36

Grace Rollout

Embed Size (px)

DESCRIPTION

A new geriatric bundle being tested at Beth Israel Deaconess Medical Center. Date of presentation is late October 2009. This is an experimental protocol. Elements may change over time based on experience.

Citation preview

Page 1: Grace Rollout
Page 2: Grace Rollout

• Created at BIDMC• Multidisciplinary input

–Nursing –Geriatrics –Hospital Medicine –Pharmacy –IS –Dept of Health Care Quality

Page 3: Grace Rollout

• Hospitalization is a vulnerable time for elderly patients

• Older patients are at risk for:– Delirium (acute confusional state)– Physical deconditioning– Medication side-effects– Loss of function

Page 4: Grace Rollout

• The GRACE initiative will address unique concerns of vulnerable elders

• Identify delirium (confusion) as soon as it develops

• Target finite resources• Implement programs to maintain function

and prevent delirium

Page 5: Grace Rollout

• Three-pronged initiative– Provider Order Entry (POE)– Pharmacy– Bedside

Page 6: Grace Rollout

• Three-pronged initiative– Provider Order Entry (POE)– Pharmacy– Bedside

Page 7: Grace Rollout

• Bedside component– For patients ≥ 80 years– Roll-out on 11R, CC7, Farr 2 anticipated in

Oct/November – 2nd wave to rollout on all other floors (except

Deac-4, Oncology and ICUs) 1-2 mo later– Springtime rollout planned for subset of 65-79

year old patients

Page 8: Grace Rollout

• Bedside component– Mainly the domain of nursing– Nurses will be the primary “go-to” for this

component but are encouraged to work with and utilize help from physicians, PT, NPs, PAs and PCTs

Page 9: Grace Rollout

• Bedside GRACE flow sheet– One sheet per day – goes in blue vital signs book/clipboard– Use 1 copy of form each day for any patient

admitted to your unit 80 years or older

Page 10: Grace Rollout
Page 11: Grace Rollout

See handout of GRACE Flowsheet

Page 12: Grace Rollout

• Bedside GRACE flow sheet– Multiple components

• 2 part Delirium screen • Morning “tether check”• Mobility protocol• Sleep protocol

Page 13: Grace Rollout

• Bedside GRACE flow sheet– Multiple components

• 2 part Delirium screen • Morning “tether check”• Mobility protocol• Sleep protocol

Page 14: Grace Rollout

2 Part Delirium (confusion) Screen1) RASS Score – two times per day2) Test of attention – once per day

Page 15: Grace Rollout

2 Part Delirium (confusion) Screen1) RASS Score

Use the Richmond Agitation and Sedation Scale

First part of the delirium screen

Page 16: Grace Rollout
Page 17: Grace Rollout

2 Part Delirium (confusion) Screen1) RASS Score – Scored two times per day

• Once between 7 am - 3 pm • Once between 3 -11 pm

Page 18: Grace Rollout

2 Part Delirium (confusion) Screen1) RASS Score– Scored two times per day

• Once between 7 am - 3 pm • Once between 3 -11 pm

– Write RASS score on Flowsheet

Page 19: Grace Rollout

2 Part Delirium (confusion) Screen1) RASS Score– Scored two times per day

• Once between 7 am - 3 pm • Once between 3 -11 pm

– Write RASS score on Flowsheet– Any score that is NOT a 0, 1 or -1, if a NEW

score to that patient, is considered a positive screen for delirium Trigger

Page 20: Grace Rollout

Daily screen for delirium (confusion)2) Test of attention – once per day

This is the second component of the delirium screen. RASS score is the first.

Page 21: Grace Rollout

Test of Attention (second part of delirium screen)1) Ask patient to state the months of year backwards(e.g., December, November, October…January). Ifable, this becomes patient's daily Test of Attention.If unable,

2) Then ask to state days of week backwards (e.g.,Sunday, Saturday, Friday…Monday). If able, thisbecomes patient's daily Test of Attention. If unable,

3) Then, ask the patient to count from 10 to 1 (10, 9,8…1). If able, 10-1 becomes this patient's dailyTest of Attention.

Page 22: Grace Rollout

• Daily screen for delirium (confusion)2) Test of attention – once per day

• Record which test of attention the patient could do.

Page 23: Grace Rollout

• Daily screen for delirium (confusion)2) Test of attention – once per day

• Record which test of attention the patient could do.

• If unable to do the test of attention from the previous day, or unable to perform any test of attention, this is a positive screen for Delirium! Trigger!

Page 24: Grace Rollout

• Bedside GRACE flow sheet• 2 part Delirium screen • Morning “tether check”• Mobility protocol• Sleep protocol

Page 25: Grace Rollout

• Bedside GRACE flow sheet• 2 part Delirium screen • Morning “tether check”• Mobility protocol• Sleep protocol

Page 26: Grace Rollout

Morning “Tether Check”• Background:

– Foleys, telemetry, IV lines and restraints are considered “tethers”

– A patient with 1 or more tethers is at increased risk for falling or developing delirium in the hospital

– We want to minimize the use of tethers in our most vulnerable patient population

Page 27: Grace Rollout

Morning “Tether Check”• Each morning, the need for a tether must be

documented.• Who can complete this section of the flowsheet?

– RN after conversation with MD/NP/PA– MD/NP/PA can do so independently– If no MD/NP/PA has completed it, day RN should

speak with the responsible MD/PA/NP and review with him/her the need for any tethers that are in use.

Page 28: Grace Rollout

• Bedside GRACE flow sheet• 2 part Delirium screen • Morning “tether check”• Mobility protocol• Sleep protocol

Page 29: Grace Rollout

• Bedside GRACE flow sheet• 2 part Delirium screen • Morning “tether check”• Mobility protocol• Sleep protocol

Page 30: Grace Rollout

Mobility Protocol• Background:

– Bedrest causes patients to lose function– Increases risks of pressure ulcers, pneumonia– Older patients are most vulnerable to losing

function while in the hospital– Loss of function leads to placement in nursing

homes after discharge from the hospital

Page 31: Grace Rollout

Mobility Protocol• Get patient out of bed to chair two times

per day unless patient unable• Ambulate patient in hallway two times per

day, unless patient unable

Q: Who can do it? A: RN, or PCT, PT, or MD

Page 32: Grace Rollout

• Bedside GRACE flow sheet• 2 part Delirium screen • Morning “tether check”• Mobility protocol• Sleep protocol

Page 33: Grace Rollout

• Bedside GRACE flow sheet• 2 part Delirium screen • Morning “tether check”• Mobility protocol• Sleep protocol

Page 34: Grace Rollout

Sleep Protocol• Background:

– Sleep deprivation can cause confusion in older patients

• Designed to normalize the sleep-wake cycle for elderly patients in the hospital

• Minimize noise, lights, lab draws, routine VS checks between 11 pm and 7 am

Page 35: Grace Rollout

It is our hope that the bedside flowsheet will be utilized by all members of the care team, including nurses, doctors, PT, OT etc.

Nurses, however, are the cornerstone to bedside care and have primary “ownership” for the completion of this form.

Page 36: Grace Rollout

Thank you!

Melissa Mattison, [email protected] 90141

Angela Botts, [email protected] 31458

Daniele Olveczky, [email protected] 38743

Julie Moran, [email protected] 33000

Christine Kristeller, [email protected]

Pager 39232

Questions: