Riverine and Lakebed Restoration Planning Public Meeting No. 3

April 4, 2011

Page 2: Lake shady plans

Public Involvement Efforts to D tDate: DNR presentation of Dam Removal and DNR presentation of Dam Removal and

Lakebed Restoration Concepts – October, 2010

Public Information Meeting #1 – February 22, 2011,

Riverine and Lakebed Restoration Planning Charrette – March 5 2011Charrette March 5, 2011

Public Information Meeting #3 – April 4, 20112011

Page 3: Lake shady plans

P j t R l t d D t tiProject Related Documentation: Public Information Meeting discussion materials g

available on the City of Oronoco Website. Look for the “Flood 2010 Information” link in the left column

Lake Shady Stakeholders Report− 55 stakeholders including 20 natural resource professionals met

10 times during 20090 t es du g 009

− Reports and presentations available on Olmsted County Website

− http://www.co.olmsted.mn.us/environmentalresourceservices/Pages/LakeShadyStakeholdersGroup aspxes/LakeShadyStakeholdersGroup.aspx

Mn/DNR website documentation on similar project completed throughout Minnesotap g− http://www.dnr.state.mn.us/eco/streamhab/reconnecting_rivers.ht

ml

Page 4: Lake shady plans

P bli M ti N 3 G lPublic Meeting No. 3 Goals Discuss park planning concepts for the Discuss park planning concepts for the

proposed restoration of the riverine system and lakebed

Solicit input from stakeholders on restoration planning concepts p g p

Develop a collective vision for the proposed Riverine and Lakebed redevelopmentRiverine and Lakebed redevelopment

Page 5: Lake shady plans

Public Comments on Past Lakebed R d l t C tRedevelopment Concepts Homeowner privacy and security is a concern. Shift river to

east and eliminate path between homes and river

Highway noise should be decreased

S hi h f i Screen highway from view

Prefer passive recreation options

Prefer a natural resources based park Prefer a natural resources based park

Create water fowl habitat

Minimize City maintenancey

Accommodate people with disabilities

Page 6: Lake shady plans

Public Comments on Past Lakebed R d l t C tRedevelopment Concepts City doesn’t need more ball fields

Existing shoreline needs to be cleaned up – walls fixed / removed

C d d ’t d dditi l it Campground doesn’t need additional capacity

Plan should consider broader watershed issues and water quality

Lots of history associated with the Lake – Historical interpretation

Opportunity to connect the proposed park with City streets by Opportunity to connect the proposed park with City streets by extending 2nd Street to the west

Liked the idea of preserving views and creating smaller, intimate spaces

Page 7: Lake shady plans
Page 8: Lake shady plans

River and Lakebed Concept C t I l dComponents Include

D R l Dam Removal

Gradual Rapids Construction

Riverine System Restoration

Lakebed and Wetland Restoration

Lakebed to be developed into a natural resources based park with passive recreational opportunities

Page 9: Lake shady plans

Dam RemovalDam Removal

D d t l f ti t b l b Dam grade control function to be replace by Gradual Rapids construction

Some concrete from the dam could be used in Some concrete from the dam could be used in restoration improvements

Estimated Project Costs ~ $264 000 Estimated Project Costs $264,000

Page 10: Lake shady plans

Gradual Rapids FeaturesGradual Rapids Features

600 id ith 7 f t f d th h i ~ 600 rapids with ~ 7 feet of drop though a series of 12 rock weirs and pools

Constructed with a combination of large boulders Constructed with a combination of large boulders and riprap

Low impact portage way along north shore of river Low impact portage way along north shore of river connects rapids to existing DNR canoe launch

Fish passage and habitatp g

Kayaking

Estimated Project Costs ~ $1 million Estimated Project Costs $1 million

Page 11: Lake shady plans

C k t R id C t tiCrookston Rapids Construction

Page 12: Lake shady plans

Crookston RapidsCrookston Rapids

Page 13: Lake shady plans

Dawson RapidsDawson Rapids

Page 14: Lake shady plans

Hutchinson RapidsHutchinson Rapids

Page 15: Lake shady plans

Riverine System RestorationRiverine System Restoration

5230 f t f i t ti ~ 5230 feet of river restoration

~ 8 Riffles with downstream pools and toe-wood bank protection including tree / shrub plantingsbank protection including tree / shrub plantings

Riffles constructed with a combination of large boulders and riprapboulders and riprap

Enhance fish habitat

Trees and shrubs planted long along erosion Trees and shrubs planted long along erosion susceptible stream banks

Estimated Project Costs ~ $1 3 million Estimated Project Costs $1.3 million

Page 16: Lake shady plans

Riverine System RestorationRiverine System Restoration

Page 17: Lake shady plans

Riverine System RestorationRiverine System Restoration

Page 18: Lake shady plans

Riverine System RestorationRiverine System Restoration

Page 19: Lake shady plans

Lakebed and Wetland Restoration F tFeatures Total impacted lakebed ~ 90 acresp

~ 5 wetland / open water features totaling ~ 7.5 acres − Approximately 4 feet deep with surrounding 20:1 aquatic

bench

I t t fl f dj t t & dit h− Intercept flows from adjacent storm sewer & ditches

~16.25 acres of tree plantingsCombination of 1” trees and seedlings− Combination of 1” trees and seedlings

~54.5 acres of native grassesDeep rooted to stabilize existing lakebed sediment− Deep rooted to stabilize existing lakebed sediment

Estimated Project Costs ~ $1 million

Page 20: Lake shady plans

W tl d R t ti E lWetland Restoration Examples

Page 21: Lake shady plans
Page 22: Lake shady plans

W tl d R t ti E lWetland Restoration Examples

Page 23: Lake shady plans

Lakebed / Park Area Passive R ti l d A I tRecreational and Access Improvements

C bi ti f 10' id bit i t il ( 8 000') Combination of 10' wide bituminous trail (~8,000') and mowed pathways (~4100')

Pedestrian Bridge ~ 250' long x 12' wide Pedestrian Bridge ~ 250 long x 12 wide− Alternate location for pedestrian bridge advantages / disadvantages

TH 52 Underpass TH 52 Underpass − Connects east and west Oronoco

− Provides access for maintenance equipmentq p

Canoe Landings and Fishing Pier

Historical Interpretative Kiosks, Park BenchesHistorical Interpretative Kiosks, Park Benches

Estimated Project Costs ~ $1.3 million

Page 24: Lake shady plans

Canoe/kayak landing

Page 25: Lake shady plans

Lakebed / Park Area Passive Recreational and Access Improvements

Page 26: Lake shady plans

Future Lakebed / Park Area Active Recreational Improvements

Future Disk Golf Parking Facilities Expansion of picnic area

Page 27: Lake shady plans

T t l P j t C t E ti tTotal Project Cost Estimate:

D R l $264 000 Dam Removal ~ $264,000

Gradual Rapids Construction ~ $1 million

Riverine System Restoration ~ $1.3 million

Lakebed and Wetland Restoration ~ $1 million

Lakebed / Park Area Passive Recreational and Access Improvements ~ $1.3 million

TOTAL ~ $4.95 million

Page 28: Lake shady plans

Project Challenges To Be AddAddress Property ownership / land acquisition

Sediment management

Channel restoration

Fisheries impacts

Economic Impacts

Historical preservation requirements

CSAH 18 bridge protection

Consensus building amongst stakeholders Consensus building amongst stakeholders

Project funding

Agency permitting (DNR, MPCA, ACOE, MN/DOT)g y p g ( , , , )

Environmental documentation

Page 29: Lake shady plans

Pl i P N t StPlanning Process - Next Steps

− Public Information Meeting No. 3

Fi li Pl i C t d

April 4, 2011

A il 15 2011− Finalize Planning Concepts and Technical Memorandum

− Present Documentation to the State

April 15, 2011

April 18 2011Legislature as part of Bonding / Flood Recover Assistance

April 18, 2011

Page 30: Lake shady plans

Discussion

Questions/Comments