RibuRp
%KDN
(1) (2) (3) (4) (5) (7) (8)BarangI. Material Langsung(Bahan baku)
1,104,737,512.25 1,104,737,512.25 90.909 90.91 1,104,737,512.25
II. Peralatan (Barang jadi)A. Sub Total BarangJasaIII. Manajemen Proyekdan PerekayasaanIV. Alat Kerja / FasilitasKerja
V. Konstruksi danFabrikasiVI. Jasa Umum 110,473,751.22 110,473,751.22 9.09 9.09 110,473,751.22B. Sub Total Jasa
C. TOTAL Biaya (A + B) 1,215,211,263.47 1,215,211,263.47 100.00 100.00 1,215,211,263.47
Formulir Rekapitulasi Perhitungan Tingkat Komponen Dalam Negeri (TKDN)
Uraian Pekerjaan Nilai Gabungan Barang/Jasa (Rp) TKDNDN LN Total Barang/ Jasa Gabungan
C. TOTAL Biaya (A + B) 1,215,211,263.47 1,215,211,263.47 100.00 100.00 1,215,211,263.47