5
PERINCIAN
' WATERPROOFING'
28/29
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :-NO. LUKISAN :-
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-WP
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
JADUAL KEMASAN
( SCHEDULE OF FINISHES )
29/29
PROJEK :
JENIS BANGUNAN :-
TAJUK LUKISAN :-
:-
:-
:-
:-
UKURAN
DISEMAK
TARIKH
DILUKIS
NO. KERJA :- NO. LUKISAN :-
AZWAN HUSIN ARCHITECT
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ARKITEK :
MASJID JAMEK TUAN
HAJI ABDUL LATIF
SEMUA REKABENTUK LUKISAN DAN SPESIFIKASI ADALAH HAK MILIK
HENDAKLAH DILAPURKAN SEGERA KE PIHAK ARKITEK SEBELUM
KONTRAKTOR BERTANGGUNGJAWAB MENYEMAK UKURAN SEBENAR DI
SEBARANG SELISIHAN UKURAN LUKISAN DAN / ATAU SPESIFIKASI
KONTRAKTOR HENDAKLAH MENGIKUT UKURAN YANG TERCATAT DI
DALAM LUKISAN.
KERJA KERJA DIMULAKAN.
AZWAN HUSIN ARCHITECT.
TAPAK BINAAN.
AHA/286/MASJID/20/PG-JKL
PELAKSANA :
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
IJSB/2020781/ST/05
PELAN STRUKTUR
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
IJSB/2020781/ST/06
PELAN STRUKTUR
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
IJSB/2020781/ST/07
PELAN STRUKTUR
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
IJSB/2020781/ST/08
PELAN STRUKTUR
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
IJSB/2020781/ST/09
PELAN STRUKTUR
KERAJAAN MALAYSIA
PEJABAT PEMBANGUNAN NEGERI PULAU PINANG
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
TYPICAL RC. APRON SLAB DETAIL.
CORNICE/COPING
TYPICAL SECTION OF
TYPICAL RAMP DETAILS
KOLAH
TYPICAL RAFT FOUNDATION FOR
BUTIRAN TIPIKAL TEMPAT WUDUK
TYPICAL STEP DETAILS FOR
TYPICAL SLAB DETAIL FOR COMPOUND
TYPICAL SUPPORT FOR METAL DECK ROOF
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected] HUSIN ARCHITECT
RUANG WUDHUK
TYPICAL STEP DETAILS FOR
ENTRANCE TO BALAI LINTANG TAMBAHAN
PELAN LANTAI ARAS 0.45m
IJSB/2020781/ST/12 13
12
PELAN STRUKTUR
BUTIRAN PINTU GERBANG - 1
1
A B C D
PELAN PENAPAK
P1/C1
JADUAL PENAPAK
1
1 1
A B C D
1 1 1 1
A B C D
PELAN LANTAI ARAS 4.553m
A B C D
PELAN LANTAI ARAS 5.185m
1B1 (200 x 953)
GB1 (225 x 600)
2B1 (350 x 444)
MEROBOH DAN MEMBINA BANGUNANTAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR.
KERAJAAN MALAYSIAPEJABAT PEMBANGUNAN NEGERI PULAU PINANG
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ZWAN USIN RCHITECTA H A
AZWAN HUSIN ARCHITECT
UNTUK :AHLI JAWATAN KUASA MASJID JAMEK TUAN HAJI ABDUL LATIF
SDN. BHD.JURUTERA PERUNDING
ILHAM JURUTERA
P1/C1
AutoCAD SHX TextGB1(225x600)
AutoCAD SHX TextGB1(225x600)
AutoCAD SHX TextNO. LUKISAN :
AutoCAD SHX TextFAIL ACAD : LYN-D:\PROJECT-O\MASJID PERMATANG PASIR\TENDER\RC\LAYOUT-GB-1B-2B
AutoCAD SHX TextTERTERA
AutoCAD SHX TextLYN
AutoCAD SHX TextSKALA - 1:50
AutoCAD SHX TextFOOTING MARK
AutoCAD SHX TextPAD FOOTING DIMENSION
AutoCAD SHX TextREINFORCEMENT
AutoCAD SHX TextBOTHWAYS
AutoCAD SHX TextTIES
AutoCAD SHX TextP1
AutoCAD SHX Text2500
AutoCAD SHX Text750
AutoCAD SHX Text250
AutoCAD SHX TextT12 - 150
AutoCAD SHX TextT10
AutoCAD SHX TextB
AutoCAD SHX TextL
AutoCAD SHX TextH
AutoCAD SHX TextSKALA - 1:50
AutoCAD SHX Text1B1(200x953)
AutoCAD SHX TextSKALA - 1:50
AutoCAD SHX Text2B1(350x444)
AutoCAD SHX Text2B1(350x444)
AutoCAD SHX TextSKALA - 1:50
AutoCAD SHX TextR10-100
AutoCAD SHX Text3X2T12
AutoCAD SHX Text2T16
AutoCAD SHX TextR10-250
AutoCAD SHX Text2T12
AutoCAD SHX Text2T12
AutoCAD SHX Text1
AutoCAD SHX Text1
AutoCAD SHX Text1-1
AutoCAD SHX TextR10-100
AutoCAD SHX TextR10-100
AutoCAD SHX TextR10-100
AutoCAD SHX Text1-1
AutoCAD SHX Text1-1
AutoCAD SHX TextSKALA - 1:20
AutoCAD SHX TextSKALA - 1:20
AutoCAD SHX TextSKALA - 1:20
AutoCAD SHX Text1
AutoCAD SHX Text1
AutoCAD SHX Text2T16
AutoCAD SHX Text3T12
AutoCAD SHX Text3T12
AutoCAD SHX Text1
AutoCAD SHX Text1
AutoCAD SHX TextSTATUS LUKISAN :
AutoCAD SHX TextTAJUK LUKISAN :
AutoCAD SHX TextTAJUK PROJEK :
AutoCAD SHX TextPEMBINAAN
AutoCAD SHX TextKONTRAK
AutoCAD SHX TextPERMULAAN
AutoCAD SHX Text`AS-BUILT'
AutoCAD SHX TextTENDER
AutoCAD SHX TextSKALA
AutoCAD SHX TextDILUKIS OLEH
AutoCAD SHX TextTARIKH
AutoCAD SHX TextMAC 2020
AutoCAD SHX TextDILULUS OLEH
AutoCAD SHX TextDISEMAK OLEH
AutoCAD SHX TextDIREKA OLEH
AutoCAD SHX TextEN. ZAHIR
AutoCAD SHX TextIR. JAMALUDDIN
AutoCAD SHX TextWATIE
AutoCAD SHX Text TARIKH
AutoCAD SHX TextPINDAAN
AutoCAD SHX TextNO
AutoCAD SHX TextDISEMAK
AutoCAD SHX TextPENGEMUKAAN
AutoCAD SHX TextJURUTERA PERUNDING SIVIL & STRUKTUR :
AutoCAD SHX TextARKITEK :
AutoCAD SHX TextPELAKSANA :
AutoCAD SHX TextJABATAN PERDANA MENTERI
AutoCAD SHX TextTANDATANGAN TUAN BANGUNAN :
AutoCAD SHX TextNAMA
AutoCAD SHX Text:
AutoCAD SHX TextNO. K/P
AutoCAD SHX Text:
AutoCAD SHX TextJAWATAN
AutoCAD SHX Text:
AutoCAD SHX TextALAMAT
AutoCAD SHX Text:
AutoCAD SHX TextNAMA
AutoCAD SHX Text:
AutoCAD SHX TextNO. K/P
AutoCAD SHX Text:
AutoCAD SHX TextJAWATAN
AutoCAD SHX Text:
AutoCAD SHX TextALAMAT
AutoCAD SHX Text:
AutoCAD SHX TextTANDATANGAN TUAN TANAH :
AutoCAD SHX Text(a)*Bahawa hakmilik tanah bagI tanah di mana bangunan-bangunanini akan dibina tidak
AutoCAD SHX Textmengandungi perjanjian atau syarat-syarat khas yang melarang pembinaan
AutoCAD SHX Textbangunan-bangunan yang tersebut:
AutoCAD SHX TextSaya mengesahkan :-
AutoCAD SHX Text(b)*Bahawa pemunya-pemunya telah mematuhi sepenuhnya dengan kehendak di dalam
AutoCAD SHX Textperjanjian-perjanjian seperti itu, atau syarat-syarat terkandung di dalam hakmilik
AutoCAD SHX TextUnit Penyelarasan Pelaksanaan Jabatan Perdana Menteri
AutoCAD SHX TextTingkat 11 & 15 Menara Boustead, Jalan Sultan Ahmad Shah,
AutoCAD SHX Text10050, Georgetown, Pulau Pinang.
AutoCAD SHX TextTel : 04- 2185700 Faks : 04-2105733
AutoCAD SHX Text( NO. SYARIKAT 436442-A )
AutoCAD SHX Text(SPAN QUALIFICATION PERSON NO. : SPAN QP 0561)
AutoCAD SHX TextCAWANGAN PULAU PINANG : NO. 7, TINGKAT 1, JALAN DAGANGAN 2,
AutoCAD SHX TextTEL : 04-5751710 FAX : 04-5751710
AutoCAD SHX TextPUSAT BANDAR BERTAM PERDANA 1, 13200 KEPALA BATAS,
AutoCAD SHX TextEmail : [email protected]
AutoCAD SHX TextSEBERANG PERAI UTARA, PULAU PINANG.
COLUMN SCHEDULE
CORNICE/COPING
TYPICAL SECTION OF
KERATAN A-A
A
PELAN TIPIKAL PENAPAK
A
IJSB/2020781/ST/13 13
13
PELAN STRUKTUR
BUTIRAN PINTU GERBANG - 2
MEROBOH DAN MEMBINA BANGUNANTAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR.
KERAJAAN MALAYSIAPEJABAT PEMBANGUNAN NEGERI PULAU PINANG
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ZWAN USIN RCHITECTA H A
AZWAN HUSIN ARCHITECT
UNTUK :AHLI JAWATAN KUASA MASJID JAMEK TUAN HAJI ABDUL LATIF
SDN. BHD.JURUTERA PERUNDING
ILHAM JURUTERA
AutoCAD SHX TextFollow
AutoCAD SHX TextTop Column
AutoCAD SHX TextMAIN BAR
AutoCAD SHX TextTIES
AutoCAD SHX TextCOL. SIZE
AutoCAD SHX Text12T12
AutoCAD SHX Text3R10 - 125
AutoCAD SHX Text350(B) X 350(H)
AutoCAD SHX Text4T20
AutoCAD SHX TextR10 - 225
AutoCAD SHX Text350 X 350
AutoCAD SHX TextMAIN BAR
AutoCAD SHX TextTIES
AutoCAD SHX TextCOL. SIZE
AutoCAD SHX TextNil.
AutoCAD SHX TextNil.
AutoCAD SHX TextNil.
AutoCAD SHX Text4T16
AutoCAD SHX TextR10 - 175
AutoCAD SHX Text350 X 350
AutoCAD SHX TextMAIN BAR
AutoCAD SHX TextTIES
AutoCAD SHX TextCOL. SIZE
AutoCAD SHX Text8T12
AutoCAD SHX TextR10 - 125
AutoCAD SHX Text350 X 350
AutoCAD SHX Text4T16
AutoCAD SHX TextR10 - 175
AutoCAD SHX Text350 X 350
AutoCAD SHX TextCOLUMN MARK
AutoCAD SHX TextC1
AutoCAD SHX TextC2
AutoCAD SHX TextSTUMP
AutoCAD SHX TextGRD.FL.LEV.
AutoCAD SHX TextGRD.FL.LEV.
AutoCAD SHX TextFIRST FLR . LEV.
AutoCAD SHX TextFIRST FLR . LEV.
AutoCAD SHX TextSECOND FLR . LEV.
AutoCAD SHX TextMAIN BARS
AutoCAD SHX TextLINKS
AutoCAD SHX Text75
AutoCAD SHX Text40
AutoCAD SHX Text75
AutoCAD SHX Text40
AutoCAD SHX TextFROM BRICKWALL
AutoCAD SHX Text6R8
AutoCAD SHX TextY10-300 DOWEL BARS
AutoCAD SHX TextR8-300
AutoCAD SHX TextN.T.S
AutoCAD SHX Text(ACTUAL DEPTH TO BE
AutoCAD SHX Text GROUND LEVEL
AutoCAD SHX TextRE-BARS (B/WS)
AutoCAD SHX TextREINF
AutoCAD SHX TextREINF
AutoCAD SHX TextTIES
AutoCAD SHX Text50 MM. THK. LEAN CONC.
AutoCAD SHX TextWELL COMPACTED HARDCORE
AutoCAD SHX Text150 MM. THK. MECHANICALLY
AutoCAD SHX TextN.T.S
AutoCAD SHX TextN.T.S
AutoCAD SHX TextN.T.S
AutoCAD SHX TextDETERMINED AT SITE)
AutoCAD SHX TextNO. LUKISAN :
AutoCAD SHX TextFAIL ACAD : LYN-D:\PROJECT-O\MASJID PERMATANG PASIR\TENDER\RC\LAYOUT-GB-1B-2B
AutoCAD SHX TextTERTERA
AutoCAD SHX TextLYN
AutoCAD SHX TextSTATUS LUKISAN :
AutoCAD SHX TextTAJUK LUKISAN :
AutoCAD SHX TextTAJUK PROJEK :
AutoCAD SHX TextPEMBINAAN
AutoCAD SHX TextKONTRAK
AutoCAD SHX TextPERMULAAN
AutoCAD SHX Text`AS-BUILT'
AutoCAD SHX TextTENDER
AutoCAD SHX TextSKALA
AutoCAD SHX TextDILUKIS OLEH
AutoCAD SHX TextTARIKH
AutoCAD SHX TextMAC 2020
AutoCAD SHX TextDILULUS OLEH
AutoCAD SHX TextDISEMAK OLEH
AutoCAD SHX TextDIREKA OLEH
AutoCAD SHX TextEN. ZAHIR
AutoCAD SHX TextIR. JAMALUDDIN
AutoCAD SHX TextWATIE
AutoCAD SHX Text TARIKH
AutoCAD SHX TextPINDAAN
AutoCAD SHX TextNO
AutoCAD SHX TextDISEMAK
AutoCAD SHX TextPENGEMUKAAN
AutoCAD SHX TextJURUTERA PERUNDING SIVIL & STRUKTUR :
AutoCAD SHX TextARKITEK :
AutoCAD SHX TextPELAKSANA :
AutoCAD SHX TextJABATAN PERDANA MENTERI
AutoCAD SHX TextTANDATANGAN TUAN BANGUNAN :
AutoCAD SHX TextNAMA
AutoCAD SHX Text:
AutoCAD SHX TextNO. K/P
AutoCAD SHX Text:
AutoCAD SHX TextJAWATAN
AutoCAD SHX Text:
AutoCAD SHX TextALAMAT
AutoCAD SHX Text:
AutoCAD SHX TextNAMA
AutoCAD SHX Text:
AutoCAD SHX TextNO. K/P
AutoCAD SHX Text:
AutoCAD SHX TextJAWATAN
AutoCAD SHX Text:
AutoCAD SHX TextALAMAT
AutoCAD SHX Text:
AutoCAD SHX TextTANDATANGAN TUAN TANAH :
AutoCAD SHX Text(a)*Bahawa hakmilik tanah bagI tanah di mana bangunan-bangunanini akan dibina tidak
AutoCAD SHX Textmengandungi perjanjian atau syarat-syarat khas yang melarang pembinaan
AutoCAD SHX Textbangunan-bangunan yang tersebut:
AutoCAD SHX TextSaya mengesahkan :-
AutoCAD SHX Text(b)*Bahawa pemunya-pemunya telah mematuhi sepenuhnya dengan kehendak di dalam
AutoCAD SHX Textperjanjian-perjanjian seperti itu, atau syarat-syarat terkandung di dalam hakmilik
AutoCAD SHX TextUnit Penyelarasan Pelaksanaan Jabatan Perdana Menteri
AutoCAD SHX TextTingkat 11 & 15 Menara Boustead, Jalan Sultan Ahmad Shah,
AutoCAD SHX Text10050, Georgetown, Pulau Pinang.
AutoCAD SHX TextTel : 04- 2185700 Faks : 04-2105733
AutoCAD SHX Text( NO. SYARIKAT 436442-A )
AutoCAD SHX Text(SPAN QUALIFICATION PERSON NO. : SPAN QP 0561)
AutoCAD SHX TextCAWANGAN PULAU PINANG : NO. 7, TINGKAT 1, JALAN DAGANGAN 2,
AutoCAD SHX TextTEL : 04-5751710 FAX : 04-5751710
AutoCAD SHX TextPUSAT BANDAR BERTAM PERDANA 1, 13200 KEPALA BATAS,
AutoCAD SHX TextEmail : [email protected]
AutoCAD SHX TextSEBERANG PERAI UTARA, PULAU PINANG.
PELAN LANTAI BAWAH
IJSB/2020781/PL/01 01
01
PELAN LANTAI BAWAH
SCHEDULE OF PIPE SIZES
STOR TAMBAHAN
(BINAAN BARU)
BA EDC
1
2
3
5
4
6
2a
7
8
3a
7a
EXISTING METER & FITTING
TYPICAL STANDPIPE TAP (AT WALL)
SDN. BHD.JURUTERA PERUNDING
ILHAM JURUTERA
MEROBOH DAN MEMBINA BANGUNANTAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR.
KERAJAAN MALAYSIAPEJABAT PEMBANGUNAN NEGERI PULAU PINANG
UNTUK :AHLI JAWATAN KUASA MASJID JAMEK TUAN HAJI ABDUL LATIF
PELAN BEKALAN AIR
No. 147, Tingkat 1, Persiaran 3,Kulim Avenue, Kulim Hi-tech Park,09000 Kulim, Kedah Darul Aman.T : 04 4080 555 F : 04 4080 666E: [email protected]
ZWAN USIN RCHITECTA H A
AZWAN HUSIN ARCHITECT
AutoCAD SHX Textkiblat
AutoCAD SHX TextU
AutoCAD SHX TextNO. LUKISAN :
AutoCAD SHX TextFAIL ACAD:LINDA-D:\PROJECTS-O\MOSQUES\MASJID PERMATANG PASIR\TENDER\PL\MPMTGPH-PL-LAYOUT
AutoCAD SHX Text12"
AutoCAD SHX Text26.60
AutoCAD SHX Text54.0
AutoCAD SHX Text33.40
AutoCAD SHX Text48.10
AutoCAD SHX Text*
AutoCAD SHX Text60.20
AutoCAD SHX Text108.0
AutoCAD SHX Text76.1
AutoCAD SHX TextSTEEL
AutoCAD SHX Text22.0
AutoCAD SHX TextABS
AutoCAD SHX TextCOPPER
AutoCAD SHX Text22.0
AutoCAD SHX TextSTAINLESS
AutoCAD SHX Text42.0
AutoCAD SHX Text42.0
AutoCAD SHX Text54.0
AutoCAD SHX Text28.0
AutoCAD SHX Text28.0
AutoCAD SHX Text48.25
AutoCAD SHX Text33.55
AutoCAD SHX Text3/4"
AutoCAD SHX Text(20mm)
AutoCAD SHX TextHDPE
AutoCAD SHX Text25
AutoCAD SHX Text(50mm)
AutoCAD SHX Text(40mm)
AutoCAD SHX Text50
AutoCAD SHX Text63
AutoCAD SHX Text1"
AutoCAD SHX Text(25mm)
AutoCAD SHX Text32
AutoCAD SHX TextPB
AutoCAD SHX Text41.27
AutoCAD SHX Text28.57
AutoCAD SHX Text22.22
AutoCAD SHX Text53.97
AutoCAD SHX TextNORMINAL SIZES
AutoCAD SHX Text168.30
AutoCAD SHX Text218.80
AutoCAD SHX Text170
AutoCAD SHX Text177.3
AutoCAD SHX Text125
AutoCAD SHX Text90
AutoCAD SHX Text222
AutoCAD SHX Text232.2
AutoCAD SHX Text2"
AutoCAD SHX Text6"
AutoCAD SHX Text4'
AutoCAD SHX Text3'
AutoCAD SHX Text8"
AutoCAD SHX Text(200mm)
AutoCAD SHX Text(300mm)
AutoCAD SHX Text1.5"
AutoCAD SHX Text(150mm)
AutoCAD SHX Text(100mm)
AutoCAD SHX Text(75mm)
AutoCAD SHX TextOUTSIDE DIAMETRE (MM)
AutoCAD SHX TextUPVC Class E
AutoCAD SHX Text26.75
AutoCAD SHX Text114.10
AutoCAD SHX Text88.90
AutoCAD SHX TextIRON
AutoCAD SHX TextDUCTILE
AutoCAD SHX TextSTEEL
AutoCAD SHX TextMILD
AutoCAD SHX TextP.A.
AutoCAD SHX Text41.0
AutoCAD SHX Text60.0
AutoCAD SHX Text16.0
AutoCAD SHX Text32.0
AutoCAD SHX Text20.0
AutoCAD SHX TextDIAMETRE
AutoCAD SHX TextINTERNAL
AutoCAD SHX Text(MM)
AutoCAD SHX TextOUTSIDE DIAMETERS FOR DIFFERENT PIPE MATERIALS TABLE
AutoCAD SHX Text(INTERNAL PLUMBING)
AutoCAD SHX TextFOR CONCEAL PIPING, UPVC PIPES SHALL NOT BE USED.
AutoCAD SHX Text* UPVC CLASS E IS ONLY ALLOWED FOR USE UNDER EXPOSED CONDITION
AutoCAD SHX TextSYMBOL
AutoCAD SHX TextLEGEND
AutoCAD SHX TextDESCRIPTION
AutoCAD SHX TextPBAPP EXISTING PIPE
AutoCAD SHX Textt
AutoCAD SHX TextTAP
AutoCAD SHX TextSKALA - 1:100
AutoCAD SHX Text32mm %%C HDPE PN16
AutoCAD SHX Text32mm %%C HDPE PN16
AutoCAD SHX Textt
AutoCAD SHX Textt
AutoCAD SHX Textt
AutoCAD SHX Textt
AutoCAD SHX Textt
AutoCAD SHX Textt
AutoCAD SHX Textt
AutoCAD SHX Textt
AutoCAD SHX Textt
AutoCAD SHX TextRUANG SOLAT
AutoCAD SHX TextUTAMA SEDIADA (L)
AutoCAD SHX TextRUANG SOLAT
AutoCAD SHX Text SEDIADA (L)
AutoCAD SHX TextRUANG SOLAT
AutoCAD SHX TextSEDIADA (P)
AutoCAD SHX TextRUANG LEGAR
AutoCAD SHX TextSEDIADA
AutoCAD SHX TextMIMBAR
AutoCAD SHX TextSEDIADA
AutoCAD SHX TextBILIK
AutoCAD SHX TextMESYUARAT
AutoCAD SHX TextSEDIADA
AutoCAD SHX TextBILIK
AutoCAD SHX TextMESYUARAT
AutoCAD SHX TextSEDIADA
AutoCAD SHX TextMINARET
AutoCAD SHX TextSEDIADA
AutoCAD SHX TextBALAI
AutoCAD SHX Text LINTANG
AutoCAD SHX TextTAMBAHAN
AutoCAD SHX TextSTOR
AutoCAD SHX TextTAMBAHAN 2
AutoCAD SHX TextNK 50
AutoCAD SHX TextNK100
AutoCAD SHX TextTN50
AutoCAD SHX TextKOLAH
AutoCAD SHX TextKAWASAN BERBUMBUNG
AutoCAD SHX TextSEDIADA
AutoCAD SHX TextRUANG WUDHUK (P)
AutoCAD SHX TextTAMBAHAN
AutoCAD SHX TextTANDAS (P)
AutoCAD SHX TextSEDIADA
AutoCAD SHX TextNK125
AutoCAD SHX TextNK125
AutoCAD SHX TextNK125
AutoCAD SHX TextNK125
AutoCAD SHX TextNK50
AutoCAD SHX TextNK
AutoCAD SHX TextLALUAN MUSLIMAT TAMBAHAN
AutoCAD SHX TextNK100
AutoCAD SHX Text(BINAAN BARU)
AutoCAD SHX TextSTOR
AutoCAD SHX TextSEDIADA DIROBOHKAN
AutoCAD SHX Text(BINAAN BARU)
AutoCAD SHX Text(BINAAN BARU)
AutoCAD SHX Text(BINAAN BARU)
AutoCAD SHX TextKOLAH
AutoCAD SHX TextSEDIADA DIROBOHKAN
AutoCAD SHX TextRUANG WUDHUK (L)
AutoCAD SHX TextTAMBAHAN
AutoCAD SHX Text(BINAAN BARU)
AutoCAD SHX TextLALUAN MUSLIMAT TAMBAHAN
AutoCAD SHX TextTANDAS (L)
AutoCAD SHX TextSEDIADA
AutoCAD SHX TextRUANG LEGAR
AutoCAD SHX TextSEDIADA
AutoCAD SHX TextRUANG LEGAR
AutoCAD SHX TextSEDIADA
AutoCAD SHX Text1
AutoCAD SHX Text2
AutoCAD SHX Text3
AutoCAD SHX Text4
AutoCAD SHX Text5
AutoCAD SHX Text6
AutoCAD SHX Text7
AutoCAD SHX Text8
AutoCAD SHX Text9
AutoCAD SHX Text10
AutoCAD SHX Text11
AutoCAD SHX Text12
AutoCAD SHX Text13
AutoCAD SHX Text14
AutoCAD SHX Text15
AutoCAD SHX Text16
AutoCAD SHX Text17
AutoCAD SHX Text18
AutoCAD SHX Text19
AutoCAD SHX Text20
AutoCAD SHX Text21
AutoCAD SHX Text22
AutoCAD SHX Text23
AutoCAD SHX Text24
AutoCAD SHX TextF.R.L 0.600
AutoCAD SHX TextF.R.L 0.000
AutoCAD SHX Textt
AutoCAD SHX Textt
AutoCAD SHX Textt
AutoCAD SHX Textt
AutoCAD SHX Textt
AutoCAD SHX Text32mm %%C HDPE PN16
AutoCAD SHX TextFloat ball valve
AutoCAD SHX TextTN166
AutoCAD SHX TextTN167
AutoCAD SHX TextTN167
AutoCAD SHX TextTN167
AutoCAD SHX TextTN166
AutoCAD SHX TextTN167
AutoCAD SHX TextTN150
AutoCAD SHX TextTN150
AutoCAD SHX TextNK150
AutoCAD SHX TextNK150
AutoCAD SHX TextJALAN SUNGAI DUA
AutoCAD SHX TextConnection to existing main pipe
AutoCAD SHX Textto bedetermined at site
AutoCAD SHX TextExisting meter `Masjid' to be
AutoCAD SHX Textrelocated if necessary
AutoCAD SHX Text32mm %%C HDPE PN16
AutoCAD SHX Text32mm %%C HDPE PN16
AutoCAD SHX TextExisting meter to be
AutoCAD SHX Textrelocate if necessary
AutoCAD SHX TextExisting meter to be
AutoCAD SHX Textrelocate if necessary
AutoCAD SHX TextPBAPP existing pipe
AutoCAD SHX Text3 nos of existing meter and fitting
AutoCAD SHX Textto be relocated if necessary
AutoCAD SHX TextSUPPLY FROM MAIN PIPE
AutoCAD SHX TextGARISAN PUTUS-PUTUS MENUNJUKKAN
AutoCAD SHX TextBANGUNAN YANG AKAN DIROBOHKAN
AutoCAD SHX Text32mm %%C HDPE PN16
AutoCAD SHX Text32mm %%C HDPE PN16
AutoCAD SHX Text32mm %%C HDPE PN16
AutoCAD SHX Text32mm %%C HDPE PN16
AutoCAD SHX Text15mm Brass elbow
AutoCAD SHX TextWall
AutoCAD SHX Text15mm tap
AutoCAD SHX TextN.T.S
AutoCAD SHX Textmale adaptor
AutoCAD SHX TextSTATUS LUKISAN :
AutoCAD SHX Text( NO. SYARIKAT 436442-A )
AutoCAD SHX Text(SPAN QUALIFICATION PERSON NO. : SPAN QP 0561)
AutoCAD SHX TextTAJUK LUKISAN :
AutoCAD SHX TextTAJUK PROJEK :
AutoCAD SHX TextPEMBINAAN
AutoCAD SHX TextKONTRAK
AutoCAD SHX TextPERMULAAN
AutoCAD SHX Text`AS-BUILT'
AutoCAD SHX TextTENDER
AutoCAD SHX TextSKALA
AutoCAD SHX TextDILUKIS OLEH
AutoCAD SHX TextTARIKH
AutoCAD SHX TextSEPERTI DITUNJUKKAN
AutoCAD SHX TextMAC 2020
AutoCAD SHX TextLYN
AutoCAD SHX TextDILULUS OLEH
AutoCAD SHX TextDISEMAK OLEH
AutoCAD SHX TextDIREKA OLEH
AutoCAD SHX TextEN. ZAHIR
AutoCAD SHX TextIR. JAMALUDDIN
AutoCAD SHX TextWATIE
AutoCAD SHX Text TARIKH
AutoCAD SHX TextPINDAAN
AutoCAD SHX TextNO
AutoCAD SHX TextDISEMAK
AutoCAD SHX TextPENGEMUKAAN
AutoCAD SHX TextJURUTERA PERUNDING SIVIL & STRUKTUR :
AutoCAD SHX TextARKITEK :
AutoCAD SHX TextPELAKSANA :
AutoCAD SHX TextJABATAN PERDANA MENTERI
AutoCAD SHX TextTANDATANGAN TUAN BANGUNAN :
AutoCAD SHX TextNAMA
AutoCAD SHX Text:
AutoCAD SHX TextNO. K/P
AutoCAD SHX Text:
AutoCAD SHX TextJAWATAN
AutoCAD SHX Text:
AutoCAD SHX TextALAMAT
AutoCAD SHX Text:
AutoCAD SHX TextNAMA
AutoCAD SHX Text:
AutoCAD SHX TextNO. K/P
AutoCAD SHX Text:
AutoCAD SHX TextJAWATAN
AutoCAD SHX Text:
AutoCAD SHX TextALAMAT
AutoCAD SHX Text:
AutoCAD SHX TextTANDATANGAN TUAN TANAH :
AutoCAD SHX Text(a)*Bahawa hakmilik tanah bagI tanah di mana bangunan-bangunanini akan dibina tidak
AutoCAD SHX Textmengandungi perjanjian atau syarat-syarat khas yang melarang pembinaan
AutoCAD SHX Textbangunan-bangunan yang tersebut:
AutoCAD SHX TextSaya mengesahkan :-
AutoCAD SHX Text(b)*Bahawa pemunya-pemunya telah mematuhi sepenuhnya dengan kehendak di dalam
AutoCAD SHX Textperjanjian-perjanjian seperti itu, atau syarat-syarat terkandung di dalam hakmilik
AutoCAD SHX TextUnit Penyelarasan Pelaksanaan Jabatan Perdana Menteri
AutoCAD SHX TextTingkat 11 & 15 Menara Boustead, Jalan Sultan Ahmad Shah,
AutoCAD SHX Text10050, Georgetown, Pulau Pinang.
AutoCAD SHX TextTel : 04- 2185700 Faks : 04-2105733
AutoCAD SHX TextCAWANGAN PULAU PINANG : NO. 7, TINGKAT 1, JALAN DAGANGAN 2,
AutoCAD SHX TextTEL : 04-5751710 FAX : 04-5751710
AutoCAD SHX TextPUSAT BANDAR BERTAM PERDANA 1, 13200 KEPALA BATAS,
AutoCAD SHX TextEmail : [email protected]
AutoCAD SHX TextSEBERANG PERAI UTARA, PULAU PINANG.
IJSB/2020781/SI/01 0101
PELAN TANDAS DALAMAN
MEROBOH DAN MEMBINA BANGUNANTAMBAHAN BAHARU MASJID JAMEK TUAN HAJI ABDUL LATIF, PERMATANG PASIR.
TIPIKAL SKEMATIK DIAGRAM DANPELAN LANTAI BAWAH,
BUTIRAN SANITARI.
BUTIRAN PERANGKAP LANTAI
1
PELAN PERANGKAP GEGELUK KERATAN 1-1
1
BUTIRAN TIPIKAL SAMBUNGAN CAWANGANPAIP NAJIS DENGAN PAIP KOTOR
90° LENGKUNGAN PANJANG OFFSET
ARAS BAWAH
ARAS BUMBUNG
TIPIKAL SKEMATIK DIAGRAM
PELAN LANTAI BAWAH
RUANG SOLAT
UTAMA SEDIADA (L)
RUANG SOLAT
SEDIADA (L)
RUANG SOLAT