填 填 填 填 填 Landfill Gas to Electricity 填填 Mr. Zhao Xu 填填填 General Manager 填填填填填填填填填填填填填填 Nangjing Longterm Environmental technology Development Co.,Ltd 2009.11.13

Landfill Gas to Electricity

Embed Size (px)

DESCRIPTION

Zhao Xu 赵旭 (Speaker 3)General Manager 总经理 - Nanjing Longterm Environmental Technology Development Co., Ltd. (南京朗顿环境技术开发有限公司) - P.R. China 中华人民共和国

Citation preview

Page 1: Landfill Gas to Electricity

填 埋 气 发 电 Landfill Gas to Electricity

赵旭 Mr. Zhao Xu总经理 General Manager

南京朗顿环境技术开发有限公司Nangjing Longterm Environmental technology Development Co.,Ltd

2009.11.13

Page 2: Landfill Gas to Electricity

我们是谁?Who are we?

• 朗顿公司于 2006 年 6 月正式成立Longterm Enviro. Co. was established in June 2006

• 有限责任制企业Limited company

• 主要人员由可宁卫沼气发电技术,市场及运营经理及骨干组成, 10年以上沼气发电项目开发及运营经验Key personnel are from Cleanaway, consisting of technical, marketing and operating managers, with 10 years of experiences in landfill gas to electricity project developments and operations.

Page 3: Landfill Gas to Electricity

管理团队Management team

职位Position

姓名Name

专业Education

工作经历Working Experience

董事Director

陈建Mr. Chen Jian

南京大学城市与资源学系自然地理专业博士PHD in Natural Geography, School of City and Resources, Nanjing University

•江苏省环境科学研究所综合研究室 / Environmental Science Research Institute of Jiang Su Province•江苏省环境保护厅污染控制处 / Pollution Control Department of EPA Jiangsu•可宁卫( CLEANAWAY )中国公司 / Cleanaway China•南京师范大学 / Nanjing Normal Univeristy

公司经理General Manager

赵旭Mr. Zhao Xu

南京大学会计系财务管理方向硕士Master of Financial Accounting, School of Accounting, Nanjing University

•可宁卫 ( 中国 ) 公司 / Cleanaway China•南京朗顿环境技术开发有限公司 / Nanjing Longterm Enviro

战略规划经理Strategic Planning Manager

黄榛Ms Jane Huang

University of New South Wales / Master of Environmental Management

University of Notre Dame Australia / Master of International Business

•Cleanaway Australia•可宁卫(中国)公司 / Cleanaway China•Evermoore Environmental Consulting Co.•南京朗顿环境技术开发有限公司 / Nanjing Longterm Enviro.

运营总监Chief Engineer

顾玉明Mr.Gu Yu Ming

Master of Engineering, School of Engineering, South East University

东南大学机械工程系工程硕士

•南京发动机配件厂 / Engine Accessories Factory of Beijing•美国彰星国际有限公司南京办事处 / Nanjing Chang Star Mechanical and Electrical Co. Ltd•南京瓦特机械有限公司 / Nanjing Watt Mechanical Co. Ltd•可宁卫(中国)公司 / Cleanaway China•威尼雅环境有限公司 / Veolia Environmental•南京朗顿环境技术开发有限公司 / Nanjing Longterm Enviro

Page 4: Landfill Gas to Electricity

问题 : 垃圾填埋气—污染?还是放错地方的资源The problem: Landfill gas—polution? Or resources displaced?

• 垃圾填埋气是垃圾中有机物经厌氧性微生物分解时所产生的气体

Landfill gas is produced from the anaerobic fermentation process when the urban solid wastes are being landfilled

• 填埋气的成分 /composition of landfill gas : CH4 : 50% ,CO2 : 50%

• 如果不加以处置,将产生如下环境影响:

If not captured and treated properly, landfill gas could cause the following adverse environmental impacts :

温室效应 / Greenhouse gas effects

臭味,毒害影响和健康问题 / Odor and health problems

爆炸 / explosion

植被影响 / killing of vegetations

• 政府每年花大量的预算整治填埋气

The government budget to treat landfill gas is huge

如好好加以利用,1 百万吨生活垃圾可产生如下经济效益

If managed well, 1 million tons of solid waste could produce the following economic benefits:

• 可以产生电力 7,000,000度 / 年

generating 7 million kwh electricity / year

• 相当于供应 7,000户城市家庭一年所需用电

equivalent to a power supply for 7,000 urban families

___,35916

___,18000

__, 6744

__, 30557

__, 39276

Page 5: Landfill Gas to Electricity

解决方案:朗顿公司垃圾填埋气发电系统的特点

The solution: Features of Longterm landfill gas to electricity system

填埋气前处理设备

Landfill gas pretreatment

System

填埋气发电机组

Generation Module

电力输出模组

Electricity Transforming

Module

并网

Incorporation to the Grid

填埋场Landfill

填埋气集气系统Landfill Gas

Capturing System

集气系统:专利技术的有机组合 , 以适应不同填埋场的不同情况,可达到同业集气水平的 2 倍Gas capturing system: Organic combination of patented technologies developed from 10 years of experiences to cater specific situations in different landfills, achieving twice as much as the industrial gas collection efficiency

填埋场沼气管理系统:随时监测,模拟场地内气量变化,实时调整不同区域的沼气抽取收集能力,可达到同业集气水平的两倍Landfill gas management system: gathering raw data to simulate the gas production situations in the landfill and adjust the capturing system, achieving twice as much as the industrial gas collection efficiency

Berwick Methane Levels

% Methane

Energy Developments

C

G

H

J

F

K

L

E

D

4x

B

033034

032 031

029 037035

036 044038

039040

041042043

061062058057 056

059

060

065049

063

064068055

045

050

053

070069

051052

054

072

071062066 067188

187

181182

185

180184

080076

074 073 075

079

172178

179084

173

177078077

171

170174

176186

183

146145

149314 151

127087083

088

102106

098103

099100104108

091107109

090095126089

094096

101105097

093

114110111112118 121

116122119117

123

115124

113

134133

140

129130128

144143

132131 162163

169165147

148 152

166168136 167

161175

156154

157158

159160

153 140

164142

130

134

141

137138139

135

155

003004

001002007008005006

011012009010

013014

015

028

016

022027 018 025

026 021

017023

024

081

082086

TEST#2TEST#1

A

M1-1

M1-2

M1-3

M1-4M1-5

M1-6

M1-7

M2-1

M2-2

M4-1

M4-2

M5-1

M5-2

M3-1

M3-2

M3-3

M3-4

M3-5

M3-6

M6-1 M6-2

M6-3

DATE SAMPLEDMonth YearRain -Temp -Pressure -Station Load -CSV -Station Flow -

0

5

10

15

20

25

30

35

40

45

50

55

60

Berwick Flow Levels

Flow (SCMH)

Energy Developments

DATE SAMPLEDJuly 1996Rain -Temp -Pressure -

C

G

H

J

F

K

L

E

D

4x

B

033034

032 031

029 037035

036 044038

039040

041042043

061062058057 056

059

060

065049

063

064068055

045

050

053

070069

051052

054

072

071062066 067188

187

181182

185

180184

080076

074 073 075

079

172178

179084

173

177078077

171

170174

176186

183

146145

149314 151

127087083

088

102106

098103

099100104108

091107109

090095126089

094096

101105097

093

114110111112118 121

116122119117

123

115124

113

134133

140

129130128

144143

132131 162163

169165147

148 152

166168136 167

161175

156154

157158

159160

153 140

164142

130

134

141

137138139

135

155

003004

001002007008005006

011012009010

013014

015

028

016

022027 018 025

026021

017023

024

081

082086

TEST#2TEST#1

A

M1-1

M1-2

M1-3

M1-4M1-5

M1-6

M1-7

M2-1

M2-2

M4-1

M4-2

M5-1

M5-2

M3-1

M3-2

M3-3

M3-4

M3-5

M3-6

M6-1 M6-2

M6-3

0

5

10

15

20

25

30

35

40

45

50

55

60

65

Page 6: Landfill Gas to Electricity

我们的项目与融资需求Our projects and finance requirements

项目类型Project Types

填埋气发电项目Landfill gas to electricity

填埋气收集,除臭方案咨询Consulting services for landfill gas capturing

and odor management

目标市场Target market

日进场量大于 700 吨的填埋场Landfills with the tipping tonnage > 700 tons / day

日进场量小于 700 吨的填埋场Landfills with the tipping tonnage < 700 tons

/ day

项目Projects

天津双口Tianjin

Shuangkou

天津大韩庄Tianjin

Dahanzhuang

成都龙泉Chengdu

洛阳Luoyang

南阳Nanyang

济南Jinan

运行状况Development

已运行 1MW1MW

commissioned

已签约MOU

在谈Negotiation

在谈Negotiation

在谈negotiation

在谈negotiation

未来计划Expansion plan

需要增容 1MWExpand to 2 MW

需要安装 1MWInstall 1 MW

需要安装 4MWInstall 4 MW

     

资金需求Financerequirement

8 m 1.2 m 10 m      

融资类型Types offinance

借贷 或 所有者权益融资Loan or equity

所有者权益融资Equity

所有者权益融资Equity

     

Page 7: Landfill Gas to Electricity

朗顿自行开发,建设,运营的项目:天津双口填埋气发电项目Tianjin Shuangkou project: owned by Longterm who has developed, invested, built and is operating the project

天津双口填埋气发电厂 - 发电机组Generation module

天津双口填埋气发电厂 - 集气站

Gas collection station

我们的项目Our projects

Page 8: Landfill Gas to Electricity

竞争Competition

• 非直接竞争 城市生活垃圾的处理方式,如焚烧,会影响

到填埋场的生活垃圾有机质含量以及填埋量,从而影响到产气量。

• 直接竞争对手 天津:无直接竞争对手 新项目:主要竞争对手 >7家

• 我公司竞争优势—突破填埋气发电项目的两个瓶颈:

技术团队:实现高于同行业 2 倍的收集效率;市场团队:维护一流的业主关系,实现一流的并网工程管理

• Indirect Competition Incorporation of other solid waste management alternatives,

such as incineration, into the total waste management strategy could possibly influence the solid waste tonnage as well as the organic content of the waste tipped in the landfill. This will influence the landfill gas volume.

• Direct Competition Tianjin: Tianjin market has been land marked by Longterm.

No direct competitors. Chengdu : Project in negotiation; competitors > 7

• Competitive advantages—Breaking through of two bottlenecks of LFGTE projects :Technical team : accomplish 2 times of landfill gas collection efficiency more than the average industry collection efficiency;Marketing team : accomplish first class external customer management, assisting to reach high collection efficiency and shorten the time required for Grid incorporation.

Page 9: Landfill Gas to Electricity

竞争优势:骨干团队经验丰富Competitive advantage: Experienced key personnel

南京水阁填埋气发电厂Nanjing Shuige LFGTE

西安江村沟填埋气发电厂Xi’an Jiangcungou LFGTE

北京阿苏卫填埋气发电厂Beijing A’suwei LFGTE

南京装机容量 4MW,是迄今为止国家唯一垃圾填埋气利用示范项目,并获得 2007年中国可再生能源产业蓝天排行榜填埋气发电项目第一名Nanjing project 4 MW, the only national showcase of landfill gas utilization project; got the firs place t in the Blue Sky Ranking list of China Renewable Energy Industry in 2007

西安装机容量 6MW,全国最大填埋气发电厂,获得 2007年中国可再生能源产业蓝天排行榜填埋气发电项目第二名Xi’an project 6 MW, the largest landfill gas power station, got the second place in the Blue Sky Ranking list of China Renewable Energy Industry in 2007

北京装机容量 2.5MW / Beijing project 2.5 MW

Page 10: Landfill Gas to Electricity

市场规模Market size

• 项目 1 :天津双口和大韩庄• Project 1: Tianjin Shuangkou and Dahanzhuang

Tianjin Total Market vs. Addressable Market

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

200120032005200720092011201320152017201920212023Year

Solid waste tons/ day

total solidwaste ofTianijin

ShuangkouLandfill

Dahanzhuang landfill

Chengdu Total Market vs Addressable Market

-

2,000

4,000

6,000

8,000

10,000

12,000

14,000

1993199519971999200120032005200720092011201320152017201920212023Year

Solid waste tons / day

Solidwastegeneration inChengdu

Solidwasteslandfilled

• 项目 2 :成都• Project 2: Chengdu

Page 11: Landfill Gas to Electricity

收入模型—装机总数Revenue model – No. of Generation Modules installed on site

ÃÏΩÚ“‘ º∞–¬œÓƒø◊∞ª˙◊‹ ˝No. of Generation Modules installed on site (Tianjin and Chengdu)

0

24

6

8

1012

14

16

2008 2009 2010 2011 2012 2013 2014 2015 2016

Page 12: Landfill Gas to Electricity

售电收入 +CDM交易(主营业务)Power and CDM revenue (Key business)

¥ Õ≥ €µÁº∞CDM ’ »ÎPower and CDM revenue

000 RMB

-10,00020,00030,00040,00050,00060,00070,000

2008 2009 2010 2011 2012 2013 2014 2015 2016ƒÍ ∑› / Y

 € µÁ ’»Î

CERΩª“◊  ’»Î

Page 13: Landfill Gas to Electricity

ÃÓ¬Ò∆ ∑¢µÁ €µÁ ’ »Îº∞CDM ’ »Î √´¿˚Gross profit of landfill gas to electricty + CDM

39.90% 42.82%

59%69.90% 71.20%

59.70% 60.80% 59.72% 59.63%

0.00%

20.00%

40.00%

60.00%

80.00%

2008 2009 2010 2011 2012 2013 2014 2015 2016

ƒÍ ∑› / y

Page 14: Landfill Gas to Electricity

À∞∫Û檿˚ / Profit after tax000 RMB

-5,000.00

-

5,000.00

10,000.00

15,000.00

20,000.00

25,000.00

30,000.00

2008 2009 2010 2011 2012 2013 2014 2015 2016

æ≠”™–‘ œ÷Ω¡˜ªÿ / Operational net cash flow000 RMB

-5,000.00

10,000.0015,000.0020,000.0025,000.0030,000.0035,000.0040,000.00

2008 2009 2010 2011 2012 2013 2014 2015 2016

Page 15: Landfill Gas to Electricity

融资需求及退出战略Finance requirement and exit strategy

融资需求- 800万人民币用于天津双口扩容,借贷或所有者权益融资方式

- 1200万人民币用于天津大韩庄建设,所有者权益方式

- 1000万人民币用于成都项目建设,所有者权益方式

退出战略- 采用发行优先股的方式,公司如果

可以上市,优先股可以转为普通股- 如果上市不成功,公司按固定利率支付优先股股息,公司现有股东同意使用现金流收购该优先股

Finance requirements- 8 m RMB is required for Tianjin Shuangkou

expansion to 2MW; bank loan or equity- 12 m RMB is required to build Tianjin

Dahanghuang power plant (2 MW); equity finance

- 10 m RMB is required to build Chengdu power station (4 MW) , equity finance

Exit strategy- Preference stock issuing; if the company

could go public, preference stock can be converted to common stock

- If fail to go public, the company will pay a fixed rate as the preference stock dividend; the shareholders agree to buy back the preference stocks by the cash flow

Page 16: Landfill Gas to Electricity

合作伙伴Strategic partners

• 国内合作方 / Domestic partners– 东南大学 / East South University– 农业部沼气研究所 / Biogas Research Institute of the

National Agriculture Department– 四川省投资集团 / Sichuan Investment Co.

• 国外合作方 / International Partners– Cleanaway Australia– Evermoore Environmental Consulting – University of New South Wales

Page 17: Landfill Gas to Electricity

南京朗顿环境技术开发有限公司 战略规划部经理 总经理 黄榛 赵旭 电话: 025-84571758 025-84571758

手机: 13501029054 13813808989 邮箱: [email protected] [email protected]