Download pdf - Sdp 3g Sr Menara Kwsp

Transcript
  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    1/40

    SITE ID : NWXXXX

    SITE NAME :

    SITE CONFIGURATION : 1+1+1

    FREQ. BAND : 3G

    CELCOM (M) BHD

    NORTHERN REGION

    SITE DESIGN PACKAGE

    MENARA KWSP

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    2/40

    SITE ID : NWXXXX

    SITE NAME : MENARA KWSP

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    Site Information

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    3/40

    SITE ID : NWXXXX

    SITE NAME : MENARA KWSP

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    RF Design

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    4/40

    SITE ID : NWXXXX

    SITE NAME : MENARA KWSP

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    Existing 2G Information

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    5/40

    SITE ID : NWXXXX

    SITE NAME : MENARA KWSP

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    New 3G Information

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    6/40

    SITE ID : NWXXXX

    SITE NAME : MENARA KWSP

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    Site Picture

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    7/40

    SITE ID : NWXXXX

    SITE NAME : MENARA KWSP

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    Mobile Checklist / BOQ

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    8/40

    SITE ID : NWXXXX

    SITE NAME : MENARA KWSP

    SITE CONFIGURATION : 1+1+1

    NORTHERN REGION

    Installation Plan

    CELCOM (M) BHD

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    9/40

    SITE ID : NWXXXX

    SITE NAME : MENARA KWSP

    SITE CONFIGURATION : 1+1+1

    CELCOM (M) BHD

    NORTHERN REGION

    Transmission Checklist

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    10/40

    SITE ID : NWXXXX

    SITE NAME : MENARA KWSP

    SITE CONFIGURATION : 1+1+1

    NORTHERN REGION

    CME BOQ

    CELCOM (M) BHD

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    11/40

    3G SITE DESIGN PACKAGE

    PENANG ISLAND

    NORTHERN

    NWXXXX

    MENARA KWSP

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    12/40

    Site Approval

     Survey Date : 30 July 2007

    Project: Celcom 3G Phase 2, Northern Region, MalaysiaCelcom (M) Bhd.

    Site: NWXXXX MENARA KWSP

    Prepared by

    Name  Mohd Nizam Mohd Noor (019-3160900)

    Company  I-Convergence Sdn Bhd 

    Verified by

    Name

     Approved by

    Name

    Department

     Approved by

    SDP APPROVAL

    Mobile Access Planning, Group Network Date

    Date

    Date

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    13/40

    CELCOM (M) BHD 1 Site Information

    NORTHERN REGION

    PENANG ISLAND 2 RF Design

    3 Existing 2G Information

    4 New 3G Information

    5 Site Picture

    6 Mobile Checklist / BOQ

    7 Installation Plan

    NWXXXX 8 Transmission Check List

    MENARA KWSP 9 CME BOQ

    10

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    14/40

    Site Informations

     Survey Date : 30 July 2007

    Project: Celcom 3G Phase 2, Northern Region, MalaysiaCelcom (M) Bhd.

    Site: NWXXXX MENARA KWSP

    1.0

    1.1 Site Location and Access

    GPS Position

    Latitude: 05 25 27 4

    SITE INFORMATIONS

    &&

    &

    2222222222222222222222222222222222222222222222222

    2222222222222222222222222222222222222222222222222

    β

    2

    2222222222222222222222222222222222222222222222222

    2222222222222222222222222222222222222222222222222

    2222222222222222222222222222222222222222222222222   −2

    2

    2

    ≅≅

    J LN  S U LT  AN   AH M  AD  S H  AH 

    J LN  S U LT  AN   AH M  AD  S H  AH 

    J LN  S U LT  AN   AH M  AD  S H  AH 

    J LN  S U LT  AN   AH M  AD  S H  AH 

    J LN  S U LT  AN   AH M  AD  S H  AH 

    J LN  S U LT  AN   AH M  AD  S H  AH 

    J LN  S U LT  AN   AH M  AD  S H  AH 

    J LN  S U LT  AN   AH M  AD  S H  AH 

    J LN  S U LT  AN   AH M  AD  S H  AH 

    J  L N   S  J  L N   S  J  L N   S  J  L N   S  J  L N   S  J  L N   S  J  L N   S  J  L N   S  J  L N   S  

         L     R    G

         C     E     Y     L    O     N

         L     R    G

         C     E     Y     L    O     N

         L     R    G

         C     E     Y     L    O     N

         L     R    G

         C     E     Y     L    O     N

         L     R    G

         C     E     Y     L    O     N

         L     R    G

         C     E     Y     L    O     N

         L     R    G

         C     E     Y     L    O     N

         L     R    G

         C     E     Y     L    O     N

         L     R    G

         C     E     Y     L    O     N

    J LN  S E R I  B  AH  AR I 

    J LN  S E R I  B  AH  AR I 

    J LN  S E R I  B  AH  AR I 

    J LN  S E R I  B  AH  AR I 

    J LN  S E R I  B  AH  AR I 

    J LN  S E R I  B  AH  AR I 

    J LN  S E R I  B  AH  AR I 

    J LN  S E R I  B  AH  AR I 

    J LN  S E R I  B  AH  AR I 

     J L N  A R G

     Y L L

     J L N  A R G

     Y L L

     J L N  A R G

     Y L L J L N 

     A R G Y L L

     J L N  A R G

     Y L L J L N 

     A R G Y L L

     J L N  A R G

     Y L L

     J L N  A R G

     Y L L

     J L N  A R G

     Y L L

    J   L J   L J   J   L J   J   L J   L J   J   L 

    STM

    WISMA MCIS

    WISMA PENANG GARDENWISMA PAHLAWAN

    DUA BLOK PEJABAT GEREJA

    KELAB PULAU PINANG

    UNIT PENILAIAN & PEPERIKSAAN PULAU PINANG

    MAKTAB PERGURUAN SRI PINANGPEJABAT PENDAFTARAN NEGARA

    JPM (YAYASAN BUMIPUTRA)

    HOTEL ANTARABANGSA

    HOTEL KOWLOONHOTEL NEW SAVOY

    HOTEL LONDON

    HOTEL SING TONG AH

    HOTEL GALLANT

    HOTEL KONG ENG

    HOTEL MINGOOD

    HOTEL NAM

    STESEN PETROL

    SEKOLAH RENDAH REREMPUAN JALAN N

    SEKOLAH RENDAH WELLESLY

    SEKOLAH RENDAH PEREMPUAN ISLAND

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    15/40

    Site Informations

     Survey Date : 30 July 2007

    Project: Celcom 3G Phase 2, Northern Region, MalaysiaCelcom (M) Bhd.

    Site: NWXXXX MENARA KWSP

    1.3 Site Details (Existing)

    Type of Site:

    Roomreno / Outdoor 

    Height of Building : Office Building (21 storey)

    Equipment Location : Roomreno

    Cabin Dimension : -

     Air Conditioning : 2 units

    Cable Ladder  : Yes

    Lightning Protection : Yes

    Type of Structure : Round Pillar 

    Structure Height : -

    Type of terrain : Flat

     Access road : Tar 

    Distance to main road : 10m

    Crane needed : No

    Site Access Information : This site located at 8th floor, Menara KWSP, Pulau Pinang.

    1.4 Contact Information

    Celcom : Mizazuddin Bin Muhiyuddin

    Telephone No. : 04-3973030 ext 1009

    Fax No. : 04-3974040

    Mobile No. : 019-5713060

    Contractor Name : Mohd Nizam Mohd Noor 

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    16/40

    Site Name:

    Site ID :

    Existing 2G Site Name:

    Existing 2G Site ID:Co-locate Operator: Cluster No:

    Version:

    Lat (N-WGS 84- Decimal):

    Long (E-WGS 84-Decimal):

    BTS room Type: BTS Type:

    BTS Configuration:

    Transmission Type on site:

    Cell Site RF Configuration

    Cell ID

     An tenn a Heigh t (mid. o f ant )

     An tenn a Direc tion (d eg)

    Electrical Tilt

    Mech. Tilt

    Cable Length (m)

    Cable Type (inch)

    Technical Site Survey Report (Existing Antenna System Locations)

    MENARA KWSP Survey Date: 30-Jul-2007

    Sector 3

    05-25-27.4

    100-19-48.1 96

    Sector 1

    Phase:

     Ams l(m):

    Sector 2

    Structure type Round Pillar 

    Pillar mounted bracket

    Height (m)

    Pillar mounted bracket

    Mount

    Type Pillar mounted bracket

    No of Pole/ Tripod

    24 44

    Round Pillar Round Pillar  

    0 0 0

    7/8" 7/8" 7/8"

    0 0 0

    24

    29.6 29.6 29.6

    80° 200° 280°

     Ant enna TypeModel Number  DBXLH-6565C-VTM DBXLH-6565C-VTM

    Beam width (deg) 65 65 65

    4+4+4

    Roomreno Alcatel Evolium Indoor  

    DBXLH-6565C-VTM

    G2313  Area: Pulau Pinang

    N/A

    2

    NWXXXX Building Height(m): 21 storey building

    MENARA KWSP Structure Height(m): N/A

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    17/40

    Site Name:

    Site ID :

    Existing 2G Site Name:

    Existing 2G Site ID:

    Co-locate Operator: Cluster No:

    Version:

    Lat (N-WGS 84- Decimal):

    Long (E-WGS 84-Decimal):

    Node B room Type: Node B Type:

    Node B Configuration:

    Transmission Type on site:

    Cell Site RF Configuration

     Antenna Height (mid. of ant )

     Antenna Direct ion (deg)

    Electrical Tilt

    Mech. TiltCable Length (m)

    Cable Type (inch)

    MHA (Y/N)

    05-25-27.4

    100-19-48.1

    Hotel Regal Malaysia Wisma MAA Part of Jalan Sultan Ahmad Shah Business Area

    Comment/ Problem:

    Sector 1 :

    Road to Padang Kota (Jalan Sultan Ahmad Shah), Business Area, Bungalow houses.

    N N N

    Existing

    Height (m)Mount

    Type Existing Existing

    No of Pole/ Tripod

    Structure type Round Pillar Round Pillar Round Pillar  

    24 24 24

    7/8" 7/8" 7/8"

    2 2 2

    0 0 0

    28.94 28.94 28.94

    80° 200° 280°

    Existing Dualband

    Beam width (deg) 65 65 65 Antenna Type

    Model Number  Existing Dualband Existing Dualband

    Sector 1 Sector 2 Sector 3

    1+1+1

    N/A

     Amsl(m): 96

    ROOMRENO Huawei 3812E

    Phase: 2

    G2313  Area: Pulau Pinang

    N/A

    NWXXXX Building Height(m): 21 storey building

    MENARA KWSP Structure Height(m): -

    Technical Site Survey Report (Proposed Antenna Location)

    MENARA KWSP Survey Date: 30-Jul-2007

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    18/40

    SECTORIAL RF VIEW

    Sector 1 80° degree

    Sector 2 200° degree

    Sector 3 280° degree

    NEW SITE RF PHOTO

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    19/40

    PANORAMIC VIEW

    View at 0°

    View at 40°

    View at 80°

    NEW SITE RF PHOTO

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    20/40

    PANORAMIC VIEW

    View at 120°

    View at 160°

    View at 200°

    NEW SITE RF PHOTO

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    21/40

    PANORAMIC VIEW

    View at 240°

    View at 280°

    View at 320°

    NEW SITE RF PHOTO

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    22/40

    a

    b

    c

    d

    a

    a

    b

    c

    Tripod 6mtr 

    GI Pipe 2 mtr 

     Aesthetic Pole

    Maximum Load (A)

    Maximum Module

    CPS Source

    Rectifier -48V Data

    Equipment Power Source

     AC Power Supply Data

    Land Cabin

    Land Outdoor 

    Rooftop Cabin

    Tower 

    TNB

    3 Phase AC

    SBC

    Genset

    Single Phase AC

    Rectifier +24VModel

    √ Rectifier -48V

    Free DC Breaker (32A)

    NoYes

    Nader 

    NoYesFree DB Space For Additional Breaker 

    Free DC Breaker (60A)Free DC Breaker (32A)

    Current Module

    Free DC Breaker (60A)

    Current Load (A)

    Free DB Space for Additional Breaker 

    DC Breaker Type

    Menara KWSP

    Site ID

    Site Name

    NWXXXX

    MENARA KWSP

    4

    E1 Status

    Celcom

     Available

    3

    E1 Type

    E1 Owner TM Maxis Digi

    MOBILE INFORMATION

    Yes   √

    √ Yes

    Plinth

    Structure

    Fiber Optic

    TX INFORMATION

    Structure Height

    Lease Line

    Room Reno√

    No

    No

    √ YesMGB Space Available

    MicroWave

    Utilise Free

    a

    Shelter Type

    NoFeeder Through Available

    meters

    Cabin Size

    Room Reno Size

    Plinth Size

    Cabin

    Shelter 

    Maxis

    TM

    2

    CME INFORMATION

    Power Supply

    Space Available

    Type Of Structure

    Room Reno Rooftop

    Roof top Outdoor 

    Roomreno Outdoor 

    Guyed Mast

    GI Pipe 6mtr 

    Monopole

    Round Pillar 

    1

    Type Of Site

    GENERAL INFORMATION

    Site Owner 

    Celcom

    Digi

    **Not ins tall yet

    ** Not ins tall yet

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    23/40

    1

    a

    b

    a

    b

    c

    d

    e

    a

    2

    3

    a

    b

    c Type

    d

    e

    REMARKS: 1. Proposed metal trunking orange (2" X 4") beside existing 2G metal trunking for all cells.

    Length = 2600mm (3 units)

    2. Proposed new service box beside existing 2G service box for all cells (3 units).3. To use 7/16 to N-type female + L adaptor (male to female) + N-type jumper to 7/16 (Rx jumper)

    for all cells (3 sets).

    New (mtr)

    New (mtr)

    New (qty)

     Additional Feeder Through (Qty)

    Extend Existing(m)

    Upgrade CPS System

    Upgrade AC System

    Cabin

    Plinth New

     Antenna Mounting New

    Change Existing

    Extend

    Share with 2G antennas (dualband)

    Structure

    TX ADDITONAL REQUIREMENTS

    Refer to Tx BQ

    MOBILE INSTALLATION METHODOLOGY

    Swap 2G Eqpt. Rearrange EqptEquipmentEquipment Mobilization

    Lorry Crane

    45 tonne

    Day

    20 tonne

    Special crane

    Night

    Specific Day

     ADDITIONAL REQUIREMENTS FOR 3G IMPLEMENTATION

    Cable Ladder (Outdoor/Indoor)

    Concrete Beam

    No

    Crane Requirements

    Crane Access

    Specific Times

    Open Roofing

    Manpower 

    Special Tools/ Requirements

    Qty

    Specify

     Antenna 2G

    √New Upgrade DB

    Change to X-Pole

     Add Module (Qty) Change Breaker (A) 20amp to

    32amp

    Permit Requirements   √ Yes

    Change To Triband

    Relocate Existing

    MGB

    Power Supply

    CME ADDITONAL REQUIREMENTS

    √ TNB Genset

    Shelter 

    Change to Dual Band UMTS/1800

    Change to 1800 wideband

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    24/40

    Site Requirements

     Survey Date : 30 July 2007

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NWXXXX MENARA KWSP

    2.0

    2.1 Exiting Equipment

    Existing Equipment Type

    No Of Cabinet

    Configuration

    Comments :

    2.2 Exi sting A ntenna Data 2G

    Make

    Height AGL (m)

    Gain (dBi)

     Antenna Band

    Polarization

    Comments :

    2.3 Feeder Data 2G

    Total no. of feeders (pcs)

    Type of feeders

    Feeder lengths (m) Tx

    Rx

    TOTAL

    Comments :

    2.4 Antenna Support Detail

    Type of antenna support : building round pillar 

    EXISTING 2G

    1800/UMTS

    DBXLH-6565C-VTM

    Cell 3

    29.6

    DBXLH-6565C-VTM

    Cell 1

    DBXLH-6565C-VTM

    Cell 2

    29.6

    184

    92

    17.5

    29.6

    Cell 3 TOTAL

    2 6

    1800/UMTS

    48 48 88

    24 24 44

    24 24

    7/8 "

    44 92

    7/8 "7/8 "

    17.5

    1800/UMTS

    + - 45 + - 45+ - 45

    17.5

    2

    Cell 1 Cell 2

    2

     Alcatel MBI5

    1

    4+4+4

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    25/40

    Site Requirements

     Survey Date : 30 July 2007

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NWXXXX MENARA KWSP

    3.0

    3.1 Feeder Data

    Total no. of feeders (pcs)

    Type of feeders

    Feeder lengths (m)

    Comments :

    3.2 CABLING

    Cable required

    Comments :

    3.3 Antenna Support Detail

    Type of antenna support : Existing

    No. of H-Boom : -

    24

    24

    88 184

    Length Needed

    9m

    TOTAL 4848

    TOTAL

    7/8" 7/8"

    Cell 1

    2

    Cell 3Cell 2

    2 62

    7/8"

    24

    Cable Lug / 35mm

    Rx 24 92

    44

    44

    Tx

    NEW SITE REQUIREMENTS

    8m

    DDF to DF Coax / 3C 2.5V Siemen Male 9m

    Node B to MGB

    92

    Cable Cable type / s ize Connec tor t ype / si ze

    Node B E1 to DF Coax / 3C 2.5V -

    Grounding / 35mm

    Node B to Breaker Grounding / 35mm Cable Lug / 35mm 7m

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    26/40

    Site Requirements

     Survey Date : 30 July 2007

    Project: Celcom 3G Phase 2, Northern Region, Malaysia

    Celcom (M) Bhd.

    Site: NWXXXX MENARA KWSP

    3.4 OTHERS

    Comments : No additional requirement needed except stated at site audit form.

    3.5 POWER SUPPLY SYSTEM

    Rectifier 

    Make Link Model Vout Iout Breaker 

    Used:

    Required:

    Used:

    Free:

    Required:

    Free:

    -

    No

    No

    No

    No

    Yes NoLightning Protection

    CommentExisting Required

    Yes No

    BTS Location Room Room

    Cable Inlet

     AC Ear th ing Busbar  Yes

    DC Earthing Busbar  N/A

    MGB Yes

    Yes

    Cable Ladder 

    Cabin Size

    Not installed yet

    Capacity

    -

    Plinth Size -

    -

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    27/40

    Existing Site Pictures

     Survey Date : 30 July 2007

     

    Si te: NWXXXX MENARA KWSP

    Photo 1 : Site View

    SITE PICTURES

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    28/40

    Existing Site Pictures

     Survey Date : 30 July 2007

     

    Si te: NWXXXX MENARA KWSPSITE PICTURES

    Photo 2 : Node B and BTS Location

    Node BBTS

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    29/40

    Existing Site Pictures

     Survey Date : 30 July 2007

     

    Si te: NWXXXX MENARA KWSPSITE PICTURES

    Photo 4 : Feeder to be connected to dualband antennas

    ProposedMetal Trunking

    Orange

    C1 antenna location

    Proposed Antenna Bracket

    Proposed

    Metal Trunking

    Orange

    C2 antenna location

    Proposed Antenna Bracket

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    30/40

    Existing Site Pictures

     Survey Date : 30 July 2007

     

    Si te: NWXXXX MENARA KWSPSITE PICTURES

    Photo 6 : Feeder to be connected to dualband antennas

    Proposed Metal

    Trunking

    Orange

    C3 antenna location

    Proposed Antenna Bracket

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    31/40

    Existing CME

     Survey Date : 30 July 2007

     

    Si te: NWXXXX MENARA KWSP

    Photo 1 : Feeder Inlet location

    SITE PICTURES

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    32/40

    Existing Tx

     Survey Date : 30 July 2007

     

    Si te: NWXXXX MENARA KWSP

    No Tx equipment installed yet

     SITE PICTURES

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    33/40

    New Requirement

     Survey Date : 30 July 2007

     

    Si te: NWXXXX

    .

    Photo 1 : Cell 1 Proposed metal trunking 2" X 4" and service box

    SITE PICTURES

    Metal

    trunking orange

    Service box

    Existing Metal

    trunking orange

    Existing Metal

    trunking orange

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    34/40

    New Requirement

     Survey Date : 30 July 2007

     

    Si te: NWXXXX

    SITE PICTURES

    Photo 3 : Cell 3 proposed metal trunking 2" X 4" and service box

    Metal

    trunking orange

    Service box

    Existing Metal

    trunking orange

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    35/40

    BILL OF QUANTITY SITE NWXXXX

    NO TYPE ITEMS ART NO. PACKING REQUEST SUPPLY

     IRON WORK Fill in your requested item(s)

    1 SPECIAL BRACKET SET

    2 6m Tripod NA SET

    3 6m BOOM N/A PC

    4 WALL BRACKET N/A SET

     POWER / RF CABLES & ACCESSORIES

    1 Power Cable METER

    2 METER

    3 AC ARMOURED CABLE, 4CORE, 16mm AC.ARM.4C.16mm METER

    4 PVC/PVC AC CABLE 5 CORE, BLACK, 10mm 5C/10mm METER

    5 CABLE TIE 4" (WHITE) CBL. TIE -W-IND-4" PC

    6 CABLE TIE 8" (WHITE) CBL. TIE -W-IND-8" PC

    7 CABLE TIE 14" (WHITE) CBL. TIE -W-IND-14" PC

    8 CABLE TIE 14" (BLACK) CBL. TIE -W-OUD-14" PC

    9 7/8" COAXIAL CABLE EC5-50 METER

    10 1/2" COAXIAL CABLE LDF4-50A METER

    11 TX JUMPER CABLE (716M - 716M), 2 MTR F4A-PDMDM-2M PC

    12 RX JUMPER CABLE (716M - NM), 2 MTR F4A-PNMDM-2M PC

     EARTHING SYSTEM 

    1 COPPER BARE WIRE, 35MM, MULTI STRAND N/A METER

    2 ANDREW CONNECTOR EARTHING KIT (INDOOR) 244495 PC

    3 ANDREW FEEDER EARTHING KIT (OUTDOOR) SGL5-06B1 PC

    CONNECTORS

    1 RFS ANGLE ADAPTER N-TYPE (MALE TO FEMALE) 15852401 PC

    2 H+S BNC CONN. (JACK FULL), 75 OHM, FOR RG59 21BNC-75-4-4 PC3 RFS 7/16 FEMALE CONNECTOR FOR 7/8" CABLE 15570560 PC

    4 H+S N-MALE CONNECTOR FOR 7/8" CABLE 11N-50-23-10 PC

    5 H+S N-MALE CONNECTOR FOR 1/2" CABLE 11N-50-12-10 PC

    6 H+S TNC-MALE TO BNC FEMALE ADAPTOR 33-TNC-BNC50-1 PC

    7 H+S N-MALE TO N-MALE ADAPTOR 32N-50-0-2 PC

    8 RFS FEEDER COUPLING (SPLICER) 155 730 60 PC

     MISCELLANEOUS ITEMS

    1 AC TRUNKING, 2" X 2", ORANGE C/W ACCESS N/A PC

    2 METAL CABLE TRAY, 4" X 1", H.D.G., C/W ACCESS N/A PC

    3 CABLE LUG 35MM N/A PC

    4 CABLE LUG 150MM N/A PC

    5 C-CLAMP (C-TYPE) COMPRESSED FOR 35MM N/A PC

    6 3M COOL SHRINK N/A PC

    7 CABLE GLAND (FEEDER THROUGH) N/A PC

    8 3M ELECTRICAL TAPE, SUPER 33+, 3/4 X 66' 6132 PC

    9 3M ELECTRICAL PUTTY , SCOTCHFILL, 1 1/2" X 60" 15140 PC

    10 FEEDER CLAMP (2 IN 1) N/A PC

    MENARA KWSP

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    36/40

    A. SITE DETAILS

    MENARA KWSP

    1 . OWN TRANSMISSION SOLUTION

     MICROWAVE VSAT FIBER OPTIC

    REMARKS

    REMARKS :

    2 . LEASED LINE

     TM LEASED LINE POI/POP : .  2 E1

     3 E1

    REMARKS :

    C . ADDITIONAL REQUIREMENT FOR TRANSMISSION SOLUTION.

    1 . CME

     TRM/TOC  DC POWER SUPPLY ( Pls specify : )

    E1 SHARING ( MAXIS / DIGI) POI/POP : .

    SITE B INSTALLED FREEUSED RESERVEDSITE A

      SITE NAME

    SITE ID

    RNC HOME

    NODE B TYPE

    TSS TRANSMISSION CHECKLIST FOR 3G

    B . TRANSMISSION MEDIA FOR NODE-B CONNECTION.

      REGION

    SURVEY BY

    SURVEY DATE

     NORTHERN

    ** 2G Transmission medium equipment not installed yet. Proposed to share with 2G.

    ISRIADI .N. NWXXXX

    23/07/2007

    INDOOR 

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    37/40

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    38/40

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    39/40

  • 8/19/2019 Sdp 3g Sr Menara Kwsp

    40/40