HEAD QUARTERS Muksyn Engineering & Services Sdn Bhd K8813/E1, Tingkat 1, Bangunan MPK, 24300 Kerteh, Kemaman, Terengganu Darul Iman SELANGOR BRANCH No. 12A-1, Jalan Kemuning Prima D33/D, Kemuning Utama, 40400 Shah Alam, Selangor. JOHOR BRANCH No 89 Jalan Kempas 1, Desaru Utama. Bandar Penawar, 81930 Kota Tinggi Johor Office Phone No: 09- 8261 949 Fax No: 09-8263 949 Email: [email protected] Dear Sir, We have pleasure in presenting our company profile relating to oil & gas industrial for inspection and Non Destructive Testing (NDT) services. If, after reviewing this profile, you require any additional information regarding our service, please do not hesitate to contact the undersigned. Yours sincerely, Ir Hj Khairil Nizam Khirudin Managing Director
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
CHAPTER 1: INTRODUCTION
Muksyn Engineering & Services Sdn Bhd (1040887 U) is a Malaysian-based incorporated company
and 100% wholly owned by Bumiputera operating in oil and gas industry, power plants, petrochemical
plants and other heavy industries entailing their shutdown and emergency requirements, specializing in
integrity inspection and Non-Destructive Testing, Mechanical and Piping, Fabrication and Civil Structural
works.
Our philospohy is that serving the best quality and commitment to customers by providing with
professional, efficient and reliable NDT services, fabrication, mechanical, piping and civil services. The
objectives of Muksyn Engineering & Services Sdn Bhd are to promote opportunity to the locals in
participating in engineering and maintenance activities with us. Also, we aim to experienced current
technology transferred from international expertise.
Muksyn Engineering & Services Sdn Bhd specializes in NDT as mentioned before, providing complete
range of Non-Destructive Testing equipment and services. The inspection of as-fabricated piping,
pressure vessels, painting and tank are at the core of our company’s services. Other than that, we also
offer inspections which are Conventional NDT (including MPI, DPI) and Advance NDT (like PAUT, ToFD,
C-Scan and etc), also industry radiography tests using isotopes and film.
We employ personnel who are active members of MLVK, ASNT, PCN, CSWIP and API; with broad
experiences and who always stay abreast with current development of the industry.
We also provide training and seminar for API inspector that will be guided professionally by our trainers
who obtained broad experiences.
We believe with our skillful management, technicians and services provided also experiences we had will
satisfy our clients.
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
CHAPTER 2: DIRECTORS’ PROFILE
IR HJ KHAIRIL NIZAM KHIRUDIN (Managing Director)
Had over 13 years’ experience in inspection, quality control, maintenance and construction of oil and gas
refineries, petrochemical plant and offshore platform. Hold various technical and professional qualifications in welding and inspection.
Certification:
BEng. (HONS) Mechanical Engineering, Universiti Teknologi Petronas MSc Asset Maintenance and Management, Universiti Teknologi Petronas
Professional Engineer of Board Of Engineer Malaysia Grade of Member of Institute of Engineer Malaysia
Authorized Inspector for API 580 – Risk Based Inspection Engineer Authorized Inspector for API 510 – Pressure Vessel
Authorized Inspector for API 570 – Process Piping
Authorized Inspector for API 653 – Storage Tank OSR Inspector
Work Experiences:
Risk Based Inspection (RBI) projects by utilizing PETRONAS, SHELL and DnV at PETRONAS, Malaysia.
Senior Inspection Engineer at Inspection Section, Gas Processing Plant Complex B (GPPB), PETRONAS GAS BERHAD.
Inspection Technical Manager @ Staff Engineer (Inspection) at Inspection and Assurance Section, PETRONAS Carigali Sdn. Bhd. (Peninsular Malaysia Operation).
Lead Integrity Engineer at Talisman Malaysia Limited.
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
IR SAIFUL AZMI BIN SUHAILI (Director)
Had over 16 years’ experience in Electrical and Instrumentation Engineer activities
Certification: Bachelor Engineering in Electrical (Hons.) from University of Technology Malaysia
Registered Professional Engineer with Board of Engineer Malaysia,
Member for ‘The Institute of Engineers, Malaysia
Work Experiences: Senior Electrical Engineer, Aworldtec Engineering Sdn Bhd (Contract Staff for PETRONAS Carigali Sdn Bhd,
PMO) Senior Electrical Engineer, Soft Triangle Services Sdn Bhd (Contract Staff with PETRONAS Carigali Sdn
Bhd)
General Services Manager cum Lead Electrical & Instrument Engineer, MECIP Global Engineers Sdn Bhd Senior Electrical & Instrument Engineer, MECIP Global Engineers Sdn Bhd
Electrical & Instrument Engineer, MECIP Global Engineers Sdn Bhd
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
CHAPTER 3: ORGANISATION STRUCTURE
Managing Director : Ir. Hj. Khairil Nizam Khirudin
Director : Ir. Saiful Azmi Suhaili
General Manager : Syed Khairi Amier Syed Radzuan
Operation Executive : Wan Norazam Munir Wan Arifin
Engineering Manager : Ir. Hj. Khairil Nizam Khirudin
Finance Executive : Nur Ain Fateha Binti Roslan
Admin & Procurement Executive : Mohd Safwan Bin Mohd
Radiation Protection Officer (RPO) : Rosnan Bin Mohamed
ASNT Level III : Shahjaan Abdullah
Michael S Trinidad
Logistic Executive : Che Muhammad Bukhari Bin Che
Muhammad Razali
Technical Executive : Muhammad Haiqal Bin Safie
HSE Representative : Safiq Faliq Agil
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
MANAGING DIRECTOR
Ir. Hj. Khairil Nizam
Khirudin
DIRECTOR
Ir. Saiful Azmi Suhaili ENGINEERING
MANAGER
Ir. Hj. Khairil Nizam
Khirudin GENERAL MANAGER
Syed Khairi Amier Syed
Radzuan
FINANCE
Nur Ain Fateha Binti
Roslan
RADIATION PROTECTION
OFFICER (RPO)
Rosnan Mohamed
ADMIN &
PROCUREMENT
Mohd Safwan Bin Mohd
KERTEH BRANCH
(HQ)
Mohd Aisamuddin Mohd
Nor
(Supervisor)
KLANG BRANCH
Syed Shahrul Azuan
Syed Radzuan
(Supervisor)
HSE
REPRESENTATIVE
Safiq Faliq
TECHNICAL
EXECUTIVE
Muhammad Haiqal
LOGISTIC
EXECUTIVE
Che Muhammad
Bukhari
NDT Technicians NDT Technicians
OPERATION EXECUTIVE
Wan Norazam Munir Wan
Arifin
CHAPTER 4: ORGANIZATION CHART
JOHOR BRANCH
Shazril Hadi Bin Sakir
Maskor
(Project Manager)
NDT Technicians
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
CHAPTER 5: RESUME OF KEY PERSONNEL
NAME/POSITION QUALIFICATION/EXPERIENCES
Ir. Hj. Khairil Nizam Khirudin Managing Director
Please refer to Directors’ Profile
Ir. Saiful Azmi Suhaili Director
Please refer to Directors’ Profile
Syed Khairi Amier Syed Radzuan
General Manager
Had over 20 years’ experience in NDT and inspection.
Certification: (RT)/Interpreter, Magnetic Particle Testing (MPI), and Dye Penetrant Test (DPT). Familiar in various codes and
standard such as ANSI/ASME, API 1104, AWS, British Standard
and client’s specifications.
Rosnan Mohamed
Radiation Protection Officer (RPO)
Had over 17 years’ experience in NDT and inspection. certified
with Radiation Protection Officer (RPO)
Wan Norazam Munir Wan Arifin
Operation Executive Had over 9 years’ experience in NDT and inspection.
Certification: ASNT Level II in UT, MPI & DPI. Familiar in various codes and standard such as ANSI/ASME, API 1104,
AWS, British Standard and client’s specifications.
Nur Ain Fateha Binti Roslan Finance Executive
Bachelor in Accounting (Hons) with 4 years’ experience
Mohd Safwan bin Mohd Procurement Executive
A Degree holder with 4 years’ experience in procurement and tender documentation.
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
CHAPTER 6: SCOPE OF BUSINESS
WHAT WE OFFERED
Offering services to the refineries and petrochemical plants entails meeting their shutdown and every day emergency
requirements. MESSB’s commitment to customer service allows us to address these daily requirements. However, it also entails understanding that specialized chemical process equipment requires:
Knowledge of the mechanical and corrosion damage mechanisms that impact equipment reliability.
Using specialized tools and procedures to examine for these types of damage.
Having knowledgeable and committed personnel who know our customers' equipment history and safety
requirements.
A) We showcase our knowledge through the following inspections and industry experiences:
Radiographic Test (RT)
Low-Rad / Safe Rad RT
Magnetic Penetrate Inspection (MPI)
Dye Penetrate Inspection (DPI)
Positive Material Identification Inspection (PMI)
UT Thickness Measurement (UTTM)
UT Flaw Detector (UTFD)
Time-of-flight Diffraction Ultrasonic Test (TOFD)
Magnetic Flux Leakage (MFL)
Vacuum Box Inspection
Videoscope/Boroscope
Hardness Test
Holiday Test
Phased Array UT (PAUT)
Post Weld Heat Treatment (PWHT)
Eddy Current Inspection
Long Range UT (LRUT)
Thermography Inspection
Tank Settlement
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
B) Engineering Inspection Services
Vendor Inspection
Inspection of Topside Equipment, Piping, Pressure Vessel, Boilers, Heat Exchanger and any kind of equipment.
Maintenance and Shutdown Inspection
Inspection of Pressure Vessel, Boilers, Heat Exchangers, Storage Tank, Piping, Valve and any others pressurized equipments in Petroleum and Oil Refineries, Chemical Plants and Power Station Shutdown and
Maintenance Inspection.
Qualification of Welding Procedure and Welders.
Provision of complete package of Welding Procedures Specification (WPS), Procedure Qualification Records
(PQR) and Welder Qualification Record (WQT).
Material Inspection
Inspection of steel plates, Structural steels, fittings, valve etc., purchaser equipment and engineering codes.
C). Professional Technical Personnel Services
Provision of Qualified Professional provider in various discipline :
QA/QC Inspector - In various discipline:
- Welding, Structural Piping, Coating, Painting and Mechanical etc.
Welding Inspector - Qualified to International Recognized.
- Qualification (CSWIP, AWS, BGAS, PCN)
NDT Inspector - Qualified to International recognized.
- Qualification (PCN, ASNT, MLVK, SIRIM.)
D). Quality Assurance
To provide Third Party Inspection services – Implementation, monitoring, auditing and review of procedures,
certification, reporting etc.
E). Rope Access (Abseiling)
To provide Rope Access (Abseiling) works at any heights location in the plant such as flare, tanks, column,
structure and high elevation piping and at any inaccessible & height location.
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
CHAPTER 7: HEALTH, SAFETY AND ENVIROMENT POLICY
The main concern of the company is the health and safety of our employees, customers, and communities in which
we work as well as the protection of the environment. This is fundamental to our business and primary concern of
the management of Muksyn Engineering & Services Sdn Bhd. We also believe that all accidents can be prevented. To
us, economic considerations do not take priority over safety, health and environmental protection.
Every employee is under the obligation to work safely and observe all rules, regulations and instructions, which
are applicable to his job.
Our goals/objectives are:
Zero accidents and all accidents can be prevented.
Protection of our employees, the public and environment.
To achieve the company's health, safety and environment policy, we will assure the following:
Prevent all accidents.
Effective procedures and standards for all level of employees and workmanship.
Continuous review of safety performance and safety program/regulations.
Emphasis health, safety and environment as a management responsibility at every level within the
organization.
Identify potential hazards and implement appropriate measures to minimize risks and ensure that appropriate
emergency response plans are in place to deal with any possible emergency.
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
HSE POLICY STATEMENT
It is the policy of Muksyn Engineering & Services Sdn Bhd to undertaken their activities, such that the
health and safety of their employees and all other persons is given due priority, and also that conversation
of the environment is reflected in those activities.
For Year 2014, Muksyn Engineering &Services Sdn Bhd in implementing this policy
CONSTANTLY, gives an extra effort and TARGET;
Will in addition to complying with relevant registration, such as DOSH and LPTA
Ensure that effective measures are employed to provide necessary protection for the safety, health and environment of those who directly or indirectly may be affected by Muksyn Engineering & Services Sdn Bhd activities.
This commitment by Muksyn Engineering & Services Sdn Bhd will include the following OBJECTIVES:
Safety is everybody business as such that the policy of company to conduct their activities in such
way that the health and safety of their employee and other person are safe guarded. The
Managing Director is directly involved in implementing and maintaining all safety measures deem
necessary to make company a safe place to work.
Ensure employee and relevant authorities are aware of potential hazards that may affect them
and the action being taken to minimize the risk involved.
Ensure that the management and employees have the relevant skills and support.
Promote safety awareness and activities on the understanding that all accidents are preventable
and that ‘zero’ accident target is the company aim.
Authorized personnel shall be responsible for the implementation of the Radiation Safety
Program and to recommend for whatever additional safety measures wherever inadequate.
IR. HJ. KHAIRIL NIZAM KHIRUDIN
MANAGING DIRECTOR
08th JANUARY 2014
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
CHAPTER 8: QUALITY POLICY
We are committed to provide materials and services that consistently meet the agreed requirements of all our
customers. We will set ourselves the target of continuous improvement in the quality of everything we do and will
continually strive towards doing it right the first time and every time
We are therefore committed to the following principles:
Quality and safety are our first priority in every business we participate
Will not compromise quality because of cost or efficiency
Committed to never ending improvement in quality in order to consistently satisfy our customers
Will ensure safe working practices and strictly follows according to code, legislation and standard.
Guide by 5 Quality Principles (5 Qps)
Conformance to requirement's
Prevention
Right thing right every time
Price of non-conformance
Proactive leadership at all levels
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
CHAPTER 9: ENGINEERING CONSTRUCTION, MAINTENANCE AND INSPECTION EQUIPMENT
1. INSPECTION EQUIPMENTS
DESCRIPTION UNIT MODEL/ MANUFACTURE
1.1 Welding Gauge 6 U.K
1.2 Pit Gauge 5 U.K
1.3 Root gap gauge 4 Japan
1.4 Inspection mirror 15 Local
1.5 Elcometer Coating thickness gauge 3 Elcometer 345/U. K
1.6 Portable Holiday detectors 3 set/kit Elcometer 236/U.K
2 ULTRASONIC TESTING EQUIPMENTS
DESCRIPTION UNIT MODEL/ MANUFACTURE
2.1 Ultrasonic Thickness Gaging 3 set 38DL Plus/ OLYMPUS,
2.2 Ultrasonic Flaw Detector 2 set OLYMPUS
2.3 Ultrasonic Flaw Detector 2 set SITESCAN D-10+,SONATEST
2.4 Calibration Block 3 set
2.5 OMNISCAN (PAUT) 4 set OMNI MX-2/Olympus
3. TANK INTERGRITY INSPECTION
DESCRIPTION UNIT MODEL/ MANUFACTURE
3.1 Magnetic Tank Floor Scanning (MFL) 1 set SilverWing MFL 3Di
3.2 Vacuum Box 3 set SilverWing V600LPAVG
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
4. RADIOGRAPHY TESTING EQUIPMENTS
DESCRIPTION UNIT MODEL/ MANUFACTURE
4.1 Projector Delta SENTINEL 880 20 unit U.S.A
4.2 Densitometer DDS2 4 unit U.K
4.3 Processing Tank 4 unit U.K
4.4 Winding Cable Remote Control 20 Unit U.S.A
4.5 Source Extention Tube 20 Unit U.S.A
4.6 Collimeter 20 Unit U.S.A
4.7 Tripod Stand 3 Unit U.K
4.8 Radiation Survey Meter 21 Unit U.K
4.9 Lead Numbers 8 set U.K
4.10 Film Viewer 4 unit U.K
4.11
Lead Screen / Film Cassette
- 4” x 10” - 4” x 15”
- 7” x 17” - 14” x 17”
500 Unit 500 Unit
10 Unit 10 Unit
U.K
4.12
Film Hanger
- 4” x 10” - 4” x 15”
- 7” x 17” - 14” x 17”
100 Unit 100 Unit
10 Unit 10 Unit
U.K
5. MAGNETIC PARTICLE TESTING
DESCRIPTION UNIT MODEL/ MANUFACTURE
5.1 Magnaflux Yoke 6 (AC/DC) 5 set U.S.A
5.2 Magnaflux Yoke 5 (Permanent) 5 set U.S.A
5.3 Field Indicator 5 unit U.S.A
5.4 Calibration Block ( 9 kg ) 2 unit U.S.A
5.5 Calibration Block ( 18 kg ) 3 unit U.S.A
5.6 UV Light 2 unit
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
6. DYE PENETRANT TESTING
DESCRIPTION UNIT MODEL/ MANUFACTURE
6.1 UV Light 2 unit USA
7. HARDNESS TEST EQUIPMENT
DESCRIPTION UNIT MODEL/ MANUFACTURE
7.1 Hardness Tester 1 set Novotest
8. VIDEOSCOPE INSPECTION TESTING
DESCRIPTION UNIT MODEL/ MANUFACTURE
8.1 Model Everest 1 set GE
8.2 Model Olympus 1 set USA
8.3 Model Wöhler 250 1 set Germany
9. MATERIAL INSPECTION
DESCRIPTION UNIT MODEL/ MANUFACTURE
9.1 PMI XRF 3 set Niton XL2 800, X-Met 3000
9.2 Ferritescope Inspection 3 set Fisher MP30
10. POST WELD HEAT TREATMENT
DESCRIPTION UNIT MODEL/ MANUFACTURE
10.1 Gas Fired High Velocity Burner System Set Complete
5 units
10.2 Heat Treatment Unit 50 KVA / 415V 20 units
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
LIST OF PROJECT UNDERTAKEN-2013 A. NDT Services
B. POST WELD HEAT TREATMENT (PWHT) 2013
NO CLIENT DESCRIPTION PO No. DURATION REMARK
1.
CARE ION
TECHNOLOGIST SDN BHD
Performing Heat Treatment Services (Post
Weld Heat Treatment) on 8” Sch. 160 A106 Gr.B Carbon Steel Pipe (6 Joints) by
Using Localize Electrical Resistance.
PO-3451 June 2013 Complete
2. SHAPADU ENERGY & ENG
SDN BHD
Performing Heat Treatment Services (Post Weld Heat Treatment) on 24” and 20”
A333 Gr.6 Carbon Steel Pipe (84 Joints) by Using Localize Electrical Resistance.
SEESB/PO/2016-
078 June 2013 Complete
3. SHAPADU ENG & ENERGY SDN BHD
Performing Heat Treatment Services
(PWHT) on various size of pipe by using localized electrical resistance & Hardness
Testing By using Hardness Tester
SEESB/PO/2016-098
September 2013 Complete
NO CLIENT DESCRIPTION PO No. DURATION REMARK
1. BULER ENGINEERING SDN
BHD
Provision for manpower supply and NDT
services for Vacuum Box PO(2013)/115-ME Dec 2013-Jan 2014 Complete
2. T & S TIMUR SDN BHD Provision for manpower supply and NDT services
D05-3022 May 2013 Complete
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
LIST PROJECT UNDERTAKEN 2014 A. NDT SERVICES
B. POST WELD HEAT TREATMENT (PWHT)
NO CLIENT DESCRIPTION PO No. DURATION REMARK
1. UBF MAINTENANCE SDN BHD
Performing Heat Treatment Services (PWHT) and Hardness Testing on 6”
(Thickness 7.4mm) Incoloy SB407 Pipe (2 joints) by Using Localize Electrical
Resistance and Hardness Tester
(Equotip 2)
January 2014 UBFM/WO/053/14 Complete
2. MUSHTARI MAINTENANCE SDN BHD
Performing Heat Treatment Services
(PWHT) on Various Size of Pipe by Using Localized Electrical Resistance.
March 2014 T428P025 Complete
NO NAME DESCRIPTION PO No. DURATION REMARK
1. PETROCHEMICAL AND POWER PLANT SERVICES
SDN BHD
Provision for Manpower Supply and NDT
Services (UT) at TNB, Paka 777-89 Jan 2014 Complete
2. MUSHTARI MAINTENANCE SERVICES
SDN BHD
Provision for GPP3 Main Mechanical
Turnaround NDT T428P020 March 2014 Complete
3. PASCA BINA SDN BHD Provision of ENGDS shore Appproach for PCSB at PPT/TCOT
PB-MES-011(PO) March 2014 Complete
4. TANJUNG MAINTENANCE
SERVICES SDN BHD
To perform UT AT Tanjung Maintenance
Yard, Telok Kalong 11P023 May 2014 Complete
5. NUCLEAR CONSULTANCY
& INSPECTION SDN BHD
Provision for Positive Material Inspection
(PMI) at offshore 0990-15 Jun 2014 Complete
6. PRESCAN SDN BHD Provision for Feritte Content Measurement (FCM) at Tenaga Tiub Nilai
30009(PO) Nov 2014 Complete
7. MUHIBBAH MARINE
ENGINEERING SDN BHD
To perform NDT works at Muhibbah
Marine Yard Pulau Indah Klang 18806 Dec 2014 Complete
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
3. UBF MAINTENANCE SDN
BHD
Performing Heat Treatment Services (Post Weld Heat Treatment Services) on
Various Size of Pipe By Using Localize Electrical Resistance.
May 2014 UBFM/WO/093/14 Complete
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
LIST PROJECT UNDERTAKEN 2015 A. NDT SERVICES
NO NAME DESCRIPTION PO No. DURATION REMARK
1 TMM ENGINEERING SDN BHD
To perform NDT works for Rectification
Work on Loop Pipelines at Export
Terminal
3887 Jan 2015 Complete
2 MUHIBBAH MARINE ENGINEERING SDN BHD
To perform NDT works for Muhibbah Marine Yard Pulau Indah Klang
20078 Jan 2015 Complete
3 MUSHTARI MAINTENANCE
ENGINEERING SDN BHD
To perform NDT works for UREA Stripper Replacement E-33-01.
T509P034 Jan 2015 Complete
4 SEMERAK SHIPYARD ENGINEERING
To perform NDT works for Ship Vessel at Tok Bali, Pasir Puteh, Kelantan
0179 April 2015 Complete
5 TMM ENGINEERING SDN BHD
To perform NDT works for Rectification Works On NPS2 PIG Signaler at Telok
Gong Lateral, Melaka
3998 Feb 2015 Complete
6 TMM ENGINEERING SDN
BHD
To perform NDT works for NPS 48”
Feed Gas Pipeline GPP4 4210 Feb 2015 Complete
7 TMM ENGINEERING SDN
BHD
To perform NDT works for Rectification Work on NPS2 & NPS8 at PGU1 – 2nd
Phase
4223 March 2015 Complete
8 DIPETRO SYNERGY ENG SDN BHD
To perform NDT works for KTSB TA 2015 DOSH Equipment CF Renewal at
Dpetro Workshop
D1412-KTSB TA 2015 Feb 2015 Complete
9 TMM ENGINEERING SDN BHD
To perform NDT works for provision for Hot Tap & Associated services at
Petronas Carigali ANSI A
4151 Feb 2015 Complete
10 TMM ENGINEERING SDN BHD
To perform NDT works for Rectification
works on NPS2 PIG Signaler at TOD
Telok Gong Melaka
4051 Feb 2015 Complete
11 DIPETRO SYNERGY ENG SDN BHD
To perform NDT works on VCM Ball
Tank A Shutdown 2015 Kaneka Paste
Polymers Sdn Bhd
D1413-KANEKA March 2015 Complete
12 NUCLEAR CONSULTANCY & INSPECTION SDN BHD
To perform NDT works for Tapis C EOR Brownfield Modifications & Rectifits
1411-01 April 2015 Complete
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
13 CKM ENGINEERING
WORK SDN BHD
To perform NDT works for Shell Malikai
at Workshop ISTA 20150304-004 May 2015 Complete
14 H.S.E RESOURCES SDN
BHD
To perform NDT works for GMP5
Project 2015 04/062 April 2015 Complete
15 NEWWIN SDN BHD To perform NDT works for BPPA-May
Shutdown 2015 MESSB/PO/2015/01 April 2015 Complete
16 TMM ENGINEERING SDN
BHD
To perform NDT works at TOD Paloh
Inai, Pekan 4267 Sep 2015 Complete
17 TMM ENGINEERING SDN BHD
To perform PAUT & C-SCAN works at TOD
3942 May 2015 Complete
18 WELDCHECK TECHNOLOGIES SDN BHD
To perform NDT works at EPIC Mushtari
PO/ME-108 May 2015 Complete
19 AMALGAMATED METAL
CORPORATION SDN BHD
To perform NDT works at AMC
Workshop 130525-00 Rev:0 May 2015 Complete
20 H.S.E RESOURCES SDN
BHD
To perform NDT works at HRSB
Workshop PO(T)15/04/062 May 2015 Complete
21 SHIN EVERSENDAI SDN
BHD To perform WQT at Eversendai Bompit DO-14202 Jun 2015 Complete
22 CKM ENGINEERING SDN
BHD
To perform NDT works for Provision of
EPCC of Gas Chromatography system for TGAST at CKM Workshop
20150527-0002 Jun 2015 Complete
23 DPETRO SYNERGY ENG
SDN BHD
To perform NDT works at DPetro
Workshop PO-00455 Jun 2015 Complete
24 SEMERAK SHIPYARD ENGINEERING
To perform NDT works at Semerak Yard
0154 Jun 2015 Complete
25 TMM ENGINEERING SDN BHD
To perform NDT works at TOD Bukit Anak Dara
4222 Jun 2015 Complete
26 TMM ENGINEERING SDN BHD
To perform corrosion monitoring facilities installation at Duyung / Sotong
Platform
4068 Jun 2015 Complete
27
MUSHTARI
MAINTENANCE
ENGINEERING SDN BHD
To perform NDT works at GPP2 Fitness (CF) Renewal
T507P016 Jun 2015 Complete
28 MUHIBBAH MARINE ENGINEERING SDN BHD
To perform NDT works for Muhibbah Marine Yard Pulau Indah Klang
20108 Jun 2015 Complete
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
29 TMM ENGINEERING SDN
BHD
To perform NDT works at ANGSI
Platform Offshore 4215 July 2015 Complete
30 TMM ENGINEERING SDN
BHD
To perform UTFD at TOD Pipeline
KP100 Sabak Bernam 4219 July 2015 Complete
31
MUSHTARI
MAINTENANCE ENGINEERING SDN BHD
To perform NDT works for Boiler
shutdown for DOSH Inspection at Instep Batu Rakit, Kuala Terengganu
T525P001 Aug 2015 Complete
32 TRANSWATER API SDN
BHD
To perform NDT works for EPIC Of Sale Billing Metering upgrade GPK, GPS at
PGB GTR Kerteh
MESSB/302 Aug 2015 Complete
33 DIPETRO SYNERGY ENG
SDN BHD
To perform NDT works for TA DOSH CF Renewal at Kerteh Terminal Sdn
Bhd
PO-00506 July 2015 Complete
34 DIALOG PLANT SERVICES
SDN BHD To perform WQT at Workshop Gebeng
P15318/WO/027/MP-
MES Sep 2015 Complete
35 INTISARI MULIA ENG
SDN BHD
To perform NDT works at HHA
Workshop Kemaman D-11290 Sep 2015 Complete
36 VG SYNERGY SDN BHD To perform NDT works for fabrication
monorail beam at PFCE-CG 30015(P) Sep 2015 Complete
37 TMM ENGINEERING SDN BHD
To perform NDT works at GPK, Kerteh 4337 Sep 2015 Complete
38 TMM ENGINEERING SDN BHD
To perform corrosion monitoring facilities at TCOT
4532 Oct 2015 Complete
39 TMM ENGINEERING SDN
BHD
To perform NDT works at TOD
Substation Paka & TMM Workshop 4221 Oct 2015 Complete
40 TMM ENGINEERING SDN
BHD
To perform NDT works KP5 & KP10
NPS36 PGU-1 at TMM Workshop 4224 Oct 2015 Complete
41 MUSHTARI MAINTENANCE
ENGINEERING SDN BHD
To perform NDT works at Mushtari
Workshop T530P147 Nov 2015 Complete
42 DIPETRO SYNERGY ENG
SDN BHD
To perform NDT works for EPPC Water
Cooled Heat Exchanger PO-00521 Nov 2015 Complete
43 H.S.E RESOURCES SDN
BHD
To perform NDT works at HRSB
Workshop PO(T)15/08/259 Nov 2011 Complete
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
B. Supply Inspector
NO. CLIENT DESCRIPTIONS PO No. DURATION REMARK
1. DIPETRO SYNERGY ENG SDN BHD
TA DOSH Register Vessel at Kerteh Terminal Sdn Bhd - API 510 Inspector
PO-00375 July 2015 Complete
2. DIPETRO SYNERGY ENG
SDN BHD
VCM Ball Tank A Shut Down at Kaneka
Paste Polymers Sdn Bhd, Gebeng - API 510 Inspector
PO-00375 Nov 2015 Complete
3.
FRAME SEPARATION
TECHNOLOGIES BV (NETHERLAND)
Inspection on vessels 1221 and 1121 at
AMC Sdn Bhd - Welding Inspector STO-100488 Sep 2015 Complete
4. DIPETRO SYNERGY ENG
SDN BHD
TA DOSH CF Renewal at Kerteh
Terminal Sdn Bhd - API 510 Inspector PO - 00506 Dec 2015 Complete
5. MUSHTARI MAINTENANCE
SDN BHD
DOSH Inspection at INSTEP Batu Rakit,
Kuala Terengganu - API 510 Inspector T525P001 Aug 2015 Complete
44 ARMADA DIMENSI
TRADING
To perform NDT works at KNM Borsig
Gebeng ADT/011-07/2015 Oct 2015 – Feb 2016 Complete
45 CORAL ALLIANCE SDN
BHD
To perform NDT works for DOSH PMT
at Workshop Coral KMN/02034 Dec 2015 Complete
46 H.S.E RESOURCES SDN
BHD
To Perform Tank Floor Scanning at
GPP3 PO(T)15/11/075 Nov 2015 Complete
47
MUSHTARI
MAINTENANCE ENGINEERING SDN BHD
To perform NDT works at ET, DCPU &
KCS T507P140 Dec 2015 Complete
48
MUSHTARI
MAINTENANCE ENGINEERING SDN BHD
To perform NDT works at TLE Cleaning
(E-1315 A,B,C,D) T425P018 Dec 2015 Complete
49 DIPETRO SYNERGY ENG
SDN BHD
To perform Phased Array UT (PAUT) at
GPP3 PO-00530 Dec 2015 Complete
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
LIST OF PROJECT UNDERTAKEN 2016-2017
NO CLIENT PROJECT PO No. DURATION REMARK
1 MUSHTARI
MAINTENANCE SDN BHD
Perform NDT Work For Mushtari
Maintenanace Sdn Bhd Project T501P259 Jan 2016 - Present On Call Basis
2 TMM ENGINEERING & SERVICES SDN BHD
Supply NDT (Basic & Advanced) Services For TOD Pipeline
4221 Jun 2015 - Present On Call Basis
3 HSE RESOURCES SDN BHD
Price Agreement (2+1) For PGB Project For NDT Services
HRSB/PO(T)15/04/062 Apr 2015 - Present On Call Basis
4 TMM ENGINEERING &
SERVICES SDN BHD
Oncall Basis For Supply NDT Services
(Onshore & Offshore) 4215 Jun 2015 - Present On Call Basis
5 DIALOG PLANT SERVICES
SDNBHD
Price Agreement To Supply Manpower And Equipment For Perform PAUT
Services For PDH Plant Project
P15318 Sep 2015-Sep 2017 On Call Basis
6 SESCORE ENGINEERING
& SUPPLY SDN BHD Supply RT For KNM Workshop
PO-005/SESCORE
/MESSB/012016 Jan 2016 Complete
7 DIPETRO SYNERGY ENG
SDN BHD
EPCC Of Water Cooled Heat Exchanges Installation At GPK – Basic NDT And
Phased Array UT (PAUT)
PO-00521 Jan 2016-Jun 2016 On Call Basis
8 HSE RESOURCES SDN
BHD
NDT Services For PP(T)SB Turnaround
(TA) 2016 HRSB/PO(T)/16/04/607 Mar 2016 Complete
9 UBF MAINTENANCE SDN
BHD
PAUT Services For PP(T)SB Turnaround
(TA) 2016 UBFM/WO/049/16 S-1 Mar 2016 Complete
10
MUSHTARI
MAINTENANCE SDN BHD
Perform NDT Work For Mushtari
Maintenanace Sdn Bhd T534P006 Feb 2016-March Complete
11 MUHIBBAH MARINE
ENGINEERING SDN BHD
Price Agreement To Perform RT For
Muhibbah Marine Engeneering Sdn Bhd at Klang
20108 Jun 2015 - Present On Call Basis
12 HSE RESOURCES SDN
BHD
NDT Services For ARKEMA Thiochemical
Turnaround (TA) 2016 HRSB/PO(T)/16/03/362 Mar 2016 – Apr 2016 Complete
13 CHAKRA BITARA SDN BHD
Supply Of The Provision Of NDT Services For Flare GPP1
PO000490 Mar 2016-Apr 2016 Complete
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
14 DA’Z ENGINEERING & SERVICES SDN BHD
Servicing And Inspection For UPV PMT Certificate Renewal Of 9 Nos Blowdown
Drum, Kertih Pipeline System
PO/2016/0026 Mar 2016-Apr 2016 Complete
15 DIPETRO SYNERGY ENG SDN
BHD
Provision Of Inspection Services For Spherical Tank At Kaneka Gebeng
PO-00714 May 2016 – Jun 2016 Complete
16 HSE RESOURCES SDN BHD
Provision Of NDT Services For Tank Q3-
201 Internal Inspection (GPK) – MFL,
Vacuum Box, UT, DPT & MPI
HRSB/PO(T)/16/ 05/686
Jun 2016 Complete
17 DYNANENTIAL ENGINEERING SDN BHD
Provision Of NDT Services For Dynanential
Engineering Sdn Bhd For RAPID Project –
Spherical Tank
DYN/PO/1628 Jun 2016 – March
2017 Ongoing
18 DYNANENTIAL ENGINEERING SDN BHD
Provision Of NDT Services At Senai And Gelang Patah, Johor
MKE/PO/2016/310 May 2016 – March
2017 Ongoing
19 DIPETRO SYNERGY ENG SDN BHD
Provision Of Inspection Services For Spherical Tank At Kaneka Gebeng
PO-00714 Jun 2016 – Jul 2016 Complete
20 CNI ENGINEERING & CONSTRUCTION SDN
BHD (CNIEC)
Provision Of NDT Services For refinery and petrochemical integrated development
project (RAPID), Package 5 - CPSWH20
16900025 YS 00020 Jul 2016 – Jul 2018 Ongoing
21 PFC ENGINEERING SDN BHD
Provision Of NDT Services (MPT, DPT & RT) At Oil & Gas Terminal (OGT)
Turnaround (TA) 2016
PROC/PFCE/0535/ 2016/NSY
Jul 2016 – Aug 2016 Complete
22
ZHONGHE HUAXING
DEVEPMENT (M) SDN
BHD
Supply Non-Destructive Examination Service For RAPID Package 2 Project
2016-8-24 Sep 2016 – March
2017 Complete
23 MISI SETIA OIL & GAS
SDN BHD
Provision Of NDT Services For refinery and
petrochemical integrated development
project (RAPID), Package 4 - – Pipe Spool Fabrication Work (PETROFAC)
MSOG-M1607-M33-
0049 Sep 2016 – Sep 2017 Ongoing
24 KNM PROCESS SYSTEM
SDN BHD
Provision Of NDT Services For refinery and petrochemical integrated development
project (RAPID), Package 5 -– PFSPROD2
16900845 Y.S 00002 Aug 2016 – Sep 2017 Ongoing
25
CHINA PETROLEUM JILIN CHEMICAL ENGINEERING
& CONSTRUCTION
CO.LTD.
Provision Of NDT Services For refinery and
petrochemical integrated development project (RAPID), Package 5B
Q001-0916-MESSB-
CPJCECCL Apr 2017 – Apr 2018 Ongoing
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
26 DESTINI OIL SDN BHD & REDTECH OFFSHORE SDN
BHD
Provision Of Engineering Preparation Removal And Disposal (EPRD) Of KAPAL
WELLBAY Module And Its Support Structure – Supply Welding Inspector
16/0558 Oct 2016 – Dec 2016 Complete
27
SINOHYDRO
CORPORATION (M) SDN BHD
NDT Services For RAPID Package 2, CDU,
ADRS, HCDU UNIT
Q001-1116-MESSB-
SCMSB
Nov 2016 – March
2017 Complete
28 DIPETRO SYNERGY ENG
SDN BHD
NDT Services for GPP2 Turnaround 2017–
EPCC Of Water Cooled Heat Exchanges Installation (PAUT, DPT & RT)
PO-00521 Feb 2017 Complete
29 MUSHTARI
MAINTENANCE SDN BHD
NDT Services for GPP2 Turnaround 2017 –
PAUT, DPT & RT T501P259 Feb 2017 Complete
30 WABAG MUHIBBAH JV
SDN BHD.BHD
Provision of NDT Services for RAPID
Project Package 16A – Effluent Treatment Plant
T0065 Feb 2017 – Nov 2018 Ongoing
31 DIPETRO SYNERGY ENG
SDN BHD
Master Servis Agreement For Tank
Inspection (1 Year + 1 Year) at Petronas OPU Kerteh
PO-00521 Jan 2017 – Dec 2018 Ongoing
32 HQC ENGINEERING
MALAYSIA SDN.BHD
Petronas Rapid Project EPC Phase PCU -
C3 Unit 3315 – Package P7 – Polypropylene
RAPID-P0007-CP6CC-
CTC-CON-002 Mar 2017 – Jul 2018 Ongoing
33 CPP PETROLEUM ENGINEERING (M) SDN
BHD
NDT Services for Petronas RAPID Project
Package 14
CPPSEA-MY-MPEI0806-
CPP5-CW-1710-0007 Oct 2017 – Sep 2018 Ongoing
34 DERMAGA OIL & GAS SDN
BHD
Provision Of NDT Services for Rehabilitation and Repair Works For
PGBGTR Pipelines System
PO-1-P2988 Oct 2017 – Sep 2020 Ongoing
35 MIE INDUSTRIAL SDN
BHD
NDT Services for Petronas RAPID Project
Package 29 (Civil & Building) PC/PKL/MESSB/302 Nov 2017 – Oct 2018 Ongoing
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
Supply Inspector
NO. CLIENT DESCRIPTIONS PO No. DURATION REMARK
1 DIPETRO SYNERGY ENG
SDN BHD
Provision Of Inspection Services For
Spherical Tank At Kaneka Gebeng PO-00714 May 2016 – Jun 2016 Complete
2 DIPETRO SYNERGY ENG
SDN BHD
Provision Of Inspection Services For
Spherical Tank At Kaneka Gebeng PO-00714 Jun 2016 – Jul 2016 Complete
3 KANEKA APICAL MALAYSIA SDN BHD
API 510 DOSH Inspection Works for KAM-GS
4500098726/v0 Jul 2016 Complete
4 HABLEM OIL & GAS (M)
SDN BHD
Welding Inspector for survey in Corroded
Surface for Mcfarland Pump 8108/2846/ZAM Jun 2016 Complete
5 DESTINI OIL SDN BHD & REDTECH OFFSHORE
SDN BHD
Provision Of Engineering Preparation
Removal And Disposal (EPRD) Of KAPAL WELLBAY Module And Its Support
Structure – Supply Welding Inspector
16/0558 Oct 2016 – Dec 2016 Complete
MUKSYN ENGINEERING & SERVICES SDN BHD [email protected]
www.muksyn.com
POST WELD HEAT TREATMENT (PWHT)
NO CLIENT PROJECT PO No. DURATION REMARK
1 CNI ENGINEERING & CONSTRUCTION SDN
BHD (CNIEC)
Provision Of PWHT Services For RAPID Package 5
16900025 YS 00020 Jul 2016 – Jul 2018 Ongoing
2
CHINA PETROLEUM JILIN CHEMICAL ENGINEERING
& CONSTRUCTION CO.LTD.
Provision Of PWHT Services For RAPID
Package 5B
Q001-0916-MESSB-
CPJCECCL Oct 2016 – Oct 2017 Ongoing
3 SINO PETROCHEMICAL CONSTRUCTION SDN
BHD
Provision Of Manpower, Equipment,
Mob/Demob And Engineering For The Purpose Of Performing Heat Treatment
Services (PWHT Works) On Various Size Of Pipe By Using Localized Electrical
Resistance At BPC Gebeng
Q002-1116-MESSB-
CPJCECCL Nov 2016 – Feb 2017 Ongoing
4 WABAG MUHIBBAH JV
SDN BHD.BHD
Provision of NDT Services for RAPID Project Package 16A – Effluent Treatment
Plant
T0065 Feb 2017 – Nov 2018 Ongoing
5 HQC ENGINEERING
MALAYSIA SDN.BHD
PETRONAS RAPID PROJECT EPC PHASE PCU - C3 Unit 3315 – Package P7 –
POLYPROPYLENE
RAPID-P0007-CP6CC-
CTC-CON-002 Mar 2017 – Jul 2018 Ongoing