TABLA DE CALCULO HIDRAULICO GEOMETRICO DE ALCANTARILLADO SANITARIO
Página 1
HABITACIONAL MUNICIPIO:POBLACION = 528 Hab ESTADO:
DENSIDAD POBLACION = 0.61 Hab/m
DOTACION = 125 l/Hab/Día Coef. Seguridad = 1.50
APORTACION = 100 l/Hab/Día Coef. Harmon =3.80
Qmin = 1.5 lps Long. total red = 860.60 m
Qmed = 1.5 lps
Qmax inst = 5.7 lps
Qmax extr = 8.55 lps
NOMBRE DE LA CALLE TRAMO
LONGITUD(m)
POBLACION
GASTOS(lps) COTAS TERRENO(m)
Tramo Tributaria Total Qmed Qmin QMax Extr Inicial
CALLE GUILLERMO PRIETO 1 2 18.90 0.00 18.90 12 3.800 1.500 1.500 8.550 161.98
CALLE GUILLERMO PRIETO 2 3 19.07 18.90 37.97 23 3.800 1.500 1.500 8.550 154.79
CALLE GUILLERMO PRIETO 7 3 62.28 0.00 62.28 38 3.800 1.500 1.500 8.550 150.27
CALLE GUILLERMO PRIETO 3 4 31.40 100.24 131.65 81 3.800 1.500 1.500 8.550 153.15
CALLE GUILLERMO PRIETO 4 5 37.18 131.65 168.82 104 3.800 1.500 1.500 8.550 141.58
CALLE GUILLERMO PRIETO 5 6 90.22 168.82 259.04 159 3.800 1.500 1.500 8.550 127.05
CALLE 5 DE MAYO 8 9 75.10 0.00 75.10 46.00 3.800 1.500 1.500 8.550 129.08
COEF. HARMON
TABLA DE CALCULO HIDRAULICO GEOMETRICO DE ALCANTARILLADO SANITARIO
Página 2
ANÁLISIS HIDRÁULICO-GEOMETRICO
COTAS TERRENO(m) PENDIENTE(m/km) DIAMETRO TUBO LLENO RELACION DE GASTOS RELACION VELOCIDAD
Final Terreno Propuesta Cálculo (cm) Pulg. Qll (lps) Vll (m/s) Qmin/Qll Qmax/Qll Vmin/Vll Vmax/Vll
154.79 380 380 5 20 8" 0.010 262.919 8.369 0.006 0.033 0.273 0.459
153.15 86 40 8 20 8" 0.010 85.744 2.729 0.017 0.100 0.380 0.640
153.15 -46 4 12 20 8" 0.010 26.967 0.858 0.056 0.317 0.540 0.887
141.58 368 269 5 20 8" 0.010 221.001 7.035 0.007 0.039 0.286 0.484
127.05 391 391 5 20 8" 0.010 266.623 8.487 0.006 0.032 0.270 0.457
121.90 57 57 7 20 8" 0.010 101.791 3.240 0.015 0.084 0.362 0.608
127.52 21 21 9 20 8" 0.010 61.452 1.956 0.024 0.139 0.421 0.704
Coef. Rug. ManningADS N-12
Efectivo ADS N-12 (cm)
TABLA DE CALCULO HIDRAULICO GEOMETRICO DE ALCANTARILLADO SANITARIO
Página 3
RELACION TIRANTES VELOCIDAD (m/s) TIRANTE (cm) COTA CLAVE (m) COTA ARRASTRE (m) PROFUNDIDAD (m)
ymin/D ymax/D Vmin Vmax ymin ymax Inicial Final Inicial Final Caida Inicial
0.055 0.124 2.287 3.844 1.100 2.48 161.08 153.89 160.88 153.69 2.00 1.10
0.092 0.214 1.038 1.747 1.840 4.28 151.89 151.12 151.69 150.92 2.00 3.10
0.161 0.387 0.463 0.762 3.220 7.74 149.37 149.12 149.17 148.92 1.10
0.059 0.135 2.012 3.406 1.180 2.70 149.12 140.68 148.92 140.48 4.23
0.054 0.123 2.292 3.878 1.080 2.46 140.68 126.15 140.48 125.95 1.10
0.085 0.196 1.172 1.969 1.700 3.92 126.15 121.00 125.95 120.80 0.27 1.10
0.108 0.252 0.824 1.377 2.160 5.04 128.18 126.62 127.98 126.42 0.30 1.10
TABLA DE CALCULO HIDRAULICO GEOMETRICO DE ALCANTARILLADO SANITARIO
Página 4
PROFUNDIDAD (m)
OBSERVACIONES
1.10 3.10 ###
2.23 4.23 ###
4.23 ###
1.10 ###
1.10 ###1.10 1.37 POZO 6 EXISTENTE
1.10 1.40 POZO 9 EXISTENTE
Final entrada
Finalsalida
CUANTIFICACIÓN DE VOLUMENES DE OBRA
Página 5
NOMBRE DE LA CALLE
TRAMO PROFUNDIDAD
MATERIAL
De A Inicial Final Caidas
ALLE GUILLERMO PRIETO 1 2 1.10 1.10 2.00 1.10 18.90 17.70 PEAD 20.000 0.233
ALLE GUILLERMO PRIETO 2 3 3.10 2.23 2.00 2.66 19.07 17.87 PEAD 20.000 0.233
ALLE GUILLERMO PRIETO 7 3 1.10 4.23 0.00 2.66 62.28 61.08 PEAD 20.000 0.233
ALLE GUILLERMO PRIETO 3 4 4.23 1.10 0.00 2.66 31.40 30.20 PEAD 20.000 0.233
ALLE GUILLERMO PRIETO 4 5 1.10 1.10 0.00 1.10 37.18 35.98 PEAD 20.000 0.233
ALLE GUILLERMO PRIETO 5 6 1.10 1.10 0.27 1.10 90.22 89.02 PEAD 20.000 0.233
CALLE 5 DE MAYO 8 9 1.10 1.10 0.30 1.10 75.10 73.90 PEAD 20.000 0.233
CALLE 5 DE MAYO 10 11 1.10 1.10 0.47 1.10 52.08 50.88 PEAD 20.000 0.233
CALLA FRANCISCO VILLA 12 13 1.10 1.10 1.74 1.10 60.60 59.40 PEAD 20.000 0.233
CALLA FRANCISCO VILLA 14 13 1.10 2.19 0.65 1.64 54.86 53.66 PEAD 20.000 0.233
CALLE EMILIANO ZAPATA 16 15 1.10 1.10 0.27 1.10 70.63 69.43 PEAD 20.000 0.233
CALLE EMILIANO ZAPATA 18 17 1.10 1.10 0.98 1.10 80.43 79.23 PEAD 20.000 0.233
CALLE MARIANO ABASOLO 20 19 1.10 1.10 0.56 1.10 74.40 73.20 PEAD 20.000 0.233
CALLE MARIANO ABASOLO 22 21 1.10 1.10 1.36 1.10 81.80 80.60 PEAD 20.000 0.233
CALLE MARIANO ABASOLO 24 23 1.10 1.10 0.45 1.10 51.66 50.46 PEAD 20.000 0.233
PROFUNDIDAD
PROMEDIO(m)
LONGITUDDE POZO A
POZO (m)
LONGITUDDE TUBERIA
(m)
DIÁMETRO INTERIOR
TUBO(cm)
DIÁMETRO EXTERIOR
TUBO(m)
CUANTIFICACIÓN DE VOLUMENES DE OBRA
Página 6
CUANTIFICACIÓN DE VOLUMENES DE OBRAIngresar % de Material Tipo C
100% 80% 20%
EXCAVACION (m3) MATERIALES DE RELLENO (M3)
Total ENCAMADO
0.630 0.100 1.200 0.000 13.38 10.70 2.68 1.115 5.189 0.755 6.323 6.323
0.630 0.100 1.200 0.000 31.10 24.88 6.22 1.126 5.238 0.762 23.975 23.975
0.630 0.100 1.200 0.000 106.31 85.05 21.26 3.848 17.905 2.604 81.958 81.958
0.630 0.100 1.200 0.000 52.58 42.06 10.52 1.903 8.855 1.288 40.531 40.531
0.630 0.100 1.200 0.000 27.20 21.76 5.44 2.267 10.547 1.534 12.851 12.851
0.630 0.100 1.200 0.000 67.30 53.84 13.46 5.608 26.096 3.796 31.798 31.798
0.630 0.100 1.200 0.000 55.87 44.69 11.17 4.656 21.664 3.151 26.398 26.398
0.630 0.100 1.200 0.000 38.47 30.77 7.69 3.205 14.916 2.169 18.175 18.175
0.630 0.100 1.200 0.000 44.91 35.93 8.98 3.742 17.413 2.533 21.218 21.218
0.630 0.100 1.200 0.000 58.99 47.19 11.80 3.381 15.731 2.288 37.592 37.592
0.630 0.100 1.200 0.000 52.49 41.99 10.50 4.374 20.354 2.960 24.801 24.801
0.630 0.100 1.200 0.000 59.90 47.92 11.98 4.991 23.226 3.378 28.302 28.302
0.630 0.100 1.200 0.000 55.34 44.27 11.07 4.612 21.459 3.121 26.148 26.148
0.630 0.100 1.200 0.000 60.93 48.75 12.19 5.078 23.628 3.437 28.791 28.791
0.630 0.100 1.200 0.000 38.15 30.52 7.63 3.179 14.792 2.152 18.025 30.518
EXCAVACION (m3) MATERIALES DE RELLENO (M3)
Total ENCAMADO
RED PRINCIPAL 860.602 762.907 610.325 152.581 53.084 247.010 35.927 426.885 439.379
DESC. DOMICILIARIAS 434.749 347.799 86.950 40.687 178.231 17.066 200.392 209.952
POZOS DE VISITA 150.486 120.388 30.097 84.003 84.003
ANCHO DE ZANJA
(m)
ALTURA D ENCAMDO
(m)
DIAMETRO INTERIOR DE
POZOS(m)
ESPESOR DE SUP. DE
RODAMIENTO (m) Mat. Tipo
COMUN"B"
Mat. Tipo ROCA
"C"
ACOSTILLADO
Y RELLENO INICIAL
VOLUMEN DE TUBO
RELLENOCOMPLEMENTARI
O
RELLENO C/MAT. LUGAR
COMPAC.
Longitud de red (m)
Mat. Tipo COMUN
"B"
Mat. Tipo ROCA
"C"
ACOSTILLADO
Y RELLENO INICIAL
VOLUMEN DE TUBO
RELLENOCOMPLEMENTARI
OTOTAL
RELLENO C/MAT. LUGAR
COMPAC.
CUANTIFICACIÓN DE VOLUMENES DE OBRA
Página 7
MATERIALES DE RELLENO (M3) CUANTIFICACION DE TUBERIA ADS N-12 RED DE ATARJEAS (m)
10.0 15.2 20.0 25.1 30.8 38.0 45.9
"DE BANCO: O
5.189 11.907 6.304 7.059 0 0.00 0.00 17.70 0.00 0.00 0.00 0.00
5.238 12.012 6.363 7.125 0 0.00 0.00 17.87 0.00 0.00 0.00 0.00
17.905 39.234 21.752 24.357 0 0.00 0.00 61.08 0.00 0.00 0.00 0.00
8.855 19.785 10.757 12.045 0 0.00 0.00 30.20 0.00 0.00 0.00 0.00
10.547 23.421 12.813 14.347 0 0.00 0.00 35.98 0.00 0.00 0.00 0.00
26.096 56.837 31.704 35.499 0 0.00 0.00 89.02 0.00 0.00 0.00 0.00
21.664 47.313 26.320 29.471 0 0.00 0.00 73.90 0.00 0.00 0.00 0.00
14.916 32.810 18.121 20.290 0 0.00 0.00 50.88 0.00 0.00 0.00 0.00
17.413 38.178 21.155 23.688 0 0.00 0.00 59.40 0.00 0.00 0.00 0.00
15.731 34.562 19.111 21.399 0 0.00 0.00 53.66 0.00 0.00 0.00 0.00
20.354 44.497 24.728 27.688 0 0.00 0.00 69.43 0.00 0.00 0.00 0.00
23.226 50.671 28.218 31.596 0 0.00 0.00 79.23 0.00 0.00 0.00 0.00
21.459 46.872 26.070 29.191 0 0.00 0.00 73.20 0.00 0.00 0.00 0.00
23.628 51.534 28.706 32.142 0 0.00 0.00 80.60 0.00 0.00 0.00 0.00
2.299 32.546 5.478 7.630 1 0.00 0.00 50.46 0.00 0.00 0.00 0.00
MATERIALES DE RELLENO (M3) CUANTIFICACION DE TUBERIA ADS N-12 RED DE ATARJEAS (m)
234.517 542.179 287.600 323.528 0.000 0.000 842.602 0.000 0.000 0.000 0.000
168.671 554.185 209.358 224.797 701.500
0.000 0.000 66.482
LIMPIEZA(M2)
MATERIALDE BANCO
(m3)
ACARREODE TIRO SIN
ABUNDAMIENTO (m3)
ACOSTILLADO Y RELLENO INICIAL CON:
MAT. COMUN=1
OMAT.
BANCO=0
RELLENO C/MAT. BANCO
COMPAC.
LIMPIEZA(M2)
MATERIALDE BANCO
(m3)
ACARREODE TIRO
(m3)RELLENO C/MAT. BANCO
COMPAC. ADS N-12 4"
ADS N-12 6"
ADS N-12 8"
ADS N-12 10"
ADS N-12 12"
ADS N-12 15"
ADS N-12 18"
CUANTIFICACIÓN DE VOLUMENES DE OBRA
Página 8
CUANTIFICACION DE TUBERIA ADS N-12 RED DE ATARJEAS (m)
61.2 76.2 91.4 105.4 120.9 151.4
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 101.55
0.00 0.00 0.00 0.00 0.00 0.00 331.68
0.00 0.00 0.00 0.00 0.00 0.00 167.26
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 0.44 0.44 0.88
0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 0.50 0.50 1.01
600.49 30.00 0.95 0.95 1.89
CUANTIFICACION DE TUBERIA ADS N-12 RED DE ATARJEAS (m)
0.000 0.000 0.000 0.000 0.000 0.000
ANDAME DE MADERA
CORTE CON CORTADORA
A CONCRETO(
M)
RUPTURA Y DEMOLICION CONCRETO
HID M3
CONST. CONCRETO
HIDRAULICO(M3)
BASE DE GRAVA
CEMENTADA 20 CM(M3)
ADS N-12 24"
ADS N-12 30"
ADS N-12 36"
ADS N-12 42"
ADS N-12 48"
ADS N-12 60"
CUANTIFICACIÓN DE VOLUMENES DE OBRA
Página 9
Ingresar Longitud de Descargas (m)
6.10
EXCAVACION (m3) MATERIALES DE RELLENO (M3)
Total ENCAMADO
MAT. LUGAR3.00 18.30 10.08 8.07 2.02 1.061 4.650 0.445 3.970 3.970 4.650 14.457 5.711
3.00 18.30 18.38 14.70 3.68 1.061 4.650 0.445 12.264 12.264 4.650 14.457 5.711
8.00 48.80 49.01 39.21 9.80 2.830 12.399 1.187 32.705 32.705 12.399 38.552 15.229
4.00 24.40 24.50 19.60 4.90 1.415 6.199 0.594 16.352 16.352 6.199 19.276 7.615
5.00 30.50 16.81 13.44 3.36 1.769 7.749 0.742 6.616 6.616 7.749 24.095 9.518
12.00 73.20 40.33 32.27 8.07 4.246 18.598 1.781 15.879 15.879 18.598 57.828 22.844
10.00 61.00 33.61 26.89 6.72 3.538 15.498 1.484 13.232 13.232 15.498 48.190 19.036
7.00 42.70 23.53 18.82 4.71 2.477 10.849 1.039 9.262 9.262 10.849 33.733 13.325
8.00 48.80 26.89 21.51 5.38 2.830 12.399 1.187 10.586 10.586 12.399 38.552 15.229
7.00 42.70 30.28 24.22 6.06 2.477 10.849 1.039 16.011 16.011 10.849 33.733 13.325
9.00 54.90 30.25 24.20 6.05 3.184 13.949 1.336 11.909 11.909 13.949 43.371 17.133
11.00 67.10 36.97 29.58 7.39 3.892 17.048 1.632 14.555 14.555 17.048 53.009 20.940
10.00 61.00 33.61 26.89 6.72 3.538 15.498 1.484 13.232 13.232 15.498 48.190 19.036
11.00 67.10 36.97 29.58 7.39 3.892 17.048 1.632 14.555 14.555 17.048 53.009 20.940
7.00 42.70 23.53 18.82 4.71 2.477 10.849 1.039 9.262 18.822 1.289 33.733 3.766
DESCARGAS DOMICILIARIAS (ALBAÑALES)
LIMPIEZA(M2)
MATERIALDE BANCO
(m3)UnidadesDrenadas
Longitud de Descarga 15.1 cm (6")
Mat. Tipo COMUN "B"
Mat. TipoROCA "C"
ACOSTILLADO
Y RELLENO INICIAL
VOLUMEN DE TUBO
RELLENOCOMPLEMEN
TARIO
RELLENO C/MAT. LUGAR
COMPAC.
RELLENO C/MAT. BANCO
COMPAC.
CUANTIFICACIÓN DE VOLUMENES DE OBRA
Página 10
20.0 25.1 30.8 38.0 45.9 61.2
6.114 0 3.00 0.00 0.00 0.00 0.00 0.00
6.114 0 3.00 0.00 0.00 0.00 0.00 0.00
16.303 0 8.00 0.00 0.00 0.00 0.00 0.00
8.152 0 4.00 0.00 0.00 0.00 0.00 0.00
10.189 0 5.00 0.00 0.00 0.00 0.00 0.00
24.455 0 12.00 0.00 0.00 0.00 0.00 0.00
20.379 0 10.00 0.00 0.00 0.00 0.00 0.00
14.265 0 7.00 0.00 0.00 0.00 0.00 0.00
16.303 0 8.00 0.00 0.00 0.00 0.00 0.00
14.265 0 7.00 0.00 0.00 0.00 0.00 0.00
18.341 0 9.00 0.00 0.00 0.00 0.00 0.00
22.417 0 11.00 0.00 0.00 0.00 0.00 0.00
20.379 0 10.00 0.00 0.00 0.00 0.00 0.00
22.417 0 11.00 0.00 0.00 0.00 0.00 0.00
4.706 1 7.00 0.00 0.00 0.00 0.00 0.00
CONEXIONES SANITARIAS (piezas)
115.000 0.000 0.000 0.000 0.000 0.000
115.00
ACARREODE TIRO
(m3)
ACOSTILLADO Y RELLENO INICIAL CON:
MAT. COMUN=1
OMAT.
BANCO=0
CUANTIFICACIÓN DE DESCARGAS DOMICILIARIASADS N-12 6"x diam
Tee Wye 8 x 6
sencilla
Tee Wye 10 x 6 sencilla
Tee Wye 12 x 6 sencilla
Tee insercion
15 x 6
Tee insercion 18
x 6
Tee insercion 24
x 6
CUANTIFICACIÓN DE VOLUMENES DE OBRA
Página 11
CUANTIFICACIÓN DE VOLUMENES DE OBRA860.602 1348.141 1078.513 269.628 93.771 425.241 52.994 711.280 733.333
EXCAVACION
1348.141
MATERIAL COMUN "B"
80.00%
1078.51 m3
A MANO CON EQUIPO
50.00% 50.00%
EN SECO EN AGUA EN SECO EN AGUA
100.00% 0.00% 100.00% 0.00%
PROF 0-2 M PROF 2-4 M PROF 0-2 M PROF 2-4 M PROF 0-6 M PROF 0-6 M
100.00% 0.00% 100.00% 0.00% 100.00% 100.00%
40.00% 0.00% 0.00% 0.00% 40.00% 0.00%
EXCAVACION M3 539.256 0.000 0.000 0.000 539.256 0.000
CODIGO CONAGUA 1010 02 1010 04 1040 02 1040 04 1100 02 1101 02
CUANTIFICACIÓN DE VOLUMENES DE OBRA
Página 12
403.188 1096.364 496.959 614.808 0.000 701.500 842.602 0.000 0.000 0.000 0.000
MATERIAL "C", ROCA
20.00%
269.63 m3
CON EQUIPO
100.00%
EN SECO EN AGUA
100.00% 0.00%
PROF 0-6 M PROF 0-6 M
100.00% 100.00%
20.00% 0.00%
269.628 0.000 1348.141
1020 02 1042 02
CUANTIFICACIÓN DE VOLUMENES DE OBRA
Página 13
0.000 0.000 0.000 0.000 0.000 0.000
CUANTIFCICACIÓN DE POZOS DE VISITA
Página 14
NOMBRE DE LA CALLE
TRAMO PROFUNDIDAD CLASIFICACION DE POZOS DE VISITA POR PROFUNDIDAD
De A Inicial Final Caidas 1.00 1.25 1.50 1.75 2.00 2.25 2.50 2.75
1 2 1.10 1.10 2.00 1 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
2 3 3.10 2.23 2.00 2 3.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7 3 1.10 4.23 0.00 7 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
3 4 4.23 1.10 0.00 3 4.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 5 1.10 1.10 0.00 4 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
5 6 1.10 1.10 0.27 5 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
8 9 1.10 1.10 0.30 8 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
10 11 1.10 1.10 0.47 10 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
12 13 1.10 1.10 1.74 12 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
14 13 1.10 2.19 0.65 14 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
16 15 1.10 1.10 0.27 16 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
18 17 1.10 1.10 0.98 18 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
20 19 1.10 1.10 0.56 20 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
22 21 1.10 1.10 1.36 22 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
24 23 1.10 1.10 0.45 24 1.10 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00
0.000 13.000 0.000 0.000 0.000 0.000 0.000 0.000
PozoInicial
No
Prof.
(m)
CUANTIFCICACIÓN DE POZOS DE VISITA
Página 15
CUANTIFICACIÓN DE POZOS DE VISITA Y CAIDAS ADOSADAS
100%
CLASIFICACION DE POZOS DE VISITA POR PROFUNDIDAD VOLUMEN (m3)
3.00 3.25 3.50 3.75 4.00 4.25 4.50 4.75 5.00 5.25 5.50 5.75 6.00 6.25 6.50 6.75 7.00 7.25 7.50 7.75 8.00 Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 19.58
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.00 0.00 0.00 0.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 26.07
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 8.06
0.000 1.000 0.000 0.000 0.000 1.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 15.000 150.486
POZOS DE VISITA
Profundidad
De
0.51
1.01
1.26
EXCAVACION
CUANTIFCICACIÓN DE POZOS DE VISITA
Página 16
Ingresar % de Material Tipo C
80% 20%
VOLUMEN (m3) CLASIFICACIÓN DE CAIDAS ADOSADAS POR PROFUNDIDAD ( m )
Pozo Tramo 0.5 1.0
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 1-2 2.00 0.00 0.00
15.67 3.92 8.65 10.93 10.932 0.000 0.000 8.652 2-3 2.00 0.00 0.00
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 7-3 0.00 0.00 0.00
20.86 5.21 11.52 14.55 14.552 0.000 0.000 11.517 3-4 0.00 0.00 0.00
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 4-5 0.00 0.00 0.00
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 5-6 0.27 1.00 0.00
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 8-9 0.30 1.00 0.00
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 10-11 0.47 1.00 0.00
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 12-13 1.74 0.00 0.00
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 14-13 0.65 0.00 1.00
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 16-15 0.27 1.00 0.00
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 18-17 0.98 0.00 1.00
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 20-19 0.56 0.00 1.00
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 22-21 1.36 0.00 0.00
6.45 1.61 3.56 4.50 4.501 0.000 0.000 3.563 24-23 0.45 1.00 0.00
120.388 30.097 66.482 84.003 84.003 0.000 0.000 66.482 5.000 3.000
POZOS DE VISITA
Profundidad Piezas Piezas
A
1.00 0.000
1.25 13.000
1.50 0.000 13.000
MATERIALDE BANCO
(m3)
ACARREODE TIRO
(m3)Mat. Tipo COMUN
"B"
Mat. Tipo ROCA
"C"
RELLENO TOTAL
RELLENO C/ MAT. LUGAR
RELLENO FINAL C/ MAT
BANCO
Prof.De Caida
al finald el tramo
CUANTIFCICACIÓN DE POZOS DE VISITA
Página 17
CLASIFICACIÓN DE CAIDAS ADOSADAS POR PROFUNDIDAD ( m )
1.5 2.0 2.5 3.0 3.5 4.0
0.00 1.00 0.00 0.00 0.00 0.00
0.00 1.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 1.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
1.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
1.000 3.000 0.000 0.000 0.000 0.000
ProfundidadPiezas
De A
0.500 1.000 3.000
1.010 1.500 1.000
1.510 2.000 3.000
CAIDA ADOSADA CON TUBERIA ADS
CUANTIFCICACIÓN DE POZOS DE VISITA
Página 18
1.51
1.76
2.01
2.26
2.51
2.76
3.01
3.26
3.51
3.76
4.01
4.26
4.51
4.76
5.01
5.26
5.51
5.76
6.01
6.26
6.51
6.76
7.01
7.26
7.51
7.76
Tapas y Brocales
CUANTIFCICACIÓN DE POZOS DE VISITA
Página 19
1.75 0.000
2.00 0.000 0.000
2.25 0.000
2.50 0.000 0.000
2.75 0.000
3.00 0.000 0.000
3.25 1.000
3.50 0.000 1.000
3.75 0.000
4.00 0.000 0.000
4.25 1.000
4.50 0.000 1.000
4.75 0.000
5.00 0.000 0.000
5.25 0.000
5.50 0.000 0.000
5.75 0.000
6.00 0.000 0.000
6.25 0.000
6.50 0.000 0.000
6.75 0.000
7.00 0.000 0.000
7.25 0.000
7.50 0.000 0.000
7.75 0.000
8.00 0.000 0.000
Tapas y Brocales 15.000
CUANTIFCICACIÓN DE POZOS DE VISITA
Página 20
2.010 2.500 0.000
2.510 3.000 0.000
3.010 3.500 0.000
3.510 4.000 0.000
7.000
CUANTIFCICACIÓN DE POZOS DE VISITA
Página 21
ADS N-12
1 2 3 4 5 6Diámetro DiámetroEspesordiamteroAncho deEspesor de
efectivo nominal pared exterior zanja plantilla
10.4 4 0.01 0.12 0.53 0.1
15.2 6 0.01 0.18 0.58 0.1
20 8 0.02 0.23 0.63 0.1
25.1 10 0.02 0.29 0.71 0.1
30.8 12 0.03 0.37 0.79 0.1
38 15 0.04 0.45 0.86 0.1
45.9 18 0.04 0.54 0.99 0.1
61.2 24 0.05 0.72 1.22 0.1
76.2 30 0.07 0.89 1.68 0.1
91.4 36 0.07 1.06 1.98 0.1
105.4 42 0.08 1.21 2.11 0.1
120.9 48 0.08 1.36 2.26 0.1
151.4 60 0.08 1.664 2.59 0.15
Recommended