Upload
tru-cong
View
167
Download
1
Embed Size (px)
Citation preview
VIN
ACON
EXE&
C ENGINEERINGCONSTRUCTION & INVESTMENT
Vinaconex E&C Profile www.vinaconexec.com.vn
ENGINEERINGCONSTRUCTION & INVESTMENT
VINACONEX E&C
Our reputation has been consistently built based on the successful accomplishment of undertaken projects as well as our keen dedication to the quality, safety, sustainability, within-budget and on-time completion, with the distinct values bring to each of its buildings.
Vinaconex E&C Profile
ABOUT US
OUR PROJECTS
BUILDING CONTRUCTION
INDUSTRIAL CONSTRUCTION
INFRASTRUCTURE CONSTRUCTION
PROJECT MANAGEMENT
REAL ESTATE DEVELOPEMENT
OUT OF WORKS
OUR HISTORY
OUR DEPARTMENT
06
08
14
22
32
38
40
42
43
We are proud of playing a rolein shaping the world we know today.
Each project we involved in closes distant lands& unlocks more development potentials
ABOUT US
Our all-sizes projects involve in construction of roads, motorway, ports, bridges, industrial plants, warehousing, hospital, business center, multistoried office-buildings, apartment, … varying from planning, design, engineering, project management and construction responsibilities.
VINACONEX E&C is a general construction company, offers a broad range of professional services in project management and engineering, caters both public and private sector to assist clients in all phases of development – from pre-construction to occupancy. VINACONEX E&C became an independent joint stock company in 2012 when VINACONEX., JSC withdrew all their capital investment from the Company
ENGINEERINGCONSTRUCTION & INVESTMENT
And we always want to venture further as meeting the client’s dreams.
For the growth of clientand development of ours.
06
Our reputation has been consistently built based on the successful accomplishment of undertaken projects as well as our keen dedication to the quality, safety, sustainability, within-budget- and on-time completion, with distinct values bring to each of its buildings. Our clients appreciate single point of responsibility, flexibility, speed, reasonable costs, and true partnering.
Headquartered in Hanoi, VINACONEX E&C employs hundred planners, designers, engineers and specialists nationwide. This represents one of the most diverse, talented and innovative workforces anywhere. All staffs of VINACONEX E&C strive to bring their expertise, experience, youth and enthusiasm for the development and success of the Company. We share the same vision and ambition in paving the way for the establishment of a modern infrastructure, convenient residential areas, and working together towards a common purpose of bringing the construction industry a growth pace and a fresh look, as well as contribute to the development of construction industry.
In the coming years, VINACONEX E&C continue to invest for a consistent development and expansion. It has been said that, “Success is a journey, not a destination” After several initial years, our successful journey has just commenced ……
We share the same vision and ambition in paving the way for the establishment of a modern infrastructure, convenient residential areas
07
OUR
PROJ
ECTS
BUIL
DIN
G CO
NTR
UCT
ION
BUILDINGCONTRUCTIONBUILDINGCONTRUCTIONVINACONEX E&C applies the tools of science, art and
engineering in our construction works. We have successfully
completed a great variety of project types and sizes,
representing millions of construction manhours, with a constant
focus on safety, quality, progress and meeting contract
requirements.
BUSINESS CENTER AND OFFICE BUIDLING
08
National Convention Center is one of the biggest and most Vietnamese large-scale comprehensive convention center that integrates convention, exhibition, performance, banquet and mas-media into a whole. National Convention Center possesses a convention venue of more than 60,000 square meters, comprising of a 3800-seat Great Conference Hall, two presidential meeting rooms, 72 small conference halls and meeting rooms, parking areas, heliport and square, built to serve a wide variety of purposes with the capacity from 10 up to 3800 people. The halls are equipped with international-advanced simultaneous interpretation system, first-rate acoustic apparatus, a live TV relay system, inside and outside communication system,
video conference system and other internally advanced facilities and equipments to meet the needs of conferences of all scales and types.
The completed National Convention Center is not only a place for large-scale political and cultural activities, but also a landmark building of construction industry in Vietnam.
We acted as one of the main Contractors during the construction stage of this fast tracked project. Thousand of Vinaconex labors and millions of man-hours spending for the successful of this project have shown our consistent adherence to principle of high efficiency, low cost and zero accident record.
Client: Project Management Unit for National
Convention Center
Location: Ha Noi City
Construction time:
Commencement: April 2004,
Completion: September 2006
National Convention Center
OUR
PROJ
ECTS
BUIL
DIN
G CO
NTR
UCT
ION
10
11
Client: Petrovietnam
Location: 18 Lang Ha - Dong Da –Ha Noi
Construction time: from 2006 to 2008
PetrovietnamTrading Centre
Petrovietnam Trading Center is one of the most modern high-rise office buildings in Hanoi, using state-of-the-art technologies and new material in construction. Setting up joint venture with REE, Vinaconex-REE is a General Contractor to provide construction, supply and installation of equipment, transferal, commis-sioning, training, instructions for equipment use for this 19-floor office building.
The services included construction work, finishing work, M&E work, lighting system, generators, elevators system, plumbing, gas
system, fire hose …. Especially the construction management of project involves in construc-tion and installation of high-tech systems such as Curtain wall system; BCMS (Control and management system of building); Security control system, including Access control security system and CCTV (Close Cable Televi-sion System); Communication and data system, including portions: Voice and Data system, network equipment and PABX (system of communication, data, network equipment and telephone switch board).
OUR
PROJ
ECTS
BUIL
DIN
G CO
NTR
UCT
ION
12
Client: REE corporation
Location: Hochiminh City
REETECH Building
Client: National Treasury of Hochiminh city
Location: Hochiminh City
Construction time: From 2004 to 2007
National Treasuryof Hochiminh city
13
OUR
PROJ
ECTS
IND
UST
RIAL
CON
STRU
CTIO
N
INDUSTRIALCONSTRUCTIONINDUSTRIALCONSTRUCTIONVINACONEX E&C completed numerous small-, medium-,
large-scale plants for the steel, chemical, oil, refinery,
electronic, warehouse, assembly, cement, water-treatment,
thermal-power, food...
Applying technology, experience and expertise which are already
accumulated in existing areas of activity, our completed plants
stand out for their durability, high yield, energy, cost efficiency
and environment-friendly considerations. Working with us and
you shall not need to look anywhere else.
14
Dung Quat refinery project is the first oil refinery plant built in Vietnam, executed by Technip Consortium. Vinaconex E&C participated in the project under two subcontracts as building temporary facility, site preparation, civil works and infrastructure of the plant such as internal road, drainage system, underground utilities, piping installations, cable trench, sleepers, concrete works, culverts, tankpad foundations ect…..
Client: PetroVietnam
Location: Dung Quat Economic Zone
Quang Ngai Province
Construction time:
From Mar 2006 to Feb 2009
Dung QuatRefinery Factory
OUR
PROJ
ECTS
IND
UST
RIAL
CON
STRU
CTIO
N
16
Client: Southern Steel Corporation (SSC)
Location: Ba Ria - Vung Tau Province
Construction time:
From October 2003 to January 2005
Phu My Rolling Steel Plant
17
Our customers have appreciated VINACONEX E&C works not only for perfect completion of single item as site preparation, silo construction, equipment foundations, warehouse, operation buildings, M&E work, .....but distinct way we approach to each specific project to provide our customers with best plant performances and reliability.
Client: Holcim Vietnam
Location: Vung Tau Province
Construction time:
From 11/06/2003 to 26/08/2004
Thi Vai Grinding Terminal
OUR
PROJ
ECTS
IND
UST
RIAL
CON
TRU
CTIO
N
Strongest advantage that VINACONEX E&C and its associates can take for cement silo construction is that the excellent master of sliding-form technology, which helps us much in assuring best quality and accelerating the progress when required, as we had made for all silo structures in previous time.
18
Client: Orion Vina Food Co., Ltd.
Location: Bac Ninh Province
Construction time: Feb 2009 - Oct 2009
Orion Vina Food Vietnam.
Client: Thang Long Logistic Co., Ltd.
Location: Thang Long IZ, Vietnam
Construction time: : 01/2007 - 05/2007
Dragon Logistic Phase III
19
Johoku Haiphong Co., Ltd Toyota Gosei Haiphong Co., Ltd
Matsuoka Vietnam Co., Ltd Sumitomo Heavy Industry Factory Phase II
Nghi Son Cement Plant – Expansion project aims at building a second cement production line with a capacity of 2.15 million tpy. This plant meets international standards for insurance, environment/social performance and local community development.
Participating in this project, VINACONEX E&C undertakes a wide range of civil construction works that include simple jobs like construc-tion of boundary walls, warehouse to special-ized structures like Silos, bunkers, tunnels, track hoppers, heavy machine foundations, Raw Material Proportioning House, Raw Mill House, Raw Mill Cyclone, Kiln Stack, Blending Silo etc.
Having the overall control of the projects from in-house shop drawings and manufacturingto on-site construction activities, start-up, finishing to commissioning creates an ideal virtual loop that guarantees on-time and quality deliveries.
Client: Nghi Son Cement Corporation
Location: Tinh Gia, Thanh Hoa Province
Construction time: 2007-2009
Nghi Son Cement PlantExpansion Project - Phase II
OUR
PROJ
ECTS
IND
UST
RIAL
CON
TRU
CTIO
N
Be it fabrication of industrial silos and
chimney of more than 100m height or
equipment structures of 90 mts
height at different levels of complexity,
We make it all possible.
20
Client: MeikoVietnam Co., Ltd.
Location: Ha Tay Province
Construction time: From 2008 to 2009
Meiko ElectronicsVietnam Factory
Client: Brother Vietnam Co., Ltd.
Location:
Phuc Dien Industrial Zone, HaiDuong Province
Construction time:
From June 2006 to January 2007.
Brother Industries(Vietnam) Ltd. Factory
21
OUR
PROJ
ECTS INFRASTRUCTURE
CONSTRUCTIONINFRASTRUCTURECONSTRUCTION
INFR
ASTR
UCT
URE
CON
STRU
CTIO
N
Our works can bridge the gap between individuals, communities, regions, and
culture as well as surmount any profound depth or steep height. Each road or
bridge project we have involved in not only quietly shapes the history of the nation,
but makes the life better and better.
22
Bai Chay bridge is a new wonder for World Heritage Site Ha Long Bay. It has total length 903m, clearance space is 50 metres high and 130 metres wide, allowing 50,000 ton ships to pass under it easily. The main span of this single-plane cable-stayed structure is 435 m, a new world record for a single span of a bridge of this type.
Subleted by Shimizu-Sumitomo Mitsui JO, VINACONEX E&C undertook substructure works at Hon Gai site, approach roads and part of superstructure works for this landmark bridge project.
The substructure work involved in the construction of shin-so pile and pneumatic caisson foundation structures, pile caps, pier columns, etc…. This construction technology and work nature required the enforcement of highest level of working safety standards, the mobilization of well-trained and high-skilled workers with technical expertise. And VINAC-ONEX E&C proved to be professional in this field.
Package BC2: Construction of Main Bridge
Client: Ministry of Transport of Vietnam
Location: Quang Ninh Province
Construction time: 2003 - 2005
Bai Chay Bridge Project
OUR
PROJ
ECTS
24
INFR
ASTR
UCT
URE
CON
STRU
CTIO
N
Package A8: Construction of Section
Km 218+040 - Km 244+155
Client: Vietnam Expressway Corporation
Location: Lao Cai Province
Construction time: 40 months,
commence in January 2010
Noi Bai Lao Cai HighwayConstruction Project
Hanoi-Lao Cao Highway Construction Project is part of Greater Mekong subregion - Kunming Haiphong Transport Corridor, aims at promoting the trade relationship between Vietnam and China as well as developing economy and culture for North – North West of Vietnam.
VINACONEX E&C is awarded for construction of package A8, Km 218+040-Km 244+155, that encompasses works of underpasses, ramp roads, bridges, drainge box culverts, pipe culverts, interchanges, traffic signal and toll plaza. The contract value is VND1627 billions under loan funded by ADB.
VINACONEX E&C, bases on its engineering know-how, huge in-house resources, and capacity for mobilizing additional resources throught its associated agencies is ready to commence the works, makes it a success and launches more development opportunities for this remote and mountainous area.
25
Package CP2: Construction of Nga Tu So
Intersection
Client: Major Projects Management Unit for
Urban Development of Hanoi (MPMU)
Location: Hanoi City
Construction time: From 2005 to 2006
Urban Transportation andInfrastructure DevelopmentProject – Phase I
Package CP5: Construction of Technical
Infrastructure for Nam Trung Yen Resettlement Area
Client: Major Projects Management Unit for
Urban Development of Hanoi (MPMU)
Location: Hanoi City
Construction time: 21 months
Urban Transportation andInfrastructure DevelopmentProject – Phase I
OUR
PROJ
ECTS
26
INFR
ASTR
UCT
URE
CON
STRU
CTIO
N
Package B2: Construction of Quy Cao Bridge
Client: Ministry of Transport
Location: Hai Phong city
Construction time: 24 months
National Highway No.10 Wideningand Improvement Project.
Package R4: Nam Dinh Bypass Section
Client: Ministry of Transport of Vietnam
Location: Nam Dinh Province
Construction time: 24 months
National Highway No.10 Wideningand Improvement Project.
27
Package NIP/CP-8:
Trang Bridge-Hung Yen Section.
Client: Project Management Unit No 2
( PMU 2) - MOT
Location: Hung Yen Province
Construction time: March 2008 to March 2010
National Highway No 38B Construction Project
Package no. 2: Km 218+500-Km 227+500.
Client: Viet Nam Expressway Corporation - MOT
Location: Ha Nam Province
Construction time: 32 months since 2007
Cau Gie – Ninh Binh HighwayConstruction Project
Pakage no. 1: Construction of Main Bridge
Client: Project Management Unit of Thang
Long - MOT
Location: Ha Noi city
Construction time: From 2003 to 2007
Thanh Tri Bridge Construction Project
OUR
PROJ
ECTS
28
INFR
ASTR
UCT
URE
CON
STRU
CTIO
N
Package NIP/CP-11: Section from Nam Dinh –
Lac Quan bridge
Client: Project Management Unit No 2
( PMU 2) - MOT
Location: Nam Dinh Province
Construction time: 24 months since 2008
National Highway No 21 Construction Project
Package PK2: Construction of Soc Son – Thai
Nguyen Section.
Client: Project Management Unit No 2
( PMU 2) - MOT
Location: From Soc Son to Thai Nguyen Province
Construction time: 42 months,
commenced early 2010
The New National Highway no. 3 is a critical highway among road network connecting Hanoi to Thai Nguyen. This project is a part of a strategy to improve Vietnam’s transportation system, aims at boosting economic exchanges between Hanoi and the northern mountainous areas surrounding Thai Nguyen. We were awarded Package 2, Construction of Section from Soc Son to Thai Nguyen in November 2009 under the capacity of a joint operation with other reliable partners. Main structures encompass 34.4km of four-lane expressway, 03 interchanges and intersections, 12 bridges, a great number of box and pipe
culverts, relocation of irrigation canals, AC pavement and other general items. The Package is funded by JBIC for nearly 1524 billion VNdong and will be implemented in late 2009. The progress is scheduled for 42 months since commencement date.
New National HighwayNo.3 Project
29
30
OUR
PROJ
ECTS
INFR
ASTR
UCT
URE
CON
STRU
CTIO
N
Package no.1: Construction of Main Bridge
and North Approach of Nhat Tan Bridge
Project.
Employer: Minstry of Transport.
Main Contractor: IHI Infrastructure System &
Sumitomo Mitsui JO
Subcontractor: Vinaconex E&C.
Location: Hanoi city
Commencement date: 2012
Nhat Tan bridge project
Ministry of Transport is the Employer of Nhat Tan bridge and approaches construction project. It locates on the Ring road II of Hanoi city with total length of 8.95km. This is a continuous stayed cable bridge with 5 Tower Bridge. The length of main bridge is 3,755m. The project is financed by ODA fund, under STEP conditions of Japan Government. Vinaconex E&C have taken part in the construction of 02 packages amongst 03 packages of project.
Vinaconex E&C have involved in the construc-tion of main bridge and approach road at the North, 3080m long and 32m wide, from Abutment A2 to Pier P11. The key work scope varies from casting and launching of super T girder, casting for deck slab, casting surface of bridge, cast-in-place box girders, cantilever works.
31
Package 2: Construction of Main bridge and
South Approach of Nhat Tan bridge project.
Employer: Minstry of Transport.
Main Contractor: Sumitomo Mitsui-
VINACONEX JO
Location: Hanoi city
Commencement date: 2012
The value of the package no. 2 is 1,312,973,190,959 Vietnam dong. The main work is construction of main bridge and South approach road of Nhat Tan bridge, with total length of 1251m, detailed in construction bridge, 1500 D bored pile, cantilever work, south approach road, all main ramp roads, retaining walls, drainage system, lighting system….
OUR
PROJ
ECTS
PROJ
ECT
MAN
AGEM
ENT
PROJECTMANAGEMENT PROJECTMANAGEMENT VINACONEX E&C management teams are prepared to provide knowledge,
experience and innovative solutions to clear the same questions of waste, cost
overrun and delays that challenge any Owner in any construction project.
We collaborate and harmonize among your designer, vendors, contractor and
specialists and believe the optimum environment is one where all parties see
each other as complimenting equals working together to bring Owners the
absolute best value they can buy.
32
Vinaconex tower is a distinguished place to all its affiliates nationwide as the headquarter of the Corporation. Located at 34 Lang Ha, Hanoi, Vinaconex building enjoys the benefit of a double frontage. This dignified office building is delivering a gross floor area of 24,000 sqm, including 27 storey and 03 basement parking.Showing a modern architecture, the building is also equipped with state-of-the art technical systems such as high-speed lifts, M&E system, security system…and distinctive curtain walls system. The construction started in 2007 and finished in 2009.
Vinaconex Tower
Client: VINACONEX Corporation
Location: Ha Noi city
Construction time: From 2007 to June 2009
OUR
PROJ
ECTS
PROJ
ECT
MAN
AGEM
ENT
34
35
The Hanoi Museum is an exceptional architecture - bringing together the old and the new on one single site. It has four storeys on the surface and two underground with total area of 53,963 square meters and is 30.7 meters high. The design and build form of the contract were firstly adopted among projects in Vietnam. Hanoi Museum has the form of a counter pyramid with a hard structure leans upon 04 cores that bear almost of loading capacity, all floors are hung up against the roof structure. This venue is harmonious with surrounding landscape and buildings, showing as a museum with the youngest and most innovative soul.
Construction began in May 2008 on site at Pham Hung street. VINACONEX E&C acted as the project management consultant during the construction and tender of this landmark project, including the selection and procurement of required equipment and the commissioning of facilities. We are also responsible for the majority of statutory compliance checking during construction stage. By providing our own unique solutions, we continue to provide the highest levels of quality and safety through workflow management and the foreseeable successful of the project.
Hanoi MuseumConstruction Project
Client: Hanoi people’s committee
Location: Ha Noi city
Construction time: Started: 19/05/2008,
estimated finishing: 19/05/2010
OUR
PROJ
ECTS
PROJ
ECT
MAN
AGEM
ENT
36
The main goal of the project was to create a well functioning residential area of high quality with all the necessary services for the low-income workers.
The scope of the project was turnkey construc-tion of 17 high-rise apartment buildings, encompasses low-income house and dormi-tory with total floor area of 135,550 sqm for 12,000 people on land area of 9 hectares.
The venue also involved in construction of infrastructure works of water supply system, water drainage system, lighting system, roads pavements and landscaping.
The overall construction works covered under separate contracts, commenced on February 2007 and scheduled to complete on 2011.
Apartment for Workers
Client: Hanoi People Committee
Location: Dong Anh, Hanoi
Construction time: 2007 - 2011
Most of workers in IZ or high-tech zone of any developing countries face the same problems of poor accommoda-tion as the physical demands of the work, low status, low pay, few bene�ts, and limited advancement potential deter them from accessing to a better living standards.
By taking part in this worker-house project, VINACONEX E&C could make a considerable contribution to release this burden.
37
OUR
PROJ
ECTS
REAL
EST
ATE
DEV
ELOP
EMEN
T
REAL ESTATEDEVELOPMENT REAL ESTATEDEVELOPMENT Even you need a small or large house, a good-to-live-in or high-class
luxury apartments or modern & comfortable offices VINACONEX E&C
can fit your dream with keen dedication to your full comfort and true
values.
Our design specialists are not limited, the only limit is your imagination.
38
At present, VINACONEX E&C is developing a mix-use project that combines offices, trading center and apartments with comprehensive service integration.
Located in Trung Hoa Nhan Chinh, Hanoi, the complex offers a lifestyle of full comfort and convenience, with in-the-door shopping mall and easy reach of the Hanoi downtown. Comprising two 23-storey and two 27-storey blocks with total gross floor area of 110.000m2, the modernity of architectural language is characterized by clear simple lines. This condo-minium development shows the harmony to surrounding environment and landscape.
The apartment units begin at 4th storey. Each floor offers both 2-, 3- and 4-bedroom unit types, In addition, to meet the needs of extended families, all towers arrange duplex 3-4 bedroom apartments, that commence from 20th floor upward. Parking facilities are provided at 03-storey basements below. The project is scheduled to complete in late 2012.
Mix-use High-rise Buildingsin Trung Hoa, Nhan Chinh
39
OUT OFWORKS
Each year, our staffs share with us their enthusiasm, energy, expertise, challenges and victories ……. ,and we desire to share our employees the joys and pleasures whenever we have chance.
We wish to give our employees the best possible conditions for a good, challenging working life and to develop an environment where each employee can fully demonstrate their skills, capabilities and maximize his/her value. Through which, energy, enthusiasm and creativity of each staff can be unlocked.
It is essential for us to balance naturally between work and family life of our staffs. And nothing is more precious than seeing happy moments together and smiles of spouse and children of their family during each company summer holiday.
40
Over the past few years, we are continually reinforcing our core competencies by fostering the development of talents through education and other relevant job-training programs. And today our team is prepared to deliver superior performance wherever there is a need for professional construction services.
Scholarship
OURHISTORYOrigin
Beginning from a Consultancy Department of Vietnam Construction and Import-Export Joint-Stock Corporation (VINACONEX), The Department of Bidding and Project Manage-ment served as a consultant of the Corpora-tion, support in management works of construction investment projects of all sizes.
To further develop the efficiency of this mode, the Corporation expanded the Department into two Centers, specializing in bidding works and management of great projects under-taken by VINACONEX, as well as providing advices and technical supports for VINACONEX affiliates in their construction and procure-ment works.
2003
Foundation for VINACONEX E&C was laid as merging two Centers of Project Manage-ment and Bidding into unique Center, centralized the bidding work and construc-tion management of large-scale project under VINACONEX trade mark
May 2007
VINACONEX E&C was established under the mode of a joint stock company. Commenced large-scale projects such as: Nghi Son Cement Plant, Vinaconex Tower, Worker House in Kim Chung, Cau Ghe-Ninh Binh construction project ….
42
2012
VINACONEX E&C turned in to an indepen-dent joint stock company at the end of 2012 when VINACONEX., JSC withdrew all their capital investment from the Company.
OURDEPARTMENT
O�ce
Tell: (84-4) 37765.888 Ext 101, 102, 107, 109, 110, 111, 213
Infrastructure Engineering Section
Tell: (84-4) 3776.5888 Ext 175 - 198
Quantity Survey Unit: 189Quality Control Unit: 179Bidding Unit: 198
Investment Dept
Tell: (84-4) 3776.5888Ext 126, 121, 128, 133, 134
Accounting and Financial Department
Tell: (84-4) 3776.5888Ext 136,104,123,125
Consultancy Section
Tell: (84-4) 37764.740
Civil & Industrial Engineering Section
Tell: (84-4) 3776.5888Ext: 150-152, 155-157, 166-172
Quantity Survey Unit: 166Quality Control Unit Bidding Unit : 157
Planning Department
Tell: (84-4) 3776.5888 Ext 214, 215
Quality system management& Safety Department
Tell: (84-4) 3776.5888 Ext 140, 131
Representative o�ce in HCMC
Tel: (84-8) 3910.4448Fax: (84-8) 3910.4448
Level 18, VINACONEX Tower34 Lang Ha Str.,Dong Da Dist.Hanoi, VietnamT (84.4) 3776 5888F (84.4) 3776 5999
2003 2007 NOW
43
Vinaconex E&C Profile
Level 18, VINACONEX Tower34 Lang Ha Str., Dong Da Dist.Hanoi, VietnamTel: (84.4) 3776 5888Fax: (84.4) 3776 5999Email: [email protected]: www.vinaconexec.com.vn
Vinaconex Engineering Construction & Investment., JSC