19
© Wärtsilä NOT YET CLASSIFIED WÄRTSILÄ LNG SOLUTIONS LNG18 April 2016 Fredrik Bonäs fi.linkedin.com/in/fredrikbonas #WartsilaKnowsGas #GasBassador 21.06.2022 Fredrik Bonäs/ Kenneth Engblom 1

Wärtsilä LNG Solutions

Embed Size (px)

Citation preview

Page 1: Wärtsilä LNG Solutions

01.05.2023 Fredrik Bonäs/ Kenneth Engblom1 © Wärtsilä NOT YET CLASSIFIED

WÄRTSILÄ LNG SOLUTIONSLNG18 April 2016

Fredrik Bonäs

fi.linkedin.com/in/fredrikbonas

#WartsilaKnowsGas #GasBassador

Page 2: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED 01.05.2023 Fredrik Bonäs/ Kenneth Engblom2

TABLE OF CONTENTS

Overview of Wärtsilä’s LNG solutions

Liquefaction plants

Terminals

Summary

Page 3: Wärtsilä LNG Solutions

01.05.2023 Fredrik Bonäs/ Kenneth Engblom3 © Wärtsilä NOT YET CLASSIFIED

BEFORE: CONVENTIONAL LNG VALUE CHAIN

Page 4: Wärtsilä LNG Solutions

01.05.2023 Fredrik Bonäs/ Kenneth Engblom4 © Wärtsilä NOT YET CLASSIFIED

AFTER: CONVENTIONAL + SMALL-SCALE VALUE CHAIN

Page 5: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED 01.05.2023 Fredrik Bonäs/ Kenneth Engblom5

WÄRTSILÄ LNG SOLUTIONSO

NSH

OR

EO

FFSH

OR

ELI

FEC

YCLE

Small LNG liquefaction plants Mini LNG liquefaction plants Small/Medium LNG terminals LNG satellite & bunkering terminals

LNG storage & regasification barge

LNG regasification BOG reliquefaction Cargo Handling SystemGas and LNG Carriers

Fuel gas handling system Ship and Cargo Tank design

Lifecycle services Start–up support Product and technical support Spares

Page 6: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED

Wärtsilä offers products and services for modern, flexible and sustainable power generation and LNG infrastructure.

WÄRTSILÄ SERVICES

EPC SparesMaintenance Operation

Project Development and Financial Services

01.05.2023 Fredrik Bonäs/ Kenneth Engblom6

Page 7: Wärtsilä LNG Solutions

01.05.2023 Fredrik Bonäs/ Kenneth Engblom7 © Wärtsilä NOT YET CLASSIFIED

SHORTENING PROJECT DEVELOPMENTAND EPC LEAD TIME

YOU HAVE AN IDEA!

Wärtsilä route• Design, Engineering, Cost Evaluations,

Constructability reviews and Safety studies• Project execution and commissioning• Asset management and maintenance agreements

Conventional route• Choose an engineering company• Conceptual design, Feasibility studies and FEED• Evaluate potential contractors• Bidding process, supplier selection and delivery

contract(s)• Manage construction of LNG terminal and power

plant• Arrange for operation maintenance and training

Your shorter & quicker route to commercial operations!(10-20 months)

Long process to FID, more time spenton administration, legal consultations and contractual setup...(20-30 months)

Page 8: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED 01.05.2023 Fredrik Bonäs/ Kenneth Engblom8

TABLE OF CONTENTS

Overview of Wärtsilä’s LNG solutions

Liquefaction plants

Terminals

Summary

Page 9: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED 01.05.2023 Fredrik Bonäs/ Kenneth Engblom9

MINI/SMALL SCALE LIQUEFACTION PLANTS

INPUT OUTPUTPLANT

Gas sources

• Pipeline gas• Biogas• Landfill gas• Associated gas• Coal seam gas• Tight gas• Shale gas

2,000 – 300,000 TPA(3,400 – 510,000 GPD)Gas pre-treatmentLiquefaction• Mixed Refrigerant: 2,000 -

30,000 TPA(3,400 – 51,000 GPD)

• Reversed Brayton: 20,000 – 300,000 TPA(34,000 – 510,000 GPD)

Storage tanksJetty & Marine facilitiesExport systems

LNG transport• Carriers• Tanker trucks• Containers• Rail cars

Peak shavinggas send-out

Ship bunkering

TPA = Tonnes Per YearGPD = Gallons Per Day

Page 10: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED

Bergen, Norway

“Twice the capacity,half the footprint!”

Kollsnes IICustomer Gasnor

Type Small scale liquefaction plant

Tank net volume 4,000 m3

Capacity 230 TPD / 84,000 TPA

Size ofliquefaction unit

12 m x 38 m

Gas source Pipeline gas. Inlet pressure typically 70 bar.

Details Extension to Kollsnes I. Includes two truck loading stations and existing loading jetty for small LNG carriers.

Scopeof supply

Complete plant, incl.• Gas pre-treatment• Cooling system (Seawater)• Double Reversed Brayton

liquefaction process• Storage tank• Electrical and control

systems• Civil works

Delivery method EPCIC

Delivered 2007

01.05.2023 Fredrik Bonäs/ Kenneth Engblom10

Page 11: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED

Oslo, Norway

“135 Oslo region buses will be able to run on biogas which means 10,000 tonnes emission reduction per year.”

EGE BiogasCustomer Cambi AS

Type Mini liquefaction plant

Tank net volume 180 m3

Capacity 11 TPD / 4,000 TPA

Size ofliquefaction unit

8 m x 14 m

Gas source Biogas from 50,000 TPA of food waste

Details Fuel production for 135 buses in the city of Oslo

Scopeof supply

Complete plant, incl.• Gas pre-treatment• Cooling system (Ambient

air)• MR liquefaction process• Storage tank• Electrical and control

systems• Service agreementExcl. Civil works and installation

Delivery method EPC

Delivered 2013

01.05.2023 Fredrik Bonäs/ Kenneth Engblom11

Page 12: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED 01.05.202312 Fredrik Bonäs/ Kenneth Engblom

TABLE OF CONTENTS

Overview of Wärtsilä’s LNG solutions

Liquefaction plants

Terminals

Summary

Page 13: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED

SMALL/MID SCALE TERMINALS

INPUT OUTPUTTERMINAL

LNG transport

• Carriers• Tanker trucks• Containers• Rail cars

Tank capacity100 – 160,000 m3

(26,400 – 42 Million gallons)Jetty & Marine facilitiesUnloading systemsStorage tanksBoil-off gas handlingRe-gasification• Up to 1,000 TPH

(1,000 MMSCFD)

Export systems

LNG transport• Carriers• Tanker trucks• Containers• Rail cars

Gas send-out

Ship bunkering

TPH = Tonnes Per HourMMSCFD = Million Standard Cubic Feet per Day

01.05.2023 Fredrik Bonäs/ Kenneth Engblom13

Page 14: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED

Tornio, Finland

“Providing the only source of gas for industries in Northern Finland.”

Tornio Manga LNGCustomer Manga LNG Oy

Type Small/Mid scale terminal

Tank net volume 50,000 m3

Send out Max 40 tonnes per hour at 6.0 barg

Scope of supply • Civil works and infrastructure

• Full containment storage tank

• Regasification & gas metering

• BOG system• Electrical and control

system• Unloading system• Bunkering and Truck

loading

Delivery method EPC Turnkey

Delivered 2018

01.05.2023 Fredrik Bonäs/ Kenneth Engblom14

Page 15: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED

San Pedro de Macoris, Dominican Republic

“Power Plant and LNG supply system combined at the same site.”

Los OrigenesCustomer César Iglesias

Type Combined Power Plant and LNG tank yard

Tank net volume 500 m3

Details LNG delivered by 3 trucks / day, 40 m3 each.

Scope of supply • Complete Wärtsilä 34 dual-fuel power plant including civil works

• Integration of customer’s LNG tank yard

Delivery method EPC

Delivered 2011

01.05.2023 Fredrik Bonäs/ Kenneth Engblom15

Page 16: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED 01.05.2023 Fredrik Bonäs/ Kenneth Engblom16

TABLE OF CONTENTS

Overview of Wärtsilä’s LNG solutions

Liquefaction plants

Terminals

Summary

Page 17: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED

COMMITMENT TO CUSTOMER SATISFACTION

• At Wärtsilä we know that every customer has unique expectations and priorities. We serve all of them with the same level of quality and excellence.

• Projects are tailored to customer needs based on a set of pre-defined scopes and proven designs, that will provide a valuable asset with the highest possible quality at an affordable cost.

01.05.2023 Fredrik Bonäs/ Kenneth Engblom17

Page 18: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED

SUPPORT FOR THE WHOLE LIFE CYCLE

24 hTechnical Support

Wärtsilä Services’ global networkWidest range of offering and expertiseWärtsilä Services provides full service throughout the product lifecycle for both Marine and Energy solutions customers,and is constantly developing its network worldwide.

70 countries, 200 locations, 11,000 service professionals

01.05.2023 Fredrik Bonäs/ Kenneth Engblom18

Page 19: Wärtsilä LNG Solutions

© Wärtsilä NOT YET CLASSIFIED

COMPLETE SOLUTIONS THAT BRING VALUE TO CUSTOMERS

Project Development & Financing

Technology EPC Operations & Maintenance

LNG Terminal or Liquefaction Plant

Gas / Dual-Fuel Power Plant

01.05.2023 Fredrik Bonäs/ Kenneth Engblom19