GRIHA CRITERION 18: Rainwater Recharge

18. rainwater recharge

Embed Size (px)

Citation preview

Page 1: 18. rainwater recharge

GRIHA CRITERION 18: Rainwater Recharge

Page 2: 18. rainwater recharge

Intent:

The intent of this criterion is to promote the recharge of groundwater aquifers.

Maximum Points: 2

Page 3: 18. rainwater recharge

Non-applicability:

If the CGWB norms suggest that the ground water table is high and ground water recharging should not be done, then the project is exempt from this criterion

Page 4: 18. rainwater recharge

Appraisals:

Recharge of surplus rainwater into aquifer (through appropriate filtration measures) – 2 points

Page 5: 18. rainwater recharge

Compliances:

Submit details of rainwater harvesting for ground water recharge and its filtration system to show that adequate preventive measures are being taken to avoid damage to the aquifer by the recharged rainwater

Page 6: 18. rainwater recharge

Rooftop rainwater harvesting Rainwater harvesting tank below road

Page 7: 18. rainwater recharge