THE RUSIZI PLAIN, AN AREA PRONE TO THE CHALLENGES OF CLIMATE
CHANGE AND SUBJECT TO POLITICAL CONSTRAINTS
- CAZENAVE-PIARROT Alain University of Toulouse 2 Jean Jaurès, France. - NDAYIRUKIYE Sylvestre University of Burundi in Bujumbura - GAHAMA Joseph University of Rwanda in Kigali - RWANYIZIRI Gaspard University of Rwanda in Butare/Huye - THIBON Christian University of Pau and Pays de l'Adour, France
THE RUSIZI PLAIN
25/08/2015 ACP- JG- SN- CT 2
SITUATION OF THE RUSIZI PLAIN
Between Kivu & Tanganyika Lakes
In the center of the Countries of the North Tanganyika
25/08/2015 ACP- JG- SN- CT 3
The physical data
- The plain of Rusizi and its drainage basins are situated in the graben of the Western Great Rift Valley
- Aera: 3 000 Km² among wich 1750 to Burundi
- Distances : 117 km from north to south ; 25 km in width at the most from east to west.
25/08/2015 ACP- JG- SN- CT 4
Rusizi river, in the plain, border Burundi-Congo DR
POPULATION DATA
• Population of Uvira (2012) 209.344 (Registry office), but probably 500 000
• Population of Bujumbura 497 160
inhabitants (Census2008), but probably 1 million
• The total population would thus
amount to 2 724 082 inhabitants (together of the plain and the mountain relief) But with the rate of natural increase, the current population can be estimated (esteemed) to more than 3 000 000 Inhabitants
25/08/2015 ACP- JG- SN- CT 5
Bujumbura, view from Kiriri District: Population, demographic pressure,
development
CONSTRAINTS AND STATEMENT
Constraints
• The confrontations which paralyzed Burundi since April, prevented the meeting in Bujumbura of a preparatory workshop for this communication. This one is pushed away in November, 2015 launch a research project on the same subject.
Statement of the problem
• Is it possible to have a political ecology in a natural and human environment which is both subject to the global change and geopolitical tensions ?
25/08/2015 ACP- JG- SN- CT 6
OUR APPROACH
1. The starting point: a familiar environment
2. Short and mid-term projections and challenges to overcome
3. The way forward: answers and implemented knowns, the unknowns of a global approach
25/08/2015 ACP- JG- SN- CT 7
Bujumbura: Ntahangwa river, Three plans- goals: maping of
vulnerable areas, sectorial public policy, long terme policy
One of our tools
25/08/2015 ACP- JG- SN- CT 8
Question of the capacity of the local populations to be been a matter of such challenges, capacity of resilience