2011 版 紧紧紧紧紧紧紧 紧紧紧紧紧紧 800-8306390 800-8306395 400-0687188 0755-82940718 [email protected] China Construction Quality Testing Industry Market Forecast and Competition Strategy Report, 2013-2017 No comprehensive trend forecast, no gain. (Help you to discover the unsatisfied market need of electric power construction industry, and explicit the development trend and

China electric power construction industry market forecast and investment strategic planning report, 2013 2018

Embed Size (px)

Citation preview

Page 1: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

2011紧固件制造行业

前 瞻 服 务 热 线 : 800-8306390 800-8306395 400-0687188 传 真 : 0755-82940718 [email protected]

China Construction Quality Testing Industry Market Forecast and Competition Strategy Report, 2013-2017No comprehensive trend forecast, no gain.

(Help you to discover the unsatisfied market need of electric power construction industry, a nd

explicit the development trend and prospect.)

Page 2: China electric power construction industry market forecast and investment strategic planning report, 2013 2018
Page 3: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

PrefaceIt is an oversupply economic era and key for corporations to success is that whether they are able to capture the demand before the demand takes shape. The outstanding corporations would prefer to spend great efforts in seeking the current demand, potential need and new requirement of the industry.

Competition of electric power construction industry is more and more fierce. In the meantime, merger and capital operation among large electric power construction corporations are ever frequent. And the outstanding electric power construction corporations in China are placing more importance on the research of the industry market, especially the depth research of industry development environment and customers. Accordingly, many splendid domestic corporations are springing up and become leaders in electric power construction industry gradually!

Basing on the market data of electric power construction market, which tracked and collected by Forward in long-term, this report provides you an overall analysis system in the height of the whole industry comprehensively and accurately. This report mainly contains the following aspects of electric power construction industry: development background of the industry; development status of the industry; construction status of the power projects and power grids; Electric Power Construction in major regions; operation of Electric Power Construction corporations; investment and credit of the industry in China. Meanwhile, the comprehensive and detailed data about nonwoven industry in current years is contained. In this way, it will help you to maintain the market trend and industry development comprehensively and accurately.

The most significant features of this report are perceptiveness and timeliness. It gives a prudent analysis and forecast of electric power construction industry according to the industry development track and Forward’s years of practical experience. In conclusion, it is a significant report to learn about the latest development trend, grab market opportunities, and make correct marketing decision and explicit corporations’ development trend for all electric power construction corporations, R&D institutes, marketing corporations and Investment corporations. Besides, it is the first heavyweight report to give a comprehensive and systematic analysis about the upstream and downstream industrial chain, as well as key corporations in electric power construction industry.

This report is useful for electric power construction corporations, R&D institutes, marketing corporations and Investment corporations for the following reasons: it will help them to accurately know the latest development trend and timely discover the market gaps, opportunities, growth points and profit points of industrial textile industry; it will assist them to grasp the unmet market demand and development trend prospectively, form the sustainable advantages, avoid the investment risks effectively, consolidate or expand relevant strategic target markets more efficiently, and firmly grasp the competition initiative.

Here, we would like to express our sincere gratitude to China Electricity Council , State Information Center, Bureau of Statistics of China, General Administration of Customs, International Information Research Institute, Chinese Academy of International Trade and Economic Cooperation, Tsinghua University Library and Development Research Center of the State Council, for their great support when we conduct this report!

Notice: All the market data, especially corporations' ranking data in the report, only for business reference. Please do not take the data for enterprise publicity. Thank you! Or Forward shall not take any responsibility

Page 4: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

for any consequences!

Special Notes: Neglecting the subtle signals of dramatically changing external environment, and untimely update strategies along with the changing environment will lead to the loss of competition advantages. The successful corporations will keep a scientific analysis upon the external environment before making their significant operational strategies!

Forward Business Intelligence sincerely wishes every ambitious corporation can make a significant operational strategy, effectively avoid the industry risks and gain the continuous success!

Forward Business Intelligence Co., Ltd. Industry Research Center Research Team of Electric Power Construction Industry

Page 5: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

CONTENTS

Chapter I:Development Background of Electric Power Construction Industry1.1 Definition of Electric Power Construction Industry

1.1.1 Definition of Electric Power Construction Industry1.1.2 Characteristics of Electric Power Construction Engineering1.1.3 Coordination of Electric Power Construction Industry and the Upstream/Downstream

1.2 Policy Background of Electric Power Construction Industry1.2.1 Policy Trend of Electric Power Construction1.2.2 Interpretation of the Development Planning of Power Industry(1) Interpretation of the 12th Five Year Planning on Energy Development(2) Interpretation of the 12th Five Year Planning on Power Industry(3) Interpretation of the Strategy and Planning on Intelligent Power Grid Development(4) Interpretation of the 12th Five Year Planning on Ultra-high Voltage Grid

1.3 Economic Background of Electric Power Construction Industry1.3.1 Growth of National GDP (1) Growth of National GDP(2) Coordination of GDP and Electric Power Construction1.3.2 Growth of National Industrial Added Value(1) Growth of National Industrial Added Value(2) Coordination of Industrial Added Value and Electric Power Construction

Chapter II:Development of Power Generation and Supply Industry2.1 Operation Status of Power Generation and Supply Industry

2.1.1 Operation of Power Generation and Supply Industry(1) Operation of Power Generation Industrya. Business Benefit of the Industryb. Profit Level of the Industry(2) Operation of Power Supply Industrya. Business Benefit of the Industryb. Profit Level of the Industry2.1.2 Operators' Scale Power Generation and Supply(1) Issuing of the Power Business License (2) Market Concentration Degree of Power Generation Group

2.2 Supply and Demand Tendency of Power Generation and Supply Industry2.2.1 Analysis of Power Supply and Demand Status(1) Analysis of Power Supplya. Analysis of Power Supply Amountb. Analysis of Power Supply Structure(2) Analysis of Power Demanda. Analysis of Power Demand Amountb. Analysis of Power Demand Structure2.2.2 Forecast of Power Supply and Demand Trend

2.3 Investment of Power Generation and Supply Industry2.3.1 Investment Scale of Power Generation and Supply Industry2.3.2 Investment Capital Sourcing Structure of Power Generation and Supply Industry2.3.3 Investment Projects' Construction of Power Generation and Supply Industry

Page 6: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

2.3.4 Investment Capital Purpose of Power Generation and Supply Industry(1) Structure of Investment Fund Flow(2) Investment Proportion of the Projects of Different Levels(3) Investment Proportion of the New Projects, Reconstruction Projects and the Projects under

Construction2.3.5 Investment Body Structure of Power Generation and Supply Industry

Chapter III:Development of Electric Power Construction Industry3.1 Investment of Electric Power Construction Industry

3.1.1 Investment Scale of Electric Power Construction3.1.2 Investment Structure of Electric Power Construction(1) Overall Structure of Power Investment(2) Investment Structure of Power Source Construction3.1.3 Construction Scale of Electric Power Construction(1) Construction Scale of Power Source(2) Construction Scale of Power Grid3.1.4 Major Investment Power Projects3.1.5 Investment Planning of Electric Power Construction

3.2 Competition of Electric Power Construction Industry3.2.1 Internal Competitive Structure of the Industry3.2.2 Competitive Strength of the Large Corporation of the Industry3.2.3 Significant Investment Merger and Reconstruction Events of the Industry(1) China Domestic Merger and Reconstruction Event(2) Oversea Merger and Reconstruction Event

3.3 Project Management Model of Electric Power Construction Industry3.3.1 Analysis of CM Project Management Model(1) Category of CM Project Management Model(2) Advantages of CM Project Management Model(3) Applicable Engineering of CM Project Management Model3.3.2 Analysis of EPC Project Management Model(1) Characteristics of EPC Project Management Model(2) Applicable Engineering of EPC Project Management Model(3) Risk Prevention of EPC Project Management Model(4) Application of EPC Project Management Model3.3.3 Analysis of PMC Project Management Model(1) Forms and Characteristics of PMC Management(2) Comparison of PMC Project Management Model(3) Applicable Engineering of PMC Project Management Model(4) Significance of PMC Project Management Model

Chapter IV:Analysis of Power Source Construction4.1 Analysis of Thermal Electric Power Construction

4.1.1 Analysis of Thermal Electric Power Construction Environment(1) Relevant Policies to Thermal Electric Power Construction(2) Technology Level of Thermal Electric Power Construction(3) Influence to Thermal Electric Power Construction Environment4.1.2 Installed Capacity of Thermal Power

Page 7: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

(1) Installed Capacity of Thermal Power(2) Installed Structure of Thermal Power(3) Installed Planning of Thermal Power4.1.3 Investment of Thermal Electric Power Construction(1) Investment Scale of Thermal Electric Power Construction(2) Investment Fund Sourcing Structure of Thermal Electric Power Construction(3) Construction of Thermal Power Projects(4) Investment Fund Purposes of Thermal Electric Power Constructiona. Investment Found Flowing Structureb. Investment Proportion of the Projects of Different Levelsc. Investment Proportion of the New Projects, Reconstruction Projects and the Projects under

Construction(5) Investment Body Structure of Thermal Electric Power Construction4.1.4 Major Thermal Electric Power Construction Projects(1) Finished Key Projects during 2011-2012(2) Key Projects under Construction or Planning during 2012-2013

4.2 Analysis of HydroElectric Power Construction4.2.1 Analysis of HydroElectric Power Construction Environment(1) Relevant Policies to HydroElectric Power Construction(2) Technology Level of HydroElectric Power Construction(3) Influence to HydroElectric Power Construction Environment4.2.2 Installed Capacity of Hydropower(1) Installed Capacity of Hydropower(2) Installed Structure of Hydropower(3) Installed Planning of Hydropower4.2.3 Investment of HydroElectric Power Construction(1) Investment Scale of HydroElectric Power Construction(2) Investment Fund Sourcing Structure of HydroElectric Power Construction(3) Construction of Hydropower Projects(4) Investment Fund Purposes of HydroElectric Power Constructiona. Investment Found Flowing Structureb. Investment Proportion of the Projects of Different Levelsc. Investment Proportion of the New Projects, Reconstruction Projects and the Projects under

Construction(5) Investment Body Structure of HydroElectric Power Construction4.2.4 Major HydroElectric Power Construction Projects(1) Finished Key Projects during 2011-2012(2) Key Projects under Construction or Planning during 2012-2013

4.3 Analysis of Nuclear Electric Power Construction4.3.1 Analysis of Nuclear Electric Power Construction Environment(1) Relevant Policies to Nuclear Electric Power Construction(2) Technology Level of Nuclear Electric Power Construction(3) Influence to Nuclear Electric Power Construction Environment4.3.2 Installed Capacity of Nuclear Power(1) Installed Capacity of Nuclear Power(2) Installed Planning of Nuclear Power

Page 8: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

4.3.3 Investment of Nuclear Electric Power Construction(1) Investment Scale of Nuclear Electric Power Construction(2) Investment Fund Sourcing Structure of Nuclear Electric Power Construction(3) Construction of Nuclear Power Projects(4) Investment Fund Purposes of Nuclear Electric Power Constructiona. Investment Found Flowing Structureb. Investment Proportion of the Projects of Different Levelsc. Investment Proportion of the New Projects, Reconstruction Projects and the Projects under

Construction(5) Investment Body Structure of Nuclear Electric Power Construction4.3.4 Major Nuclear Electric Power Construction Projects(1) Finished Key Projects during 2011-2012(2) Key Projects under Construction or Planning during 2012-2013

4.4 Construction of Other Energies4.4.1 Analysis of Wind Power Generation Construction(1) Analysis of Wind Power Generation Construction Environmenta. Relevant Policies to Wind Power Generation Constructionb. Technology Level of Wind Power Generation Constructionc. Influence to Wind Power Generation Construction Environment(2) Installed Capacity of Wind Power Generationa. Installed Capacity of Wind Power Generationb. Installed Planning of Wind Power Generation(3) Investment of Wind Power Generation Constructiona. Investment Scale of Wind Power Generation Constructionb. Investment Planning of Wind Power Generation Construction(4) Major Wind Power Generation Construction Projectsa. Finished Key Projects during 2011-2012b. Key Projects under Construction or Planning during 2012-20134.4.2 Analysis of Photovoltaic Power Generation Construction(1) Analysis of Photovoltaic Power Generation Construction Environmenta. Relevant Policies to Photovoltaic Power Generation Constructionb. Technology Level of Photovoltaic Power Generation Construction(2) Installed Capacity of Photovoltaic Power Generationa. Installed Capacity of Photovoltaic Power Generationb. Installed Planning of Photovoltaic Power Generation(3) Major Photovoltaic Power Generation Construction Projectsa. Finished Key Projects during 2011-2012b. Key Projects under Construction or Planning during 2012-20134.4.3 Analysis of Biomass Power Generation Construction(1) Analysis of Biomass Power Generation Construction Environmenta. Relevant Policies to Biomass Power Generation Constructionb. Technology Level of Biomass Power Generation Constructionc. Influence to Biomass Power Generation Construction Environment(2) Installed Capacity of Biomass Power Generationa. Installed Capacity of Biomass Power Generationb. Installed Planning of Biomass Power Generation

Page 9: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

(3) Investment of Biomass Power Generation Construction(4) Major Biomass Power Generation Construction Projectsa. Finished Key Projectsb. Key Projects under Construction or Planning

Chapter V:Analysis of Power Grid Construction5.1 Investment to Power Grid

5.1.1 Investment Scale of Power Grid5.1.2 Investment Structure of Power Grid5.1.3 Investment of Intelligent Power Grid(1) Investment Scale of Intelligent Power Grid(2) Investment Structure of Intelligent Power Grida. Investment Structure of Different Sectionsb. Investment Structure of Different Regions5.1.4 Investment Planning of Power Grid

5.2 Analysis of Power Grid Construction5.2.1 Analysis of Power Grid Construction Scale5.2.2 Power Grid Construction of Different Sections(1) Construction of Power Transmission Section(2) Construction of Power Transformation Section(3) Construction of Power Distribution Section5.2.3 Pilot Construction Projects of Intelligent Power Grid5.2.4 Significant Fields and Implementation Progress of Intelligent Power Grid

5.3 Bottlenecks of Power Grid5.3.1 Bottleneck Status of Power Grid5.3.2 Influence of the Power Grid Bottlenecks to Power Industry5.3.3 Intelligent Power Grid is the Solution to the Bottlenecks(1) Intelligent Power Grid Solves Entry Bottlenecks of New Energy(2) Intelligent Power Grid Dispatches Electricity Consumption during Electro-Peak

Chapter VI:Analysis of Electric Power Construction Industry in Major Regions6.1 Analysis of Electric Power Construction in Northern China

6.1.1 Power Supply and Demand Trend of the Power Grid in Northern China6.1.2 Electric Power Construction Demand in Northern China6.1.3 Electric Power Construction Scale in Northern China6.1.4 Electric Power Construction Planning in Northern China

6.2 Analysis of Electric Power Construction in Eastern China6.2.1 Power Supply and Demand Trend of the Power Grid in Eastern China6.2.2 Electric Power Construction Demand in Eastern China6.2.3 Electric Power Construction Scale in Eastern China6.2.4 Electric Power Construction Planning in Eastern China

6.3 Analysis of Electric Power Construction in Central China6.3.1 Power Supply and Demand Trend of the Power Grid in Central China6.3.2 Electric Power Construction Demand in Central China6.3.3 Electric Power Construction Scale in Central China6.3.4 Electric Power Construction Planning in Central China

6.4 Analysis of Electric Power Construction in Northeast China

Page 10: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

6.4.1 Power Supply and Demand Trend of the Power Grid in Northeast China6.4.2 Electric Power Construction Demand in Northeast China6.4.3 Electric Power Construction Scale in Northeast China6.4.4 Electric Power Construction Planning in Northeast China

6.5 Analysis of Electric Power Construction in Northwest China6.5.1 Power Supply and Demand Trend of the Power Grid in Northwest China6.5.2 Electric Power Construction Demand in Northwest China6.5.3 Electric Power Construction Scale in Northwest China6.5.4 Electric Power Construction Planning in Northwest China

6.6 Analysis of Electric Power Construction in Southern China6.6.1 Power Supply and Demand Trend of the Power Grid in Southern China6.6.2 Electric Power Construction Demand in Southern China6.6.3 Electric Power Construction Scale in Southern China6.6.4 Electric Power Construction Planning in Southern China

Chapter Ⅶ:Operation of Major Corporations of Electric Power Construction Industry7.1 Analysis of Major Power Source Construction Corporations

7.1.1 Operation of Beijing Electric Power Construction Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Project Management Model of the Company(5) Major Engineering Performance of the Company(6) Operation Status of the Company(7) Operation Advantages and Disadvantages of the Company(8) Development Strategy of the Company(9) Latest Development Trend of the Company7.1.2 Operation of Sinohydro Group Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Companya. Major Economic Indexb. Profitability of the Companyc. Operation Capability of the Companyd. Debt-paying Capability of the Companye. Development Capability of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company7.1.3 Operation of Hebei No.1 Electric Electric Power Construction Company(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company

Page 11: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

(5) Operation Advantages and Disadvantages of the Company7.1.4 Operation of Sinohydro Group No.4 Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company7.1.5 Operation of Tianjin Electric Power Construction Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company7.1.6 Operation of China WindPower Group Limited(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Companya. Major Economic Indexb. Profitability of the Companyc. Operation Capability of the Companyd. Debt-paying Capability of the Companye. Development Capability of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company7.1.7 Operation of Gezhouba Group Power Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company7.1.8 Operation of Jiangsu Electric Power Construction No.1 Engineering Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company

Page 12: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Latest Development Trend of the Company7.1.9 Operation of Shandong Power Infrastructure Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Latest Development Trend of the Company7.1.10 Operation of Shandong Electric Power No.3 Corporation(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company7.1.11 Operation of Shanghai Electric Power Construction Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Latest Development Trend of the Company7.1.12 Operation of Zhejiang Thermal Electric Power Construction Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company7.1.13 Operation of Anhui Electric Power Construction No.2 Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company7.1.14 Operation of Gezhouba Group No.1 Engineering Co., Ltd.

Page 13: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Latest Development Trend of the Company7.1.15 Operation of Guangdong Thermal Power Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company7.1.16 Operation of China Guangdong Nuclear Power Gr oup Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company7.1.17 Operation of Northeast No.2 Electric Power Construction Company(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company7.1.18 Operation of The First Northeast Electric Power Engineering Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company7.1.19 Operation of Heilongjiang No.3 Thermal Power Construction Corp. of China Energy

Engineering Group(1) Development Briefing of the Company

Page 14: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company7.1.20 Operation of Northwest Electric Power Construction No.1 Engineering Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Advantages and Disadvantages of the Company(6) Development Strategy of the Company7.1.21 Operation of Chongqing Electric Power Construction Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company7.1.22 Operation of Guizhou Electric Power Construction No.1 Engineering Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Advantages and Disadvantages of the Company7.1.23 Operation of Sinohydro Bureau 7 Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company

7.2 Analysis of Major Power Grid Construction Corporations7.2.1 Operation of Beijing Power Transmission and Distribution Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company(8) Latest Development Trend of the Company

Page 15: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

7.2.2 Operation of Tianjin Power Transmission and Distribution Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company7.2.3 Operation of Shanghai Power Transmission and Distribution Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Advantages and Disadvantages of the Company7.2.4 Operation of Zhejiang Power Transmission and Distribution Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Advantages and Disadvantages of the Company7.2.5 Operation of Anhui Power Transmission and Distribution Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Development Strategy of the Company7.2.6 Operation of Guangxi Power Transmission and Distribution Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Latest Development Trend of the Company7.2.7 Operation of Hubei Power Transmission and Distribution Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Advantages and Disadvantages of the Company(6) Development Strategy of the Company7.2.8 Operation of Northeast China Electric Power Transmission Construction Company(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company

Page 16: China electric power construction industry market forecast and investment strategic planning report, 2013 2018

(4) Major Engineering Performance of the Company(5) Operation Advantages and Disadvantages of the Company7.2.9 Operation of Sinkiang Power Transmission and Distribution Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Status of the Company(6) Operation Advantages and Disadvantages of the Company(7) Latest Development Trend of the Company7.2.10 Operation of Yunnan Power Transmission and Distribution Co., Ltd.(1) Development Briefing of the Company(2) Major Business of the Company(3) Qualification and Capability of the Company(4) Major Engineering Performance of the Company(5) Operation Advantages and Disadvantages of the Company

Chapter VIII:Investment, Financing and Credit of China Construction Industry8.1 Investment and Financing of Electric Power Construction Industry

8.1.1 Characteristics of Investment and Financing System of Electric Power Construction Industry

8.1.2 Reform Progress of Investment and Financing System of Electric Power Construction Industry

8.1.3 Investment and Financing Problems of Electric Power Construction Industry8.1.4 Development Trend of the Investment Structure of Electric Power Construction Industry8.1.5 Investment and Financing Suggestions to Electric Power Construction Industry

8.2 Investment and Financing of Electric Power Construction Project8.2.1 Financing Risks of Electric Power Construction Project8.2.2 Financing Risk Management of Electric Power Construction Project8.2.3 Financing Model of Electric Power Construction Project8.2.4 Financing Channels of Electric Power Construction Project

8.3 Bank Credit Opportunities and Suggestions to Electric Power Construction Industry8.3.1 Overall Credit Opportunities and Suggestions8.3.2 Regional Credit Opportunities and Suggestions(1) Characteristics and Summary of Regional Development(2) Credit Suggestions to Regional Market8.3.3 Credit Opportunities and Suggestions to the Corporations