Transcript

www.nov.com

National Oilwell Varco

700-605 03

Commissioning Procedure

www.nov.com

REVISION HISTORY

Rev Date (dd.mm.yyyy) Reason for issue Prepared Checked Approved

CHANGE DESCRIPTION

www.nov.com

INTRODUCTION.......................................................................................................................... 51 PRELIMINARY CHECKS .................................................................................................. 5

2 ALARMS ........................................................................................................................... 6

3 TOP DRIVE / ROTARY TABLE ...................................................................................... 11

4 TOP DRIVE OPERATIONAL MODES ............................................................................ 16

www.nov.com

5 BRAKE AND PIPE HANDLING EQUIPMENT ................................................................ 21

6 SIGNAL CONDITIONERS............................................................................................... 26

www.nov.com

INTRODUCTION

1 PRELIMINARY CHECKS

1.1 Interconnect Wiring

1.2 PLC Program

www.nov.com

1.3 Driller’s Console Lamp Test

1.4 Signal Conditioners

2 ALARMS

2.1 Stalled Motor Fault & Auto Unwind Sequence

2.1.1 Sequence

www.nov.com

Note

Note

www.nov.com

2.1.2 Test

2.2 Air Flow Loss Alarm

www.nov.com

2.3 Top Drive Drill Motor High Temperature Alarm

www.nov.com

2.4 Top Drive Low Gear Oil Pressure Alarm

2.5 TD Control Console & Transfer Panel Purge Alarm

2.6 Upper Crown Alarm and Lower Crown Warning

www.nov.com

3 TOP DRIVE / ROTARY TABLE

3.1 Top Drive Assignment / De-assignment

3.1.1 TD Assignment

www.nov.com

3.1.2 TD De-assignment

www.nov.com

3.2 Rotary Table Assignment / De-assignment

3.2.1 RT Assignment

3.2.2 RT De-assignment

www.nov.com

3.3 Torque Set Points

www.nov.com

3.4 TD Transmission

3.5 Speed and Torque

www.nov.com

3.6 Mode Latch

4 TOP DRIVE OPERATIONAL MODES

4.1 Drill Mode

www.nov.com

4.2 Spin Mode

4.2.1 Spin Speed and Torque

4.2.2 Spin Out

4.2.3 Spin In

www.nov.com

4.3 Makeup Mode

4.3.1 Makeup Completes

4.3.2 Makeup Completes – Switch Held for Five Seconds

4.3.3 Mode Switch to Makeup Before Spin In Complete

www.nov.com

4.3.4 Mode Switch Released from Makeup Before Makeup Completes

4.3.5 Top Drive Fails to Reach Makeup Torque

4.3.6 Top Drive Rotates During Makeup

www.nov.com

4.4 Breakout Mode

4.4.1 Breakout Completes

4.4.2 Breakout Fails

www.nov.com

5 BRAKE AND PIPE HANDLING EQUIPMENT

5.1 Drill Motor Brake

5.1.1 Brake Modes

5.1.1.1 Brake Off

5.1.1.2 Brake Auto

5.1.1.3 Brake On

5.2 IBOP

5.2.1 IBOP Open

www.nov.com

5.2.2 IBOP Close

5.3 Grabs

CAUTION:

www.nov.com

5.4 Drawworks Clutch Solenoid

www.nov.com

5.5 Handling Ring

5.5.1 Lock/Unlock

5.5.2 Spin Left/Right

5.6 Link Tilt

www.nov.com

5.7 Counterbalance

5.8 Top Drive Hour Meter

www.nov.com

6 SIGNAL CONDITIONERS

6.1 Potentiometer Signal Conditioners (Control Console) (Type G438)

6.2 Analog Signal Conditioners (Control Console) (Type G408)

6.3 Analog Signal Conditioners (Transfer Cabinet) (Type G408)