Experiences from de Stroomversnelling

nZEB renovation of row housing

Mieke Oostra

professor Spatial Transformations Hanze University of Applied Sciences

Page 2: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

 •  Introduc*on  of  de  stroomversnelling  •  Why  was  de  Stroomversnelling  

developed    •  Before  de  Stroomversnelling  •  How  it  evolved  •  What  is  new    •  What  is  currently  happening  in  rela*on  

to  housing  associa*ons  &  private  house  owners      

•  What  is  s*ll  needed  to  accelerate  upscaling    

CONTENTS

www.westonpain*ngcontractors.co.uk  

Page 3: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

The  introduc*on  to    A  Dutch  retrofiCng  programme    

for  row  housing  stroomversnelling  huur  

 

Page 4: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

Dutch row housing

picture:  de  stroomversnelling  

Page 5: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

     •  a  Dutch  deal  to  accelerate  deep  

retrofiCng  by  4  contractors  and  6  housing  associa*ons  

•  part  of  Energiesprong,  an  innova*on  programme  commissioned  by  the  Dutch  Ministry  of  the  Interior    

•  signed  on  the  20th  of  June  2013  •  to  convert  11.000  houses  to  Net  Zero  

Energy  Buildings    

Page 6: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

GOALS    •  10  year  warranty  on  energy  performance  •  retrofit  within  a  week  •  costs  of  living  remain  the  same  for  occupant  •  aUrac*ve  for  occupants  

Page 7: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

picture:  de  stroomversnelling  

Page 8: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

ROOF  

FACADE  

NEW  KITCHEN,  BATHROOM  &  TOILET  

INSTALATIONS  

INSULATION  (GROUND  FLOOR)  

picture:  de  stroomversnelling  

Page 9: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

How are these realised?

picture:  de  stroomversnelling  

Page 10: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

pilot Schrijverswijk Heerhugowaard

picture:  de  stroomversnelling  

Page 11: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

pilot Schrijverswijk Heerhugowaard

hUps://www.youtube.com/watch?v=5Do2IMB8xQs  

Page 12: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

Melick

hUps://www.youtube.com/watch?v=BvXVVQZ_hso  

Page 13: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

Nieuw  Buinen  

Page 14: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling
Page 15: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

hUp://www.roCnghuis.nl/nl/projecten/detail/testwoning-­‐stroomversnelling-­‐nieuw-­‐buinen      

Page 16: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling
Page 17: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling
Page 18: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

pilot 2.1 Nieuw Buinen

source:  hUps://m.youtube.com/watch?v=I3WBT2eAArI  

Page 19: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

     Challenge  1  -­‐  a  20%  reduc*on  of  CO2  emissions  and  14%  renewable  energy  genera*on  in  2020.  An  enormous  challenge      Challenge  2  -­‐    more  commercial  ini*a*ves,  a  reduc*on  of  government  and  reduc*on  of  governmental  spending.      How  to  combine  these  two  challenges?  The  ingredients  are:  leave  more  to  the  market,  coopera*on  between  companies  &  knowledge  ins*tutes  and  a  green  deal  with  partners.    

WHY

www.unitedisaan.com  

Page 20: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

             Pilot  projects  as:  •  To  proof  new  technology  concepts  •  To  test  and  present  a  renova*on  concept  •  For  dissemina*on  purposes  

BEFORE - one off pilot dwellings

Onshuisverdienthet.nl  

Page 21: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

     •  Step  from  building  to  area  •  Focus  on  retrofiCng,  new  

build  and  replacement  of  buildings  

•  Real  change  within  2  years.  •  For  this  GEN  (Gebieden  

Energie  Neutraal)  was  ini*ated.    

 e.g.  Valkenburg  &  Kerschoten  

BEFORE – area’s

Page 22: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

     •  Knowledge  development  vs  realisa*on  •  Development  of  different  themes  (micro,  

macro,  finance,  business  models  &  area  management)  vs  integral  approach  

•  Lowest  housing  costs  vs  client  oriented  approach  

•  Proven  technology  vs  technology  of  the  future    

•  Top-­‐down  vs  boUom-­‐up  ini*a*ves  

BEFORE – area’s – some dilemma’s

Page 23: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

     •  Short  term  results  needed    •  Ten  leading  companies:  Alliander,  BAM,  

Cofely  GDF  Suez,  Eneco,  Eversheds  Faasen,  KPMG,  Rabobank,  Royal  Haskoning  DHV,  TNO,  United  Energy  Works.    

•  Companies  wan*ng  change  within  2  years.  •  Forma*on  of  GEN  (Gebieden  Energie  

Neutraal).        e.g.  Valkenburg  &  Kerschoten  

BEFORE – pilot projects for row housing

     

Page 24: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

     •  Short  term  results  needed    •  Ten  leading  companies:  Alliander,  BAM,  

Cofely  GDF  Suez,  Eneco,  Eversheds  Faasen,  KPMG,  Rabobank,  Royal  Haskoning  DHV,  TNO,  United  Energy  Works.    

•  Companies  wan*ng  change  within  2  years.  •  Forma*on  of  GEN  (Gebieden  Energie  

Neutraal).        e.g.  Valkenburg  &  Kerschoten  

BEFORE – LALOG

Page 25: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

stroomversnelling huur

Page 26: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling
Page 27: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

     

ONS  HUIS  VERDIENT  HET  

Page 28: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

     

ONS  HUIS  VERDIENT  HET  

Page 29: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

stroomversnelling koop

Foto:  Riesjard  Schropp    

Page 30: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

stroomversnelling koop

Page 31: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

     

WHAT  IS  NEW?  

Page 32: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

     •  Directed  at  upscaling  •  Involving  all  stakeholders  •  Flexible  •  Step  change  innova*on  •  Not  only  technical  innova*on  

but  also  system  innova*on  e.g.  energy  performance  fee  

•  New  roles  &  responsibili*es  for  stakeholders  

New about the programme

Blog.gemalto.com  

Page 33: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

Outcome: cost reduction

Page 34: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

... time reduction & increased integration

picture:  de  stroomversnelling  

Page 35: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

…process innovation,

picture:  de  stroomversnelling  

Page 36: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

& supply chain management

picture:  de  stroomversnelling  

Page 37: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

       

One off pilot projects

www.stroomversnelling.nl/publica*e  

Energy  performance  fee  

Page 38: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

WHAT’S  NEXT?        

deals  in  different  regions:  •  Utrecht  •  Brabant  •  Overijssel  &  Gelderland  •  Groningen    

Page 39: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

Construction period  

Row houses  

Percentage of total

number (%)  1946 - 1964   480,000   7  1965 – 1974   606,000   9  1975 - 1991   879,000   12.9  

Total   1,965,000   29  

TO  CREATE  IMPACT    

•  The  average  energy  consump*on  per  dwelling  in  the  Netherlands  in  1440  m3  natural  gas  and  3440  kWh  of  electricity  (Nibud,  2015).  53  GJ  per  dwelling.    

•  RetrofiCng  10  %  of  housing  stock  to  nZEB  in  10  years  (19,650  a  year)  will  represent  a  saving  of  1.04  PJ  of  fossil  energy  a  year.  

Page 40: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

               hUps://www.youtube.com/watch?v=pAAQBmsGmDE&list=PLxqrMoxgE53ndDAFqpEb9h9tbLuB3MD7c&index=2  

One off pilot projects

www.unitedisaan.com  

Page 41: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

              www.unitedisaan.com  

Page 42: BUILD UPON: Mieke Oostra - Experiences from de Stroomversnelling

Thank  you  for  your  kind  aUen*on  [email protected]  

   Ques*ons?