PPSE - PIK 2009 July 3, 2009
Ketersediaan & Pemanfaatan Air 1
KETERSEDIAAN & KETERSEDIAAN & PEMANFAATAN AIRPEMANFAATAN AIR
PerencanaanPerencanaan InfrastrukturInfrastruktur KeairanKeairan12 12 FebruariFebruari 20092009
KetersediaanKetersediaan AirAir
RasionalQ = α I AP = a I A
Horton f = fo + (fo- fc) e-kt
I = f A
Darcy q = k dh/dxQ = q A
ΔQ = P – I - E
RainfallRainfall--RunoffRunoffRelationRelation
Hutan C=0.2
Kebun C=0.5
Sawah C=0.8
Pemukiman C=1
Hapus
0
5
10
15
20
25
30
35
40
45
1 3 5 7 9 11 13 15
AliranHujan
Rainfall R(t)
Rainfall I(t)
Watershed Boundary
Watershed Surface
System Boundary DischargeQ(t) Operator
Input R(t)
Output Q(t)
R
t
t
Q
Ω c)t(I)t(Q==
c = koef. Aliran
= f (tata guna lahan, topografi, intensitas, dll.)
R(t)
Q(t)
PPSE - PIK 2009 July 3, 2009
Ketersediaan & Pemanfaatan Air 2
Analisis Curah Hujan Andalan pada Sta. Bogor Empang (mm)
Tahun Jan Feb Mrt Apr Mei Jun Jul Ags Sep Okt Nov Des Tahunan Tahunan Ranking Tahun Peluangm P=m/(n+1)*100%
1981 297 243 577 242 292 46 59 46 69 123 312 314 2620 2985 1 1988 6.25 1981 218.3 248.8 881982 313 257 224 265 268 23 79 28 54 116 258 378 2263 2803 2 1985 12.50 1982 188.6 233.6 851983 330 171 224 287 325 97 43 39 66 348 209 183 2322 2690 3 1991 18.75 1983 193.5 224.2 911984 116 309 364 174 251 108 24 73 76 134 246 303 2178 2620 4 1981 25.00 1984 181.5 218.3 811985 425 358 407 242 224 90 98 41 107 246 179 386 2803 2592 5 1987 31.25 1985 233.6 216 871986 287 171 235 229 103 31 102 48 93 177 127 322 1925 2572 6 1989 37.50 1986 160.4 214.3 891987 196 348 237 263 259 91 79 63 62 260 273 461 2592 2540 7 1992 43.75 1987 216 211.7 921988 445 533 292 266 282 106 95 40 141 197 284 304 2985 2454 8 1990 50.00 1988 248.8 204.5 901989 331 162 357 423 214 60 57 65 79 203 247 374 2572 2322 9 1983 56.25 1989 214.3 193.5 831990 412 180 326 205 71 104 82 90 73 233 372 306 2454 2263 10 1982 62.50 1990 204.5 188.6 821991 347 222 327 432 146 114 73 82 91 131 406 319 2690 2178 11 1984 68.75 1991 224.2 181.5 841992 391 293 352 190 269 117 51 68 165 239 240 165 2540 2150 12 1993 75.00 1992 211.7 179.2 931993 267 321 234 209 198 98 37 49 93 175 212 257 2150 2135 13 1994 81.25 1993 179.2 177.9 941994 344 220 396 171 157 60 98 10 44 127 207 301 2135 2099 14 1995 87.50 1994 177.9 174.9 951995 289 190 285 253 64 59 27 51 37 293 261 290 2099 1925 15 1986 93.75 1995 174.9 160.4 86
1984 116 309 364 174 251 108 24 73 76 134 246 303 21781993 267 321 234 209 198 98 37 49 93 175 212 257 21501994 344 220 396 171 157 60 98 10 44 127 207 301 21351995 289 190 285 253 64 59 27 51 37 293 261 290 20991986 287 171 235 229 103 31 102 48 93 177 127 322 1925
260.6 242.2 302.8 207.2 154.6 71.2 57.6 46.2 68.6 181.2 210.6 294.6 2097.4267 220 285 209 157 60 37 48 76 177 212 290 2038
0
50
100
150
200
250
300
350
1 2 3 4 5 6 7 8 9 10 11 12
Sumber: Dinas Tata Kota DKI Jakarta, dalam disertasi Rudi Tambunan, 2004
Surface Surface water supplywater supply
Unregulated Unregulated streamstream
OnOn--stream stream storagestorage
Direct supply Direct supply sourcesource
OffOff--stream stream storagestorage
Sources of surface water supply (Handbook of Hydrology, 1994)
JWRMS, 1994
Air Industri; 2,0 %
Air Minum; 6,0 %
Air Perkotaan;
0,3 %
Air Irigasi; 86,7 %
Belum dimanfaatkan
; 5,0%
42.1%
57.9%
Citarum46%
Sungai Lainnya54%
Contoh Pengelolaan On-Stream StorageJUMLAH POTENSI SUMBER DAYA AIR
± 12,95 M m3/tahun
PENGENDALIAN POTENSI SUMBER DAYA AIR
PEMANFAATAN SUMBER DAYA AIR (Dari 7,5 M m3 / tahun)
•ENERGI LISTRIK (daya terpasang)PLTA Saguling 700 MWPLTA Cirata 1000 MWPLTA Djuanda 187 MW
•AIR BAKU AIR MINUM (domestik)± 450 juta m3 (6,0 %)
•AIR BAKU INDUSTRI± 151 juta m3 (2,0 %)
•AIR PERKOTAAN± 25 juta m3 (0,3 %)
•AIR IRIGASI± 6500 juta m3 (86,7 %)
•BELUM DIMANFAATKAN± 450 juta m3 (5,0 %)
Telah membayarIuran E&P
Belum membayarIuran E&P
Tidak dipungutIuran E&P
• Telah dikendalikan; 7,5 M m3/th (57,9 %); dari Citarum ± 6,0 M m3/th dan sungailainnya ± 1,5 M m3/th
• Belum dikendalikan; 5,45 M m3/th (42,1 %); terbuang ke laut
KONFIGURASI POTENSI DAN PEMANFAATAN SUMBER AIRSUNGAI CITARUM
(Dari 74 sungai dan anaksungai)
PPSE - PIK 2009 July 3, 2009
Ketersediaan & Pemanfaatan Air 3
Contoh Pengelolaan Un-regulated Stream
• PDAM Tirta Kahuripan, Kab. Bogor– Total kapasitas air terpasang 2078 liter/detik dari
12 instalasi pengolahan terdiri dari:• 1180 l/dtk dari air permukaan atau sungai• 781 l/dtk dari 9 mata air• 117 l/dtk dari 13 sumur bor
Pos Kota, 12 Sept. 2006 16.816903220192.21.905Indonesia
251.519949813.90.492Maluku+Irian Jaya
98.81884100810.20.535Kalimantan
18.4156773840.10.471Sumatera
18.3132124713.50.187Sulawesi
5.56986010.80.086Bali+NTB+NTB+TT
1.61406187113.60.133Jawa
7.6316426505588135Dunia
84268240028.78.95Australia dan Oceania
386741203031517.86Amerika Selatan
4.030913508340343.48Asia
5.7134404070830.10Afrika
17320777044824.25Amerika Utara
4.2278290068510.46Eropa
Per kapitaPer Km2
Potensi Ketersediaan Air
(1000m3/Thn)
Sumberdaya Air
(Km3/Thn)
Penduduk(juta)
Luas(juta km2)
Benua
KETERSEDIAAN POTENSI SUMBERDAYA AIRKETERSEDIAAN POTENSI SUMBERDAYA AIR
Sumber : Shiklomanov, 1997, Badruddin Machbud, 1999
NERACA AIR NASIONAL NERACA AIR NASIONAL TAHUN 2003 DAN 2020TAHUN 2003 DAN 2020
(Juta m3)
1,474,149.8 (Juta m3) 483,055.2 (Juta m3)
(Juta m3)
45,821.5 (Juta m3) 66,454.1 (Juta m3)
NASIONAL TH. 2003KETERSEDIAAN AIR TOTAL
1,957,205.0MUSIM HUJAN MUSIM KEMARAU
SURPLUS SURPLUS
KEBUTUHAN AIR TOTAL 112,275.7
MUSIM HUJAN MUSIM KEMARAU
(Juta m3)
1,474,149.8 (Juta m3) 483,055.2 (Juta m3)
(Juta m3)
52,176.3 (Juta m3) 75,530.8 (Juta m3)
NASIONAL TH. 2020KETERSEDIAAN AIR TOTAL
1,957,205.0MUSIM HUJAN MUSIM KEMARAU
SURPLUS SURPLUS
KEBUTUHAN AIR TOTAL 127,707.1
MUSIM HUJAN MUSIM KEMARAU
NERACA AIRPER PULAU TAHUN 2003
(Juta m3) 25 % Tot. Nas
384,774.4 (Juta m3) 96,193.6 (Juta m3)
(Juta m3) 18 % Tot. Nas
8,319.0 (Juta m3) 11,646.7 (Juta m3)
480,968.0
19,965.7
PULAU SUMATERAKETERSEDIAAN AIR TOTAL
MUSIM HUJAN MUSIM KEMARAU
KEBUTUHAN AIR TOTAL
MUSIM HUJAN MUSIM KEMARAU
SURPLUS SURPLUS
(Juta m3) 28 % Tot. Nas
389,689.3 (Juta m3) 167,009.7 (Juta m3)
(Juta m3) 4 % Tot. Nas
2,040.8 (Juta m3) 2,857.2 (Juta m3)MUSIM KEMARAU
MUSIM HUJAN MUSIM KEMARAU
PULAU KALIMANTANKETERSEDIAAN AIR TOTAL
556,699.0
SURPLUS SURPLUS
KEBUTUHAN AIR TOTAL 4,898.0
MUSIM HUJAN
(Juta m3) 7 % Tot. Nas
129,400.2 (Juta m3) 14,377.8 (Juta m3)
(Juta m3) 14 % Tot. Nas
6,433.3 (Juta m3) 9,006.7 (Juta m3)
PULAU SULAWESIKETERSEDIAAN AIR TOTAL
KEBUTUHAN AIR TOTAL 15,440.0
143,778.0MUSIM HUJAN MUSIM KEMARAU
MUSIM HUJAN MUSIM KEMARAU
SURPLUS SURPLUS
(Juta m3) 7 % Tot. Nas
101,160.8 (Juta m3) 25,290.2 (Juta m3)
(Juta m3) 59 % Tot. Nas
27,432.9 (Juta m3) 38,406.1 (Juta m3)
PULAU JAWA DAN BALIKETERSEDIAAN AIR TOTAL
126,451.0MUSIM HUJAN MUSIM KEMARAU
MUSIM HUJAN MUSIM KEMARAU
KEBUTUHAN AIR TOTAL 65,839.1
SURPLUS DEFISIT
(Juta m3) 2 % Tot. Nas
37,940.4 (Juta m3) 4,215.6 (Juta m3)
(Juta m3) 5 % Tot. Nas
1,440.0 (Juta m3) 4,320.0 (Juta m3)
PULAU NUSA TENGGARAKETERSEDIAAN AIR TOTAL
42,156.0MUSIM HUJAN MUSIM KEMARAU
KEBUTUHAN AIR TOTAL 5,760.0
MUSIM HUJAN MUSIM KEMARAU
SURPLUS DEFISIT
(Juta m3) 4 % Tot. Nas
49,420.8 (Juta m3) 12,355.2 (Juta m3)
(Juta m3) 0.2 Tot. Nas
98.2 (Juta m3) 137.5 (Juta m3)SURPLUS SURPLUS
KEBUTUHAN AIR TOTAL 235.7
61,776.0MUSIM HUJAN MUSIM KEMARAU
MUSIM HUJAN MUSIM KEMARAU
PULAU MALUKUKETERSEDIAAN AIR TOTAL
(Juta m3) 28 % Tot. Nas
381,763.9 (Juta m3) 163,613.1 (Juta m3)
(Juta m3) 0.1 % Tot. Nas
57.2 (Juta m3) 80.0 (Juta m3)
PULAU PAPUAKETERSEDIAAN AIR TOTAL
545,377.0
SURPLUS SURPLUS
KEBUTUHAN AIR TOTAL 137.2
MUSIM HUJAN MUSIM KEMARAU
MUSIM HUJAN MUSIM KEMARAU
NERACA AIRPER PULAU TAHUN 2020
(Juta m3) 25 % Tot. Nas
384,774.4 (Juta m3) 96,193.6 (Juta m3)
(Juta m3) 18 % Tot. Nas
9,485.8 (Juta m3) 13,280.2 (Juta m3)
KEBUTUHAN AIR TOTAL
MUSIM HUJAN MUSIM KEMARAU
SURPLUS SURPLUS
480,968.0
22,766.0
PULAU SUMATERAKETERSEDIAAN AIR TOTAL
MUSIM HUJAN MUSIM KEMARAU(Juta m3) 28 % Tot. Nas
389,689.3 (Juta m3) 167,009.7 (Juta m3)
(Juta m3) 5 % Tot. Nas
2,505.8 (Juta m3) 3,508.2 (Juta m3)
KEBUTUHAN AIR TOTAL 6,014.0
MUSIM HUJAN
SURPLUS SURPLUS
MUSIM KEMARAU
MUSIM HUJAN MUSIM KEMARAU
PULAU KALIMANTANKETERSEDIAAN AIR TOTAL 556,699.0 (Juta m3) 7 % Tot. Nas
129,400.2 (Juta m3) 14,377.8 (Juta m3)
(Juta m3) 13 % Tot. Nas
6,921.7 (Juta m3) 9,690.3 (Juta m3)SURPLUS SURPLUS
MUSIM HUJAN MUSIM KEMARAU
KEBUTUHAN AIR TOTAL 16,612.0
143,778.0MUSIM HUJAN MUSIM KEMARAU
PULAU SULAWESIKETERSEDIAAN AIR TOTAL
(Juta m3) 7 % Tot. Nas
101,160.8 (Juta m3) 25,290.2 (Juta m3)
(Juta m3) 59 % Tot. Nas
31,487.1 (Juta m3) 44,081.9 (Juta m3)SURPLUS DEFISIT
MUSIM HUJAN MUSIM KEMARAU
KEBUTUHAN AIR TOTAL 75,569.0
KETERSEDIAAN AIR TOTAL 126,451.0
MUSIM HUJAN MUSIM KEMARAU
PULAU JAWA DAN BALI
(Juta m3) 2 % Tot. Nas
37,940.4 (Juta m3) 4,215.6 (Juta m3)
(Juta m3) 5 % Tot. Nas
1,552.5 (Juta m3) 4,657.6 (Juta m3)DEFISITSURPLUS
KEBUTUHAN AIR TOTAL 6,210.1
MUSIM HUJAN MUSIM KEMARAU
PULAU NUSA TENGGARAKETERSEDIAAN AIR TOTAL
42,156.0MUSIM HUJAN MUSIM KEMARAU
(Juta m3) 4 % Tot. Nas
49,420.8 (Juta m3) 12,355.2 (Juta m3)
(Juta m3) 0.2 % Tot. Nas
106.2 (Juta m3) 148.7 (Juta m3)MUSIM HUJAN MUSIM KEMARAU
PULAU MALUKUKETERSEDIAAN AIR TOTAL
SURPLUS SURPLUS
KEBUTUHAN AIR TOTAL 254.9
61,776.0MUSIM HUJAN MUSIM KEMARAU
(Juta m3) 28 % Tot. Nas
381,763.9 (Juta m3) 163,613.1 (Juta m3)
(Juta m3) 0.2 % Tot. Nas
117.1 (Juta m3) 163.9 (Juta m3)SURPLUS SURPLUS
KEBUTUHAN AIR TOTAL 281.0
MUSIM HUJAN MUSIM KEMARAU
MUSIM HUJAN MUSIM KEMARAU
PULAU PAPUAKETERSEDIAAN AIR TOTAL 545,377.0
PemanfaatanPemanfaatan AirAir
PPSE - PIK 2009 July 3, 2009
Ketersediaan & Pemanfaatan Air 4
PPSE - PIK 2009 July 3, 2009
Ketersediaan & Pemanfaatan Air 5
Water Demand ForecastingWater Demand Forecasting
Chapter 23: Water Demand Analysis23.2.5.3: IWR-MAIN Model
PerhitunganPerhitungan KebutuhanKebutuhan Air Air RumahRumah TanggaTangga
Waktu pengamatan hari, tanggal …waktu/ durasi (…. - ….) …
Karateristik tempat tinggaldaerah tempat tinggal …luas tempat tinggal …Jumlah anggota keluarga pemakai air …rata-rata penghasilan …tingkat pendidikan …
Sumber Air (√) (boleh lebih dari satu)- PAM …- sumur gali …- pompa air dangkal (< 20 m) …- pompa air dalam (jetpump) (> 20 m) …- tanki air (komunal) …- truk air …- penjual air keliling …- mata air …- sungai …- empang/embung/danau …- tadah hujan …
Karakteristik Unit Jenis A (m2) h (m) Q (liter/detik) t (detik) V (liter)Penggunaan Air luas ketinggian air debit waktu aliran volumeDi kamar mandi- bak mandi- pancuran/shower- keran wudhu- keran cuci tangan- bath tube- keran lain- …Di wc/toilet:- wc single flush- wc dual flush- keran lain- …Di dapur:- bak cuci satu keran- bak cuci dua keran- dish washer- keran lain- …Di tempat cuci pakaian:- mesin cuci- keran lain- …Di garasi/parkir:- keran cuci kendaraan- keran siram taman- …Lain-lain:- sprinkler taman- sprinkler kebakaran- kolam renang- kolam ikan- …- …
Total volume pemakaian … (liter)
Total waktu pemakaian … (jam)
Total pemakai … (jiwa)
Kuisioner Pengamatan Kebutuhan Air di Rumah Tangga
Profil pemakaian air:
Y = α+ β1X1 + β2X2 + β3X3 +ε
Dimana:
α , β1, β2, β3= koefisienX1, X2, X3 = variabel bebasε = kesalahan acak
Dalam pengolahan kuisioner ini:
X1 = jumlah pemakai total (orang)X2 = penghasilan (juta rupiah)X3 = luas tempat tinggal (m2)Y = penggunaan air total per rumah tangga
PerhitunganPerhitungan KebutuhanKebutuhan Air Air IrigasiIrigasi
PPSE - PIK 2009 July 3, 2009
Ketersediaan & Pemanfaatan Air 6
PENGELOLAAN SUMBER AIR( Kuantitas )
Waduk Ir. H. Djuanda Volume 2,5 M m3( + 107.00 m )
Waduk SagulingVolume 0.9 M m3( + 643.00 m )
Waduk Cirata Volume 1,9 M m3( + 220.00 m )
Citarum
Cilalanang
Cibeet
Ciherang
Cilamaya Ciasem
Cipunegara
CikarangK. Bekasi
Ciliwung
CBL (Q max 800 m3/det)
Kedung Gede
B. Walahar
Saluran Tarum Utara
B. Curug
B. Beet
B. Karang
B. Bekasi
B. Barugbug
B. Salamdarma
LAUT JAWA
SKEMA JARINGAN PENGAIRAN JATILUHUR
Saluran Tarum Barat
Saluran Tarum Timur
Q maks 300 m3/det
Q maks 678 m3/det
Q maks 350 m3/det
Q maks 1050 m3/det
Q maks 1600 m3/det
PPSE - PIK 2009 July 3, 2009
Ketersediaan & Pemanfaatan Air 7
PPSE - PIK 2009 July 3, 2009
Ketersediaan & Pemanfaatan Air 8
PPSE - PIK 2009 July 3, 2009
Ketersediaan & Pemanfaatan Air 9
PerhitunganPerhitungan KebutuhanKebutuhan Air Air LainnyaLainnya
• Industri• PLTA• Habitat• dll
Chapter 27: Hydrologic Design for Water Use (Handbook of Water Resources Management)
Chapter 23: Water Demand Analysis (Handbook of Hydrology)
17,3
18,1
19,5
22,2 16,2
1433
Salak Contour Canal (2)
Ciliwung (1)
Spring (0,4)
42,1
8
SerangTangerang
Jakarta Bekasi
Bogor
Karawang-Purwakarta
KarianPasirkopoBojongmanikUnreg.
TanjungCilawangUnreg.
GentengUnreg.
6Narogong
Existing Citarum System
95
WTC
Canal 2
Total Kebutuhan Air: 135,4 m3/detik
Total Ketersediaan Air: 159,4 m3/detik
Total: 51,512 juta
PPSE - PIK 2009 July 3, 2009
Ketersediaan & Pemanfaatan Air 10