PROJECT BRIEF CONSTRUCTION OF “HOME” JALAN PJS 5/28, PUSAT DAGANGAN PETALING JAYA SELATAN, SELANGOR, MALAYSIA PREPARED BY NURUL ATIQAH BT MOHD GHAZALI (0325630) MODULE: INTRODUCTION TO CONSTRUCTION INDUSTRY INTAKE: FNBE JULY 2015 LECTURER: PN. HASMANIRA – MISS. ANN

FINAL ICI Project : Project Brief

Embed Size (px)

Citation preview

Page 1: FINAL ICI Project : Project Brief

     

PROJECT  BRIEF    

CONSTRUCTION  OF      

“HOME”    

JALAN  PJS  5/28,  PUSAT  DAGANGAN  PETALING  JAYA  SELATAN,    SELANGOR,  MALAYSIA  

   

         

 PREPARED  BY  NURUL  ATIQAH  BT  MOHD  GHAZALI  

 (0325630)  

 MODULE:  INTRODUCTION  TO  CONSTRUCTION  INDUSTRY    

 INTAKE:  FNBE  JULY  2015  

 LECTURER:  PN.  HASMANIRA  –  MISS.  ANN    

 

Page 2: FINAL ICI Project : Project Brief

CONTENTS    1. Introduction  to  the  Project  

a. Project  Description  b. Site  Analysis  and  Observation  c. Project  Concept  and  Ideas  d. Visuals:  Diagrams,  Sketches  and  Images    e. Project  Benefits  

2. Project  Organization  a.  Overview  b. Project  Management  Team  c. Team  Objective  d. Tasks    

     

Page 3: FINAL ICI Project : Project Brief

1.  INTRODUCTION  TO  THE  PROJECT    a.  Project  Description    The  name  of  this  project  is  “Home”.  This  project  proposes  to  create  a  commercial  area  in  the  land  of  3,  500  meter  squared  (70m  x  50m).    It  is  located  in  Jalan  PJS  5/28,  Pusat  Dagangan  Petaling  Jaya  Selatan,  Selangor,  Malaysia.  This  project  involves  the  construction  of  the  commercial  building.  The  area  of  the  commercial  building  is  810  meter  squared  (30m  x  27m).  It  is  a  3-­‐floor  building  and  it  consists  of  a  hypermarket:  ground  floor  selling  agricultural  products  and  food,  2nd  floor  selling  clothes  and  3rd  floor  selling  housing  items.  There  are  also  some  parking  lots  available  around  the  commercial  building  for  the  people  that  want  to  shop  there.        This  proposal  is  estimate  to  be  approved  and  signed  by  November  20,  2015.  The  construction  process  would  take  about  12  months.        

 

PLAN  VIEW  OF  EXISTING  SITE  

Page  1  

Page 4: FINAL ICI Project : Project Brief

 LOCATION  PLAN  OF  THE  SITE  

(The  red  boundary  line  is  where  the  commercial  area  is  located)    

Page  2  

Page 5: FINAL ICI Project : Project Brief

b.    Site  Analysis  and  Observation                              

     Observation  of  the  site  includes  how  it  is  abandoned  and  that  it  is  securely  closed.  It  has  a  fence  around  it  to  prevent  people  from  going  in.  But  in  the  site,  the  area  is  covered  with  mostly  grass  and  trees.    

Fence  around  the  site  and  parking  lot  near  it.   Commercial  buildings  

The  entrance  door  to  the  site.   Commercial  buildings  with  small  shops,  pharmacies  and  restaurants.  

Page  3  

Page 6: FINAL ICI Project : Project Brief

The  site  is  ideal  for  the  commercial  area  due  to  the  following  site  analysis:    

• There  are  many  residential  areas  around  there.  Many  houses  are  located  on  the  eastern  side  of  the  site.      

• There  are  also  some  apartments  located  on  the  southern  and  northern  part  of  the  area.  

• Northern  part  of  the  site  has  many  blocks  of  commercial  buildings:  small  shops,  restaurants,  pharmacies,  hotels  and  mini  market.    

• There  are  already  many  parking  lots  available  near  there,  so  car  parks  don’t  need  to  be  constructed  inside  the  proposed  commercial  area.  

• Not  much  pedestrian  path  is  available  around  the  site.  • Many  bus  pass  by  the  area  of  the  site.  • There  is  a  lake  located  about  40  meter  away  from  the  site.          

         

     

Page  4  

Page 7: FINAL ICI Project : Project Brief

 MASTER  PLAN  “HOME”  

   

         

   ENTRANCE  FOR  CAR  

ENTRANCE  FOR  PEDESTRIAN  

 ENTRANCE  FOR  TRUCKS                    EXIT  FOR  BOTH  TRUCKS  AND  CARS  

Page  5  

Page 8: FINAL ICI Project : Project Brief

 LOCATION  PLAN  OF  THE  SITE  

   

Page 9: FINAL ICI Project : Project Brief

c.  Project  Concepts  and  Ideas    After  conducting  the  site  analysis,  the  project  plan  is  to  construct  a  commercial  area  where  residents  can  go  and  shop  for  home  materials  such  as  food,  clothing  and  home  furniture.      The  concept  and  ideas  of    “Home”  are:  

• There  will  be  a  wall  surrounding  the  land.  • There  is  2  entrance  to  go  in  the  area.  If  residents  want  to  come  in  by  car  and  park  inside  the  area,  they  have  to  pass  through  the  

entrance  barrier.  A  payment  have  to  be  made  in  order  to  park  inside  the  commercial  area.    Another  entrance  is  only  for  pedestrians.  This  is  for  people  that  walked  to  the  hypermarket  and  it  just  have  gate  door.    

• There  are  not  many  parking  inside  the  area  due  to  many  parking  already  outside  the  area.  So  only  26  parking  lots.  • Shrubs  and  shading  trees  are  located  in  front  of    the  car  parks  to  give  some  shading  and  some  nature  element.    • The  front,  and  2  sides  of  the  commercial  building  have  a  pedestrian  walkway.    • On  the  pedestrian  walkway,  there  are  some  benches  to  for  shoppers  to  sit  on  and  wait  for  their  family.  • There  are  also  a  rest  area  on  the    left  side  of  the  building.  Benches  are  provided  as  well  as  some  shading  trees.  No  vehicles  are  

allowed  to  pass  by  here.  • The  back  of  the  building  is  only  allowed  for  trucks  that  delivered  the  products.  There  will  be  a  fenced  to  cover  that  part.  Trucks  

have  their  own  entrance.  They  also  have  their  own  parking  lots  as  well  as  a  big  dumpster.    • Dustbins  are  available  at  the  edge  part  of  the  building  in  front.  • The  exit  is  located  near  the  back  of  the  building.  • The  roofs  of  the  building  are  glass.  • There  is  a  tile  flooring  for  the  pedestrian  to  walk  on  and  push  their  trolleys  on.  

           

Page  6  

Page 10: FINAL ICI Project : Project Brief

 d. Visuals:  Diagrams,  Sketches  and  Images  

 BUBBLE  DIAGRAM  

     

               

   

       

SEAT  

GATHERING   REST  PLANTINGS  

PEDESTRIAN  PATH  

COMMERCIAL  BUILDING  

PARKING  LOTS  

PLANTINGS  

Page  7  

Page 11: FINAL ICI Project : Project Brief

IMAGES      

Shading  Trees  

Bushes  

Lamppost  

Benches  

Page  8  

Page 12: FINAL ICI Project : Project Brief

     

Entrance  Barrier

Car  Parks

Pedestrian  Walkway  

Glass  Curve  Rooftop  

Page  9  

Page 13: FINAL ICI Project : Project Brief

     

Dustbin  

Dumpster  

Supermarket  Sign  Board  

Page  10  

Page 14: FINAL ICI Project : Project Brief

SKETCHES                                  

Page  11  

Sketch  of  the  entrance  to  the  commercial  area  “Home”  

Sketch  of  the  commercial  building  “Home”  

Sketch  of  the  car  parks,  trees  and  bushes  

Page 15: FINAL ICI Project : Project Brief

3. Project  Benefits    

• Residents  can  gain  benefit  from  this  by  saving  them  time  from  traveling  far  to  grocery  shop.  They  can  just  go  by  walking  if  their  home  is  near.  

• Shoppers  might  go  to  near  restaurants  near  there  and  the  restaurants  would  gain  profit.  • The  space  of  the  land  is  perfectly  utilized.  • Not  much  parking  lot  is  available  in  the  land  therefore  it  won’t  be  too  crowded  in  the  commercial  area.  • The  soft  scape  and  hardscape  elements  give  a  nice  atmosphere  and  make  the  area  look  more  developed  with  nature.  

 2.  Project  Organization    a.  Overview    Project  Requestor:  Jurapat  Sdn.  Berhad  Project  Sponsor:  Jurapat  Sdn.  Berhad  Project  Owner:  Jurapat  Sdn.  Berhad  Project  Manager:  Ar.  Nurul  Atiqah      Team  Members:  

• Architect  -­‐  Ar.  Nurul  Atiqah  Binti    • Landscape  Architect  -­‐  Ar.  Hanis  Maisarah      • Quantity  Surveyor  -­‐  Sr.  Najmi  Afiquddin  • Civil  and  Structural  Engineer  –  Ir.  Mohd  Ghazali  • Mechanical  and  Electrical  Engineer  –  Mr.  Mohd  Faris  • Contractor  –  Miss  Natasya  Jasmin  

 

Page  12  

Page 16: FINAL ICI Project : Project Brief

b.  Tasks    Architect:  

• Have  to  translate  the  site  requirements,  create  a  concept  and  designs  and  then  make  it  into  reality.  • Ascertaining  and  interpreting  the  Jurupat  Sdn  Berhad’s  requirement.  • Coordinate  necessary  environmental  and  engineering  service  to  building  design.  • Clarify  client’s  requirement  in  a  building  project  because  of  their  knowledge  in  site  analysis,  building  regulations  and  building  

design.  • Prepare  estimated  cost  and  the  project  timeline  (starting  date,  duration  of  the  process,  etc.)  • Have  to  submit  drawings  to  authorities  for  approval.  • Awarding  tenders  and  contract  administration.    • Administrating  building  contract-­‐  help  resolve  problems  between  clients  and  contractor.  • Able  to  handle  cost,  design  issues  and  consultants  appointments.  • Outline  proposal  and  sketch  the  design  of  the  building.  Should  know  the  time  and  costing.  • Submit  design  development  and  product  information.  • Supervise  the  progress  on  site  and  advise  on  insurance  required.  • Ensure  that  the  progress  on  the  site  is  monitored  and  meet  requirements.  • Resolve  any  contract  dispute.  • Submit  modification  of  the  design  of  “Home”  to  contractor.  • Conduct  assessment  of  “Home”  to  Jurupat  Sdn.  Berhad  authorities.  • Consider  any  operations  of  facilities  of  “Home”  and  think  about  further  maintenance.  • Ensure  that  requirements  and  dealines  are  met.  

 Landscape  Architect:  

• Look  at  the  design  of  “Home”  and  include  some  urban  schemes  and  natural  characteristics  of  the  given  site.  • Establish  general  landscape  requirements  with  Jurupat  Sdn.  Berhad.  • Conduct  assessment  and  site  analysis  of  the  site  for  “Home”  (soils,  buildings).  • Present  to  clients  the  proposal  and  deal  with  any  problems  and  negotiate  with  them  for  the  final  design.    

Page  13  

Page 17: FINAL ICI Project : Project Brief

• Asses  “Home”  ‘s  potential  and  meet  the  client’s  requirements  and  specification.  • Carry  out  any  environmental  impact  assessment  of  constructing  “Home”.  • Select  hardscapes  and  soft-­‐scapes  (materials  and  plants)  to  be  implement  in  “Home”.  • Get  rid  of  any  existing  plants  that  are  not  needed  anymore  or  that  are  not  well  maintained.      • Prepare  and  present  detailed  drawings  and  plans,  including  applications,  construction  and  specifications  for    “Home”.  • Monitor  and  check  on  site  frequently  • Ensure  that  the  plants  are  put  into  the  right  place.  • Authorizing  payment  once  construction  work  of  “Home”  is  completed.    

Quantity  Surveyor:  • Go  to  site  visit  with  the  Architect,  Landscape  Architect  and  Clients.  • Estimate  the  define  project  budget  of  “Home”.  • Analyze  the  effect  of  design  changes  on  the  project  budget  of  “Home”.  • Create  order  of  cost  and  estimate,  then  obtain  strategy  of  “Home”.  • Negotiate  with  both  the  Architect  and  Landscape  Architect  regarding  the  cost  of  “Home”.  • Prepare  Bill  of  Quantities  to  assist  in  tender  process.  • Provision  of  cost  control  service  during  construction  process.  • Asses  contractor’s  progress  and  variation  claims  while  constructing  “Home”.  • Negotiate  and  settle  things  during  construction  process..  • Carry  out  monthly  predictions  and  report  the  costs  during  construction  process.  • Carry  out  monthly  negotiations  and  agreements  of  payment  for  “Home”.  • Prepare  tax  depreciation  reports  for  Jurupat  Sdn.  Berhad.  • Prepare  detailed  cost  analysis  and  Statement  of  Final  Account.  

 Civil  and  Structural  Engineer  

• Design  structures  to  ensure  that  the  building,  the  floors  withstands  stresses  and  pressure  • Able  to  construct  a  building  that  would  stand  for  a  long  period  of  time.  • Choose  appropriate  materials  to  meet  specifications  of  the  design  for  “Home”.    

Page  14  

Page 18: FINAL ICI Project : Project Brief

• Analyze  the  roads  and  parking  lots.  • Conduct  analysis  for  stress  and  pressure  and  make  sure  that  each  component  of  structures  in  “Home”  will  experience  due  to  

human  or  environmental  factors.  • Ensure  the  safety  and  risks  of  “Home”  .  • Include  a  safety  plan  when  there  is  a  fire.  

 Mechanical  and  Electrical  Engineer  

• Collaborate  with  Architect  and  landscape  Architect  for  a  plan  for  electrical  works.  • Specialist  in  electrical  works  such  as  air  conditioning,  electrical  wiring,  lights.  • Make  sure  that  the  lights  are  bright  enough  to  see  clearly  and  not  too  dim  when  at  night.  • Make  sure  fire  alarms  are  installed.  

 Contractor  

• Tender  for  the  job  of  construction  “Home”.  • Complete  works  at  a  given  time  and  budget  when  assigned.  • Carry  out  quality  construction  of    “Home”  by  giving  a  multi  disciplined  workforce.  • Consult  and  give  orders  to  workers.  • Provide  information  that  is  sufficient  and  relevant  for  the  workers  to  build  “Home”.  • Ensure  that  “Home”  is  build  accurately  as  the  drawings  and  plans.  • Make  agreements  with  the  Architect,  Landscape  Architect  and  owners  to  achieve  the  goal  of  “Home”  being  completed  on  the  

deadline.    

 

Page  15