CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 1 FECHA: 08/04/2013 FOTO No. 2 FECHA: 24/04/2013
RUBRO: RUBRO:
FOTO No. 3 FECHA: 08/04/2013 FOTO No. 4 FECHA: 25/04/2013
RUBRO: RUBRO:
FOTO No. 5 FECHA: 25/04/2013 FOTO No. 6 FECHA: 25/04/2013
RUBRO: RUBRO:
RESIDENTE DE OBRA FISCALIZADOR
NOMENCLATURA DE BRIDAS UTILIZADAS NOMENCLATURA DE BRIDAS UTILIZADAS
OBSERVACIONES
FIRMAS DE RESPONSABILIDAD
TRABAJOS REALIZADOS
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO (CARRETE 1-A/1-C)
MAUKRI
1
CARRETE 1-A CARRETE 1-C
SOLDADURA DE SPOOL VERIFICACION DE NIVEL PARA LIBERACION DE SPOOL
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 7 FECHA: 09/04/2013 FOTO No. 8 FECHA: 26/04/2013
RUBRO: RUBRO:
FOTO No. 9 FECHA: 09/04/2013 FOTO No. 10 FECHA: 14/04/2013
RUBRO: RUBRO:
FOTO No. 11 FECHA: 14/04/2013 FOTO No. 12 FECHA: 14/04/2013
RUBRO: RUBRO:
TRABAJOS REALIZADOS
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO. (CARRETE 2A, 2C)
CARRETE 2-A CARRETE 2-C
MAUKRI
2
NOMENCLATURA DE BRIDAS UTILIZADAS NOMENCLATURA DE BRIDAS UTILIZADAS
OBSERVACIONES
LIBERACION DE CARRETE LIBERACION DE CARRETE
FIRMAS DE RESPONSABILIDAD
RESIDENTE DE OBRA FISCALIZADOR
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 13 FECHA: 10/04/2013 FOTO No. 14 FECHA: 10/04/2013
RUBRO: RUBRO:
FOTO No. 15 FECHA: 28/04/2013 FOTO No. 16 FECHA: 14/04/2013
RUBRO: RUBRO:
FOTO No. 17 FECHA: 14/04/2013 FOTO No. 18 FECHA: 14/04/2013
RUBRO: RUBRO:
TRABAJOS REALIZADOS
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO (SPOOL 1A, 1C)
SPOOL TOTALMENTE ARMADO SPOOL 1-A
MAUKRI
3
BRIDAS UTILIZADAS BRIDAS UTILIZADAS
OBSERVACIONES
SPOOL 1-C LIBERACION DE SPOOL
FIRMAS DE RESPONSABILIDAD
RESIDENTE DE OBRA FISCALIZADOR
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 19 FECHA: 11/04/2013 FOTO No. 20 FECHA: 28/04/2013
RUBRO: RUBRO:
FOTO No. 21 FECHA: 28/04/2013 FOTO No. 22 FECHA: 28/04/2013
RUBRO: RUBRO:
FOTO No. 23 FECHA: 28/04/2013 FOTO No. 24 FECHA: 28/04/2013
RUBRO: RUBRO:
TRABAJOS REALIZADOS
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO (SPOOL 2A, 2C)
SPOOL 2-A SPOOL 2-C
MAUKRI
4
BRIDAS UTILIZADAS BRIDAS UTILIZADAS
OBSERVACIONES
PREPARACION DE MATERIAL ACCESORIOS PARA SOLDADURA
FIRMAS DE RESPONSABILIDAD
RESIDENTE DE OBRA FISCALIZADOR
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 25 FECHA: 12/04/2013 FOTO No. 26 FECHA: 12/04/2013
RUBRO: RUBRO:
FOTO No. 27 FECHA: 26/04/2013 FOTO No. 28 FECHA: 26/04/2013
RUBRO: RUBRO:
FOTO No. 29 FECHA: 26/04/2013 FOTO No. 30 FECHA: 26/04/2013
RUBRO: RUBRO:
REPORTE FOTOGRAFICO DE PROYECTOS
MONTEVERDE
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO (SPOOL 3A, 3C)
SPOOL 3-A SPOOL A SOLDAR
MAUKRI
5
BRIDAS UTILIZADAS BRIDAS UTILIZADAS
OBSERVACIONES
BRIDA UTILIZADA ARMADO DE SPOOL
FIRMAS DE RESPONSABILIDAD
RESIDENTE DE OBRA FISCALIZADOR
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 31 FECHA: 27/04/2013 FOTO No. 32 FECHA: 14/03/2013
RUBRO: RUBRO:
FOTO No. 33 FECHA: 27/04/2013 FOTO No. 34 FECHA: 27/04/2013
RUBRO: RUBRO:
FOTO No. 35 FECHA: 27/04/2013 FOTO No. 36 FECHA: 27/04/2013
RUBRO: RUBRO:
REPORTE FOTOGRAFICO DE PROYECTOS
MONTEVERDE
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO (SPOOL 4A, 4C)
SPOOL 4-C SPOOL 4-A
MAUKRI
6
LIBERACION DE SPOOL BRIDA UTILIZADA
OBSERVACIONES
SPOOL A SOLDAR PREPARACION DE MATERIAL
FIRMAS DE RESPONSABILIDAD
RESIDENTE DE OBRA FISCALIZADOR
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 37 FECHA: 15/04/2013 FOTO No. 38 FECHA: 29/04/2013
RUBRO: RUBRO:
FOTO No. 39 FECHA: 29/04/2013 FOTO No. 40 FECHA: 29/04/2013
RUBRO: RUBRO:
FOTO No. 41 FECHA: 29/04/2013 FOTO No. 42 FECHA: 29/04/2013
RUBRO: RUBRO:
RESIDENTE DE OBRA FISCALIZADOR
LIBERACION DE CARRETE BRIDA UTILIZADA
OBSERVACIONES
FIRMAS DE RESPONSABILIDAD
ARMADO DE CARRETE CARRETE A SOLDAR
REPORTE FOTOGRAFICO DE PROYECTOS
MONTEVERDE
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO (CARRETE 1-B, 1-D)
MAUKRI
7
CARRETE 1-B CARRETE 1-D
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 43 FECHA: 16/04/2013 FOTO No. 44 FECHA: 29/04/2013
RUBRO: RUBRO:
FOTO No. 45 FECHA: 29/04/2013 FOTO No. 46 FECHA: 16/04/2013
RUBRO: RUBRO:
FOTO No. 47 FECHA: 29/04/2013 FOTO No. 48 FECHA: 29/04/2013
RUBRO: RUBRO:
FIRMAS DE RESPONSABILIDAD
RESIDENTE DE OBRA FISCALIZADOR
LIBERACION DE CARRETE ANTES DE SOLDADURA PRESENTACION DEL CORDON DE RAIZ
LIBERACION DE CARRTE BRIDA UTILIZADA
OBSERVACIONES
CARRETE 2-B CARRETE 2-D
REPORTE FOTOGRAFICO DE PROYECTOS
MONTEVERDE
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO (CARRETE 2-B, 2-D)
MAUKRI
8
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 49 FECHA: 20/04/2013 FOTO No. 50 FECHA: 30/04/2013
RUBRO: RUBRO:
FOTO No. 51 FECHA: 30/04/2013 FOTO No. 52 FECHA: 30/04/2013
RUBRO: RUBRO:
FOTO No. 53 FECHA: 30/04/2013 FOTO No. 54 FECHA: 30/04/2013
RUBRO: RUBRO:
RESIDENTE DE OBRA FISCALIZADOR
LIBERACION DE CARRETE BRIDA UTILIZADA
OBSERVACIONES
FIRMAS DE RESPONSABILIDAD
PREPARACION DE MATERIAL PREPARACION DE MATERIAL
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO (CARRETE 3-B, 3-D)
MAUKRI
9
CARRETE 3-B CARRETE 3-D
REPORTE FOTOGRAFICO DE PROYECTOS
MONTEVERDE
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 55 FECHA: 17/04/2013 FOTO No. 56 FECHA: 02/04/2013
RUBRO: RUBRO:
FOTO No. 3 FECHA: 17/04/2013 FOTO No. 4 FECHA: 17/04/2013
RUBRO: RUBRO:
FOTO No. 57 FECHA: 02/04/2013 FOTO No. 58 FECHA: 02/04/2013
RUBRO: RUBRO:
FIRMAS DE RESPONSABILIDAD
RESIDENTE DE OBRA FISCALIZADOR
LIBERACION DE HI-LOW LIBERACION DE SPOOL
BRIDA UTILIZADA BRIDA UTILIZADA
OBSERVACIONES
SPOOL 1-B SPOOL 1-D
REPORTE FOTOGRAFICO DE PROYECTOS
MONTEVERDE
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO (SPOOL 1-B, 1-D)
MAUKRI
10
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 59 FECHA: 19/04/2013 FOTO No. 60 FECHA: 19/04/2013
RUBRO: RUBRO:
FOTO No. 61 FECHA: 18/04/2013 FOTO No. 62 FECHA: 19/04/2013
RUBRO: RUBRO:
FOTO No. 63 FECHA: 19/04/2013 FOTO No. 64 FECHA: 19/04/2013
RUBRO: RUBRO:
RESIDENTE DE OBRA FISCALIZADOR
BRIDA UTILIZADA BRIDA UTILIZADA
OBSERVACIONES
FIRMAS DE RESPONSABILIDAD
SOLDARURA SOLDADURA
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO (SPOOL 2-B, 2-D)
MAUKRI
11
SPOOL 2-B SPOOL 2-D (ARMADO)
REPORTE FOTOGRAFICO DE PROYECTOS
MONTEVERDE
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 65 FECHA: 20/04/2013 FOTO No. 66 FECHA: 03/05/2013
RUBRO: RUBRO:
FOTO No. 67 FECHA: 03/05/2013 FOTO No. 68 FECHA: 20/04/2013
RUBRO: RUBRO:
FOTO No. 69 FECHA: 20/04/2013 FOTO No. 70 FECHA: 20/04/2013
RUBRO: RUBRO:
ARMADO DE SPOOL PRESENTACION DEL CORDON DE RAIZ
RESIDENTE DE OBRA FISCALIZADOR
FIRMAS DE RESPONSABILIDAD
OBSERVACIONES
BRIDA UTILIZADASPOOL A SOLDAR
SPOOL 3-B SPOOL 3-D
REPORTE FOTOGRAFICO DE PROYECTOS
MONTEVERDE
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO (SPOOL 3-B, 3-D)
MAUKRI
12
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 71 FECHA: 26/04/2013 FOTO No. 72 FECHA: 26/04/2013
RUBRO: RUBRO:
FOTO No. 73 FECHA: 26/04/2013 FOTO No. 74 FECHA: 26/04/2013
RUBRO: RUBRO:
FOTO No. 75 FECHA: 26/04/2013 FOTO No. 76 FECHA: 26/04/2013
RUBRO: RUBRO:
REPORTE FOTOGRAFICO DE PROYECTOS
MONTEVERDE
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO(PRUEBA HIDROSTATICA PREVIA EN SPOOL 1-B)
MAUKRI
13
PREPARACION DE SPOOL PARA LA PRUEBA HIDROSTATICA PREPARACION DEL AREA PARA LA PRUEBA
PRESION INICIAL 840 lb AJUSTES DE VALVULAS
FIRMAS DE RESPONSABILIDAD
RESIDENTE DE OBRA FISCALIZADOR
PRESION DE 820 lb (10:45pm) PRESION DE 820 lb (11:30pm)
OBSERVACIONES
CONTRATO No.
PROYECTO
CONTRATISTA
PERIODO DESDE: 06/04/2013 HASTA: INFORME No.
FOTO No. 77 FECHA: 30/05/2013 FOTO No. 78 FECHA: 30/05/2013
RUBRO: RUBRO:
FOTO No. 79 FECHA: 30/05/2013 FOTO No. 80 FECHA: 30/05/2013
RUBRO: RUBRO:
FOTO No. 81 FECHA: 30/05/2013 FOTO No. 82 FECHA: 30/05/2013
RUBRO: RUBRO:
FIRMAS DE RESPONSABILIDAD
RESIDENTE DE OBRA FISCALIZADOR
OBSERVACIONES
INSTALACION DE SOCKOLET INSTALACION DE SOCKOLET
INSTALACION DE SOCKOLET INSTALACION DE SOCKOLET
REPORTE FOTOGRAFICO DE PROYECTOS
MONTEVERDE
SKID DE SISTEMA DE MEDICION GLP - PROPANO - BUTANO(LINEAS SECUNDARIAS)
MAUKRI
14