PERHITUNGAN KONSTRUKSI BETON PBI
2080 kg/cm21400 kg/cm275 kg/cm2
n 21
KodeDimensi balokMoment (kgm) Baris Atas Baris Bawah Æ A A' Tulangan Pakaibalok ht b + Tumpuan Ca d Æ 100nw ca Æ 100nw ca Æ > Æ o 100.nw w.b.h d.A Amin A A' Ket
cm cm - Lapangan tabel N Lentur Tabel Tabel? ? ? ? ? ? ? ? ? ? ? ? ?
B1 50 25 + 3750 3.333 0.2 1.899 9.82 3.39 1.857 10.21 3.328 0.8889 1.8606 10.1765 6.06 1.21 7.21 16 4 - D16 (8.04) 16 1 - D16 (2.01) ok50 25 - 2750 3.892 0.2 2.279 7.112 3.956 2.226 7.415 3.878 0.8889 2.2358 7.3587 4.38 0.88 7.21 19 3 - D19 (8.51) 19 1 - D19 (2.84) ok
B2 80 25 + 7672 3.729 0 2.04 8.066 3.732 2.03 8.127 3.718 0.8889 2.0377 8.0803 7.70 0.00 11.54 19 5 - D19 (14.18) 19 2 - D19 (5.67) ok80 25 - 3952 5.195 0 3.065 4.013 5.21 3.048 4.051 5.186 0.8889 3.0545 4.0364 3.84 0.00 11.54 19 5 - D19 (14.18) 19 2 - D19 (5.67) ok
B3 80 25 + 13128 2.850 0 1.439 14.24 2.851 1.433 14.34 2.843 0.8889 1.4386 14.2467 13.57 0.00 11.54 19 5 - D19 (14.18) 19 2 - D19 (5.67) ok80 25 - 9687 3.318 0 1.762 10.27 3.328 1.755 10.34 3.316 0.8889 1.7564 10.3264 9.83 0.00 11.54 19 5 - D19 (14.18) 19 2 - D19 (5.67) ok
B1 37 25 + 14092 1.272 0.8 1 69.44 1.282 0.98 74.57 1.237 0.8889 0.9958 70.5290 31.07 24.85 5.34 19 11 - D19 (31.19) 19 9 - D19 (25.52) ok37 25 - 10871 1.449 0.6 0.961 53.3 1.473 0.942 56.19 1.434 0.8889 0.9492 55.0975 24.27 14.56 5.34 19 9 - D19 (25.52) 19 6 - D19 (17.01) ok
B2 80 25 + 7672 3.729 0 2.04 8.066 3.732 2.03 8.127 3.718 0.8889 2.0377 8.0803 7.70 0.00 11.54 19 5 - D19 (14.18) 19 2 - D19 (5.67) ok80 25 - 3952 5.195 0 3.065 4.013 5.21 3.048 4.051 5.186 0.8889 3.0545 4.0364 3.84 0.00 11.54 19 5 - D19 (14.18) 19 2 - D19 (5.67) ok
s*aus'as'b
Æ os'a
n.s'b Cm2 Cm2 Cm2 Æ (mm) Cm2 Æ (mm) Cm2
Lokasi : Reception Lantai Atas Ruang Utama
Lokasi : Reception Lantai Atas Pons
PERHITUNGAN KONSTRUKSI BETON TANGGA
DATA :- Mutu Beton K - 225
225 kg/cm2 6.5 kg/cm2 beban tetap, tanpa tulangan geser75 kg/cm2 10 kg/cm2 beban sementara, tanpa tulangan geser
n 21 16 kg/cm2 beban tetap, dengan tulangan geser20 kg/cm2 beban tetap, dengan tulangan geser & puntir
- Mutu Baja U242080 kg/cm21400 kg/cm2
1400 = 0.88921 75
- BJ Beton Bertulang = 2500 kg/m3- Berat Dinding = 250 kg/m2- Berat Spesi = 21 kg/m2 tebal 3 cm- Berat Lantai = 24 kg/m2 tebal 2 cm- Berat Guna = 250 kg/m2
PENYELESAIAN :x y
Ukuran Plat Lantai : 3.13 1.5 m
Tebal Plat Lantai ht : 12 cm 0.12 cmh : 12 - 4 = 8 cm
Beban yang terjadi :- BS. Plat = 0.12 x 2500 x 1 = 300 kg/m1- B. Spesi = 3 x 21 x 1 = 63 kg/m1- B. Lantai = 2 x 24 x 1 = 48 kg/m1- B. Guna = 250 x 1 = 250 kg/m1
q = 661 kg/m1q/m' = 661 kg/m1
diambil q = 700 kg/m1
Perhitungan Penulangan :Ly = 1.5 = 0.48 Tabel M Lx = 62 -Mty = 62Lx 3.13 M Ly = 34 -Mty = 34
M Lx = 0.001 x 700 x 9.7969 x 62.00 = 425.19 kgm-Mtx = 0.001 x 700 x 9.7969 x 62.00 = 425.19 kgmM Ly = 0.001 x 700 x 9.7969 x 34.00 = 233.17 kgm-Mty = 0.001 x 700 x 9.7969 x 34.00 = 233.17 kgm
Arah X - X
Ca = 8 = 3.168 d = 0Tabel Æ = 1.678 0.025
21 425.2 100nw = 7.03 3.168 2.1631 1400 nw = 0.0703 Æ 100nw
3.149 3.826A = 0.070276 x 100 x 8 = 2.68 cm2 3.132 3.863
21 0.017 -0.037
Amin = 0.25 x 100 x 12 = 3.00 cm2 0.680 -1.480100 1.471 -3.202
A' = 0 x 3.00 = 0.00 cm2 1.678 7.028
Dipakai besi Æ 12 - 20 = 5.65 cm2 > 3.00 cm2
Arah Y - Y
Tbk TbtTb' Tbs
Tbm,tTbm,t
T*auTa'
- Æ o
Ca = 8 = 4.278 d = 0Tabel Æ = 2.433 0.025
21 233.17 100nw = 5.38 4.278 1.0531 1400 nw = 0.0538 Æ 100nw
3.149 3.826A = 0.053849 x 100 x 8 = 2.05 cm2 3.132 3.863
21 0.017 -0.037
Amin = 0.25 x 100 x 12 = 3.00 cm2 0.680 -1.480100 0.716 -1.559
A' = 0 x 3.00 = 0.00 cm2 2.433 5.385
Dipakai besi Æ 12 - 20 = 5.65 cm2 > 3.00 cm2
820.3125
BORDES
DATA :- Mutu Beton K - 225
225 kg/cm2 6.5 kg/cm2 beban tetap, tanpa tulangan geser75 kg/cm2 10 kg/cm2 beban sementara, tanpa tulangan geser
n 21 16 kg/cm2 beban tetap, dengan tulangan geser20 kg/cm2 beban tetap, dengan tulangan geser & puntir
- Mutu Baja U242080 kg/cm21400 kg/cm2
1400 = 0.88921 75
- BJ Beton Bertulang = 2500 kg/m3- Berat Dinding = 250 kg/m2- Berat Spesi = 21 kg/m2 tebal 3 cm- Berat Lantai = 24 kg/m2 tebal 2 cm- Berat Guna = 250 kg/m2
PENYELESAIAN :x y
Ukuran Plat Lantai : 1.25 2.5 m
Tebal Plat Lantai ht : 12.5 cm 0.125 cmh : 12.5 - 4 = 8.5 cm
Beban yang terjadi :- BS. Plat = 0.125 x 2500 x 1 = 312.5 kg/m1- B. Spesi = 3 x 21 x 1 = 63 kg/m1- B. Lantai = 2 x 24 x 1 = 48 kg/m1- B. Guna = 250 x 1 = 250 kg/m1
q = 673.5 kg/m1q/m' = 673.5 kg/m1
diambil q = 700 kg/m1
Tbk TbtTb' Tbs
Tbm,tTbm,t
T*auTa'
- Æ o
Perhitungan Penulangan :Ly = 2.5 = 2.00 Tabel M Lx = 85 -Mty = 85Lx 1.25 M Ly = 50 -Mty = 50
M Lx = 0.001 x 700 x 1.5625 x 85.00 = 92.97 kgm-Mtx = 0.001 x 700 x 1.5625 x 85.00 = 92.97 kgmM Ly = 0.001 x 700 x 1.5625 x 50.00 = 54.69 kgm-Mty = 0.001 x 700 x 1.5625 x 50.00 = 54.69 kgm
Arah X - X
PERHITUNGAN KONSTRUKSI BETON PLAT SEGITIGA PBI
DATA :- Mutu Beton K - 225
225 kg/cm2 6.5 kg/cm2 beban tetap, tanpa tulangan geser75 kg/cm2 10 kg/cm2 beban sementara, tanpa tulangan geser
n 21 16 kg/cm2 beban tetap, dengan tulangan geser20 kg/cm2 beban tetap, dengan tulangan geser & puntir
- Mutu Baja U242780 kg/cm21850 kg/cm2
1850 = 1.17521 75
- BJ Beton Bertulang = 2500 kg/m3- Berat dinding = 250 kg/m2
PENYELESAIAN :b ht
Ukuran Balok I : 20 60 cm0.2 0.6 m
Bentang Balok : 4 m 2 2h : 60 - 5 = 55 cm
Beban yang terjadi :
- BS. Balok = 0.2 x 0.48 x 2500 = 240.0 kg/m1- B. Dinding = 0 x 250 = 0.0 kg/m1- B. Plat 1 = 700 x 1 x 1 = 700.0 kg/m1
940.0
M Lap 1 = 1 x 940.000 16 = 13388.27 kgm11
M Tump 1 = 1 x 940.000 16 = 34426.98 kgm16
M Lapangan 1
Ca = 55 = 1.995 d = 0.6Tabel Æ = 1.239 0.044
21 13388.27 100nw = 28.90 1.995 0.0150.2 1850 nw = 0.2890 Æ 100nw
1.247 28.450A = 0.288966 x 20 x 55 = 15.14 cm2 1.222 29.78
21 5.35 0.025 -1.33
Amin = 12 x 20 x 55 = 4.75 cm2 0.568 -30.2272780 1.68 0.008 -0.447
A' = 0.6 x 15.14 = 9.08 cm2 1.239 28.8973.21
Dipakai besi 6 Æ 19 = 16.98 cm2 > 15.14 cm2 bawahDipakai besi 4 Æ 19 = 11.32 cm2 > 9.08 cm2 atas
Æ 19 = 2.83 cm219 = 2.83
M Tump 1
Tbk TbtTb' Tbs
Tbm,tTbm,t
T*auTb'
- Æ o
Ca = 55 = 1.244 d = 0.2Tabel Æ = 0.447 0.074
21 34427.0 100nw = 18.86 1.244 2.5580.2 1850 nw = 0.1886 Æ 100nw
2.175 7.728A = 0.188577 x 20 x 55 = 9.88 cm2 2.125 8.05
21 8.74 0.05 -0.322
Amin = 12 x 20 x 55 = 4.75 cm2 0.676 -4.3512780 4.20 1.728 -11.130
A' = 0.2 x 9.88 = 1.98 cm2 0.447 18.8581.75
Dipakai besi 4 Æ 16 = 4.5216 cm2 > 9.88 cm2 atasDipakai besi 2 Æ 16 = 2.2608 cm2 > 1.98 cm2 bawah
Æ 16 = 1.1304 cm216 = 1.1304
Kontrol Tegangan Geser :
Qmax = 0.5 x 940.000 x 4 = 1880.000 kg
t = 8 x 1880 = 1.953247 < 6.5 kg/cm27 x 20 x 55 < 10 kg/cm2
< 16 kg/cm2< 20 kg/cm2
Diambil harga tegangan max : -4.546753Seluruh tegangan geser dipikul oleh tulangan geser berupa sengkang dan tulangan miringDipakai :
6 = 0 cm26 = 0 cm2
- Misalkan Tulangan Sengkang menahan 50% -4.5468 = 0 x 2780
as x 55
as = #DIV/0! diambil 15 cm6 - 150 mm
t = 0 x 2780 = 015 x 55
- Misalkan Tulangan Miring menahan 50% -4.5468 = 0 x 2780 ( sin 45 + cos 45 )
am x 55-4.5468 = 0 x ( 0.850904 + 0.525322 )
am x 55am = #DIV/0! diambil 10 cm
6 - 100 mm
= 0 x 2780 x 1.376226 = 0.000 cm10 x 55
= 0 + 0.000 = 0 kg/cm2 > -4.546753 kg/cm2 ok!
- Tul. Sengkang As Æ- Tul. Miring Am Æ
tm
Dipakai sengkang Æ
tm
Diberi tul. miring Æ
tm
Total t
KONSTRUKSI BETON PBI
MEKTEK
ca2.011.966
HELP
Perhitungan konstruksi beton tanggaPerhitungan konstruksi beton plat PBIPerhitungan konstruksi beton plat segitiga PBI
Perhitungan konstruksi beton plat segitiga PBI (B1sendi)Perhitungan konstruksi beton plat segitiga PBI (B1plat)Perhitungan konstruksi beton plat segitiga PBI (Bjepit)Perhitungan konstruksi beton plat trapesium PBIPerhitungan konstruksi beton kolom PBI
Tegangan dan lendutan balok baja (lendutan baja stage)Lendutan balok beton (lendutan plat)Perhitungan tegangan stage baja (plat)Tegangan balok baja (penopang)
interpolasiinterpolasi
ca3.8023.728
interpolasiinterpolasiinterpolasiinterpolasi
PERHITUNGAN KONSTRUKSI BETON PORTAL PLAT TRAPESIUM PBI
DATA :- Mutu Beton K - 225
225 kg/cm2 6.5 kg/cm2 beban tetap, tanpa tulangan geser75 kg/cm2 10 kg/cm2 beban sementara, tanpa tulangan geser
n 21 16 kg/cm2 beban tetap, dengan tulangan geser20 kg/cm2 beban tetap, dengan tulangan geser & puntir
- Mutu Baja U242080 kg/cm21400 kg/cm2
1400 = 0.88921 75
- BJ Beton Bertulang = 2500 kg/m3- Berat dinding = 250 kg/m2
PENYELESAIAN :b ht
Ukuran Balok I : 15 15 cm0.15 0.15 m
Bentang Balok : 7 m 3 4h : 15 - 3 = 12 cm
Beban yang terjadi :
- BS. Balok = 0.15 x 0.03 x 2500 = 11.3 kg/m1- B. Dinding = 1 x 250 = 250.0 kg/m1- B. Plat = 700 x 1.5 x 1 = 1050.0 kg/m1
MB = 0RA = 5.5 1050 3.5
= 2887.5
MA = 0RB = 5.5 1050 3.5
= 2887.5
KONTROL RA + RB = 5775
5775 = 5775 ok!
Mmax = 2887.5 3.5 - 0.75 1050 2.500 - 2100 1.000
= 10106.25 - 1968.75 - 2100.000
Mmax = 6037.500
6037.50 = 1 x 498
6037.50 = 6.125
= 985.7143 kg/m
Tbk TbtTb' Tbs
Tbm,tTbm,t
T*auTb'
- Æ o
q eq
q eq
q eq
MB = 0RA = 0.5 1247.0 49
= 4364.375 kg
MA = 0RB = 0.5 1247.0 49
= 4364.375 kg
KONTROL RA + RB = 8728.75
8728.75 = 8728.8 ok!
Mmax = 4364.375 3.5 - 0.5 1246.964 12.25
Mmax = 7637.656 kgm
M Lap 1 = 4 x 7637.656 = 6110.13 kgm5
M Tump 1 = 1 x 7637.656 = 3818.83 kgm2
M Lapangan 1
Ca = 12 = 0.485 d = 0.2Tabel Æ = -0.146 0.025
21 6110.13 100nw = 11.00 0.485 4.8460.15 1400 nw = 0.1100 Æ 100nw
3.149 3.826A = 0.109974 x 15 x 12 = 0.94 cm2 3.132 3.863
21 0.47 0.017 -0.037
Amin = 12 x 15 x 12 = 1.04 cm2 0.680 -1.4802080 0.52 3.295 -7.171
A' = 0.2 x 0.94 = 0.19 cm2 -0.146 10.9970.09
Dipakai besi 3 Æ 16 = 6.03 cm2 > 0.94 cm2 bawahDipakai besi 2 Æ 16 = 4.02 cm2 > 0.19 cm2 atas
Æ 16 = 2.01 cm2
M Tump 1
Ca = 12 = 0.614 d = 0.2Tabel Æ = -0.059 0.025
21 3818.8 100nw = 10.81 0.614 4.7170.15 1400 nw = 0.1081 Æ 100nw
3.149 3.826A = 0.108071 x 15 x 12 = 0.93 cm2 3.132 3.863
21 0.46 0.017 -0.037
Amin = 12 x 15 x 12 = 1.04 cm2 0.680 -1.4802080 0.52 3.208 -6.981
A' = 0.2 x 0.93 = 0.19 cm2 -0.059 10.8070.09
Dipakai besi 2 Æ 16 = 4.02 cm2 > 0.93 cm2 atasDipakai besi 2 Æ 16 = 4.02 cm2 > 0.19 cm2 bawah
Æ 16 = 2.01 cm2
Kontrol Tegangan Geser :
Qmax Ujung = 1 x 7637.656 = 7637.656 kg
t = 8 x 7637.656 = 48.49306 < 6.5 kg/cm27 x 15 x 12 < 10 kg/cm2
< 16 kg/cm2< 20 kg/cm2
PERHITUNGAN KONSTRUKSI BETON PLAT PBI
DATA :- Mutu Beton K - 225
225 kg/cm2 6.5 kg/cm2 beban tetap, tanpa tulangan geser75 kg/cm2 10 kg/cm2 beban sementara, tanpa tulangan geser
n 21 16 kg/cm2 beban tetap, dengan tulangan geser20 kg/cm2 beban tetap, dengan tulangan geser & puntir
- Mutu Baja U242080 kg/cm21400 kg/cm2
1400 = 0.88921 75
- BJ Beton Bertulang = 2500 kg/m3- Berat Dinding = 250 kg/m2- Berat Spesi = 21 kg/m2 tebal 3 cm- Berat Lantai = 24 kg/m2 tebal 2 cm- Berat Guna = 250 kg/m2
PENYELESAIAN :x y
Ukuran Plat Lantai : 4 4 m
Tebal Plat Lantai ht : 12 cm 0.12 mh : 12 - 2 = 10 cm
Beban yang terjadi :- BS. Plat = 0.12 x 2500 x 1 = 300 kg/m1- B. Spesi = 3 x 21 x 1 = 63 kg/m1- B. Lantai = 2 x 24 x 1 = 48 kg/m1- B. Guna = 250 x 1 = 250 kg/m1
q = 661 kg/m1q/m' = 661 kg/m1
diambil q = 700 kg/m1
Perhitungan Penulangan :Ly = 4 = 1.00 Tabel M Lx = 21 -Mty = 52Lx 4 M Ly = 21 -Mty = 52
M Lx = 0.001 x 700 x 16 x 21.00 = 235.20 kgm-Mtx = 0.001 x 700 x 16 x 52.00 = 582.40 kgmM Ly = 0.001 x 700 x 16 x 21.00 = 235.20 kgm-Mty = 0.001 x 700 x 16 x 52.00 = 582.40 kgm
Arah X - X
Ca = 10 = 5.324 d = 0Tabel Æ = 3.144 0.025
21 235.2 100nw = 3.84 5.324 0.0071 1400 nw = 0.0384 Æ 100nw
3.149 3.826
Tbk TbtTb' Tbs
Tbm,tTbm,t
T*auTa'
- Æ o
A = 0.03836 x 100 x 10 = 1.83 cm2 3.132 3.86321 0.017 -0.037
Amin = 0.25 x 100 x 12 = 3.00 cm2 0.680 -1.480100 0.005 -0.010
A' = 0 x 1.83 = 0.00 cm2 3.144 3.836
Dipakai besi Æ 10 - 20 = 3.93 cm2 > 1.83 cm2
Arah Y - Y
Ca = 10 = 5.324 d = 0Tabel Æ = 3.193 0.015
21 235.20 100nw = 2.21 5.324 -1.2461 1400 nw = 0.0221 Æ 100nw
2.279 6.692A = 0.02207 x 100 x 10 = 1.05 cm2 2.268 6.746
21 0.011 -0.054
Amin = 0.25 x 100 x 12 = 3.00 cm2 0.733 -3.600100 -0.914 4.485
A' = 0 x 1.05 = 0.00 cm2 3.193 2.207
Dipakai besi Æ 10 - 20 = 3.93 cm2 > 1.05 cm2
PERHITUNGAN KONSTRUKSI BETON KOLOM PBI
DATA :- Mutu Beton K - 225
225 kg/cm2 6.5 kg/cm2 beban tetap, tanpa tulangan geser75 kg/cm2 10 kg/cm2 beban sementara, tanpa tulangan geser
n 21 16 kg/cm2 beban tetap, dengan tulangan geser20 kg/cm2 beban tetap, dengan tulangan geser & puntir
- Mutu Baja U322650 kg/cm21850 kg/cm2
1850 = 1.17521 75
- BJ Beton Bertulang = 2500 kg/m3- Berat dinding = 250 kg/m2
PENYELESAIAN :b ht
Ukuran Kolom : 30 30 cm0.3 0.3 m
Tinggi Kolom 4 mh : 30 - 5 = 25 cm 0.25 m
Beban yang terjadi :- BS. Kolom = 0.3 x 0.3 x 4 x 2500 = 900.00 kg- R. Kolom atas 3 = 14940.00 = 14940.00 kg- R. Balok 1 = 4124 x 1 = 4124.00 kg- R. Balok 11 = 2100 x 1 = 2100.00 kg- R. Balok 13 = 3913 x 1 = 3913.00 kg- R. Balok 7 = x 0 = 0.00 kg
M(kgm) N(kg) hitungsendiri(1/0) P = 25977.00 kg0 52660 52660
eo1 = 0 = 052660
eo2 = 1 0.3 = 0.01 m minimum 0.02 m30 eo/ht c2 0.0666667
eo = 0 + 0.02 = 0.02 m 0.1 6.45 tidak0.1 6.96
eo = 0.02 = 0.0666667 Tabel C2 = 6.62 C1 = 1ht 0.3e1 = 6.62 0.7 x 4 ^2 x 0.3 = 0.0173
100 x 0.3e2 = 0.15 x 0.3 = 0.045e = 0.02 + 0.0173 + 0.045 = 0.082ea = 0.082 + 0.5 x 0.3 - 0.05 = 0.1823
Nea = 52660.00 x 0.1823 = 9599.932 kgm
Ca = 25 = 1.312 d = 1 tidakTabel Æ = 1.296 0.066
21 9599.932 100nw = 65.46 1.312 0.0070.3 1850 nw = 0.6546 Æ 100nw ca
1.299 64.690 1.319d = 1 - 7 0.25 = -0.200 N bekerja 1.273 71.7 1.253
8 0.1823 didalam kern 0.026 -7.01
0.394 -106.212A = 0.6546 x 30 x 25 = 23.38 cm2 0.003 -0.773
21 8.251.296 65.463
Amin = 1 x 30 x 30 = 9.00 cm2100 3.17
1/2Amin = 0.5 x 9.00 = 4.51.59
A' = 1 x 23.38 = 23.38 cm28.25
Tbk TbtTb' Tbs
Tbm,tTbm,t
T*auTa'
- Æ o
interpolasi
interpolasi
Dipakai besi 9 Æ 25 = 25.517586 cm2 > 23.38 cm2Dipakai besi 9 Æ 25 = 25.517586 cm2 > 23.38 cm2
Æ 19 = 2.83528737 cm2
b s D-begel(cm) D-utama jml tul30 2 0.8 2.5 6
s 1.88 > 2.85
KONSTRUKSI BETON PBI
MEKTEK
HELP
Perhitungan konstruksi beton tanggaPerhitungan konstruksi beton plat PBIPerhitungan konstruksi beton plat segitiga PBI
Perhitungan konstruksi beton plat segitiga PBI (B1sendi)Perhitungan konstruksi beton plat segitiga PBI (B1plat)Perhitungan konstruksi beton plat segitiga PBI (Bjepit)Perhitungan konstruksi beton plat trapesium PBIPerhitungan konstruksi beton kolom PBI
Tegangan dan lendutan balok baja (lendutan baja stage)Lendutan balok beton (lendutan plat)Perhitungan tegangan stage baja (plat)Tegangan balok baja (penopang)
TEGANGAN BALOK BAJA
Bentang = 10 m 1000 cmJarak antar batang m
Data baja Profil WF 400 400 428 407Mutu baja = ST37Teg. Dasar = 1600 kg/m2Teg. Leleh = 2400 kg/m2Berat baja = 283 kg/m1 ditambah 10% = 311.3 kg/m1Luas tampan = 360.7 cm2Momen Ix = 119000 cm4Momen Iy = 39400 cm4Momen Wx = 5570 cm3Momen Wy = 1930 cm3E = 2.1 . 10^6 kg/cm2 = 2100000
Data BebanBerat papan = kg/m1Berat guna = kg/cm2
PembebananBerat baja = 311.3 = 311.3 kg/m1 3.113 kg/cmBerat balok = #REF! = #REF! kg/m1 #REF! kg/cmBerat guna = 0 x 0 = 0 kg/m1 0 kg/cm
= #REF! kg/m1 #REF! kg/cm
Momen = 0.5 x Q x L^2
= 0.5 x #REF! x 100
= #REF! kgm = #REF! kgcm
Tegangan = MWx
= #REF! kgcm = #REF! kg/cm2 < 1600 kg/cm2 Teg. Dasar5570 cm3 < 2400 kg/cm2 Teg. Leleh
< 2080 kg/cm2 Teg. Sementa
LENDUTAN BALOK BAJA
Fx = 5 qx Lx^4 + Px Lx^3384 E Ix 48 E Ix
= 5 #REF! 1000000000000 + 100 1E+09384 2100000 119000 48 2E+06 119000
= 0.013020833333 #REF! + 1E+11249900000000 1.1995E+13
= 0.013020833333 #REF! + 0.00833667
= #REF! + 0.008336668001
= #REF! cm
Fy = 5 qy 0,5 L^4 + Py 0,5 L^3384 E Iy 48 E ly
= 5 0 62500000000 + 0 1E+08
384 2100000 39400 48 2E+06 39400
= 0.013020833333 0 + 0
= 0 + 0
= 0
Fx + Fy = #REF! + 0
= #REF!
= #REF! cm > 3.3333 #REF!
F ijin = 0.003333333333 10= 0.033333333333 m = 3.333333333333 cm
KONSTRUKSI BETON PBI
MEKTEK
#REF!#REF!#REF!
HELP
Perhitungan konstruksi beton tanggaPerhitungan konstruksi beton plat PBIPerhitungan konstruksi beton plat segitiga PBIPerhitungan konstruksi beton plat segitiga PBI (B1sendi)Perhitungan konstruksi beton plat segitiga PBI (B1plat)Perhitungan konstruksi beton plat segitiga PBI (Bjepit)Perhitungan konstruksi beton plat trapesium PBIPerhitungan konstruksi beton kolom PBI
Tegangan dan lendutan balok baja (lendutan baja stage)Lendutan balok beton (lendutan plat)Perhitungan tegangan stage baja (plat)Tegangan balok baja (penopang)
LENDUTAN BALOK BETON
A. Plat Lantai
b htBalok 100 12Selimut 2.5 cmBentang 9
Lendutan ijin f < 1 lo250
f < 0.004 900f < 3.6 cm
lo = 9 m900 cm
Lendutan yang terjadi f = fe g' k1 k2 + p'g + p
f = 12.43116 295 0 0.5 + 100295 + 100
f = 12.43116 100395
f = 12.43116 0.2531646
f = 3.1471291 cm < 3.6 OK!
g = beban mati terbagi rata per m2 pada pelat dan per m1 pada balok = 295
p = beban hidup terbagi rata per m2 pada pelat dan per m1 pada balok = 100
g' = beban jangka panjang terbagi rata per m2 pada pelat dan per m1 pada balok = 295yaitu beban mati + bagian dari beban hidup yang bersifat tetap
p' = beban jangka pendek terbagi rata per m2 pada pelat dan per m1 pada balok = 100yaitu bagian dari beban hidup yang bersifat sementara, yaitu bekerja kontinyuselama kurang dari 24 jam dan ditentukan lebih lanjut sbb:
k1 = koefisien yang bergantung pada bentuk penampang dan harus diambil sbb :- balok persegi, balok I dan balok kotak = 0
k2 = 1 = 11 + A'/A 1 + 1
= 0.5
A' = 5.24
A = 5.24
fe = Ta lo ^2 10 ^-6 (cm)a (1 - Z) h
= 1850 810000 10 ^-6 cm22.4 0.7687746 7
= 1498500000 10 ^-6 = 12431160 10 ^-6 cm120.543858
= 12.43116 cm
Ta = 1850 kg/cm2 u32
lo = 900 cm
h = 7 cm
a = 22.4 profil 22.4polos 20.8
Z = 2.5 A . T*au = 2.5 5.24 2780b . h . T'bk 100 7 225
= 2.5 14567.2 = 0.2312254157500
A = 5.24T*au = 2780 u32T'bk = 225
PERHITUNGAN KONSTRUKSI BETON
DATA :- Mutu Beton K - 225
225 kg/cm2 6.5 kg/cm2 beban tetap, tanpa tulangan geser75 kg/cm2 10 kg/cm2 beban sementara, tanpa tulangan geser
n 21 16 kg/cm2 beban tetap, dengan tulangan geser20 kg/cm2 beban tetap, dengan tulangan geser & puntir
- Mutu Baja U322780 kg/cm21850 kg/cm2
1850 = 1.17521 75
- BJ Beton Bertulang = 2400 kg/m3- Berat Dinding = 0 kg/m2- Berat Spesi = 0 kg/m2- Berat Lantai = 20 kg/m2- Berat Guna = 500 kg/m2
PENYELESAIAN :x y
Ukuran Plat Lantai : 2.25 2.25 m
Tebal Plat Lantai ht : 12 cm 0.12 cmh : 12 - 5 = 7 cm
Beban yang terjadi :- BS. Plat = 0.12 x 2400 x 1 = 288 kg/m1- B. Spesi = 0 x 0 x 1 = 0 kg/m1- B. Lantai = 1 x 7 x 1 = 7 kg/m1- B. Air = 0.05 x 1000 x 1 = 50 kg/m1- B. Guna = 100 x 1 = 100 kg/m1
q = 445 kg/m1q/m' = 445 kg/m1
diambil q = 450 kg/m1
Perhitungan Penulangan :Ly = 2.25 = 1.00 Tabel M Lx = 63 -Mtx = 125Lx 2.25 M Ly = 13 -Mty = 0
M Lx = 0.001 x 450 x 5.0625 x 63.00 = 143.52 kgm-Mtx = 0.001 x 450 x 5.0625 x 125.00 = 284.77 kgmM Ly = 0.001 x 450 x 5.0625 x 13.00 = 29.62 kgm-Mty = 0.001 x 450 x 5.0625 x 0.00 = 0.00 kgm
Tbk TbtTb' Tbs
Tbm,tTbm,t
T*auTa'
- Æ o
Arah X - X
Ca = 7 = 3.893 d = 0 5.615 5.588Tabel Æ = 2.137 0.027
21 284.8 100nw = 5.67 3.893 1.7221 1850 nw = 0.05667 Æ 100nw
3.348 3.435A = 0.05667 x 100 x 7 = 1.89 cm2 3.329 3.47
21 0.019 -0.035
Amin = 0.25 x 100 x 12 = 3.00 cm2 0.704 -1.296100 1.211 -2.232
A' = 0 x 1.89 = 0.00 cm2 2.137 5.667
Dipakai besi Æ 10 - 15 = 5.24 cm2 > 3.00 cm2 ok!